EN
Extron electronic logo
Official user manual

Extron electronic PVS 400

46 pages·10.4 MB·Switch·PDF·ENDEFRITNLJA
Extron electronic PVS 400
Table of Contents 66 sections Front cover · Precautions · Introduction · PoleVault System installation and wiring overview · … ShowHide
Front coverp.1Precautionsp.2Introductionp.3PoleVault System installation and wiring overviewp.4Overviewp.3The PoleVault Systemp.3Before you Begin Installation - Planningp.51. Room layoutp.5a. The roomp.5b. Location of the screen and projectorp.6c. Location of MediaLink Controller and Wall Platesp.7d. Type and location of the speakersp.72. Inventoryp.8a. Included itemsp.8b. Items not includedp.11c. Optional itemsp.11d. Installation toolsp.12Installationp.13Installation Overviewp.13Outline of installation stepsp.13Stage One - Install the Screen and Projectorp.14hardwarep.141. Mark screen locationp.152. Install projector to verify locationp.153. Verify the image locationp.164. Cut the ceiling tilep.175. Finish Projector Ceiling Mount installationp.176. Secure the Projector Ceiling Mount to the ceilingp.187. Install the Screenp.19Stage Two - Install the Wallplates and MLC 104 IP Plusp.201. Install mud ringsp.222. Pull cablesp.233. Install wall platesp.244. Install MediaLink Controllerp.25Stage Three - Install the SI 3CT LP Ceiling Speakersp.281. Cut ceiling tilep.292. Install the speaker in the ceiling tilep.293. Secure speakers to structural ceilingp.304. Cable the speakersp.305. Finish speaker installationp.32Stage Four - Install the PMK 450 and the PVS 204SAp.331. Pull the cablesp.342. Install the PMK 450 projector mounting kitp.343. Install the PVS 204SA switcherp.354. Finish installing the projector mounting kitp.36Stage Five - Configure the Systemp.381. Configure the systemp.382. Test the systemp.403. Final installationp.41Optional Accessory Installation - PPC 25p.421. Connect sensor to paging speakerp.422. Connect sensor to the PPC 25p.423. Connect the PPC 25 to the switcherp.42Installation - Reference Informationp.43Specificationsp.43Mounting hardwarep.43PCM 240p.43PMP 6p.43PMK 450p.43UPB 25p.43Devicesp.44PVS 204SAp.44MLC 104 IP Plusp.44PVT CV D and PVT RGB Dp.44Ceiling mount installation diagram (with item weights) for PoleVault Systemp.45Outline of installation stepsp.46
Page 1 of the Extron electronic PVS 400 user manual — PoleVault Systems
Page 1 · click to enlarge
Page 1
Extron electronic PVS 400 — Front cover diagram (page 1)
Fig. 1 · Front cover

PoleVault Systems

Installation Guide for the PVS 200, 300, and 400

68-1390-01 Rev. C

Page 2 of the Extron electronic PVS 400 user manual — 触电危险不要自己试图打开设备盖子维修该设备。 通风孔 • 有些设备机壳上有通风槽或孔,它们是用来防止机内敏感元件过热。 不要用任何东
Page 2 · click to enlarge
Page 2

Precautions

Safety Instructions • English

This symbol is intended to alert the user of important operating and maintenance (servicing) instructions in the literature provided with the equipment.

equipment is intended to be used with a main power system with a grounded (neutral) conductor. The third (grounding) pin is a safety feature, do not attempt to bypass or disable it.

This symbol is intended to alert the user of the presence of uninsulated dangerous voltage within the product’s enclosure that may present a risk of electric shock.

Power disconnection • To remove power from the equipment safely, remove all power cords from the rear of

the equipment, or the desktop power module (if detachable), or from the power source receptacle (wall plug).

Power cord protection • Power cords should be routed so that they are not likely to be stepped on or pinched by

items placed upon or against them.

Retain Instructions • The safety instructions should be kept for future reference.

Servicing • Refer all servicing to qualified service personnel. There are no user-serviceable parts inside. To

prevent the risk of shock, do not attempt to service this equipment yourself because opening or removing covers may expose you to dangerous voltage or other hazards.

Follow Warnings • Follow all warnings and instructions marked on the equipment or in the user

information.

Avoid Attachments • Do not use tools or attachments that are not recommended by the equipment

Slots and openings • If the equipment has slots or holes in the enclosure, these are provided to prevent

manufacturer because they may be hazardous.

overheating of sensitive components inside. These openings must never be blocked by other objects.

Lithium battery • There is a danger of explosion if battery is incorrectly replaced. Replace it only with the

same or equivalent type recommended by the manufacturer. Dispose of used batteries according to the manufacturer’s instructions.

Consignes de Sécurité • F rançais

Ce symbole sert à avertir l’utilisateur que la documentation fournie avec le matériel contient des instructions importantes concernant l’exploitation et la maintenance (réparation).

matériel doit être utilisé avec une alimentation principale comportant un fil de terre (neutre). Le troisième contact (de mise à la terre) constitue un dispositif de sécurité : n’essayez pas de la contourner ni de la désactiver.

Ce symbole sert à avertir l’utilisateur de la présence dans le boîtier de l’appareil de tensions dangereuses non isolées posant des risques d’électrocution.

Déconnexion de l’alimentation• Pour mettre le matériel hors tension sans danger, déconnectez tous les cordons

d’alimentation de l’arrière de l’appareil ou du module d’alimentation de bureau (s’il est amovible) ou encore de la prise secteur.

Protection du cordon d’alimentation • Acheminer les cordons d’alimentation de manière à ce que personne ne

risque de marcher dessus et à ce qu’ils ne soient pas écrasés ou pincés par des objets.

d’utiliser le matériel.

Réparation-maintenance • Faire exécuter toutes les interventions de réparation-maintenance par un technicien

Conserver les instructions• Ranger les consignes de sécurité afin de pouvoir les consulter à l’avenir.

qualifié. Aucun des éléments internes ne peut être réparé par l’utilisateur. Afin d’éviter tout danger d’électrocution, l’utilisateur ne doit pas essayer de procéder lui-même à ces opérations car l’ouverture ou le retrait des couvercles risquent de l’exposer à de hautes tensions et autres dangers.

Respecter les avertissements • Observer tous les avertissements et consignes marqués sur le matériel ou

présentés dans la documentation utilisateur.

Fentes et orifices • Si le boîtier de l’appareil comporte des fentes ou des orifices, ceux-ci servent à empêcher

Eviter les pièces de fixation • Ne pas utiliser de pièces de fixation ni d’outils non recommandés par le

les composants internes sensibles de surchauffer. Ces ouvertures ne doivent jamais être bloquées par des objets.

fabricant du matériel car cela risquerait de poser certains dangers.

Lithium Batterie • Il a danger d’explosion s’ll y a remplacment incorrect de la batterie. Remplacer uniquement

avec une batterie du meme type ou d’un ype equivalent recommande par le constructeur. Mettre au reut les batteries usagees conformement aux instructions du fabricant.

Sicherheitsanleitungen • Deutsch

Dieses Symbol soll dem Benutzer in der im Lieferumfang enthaltenen Dokumentation besonders wichtige Hinweise zur Bedienung und Wartung (Instandhaltung) geben.

Dieses Gerät wurde für eine Verwendung mit einer Hauptstromleitung mit einem geerdeten (neutralen) Leiter konzipiert. Der dritte Kontakt ist für einen Erdanschluß, und stellt eine Sicherheitsfunktion dar. Diese sollte nicht umgangen oder außer Betrieb gesetzt werden.

Dieses Symbol soll den Benutzer darauf aufmerksam machen, daß im Inneren des Gehäuses dieses Produktes gefährliche Spannungen, die nicht isoliert sind und die einen elektrischen Schock verursachen können, herrschen.

Stromunterbrechung • Um das Gerät auf sichere Weise vom Netz zu trennen, sollten Sie alle Netzkabel

aus der Rückseite des Gerätes, aus der externen Stomversorgung (falls dies möglich ist) oder aus der Wandsteckdose ziehen.

Schutz des Netzkabels • Netzkabel sollten stets so verlegt werden, daß sie nicht im Weg liegen und niemand

darauf treten kann oder Objekte darauf- oder unmittelbar dagegengestellt werden können.

Wartung • Alle Wartungsmaßnahmen sollten nur von qualifiziertem Servicepersonal durchgeführt werden.

Bedienungsanleitungen genau durchlesen und verstehen.

Die internen Komponenten des Gerätes sind wartungsfrei. Zur Vermeidung eines elektrischen Schocks versuchen Sie in keinem Fall, dieses Gerät selbst öffnen, da beim Entfernen der Abdeckungen die Gefahr eines elektrischen Schlags und/oder andere Gefahren bestehen.

Aufbewahren der Anleitungen • Die Hinweise zur elektrischen Sicherheit des Produktes sollten Sie

aufbewahren, damit Sie im Bedarfsfall darauf zurückgreifen können.

Schlitze und Öffnungen • Wenn das Gerät Schlitze oder Löcher im Gehäuse aufweist, dienen diese zur

Befolgen der Warnhinweise • Befolgen Sie alle Warnhinweise und Anleitungen auf dem Gerät oder in der

Vermeidung einer Überhitzung der empfindlichen Teile im Inneren. Diese Öffnungen dürfen niemals von anderen Objekten blockiert werden.

Benutzerdokumentation.

Keine Zusatzgeräte • Verwenden Sie keine Werkzeuge oder Zusatzgeräte, die nicht ausdrücklich vom

Hersteller empfohlen wurden, da diese eine Gefahrenquelle darstellen können.

Litium-Batterie • Explosionsgefahr, falls die Batterie nicht richtig ersetzt wird. Ersetzen Sie verbrauchte

Batterien nur durch den gleichen oder einen vergleichbaren Batterietyp, der auch vom Hersteller empfohlen wird. Entsorgen Sie verbrauchte Batterien bitte gemäß den Herstelleranweisungen.

Instrucciones de seguridad • Español

Este símbolo se utiliza para advertir al usuario sobre instrucciones importantes de operación y mantenimiento (o cambio de partes) que se desean destacar en el contenido de la documentación suministrada con los equipos.

indicada en el mismo. La alimentación eléctrica de este equipo debe provenir de un sistema de distribución general con conductor neutro a tierra. La tercera pata (puesta a tierra) es una medida de seguridad, no puentearia ni eliminaria.

Este símbolo se utiliza para advertir al usuario sobre la presencia de elementos con voltaje peligroso sin protección aislante, que puedan encontrarse dentro de la caja o alojamiento del producto, y que puedan representar riesgo de electrocución.

Desconexión de alimentación eléctrica • Para desconectar con seguridad la acometida de alimentación eléctrica

al equipo, desenchufar todos los cables de alimentación en el panel trasero del equipo, o desenchufar el módulo de alimentación (si fuera independiente), o desenchufar el cable del receptáculo de la pared.

Protección del cables de alimentación • Los cables de alimentación eléctrica se deben instalar en lugares donde

no sean pisados ni apretados por objetos que se puedan apoyar sobre ellos.

Reparaciones/mantenimiento • Solicitar siempre los servicios técnicos de personal calificado. En el interior no

equipo.

hay partes a las que el usuario deba acceder. Para evitar riesgo de electrocución, no intentar personalmente la reparación/mantenimiento de este equipo, ya que al abrir o extraer las tapas puede quedar expuesto a voltajes peligrosos u otros riesgos.

Conservar las instrucciones • Conservar las instrucciones de seguridad para futura consulta.

Obedecer las advertencias • Todas las advertencias e instrucciones marcadas en el equipo o en la

Ranuras y aberturas • Si el equipo posee ranuras o orificios en su caja/alojamiento, es para evitar el

documentación del usuario, deben ser obedecidas.

sobrecalientamiento de componentes internos sensibles. Estas aberturas nunca se deben obstruir con otros objetos.

Evitar el uso de accesorios • No usar herramientas o accesorios que no sean especificamente recomendados

por el fabricante, ya que podrian implicar riesgos.

Batería de litio • Existe riesgo de explosión si esta batería se coloca en la posición incorrecta. Cambiar esta

batería únicamente con el mismo tipo (o su equivalente) recomendado por el fabricante. Desachar las baterías usadas siguiendo las instrucciones del fabricante.

安全须知 • 中文

警告 电源 • 该设备只能使用产品上标明的电源。 设备必须使用有地线的供电系统供电。 第三条线

这个符号提示用户该设备用户手册中有重要的操作和维护说明。

(地线)是安全设施,不能不用或跳过 。 拔掉电源 • 为安全地从设备拔掉电源,请拔掉所有设备后或桌面电源的电源线,或任何接到市

这个符号警告用户该设备机壳内有暴露的危险电压,有触电危险。

  • 电系统的电源线。 电源线保护
  • 妥善布线, 避免被踩踏,或重物挤压。 维护
  • 所有维修必须由认证的维修人员进行。 设备内部没有用户可以更换的零件。为避免出现
  • 注意 阅读说明书
  • 用户使用该设备前必须阅读并理解所有安全和使用说明。 保存说明书
  • 用户应保存安全说明书以备将来使用。 遵守警告
  • 用户应遵守产品和用户指南上的所有安全和操作说明。 避免追加
  • 不要使用该产品厂商没有推荐的工具或追加设备,以避免危险。

触电危险不要自己试图打开设备盖子维修该设备。 通风孔 • 有些设备机壳上有通风槽或孔,它们是用来防止机内敏感元件过热。 不要用任何东

西挡住通风孔。 锂电池 • 不正确的更换电池会有爆炸的危险。必须使用与厂家推荐的相同或相近型号的电池。

按照生产厂的建议处理废弃电池。

Page 3 of the Extron electronic PVS 400 user manual — 1-1 PoleVault Systems Installation • Introduction
Page 3 · click to enlarge
Page 3

Introduction

Extron electronic PVS 400 — Introduction diagram (page 3)
Fig. 2 · Introduction

FCC Class A Notice

This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. The Class A limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with the instruction manual, may cause harmful interference to radio communications. Operation of this equipment in a residential area is likely to cause harmful interference, in which case the user will be required to correct the interference at his own expense.

Overview

This manual covers the installation of the Extron PoleVault™ System in a drop ceiling room with a wood or concrete structural ceiling. If the location has a concrete or beam style ceiling, alternative ceiling mounts can be obtained separately from Extron (see 2c, "Optional items", later in this chapter). For those types of installation, refer to the individual mounting hardware user's manuals for method.

It is assumed that the installer has some knowledge and experience of A/V, electrical, or electronic device installation. This manual guides the A/V installer through the steps for installation and connection of each of the system’s component parts.

It may be that the locations for the devices (e.g., wall plates, projector, and screen) have been pre-determined. However, some room installation examples are given to help in installations where final location is yet to be determined.

The PoleVault System

Extron PoleVault Systems are easy-to-use, network-enabled, all-inclusive packages, making them ideal for single- projector K-12 classrooms. PoleVault Systems use economical twisted pair cables for transmitting signals and include network connectivity for Web-based asset management, monitoring, and control.

Extron electronic PVS 400 — The PoleVault System diagram (page 3)
Fig. 3 · The PoleVault System

N The hardware and devices listed on the inventory pages have individual user manuals which have detailed safety

information, installation, set-up, and configuration instructions, and should be referred to as needed.

For operation and set up of the projector, screen, and input devices, refer to the relevant manufacturer's manuals supplied with those devices.

1-1 PoleVault Systems Installation • Introduction

Page 4 of the Extron electronic PVS 400 user manual — PoleVault Systems Installation • Introduction 1-2
Page 4 · click to enlarge
Page 4

Introduction, cont'd

Extron electronic PVS 400 — Introduction, cont'd diagram (page 4)
Fig. 4 · Introduction, cont'd

PV SI 3C LP Full Range Single Driver Ceiling Speakers

Projector on/off control Projector input switching Projector volume control 2 Gang (depth: 1.78”)

UTP network cable - not included PoleVault System installation and wiring overview

PoleVault Systems Installation • Introduction 1-2

Page 5 of the Extron electronic PVS 400 user manual — 1-3 PoleVault Systems Installation • Introduction — Planning
Page 5 · click to enlarge
Page 5

Before you Begin Installation - Planning

Before installation is started, several major factors must be considered to ensure that the overall installation is as smooth and trouble free as possible, and that the final finished project meets the needs of the customers, users, audiences, and installer.

The installation consideration on the following pages, though not comprehensive, should be consulted to help ensure that key aspects have been considered.

1. Room layout

a. The room

The application diagram below shows a typical classroom installation.

Extron electronic PVS 400 — a. The room diagram (page 5)
Fig. 5 · a. The room

Typical classroom installation

Room factors to be considered should include, but are not confined to:

  • Room size, orientation, and layout:

Audience factors (e.g. number, ADA requirements, seating arrangements)

Existing installed furniture (bookcases, racks, cabinets, workbenches, sinks, etc.)

Windows, doors, and support pillar locations in relationship to the proposed screen location

  • Ceiling and wall type (important in assessing the installation hardware needed)
Ceiling typedropped, spline, hard lid etc., structural type (wood, concrete, trusses), plenum or non-plenum

Wall type: drywall, cement, brick etc.

Extron electronic PVS 400 — Typical classroom installation diagram (page 5)
Fig. 6 · Typical classroom installation

W Check the structural ceiling to ensure that it can handle a load four times the weight of the final setup.

1-3 PoleVault Systems Installation • Introduction — Planning

Page 6 of the Extron electronic PVS 400 user manual — ADA overhead and side clearance requirements
Page 6 · click to enlarge
Page 6

Introduction — Planning, cont’d

  • Lighting

Type and control (important for projector image viewing)

Ambient light from windows

Teacher’s Desk TV / VCR / DVD Inputs

PVT A/V Wallplate Location

Example classroom installation

b. Location of the screen and projector

  • Proposed screen location

Normally located at the front center of the room (not covering fire alarm strobes when screen is lowered)

Dimensions and type of screen (maximum image size, motorized or hanging screen)

  • Proposed projector location

Aligned with center of the screen. Not an obstruction to viewing

Projector's throw distance (maximum and minimum limits to screen) of the image

Horizontal offset (horizontal distance from the center of the lens to the center of the projector)

Vertical offset of the projected image (height relationship between the projector and the screen)

Projector angle (image projected up, down, or horizontal to screen)

Power source for the projectorexisting and accessible or needing installation

Projector weight. The Universal Projector Bracket (UPB 25) supports a maximum weight of 25 lbs.

Overhead clearances (refer to a copy of "ADA Standards for Accessible Design", "Section 4-4", "Head Room" for ADA requirements)

27" (68.5 cm)

Walking Parallel to a Wall

(ADA referenced figure 8a, redrawn)

ADA overhead and side clearance requirements

PoleVault Systems Installation • Introduction — Planning 1-4

Show 11 more labels / short text on this page
Student Desks · Speaker Location · Windows · Projector/Switcher Location · MLC Controller Location · Screen/White Board Location · 4" (10 cm) · Max · 80" (203 cm) · Min · Greater than
Page 7 of the Extron electronic PVS 400 user manual — Example classroom with four speaker installation
Page 7 · click to enlarge
Page 7
  • Viewing obstructions

Pillars, furniture etc., window locations for glare reduction, obstructions between projector and screen

c. Location of MediaLink Controller and Wall Plates

  • Forward and side reach (for full details refer to a copy of "ADA Standards for Accessible Design", "Section 4-2", "Space Allowance and Reach Ranges" ) 30" (76 cm) 10" (25.5 cm)
Extron electronic PVS 400 — c. Location of MediaLink Controller and Wall Plates diagram (page 7)
Fig. 7 · c. Location of MediaLink Controller and Wall Plates

(ADA referenced figure 6c, redrawn) (ADA referenced figure 6b, redrawn) High Forward Reach Limits

High / Low Side Reach Limits

Max Side Reach over Obstruction Limits

(ADA referenced figure 5a, redrawn)

ADA high/low forward, side and over obstruction reach limit requirements

  • Location of source devices

Desk, table, or rack mounted, proximity to proposed transmitter location (wall, podium, or furniture)

  • Cabling obstacles

Studs, utility pipes, power supply location (raceway installation needed?)

  • Network drop for MediaLink Controller

Wall or floor cabled

d. Type and location of the speakers

  • Speaker type based on room ceiling and wall type
  • Total number and spacing of speakers

Based on ceiling height and room size

  • Audience seating and room acoustics

Desired evenness of sound coverage and ambient noise level compensation

Extron electronic PVS 400 — d. Type and location of the speakers diagram (page 7)
Fig. 8 · d. Type and location of the speakers

Each speaker covers one-fourth of listening area.

PVT A/V Wallplate Location

Example classroom with four speaker installation

1-5 PoleVault Systems Installation • Introduction — Planning

Show 6 more labels / short text on this page
Student Desks · Windows · Speaker Location · Projector/Switcher Location · MLC Controller Location · Screen/White board Location
Page 8 of the Extron electronic PVS 400 user manual — PoleVault Systems Installation • Introduction — Inventory Overview 1-6
Page 8 · click to enlarge
Page 8

Introduction — Inventory Overview

2. Inventory

a. Included items

The PoleVault System (PVS xxx) ships in two boxes. The larger box (42-1xx-xx) contain the devices and hardware, individually boxed and labeled. The smaller box (42-103-13) contains only the PV SI 3C LP speakers. Each PVS system has the same quantities of speakers, hardware and devices, but differ in the number and type of PoleVault A/V Source Input Wall Plates, and are shipped as follows:

  • PVS 200 (part # 42-108-03 ) includes one PVT RGB D and one PVT CV D
  • PVS 300 (part # 42-109-03 ) includes two PVT RGB D and one PVT CV D
  • PVS 400 (part # 42-110-03 ) includes two PVT RGB D and two PVT CV D (see front cover of this manual)

Carefully check all the received items against the following lists.

Extron electronic PVS 400 — a. Included items diagram (page 8)
Fig. 9 · a. Included items

UPB 25 Universal Projector Bracket PCM 240 Projector Ceiling Mount

(4) M6 x 40 mm screws (4) M5 x 40 mm screws (4) M4 x 40 mm screws (4) M3 x 40 mm screws 0.328 ID washers (4) #10 washers (4) #6 washers (4) Adhesive pads (4) Hex key (1)

(7) Replacement screws (2) Velcro™ pads (1) Set screw Hex wrench (1) Security screw Hex wrench

(4)Turnbuckles (5) Lag eyes screws (5) Concrete anchors (2) Cable clamps, Gal Steel (1) Safety wire (15 ft 1/8” dia) (2) Tie wire (30 ft, 14 AWG) (4) Locking Screws (4) Adhesive pads (1) Hex key

CAT5 T568A Patch, 50’ Quantity varies depending on PVS system ordered.

These may be boxed separately or loose inside larger box.

PoleVault Systems Installation • Introduction — Inventory Overview 1-6

Page 9 of the Extron electronic PVS 400 user manual — 1-7 PoleVault Systems Installation • Introduction — Inventory Overview
Page 9 · click to enlarge
Page 9
Extron electronic PVS 400 — 2. Inventory diagram (page 9)
Fig. 10 · 2. Inventory

(1) 2-pole connector (orange) (2) 3-pole connector (blue) (1) 5-pole connector (blue) (1) Audio connector (black) (2) Securing screws (4) Tie wraps (4) Adhesive foot pads (2) Velcro® pads

(1) Mud ring (2) Dog legs (2) Dog leg screws (2) PVT mounting screws (1) Decora® Faceplate (2) Faceplate screws

(1) Mud ring (2) Dog legs (2) Dog leg screws (2) PVT mounting screws (1) Decora® Faceplate (2) Faceplate screws

(1) Mud ring (8) Mud ring screws (8) Replacement screws

*Part #’s 42-109-03 and 42-110-03 contain 3 or 4 PoleVault Wallplates, according to type ordered.

1-7 PoleVault Systems Installation • Introduction — Inventory Overview

Page 10 of the Extron electronic PVS 400 user manual — 1-8 PoleVault Systems Installation • Introduction — Inventory Overview 1-8
Page 10 · click to enlarge
Page 10

Introduction — Inventory Overview, cont’d

Extron electronic PVS 400 — Introduction — Inventory Overview, cont’d diagram (page 10)
Fig. 11 · Introduction — Inventory Overview, cont’d

(2) Speaker grills (8 pcs) Grill putty (1) Grill key

N If any items in the PoleVault System boxes are damaged or missing, contact the Extron Technical Hotline (see rear

1-8 PoleVault Systems Installation • Introduction — Inventory Overview 1-8

Page 11 of the Extron electronic PVS 400 user manual — 1-9 PoleVault Systems Installation • Introduction — Inventory Overview
Page 11 · click to enlarge
Page 11

b. Items not included

The following items are not included. However, input and display devices are essential parts of the system, and at any installation they may vary depending on their use. This list suggests various devices that may be used.

  • Projector (or display device)
  • Screen (and mounting hardware)
  • Input devices, such as:

DVD/CD/VCR combo player (and cables)

Document camera (and cables)

PC or Mac (with keyboard, mouse, local monitor, VGA cables, RJ-45 network cables, power cords, and, where desired, a P/2 DA2 or DA for PC signal to local monitor and projector)

  • Installation hardware needed (may vary per installation):

Bolts for concrete structural ceilings where needed

Toggles (used for screen mounting on dry wall)

S-hooks for hanging the screen

Spare ceiling tiles in case of accidental damage during installation

Electrical box, where installation of a box on the PCM 240 is desired

Safety wire, lag eye bolts, and strain reliefs for installation and securing ceiling speakers

Heat shrink, extension cord

c. Optional items

The optional items suggested below can be added to or substituted for items in the standard PoleVault System.

  • Optional accessories:

MLP 101 D (mic to line pre-amplifier)

Wall mount speakers (e.g., SI 26) or extra ceiling speakers

MLC 104 IP Plus DV+ controller (includes DVD/VCR IR control)

MLC 104 IP Plus L controller (with lectern faceplate)

MLC 104 IP Plus AAP controller (with AAP opening)

PPC 25 Priority Page Controller

P/2 DA2

  • Optional installation hardware:

FCMP (flat ceiling mount)

ACMP (angled ceiling mount)

SMB (surface mount boxes for installing the MLC on a podium or desk)

EWB (external wall boxes to mount devices for a surface raceway system)

MLM-WB+ (lockable metal wall box with flip-down 4U rack space)

  • Optional A/V source inputs:

PVT CV AAP (composite video architectural adapter plate model)

PVT RGB AAP (RGB architectural adapter plate model)

PVT RGB (RGB rack mount model)

PVT SW RGB (RGB rack mount model with switching capabilities)

PVT CV (composite video rack mount model)

PVT RGB CV (RGB and composite video rack mount model)

  • Optional speakers:

SI 3 (Compact Full-Range Surface Mount Speakers)

SI 26X (Two-Way Open Back Ceiling Speakers)

SI 26W (Two-Way-In-Wall Speakers with 6.5" Woofer)

SI 28W (Two-Way-In-Wall Speakers with 8" Woofer)

SI 26CT (Two-Way Ceiling Speakers with 8" Back Can and Transformer)

SI 26 (Two-Way Surface Mount Speakers with 6.5" Woofer)

1-9 PoleVault Systems Installation • Introduction — Inventory Overview

Page 12 of the Extron electronic PVS 400 user manual — PoleVault Systems Installation • Introduction — Inventory Overview 1-10
Page 12 · click to enlarge
Page 12

Introduction — Inventory Overview, cont’d

d. Installation tools

To aid the professional installer, this checklist gives the tools recommended to complete the installation. Tools should include, but are not confined to:

  • Laser level, or two levels (large for screen installation, small for wall plates and projector mounts)
  • Tape measure
  • Stud finder
  • Drill and drill bit set including a Unibit to cut through metal studs
  • Extension drill bit (3/4" min., 4 to 8 foot length, to drill through fire-breaks)
  • Socket set
  • Pipe strap or wrapped pipe wrench
  • Lineman’s pliers and wire strippers
  • Standard screwdriver set and Tweeker
  • Cable cutters (to cut safety wire)
  • Dry wall saw and hacksaw blade mounted on handle (for cutting ceiling tiles)
  • Flashlight and safety goggles
  • Razor knife
  • 2" hole saw
  • Painter's tape (to mark up walls), pencil, and marker pen
  • RJ-45 crimpers and RJ-45 connectors
  • Voltage tester
  • Fish tape, pull string, and electrical tape (for taping fish tape to pull string)
  • Zip ties
  • Vacuum cleaner
  • Heat gun

PoleVault Systems Installation • Introduction — Inventory Overview 1-10

Page 13 of the Extron electronic PVS 400 user manual — 2-1 PoleVault Systems Installation • Installation Overview
Page 13 · click to enlarge
Page 13

Installation Overview Installation Overview

This overview outlines the basic steps for installing the PoleVault System. Detailed description of these steps is given in five sections, Stages One though Five.

Extron electronic PVS 400 — Installation Overview Installation Overview diagram (page 13)
Fig. 12 · Installation Overview Installation Overview

N Additional installation hardware is needed and should be supplied by the installer. See Introduction, “Items not

included”, for a list. Optional accessories may be desired for this installation. See Introduction, “Optional items”, for a list, or visit www.extron.com for details. Refer to local building standards and codes to verify that the installation will meet all the regulatory requirements. Observe all local and national building and safety codes, UL requirements, and ADA Accessibility Guidelines. For details of the OSHPD approved method of installation (OPA-1782), consult the PCM 240 User’s Manual, 68-1180-01, Rev D. Refer to the specifications on pages 2-31 through 2-33 for system hardware weights and dimensions.

Carefully check inventory of PoleVault system packages, input and output devices, any optional accessories, and installation hardware before commencing.

Outline of installation steps Stage One — Install the Screen and Projector.

Extron electronic PVS 400 — Installation Overview Installation Overview diagram (page 13)
Fig. 13 · Installation Overview Installation Overview

c Mark the screen location (page 2-3).

c Install projector to verify location (page 2-3).

c Verify the image location (page 2-4).

c Cut the ceiling tile (page 2-5).

c Finish projector ceiling mount installation (page 2-5).

c Secure the projector ceiling mount to the ceiling (page 2-6).

c Install the screen (page 2-7).

Stage Two — Install the A/V Source Input Wall Plates and MLC 104 IP Plus.

c Install the mud rings (page 2-10).

c Pull cables (page 2-11).

c Install the wall plates (page 2-12).

c Install the MediaLink Controller (page 2-13).

Stage Three — Install the PV SI 3C LP Ceiling Speakers.

c Cut the ceiling tile (page 2-17).

c Install the speaker in the ceiling tile (page 2-17).

c Secure the speakers to the structural ceiling (page 2-18).

c Cable the speakers (page 2-18).

c Finish speaker installation (page 2-20).

Stage Four — Install the PMK 450 and the PVS 204SA.

c Pull the cables (page 2-22).

c Install the PMK 450 pole mount kit (page 2-22).

c Install the PVS 204SA switcher (page 2-23).

c Finish installing the pole mount kit (page 2-24).

Stage Five — Configuring the system.

c Configure the system (page 2-26).

c Test the system (page 2-28).

c Final installation (page 2-29).

Where possible in the following pages, line drawings and photos from an actual installation are used to clarify some of the steps discussed in the text. Each image has a number corresponding to the particular step (e.g., Ñ) described.

2-1 PoleVault Systems Installation • Installation Overview

Page 14 of the Extron electronic PVS 400 user manual — UPB 25 Universal Projector Bracket (shown separated into the two sections)
Page 14 · click to enlarge
Page 14

Stage One — Install the Screen and Projector

Stage 1

This stage involves installing the three pieces of hardware shown below.

Extron electronic PVS 400 — Stage One — Install the Screen and Projector diagram (page 14)
Fig. 14 · Stage One — Install the Screen and Projector

1-gang and 2-gang Accessory Mounting Points (e.g. power sockets)

Where it goes: Attaches to structural ceiling, rests on suspended ceiling.

What it does: Holds Pole Mount Kit and projector.

What it does: Holds PMP, Pole Mount Kit (see Stage 4), and projector.

UPB 25 Universal Projector Bracket (shown separated into the two sections)

Where it goes: Adjuster plate screws onto base of PMP, and projector bracket attaches to projector.

What it does: Attaches projector to PMP. Allows projector orientation to be adjusted in three planes.

Page 15 of the Extron electronic PVS 400 user manual — 2d Screw the adjuster plate onto the PMP
Page 15 · click to enlarge
Page 15
1. Mark screen location a. Mark the center line and the outer edges of screen.
Extron electronic PVS 400 — 1. Mark screen location diagram (page 15)
Fig. 15 · 1. Mark screen location
Extron electronic PVS 400 — 1. Mark screen location diagram (page 15)
Fig. 16 · 1. Mark screen location

T When marking the location of screens, devices, or site

for installing transmitters and MediaLink control devices, use painters’ tape to avoid wall surface damage.

1a Mark the screen location

When marking the center line of the screen, where possible, keep it aligned with the center of the ceiling tile. This makes the projector installation and alignment easier.

b. Mark any structural studs, utility pipes, conduits,

or fire-breaks before drilling the hardware holes. Do not drill the holes at this time.

2. Install projector to verify location a. Remove the ceiling tiles, and mark the maximum and
Extron electronic PVS 400 — 1a Mark the screen location diagram (page 15)
Fig. 17 · 1a Mark the screen location

PCM

minimum throw distances on the T-frame.

Minimum/Maximum Throw Distance Marks

b. Place the PCM 240 over the T-frame, between the two

marks. Lightly tighten the frame screws.

2b Place the PCM 240 on the T-bar

c. Back out the set screws on the PCM 240 adapter plate

Extron electronic PVS 400 — 2b Place the PCM 240 on the T-bar diagram (page 15)
Fig. 18 · 2b Place the PCM 240 on the T-bar

and screw the PMP into the pipe adapter, with the cable access hole closest to the ceiling. Turn it so the cable access hole faces away from the screen. Tighten the set screws.

PMP installed onto PCM 240

d. Back out the set screws on the top portion (the adjuster

plate, see a below) of the UPB 25, and screw the plate onto the base of the PMP. Align it so the security flange is at the rear. Tighten the set screw.

2c Install the PMP

a

Loosen the four Adjuster Plate Locking Screws and slide the Adjuster Plate away from the Projector Bracket

b

Adjuster Plate Locking Screws (4)

2d Screw the adjuster plate onto the PMP

Set Screws (2) · Adjuster Plate · Projector Bracket

Page 16 of the Extron electronic PVS 400 user manual — 2f Slide and lock the projector onto the adjuster plate
Page 16 · click to enlarge
Page 16

Installation — Stage One, cont’d

e. Using suitable screws, mount the projector onto the

lower portion of the UPB 25 (the projector bracket, see b in step 2d’s drawing). Align it so the security flange is at the rear. A minimum of three arms need to be attached to the projector Adjust the arms to fit as needed. Lock down the arm adjustment screws.

Extron electronic PVS 400 — Installation — Stage One, cont’d diagram (page 16)
Fig. 19 · Installation — Stage One, cont’d

T Adjust the threaded barrels at the end of each

arm to keep the bracket level.

2e Attach the bracket to the projector

f. Lift the projector up to the mount plate and slide it into

place. Tighten down the locking and pivot screws.

2f Slide and lock the projector onto the adjuster plate

3. Verify the image location a. Connect a power cable to the projector and turn it on.

b. Verify image size and location by loosening the

PCM 240 adapter plate locking nuts, and adjust the plate (left-right) to center the image.

Extron electronic PVS 400 — 2f Slide and lock the projector onto the adjuster plate diagram (page 16)
Fig. 20 · 2f Slide and lock the projector onto the adjuster pl…

T Remember to include the vertical and horizontal offsets

when aligning the projector. Refer to the projector manual for information.

Measure the horizontal offset

c. When satisfied lock down the plate locking nuts.

Projector Center Line · Lens Center Line · T Horizontal offset

Page 17 of the Extron electronic PVS 400 user manual — 5d Screw the PMP into the mounting plate (viewed from below)
Page 17 · click to enlarge
Page 17
4. Cut the ceiling tile a. Mark the location of the PCM 240 on the T-bar, before

removing it. This aids putting it back in the correct location when the tile is replaced.

X"

Extron electronic PVS 400 — X" diagram (page 17)
Fig. 21

T Mark the screen direction on back of the tile (e.g. with

Y"

an arrow or “to front”) to help orientation of tile when replacing it after cutting.

b. Measure the distances X and Y (see figure) from the inner

vertical section of the front and left T-bar runners to the center of the Pipe Adapter Plate.

Minimum and Maximum Throw Distance Marks

4b Take measurements with the PCM 240 on the T-bar

c. Using these dimensions, mark and cut a hole for the

PMP in the ceiling tile.

Extron electronic PVS 400 — 4b Take measurements with the PCM 240 on the T-bar diagram (page 17)
Fig. 22 · 4b Take measurements with the PCM 240 on the T-bar

T Place the tile on a box, mark hole center on the

underside of the tile. Use a hole saw bit to start to cut the hole by hand (turning bit counter clockwise) to avoid damaging the tile. When the drill bit is through the tile, turn the tile over and finish cutting from the top side.

4c Mark and start cutting the hole on the underside. Finish on the top side.

5. Finish Projector Ceiling Mount installation a. Loosen the set screws and unscrew the UPB 25 from the

mounting pole. Do not remove the projector bracket from the projector.

Extron electronic PVS 400 — 4b Take measurements with the PCM 240 on the T-bar diagram (page 17)
Fig. 23 · 4b Take measurements with the PCM 240 on the T-bar

b. Loosen the PCM 240 ‘s set screw and remove the

mounting pole, then remove the PCM 240.

c. Replace the cut ceiling tile, checking the orientation to

align the hole with the PCM 240.

d. Replace the PCM 240 over the ceiling tile and screw

the mounting pole (with the access hole uppermost) up through the hole into the mounting plate. Tighten the set screws.

5d Screw the PMP into the mounting plate (viewed from below)

T-bar

Page 18 of the Extron electronic PVS 400 user manual — 6e Tighten the turnbuckles
Page 18 · click to enlarge
Page 18

Installation — Stage One, cont’d

6. Secure the Projector Ceiling Mount to the ceiling a. Attach the four turnbuckles to the mounting plate, one at
Extron electronic PVS 400 — Installation — Stage One, cont’d diagram (page 18)
Fig. 24 · Installation — Stage One, cont’d

C DO NOT rest or lean on the mounting plate or

suspended ceiling when attaching turnbuckles, tie wire, or when drilling into the ceiling

b. Mark and drill holes at 10 degrees out from vertical.

Drill a fifth hole directly centered above the PCM 240 for the safety cable.

c. Install appropriate anchors or lag eye-bolts for the

structural ceiling into each drilled hole

d. Cut four equal lengths of the supplied hanging wire, and

loop the wire through the anchors or eye screws, and the turnbuckles, then twist the wire around itself at least five times tightly.

6b Mark structural ceiling for lag bolt installation

e. Hand tighten the turnbuckles, and level the plate so it

just rests on the grid.

PCM

Extron electronic PVS 400 — PCM diagram (page 18)
Fig. 25

C The four hanging wires should be taut, taking

the full weight of the completed installation.

Do not overtighten the turnbuckles or the T‑bar assembly could be lifted, making the suspended ceiling bowed and unsafe.

Adjust the turnbuckles to take up any slack in the hanging wire.

f. Tighten the four T-bar securing screws on the PCM 240.

g. Mark a point in the ceiling directly above the plate’s

6e Tighten the turnbuckles

center, drill a hole and install a ceiling anchor or eye screw

C DO NOT rest or lean on the plate or suspended ceiling grid during installation of safety cable, or during installation and wiring of electrical boxes, accessories, and projector.

T-bar

Page 19 of the Extron electronic PVS 400 user manual — 7. Install the Screen a. Following the screen manufacturers guidelines, continue
Page 19 · click to enlarge
Page 19
Extron electronic PVS 400 — 7. Install the Screen diagram (page 19)
Fig. 26 · 7. Install the Screen

h. Pass the safety cable through the anchor and attach it to

the center holes on either side of the plate. Ensure the cable is of equal length on both sides of the anchor and secure the cable using the cable clamps.

Attach safety cable to center holes and secure with cable clamps.

T Install any optional power outlets in the 2 gang opening

on the mounting plate, towards the outside edge of the mount, so it does not interfere with the PMK 450 when installed.

C For safety, all wiring of the electrical boxes and

accessories should be completed after the plate is fully installed and secure.

Install power outlet in the 2-gang cutout (RACO box installed)

7. Install the Screen a. Following the screen manufacturers guidelines, continue

to install the screen mounting brackets and then hang the screen.

Extron electronic PVS 400 — 7. Install the Screen a. Following the screen manufacturers guidelines, continue diagram (page 19)
Fig. 27 · 7. Install the Screen a. Following the screen manufa…

T Use S-hooks to hang the screen from the brackets.

Bend the ends of the S-hooks so the screen does not fall when it is rolled up.

Page 20 of the Extron electronic PVS 400 user manual — Stage Two — Install the Wall Plates and MLC 104 IP
Page 20 · click to enlarge
Page 20

Stage Two — Install the Wall Plates and MLC 104 IP

Stage 2

This stage involves installing the devices shown below.

Extron electronic PVS 400 — Stage Two — Install the Wall Plates and MLC 104 IP diagram (page 20)
Fig. 28 · Stage Two — Install the Wall Plates and MLC 104 IP

PVT CV D and PVT RGB D PoleVault A/V Source Input Wall Plates

Audio and Video output ports (2* - at rear)

* Each RGB wall plate needs 2 output cables, A and B.

Where it goes: Installs in a wall near input location.

What it does: Transmits an input’s composite or RGB video and audio signals to the switcher.

Where it goes: Installs in a wall at a location convenient to user.

What it does: Provides remote control of switcher and projector.

Page 21 of the Extron electronic PVS 400 user manual — Stage Two - Install the Wallplates and MLC 104 IP Plus
Page 21 · click to enlarge
Page 21
Extron electronic PVS 400 — Stage Two - Install the Wallplates and MLC 104 IP Plus diagram (page 21)
Fig. 29 · Stage Two - Install the Wallplates and MLC 104 IP Pl…
  • CAT 5 T568A signal transmission cables (connects PVT’s to PVS 204SA switcher)
  • MLC power and RS-232 control cable (connects the MLC to the MLC/Power control port on the PVS 204SA switcher)
  • IR/RS-232 communications cable control cable (connects the MLC to the projector via RS-232 or to an IR emitter)
  • LAN network cables (not supplied - connects the MLC to LAN)
Page 22 of the Extron electronic PVS 400 user manual — Stage Two — Install the Wallplates and MLC 104 IP Plus
Page 22 · click to enlarge
Page 22

Stage Two — Install the Wallplates and MLC 104 IP Plus

Extron electronic PVS 400 — Stage Two — Install the Wallplates and MLC 104 IP Plus diagram (page 22)
Fig. 30 · Stage Two — Install the Wallplates and MLC 104 IP Pl…

local electrical codes, and UL requirements. Refer to the devices’ user manuals for details.

1. Install mud rings N These devices can be installed using the supplied

mud ring or a wall box. If installing a box, allow enough depth for the plate, and the cables. The box should be at least 2.5" (6.4 cm) deep to accommodate the connectors and cables. If a suitable wall box is already installed, follow step 2 onwards.

a. Mark the holes for the mud rings.

Extron electronic PVS 400 — Stage Two — Install the Wallplates and MLC 104 IP Plus diagram (page 22)
Fig. 31 · Stage Two — Install the Wallplates and MLC 104 IP Pl…

b. Cut out the material from the marked area.

c. Insert the mud ring into the opening. The mud ring’s

rear connectors should fit easily into the opening. Bend over the mud ring doglegs and secure with the screws provided.

Repeat steps a to c for all the transmitters needing to be installed.

d. At the desired location repeat steps a to c for the larger

Page 23 of the Extron electronic PVS 400 user manual — Signal Cable Label color
Page 23 · click to enlarge
Page 23

2. Pull cables The following cables need to be installed:

  • CAT 5 cables for signal transmission from the A/V Wall plates to the PVS 204SA.
Extron electronic PVS 400 — 2. Pull cables The following cables need to be installed: diagram (page 23)
Fig. 32 · 2. Pull cables The following cables need to be insta…

N For PVT RGB D Wall plates, two CAT 5 signal

cables for each input are needed.

Maximum distance from the PVS 204SA to the Wall plates is 100 feet. The optimum distance is between 50 and 75 feet.

The CAT 5 cables supplied are terminated to the TIA 568A standard. Other CAT 5 cables can be used if they are TIA 568A or 568B standards and terminated to the same standard at both ends.

then wrap the clear section around it.

  • CAT 5 cables for MLC network connection
  • PoleVault switcher communication cable from the MediaLink controller

RGB #1A

  • Projector communication cables from the MediaLink controller.

2b Use the supplied labels for clear cable identification during installation.

a. Drill cable pathways through any obstructions

(e.g., wall caps, fire-breaks, or horizontal studs).

Signal Cable Label color

b. Label the CAT 5 signal cables at both ends with the

RGB 1A (Input 1 RGB) Orange

supplied labels. Refer to the PVS 204SA User’s Manual for labeling details.

RGB 1 B (Input 1 RGB) Orange w/black stripe

RGB 2A (Input 2 RGB) Yellow

RGB 2B (Input 2 RGB) Yellow w/black stripe

Video 3 (Input 3 Composite Vid) Green

Video 4 (Input 1 Composite Vid) Red

Extron electronic PVS 400 — Signal Cable Label color diagram (page 23)
Fig. 33 · Signal Cable Label color

c. Pull the cabling through the wall from the ceiling space

down to the location of the transmitters and other wall devices, and out through the openings.

T Secure cables with cable clamps to provide strain relief.

Trim back the outer foil shield to the point where the

cable exits the cable clamp, and insulate exposed cable shields with heat shrink to reduce the chance of short circuits.

Both braided and foil shields should be connected to an

equipment ground at the other end of the cable.

Page 24 of the Extron electronic PVS 400 user manual — Installation — Stage Two, cont’d
Page 24 · click to enlarge
Page 24

Installation — Stage Two, cont’d

3. Install wall plates a. Connect the CAT 5 cables to the rear of the input devices
Extron electronic PVS 400 — Installation — Stage Two, cont’d diagram (page 24)
Fig. 34 · Installation — Stage Two, cont’d

(for RGB devices, cable labeled A to port A, cable B to port B).

3a Connect the cables to the A/V source input devices at each location.

b. Mount each device into the mud ring.

c. Attach the supplied Decora faceplate.

d. Label the Decora plate with the supplied label, using the

appropriate input number. This makes inputs easier to identify when configuring the switcher.

e. Repeat steps a-d for other wall plates.

3b Mount the PVT in the mud ring, then attach 3c and label 3d the Decora faceplate.

Page 25 of the Extron electronic PVS 400 user manual — 4. Install MediaLink Controller
Page 25 · click to enlarge
Page 25

4. Install MediaLink Controller

Extron electronic PVS 400 — 4. Install MediaLink Controller diagram (page 25)
Fig. 35 · 4. Install MediaLink Controller

T Before cabling and installing the MLC 104 IP Plus,

locate and write down the MAC address of the device for configuring the IP address. The 12 character alphanumeric address (e.g., 00-05-A6-03-9G-H4) can be found on a label on the rear of the controller.

Heat Shrink on Outer Jacket to Inner Conductor Transition

T The length of exposed wire is critical to avoid

transmission problems. Ensure the lengths given here are adhered to when stripping the cables for connection.

N If a drain wire is used, both ends of the

wire must be covered by heat shrink to avoid accidental grounding.

a. Connect the MLC power and RS-232 control cable as

shown.

Extron electronic PVS 400 — 4. Install MediaLink Controller diagram (page 25)
Fig. 36 · 4. Install MediaLink Controller

N The MLC 104 IP Plus is powered from the

PVS 204SA. DO NOT connect an external power supply to the MLC 104 IP Plus unless installing an optional secondary control panel.

PVS 204SA Switcher's rear panel RS-232/MLC/IR port A B C D E

A - (Rx on the MLS port) White A - (Tx on the RS-232 port)

B - (Tx on the MLS port) Violet B - (Rx on the RS-232 port)

the drain wire to ground at both ends. Apply heat shrink cover to both ends of the wire to avoid accidental grounding.

Page 26 of the Extron electronic PVS 400 user manual — 4c Connect to the LAN using a CAT 5 cable
Page 26 · click to enlarge
Page 26

Installation — Stage Two, cont’d

Extron electronic PVS 400 — Installation — Stage Two, cont’d diagram (page 26)
Fig. 37 · Installation — Stage Two, cont’d

4b Connect the MLC to the projector with an RS-232 cable or IR emitter cable, as appropriate.

c. Connect a CAT 5, 5e, or 6 straight through cable to the

4c Connect to the LAN using a CAT 5 cable

Page 27 of the Extron electronic PVS 400 user manual — 4e Secure the MLC 104 IP Plus to the mud ring
Page 27 · click to enlarge
Page 27

The connections between the MLC 104 IP Plus and the PVS 204SA switcher should look like this.

Extron electronic PVS 400 — 4. Install MediaLink Controller diagram (page 27)
Fig. 38 · 4. Install MediaLink Controller

Plenum Rated UL 2043 Suitable for Use in Air-Handling Spaces

e. Sliding the cables into the opening, secure the

Extron electronic PVS 400 — 4. Install MediaLink Controller diagram (page 27)
Fig. 39 · 4. Install MediaLink Controller

MLC 104 IP Plus to the mud ring with the provided machine screws

4e Secure the MLC 104 IP Plus to the mud ring

Page 28 of the Extron electronic PVS 400 user manual — Stage Three — Install the PV SI 3C LP Ceiling Speakers
Page 28 · click to enlarge
Page 28

Stage Three — Install the PV SI 3C LP Ceiling Speakers

Stage 3

This stage involves installing the devices shown below.

Extron electronic PVS 400 — Stage Three — Install the PV SI 3C LP Ceiling Speakers diagram (page 28)
Fig. 40 · Stage Three — Install the PV SI 3C LP Ceiling Speake…

Where it goes: Installs in ceiling tiles at predetermined location for best acoustics. Connects to switcher.

What it doesReceives and outputs audio signal from PVS 204SA switcher
  • Speaker cable (connects ceiling speakers to the PVS 204SA switcher)
Page 29 of the Extron electronic PVS 400 user manual — 2c Remove plenum cover
Page 29 · click to enlarge
Page 29
Extron electronic PVS 400 — 1. Cut ceiling tile diagram (page 29)
Fig. 41 · 1. Cut ceiling tile

N The installation must conform to national and

Extron electronic PVS 400 — 1. Cut ceiling tile diagram (page 29)
Fig. 42 · 1. Cut ceiling tile

local electrical codes, and UL requirements. Refer to the device’s user manual for details.

1. Cut ceiling tile If installing PV SI 3C LP speakers, do the following:

a. Remove the ceiling tiles where the speakers are to be

installed.

Extron electronic PVS 400 — 1. Cut ceiling tile diagram (page 29)
Fig. 43 · 1. Cut ceiling tile

T For ease of working on the speaker when it is replaced

on the T-bar, remove an adjacent tile(s).

b. Locate the tile center, and using the supplied template,

trace and cut the hole for the speaker.

Extron electronic PVS 400 — 1. Cut ceiling tile diagram (page 29)
Fig. 44 · 1. Cut ceiling tile

T Place an empty box under the tile for support and to

collect the waste.

Measure and mark the center point of the tile and align

1b Mark the tile and cut the hole

the cross marks with those on the supplied template.

Use a fine hacksaw blade to cut the tile without

damaging the face.

2. Install the speaker in the ceiling tile

Extron electronic PVS 400 — 2. Install the speaker in the ceiling tile diagram (page 29)
Fig. 45 · 2. Install the speaker in the ceiling tile

a. Lay two supplied speaker V-rails across the tile on either

side of the hole.

b. Remove the C-ring from the speakers and attach it to the

center of the V-rails with the supplied hardware.

Extron electronic PVS 400 — 2. Install the speaker in the ceiling tile diagram (page 29)
Fig. 46 · 2. Install the speaker in the ceiling tile

T At the ends of each V-rail, bend the tabs upwards.

This makes it easier when replacing the tile back on the T-bars. When installation is complete, bend the V-tabs down onto the T-bars

2a Place the V-rails on either side of the hole, insert and 2b attach the C-ring

Extron electronic PVS 400 — 2. Install the speaker in the ceiling tile diagram (page 29)
Fig. 47 · 2. Install the speaker in the ceiling tile

Bend Tabs Upwards

Bend the end tabs upwards.

c. Remove the plenum cover from the speaker terminals

Extron electronic PVS 400 — Bend Tabs Upwards diagram (page 29)
Fig. 48 · Bend Tabs Upwards

Loosen the screws and remove the plenum cover.

d. Insert the speaker into the ceiling tile from the face side.

2c Remove plenum cover

Page 30 of the Extron electronic PVS 400 user manual — 3c Attach hanging cable to seismic tab
Page 30 · click to enlarge
Page 30

Installation — Stage Three, cont’d

e. Loosen the four screws on the front baffle (counter

Extron electronic PVS 400 — Installation — Stage Three, cont’d diagram (page 30)
Fig. 49 · Installation — Stage Three, cont’d

clockwise) 1/2 turn (see figure, A) and turn the doglegs to lock onto the C-ring. Tighten down the front screws (see figure, B).

Extron electronic PVS 400 — Installation — Stage Three, cont’d diagram (page 30)
Fig. 50 · Installation — Stage Three, cont’d

T Use a handheld screwdriver, as a powered screwdriver

may slip and damage the speaker.

A B

f. Repeat steps a through e for each speaker that is to be

installed.

2e Turn and lock down the four dog legs on the C‑ring

3. Secure speakers to structural ceiling a. Replace each tile and speaker on the T-bar frame
Extron electronic PVS 400 — 2e Turn and lock down the four dog legs on the C‑ring diagram (page 30)
Fig. 51 · 2e Turn and lock down the four dog legs on the C‑rin…

b. Bend down the V-rail tabs to hold it in place and give

added support.

3b Replace tile and bend V-rail tabs down

c. Drill a hole into the structural ceiling and install a lag eye

Extron electronic PVS 400 — 3b Replace tile and bend V-rail tabs down diagram (page 30)
Fig. 52 · 3b Replace tile and bend V-rail tabs down

bolt at a suitable location over the speaker.

Mark, drill a hole, and insert a lag eyebolt in the structural ceiling.

d. Attach a hanging wire to the speaker seismic tab.

Attach hanging wire to the speaker (seismic tab) and to the eye bolt.

3c Attach hanging cable to seismic tab

4. Cable the speakers a. Cut the included speaker cable (SPK 18) to length and

run the cable from the PVS 204SA to the first speaker in the speaker system being installed.

Extron electronic PVS 400 — 3c Attach hanging cable to seismic tab diagram (page 30)
Fig. 53 · 3c Attach hanging cable to seismic tab

b. If not using conduit, insert a ½" clamp into the terminal

(plenum) cover knockout and pass the cable through the knockout. Clamp the cable or conduit to the cover.

Attach the Conduit or Cable to the Terminal Cover

Page 31 of the Extron electronic PVS 400 user manual — Stereo or Dual Mono output using parallel speaker wiring
Page 31 · click to enlarge
Page 31

c. To terminate the cable, strip the end of the cable 0.2" (5

Extron electronic PVS 400 — 3. Secure speakers to structural ceiling diagram (page 31)
Fig. 54 · 3. Secure speakers to structural ceiling

mm) and secure the wires into the supplied 4-pole captive screw connector.

d. Plug the 4-pole connector into the speaker terminal and

observed when setting up a speaker system See figures below for examples.

Stereo or Dual Mono output using parallel speaker wiring

Two 8 ohm speakers wired in parallel equal a 4 ohm load.

Page 32 of the Extron electronic PVS 400 user manual — Installation — Stage Three, cont’d
Page 32 · click to enlarge
Page 32

Installation — Stage Three, cont’d

5. Finish speaker installation a. Install/replace the speaker grill on the front of the
Extron electronic PVS 400 — Installation — Stage Three, cont’d diagram (page 32)
Fig. 55 · Installation — Stage Three, cont’d

speaker, using the supplied adhesive tabs (putty) to secure it in place.

Apply 4 pieces of black putty (supplied), equally spaced 90° apart, to the upper inside edge of the grille.

5a Apply putty to speaker grill.

b. Repeat cabling and final installation steps for all

speakers, connecting the speakers according to the system preferred (e.g in parallel, see page 2-19)

Page 33 of the Extron electronic PVS 400 user manual — Stage Four — Install the PMK 450 and the PVS 204SA
Page 33 · click to enlarge
Page 33

Stage Four — Install the PMK 450 and the PVS 204SA

Stage 4

This stage covers installing the devices shown below.

Extron electronic PVS 400 — Stage Four — Install the PMK 450 and the PVS 204SA diagram (page 33)
Fig. 56 · Stage Four — Install the PMK 450 and the PVS 204SA

Where it goes: Attaches to PMP around cable access hole, above the projector.

What it does: Supports and hides the installed PVS 204SA switcher, power supply, and any installed optional accessories.

Plenum Rated UL 2043 Suitable for Use in Air-Handling Spaces

Where it goes: PVS 204SA and power supply install on the base plate of the PMK 450.

What it does: Receives input video and audio signals from A/V source input wall plates, outputs and switches the signals to projector and ceiling speakers.

Page 34 of the Extron electronic PVS 400 user manual — Switcher and projector cable overview
Page 34 · click to enlarge
Page 34

Installation — Stage Four, cont’d

Extron electronic PVS 400 — Installation — Stage Four, cont’d diagram (page 34)
Fig. 57 · Installation — Stage Four, cont’d

N The installation must conform to national and local

electrical codes, and UL requirements. Refer to the device’s user manual for details.

1. Pull the cables

a. Loosen the PCM 240 set screws and remove the PMP.

Extron electronic PVS 400 — 1. Pull the cables diagram (page 34)
Fig. 58 · 1. Pull the cables

b. Gather all the cables from the speakers, A/V wall plates,

MLC 104 IP Plus controller, and any optional devices installed that have been run to the projector location, and pull them down through the hole in the ceiling tile. These cables are: the MLC power/RS-232 cable, the CAT 5 input cables from the wall plates, the speaker cables, the MLC to projector IR/Serial comms cable, any optional device cables (e.g. PPC 25 sensor)

c. Gather the cables together below the suspended ceiling

1c Gather the cables, pass them down the PMP and 1d screw it into place.

and pass them down the PMP.

d. Screw the PMP back up into position and tighten the set

screws on the PCM 240.

Extron electronic PVS 400 — 1. Pull the cables diagram (page 34)
Fig. 59 · 1. Pull the cables
2. Install the PMK 450 Pole Mount kit a. Remove the front and rear plates from the PMK 450,

Slide the top cover upwards until it is located just above the cable access hole.

remove the side screws, and slide the top plate forward and away from the base plate lugs.

Extron electronic PVS 400 — 1. Pull the cables diagram (page 34)
Fig. 60 · 1. Pull the cables
Extron electronic PVS 400 — 1. Pull the cables diagram (page 34)
Fig. 61 · 1. Pull the cables

b. Slide the PMK 450’s top plate up the projector pole until

it is located just above the cable access hole.

Extron electronic PVS 400 — 1. Pull the cables diagram (page 34)
Fig. 62 · 1. Pull the cables

PMK 450 Top Plate

c. Level the plate and secure it in place with the four set

screws located on the collar, ensuring that a minimum of three set screws are tightened firmly against the pole. Rotate the pipe if necessary to achieve this.

2b Slide the top plate up onto the pole

d. Pull the CAT 5 cables from the wall plates, the speaker’s

cable, and the MLC control cable through the access hole, ready for connection to the switcher. Leave the MLC to projector serial communications cable to hang out of the bottom of the pipe.

Extron electronic PVS 400 — 2b Slide the top plate up onto the pole diagram (page 34)
Fig. 63 · 2b Slide the top plate up onto the pole

Cables from A/V wall plates, MLC 104 IP Plus, and SI 3CT LP speakers.

1 1 1 2 3 4 4

e. Insert the output video signal cables (VGA and RCA)

Cables to PVS 204SA

into the access hole and pull them down the pipe so one end hangs out the pipe with the MLC to projector communication cable. These cables connect to the projector later.

A/V wall plate cables, RGB (2), Video (1)

MLC 104 IP Plus switcher control cable

4 SI 3CT LP speaker cables

Cables from PVS 204SA

2 MLC 104 IP Plus projector control cable

Switcher and projector cable overview

Show 8 more labels / short text on this page
Front (towards screen) · Cable access hole · PMP Projector pipe · To PVS 204SA · Cables to Projector · VGA cable · To Projector · Video cable
Page 35 of the Extron electronic PVS 400 user manual — 3c Wire the captive screw connector for the power supply
Page 35 · click to enlarge
Page 35
3. Install the PVS 204SA switcher a. Pass two 4-40 x 3/16" screws up through the PMK’s
Extron electronic PVS 400 — 3. Install the PVS 204SA switcher diagram (page 35)
Fig. 64 · 3. Install the PVS 204SA switcher

bottom plate into the holes in the base of the switcher, and secure it in place at the left front of the bottom plate.

N Do not install the rubber feet on the switcher

b. Install the power supply on the right rear of the

PMK 450 bottom plate and secure it using velcro.

3a Install the switcher and power supply onto the base plate of the PMK 450

c. Attach the supplied 2-pole male captive screw connector

to the cord of the supplied power source and connect the power cord to the rear of switcher.

T Insert the extra captive screw connectors into any

ports which are not going to be used at this time. This keeps the connectors handy for any future system modifications.

3c Wire the captive screw connector for the power supply

d. Set the DIP switches on the rear panel of the

PVS 204SA to Dual Mono and high pass filter off. Refer to the PVS 204SA User’s Manual for details.

Extron electronic PVS 400 — 3c Wire the captive screw connector for the power supply diagram (page 35)
Fig. 65 · 3c Wire the captive screw connector for the power su…

Plenum Rated UL 2043 Suitable for Use in Air-Handling Spaces

e. Install any other optional devices, such as the Extron

Priority Page Sensor Kit on the PMK 450, following the installation steps in the devices’ user’s manuals. See the “Optional Accessory Installation — PPC-25” section in this manual for an overview.

Page 36 of the Extron electronic PVS 400 user manual — a CAT 5 cables according to the cable labels
Page 36 · click to enlarge
Page 36

Installation — Stage Four, cont’d

4. Finish installing the Pole Mount kit a. Lift the bottom plate (complete with the PVS 204SA
Extron electronic PVS 400 — Installation — Stage Four, cont’d diagram (page 36)
Fig. 66 · Installation — Stage Four, cont’d

and power supply installed) up to base of the pole and connect the cables as follows:

a CAT 5 cables according to the cable labels

b Control/power cable from the MLC 104 IP Plus

f Power supply cable. Do not apply power yet.

N Do not thread the power cable through the

projector pipe. Threading the power cable through the pipe violates national electrical regulations.

PVT RGB D Input (2 cables, A and B)

Plenum Rated UL 2043 Suitable for Use in Air-Handling Spaces

Page 37 of the Extron electronic PVS 400 user manual — 4. Finish installing the projector mounting kit
Page 37 · click to enlarge
Page 37
Extron electronic PVS 400 — 4. Finish installing the projector mounting kit diagram (page 37)
Fig. 67 · 4. Finish installing the projector mounting kit

b. Align the bottom plate lugs with the slots in the top plate

and slide up and into place.

c. Attach the rear plate to secure the PMK 450. Ensure the

power cable exits via the cable notch in the top plate, or via the gap in front of the filler plate at the bottom.

d. Screw the UPB 25 adjuster plate back onto the base of the

PMP, and replace the projector (with the UPB 25 bracket attached) on the adjuster plate.

e. Connect the switchers VGA and RCA cables to the

projector.

f. Connect the projector control cable from the MLC to the

projector. Refer to the projector’s user manual for RS-232 control port pinout details.

Page 38 of the Extron electronic PVS 400 user manual — 1c Launch the Global Configurator 2 program
Page 38 · click to enlarge
Page 38

Stage Five — Configure the System

Stage Five — Configure the System

Stage 5

Items needed to help complete this stage:

  • Laptop (or PC) with a network connection
  • GC 2 configuration program (download from <a href="http://www.extron.com" rel="nofollow noopener" target="_blank">www.extron.com</a> )
  • MLC 104 IP Plus User’s Manual
  • Projector manufacturer’s user’s manual
  • Device driver and/or driver package (download from <a href="http://www.extron.com" rel="nofollow noopener" target="_blank">www.extron.com</a> )
Extron electronic PVS 400 — Stage Five — Configure the System diagram (page 38)
Fig. 68 · Stage Five — Configure the System
Extron electronic PVS 400 — Stage Five — Configure the System diagram (page 38)
Fig. 69 · Stage Five — Configure the System

1. Configure the system a. Download and install Extron’s Global Configurator

(GC2) configuration program (available at www.extron.com) on the laptop or PC

1a Load Global Configurator 2 software

b. Ensure the laptop (or PC), and the MLC 104 IP Plus are

connected to the LAN.

Extron electronic PVS 400 — 1a Load Global Configurator 2 software diagram (page 38)
Fig. 70 · 1a Load Global Configurator 2 software

N If this is not possible, connect a 2.5 mm TRS

configuration cable (part # 70-355-01) to the laptop (or PC) and to the front panel configuration port of the MLC 104 IP Plus.

Extron electronic PVS 400 — 1a Load Global Configurator 2 software diagram (page 38)
Fig. 71 · 1a Load Global Configurator 2 software
Extron electronic PVS 400 — 1a Load Global Configurator 2 software diagram (page 38)
Fig. 72 · 1a Load Global Configurator 2 software

c. Launch GC2. Click on Help, then Contents (or press F1).

1c Launch the Global Configurator 2 program

Page 39 of the Extron electronic PVS 400 user manual — 1d Select MLC 104 IP Plus/PoleVault System from the drop down box
Page 39 · click to enlarge
Page 39

d. Select the MLC 104 IP Plus/PoleVault system from the

Extron electronic PVS 400 — Stage Five - Configure the System diagram (page 39)
Fig. 73 · Stage Five - Configure the System
Extron electronic PVS 400 — Stage Five - Configure the System diagram (page 39)
Fig. 74 · Stage Five - Configure the System

drop-down box. Follow the instructions on the help page.

1d Select MLC 104 IP Plus/PoleVault System from the drop down box

e. To move to the next page (shown in the yellow box),

Extron electronic PVS 400 — 1d Select MLC 104 IP Plus/PoleVault System from the drop down box diagram (page 39)
Fig. 75 · 1d Select MLC 104 IP Plus/PoleVault System from the…
Extron electronic PVS 400 — 1d Select MLC 104 IP Plus/PoleVault System from the drop down box diagram (page 39)
Fig. 76 · 1d Select MLC 104 IP Plus/PoleVault System from the…

click the NEXT button above the drop-down box. Repeat as needed, following the instructions on the pages to configure the MLC 104 IP Plus, as needed.

1e Click next to navigate through the pages to configure the MLC 104 IP Plus

Page 40 of the Extron electronic PVS 400 user manual — Installation — Stage Five, cont’d
Page 40 · click to enlarge
Page 40

Installation — Stage Five, cont’d

2. Test the system a. Ensure power is supplied to the PVS 204SA switcher,
Extron electronic PVS 400 — Installation — Stage Five, cont’d diagram (page 40)
Fig. 77 · Installation — Stage Five, cont’d

and power on the MLC 104 IP Plus.

2a Turn on the MLC 104 IP Plus controller and the PVS 204Sa switcher

b. Connect all the input devices (e.g., PC, DVD, document

camera, etc.) to the transmitters and power up the input devices. Check that power and signal are present at the transmitters. The LEDs light red when only power is present and light green when power and a signal are present.

c. Power on the projector and with a video source (PC

or DVD playing) check that a good image is shown on screen. Adjust projector settings as follows:

  • Adjust the rotation ( yaw ) by turning the unit on the projector pole. Secure the location by tightening the two set screws on the UPB mount plate to the pole (see below).
  • Loosen all pivot screws and adjust the vertical angle ( pitch ) of the projector. Lock down the four adjustment screws.
  • Adjust the horizontal tilt ( roll ) of the projector. Lock down all the remaining adjustment and pivot screws.
  • Adjust the image settings on the projector (zoom, focus, keystone, brightness, contrast, etc.). Refer to the manufacturer’s user manual.
Extron electronic PVS 400 — Installation — Stage Five, cont’d diagram (page 40)
Fig. 78 · Installation — Stage Five, cont’d

Tighten these 2 set screws (one each side) to lock the UPB onto the pole.

2c Check that an image is present, adjust as needed.

Page 41 of the Extron electronic PVS 400 user manual — REAR
Page 41 · click to enlarge
Page 41

d. Test the controller’s configuration with the following:

Extron electronic PVS 400 — 3. Final installation diagram (page 41)
Fig. 79 · 3. Final installation
  • Check that the MLC is controlling the PVS 204SA switcher and projector, and does output the correct image when switching inputs.
  • Check the projector’s power control (turn it off and on at the MLC controller).
  • Adjust the configuration as necessary.

e. Adjust the audio input sensitivity as follows:

  • Ensure there is an audio source at each transmitter.
  • Set the MLC controller’s volume to maximum.
  • On the PVS 204SA switcher, press and hold the selected input buttons for 3 seconds. The input’s LED will blink.
  • While holding the input button in, rotate the level encoder until the clip LED blinks, then turn the encoder back down until the blinking stops.

AUDIO

MIN/MAX CLIP AUX/MIX LEVEL

This LED flashes when the amplifier output is clipping.

  • Repeat Step e for all inputs.

f. If necessary adjust the amplifier level by rotating

the same encoder used in Step e.

2e Set MLC volume to maximum, and adjust the level on the switcher

g. If necessary set the Aux/Mix level by rotating the

Aux/Mix encoder.

Extron electronic PVS 400 — AUDIO diagram (page 41)
Fig. 80
3. Final installation a. Replace the front plate of the PMK 450. The power

FRONT

cable exits the unit through the power cable access slot at the rear.

Tighten Front and Rear Plate Screws (4) and Side Screws (2)

REAR

Cable from power source

b. Tighten down all six screws on the PMK 450, four on

the front and rear plates, and two on the sides.

3a Replace the front plate and 3b tighten down the screws on the mounting kit

c. Check and tighten the adjuster plate locking screws

on the projector bracket.

Front Plate

Page 42 of the Extron electronic PVS 400 user manual — PoleVault Systems Installation • Optional Accessory Installation 2-30
Page 42 · click to enlarge
Page 42

Optional Accessory Installation — PPC 25

The example below is the installation of the optional accessory Priority Page Controller and Sensor (PPC 25). The Priority Page Controller momentarily silences classroom audio whenever a page is made from a public address (PA) system.

For detailed information, refer to the PPC 25 Installation Instructions, supplied with the device.

Extron electronic PVS 400 — Optional Accessory Installation — PPC 25 diagram (page 42)
Fig. 81 · Optional Accessory Installation — PPC 25

N Follow all local fire and safety code requirements for installation and anchoring.

1. Connect sensor to paging speaker a. Open the top of the Priority Page Sensor.

b. Loop (only) one of the Paging speaker wire leads around

the top (open) part of the Sensor. Either speaker wire will work. Leave the other speaker wire connected directly to the Paging speaker. Polarity need not be observed.

  • For a 25 V or 70V system — wrap 5 to 8 loops .
  • For a 4/8 ohm system — wrap 2 to 4 loops .

c. Close the top of the Priority Page Sensor.

1a Open the sensor and 1b Loop wire around the sensor

2. Connect sensor to the PPC 25 a. Cut an 18" section from the unterminated end of the

supplied blue sensor cable, for use in step 3.

b. Connect the bare wire end of the supplied blue sensor

cable to the 2-pole captive screw connector on the Page Sensor. Polarity need not be observed.

c. Route the connector end of the sensor cable to the PPC 25

Controller and plug it into the Paging Sensor port.

Extron electronic PVS 400 — 1a Open the sensor and 1b Loop wire around the sensor diagram (page 42)
Fig. 82 · 1a Open the sensor and 1b Loop wire around the senso…
3. Connect the PPC 25 to the switcher a . Connect the 18" cable made in step 2a to the Relay Out

port on the PPC 25 Controller and to the mute and ground pins on the PVS 204SA Vol/Mute port. Polarity need not be observed.

b. Use the included power supply cable assembly

(PN 27-576-01LF) to power the PPC 25 from the PVS 204SA power supply. The PPC 25 must be mounted near the PVS 204SA and its power supply.

Plenum Rated UL 2043 Suitable for Use in Air-Handling Spaces

PoleVault Systems Installation • Optional Accessory Installation 2-30

Page 43 of the Extron electronic PVS 400 user manual — 2-31 PoleVault Systems Installation • Reference Information
Page 43 · click to enlarge
Page 43

Installation — Reference Information

Specifications

For detailed specifications and warranty information of the PoleVault System components, refer to the device manuals, or the product pages at www.extron.com

Mounting hardware

PCM 240

Mounting Drop ceiling mount Enclosure type 14 gauge steel/powder coated white Plate dimensions 25.8" L x 8.0" W x 1.2" D (65.5 cm L x 20.3 cm W x 3.0 cm D) Product weight 5.6 lbs (2.5 kg) Listings UL, CUL as an accessory, for use with UL Listed mount and projector Compliances CE, OSHPD anchorage pre-approval Vibration ISTA 1A in carton (International Safe Transit Association)

PMP 6

Material Steel Pipe Color/finishes White or black powder coat Pipe dimensions 6" length, 1.5"-11.5 NPT threads) Product weight 1.0 lbs (0.5 kg) Listings UL, CUL as an accessory, for use with UL Listed mount and projector Compliances CE Vibration ISTA 1A in carton (International Safe Transit Association)

PMK 450

Mounting Mountable to round projector mount pipes with an outer diameter of 1.85" to 1.95"

(4.7 cm to 5.0 cm) using included hardware Maximum load 15 lbs (6.8 kg) Enclosure type (material) Metal Enclosure dimensions 2.32" H x 12.25" W x 11.63" D (5.9 cm H x 31.1 cm W x 29.5 cm D) Product weight 2.4 lbs (1.2 kg) Listings UL, CUL Compliances CE Vibration ISTA 1A in carton (International Safe Transit Association)

UPB 25

Material Steel General dimensions Refer to UPB 25 Manual Product weight 3.7 lbs (1.7 kg) Maximum capacity 25 lbs (11.3 kg) Listing UL, CUL as an accessory, for use with UL Listed mount and projector Compliances CE Vibration ISTA 1A in carton (International Safe Transit Association)

N Specifications are subject to change without notice.

2-31 PoleVault Systems Installation • Reference Information

Page 44 of the Extron electronic PVS 400 user manual — PoleVault Systems Installation • Reference Information 2-32
Page 44 · click to enlarge
Page 44

Installation — Reference Information, cont’d

Devices

PVS 204SA

External power supply 100 VAC to 240 VAC, 50/60 Hz, external, autoswitchable; to 12 VDC, 3 A, regulated Power input requirements 12 VDC, 0.97 A (typical) Temperature/humidity Storage: -40 to +158 °F (-40 to +70 °C) / 10% to 90%, noncondensing

Operating: +32 to +122 °F (0 to +50 °C) / 10% to 90%, noncondensing Enclosure type Metal Enclosure dimensions 1.7" H x 8.7" W x 3.0" D (1U high, half rack wide) (4.3 cm H x 22.1 cm W x 7.6 cm D) Product weight 2.5 lbs (1.1 kg), plus power supply 0.8 lbs (0.4 kg) Vibration ISTA 1A in carton (International Safe Transit Association) Listings UL, CUL, (UL rated for use in plenum airspaces: meets UL 2043 for heat and smoke release,

excluding the power supply; meets UL 60065 for safety) Compliances CE, FCC Class A, VCCI, AS/NZS, ICES MTBF 30,000 hours

MLC 104 IP Plus

Power Supplied by the PVS 204SA twisted pair receiver/switcher Power input requirements 12 VDC, 0.19 A (0.305 A if used with an optional IRCM-DV+) Temperature/humidity Storage: -40 to +158 °F (-40 to +70 °C) / 10% to 90%, noncondensing Operating: +32 to +122 °F (0 to +50 °C) / 10% to 90%, noncondensing Rack mount Wall and furniture mountable Enclosure type Metal Enclosure dimensions MLC 104 IP Plus faceplate 4.5" H x 4.6" W x 0.1" D (11.4 cm H x 11.7 cm W x 0.3 cm D)

MLC 104 IP Plus device 2.7" H x 3.4" W x 1.8" D (6.9 cm H x 8.6 cm W x 4.6 cm D) (Depth excludes knob and buttons. Fits some 2 gang boxes. Allow at least 1.9" [4.8 cm] depth

in the wall or furniture.) Product weight 1.9 lbs (0.9 kg) Vibration ISTA 1A in carton (International Safe Transit Association) Listings UL, CUL Compliances CE, FCC Class A, VCCI, AS/NZS, ICES, Section 508 of the Rehabilitation Act

(29 U.S.C. 794d) MTBF 30,000 hours

PVT CV D and PVT RGB D

Power Supplied by the PVS 204SA twisted pair receiver/switcher Power input requirements 5 VDC, 0.10 A for PVT CV D; 5 VDC, 0.15 A for PVT RGB D Temperature/humidity Storage: -40 to +158 °F (-40 to +70 °C) / 10% to 90%, noncondensing Operating: +32 to +122 °F (0 to +50 °C) / 10% to 90%, noncondensing Mount Wall or furniture mountable with included Decora wall plate. Enclosure type Metal Enclosure dimensions Faceplate 2.6" H x 1.3" W x 0.3" D (6.6 cm H x 3.3 cm W x 0.7 cm D)

(fits the opening in a 1 gang Decora plate) Device 2.6" H x 1.6" W x 0.7" D (6.6 cm H x 4.1 cm W x 1.8 cm D) (Depth excludes connectors, height excludes mounting tabs.)

Product weight 0.2 lbs (0.1 kg) Vibration ISTA 1A in carton (International Safe Transit Association) Listings UL, CUL Compliances CE, FCC Class A, VCCI, AS/NZS, ICES MTBF 30,000 hours

N All nominal levels are at ± 10%

N Specifications are subject to change without notice.

PoleVault Systems Installation • Reference Information 2-32

Page 45 of the Extron electronic PVS 400 user manual — Ceiling mount installation diagram (with item weights) for PoleVault System
Page 45 · click to enlarge
Page 45
Extron electronic PVS 400 — Ceiling mount installation diagram (with item weights) for PoleVault System diagram (page 45)
Fig. 83 · Ceiling mount installation diagram (with item weight…

Extron PCM 240 Projector Drop Ceiling Mount weight 5.5 lbs (2.5 kg)

Extron PMK 450 Low Profile Multi-Product Pole Mount Kit weight 2.5 lbs (1.2 kg)

Extron PVS 204SA PoleVault ™ Switcher weight 2.5 lbs (1.2 kg)

Extron PMP 6 6” Projector Mount Pole weight 1.0 lbs (0.5 kg)

Extron Power Supply weight 0.8 lbs (0.4 kg)

Extron UPB 25 Universal Projector Mounting Bracket weight 3.7 lbs (1.7 kg)

Total weight (without projector)* 16-18 lbs (7.3-8.2 kg)

* Projector weight must not exceed 25 lbs (11.3 kg)

Ceiling mount installation diagram (with item weights) for PoleVault System

2-33 PoleVault Systems Installation • Installation - Reference Information

Page 46 of the Extron electronic PVS 400 user manual — +1.919.863.1794 +1.919.863.1797 FAX
Page 46 · click to enlarge
Page 46
Extron electronic PVS 400 — Outline of installation steps diagram (page 46)
Fig. 84 · Outline of installation steps
Extron electronic PVS 400 — Outline of installation steps diagram (page 46)
Fig. 85 · Outline of installation steps

Outline of installation steps

Stage One — Install the Screen and Projector.

c Mark the screen location (page 2-3).

c Install projector to verify location (page 2-3).

c Verify the image location (page 2-4).

c Cut the ceiling tile (page 2-5).

c Finish projector ceiling mount installation (page 2-5).

c Secure the projector ceiling mount to the ceiling (page 2-6).

c Install the screen (page 2-7).

Stage Two — Install the A/V Source Input wall plates and MLC 104 IP Plus.

c Install the mud rings (page 2-10).

c Pull cables (page 2-11).

c Install the wall plates (page 2-12).

c Install the MediaLink Controller (page 2-13).

Stage Three — Install the PV SI 3C LP Ceiling Speakers.

c Cut the ceiling tile (page 2-17).

c Install the speaker in the ceiling tile (page 2-17).

c Secure the speakers to the structural ceiling (page 2-18).

c Cable the speakers (page 2-18).

c Finish speaker installation (page 2-20).

Stage Four — Install the PMK 450 and the PVS 204SA.

c Pull the cables (page 2-22).

c Install the PMK 450 pole mount kit (page 2-22).

c Install the PVS 204SA switcher (page 2-23).

c Finish installing the pole mount kit (page 2-24).

Stage Five — Configuring the system.

c Configure the system (page 2-26).

c Test the system (page 2-28).

c Final installation (page 2-29).

Extron USA - West Headquarters

Extron USA - East

+800.633.9876 Inside USA / Canada Only

+800.3987.6673 Inside Europe Only

+800.7339.8766 Inside Asia Only

+81.3.3511.7655 +81.3.3511.7656 FAX

+400.883.1568 Inside China Only

+971.4.2991800 +971.4.2991880 FAX

+800.633.9876 Inside USA / Canada Only

+1.919.863.1794 +1.919.863.1797 FAX

+31.33.453.4040 +31.33.453.4050 FAX

+65.6383.4400 +65.6383.4664 FAX

+86.21.3760.1568 +86.21.3760.1566 FAX

+1.714.491.1500 +1.714.491.1517 FAX

© 2008 Extron Electronics. All rights reserved.

Show 5 more labels / short text on this page
Extron EMEA · Extron Asia · Extron Japan · Extron China · Extron Middle East
Sources

References & links

Pages referenced in this manual — manufacturer, support and downloads.

Ask about the Extron electronic PVS 400

Owners and our team usually reply within a day — and your question helps the next person too.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
No questions yet about the Extron electronic PVS 400

Be the first to ask — other owners or our team will answer.

Original document

Extron electronic PVS 400 manual PDF

46 pages·10.4 MB·Switch·PDF
Click any page above to open it here
Page 1 / …
100%
Loading pages…