Copyright 2008 Force10 Networks All rights reserved. Printed in the USA. April 2008.
Force10 Networks® reserves the right to change, modify, revise this publication without notice.
Force10 Networks® and E-Series® are registered trademarks of Force10 Networks, Inc. Force10, the Force10 logo, E1200, E1200i, E600, E600i, E300, EtherScale, TeraScale, and FTOS are trademarks of Force10 Networks, Inc. All other brand and product names are registered trademarks or trademarks of their respective holders.
In the interest of improving internal design, operational function, and/or reliability, Force10 Networks reserves the right to make changes to products described in this document without notice. Force10 Networks does not assume any liability that may occur due to the use or application of the product(s) described herein.









This guide provides site preparation recommendations, step-by-step procedures to rack mount the Force10 Networks E1200i chassis, as well as instructions to install fan trays, power supplies, route processor modules (RPMs), switch fabric modules (SFMs), and line cards.
This guide also includes instructions for removing and installing field-replaceable parts, including power supplies for both the AC and DC models. The E1200i system is packaged with components necessary for optimal performance, including blank panels for RPM, SFM, and line card slots. Blanks are required in empty slots to ensure adequate system cooling and for EMI containment during operation.
After you complete the hardware installation process and power up the system, refer to the FTOS Configuration Guide for preliminary software configuration information. E1200i systems run Force10 OS (FTOS™) software. The FTOS Command Reference for the E-Series provides detailed CLI information, and the FTOS Configuration Guide for the E-Series includes FTOS configuration information.
Table 1 defines the information symbols used throughout this guide.
Table 1 Information Symbols
This symbol warns that improper handling and installation could result in bodily injury. Before you begin work on this equipment, be aware of hazards involving electrical circuitry, networking environments, and instigate accident prevention procedures.
Symbol Warning Description


Visible and invisible laser radiation may be emitted from the aperture of the optical transceiver ports when no cable is connected. Avoid exposure to laser radiation and do not stare into open apertures.
See Chapter 3, Site Preparation for more cautions.
For more information about the E1200i system, refer to the following documents:
12 About This Guide

The Force10 Networks E1200i system is a carrier-class, high-capacity aggregation router. The 16-slot modular system provides two slots dedicated for Route Processor Modules (RPMs) and 14 slots for line cards with Layer 2 switching and Layer 3 and routing capabilities.
The E1200i system requires a Route Processor Module (RPM), at least one line card, and at least eight Switch Fabric Modules (SFMs) for packet processing. The RPM is the core for routing and control operations; all traffic destined to the E1200i terminates on the RPM. Routing table entries are built on the RPM and directed to the forwarding information tables on the line cards.
Software processes, such as Telnet, SNMP, CLI, Layer 2, and Layer 3 functions, are divided among three CPUs for redundancy and speed. Independent software images run on each CPU. Each CPU has its own memory, which isolates processes from each other, increasing reliability. Operating the E1200i system with redundant RPMs enables automatic fail-over redundancy.
Line cards perform all data forwarding operations. Each line card has Force10 Networks proprietary ASICs — the flexible packet classification (FPC) ASIC and the Buffer and Traffic Manager (BTM) ASIC. The FPC accepts packets, feeds packets to input/output ports, handles packet classification (access lists, and Layer 2 and Layer 3 lookups), and packet-marking (Diffserv or 802.1p). The BTM is responsible for all queuing operations.
The internal flash memory device shipped with the RPM contains the boot ROM and runtime images. Each RPM accommodates an external flash memory card that can be used to copy and store system boot, software images, and configuration files. For information about using a flash card, refer to Appendix A, on page 75.

Figure 1 E1200i AC Chassis Front View

14 The E1200i System

Figure 2 E1200i AC Chassis Rear View

Empty Fan Tray with
locking screw · Installed Fan Tray · Self-closing Door

Figure 3 E1200i DC Chassis Front View

16 The E1200i System

Figure 4 E1200i DC Chassis Rear View

Empty Fan Tray with
Table 2 E1200i Hardware Component Operating Requirements Summary
Component Minimum Maximum Field-Replaceable
Backplane (factory installed) 1 1 N
Air filter (factory installed) 1 1 Y
Fan trays 2 2 Y
RPMs 1 2 Y
Line cards 1 14 Y
SFMs 8 9 Y
AC Power Supply 2 6 Y
DC Power Supply 1 2 Y
Cable management system 0 1 Y
Cable management system cover 0 1 Y
Self-closing Door

To install the E1200i system, Force10 Networks recommends that you perform the installation procedures in the following order:
Unpacking the E1200i AC System on page 23
Unpacking the E1200i DC System on page 27
Standard Front Chassis Mounting on page 24 Installing the Chassis into an Equipment Cabinet on page 25
Mount the DC chassis
Standard Front Chassis Mounting on page 28 Installing the Chassis into an Equipment Cabinet on page 29
Installing Fan Trays on page 31
Installing AC Power Supplies on page 35 Installing DC Power Supplies on page 41
Installing Line Cards and RPMs on page 50 Installing Switch Fabric Modules (SFMs) on page 54
18 The E1200i System
Step Task Section · or

This chapter describes factors to consider before installing your E1200i system. The following topics are discussed:
For complete E1200i System Specifications, refer to Appendix D, on page 91.
Before you begin the installation process, make sure that the area where you intend to install your E1200i meets the following safety requirements.
Select a site:

When you prepare your equipment rack, make sure the rack is bolted to the floor and/or braced to a wall or ceiling.
When you install the chassis:
The cabinet must meet the following criteria:
At a minimum, the E1200i requires either 2 AC Power Supplies or 1 DC PEM to operate.
20 Site Preparation

Each E1200i system requires at least two AC Power Supplies or at least one DC Power Supply to operate.
Three AC units are required for power supply redundancy, four AC units are required for full facility redundancy, and six AC units provide 3+3 redundancy
Two DC units are required for power supply and full facility redundancy.
Refer to Appendix D, on page 91 for specifications on thermal output and other power related numbers.
Your E1200i chassis contains two field-replaceable fan trays. Air flows through the system from a filtered-intake vent located in the lower part of the chassis. Air circulates from the bottom front (and sides) to the back and exhausts through a top rear vent. The variable fan speed is reduced at normal operating temperatures and increases to full speed as operating temperatures increase, up to 104° F (40° C).
For fan tray access, maintenance and proper ventilation, position the chassis and equipment rack or cabinet so that:
For instructions on replacing a fan tray, refer to Removing and Replacing Fan Trays on page 65.

Caution: Do not transport a chassis with components (line cards, power supplies, RPMs, Fan Trays, Power Supply, or SFMs) installed in the chassis. Place the modules in their original ESD-preventative packaging and attach the Front Shipping Cover on the front of the chassis prior to placing the chassis in its original shipping crate. Shipping the chassis with components installed may damage the components and the chassis backplane.
If you do not install your E1200i system and components right away, Force10 Networks recommends that you properly store components and all extra field-replaceable components (spares) until you are ready to install them. Keep all components in the original packaging during storage.
Follow these indoor storage guidelines:
22 Site Preparation

This chapter provides instructions to rack mount your E1200i AC system into a standard 19-inch or 23-inch equipment rack. It contains the following sections:
The E1200i AC system and components are shipped on a wooden pallet with Front Shipping cover. Remove the chassis from the shipping packaging and move the chassis with a hand cart, pallet jack, or fork lift to its rack. Do not unpack the power supplies, fan trays, air filter, or cards until the chassis is installed.

The rack shelf bar (Figure 5) enables you to easily position the chassis into the rack and provides the unit additional stability. The E1200i AC system must be mounted in a rack that is permanently secured to the floor.

To install a equipment rack shelf bar:
Install the E1200i AC system after you secure the equipment rack shelf bar. Load the chassis in the lower half of an empty rack to avoid a top-heavy rack (Figure 6).
24 Installing the AC Chassis
Step Task

Figure 6 Rack Mounting the Chassis

To install the chassis into a prepared rack:
Install the E1200i AC system after you secure the rack shelf bar. Load the chassis in the lower half of the cabinet to avoid it becoming top-heavy. Make sure the cabinet is positioned with adequate space in the front, rear, and sides of the unit for proper ventilation, access to cables, and access for maintenance.
Refer to Chapter 3, Site Preparation for complete requirements.
To install the chassis into an equipment cabinet:
Step Task · Step Task

26 Installing the AC Chassis
Step Task

This chapter provides instructions to rack mount your E1200i DC system into a standard 19-inch or 23-inch equipment rack. It contains the following sections:
The E1200i DC system and components are shipped on a wooden pallet with Front Shipping cover. Remove the chassis from the shipping packaging and move the chassis with a hand cart, pallet jack, or fork lift to its rack. Do not unpack the power supplies, fan trays, air filter, or cards until the chassis is installed.

The rack shelf bar (Figure 7) enables you to easily position the chassis into the rack and provides the unit additional stability. The E1200i DC system must be mounted in a rack that is permanently secured to the floor.

To install a equipment rack shelf bar:
Install the E1200i DC system after you secure the equipment rack shelf bar. Load the chassis in the lower half of an empty rack to avoid a top-heavy rack (Figure 8).
28 Installing the DC Chassis
Step Task

Figure 8 Rack-Mounting the Chassis

To install the chassis into a prepared rack:
Install the E1200i DC system after you secure the rack shelf bar. Load the chassis in the lower half of the cabinet to avoid it becoming top-heavy. Make sure the cabinet is positioned with adequate space in the front, rear, and sides of the unit for proper ventilation, access to cables, and access for maintenance.
Refer to Chapter 3, Site Preparation for complete requirements.
To install the chassis into an equipment cabinet:
Step Task · Step Task

30 Installing the DC Chassis
Step Task

Access the fan tray slots from the rear of the chassis (Figure 9). Two fan trays are required in the chassis. When a fan tray is not installed in the lower slot, a self-closing door will seal the slot. Panel blanks are not required. However, to ensure fail-safe chassis operation, do not operate the chassis with only one fan tray for more than 30 minutes.

Figure 9 Installing Fan Tray

Figure 10 Fan Tray

32 Installing Fan Trays

To install fan trays:
Table 3 is an illustration of the fan tray safety labels:
Table 3 Fan Tray Safety Labels
Step Task · Label Location · Fan tray faceplate

34 Installing Fan Trays


The E1200i AC system requires a minimum of two AC power supplies to operate, three for power redundancy, four for facility redundancy (2+2), and 6 for 3+3 redundancy. To comply with safety agency and EMI regulations, you must install the AC-cord retainer over all power cords. The E1200i AC chassis contains six AC power supply slots, as shown in Figure 11.


Figure 11 E1200i AC Power Supply Shelf

This retainer must be in place during normal operation. Do not remove except for servicing

Secure your chassis ground first and then install each power supply.
a Use ANSI UNC 1/4-20 x 1/2 bolt. b Tighten the bolt (torque should not exceed 25inch/lbs). c Connect the opposite end of the grounding cable to the nearest appropriate facility grounding post.
Figure 12 Cable Connector Required for E1200i AC
All measurements in inches.
0.750"
36 Installing AC Power Supplies

Figure 13 Insert power supply


Once your power supplies and fan trays are installed, verify their operability by supplying power to the chassis and verifying the status LEDs.
Before you begin this power test, inspect your equipment rack and chassis. Verify that:
Step Task (continued)

To test the power supplies and fan trays:
Table 4 Power Supply LEDs
Status LED is ...
Operational (On/Standby switch may be set to Standby) Lit: GREEN
Table 5 Fan Tray LEDs
Status LED is ...
38 Installing AC Power Supplies
Step Task

Table 5 Fan Tray LEDs
Status LED is ...
Loss of Power Unlit

40 Installing AC Power Supplies


The E1200i DC system requires a minimum of one DC Power Entry Module (PEM) to operate, but two are recommended for redundancy. To comply with safety agency and EMI regulations, you must install covers on all power supply slots not containing a PEM. Connect the PEMs to the appropriate branch circuit protection as defined by local electrical codes.
For full redundancy, each PEM must be attached to an independent power source with a dedicated circuit breaker. For example, the PEM in slot 0 connects to circuit breaker A and the PEM in slot 1 connects to circuit breaker B.
The E1200i DC chassis contains two DC PEM slots, as shown in Figure 14.
Figure 14 PEM 0 and PEM 1 Chassis Locations

The DC PEM shown in Figure 15 is used in both the E1200 and E1200i DC chassis.
Figure 15 E1200i DC PEM


Figure 16 E1200i DC PEM Front Panel

You must provide your own cables to connect to a remote power source (for example, a circuit breaker panel) in your equipment rack or office. Cables must be sized to meet the following criteria:
Before you make the cable connections, apply a coat of antioxidant paste to un-plated metal contact surfaces. File un-plated connectors, braided straps, and bus bars to a shiny finish. It is not necessary to file and coat tinned connectors or other plated connection surfaces, such as on the E1200i DC PEM studs.
Each E1200i DC system requires at least one load-sharing DC PEM to operate. Two units are recommended for full facility redundancy.
Maximum DC PEM Input Current 150A
Maximum Power Dissipation 6850W (21,598 BTU/hour)
Input Voltage -48 to -60 Vdc
42 Installing DC Power Supplies
Parameter Specifications

Use the following steps to install a DC PEM:

Step Task


a Lift up and hold the PEM interlock lever and carefully push the unit inward to fully seat it to the backplane. When the PEM is fully inserted, the interlock lever will drop to hold the PEM in position.
b Tighten the two locking screws with a #2 Phillips screw driver to secure the PEM. Do not exceed 5 inch/lbs torque.

a Remove one outer nut and one washer from each of the six studs. One nut should remain, tight on the stud. If the inner nut is loose, re-tighten it to 25 inch/lbs. maximum.
b Locate the chassis ground connector studs on the PEM front panel (see Figure 16). The two rightmost studs are the ground connection. c Install the grounding cable onto the ground studs. The grounding cable must comply with your local electrical codes in size and color (typically the color is green or green with yellow stripe).
d Replace the two washers and nuts on the studs. e With a 7/16-inch box or socket wrench, tighten the nuts (torque should not exceed 25inch/lbs). f Connect the opposite end of the grounding cable to the nearest appropriate facility grounding post.
Figure 17 Cable Connector Required for E1200i DC PEM
All measurements shown in inches.
0.750"
a Check that the remote power sources (for example, circuit breakers) are in the OFF position.
b Locate the appropriate studs on the PEM front panel (Figure 16). c The two leftmost studs on the PEM are the -48 VDC (-) connection. The cable attached to these studs is typically black. • The two middle studs are the return (+) connection. The cable attached to these studs is typically red. d Install the -48 VDC and Return cables on the studs. The cables should be of the size and color to comply with local electrical codes. Note: Power cables must be terminated only with a UL-listed 2-hole lug with 1/4-inch studs with 3/4-inch spacing (Figure 19).
e Replace the washers and nuts on the studs. f With a 7/16-inch box or socket wrench, tighten the nuts.

Figure 18 Connecting the Ground Cable to the E1200i DC PEM

Figure 19 DC PEM with Connections in Place

-48 (-) cable typically black Return cable (+) typically red
46 Installing DC Power Supplies
Step Task (continued)

Figure 20 Reinstalling the PEM Safety Cover

Energize the remote power source. The Voltage LED should be green. If it is amber, the -48 VDC and Return cables are connected incorrectly or are reversed.
After you have completed the fan tray and PEM installation, verify their operability by supplying power to the chassis and verifying the status LEDs.
Before you begin this power test, inspect your equipment rack and chassis. Verify that:
Step Task (continued)

To test the power supplies and fan trays:
If an LED is not lit or is amber, check that the unit is properly installed. Verify the power source. If the LED remains unlit, power off all modules and replace the unit.
If a fan tray is not operating properly or air is not flowing through the chassis, power off the chassis at the remote power source. Ensure that all fan trays are properly installed. Verify the remote power source. If a fan tray LED remains unlit, replace the fan tray.
48 Installing DC Power Supplies
Step Task

and SFMs
This chapter provides instructions for installing cards into the E1200i AC or DC chassis. It contains the following sections:
Force10 Networks recommends that you keep all components in the original packaging until you are ready to install them.

At a minimum, the E1200i requires one RPM and one line card to operate.
The E1200i system requires the installation of at least one RPM, although two are recommended for redundancy. RPMs are designed to be installed in either the center R0 or R1 slots. Since FTOS searches for an RPM in slot 0 first, Force 10 recommends you install your RPM in slot 0 when only running with one RPM. Do not force RPMs into line card slots. RPMs are keyed differently than line cards to prevent improper installation.
You can hot-insert a second RPM into a running system without performance interruption or software intervention. A second RPM for redundant functionality provides uninterrupted operability if the system transitions from the active RPM to the standby RPM. The standby RPM constantly performs updates and receives the same configuration information received by the active RPM. The standby RPM also performs diagnostics on its subsystems. In the event of a failover, the standby RPM immediately takes over and resumes the control activities that the active RPM was performing. Installing a Second RPM on page 53 provides more information on the second RPM.
The RPM Major and Minor alarm LEDs are controlled by software which sets the threshold levels for triggering the different stages of alarms.
Your E1200i configuration requires a minimum of one line card. Line cards are hot-swappable. The line card ports provide external interface functions for connections to other systems (for example, a router or switch). Each line card has an onboard CPU for line card management which updates packet forwarding information, obtains statistical information, and performs synchronization tasks with the RPM, as well as Force10 Networks custom-built ASICs, which enable line-rate forwarding.
There are 14 line card slots available in the E1200i chassis. A minimum of one line card is required for operation. Line cards are installed in slots 0 through 13. Ports on line cards are numbered from the top, starting from 0 (see Figure 21).
50 Installing RPMs, Line Cards, and SFMs

Figure 21 24 Port 1GE and 2-Port 10GE Line Card Port Numbering

Blank panels for RPMs, SFMs, and line cards must be installed in empty slots to control airflow. If a slot is not filled for more than five minutes, the following message appears on the console:
Blank panels are shipped with the system to ensure that all chassis slots are installed with operational modules or blanks.
To prolong the life of the EMI seals, begin installing cards in the right-most slot (slot 13), filling the slots leftward (slot 12, then slot 11, then slot 10, and so on).

Figure 22 Installing an RPM into the E1200i

Figure 23 RPM and Line Card Slot Numbering Label

To install line cards and RPMs:
52 Installing RPMs, Line Cards, and SFMs
Step Task

Install a second RPM either before the system is powered on or after the Primary RPM is up and stable. After the second RPM is installed, wait several seconds until the connection between the two RPMs is established before configuring any commands. Below is an example of the messages that should appear:
%RAM-6-RAM_TASK: RPM1 is in Standby State.
Once the link between the two RPMs is established, copy the running configuration to the startup configuration.
Table 6 describes the RPM LED states and the RPM front panel.
Table 6 RPM LEDs
L: Green: link is up A: Green: activity on port
tray failure, an overcurrent condition in a power supply, or an out-of-tolerance voltage. The RPM LEDs are controlled by software which sets the threshold levels for triggering the different stages of alarms. Unlit: no major conditions
fan failure, or a line card failure. The RPM LEDs are controlled by software, which sets the threshold levels for triggering the different stages of alarms. Unlit: no minor alarm conditions
ACO/LT Allows you to test the operability of LEDs to verify that they are able to light. Press the ACO/LT button to temporarily illuminate the LEDs on the RPM. If you press this button when the alarm status LED is lit, the alarm relay contacts are reset until the next alarm event.
Flash In Use Green: flash memory card is in the process of a read or write process. Do not
remove the flash card when the In Use LED is lit. Unlit: not in use
Section Label Description · Management 10/100 Ethernet

Table 6 RPM LEDs
Status This is a bi-color LED. Green: operational Amber: fault detected Flashing green: booting Unlit: in secondary mode or power is off
A minimum of eight SFMs are required in order for the E1200i system to operate properly. Slot 9 allows for a redundant SFM, allowing up to ten SFMs in the E1200i system.
SFMs carry user traffic between line cards or between RPMs and a line card. SFMs plug directly into the backplane, which provides high-speed access to the line cards. The switch fabric receives user data packets and redirects them to the appropriate destinations according to the routing information.
Install SFMs from the right-most slot (9) to the left-most slot (0).
54 Installing RPMs, Line Cards, and SFMs
Step Task

Figure 24 Installing SFMs

Start with slot 8 or slot 9
Table 7 illustrates the SFM front panel and LEDs.
Table 7 SFM Front Panel and LED Descriptions

Active Green: active and passing traffic Unlit: in standby mode Status Flashing Green: booting Green: operational Flashing Amber: communication failure Amber: fault detected Unlit: no power

Force10 provides a variety of E1200i chassis cable management systems to manage your fiber optic and auxiliary cables connecting to line cards. For details, see the Force10 price list. For installation instructions, see the instructions that come with the specific cable management system.
56 Installing RPMs, Line Cards, and SFMs

This chapter describes standard RPM cables and adapter pin assignments for the E1200i AC and DC systems. It contains the following sections:
There are three ports on the RPM. They are labeled and described as:
The console and auxiliary ports are asynchronous serial ports. If you connect a device to these ports, it must be capable of asynchronous transmission. Your terminal or terminal emulation mode must be set to VT100 with the following settings:

Use the E1200i Console port on the RPM to connect to a terminal port, PC serial port, or a terminal server to configure and monitor your system. Use the E1200i Auxiliary port on the RPM to connect to a modem.
Both the Console and Auxiliary port are RJ-45 ports. Figure 25 displays the pinouts in an RJ-45 port.
Figure 25 Pinout for an RJ-45 Connector End Adaptors
Table 8 displays the RJ-45 console port pin assignments. Table 9 displays the RJ-45 auxiliary port pin assignments.
Table 8 Console Port (RJ-45) Pin Assignments
1 NC (unused) -
5 GND -
8 NC (unused) -
Table 9 Auxiliary Port (RJ-45) Pin Assignments
5 GND -
58 RPM Ports and Cables

Table 9 Auxiliary Port (RJ-45) Pin Assignments
You can connect to the console using a RJ-45 to RJ-45 rollover cable and a RJ-45 to DB-9 female DTE adapter (labeled “TERMINAL”) to a terminal server (for example, PC). Table 10 lists the pin assignments.
Table 10 Pin Assignments Between the E1200i Console and a DTE Terminal Server
E1200i Console Port RJ-45 to RJ-45 Rollover Cable
Signal RJ-45 pinout RJ-45 Pinout DB-9 Pin Signal
DTR 2 7 6 DSR
TxD 3 6 2 RxD
GND 5 4 5 GND
RxD 6 3 3 TxD
CTS 8 1 7 RTS
Accessing the Console with a DB-25 Adapter
You can connect to the console using an RJ-45 to RJ-45 rollover cable and RJ-45 to DB-25 female DTE adapter. Table 11 lists the pin assignments.
Table 11 Pin Assignments Between E1200i Console and DB-25 Adapter
E1200i Console Port RJ-45 to RJ-45 Rollover Cable
RJ-45 to DB-25 Modem Adapter
Signal RJ-45 Pinout RJ-45 Pinout DB-25 Pinout Signal
DTR 2 7 6 DSR
TxD 3 6 3 RxD
GND 5 4 7 GND
RxD 6 3 2 TxD
CTS 8 1 RTS

You can access the auxiliary port using a dial-up modem using an RJ-45 to RJ-45 rollover cable and RJ-45 to DB-25 male DCE adapter (labeled “MODEM”). Table 12 lists the pin assignments.
Table 12 RJ-45 to DB-25 Adapter Pin (Modem) Assignments
RJ-45 to RJ-45 Rollover Cable RJ-45 to DB-25 Modem Adapter Modem
Signal RJ-45 Pinout RJ-45 Pinout DB-45 Pinout Signal
DTR 2 7 20 DTR
TxD 3 6 3 TxD
GND 5 4 7 GND
RxD 6 3 2 RxD
CTS 8 1 5 CTS
Accessing the 10/100 Ethernet Management Port
Configure the 10/100 Ethernet management port, labeled 10/100 Ethernet on the primary RPM card in order to obtain network access capability, such as downloading a runtime image onto your system. You can connect this port to an Ethernet hub or FastEthernet port on a router.
Table 13 10/100 Ethernet Management Port LEDs
60 RPM Ports and Cables
E1200i Auxiliary Port · Label Description

This chapter provides instructions for powering up your E1200i AC or DC system after you have installed all the chassis components and made your power and network connections. It covers the following topics:
Before you supply power to your chassis, Force10 Networks recommends that you re-inspect your equipment rack and chassis.
Verify that:

To turn the chassis power off, flip the On/Standby switch to the Standby position.
Step Task · Step Task · 62 Powering Up

After you supply power to the system, the following should occur:
When you supply power to the E1200i system, the system performs a series of power-on self tests. RPM, line card, and SFM LEDs blink as the diagnostic programs run. No user interaction is required at this point. Observe the process on your console monitor. When the boot process is complete, the card LEDs remain online (green) and the console monitor displays the Command Line Interface (CLI) prompt.
Refer to the FTOS Configuration Guide, on the technical publications CD-ROM, for initial configuration procedures and configuration instructions.
The initial boot operation automatically brings up the system to the runtime CLI. To interrupt the automatic boot process, issue a break key sequence (CNTL^). The console monitor will display the default BOOT_USER # prompt. Refer to Appendix B, on page 79 for instructions to continue the boot process.

64 Powering Up

Components
This chapter provides instructions for removing and replacing E1200i AC and DC components. It covers the following topics:
When a component fails, the E1200i system triggers major or minor alarm LEDs (located on the RPM), sends events to the SNMP trap and show alarms table, disables or changes component Status LEDs or triggers an audible alarm. Refer to Appendix C, on page 87 for more information on alarms.
In the event of a fan tray failure, signified by an amber LED, an SNMP trap, or major alarm event, the entire fan tray must be replaced. If one or more fans within a fan tray fail, the system generates a minor alarm and an SNMP trap.
The fan trays are hot-swappable.
To remove and replace the fan tray, you must have access to the rear of the chassis and be able to pull the fan tray completely out of the slot (at least 20 inches).
To remove and replace a fan tray:
Step Task

Figure 26 Securing the Fan Tray Screw Latch

If you are operating your E1200i AC chassis with redundant Power Supplies, you can install, remove, or replace a Power Supply without affecting system operation. If you are operating your E1200i AC system with only two Power Supplies (the minimum), you must completely power off the system.
66 Removing and Replacing Components
Step Task



This retainer must be in place during normal operation. Do not remove except for servicing
68 Removing and Replacing Components
Step Task · Step Task

If you are operating your E1200i DC chassis with redundant Power Supplies, you can install, remove, or replace a Power Supply without affecting system operation. If you are operating your E1200i DC system with only one Power Supply (the minimum), you must completely power off the system.



70 Removing and Replacing Components
Step Task

You can add, replace, or remove modules without interrupting the system power or system operations. RPMs, line cards, and SFMs are hot-swappable. The E1200i system generates major alarm events for high temperatures (over 75°C) and module failures depending on the module and whether or not it is redundant. Minor alarms are generated for component temperatures over 65°C and 75°C for line cards. SNMP traps are sent for both alarm types. Refer to Appendix C, on page 87 for more details.
To remove and replace E1200i line card or RPM modules:
Step Task (continued) · Step Task

To remove and replace an SFM:
Wait 5 to 10 seconds to install a new SFM or reinsert an SFM. *
72 Removing and Replacing Components
Step Task (continued) · Step Task

A factory-installed air filter (Figure 27) is shipped with the E1200i system. The hot-swappable air filter prevents large particles, debris, and dust from entering and circulating through the system, and ensures proper air flow through the system. Filters should be inspected monthly and replaced every twelve months or as required.
Do not operate without a filter for any longer than 30 minutes to avoid card over-temperature conditions.
To remove and replace the air filter:
Figure 27 Replacing the Air Filter

Step Task

74 Removing and Replacing Components

This appendix provides information about using an external flash memory card and contains the following sections:
Each RPM card is designed with a slot to accommodate an external flash memory card (slot0:). You can use a flash card to copy the image and configuration files for storage and backup purposes. For complex configurations, use the copies for other E1200i systems in your network. Configure your boot execution process to use the images stored on a flash card as the primary (active), secondary (standby), or default boot order preference. Optional external flash memory cards are shipped blank.

To install the flash memory card:
Removing the External Flash Memory Card
To remove the flash memory card:
New external flash cards must be formatted in the E1200i before use.
Flash cards used on systems other than the E1200i as well as cards formatted on PCs must be reformatted in the E1200i flash slot before they can be used. Similar to formatting a new diskette, formatting erases all information stored on the flash card.
To format the flash card:
Step Task · Step Task · Step Task

Copy files to the flash when you want keep a backup image. The In Use LED illuminates during a read or write operation. Do not eject the flash card from the slot while this LED is lit.
To copy files to the external flash card use the following command:
Command Syntax Command Mode Purpose
Flash cards can be used to copy and store system images, boot images, and configuration files. Optional flash memory cards are shipped blank.
To display files stored on a flash, use the following command:.
Command Syntax Command Mode Purpose
dir [filesystem] EXEC Privilege Configure the following optional parameters to view files on the flash card: • filesystem: enter either flash: for the internal flash or slot0: for the external flash.
Figure 28 dir Command Example
1 -rwx 6478482 Sep 7 101 16:54:34 E1200i.BIN
FTOS supports up to a 40-character file name length, up to a 180-character local file path length, and up to a 256-character remote file path length.



This appendix provides instructions to boot the E1200i AC and DC system from the BOOT_USER prompt.
When you supply power to the E1200i system, the system performs a series of power-on self-tests. RPM, and line card Status LEDs blink during initialization. No user interaction is required as long as the boot process proceeds without interruption. Observe the process on your console monitor and note the message output on the display. When the boot process is complete, the RPM and line card Status LEDs remain online (green) and the console monitor displays the command line interface (CLI) prompt, Force10>.
The RPM cards in the E1200i system contain an internal flash memory card (flash:). This is the default storage area for the boot files and the startup configuration file. Upon system power up or a system reset, the boot process uses parameters stored in non-volatile random access memory (NVRAM) to boot the system.
Each RPM card is equipped with a slot for an external flash memory card (slot0:). You can copy the image files and configuration files to the external flash device on the primary RPM. You can also begin your boot process by accessing a remote server containing the boot image and system image files. When you configure your system to boot, you can specify the boot preference order: primary, secondary, or default in the BOOT_USER mode and the CLI mode.
For information about the flash memory card, refer to Appendix A, on page 75.
To get into the BOOT_USER mode, you can issue a break control sequence (CNTL^ ) to interrupt the automatic boot process or if you experience boot problems. This mode allows you to modify the parameters necessary to manage the boot process. Only console port access is enabled for the BOOT_USER mode.

To configure the chassis from the BOOT_USER prompt:
Step Command Task · 80 System Boot

Step Command Task (continued)
BOOT_USER # show boot selector
ROM BOOTSTRAP SELECTOR PARMETERS: ================================ Current ROM bootstrap selector set to Bootflash partition A.
Last ROM bootstrap occurred from Bootflash partition A.
BOOT_USER # show bootflash
GENERAL BOOTFLASH INFO ====================== Bootflash Partition A: Force10 Networks System Boot Copyright 1999-2007 Force10 Networks, Inc. ROM Header Version 1.0 Official CP_IMG_BOOT, BSP Release 2.0.0.14 Created Fri Nov 2 18:22:47 US/Pacific 2007
Bootflash Partition B: Force10 Networks System Boot Copyright 1999-2007 Force10 Networks, Inc. ROM Header Version 1.0 Official CP_IMG_BOOT, BSP Release 2.0.0.14 Created Fri Nov 2 18:22:47 US/Pacific 2007
Boot Selector Partition: Force10 Networks System Boot Copyright 1999-2007 Force10 Networks, Inc. ROM Header Version 1.0 Official CP_IMG_BOOT_SELECTOR, BSP Release 2.0.0.14 Created Fri Nov 2 18:26:56 US/Pacific 2007 BOOT_USER #

Step Command Task (continued)
BOOT_USER # show bootvar
SECONDARY OPERATING SYSTEM BOOT PARAMETERS: ========================================== No Operating System boot parameters specified!
82 System Boot

Step Command Task (continued)
BOOT_USER # boot change primary
'.' = clear field; '-' = go to previous field
BOOT_USER # boot change default
'.' = clear field; '-' = go to previous field

Step Command Task (continued)
BOOT_USER # show interface management ethernet No IP address set for interface management ethernet 0/0!
BOOT_USER # interface management ethernet ip address 1.2.3.4 255.255.0.0 Management ethernet 0/0 IP address: 1.2.3.4 255.255.0.0
BOOT_USER # show interface management ethernet
(Optional) Use the show default-gateway command to view gateway information. If your server is on the same subnet, you do not need to configure a gateway parameter. If your server is not on the same subnet, use the default-gateway ip-address command to set the gateway IP address.
BOOT_USER # show default-gateway
No gateway IP address specified!
BOOT_USER # default-gateway ip 1.2.3.5 Gateway IP address 1.2.3.5 BOOT_USER # show default-gateway
Use the dir flash: command to list files stored on the internal flash device. Use the dir slot0: command to list files stored on the external flash device.
BOOT_USER # dir flash: Displaying files in flash: size date time name 11187685 FEB-15-2002 05:37:58 e1200-.bin 11031398 FEB-23-2002 22:42:46 E1200-3.bin 9280984 FEB-17-2002 21:02:36 E1200-2.bin 10778521 FEB-18-2002 22:53:26 E1200-3.1.bin 1787 FEB-23-2002 22:42:46 startup-config
84 System Boot

Step Command Task (continued)
Refer to the FTOS Command Line Interface Reference for CLI configuration procedures and configuration instructions.

86 System Boot

The E1200i generates major and minor alarms for the following conditions:
A major alarm is any fault that would render the E1200i non-functional.
A minor alarm is any fault that threatens the operation of the E1200i.
You can monitor alarm conditions on the E1200i system through the console, LEDs, and audible alarms. If you configure the SNMP command (snmp-server enable traps envmon), the FTOS also sends an SNMP trap.
In the E1200i system, alarms are logged for each occurrence, but the system may not send an event log for multiple occurrences. For example, whenever a module exceeds the shutdown threshold, the module shuts down. If more than one module exceeds the warning or high temperature thresholds within a five minute period, the system generates one event for all effected modules, but alarms are logged for each occurrence. If the modules temperature falls to 5° lower than the warning threshold temperature, the system clears the alarm and an SNMP trap.
Table 14 Alarm Events and Reporting
Reported in event log
Status LED on Module
Module Alarm Event Alarm LED
Fans Entire Fan Tray fails major (red) major unlit yes
1 or 2 individual fans fail minor (amber) minor unlit no
Power Supply input power fail major (red) major unlit yes
Power Supply power fails at boot1 unlit not reported unlit no
Audible Alarm? · Power Supply

Table 14 Alarm Events and Reporting
Reported in event log
Status LED on Module
Module Alarm Event Alarm LED
Line Card Hardware failure major (red) major amber no
Exceeds high temperature limit major (red) major unlit yes
Exceeds warning temperature limit
minor (amber) minor green yes
Individual interface fails minor (amber) reported amber2 no
RPM (Non-redundant Configuration with 1 RPM)
Exceeds high temperature limit major (red) major unlit yes
Exceeds warning temperature limit
minor (amber) minor green no
RPM fails but CP is ok major (red) major amber yes
SFMs (Redundant Configuration with 10 SFMs)
Exceeds high temperature limit major (red) major unlit yes
Exceeds warning temperature limit
minor (amber) minor green no
Any card fails minor (amber) minor amber no
Any card removed minor (amber) minor unlit no
8 SFMs (Non-Redundant Configuration)
Exceeds high temperature limit major (red) major unlit yes
Exceeds warning temperature limit
minor (amber) minor green no
Any card fails major (red) major amber yes
Any card removed major (red) major unlit yes
1 Event appears only in the show alarms command output.
2 The interface’s Link LED is unlit.
If a Power Supply fails while the E1200i is operating, the software generates a major alarm and an SNMP trap, lights the major LED, and activates the audible alarm.
When a Power Supply fails, the software also records one alarm event for line cards, RPM, and SFM, though each contains its own power source. The system generates one alarm event and SNMP trap summarizing the Power Supply failure and the components affected.
Audible Alarm? · 88 Alarms

The number of SFMs present in the system when it boots determines the level of alarms sent when a tenth (redundant) SFM is removed or fails. At boot time, if ten SFMs are present and functioning, the E1200i system issues no alarms. However, if one SFM fails or is removed, the system sends a minor alarm stating that nine SFMs are present. The system requires eight functioning SFMs to pass traffic.
At boot time, if eight SFMs are present and functioning, the E1200i system issues no alarms. The system issues no alarms if an SFM is added to the system; however, if the number of functioning SFMs changes from nine to eight, the system sends a minor alarm event. The system always triggers a major alarm when the number of working SFMs reaches seven.

90 Alarms

This appendix contains two major sections:
Height 42 inches (106.68 cm)
Width 17.40 inches (44.20 cm)
Depth (without cable management system) 22.25 inches (56.51 cm)
Chassis weight with factory-installed components (backplane and air filter)
139 pounds (approx.) (63.05kg)
Weight fully loaded (backplane, air filter, 2 fan trays, 10 SFMs, RPMs, and 14 line cards)
394 pounds (approx.) (178.7 kg)
Mounting Attached rack mount brackets are factory set for front mounting in a standard 19-inch rack. Mounting brackets are adjustable for center and rear mounting. Optional brackets are available for front or center mounting in a 23-inch rack or cabinet.
Maximum for fully loaded chassis 7,784W (26,578BTU/HR)
Minimum for chassis with one 48-port 1GE line card 1,450W (4,951 BTU/HR)
Maximum Power Consumption 7,784W
Input Voltage Range 200-240 VAC 50/60 Hz
Parameter Specifications · Thermal Output · Parameter Specifications

Maximum Heat Dissipation 7,188W (24,541 BTU/HR)
Maximum Power Supply Input Current 16A per module
92 System Specifications

Height 36.75 inches (93.35 cm)
Width 17.40 inches (44.20 cm)
Depth (without cable management system) 21.25 inches (53.98 cm)
Chassis weight with factory-installed components (backplane and air filter)
97 pounds (approx.) (44.00 kg)
Weight fully loaded (backplane, air filter, 2 fan trays, 10 SFMs, RPMs, and 14 line cards)
319 pounds (approx.) (144.70 kg)
Mounting Attached rack mount brackets are factory set for front mounting in a standard 19-inch rack. Mounting brackets are adjustable for center and rear mounting. Optional brackets are available for front or center mounting in a 23-inch rack or cabinet.
Maximum for fully loaded chassis 6850W (23,389 BTU/HR)
Minimum for chassis with one 48-port 1GE line card 1,450W (4,951 BTU/HR)
Maximum Power Consumption 6,850W
Input Voltage Range 200-240 VAC 50/60 Hz
Maximum Heat Dissipation 6,325W (21,598 BTU/HR)
Maximum Power Supply Input Current 16A per module
Parameter Specifications · Thermal Output · Parameter Specifications

Temperature 32° to 104°F (0° to 40°C)
Maximum altitude No performance degradation to 10,000 feet (3,048 meters)
Relative humidity 5 to 85 percent, noncondensing
Shock Designed to meet Telcordia GR-63 CORE
Vibration Designed to meet Telcordia GR-63 CORE
Temperature -40° to 158°F (-40° to 70°C)
Maximum altitude 15,000 feet (4,572 meters)
Relative humidity 5 to 95 percent, noncondensing
The E1200i is designed to comply with the following safety and agency requirements.
USA Federal Communications Commission (FCC) Statement This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to Part 15 of the FCC rules. These limits are designated to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment generates, uses, and can radiate radio frequency energy. If it is not installed and used in accordance to the instructions, it may cause harmful interference to radio communications. Operation of this equipment in a residential area is likely to cause harmful interference, in which case users will be required to take whatever measures necessary to correct the interference at their own expense. Properly shielded and grounded cables and connectors must be used in order to meet FCC emission limits. Force10 Networks is not responsible for any radio or television interference caused by using other than recommended cables and connectors or by unauthorized changes or modifications in the equipment. Unauthorized changes or modification could void the user’s authority to operate the equipment. This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation.
Canadian Department of Communication Statement

European Union EMC Directive Conformance Statement This product is in conformity with the protection requirements of EU Council Directive 2004/108/EC on the approximation of the laws of the Member States relating to electromagnetic compatibility. Force 10 Networks can not accept responsibility for any failure to satisfy the protection requirements resulting from a non-recommended modification of this product, including the fitting of non-Force10 option cards. This product has been tested and found to comply with the limits for Class A Information Technology Equipment according to CISPR 22/European Standard EN 55022. The limits for Class A equipment were derived for

commercial and industrial environments to provide reasonable protection against interference with licensed communication equipment. .
European Community Contact Force10 Networks, EMEA - Central Dahlienweg 19 66265 Heusweiler Germany http://www.force10networks.com/german/ Tel: +49 172 6802630 Email: EMEA Central Sales

This is Class A product based on the standard of the Voluntary Control Council For Interference by Information Technology Equipment (VCCI). If this equipment is used in a domestic environment, radio disturbance may arise. When such trouble occurs, the user may be required to take corrective actions.


Korea (MIC certification)

This switch must be recycled or discarded according to applicable local and national regulations. Force10 Networks encourages owners of information technology (IT) equipment to responsibly recycle their equipment when it is no longer needed. Force10 offers a variety of product return programs and services in several countries to assist equipment owners in recycling their IT products.
Waste Electrical and Electronic Equipment (WEEE) Directive for Recovery, Recycle and Reuse of IT and Telecommunications Products
Force10 switches are labeled in accordance with European Directive 2002/96/EC concerning waste electrical and electronic equipment (WEEE). The Directive determines the framework for the return and recycling of used appliances as applicable throughout the European Union. This label, as shown in Figure 29, is applied to various products to indicate that the product is not to be thrown away, but rather reclaimed upon end of life per this Directive.
96 System Specifications

Figure 29 The European WEEE symbol

In accordance with the European WEEE Directive, electrical and electronic equipment (EEE) is to be collected separately and to be reused, recycled, or recovered at end of life. Users of EEE with the WEEE marking per Annex IV of the WEEE Directive, as shown above, must not dispose of end of life EEE as unsorted municipal waste, but use the collection framework available to customers for the return, recycling and recovery of WEEE. Customer participation is important to minimize any potential effects of EEE on the environment and human health due to the potential presence of hazardous substances in EEE.
Force10 Networks products, which fall within the scope of the WEEE, are labeled with the crossed-out wheelie-bin symbol, as shown above, as required by WEEE.
For information on Force10 product recycling offerings, see the WEEE Recycling instructions on iSupport at: https://www.force10networks.com/CSPortal20/Support/WEEEandRecycling.pdf For more information, contact the Force10 Technical Assistance Center (TAC) (see Appendix E, Technical Support).
For California:
Perchlorate Material — Special handling may apply. See: http://www.dtsc.ca.gov/hazardouswaste/perchlorate
The foregoing notice is provided in accordance with California Code of Regulations Title 22, Division 4.5 Chapter 33. Best Management Practices for Perchlorate Materials.

98 System Specifications

This appendix contains these major sections:
iSupport provides a range of documents and tools to assist you with effectively using Force10 equipment and mitigating the impact of network outages. Through iSupport you can obtain technical information regarding Force10 products, access to software upgrades and patches, and open and manage your Technical Assistance Center (TAC) cases. Force10 iSupport provides integrated, secure access to these services.
The i-Support website (see Figure 30, below) (http://www.force10networks.com/support/) contains a publicly available interface that includes access to techtips, white papers, and user manuals. After you get an account and log in, the available documentation expands to other types, including bug lists, error message decoder, release notes. You can even track your own Force10 inventory.
Once you are logged in, the following five tabs become available:

Figure 30 Support Policies section of iSupport

The screenshot above shows the Support Policies section of iSupport. The Support Guide, available on that page, details the types of information and services that you can access through iSupport and through various types of support contracts.
The URL for iSupport is http://www.force10networks.com/support/ To access iSupport services you must have a userid and password. If you do not have one, you can request one at the website:
100 Technical Support

Log in to iSupport at http://www.force10networks.com/support/ and select the Service Request tab.
How to Contact Force10 TAC
Information to Submit When Opening a Support Case
Managing Your Case Log in to iSupport, and select the Service Request tab to view all open cases and RMAs.
Log in to iSupport, and select the Software Center tab.
Technical Documentation Log in to iSupport, and select the Documents tab. This page can be accessed without logging in via the Documentation link on the iSupport page.
Telephone:
Downloading Software Updates

To request replacement hardware, follow these steps:
1 Determine the part number and serial number of the component. To list the numbers for all components installed in the chassis, use the show hardware command.
2 Request a Return Materials Authorization (RMA) number from TAC by opening a support case. Open a support case by:
Step Task · 102 Technical Support


Pages referenced in this manual — manufacturer, support and downloads.
Owners and our team usually reply within a day — and your question helps the next person too.
Be the first to ask — other owners or our team will answer.