EN
Epson logo
Official user manual

Epson Projector (P)-1)

48 pages·4.8 MB·Printer·PDF·ENDEFRITNLJA
Epson Projector (P)-1)
Table of Contents 80 sections INSTALLATION INSTRUCTIONS AND · OWNER'S MANUAL · DIRECT VENT WALL FURNACE · STANDARD MODELS: · … ShowHide
INSTALLATION INSTRUCTIONS ANDp.1OWNER'S MANUALp.1DIRECT VENT WALL FURNACEp.1STANDARD MODELS:p.1HWDV080DV(N,P)-1 HWDV181DV(N,P)-1p.1MODELS WITH BLOWER:p.1HWDV080BDV(N,P)-1 HWDV181BDV(N,P)-1p.1GAS-FIREDp.1— Do not store or use gasoline or other flam-p.1— Installation and service must be performedp.1INCLUDED IN THE BOXp.3DIRECT VENT HEATER (INSIDE WALL MOUNTING PLATEp.3ATTACHED ON BACK)p.3INSTALLATION TEMPLATE (TEMPLATE FOR HWDV080p.3ON REVERSE SIDE)p.3HEATER HARDWARE PACKETp.3VENT KIT HARDWARE PACKETp.3VENT SHIELDp.3OUTSIDE WALL MOUNTING PLATEp.3INLET & OUTLET TUBESp.3& VENT CAPp.3TAPE MEASUREp.4SAWp.4DRILLp.4HIGH ALTITUDE SPECIFICATIONSp.5IMPORTANT SAFETY INFORMATIONp.7SAFETY INFORMATION FOR USERS OF LP-GASp.8NO ODOR DETECTED - ODOR FADEp.8SOME POINTS TO REMEMBERp.8INTRODUCTIONp.9REQUIREMENTS FOR MASSACHUSETTSp.10TERMINATION CLEARANCESp.11GAS SUPPLYp.12GAS SUPPLY (continued)p.13CLEARANCESp.13INSTALLATION INSTRUCTIONS OVERVIEWp.14INSTALLATION AND ASSEMBLYp.15INSTALLATION OVERVIEWp.15WALL MOUNTING SCREWSp.15WALL MOUNTING PLATEp.15WALL MOUNTING TABp.15HEATER TO BACK CASING MOUNTING SCREWSp.152 SILICON-BASED SEALANTp.16MOUNTING PLATEp.16CAPp.16FLUE OUTLET TUBEp.16AIR INLET TUBEp.16INSTALLATION OF HOUSEWARMER PRODUCTp.16CLEARANCES TO COMBUSTIBLESp.16INTERIOR PREPARATION AND INSTALLATION OF THE BACK OF THE UNITp.17SEE OTHER SIDE FOR HWDV080p.17INTERIOR INSTALLATION OF THE FRONT OF THE UNITp.20GAS LINEp.20CUTTING THE VENT TUBESp.21LONG SCREWS (4X)p.21SCREWS (3X)p.21MARKERp.22COLLAR OF FLUE OUTLETp.22EXTERIOR INSTALLATION OF THE VENTINGp.233” DIA. VENT CAP COLLARp.24FURNACE CEMENTp.24REASSEMBLY AND RESEALING VENT-AIR INTAKE SYSTEMp.26INSTALLATION OF OPTIONAL BLOWER KIT HW125SCBp.29ROUTE CORDS THROUGH BOTTOM HOLEp.30STRAIN RELIEFp.32BEFORE OPERATING APPLIANCEp.33OPERATING INSTRUCTIONSp.37FOR YOUR SAFETY READ BEFORE LIGHTINGp.37LIGHTING INSTRUCTIONSp.38CONTROL KNOBp.38INDICATORp.38GAS CONTROL KNOBp.38SHOWN IN “OFF”p.38POSITIONp.38TO TURN OFF GAS TO APPLIANCEp.38PILOT FLAME CHARACTERISTICSp.39MAIN BURNERp.39BURNER CHANNELp.39PILOT FLAMEp.39THERMOCOUPLEp.39
Page 1 of the Epson Projector (P)-1) user manual — — Installation and service must be performed
Page 1 · click to enlarge
Page 1

INSTALLATION INSTRUCTIONS AND

OWNER'S MANUAL

DIRECT VENT WALL FURNACE

STANDARD MODELS:

HWDV080DV(N,P)-1 HWDV181DV(N,P)-1

MODELS WITH BLOWER:

HWDV080BDV(N,P)-1 HWDV181BDV(N,P)-1

GAS-FIRED

InstallerLeave this manual with the appliance. Consumer: Retain this manual for future

reference.

This appliance may be installed in an after- market, permanently located, manufactured home (USA only), or mobile home, where not prohibited by state or local codes.

This appliance is only for use with the type of gas indicated on the rating plate. This appliance is not convertible for use with other gases.

— Do not store or use gasoline or other flam-

mable vapors and liquids in the vicinity of this or any other appliance.

  • — WHAT TO DO IF YOU SMELL GAS
  • Do not try to light any appliance.
  • Do not touch any electrical switch; do not use any phone in your building.
  • Immediately call your gas supplier from a neighbor’s phone. Follow the gas supplier’s instructions.
  • If you cannot reach your gas supplier, call the fire department.

DO NOT RETURN THIS PRODUCT TO THE STORE WHERE YOU PURCHASED IT. IF YOU ARE MISSING PARTS, OR HAVE ANY PROBLEMS, CONTACT EMPIRE COMFORT SYSTEMS INC. AT (877) 459-1583.

— Installation and service must be performed

by a qualified installer, service agency or the gas supplier.

Page 2 of the Epson Projector (P)-1) user manual — INSTALLATION INSTRUCTIONS AND
Page 2 · click to enlarge
Page 2
Page 2 of the Epson Projector (P)-1) user manual — INSTALLATION INSTRUCTIONS AND
Page 3 of the Epson Projector (P)-1) user manual — DIRECT VENT HEATER (INSIDE WALL MOUNTING PLATE
Page 3 · click to enlarge
Page 3

INCLUDED IN THE BOX

Epson Projector (P)-1) — INCLUDED IN THE BOX diagram (page 3)
Fig. 1
Epson Projector (P)-1) — INCLUDED IN THE BOX diagram (page 3)
Fig. 2

DIRECT VENT HEATER (INSIDE WALL MOUNTING PLATE

ATTACHED ON BACK)

INSTALLATION TEMPLATE (TEMPLATE FOR HWDV080

ON REVERSE SIDE)

HEATER HARDWARE PACKET

VENT KIT HARDWARE PACKET

VENT SHIELD

OUTSIDE WALL MOUNTING PLATE

INLET & OUTLET TUBES

& VENT CAP

Page 4 of the Epson Projector (P)-1) user manual — SAW
Page 4 · click to enlarge
Page 4
Epson Projector (P)-1) — TAPE MEASURE diagram (page 4)
Fig. 3

#10 X 1 ” SLOTTED HEX HEAD SCREW (6) ½

TAPE MEASURE

Epson Projector (P)-1) — TAPE MEASURE diagram (page 4)
Fig. 4

SAW

DRILL

Page 5 of the Epson Projector (P)-1) user manual — HIGH ALTITUDE SPECIFICATIONS
Page 5 · click to enlarge
Page 5
GAS SPECIFICATIONS MODELFUELMAXIMUM INPUTMINIMUM INPUT HW080Propane/LP -- Natural gas8,000 Btu/hr5,000 Btu/hr HW18118,000 Btu/hr9,000 Btu/hr NAT 9,500 Btu/hr LP MANIFOLD PRESSURENatural gas: 4" water column pressure Propane/LP gas: 10.0" water column pressure Gas Inlet3/8" SUPPLYMINIMUM PRESSUREMAXIMUM PRESSURE Natural Gas5" W.C.P.10.5" W.C.P. LP Gas11" W.C.P.13" W.C.P.
Epson Projector (P)-1) — HIGH ALTITUDE SPECIFICATIONS diagram (page 5)
Fig. 5
SPECIFICATIONS MODELSHWDV080(B)DVHWDV181(B)DV COMBUSTIONATMOSPHERIC BURNER STANDARD HEATING SPACE85 - 250 Sq. Ft.169 - 529 Sq. Ft. EXTERNAL DIMENSIONS INCHESHEIGHT21 11/16"25 3/16" WIDTH18 5/16"22 5/16" DEPTH8 7/8"9 3/8" NET WEIGHT LBS.33.545.5 MAX. GAS CONSUMPTION8,000 Btu/hr.18,000 Btu/hr. SAFETY DEVICESSafety valve (thermocouple)
Epson Projector (P)-1) — HIGH ALTITUDE SPECIFICATIONS diagram (page 5)
Fig. 6

HIGH ALTITUDE SPECIFICATIONS

For altitudes/elevations above 2,000 feet (610 m), input ratings should be reduced at the rate of 4% for each 1,000 feet (305 m) above sea level. Canadian High Altitudes for locations having an elevation above mean sea level between 2,000 feet (609.9 m) and 4,500 feet (1,370 m), use orifices as indicated in the following table:

Model0 - 2,000 feet (0 - 610 m)2,000 - 4,500 feet (610 - 1 370 m) Main Burner Orifice/Gas PressureMain Burner Orifice/Gas Pressure Natural GasLP GasNatural GasLP Gas HW080#55 (4")#66 (10")#1.27 mm (4")#67 (10") HW181#49 (4")#56 (10")#50 (4")#57 (10")
Epson Projector (P)-1) — HIGH ALTITUDE SPECIFICATIONS diagram (page 5)
Fig. 7
Page 6 of the Epson Projector (P)-1) user manual — HIGH ALTITUDE SPECIFICATIONS
Page 6 · click to enlarge
Page 6
Epson Projector (P)-1) — HIGH ALTITUDE SPECIFICATIONS diagram (page 6)
Fig. 8

MAKE SURE THAT APPLIANCE IS SUITABLE FOR THE GAS SUPPLY AVAILABLE:

Page 7 of the Epson Projector (P)-1) user manual — IMPORTANT SAFETY INFORMATION
Page 7 · click to enlarge
Page 7

IMPORTANT SAFETY INFORMATION

Children and adults should be alerted to the haz- ards of high surface temperatures and should stay away to avoid burns or clothing ignition.

More frequent cleaning may be required due to ex- cessive lint from carpeting, bedding material etc. It is imperative that control compartments, burners, and circulating air passageways of the appliance be kept clean.

Any safety screen or guard removed for servicing must be replaced prior to operating the heater.

Do not use this heater if it has been under water. Immediately call a qualified service technician to inspect the heater and to replace any part of the control system and any gas control which has been under water.

Follow State and Local codes for installation.

DO NOT put anything around or on top of the fur- nace that will obstruct the flow of combustion and ventilation air. DO keep the appliance area clear and free from combustible material, gasoline and other flamma- ble vapors and liquids. DO examine venting system periodically and re- place damaged parts. DO make a periodic visual check of pilot and burn- ers. Clean and replace damaged parts. CAUTION: Pilot hole cover must be kept tightly closed during operation.

Young children should be carefully supervised when they are in the same room as the heater.

Installation and repair should be done by a quali- fied service person. Heater should be inspected be- fore use and at least annually by a qualified service person.

Vent cap hot while furnace is in operation.

Page 8 of the Epson Projector (P)-1) user manual — SOME POINTS TO REMEMBER
Page 8 · click to enlarge
Page 8

SAFETY INFORMATION FOR USERS OF LP-GAS

Propane (LP-Gas) is a flammable gas which can cause fires and explosions. In its natural state, propane is odorless and colorless. You may not know all the following safety precautions which can protect both you and your family from an accident. Read them carefully now, then review them point by point

with the members of your household. Someday when there may not be a minute to lose, everyone's safety will depend on knowing exactly what to do. If, after reading the following information, you feel you still need more information, please contact your gas supplier.

LP-GAS WARNING ODOR If a gas leak happens, you should be able to smell the gas because of the odorant put in the LP-Gas.

That's your signal to go into immediate action!

  • Do not operate electric switches, light matches, use your phone. Do not do anything that could ignite the gas.
  • Get everyone out of the building, vehicle, trailer, or area. Do that IMMEDIATELY.
  • Close all gas tank or cylinder supply valves.
  • LP-Gas is heavier than air and may settle in low areas such as basements. When you have reason to suspect a gas leak, keep out of basements and other low areas. Stay out until firefighters declare them to be safe.
  • Use your neighbor's phone and call a trained LP-Gas service person and the fire department. Even though you may not continue to smell gas, do not turn on the gas again. Do not re-enter the building, vehicle, trailer, or area.
  • Finally, let the service man and firefighters check for escaped gas. Have them air out the area before you return. Properly trained LP-Gas service people should repair the leak, then check and relight the gas appliance for you.

NO ODOR DETECTED - ODOR FADE

Some people cannot smell well. Some people cannot smell the odor of the chemical put into the gas. You must find out if you can smell the odorant in propane. Smoking can decrease your ability to smell. Being around an odor for a time can affect your sensitivity or ability to detect that odor. Sometimes other odors in the area mask the gas odor. People may not smell the gas odor or their minds are on something else. Thinking about smelling a gas odor can make it easier to smell.

there is rust inside the storage tank or in iron gas pipes.

The odorant in escaped gas can adsorb or absorb onto or into walls, masonry and other materials and fabrics in a room. That will take some of the odorant out of the gas, reducing its odor intensity.

LP-Gas may stratify in a closed area, and the odor intensity could vary at different levels. Since it is heavier than air, there may be more odor at lower levels. Always be sensitive to the slightest gas odor. If you detect any odor, treat it as a serious leak. Immediately go into action as instructed earlier.

The odorant in LP-gas is colorless, and it can fade under some circumstances. For example, if there is an underground leak, the movement of the gas through soil can filter the odorant. Odorants in LP-Gas also are subject to oxidation. This fading can occur if

SOME POINTS TO REMEMBER

  • Learn to recognize the odor of LP-gas. Your local LP-Gas Dealer can give you a "Scratch and Sniff" pamphlet. Use it to find out what the propane odor smells like. If you suspect that your LP-Gas has a weak or abnormal odor, call your LP-Gas Dealer.

to set too long before refilling. Cylinders and tanks which have been out of service for a time may develop internal rust which will cause odor fade. If such conditions are suspected to exist, a periodic sniff test of the gas is advisable. If you have any question about the gas odor, call your LP-gas dealer. A periodic sniff test of the LP-gas is a good safety measure under any condition.

  • If you are not qualified, do not light pilot lights, perform service, or make adjustments to appliances on the LP-Gas system. If you are qualified, consciously think about the odor of LP-Gas prior to and while lighting pilot lights or performing service or making adjustments.
  • If, at any time, you do not smell the LP-Gas odorant and you think you should, assume you have a leak. Then take the same immediate action recommended above for the occasion when you do detect the odorized LP-Gas.
  • Sometimes a basement or a closed-up house has a musty smell that can cover up the LP-Gas odor. Do not try to light pilot lights, perform service, or make adjustments in an area where the conditions are such that you may not detect the odor if there has been a leak of LP-Gas.
  • If you experience a complete "gas out," (the container is under no vapor pressure), turn the tank valve off immediately. If the container valve is left on, the container may draw in some air through openings such as pilot light orifices. If this occurs, some new internal rusting could occur. If the valve is left open, then treat the container as a new tank. Always be sure your container is under vapor pressure by turning it off at the container before it goes completely empty or having it refilled before it is completely empty.
  • Odor fade, due to oxidation by rust or adsorption on walls of new cylinders and tanks, is possible. Therefore, people should be particularly alert and careful when new tanks or cylinders are placed in service. Odor fade can occur in new tanks, or reinstalled old tanks, if they are filled and allowed
Page 9 of the Epson Projector (P)-1) user manual — INTRODUCTION
Page 9 · click to enlarge
Page 9

INTRODUCTION

Always consult your local Building Department regarding regu- lations, codes or ordinances which apply to the installation of a direct vent wall furnace.

Qualified Installing Agency Installation and replacement of gas piping, gas utilization equip- ment or accessories and repair and servicing of equipment shall be performed by a qualified agency. The term “qualified agency” means any individual, firm, corporation or company which either in person or through a representative is engaged in and is respon- sible for (1) the installation or replacement of gas piping or (2) the connection, installation, repair or servicing of equipment, who is experienced in such work, familiar with all precautions required and has complied with all the requirements of the authority hav- ing jurisdiction.

Instructions to Installer 1. Installer must leave instruction manual with owner after instal- lation. 2. Installer must have owner fill out and mail warranty card sup- plied with furnace. 3. Installer should show owner how to start and operate furnace and thermostat.

State of Massachusetts: The installation must be made by a licensed plumber or gas fitter in the Commonwealth of Mas- sachusetts. The state of Massachusetts requires that a flexible appliance connector cannot exceed three feet in length.

The installation must conform with local codes or, in the absence of local codes, with the National Fuel Gas Code ANSI Z223.1/ NFPA 54* Natural Gas and Propane Installation Code, CSA B149.1. *Available from the American National Standards Institute, Inc., 11 West 42nd St., New York, N.Y. 10036.

General Information This furnace is design certified in accordance with American Na- tional Standard/CSA Standard Z21.86 and CSA 2.32 by Under- writers Laboratory as a direct vent wall furnace to be installed according to these instructions.

The vent terminal of a direct vent appliance, with an input of 10,000 Btu per hour (3 kW) or less shall be located at least 6" (150 mm) from any air opening into a building, and such an ap- pliance with an input over 10,000 Btu per hour (3 kW) but not over 50,000 Btu per hour (14.7 kW) shall be installed with a 9" (229 mm) vent terminal clearance and the bottom of the vent ter- minal and the air intake shall be located at least 12" (305 mm) above grade.

Any alteration of the original design, installed other than as shown in these instructions or use with a type of gas not shown on the rating plate is the responsibility of the person and com- pany making the change.

Installation in Residential Garages Gas utilization equipment in residential garages shall be installed so that all burners and burner ignition devices are located not less than 18" above the floor. Such equipment shall be located, or protected, so it is not subject to physical damage by a moving vehicle.

Page 10 of the Epson Projector (P)-1) user manual — REQUIREMENTS FOR MASSACHUSETTS
Page 10 · click to enlarge
Page 10

REQUIREMENTS FOR MASSACHUSETTS

For all side wall horizontally vented gas fueled equipment installed in every dwelling, building or structure used in whole or in part for residential purposes, including those owned or operated by the Commonwealth and where the side wall exhaust vent termination is less than seven (7) feet above finished grade in the area of the venting, including but not limited to decks and porches, the fol- lowing requirements shall be satisfied:

3. SIGNAGE. A metal or plastic identification plate shall be permanently mounted to the exterior of the building at a minimum height of eight (8) feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment. The sign shall read, in print size no less than one-half (1/2) inch in size, “GAS VENT DIRECTLY BELOW. KEEP CLEAR OF ALL OBSTRUCTIONS”.

1. INSTALLATION OF CARBON MONOXIDE DETECTORS. At the time of installation of the side wall horizontal vented gas fueled equipment, the installing plumber or gasfitter shall observe that a hard wired carbon monoxide detector with an alarm and battery back-up is installed on the floor level where the gas equipment is to be installed. In addition, the installing plumber or gasfitter shall observe that a battery operated or hard wired carbon monoxide detector with an alarm is installed on each additional level of the dwelling, building or structure served by the side wall horizontal vented gas fueled equipment. It shall be the responsibility of the property owner to secure the services of qualified licensed professionals for the installation of hard wired carbon monoxide detectors.

4. INSPECTION. The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation unless, upon inspection, the inspector observes carbon monoxide detectors and signage installed in accordance with the provisions of 248 CMR 5.08(2)(a) 1 through 4.
(b) EXEMPTIONSThe following equipment is exempt from

248 CMR 5.08(2)(a)1 through 4: 1. The equipment listed in Chapter 10 entitled “Equip- ment Not Required To Be Vented” in the most current edition of NFPA 54 as adopted by the Board; and 2. Product Approved side wall horizontally vented gas fueled equipment installed in a room or structure separate from the dwelling, building or structure used in whole or in part for residential purposes.

(a) In the event that the side wall horizontally vented gas

fueled equipment is installed in a crawl space or an attic, the hard wired carbon monoxide detector with alarm and battery back-up may be installed on the next adjacent floor level.

(c) MANUFACTURER REQUIREMENTS - GAS EQUIP-

MENT VENTING SYSTEM PROVIDED. When the manufacturer of Product Approved side wall horizontally vented gas equipment provides a venting system design or venting system components with the equipment, the instructions provided by the manufacturer for installation of the equipment and the venting system shall include: 1. Detailed instructions for the installation of the vent- ing system design or the venting system components; and 2. A complete parts list for the venting system design or venting system.

(b) In the event that the requirements of this subdivision can

not be met at the time of completion of installation, the owner shall have a period of thirty (30) days to comply with the above requirements; provided, however, that dur- ing said thirty (30) day period, a battery operated carbon monoxide detector with an alarm shall be installed.

2. APPROVED CARBON MONOXIDE DETECTORS. Each carbon monoxide detector as required in accordance with the above provisions shall comply with NFPA 720 and be ANSI/UL 2034 listed and IAS certified.

(e) A copy of all installation instructions for all Product Ap-

proved side wall horizontally vented gas fueled equipment, all venting instructions, all parts lists for venting instruc- tions, and/or all venting design instructions shall remain with the appliance or equipment at the completion of the installation.

Page 11 of the Epson Projector (P)-1) user manual — TERMINATION CLEARANCES
Page 11 · click to enlarge
Page 11

TERMINATION CLEARANCES

DescriptionUS Installations1 A Clearance above grade, veranda, porch, deck, or balcony 12 inches (305 mm) B Clearance to window or door that may be open6 inches (152 mm) for appliance ≤ 10,000 Btuh (3 kW), 9 inches (229 mm) for appliances > 10,000 Btuh (3 kW) and ≤ 50,000 Btuh (15 kW), 12 inches (305 mm) for appliances > 50,000 Btuh (15 kW) C Clearance to permanently closed window* D Vertical clearance to ventilated soffit located above terminal within a horizontal distance of 2 feet (610 m from the center line of the terminalthe * m) E Clearance to unventilated soffit* F Clearance to outside corner24" G Clearance to inside corner24" H Clearance to each side of center line extended above ter/regulator assemblyme- * I Clearance to service regulator vent outlet* J Clearance to non-mechanical air supply inlet to build or the combustion air inlet to any other appliance.ing 6 inches (152 mm) for appliance ≤ 10,000 Btuh (3 kW), 9 inches (229 mm) for appliances > 10,000 Btuh (3 kW) and ≤ 50,000 Btuh (15 kW), 12 inches (305 mm) for appliances > 50,000 Btuh (15 kW) K Clearance to a mechanical air supply inlet3 feet (914 mm) above if within 10 feet (3.04 m) horizontally L Clearance above paved sidewalk or paved driveway cated on public propertylo- * M Clearance under veranda, porch, deck, or balcony.*

1 In accordance with current ANSI Z223.1/NFPA 54, National Fuel Gas Code * For clearances not specified in ANSI Z223.1/NFPA 54 or CSA B149.1, one of the following shall be indicated: a) A minimum clearance value determined by testing in accordance with section 2.19.6, or; b) A reference to the following footnote: “Clearance in accordance with local installation codes and the requirements of the gas supplier.”

Page 12 of the Epson Projector (P)-1) user manual — GAS SUPPLY
Page 12 · click to enlarge
Page 12

GAS SUPPLY

Locating Gas Supply The gas line can enter the unit either through the floor or outside wall. The gas line opening should be made at this time. Location of the opening will be determined by the position of floor joists and the valve and union used for servicing.

Installing a New Main Gas Cock Each appliance should have its own manual gas cock.

A manual main gas cock should be located in the vicinity of the unit. Where none exists, or where its size or location is not adequate, contact your local authorized installer for installation or relocation. Compounds used on threaded joints of gas piping shall be resistant to the action of liquefied petroleum gases. The gas lines must be checked for leaks by the installer. This should be done with a soap solution watching for bubbles on all exposed connections, and if unexposed, a pressure test should be made.

Pipe LengthSchedule 40 Pipe Inside DiameterTubing, Type L Outside Diameter Nat.L.P.Nat.L.P. 0-10 feet 0-3 meters 11/2” 2.7 mm3/8” 9.5 mm 11/2” 2.7 mm3/8” 9.5 mm 10-40 feet 4-12 meters 11/2” 2.7 mm1/2” 12.7 mm 15/8” 5.9 mm1/2” 12.7 mm 40-100 feet 13-30 meters 11/2” 2.7 mm1/2” 12.7 mm3/4” 19 mm1/2” 12.7 mm 100-150 feet 31-46 meters 13/4” 9 mm1/2” 12.7 mm 27/8” 2.2 mm3/4” 19 mm
Epson Projector (P)-1) — GAS SUPPLY diagram (page 12)
Fig. 9

Never use an exposed flame to check for leaks. Appliance must be disconnected from piping at inlet of control valve and pipe capped or plugged for pressure test. Never pressure test with appliance connected; control valve will sustain damage!

A gas valve and ground joint union should be installed in the gas line upstream of the gas control to aid in servicing. It is required by the National Fuel Gas Code that a drip line be installed near the gas inlet. This should consist of a vertical length of pipe tee connected into the gas line that is capped on the bottom in which condensation and foreign particles may collect.

Epson Projector (P)-1) — GAS SUPPLY diagram (page 12)
Fig. 10

and Fittings — ANS Z21.45 Assembled Flexible Appliance Connectors of

Other Than All-Metal Construction The above connectors may be used if acceptable by the authority having jurisdiction. The state of Massachusetts requires that a flexible appliance connector cannot exceed three feet in length.

Epson Projector (P)-1) — GAS SUPPLY diagram (page 12)
Fig. 11

Method of Installing a Tee Fitting Sediment Trap

Consult the current National Fuel Gas Code, ANSI Z223.1 CAN/ CGA-B149 (.1 or .2) installation code.

Page 13 of the Epson Projector (P)-1) user manual — CLEARANCES
Page 13 · click to enlarge
Page 13

GAS SUPPLY (continued)

Pressure Testing of the Gas Supply System 1. To check the inlet pressure to the gas valve, a 1/8" (3 mm) N.P.T. plugged tapping, accessible for test gauge connection, must be placed immediately upstream of the gas supply connection to the appliance. 2. The appliance and its individual shutoff valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of 1/2 psig (3.5 kPa). 3. The appliance must be isolated from the gas supply piping system by closing its individual manual shutoff valve during any pressure testing of the gas supply piping system at test pressures equal to or less than 1/2 psig (3.5 kPa).

Checking Manifold Pressure Both Propane and Natural have a pressure regulator attached to the gas valve. Natural gas models will have a manifold pressure of approximately 4.0" w.c. (.996 kPa) at the valve outlet with the inlet pressure to the valve from a minimum of 5.0" w.c. (1.245 kPa) for the purpose of input adjustment to a maximum of 10.5" w.c. (2.61 kPa). Propane gas models will have a manifold pressure approximately 10.0" w.c. (2.49 kPa) at the valve outlet with the inlet pressure to the valve from a minimum of 11.0" w.c. (2.739 kPa) for the purpose of input adjustment to a maximum of 13.0" w.c. (3.237 kPa).

A 1/8" (3 mm) N.P.T. plugged tapping, accessible for test gauge connection, is located on the side of the gas pressure regulator.

CLEARANCES

1. In selecting a location for installation, it is necessary to provide adequate accessibility clearances for servicing and proper installation. 2. Unit is supported by a wall bracket secured to the wall. 3. The minimum clearances from casing to combustible construction is 36" (914.4 mm) on top, 6" (152 mm) on each side and 4" (102 mm) from the floor or from the top surface of carpeting, tile or other floor covering and 0" (0 mm) to rear wall. 4. The minimum distance from the center of the vent cap to the nearest outside corner or obstruction is 24" (610 mm). 5. The minimum wall depth is 4 1/2" (114.3 mm) and the maximum is 12" (304.8 mm). The use of tubes not supplied by the manufacturer results in unsatisfactory performance.

The vent terminal of a direct vent appliance, with an input of 50,000 (14.6 KW) BTU per hour or less shall be located at least 9" (229 mm) from any opening through which flue gases could enter a building. The bottom of the vent terminal and the air intake shall be located at least 12" (305 mm) above grade.

The vent terminal of a direct vent appliance, with an input of 10,000 Btu per hour (3 kW) or less shall be located at least 6" (150 mm) from any air opening into a building, and such an ap- pliance with an input over 10,000 Btu per hour (3 kW) but not over 50,000 Btu per hour (14.7 kW) shall be installed with a 9" (229 mm) vent terminal clearance and the bottom of the vent ter- minal and the air intake shall be located at least 12" (305 mm) above grade.

Page 14 of the Epson Projector (P)-1) user manual — INSTALLATION INSTRUCTIONS OVERVIEW
Page 14 · click to enlarge
Page 14

INSTALLATION INSTRUCTIONS OVERVIEW

Location - All Models

For large homes or spread-out floor plans, two or more furnaces are recommended.

Select a location near the center of the space to be heated. Overflow heat will circulate through doorways into adjacent rooms.

Do not locate furnace where a door could swing over the outer casing, or where circulation could be retarded by furniture or cabinets. See Figure 4.

The furnace is to be located on an outside wall. Locate wall studs so that wall opening will be located between wall studs. One wall stud can be used for attachment of inside wall plate. The wall opening required as shown in Figure 3 is a minimum diameter of 6 1/4" (159 mm). The inside wall plate and the outside wall plate are large enough to permit a wall opening diameter of 8" (203 mm). A template is provided in furnace carton for positioning furnace on the wall. Also, refer to Figure 3 for positioning the furnace on wall and for locating gas line connection.

Do not install in a closet, alcove or small hallway where the furnace could be isolated by closing doors to the heated space. See Figures 5 and 6.

When location is selected, check the walls to make sure there are no obstructions such as pipes, electric wiring, etc., which would interfere with the installation of the furnace or vent pipe.

Epson Projector (P)-1) — INSTALLATION INSTRUCTIONS OVERVIEW diagram (page 14)
Fig. 12

See Page 18, Box 4 for dimensions.

Epson Projector (P)-1) — INSTALLATION INSTRUCTIONS OVERVIEW diagram (page 14)
Fig. 13
Epson Projector (P)-1) — INSTALLATION INSTRUCTIONS OVERVIEW diagram (page 14)
Fig. 14
Epson Projector (P)-1) — INSTALLATION INSTRUCTIONS OVERVIEW diagram (page 14)
Fig. 15

Figure 4 Figure 5 Figure 6

Page 15 of the Epson Projector (P)-1) user manual — HEATER TO BACK CASING MOUNTING SCREWS
Page 15 · click to enlarge
Page 15

INSTALLATION AND ASSEMBLY

A manufactured home (USA only) installation must conform with the Manufactured Home Construction and Safety Standard, Title 24 CFR, Part 3280 or, when such standard is not applicable, the Standard for Manufactured Home Installations, ANSI Z225.1.

Due to high surface temperature, keep children, clothing, and furniture away. Keep burner and control compartments clean.

INSTALLATION OVERVIEW

These wall furnace models are designed for direct venting through a wall. Only venting components approved for these furnaces may be used.

This unit is to be installed on a wall from 4 1/2" to 12" (114.3 mm to 304.8 mm) thick.

WALL MOUNTING SCREWS

WALL MOUNTING PLATE

Mark the venting system hole location (as indicated on page 18) and the six holes through the wall mounting plate. Drill accordingly. Insert the four wall anchors provided and tighten the wall mounting plate firmly. Use special anchor fasteners if the heater is to be installed on a wooden (hollow) wall. Line up the two (2) tabs on the top of the wall mounting plate with the holes in the back of the unit. Slide the back of the unit onto the tabs of the wall mounting plate. Secure the back of the unit into place using two (2) screws. Replace casing door. The heater is now ready to receive the venting system assembly from the opposite side of the wall.

WALL MOUNTING TAB

HEATER TO BACK CASING MOUNTING SCREWS

Page 16 of the Epson Projector (P)-1) user manual — CLEARANCES TO COMBUSTIBLES
Page 16 · click to enlarge
Page 16

INSTALLATION AND ASSEMBLY

2 SILICON-BASED SEALANT

MOUNTING PLATE

CAP

FLUE OUTLET TUBE

Failure to position these parts in accordance with diagram or failure to use only parts specifically approved with these appliances may result in property damage or personal injury.

AIR INLET TUBE

INSTALLATION OF HOUSEWARMER PRODUCT

INSTALLATION AND ANY REPAIRS TO THIS APPLIANCE MUST BE DONE BY A QUALIFIED SERVICE PERSON.

A qualified service person should be called to inspect this appliance annually. Have all of your appliances checked annually.

CLEARANCES TO COMBUSTIBLES

Allow clearances (for all models) to adjacent combustible con- struction.

Page 17 of the Epson Projector (P)-1) user manual — SEE OTHER SIDE FOR HWDV080
Page 17 · click to enlarge
Page 17

INTERIOR PREPARATION AND INSTALLATION OF THE BACK OF THE UNIT

1 Before installing unit, remove wall mounting plate from back of unit.

Locate the wall mounting plate template included in your kit and remove the perforated sections. Use painters tape to secure the wall mounting plate template onto the interior wall where the heater will be located. (Template for HWDV080 will be on the opposite side of the shown template.) MOUNTING TEMPLATE FOR

SEE OTHER SIDE FOR HWDV080

3 Trace the template wall hole and (if applicable) the gas inlet hole onto the wall. Mark the six (6) wall mounting plate screw holes onto the wall. The size of the gas inlet hole will depend upon the size of gas pipe coming into the unit. (See page 17, box 2 and page 18, box 4).

Page 18 of the Epson Projector (P)-1) user manual — INTERIOR PREPARATION AND INSTALLATION OF THE BACK OF THE UNIT
Page 18 · click to enlarge
Page 18
Epson Projector (P)-1) — INTERIOR PREPARATION AND INSTALLATION OF THE BACK OF THE UNIT diagram (page 18)
Fig. 16

INTERIOR PREPARATION AND INSTALLATION OF THE BACK OF THE UNIT

Housewarmer recommends the use of the wall template to properly cut the wall holes and place the heater. If the template is damaged or not included, refer to the table and graphic below for proper alignment of the wall holes and heater.. Be sure the baseboard does not get in the way.

Epson Projector (P)-1) — INTERIOR PREPARATION AND INSTALLATION OF THE BACK OF THE UNIT diagram (page 18)
Fig. 17

Remove the template from the wall after the holes are marked. The hole location markings will be present on the wall.

Page 19 of the Epson Projector (P)-1) user manual — INTERIOR PREPARATION AND INSTALLATION OF THE BACK OF THE UNIT
Page 19 · click to enlarge
Page 19

INTERIOR PREPARATION AND INSTALLATION OF THE BACK OF THE UNIT

Drill a pilot hole inside of the traced circle so that a jigsaw can be used to cut the holes out.

Use a jigsaw to cut the holes out of the wall and discard the inner circle debris. The wall is now prepared for the installation of the unit.

Pivot and remove casing door. Remove two screws from the back inside of the unit and detach the wall mounting plate from outside back of the unit.

Locate the studs in the wall and use at least four (4) wood screws to attach the wall mounting plate to the wall.

If installing onto drywall (not into a stud), anchors must be used.

Pilot Hole

Page 20 of the Epson Projector (P)-1) user manual — GAS LINE
Page 20 · click to enlarge
Page 20

INTERIOR INSTALLATION OF THE FRONT OF THE UNIT

Line up the two (2) tabs on the top of the wall mounting plate with the holes in the back of the unit. Slide the back of the unit onto the tabs of the wall mounting plate.

Secure the back of the unit into place using two (2) screws. Replace casing door.

After the back of the unit is attached to the wall, bring in the gas line as shown on page 18, or follow the installation template indications. Following your city, local and state codes, attach the gas line to the unit.

GAS LINE

Page 21 of the Epson Projector (P)-1) user manual — FLUE OUTLET TUBE
Page 21 · click to enlarge
Page 21

CUTTING THE VENT TUBES

FLUE OUTLET TUBE

AIR INLET TUBE

MOUNTING PLATE

CAP

LONG SCREWS (4X)

SCREWS (3X)

4 1/2” to 12” THICK WALL

This unit is to be installed on wall from 4 1/2" to 12" (114.3 mm to 304.8 mm) thick.

Page 22 of the Epson Projector (P)-1) user manual — MARKER
Page 22 · click to enlarge
Page 22

CUTTING THE VENT TUBES

With the furnace installed on wall the 5" (127 mm) diameter air inlet tube and 3" (76 mm) diameter flue outlet tube are to be marked and cut using the following procedure. After cutting the tubes, each tube should be individually checked for proper length before installing by fitting in place.

Attach 5" (127 mm) diameter air inlet tube onto the collar of air drop assembly. Be sure 5" (127 mm) diameter air inlet tube is placed as far as possible onto the collar of the air drop assembly. Mark the 5" (127 mm) diameter air inlet tube 1 7/16" (36.5 mm) beyond the mounting surface for the outside wall plate. Remove 5" (127 mm) diameter air inlet tube from collar of air drop assembly.

MARKER

FLUE OUTLET TUBE

COLLAR OF FLUE OUTLET

Attach 3" (76 mm) diameter flue outlet tube onto flue outlet collar on combustion chamber. Be sure 3" (76 mm) diameter flue outlet tube is placed as far as possible onto the collar of flue outlet. Mark the 3" (76 mm) diameter flue outlet tube 2 7/8" (73.0 mm) beyond the mounting surface for the outside wall plate. Remove 3" (76 mm) diameter flue outlet tube from collar of flue outlet on combustion chamber.

Mark or wrap tape completely around the tubes at the marked points to help in making a true cut. Do not crimp or enlarge tubes.

Page 23 of the Epson Projector (P)-1) user manual — EXTERIOR INSTALLATION OF THE VENTING
Page 23 · click to enlarge
Page 23

EXTERIOR INSTALLATION OF THE VENTING

Place caulking (not provided) beneath the edge of the outside wall mounting plate. Use additional caulking to correct uneven wall surface, such as clapboard.

Attach 5" (127 mm) diameter air inlet tube onto the collar of air drop assembly. Attach caulked, outside wall mounting plate into the 5" (127 mm) diameter air inlet tube. Flue outlet tube must be tightly sealed against the heater and vent cap for safe and proper operation.

(4) #10 x 2 ½” SCREWS

Position the outside wall mounting plate so that 5" (127 mm) diameter air inlet tube has a slight downward slope to the outside. The downward slope is necessary to prevent the entry of rainwater. Attach outside wall mounting plate to exterior wall with (4) #10 x 2 1/2" (63.5 mm) screws provided.

Page 24 of the Epson Projector (P)-1) user manual — FLUE OUTLET TUBE
Page 24 · click to enlarge
Page 24

EXTERIOR INSTALLATION OF THE VENTING

If installing onto vinyl, aluminum, or any type of siding that may warp or discolor, attach vent shield using two of the screws that attach the outside wall mounting plate.

3” DIA. VENT CAP COLLAR

FURNACE CEMENT

Apply furnace cement (not provided) to 3" (76 mm) diameter flue outlet collar on combustion chamber and to 3" (76 mm) diameter collar on vent cap.

FLUE OUTLET TUBE

COLLAR OF FLUE OUTLET

Attach 3" (76 mm) diameter flue outlet tube onto flue outlet collar on combustion chamber.

Page 25 of the Epson Projector (P)-1) user manual — EXTERIOR INSTALLATION OF THE VENTING
Page 25 · click to enlarge
Page 25

EXTERIOR INSTALLATION OF THE VENTING

(3) #10 x ½” SCREWS

Attach vent cap into the 3" (76 mm) diameter flue outlet tube. Attach vent cap to outside wall mounting plate with (3) #10 x 1/2" (13 mm) screws provided.

Installation of this Housewarmer product is complete.

Page 26 of the Epson Projector (P)-1) user manual — REASSEMBLY AND RESEALING VENT-AIR INTAKE SYSTEM
Page 26 · click to enlarge
Page 26

REASSEMBLY AND RESEALING VENT-AIR INTAKE SYSTEM

When vent-air intake system is removed for servicing the furnace, the following steps will assure proper reassembly and resealing of the vent-air intake assembly.

Epson Projector (P)-1) — REASSEMBLY AND RESEALING VENT-AIR INTAKE SYSTEM diagram (page 26)
Fig. 18

Remove old furnace cement from flue outlet collar on combustion chamber and collar of vent cap. Remove old furnace cement from both ends of 3" (76 mm) diameter flue outlet tube.

Epson Projector (P)-1) — REASSEMBLY AND RESEALING VENT-AIR INTAKE SYSTEM diagram (page 26)
Fig. 19

Remove old caulking beneath the edge of the outside wall mounting plate. Apply new caulking beneath the edge of the outside wall mounting plate. Use additional caulking to correct uneven wall surface, such as clapboard.

Epson Projector (P)-1) — REASSEMBLY AND RESEALING VENT-AIR INTAKE SYSTEM diagram (page 26)
Fig. 20

Attach 5" (127 mm) diameter air inlet tube onto the collar of air drop assembly. Attach caulked, outside wall mounting plate into the 5" (127 mm) diameter air inlet tube. Position the outside wall mounting plate so that 5" (127 mm) diameter air inlet tube has a slight downward slope to the outside. The downward slope is necessary to prevent the entry of rainwater. Attach outside wall mounting plate to exterior wall with (4) #10 x 1" (25 mm) screws provided.

Page 27 of the Epson Projector (P)-1) user manual — FLUE OUTLET TUBE
Page 27 · click to enlarge
Page 27

REASSEMBLY AND RESEALING VENT-AIR INTAKE SYSTEM

If installing onto a vinyl sided exterior wall, attach vinyl siding vent shield using two of the screws that attach the outside wall plate.

3” DIA. VENT CAP COLLAR

FURNACE CEMENT

Apply furnace cement to 3" (76 mm) diameter flue outlet collar on combustion chamber and to 3" (76 mm) diameter collar on vent cap.

FLUE OUTLET TUBE

COLLAR OF FLUE OUTLET

Attach 3" (76 mm) diameter flue outlet tube onto flue outlet collar on combustion chamber.

Page 28 of the Epson Projector (P)-1) user manual — REASSEMBLY AND RESEALING VENT-AIR INTAKE SYSTEM
Page 28 · click to enlarge
Page 28

REASSEMBLY AND RESEALING VENT-AIR INTAKE SYSTEM

(3) #10 x ½” SCREWS

Attach vent cap into the 3" (76 mm) diameter flue outlet tube. Attach vent cap to outside wall mounting plate with (3) #10 x 1/2" (13 mm) screws provided.

Reassembly and resealing vent-air intake system is completed.

Page 29 of the Epson Projector (P)-1) user manual — INSTALLATION OF OPTIONAL BLOWER KIT HW125SCB
Page 29 · click to enlarge
Page 29

INSTALLATION OF OPTIONAL BLOWER KIT HW125SCB

Remove front panel of heater by opening, then lifting one side out then the other.

Disconnect the power cord from the blower assembly.

Remove ground screw from blower mounting bracket.

Page 30 of the Epson Projector (P)-1) user manual — ROUTE CORDS THROUGH BOTTOM HOLE
Page 30 · click to enlarge
Page 30

INSTALLATION OF OPTIONAL BLOWER KIT HW125SCB

Insert blower into bottom of heater and attach with four (4) screws (provided).

Insert power cord through the hole in the bottom of the heater.

ROUTE CORDS THROUGH BOTTOM HOLE

Page 31 of the Epson Projector (P)-1) user manual — INSTALLATION OF OPTIONAL BLOWER KIT HW125SCB
Page 31 · click to enlarge
Page 31

INSTALLATION OF OPTIONAL BLOWER KIT HW125SCB

Reconnect power cord to blower assembly.

Attach ground wires from the blower and power cord to the blower mounting bracket.

Slide fan control into the tabs on the right side of the chamber support.

Page 32 of the Epson Projector (P)-1) user manual — STRAIN RELIEF
Page 32 · click to enlarge
Page 32

INSTALLATION OF OPTIONAL BLOWER KIT HW125SCB

Pull blower cord from bottom to remove any excess wire from inside of the heater and attach strain relief to the cord on the underside of the heater. Insert strain relief into hole in the bottom of the heater.

STRAIN RELIEF

Plug power cord into wall receptacle and reattach front panel of heater to complete installation.

For replacement parts see Parts List on pages 42 and 43 and Parts View on page 44.

Page 33 of the Epson Projector (P)-1) user manual — BEFORE OPERATING APPLIANCE
Page 33 · click to enlarge
Page 33

BEFORE OPERATING APPLIANCE

Under no circumstances should these heaters be modified.

In case of gas leaks, close gas valve and call your Qualified Ser- vice Person.

Air must be purged from pipeline by depressing to pilot setting or by loosening gas inlet connection until you smell gas. Qualified service persons must conduct this procedure only for the first time the heater is operated, in a well ventilated room, with doors and windows open. If loosened, tighten gas inlet connection. Check gas inlet connection with a soapy water solution to assure no leaks are present. Do not regulate primary air burner. They both have been adjusted according to corresponding gas. If burner produces a permanent bright yellow flame when igniting or when ignited, call: (877) 459-1583.

ATTENTION INSTALLER: The appliance must be isolated from the gas supply piping system by closing its equipment shut-off valve during any pressure testing of the gas supply piping system at test pressures equal to or less than 1/2 psi (3.5 kPa). The appliance and its appliance main gas valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of 1/2 psi (3.5 kPa).

DO NOT RECESS INTO WALLS, BOOKCASES, ETC. CHECK THE FOLLOWING BEFORE OPERATING APPLIANCE

Page 34 of the Epson Projector (P)-1) user manual — BEFORE OPERATING APPLIANCE
Page 34 · click to enlarge
Page 34
Epson Projector (P)-1) — BEFORE OPERATING APPLIANCE diagram (page 34)
Fig. 21

Do not use gases other than those indicated on the heater’s rating plate label.

Due to high temperature, the appliances should be located out of traffic and away from furniture and draperies.

Do not place clothing or other flammable material on or near the appliance. Do not dry clothes over heater. Blockage of hot air outlet will cause overheating of appliance, and possible fire.

Do not spray any aerosol near heater when in operation. Do not store these elements near appliance.

Page 35 of the Epson Projector (P)-1) user manual — BEFORE OPERATING APPLIANCE
Page 35 · click to enlarge
Page 35

BEFORE OPERATING APPLIANCE

Epson Projector (P)-1) — BEFORE OPERATING APPLIANCE diagram (page 35)
Fig. 22

Do not touch grill while operating. Avoid burning yourself.

Do not place flammable elements on or near the heater.

Page 36 of the Epson Projector (P)-1) user manual — BEFORE OPERATING APPLIANCE
Page 36 · click to enlarge
Page 36

BEFORE OPERATING APPLIANCE

  • 8 WHAT TO DO IF YOU SMELL GAS
  • Do not try to light any appliance.
  • Do not touch any electrical switch; do not use any phone in your building.
  • Immediately call your gas supplier from a neighbor’s phone. Follow the gas supplier’s instructions.
  • If you cannot reach your gas supplier, call the fire department.
  • If you smell gas, shut off control valve, open doors and windows, and do not use any electrical device. Call our technical department at (877) 459-1583.

Any compound used on the threaded gas piping joint shall be resistant to any action of liquefied petroleum gas.

A shut off valve (or appliance connector valve) must be installed in the gas line upstream to permit servicing.

After completion of gas pipe connections, all joints must be checked for gas-tightness by means of leak detector solution, soapy water or an equivalent solution, as applicable.

Page 37 of the Epson Projector (P)-1) user manual — OPERATING INSTRUCTIONS
Page 37 · click to enlarge
Page 37

OPERATING INSTRUCTIONS

FOR YOUR SAFETY READ BEFORE LIGHTING

A) This appliance has a pilot which must be lighted by hand.

D) Do not use this appliance if it has been under water. Immedi-

When lighting the pilot, follow these instructions exactly.

ately call a qualified service technician to inspect the heater and to replace any part of the control system and any gas control which has been under water.

B) BEFORE LIGHTING, smell all around the appliance area

for gas. Be sure to smell next to the floor because some gas is heavier than air and will settle on the floor.

  • WHAT TO DO IF YOU SMELL GAS:
  • Do not try to light any appliance.
  • Do not touch any electrical switch; do not use any phone in

your building. • Immediately call your gas supplier from a neighbor’s phone.

ONCE THE UNIT IS IN OPERATION, CHECK ALL GAS CONNECTIONS WITH A SOAPY WATER SOLUTION. CHECK THE TEST POINT PRESSURE; IT MUST BE 4" W.C. FOR NATURAL GAS AND 10.0" W.C. FOR LP GAS.

Follow the gas supplier’s instructions. • If you cannot reach your gas supplier, call the fire depart-

ment.

C) Use only your hands to push in or turn the gas control knob.

Never use tools. If the knob will not push in or turn by hand, do not try to repair it; call a qualified service technician. Force or attempted repair may result in a fire or explosion.

Page 38 of the Epson Projector (P)-1) user manual — CONTROL KNOB
Page 38 · click to enlarge
Page 38

LIGHTING INSTRUCTIONS

1. STOP! Read the safety information on pages 36 and 37. 2. Set the thermostat (gas control knob) to lowest setting. 3. Turn off all electric power to the appliance (if applicable). 4. Push in gas control knob slightly and turn clockwise

10. Attention! Gas control has an INTERLOCK latching de- vice. When the pilot is initially lit and the safety magnet is energized (pilot stays "ON") the INTERLOCK latching de- vice becomes operative. If the gas control is turned to the "OFF" position or gas flow to the appliance is shut off, the pilot cannot be relighted until the safety magnet is de-energized (approximately 60 seconds). There will be an audible "click" when the safety magnet in the gas control is de-energized. Pilot can now be relighted, repeat steps 4 through 8. 11. Replace pilot access cover. CAUTION: Access cover must be kept tightly closed during operation. 12. Turn gas control knob counterclockwise

to "OFF." Do not force. 5. Wait ten (10) minutes to clear out any gas. Then smell for gas, including near floor. If you smell gas, STOP! Follow "B" in the safety information on page 37. If you do not smell gas, go to the next step. 6. Remove pilot access cover located on the combustion cham- ber. 7. Find pilot - follow metal tube from gas control. 8. Turn manual gas control knob counterclockwise

to "HIGH." 13. Turn on all electric power to the appliance (if applicable). 14. Set thermostat (gas control knob) to desired setting from "HIGH" to "LOW."

  • to "PILOT." 9. Push in manual gas control knob all the way and hold in. Repeatedly push the piezo ignitor button until pilot is lit ( or use a match to light). Continue to hold the control knob in for about one (1) minute after the pilot is lit. Release knob and it will pop back up. Pilot should remain lit. If it goes out, repeat steps 4 through 8.
  • If knob does not pop up when released, stop and immediately call a qualified service technician or gas supplier.
  • If the pilot will not stay lit after several tries, turn the gas control knob to "OFF" and call a qualified service technician or gas supplier.

CONTROL KNOB

INDICATOR

GAS CONTROL KNOB

SHOWN IN “OFF”

POSITION

TO TURN OFF GAS TO APPLIANCE

1. Set thermostat (gas control knob) to lowest setting. 2. Turn off all electric power to the appliance if service is to be performed (if applicable).
3. Push in gas control knob slightly and turn clockwise

to "OFF." Do not force.

Page 39 of the Epson Projector (P)-1) user manual — BURNER CHANNEL
Page 39 · click to enlarge
Page 39

PILOT FLAME CHARACTERISTICS

MAIN BURNER

The pilot flame is blue and goes toward the main burner and thermocouple horizontally. A slight yellow tip on the flame is normal. The pilot flame must surround and extend approximately 1/4" (6 mm) beyond the thermocouple, and must extend beyond the first row toward the second row of main burner ports.

BURNER CHANNEL

PILOT FLAME

THERMOCOUPLE

MAIN BURNER FLAME CHARACTERISTICS

On the main burner, the burning gas forms a primary flame and a secondary flame. The primary flame is blue and about 3/16" (5 mm) high. The secondary flame is very pale blue, 3" (76 mm) to 5" (127 mm) high. Dust in the combustion air will produce an orange flame. Do not mistake it for an improper yellow flame.

Page 40 of the Epson Projector (P)-1) user manual — OPERATION FREQUENCY FAULTS TO BE
Page 40 · click to enlarge
Page 40

MAINTENANCE INSTRUCTIONS

WARNING:

  • Prior to any maintenance operation, it will be necessary to close the gas supply.
  • Only qualified personnel are allowed to operate these appliances without the front cabinet installed.

OPERATION FREQUENCY FAULTS TO BE

REMARKS

PREVENTED

External cleaning As required Dirty exterior With wet rag or soft cloth. No

qualified persons required General cleaning of appliances As required. It is advisable to perform this operation annually.

Recirculation of suspended particles in surrounding air,

To be performed by qualified

deposits on the appliance

Gas leakage control Only if the equipment has been moved or if any gas circuit ele-

Gas leakage Check with soapy water solution.

To be performed by qualified

personnel Cleaning of pilot burner As required Clogging of same To be performed by qualified

ment has been changed.

personnel In case of doubt, please check with our Customer Service Department

Use soft dry cloth to wipe cabinet. Use compressed air to remove dust from around pilot and main burner.

Use a vacuum cleaner or compressed air to clean cap and air inlet ring.

CLEANING BURNER AND PILOT Cleaning of the burner and pilot may be performed by gently vacuuming loose particles and dust from the burner ports and cleaning the air intake. Clean the pilot burner with compressed air, pipe cleaner or toothbrush. Do not insert any object (pin, drill bit, etc.) through pilot orifice. This will destroy the orifice. Any service which requires disconnecting the gas supply line must be performed by a qualified service person.

personnel

Page 41 of the Epson Projector (P)-1) user manual — HOW TO ORDER REPAIR PARTS
Page 41 · click to enlarge
Page 41

TROUBLESHOOTING

PROBLEM CAUSES SOLUTION

Pilot flame does not light A) Gas supply valve closed B) Air in gas pipes C) Valve does not work properly

A) Open gas supply valve B) Repeat ignition procedure C) Place knob on PILOT position and

When ignition knob is released, pilot extinguishes

A) Air remains in gas pipes B) Dirty pilot C) Thermocouple is defective

A) Repeat ignition procedure B) Clean pilot C) Check with Service Department

Burner burns abnormally A) Gas supply valve is not fully open B) Flame lifts when appliance is cold

A) Open gas supply valve fully B) Keep on MIN. for about 10 minutes

Burner shuts down while in operation A) Gas supply interrupted B) Incorrect piping connection

A) Gas supply re-established B) Connect piping according to installa-

Burner burns with yellow flames A) Incorrect piping connection A) Connect piping according to installa-

Difficulties in heating room A) Incorrect heater size B) Low gas pressure C) Partially plugged injector

A) Contact Service Department for sizing

room B) Check with Service Department C) Check with Service Department

HOW TO ORDER REPAIR PARTS

To order parts, please visit our website at www.housewarmerproducts.com or call 877-459-1583.

All parts listed in the Parts List have a Part Number. When ordering parts, first obtain the Model Number from the name plate on your equipment. Then determine the Part Number (not the Index Number) and the Description of each part from the following appropriate illustration and list. Be sure to give all this information.

Furnace Model Number Part Description

Furnace Serial Number Part Number

Type of Gas (Propane or Natural)

Do not order bolts, screws, washers or nuts. They are standard hardware items and can be purchased at any local hardware store.

Shipments contingent upon strikes, fires and all causes beyond our control.

Empire Comfort Systems, Inc. Nine Eighteen Freeburg Ave. Belleville, IL 62222-0529

depress fully · tion instructions · tion instructions

Page 42 of the Epson Projector (P)-1) user manual — PARTS LIST
Page 42 · click to enlarge
Page 42

PARTS LIST

PLEASE NOTE: When ordering parts, it is very important that part number and description of part coincide.

INDEX NO. PART NO. DESCRIPTION HWDV080 HWDV181 1 24622 24623 WALL MOUNTING PLATE, INSIDE 2 24679 24680 CASING ASSEMBLY (INCLUDES CASING DOOR) 3 24606 24607 CASING ASSEMBLY (INCLUDES MAGNETS) 4 24614 24615 CASING DOOR 5 24577 24578 AIR DROP 6 24639 24640 CASING BACK 7 24584 24585 COMBUSTION CHAMBER 8 M155 M155 GASKET, OBSERVATION HOLE 9 R1055 R1055 ELECTRODE AND WIRE 10 DV781 DV781 OBSERVATION HOLE COVER 11 R1122 R1122 WING NUT 12 TH275 24644 BURNER 13 R2256 R2256 THERMOCOUPLE 14 R2893 R2893 PILOT - NAT 14 R2890 R2890 PILOT - LPG 15 TH335 TH335 PILOT SHIELD 16 M151 M151 GASKET, PILOT 17 TH133 TH134 CHAMBER DOOR WITH GASKET 18 24605 24605 PILOT TUBING - NAT (INCLUDES FERRULES) 18 24647 24647 PILOT TUBING - LPG (INCLUDES FERRULES) 19 R2708 R2708 PIEZO IGNITOR 20 TH289 TH289 PIEZO IGNITOR BRACKET 21 P8655 - ORIFICE NO.55 - NAT 21 P8666 - ORIFICE NO.66 - LPG 21 - P8649 ORIFICE NO.49 - NAT 21 - P8656 ORIFICE NO.56 - LPG 22 P104 P104 ORIFICE FITTING 23 R2423 R2423 CONNECTOR 24 24604 24604 INLET TUBING

USE ONLY MANUFACTURER'S REPLACEMENT PARTS. USE OF ANY OTHER PARTS COULD CAUSE INJURY OR DEATH.

Page 43 of the Epson Projector (P)-1) user manual — INDEX NO. PART NO. DESCRIPTION HWDV080 HWDV181
Page 43 · click to enlarge
Page 43

PARTS LIST

PLEASE NOTE: When ordering parts, it is very important that part number and description of part coincide.

INDEX NO. PART NO. DESCRIPTION HWDV080 HWDV181

25 R2882 R2882 BULB CLIP 26 24681 24681 BLOWER WITH MOUNTING BRACKET 27 R2298 R2298 VALVE MOUNTING SCREWS 28 R9904 R9904 COTTER PIN 29 R2423 R2423 CONNECTOR 30 R9902 R9902 REGULATOR, 4.0 W.C. 3/8 NPT X 3/8 NPT - NAT 30 R2312 R2312 REGULATOR, 10.0 W.C. 3/8 NPT X 3/8 NPT - LPG 31 R8898 R8898 NIPPLE, 3/8 NPT X 1” 32 24599 24601 GAS VALVE - NAT 32 24600 24602 GAS VALVE - LPG 33 24603 24603 VALVE BRACKET 34 R9893 - CONTROL ROD 34 - R9894 CONTROL ROD 35 R9882 R9882 CONTROL KNOB 36 24624 24624 VENT KIT 37 TH109 TH109 FLUE OUTLET TUBE 38 TH107 TH107 AIR INLET TUBE 39 24625 24625 WALL MOUNTING PLATE, OUTSIDE 40 24626 24626 VENT SHIELD 41 TH334 TH334 VENT CAP NOT SHOWN 742158 742158 PILOT ORIFICE .014 - NAT NOT SHOWN 742266 742266 PILOT ORIFICE .009 - LPG NOT SHOWN 24633 24633 HARDWARE PACKAGE - HEATER NOT SHOWN 24630 24630 HARDWARE PACKAGE - VENT KIT NOT SHOWN 24670 24670 HARDWARE PACKAGE - BLOWER NOT SHOWN R7649 R7649 FAN CONTROL SWITCH - BLOWER NOT SHOWN R9923 R9923 FAN CONTROL WIRE - BLOWER NOT SHOWN R2099 R2099 CORD SET - BLOWER

USE ONLY MANUFACTURER'S REPLACEMENT PARTS. USE OF ANY OTHER PARTS COULD CAUSE INJURY OR DEATH.

Page 44 of the Epson Projector (P)-1) user manual — PARTS VIEW
Page 44 · click to enlarge
Page 44

PARTS VIEW

8 9 10 11 12

Page 45 of the Epson Projector (P)-1) user manual — SERVICE NOTES
Page 45 · click to enlarge
Page 45

SERVICE NOTES

Page 46 of the Epson Projector (P)-1) user manual — SERVICE NOTES
Page 46 · click to enlarge
Page 46

SERVICE NOTES

Page 47 of the Epson Projector (P)-1) user manual — SERVICE NOTES
Page 47 · click to enlarge
Page 47

SERVICE NOTES

Page 48 of the Epson Projector (P)-1) user manual — EMPIRE EMPIRE
Page 48 · click to enlarge
Page 48

HOUSEWARMER is a registered trademark of

Empire Comfort Systems Inc. www.housewarmerproducts.com

Manufactured forEmpire Comfort Systems Inc. 918 Freeburg Ave. Belleville, IL 62220 PH:877-459-1583 FAX: 877-459-0514

EMPIRE EMPIRE

Comfort Systems

Sources

References & links

Pages referenced in this manual — manufacturer, support and downloads.

Fix-it

Troubleshooting

Common problems, likely causes, and what to do.

ProblemPossible causeRemedy
Pilot flame does not lightA) Gas supply valve closed B) Air in gas pipes C) Valve does not work properlyA) Open gas supply valve B) Repeat ignition procedure C) Place knob on PILOT position and depress fully p.41
When ignition knob is released, pilot extinguishesA) Air remains in gas pipes B) Dirty pilot C) Thermocouple is defectiveA) Repeat ignition procedure B) Clean pilot C) Check with Service Department p.41
Burner burns abnormallyA) Gas supply valve is not fully open B) Flame lifts when appliance is coldA) Open gas supply valve fully B) Keep on MIN. for about 10 minutes p.41
Burner shuts down while in operationA) Gas supply interrupted B) Incorrect piping connectionA) Gas supply re-established B) Connect piping according to installa- tion instructions p.41
Burner burns with yellow flamesA) Incorrect piping connectionA) Connect piping according to installa- tion instructions p.41
Difficulties in heating roomA) Incorrect heater size B) Low gas pressure C) Partially plugged injectorA) Contact Service Department for sizing room B) Check with Service Department C) Check with Service Department p.41

Ask about the Epson Projector (P)-1)

Owners and our team usually reply within a day — and your question helps the next person too.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
No questions yet about the Epson Projector (P)-1)

Be the first to ask — other owners or our team will answer.

Original document

Epson Projector (P)-1) manual PDF

48 pages·4.8 MB·Printer·PDF
Click any page above to open it here
Page 1 / …
100%
Loading pages…