EN
Emerson logo
Official user manual

Emerson E2 RX

273 pages·10.6 MB·Freezer·PDF·ENDEFRITNLJA
Emerson E2 RX
Table of Contents 758 sections E2 Installation and Operation Manual for RX Refrigeration, BX HVAC, and CX Convenience Store Controllers · Table of Contents · 1 Introduction · 1.1 The E2 Refrigeration Controller · … ShowHide
E2 Installation and Operation Manual for RX Refrigeration, BX HVAC, and CX Convenience Store Controllersp.1Table of Contentsp.51 Introductionp.171.1 The E2 Refrigeration Controllerp.171.2 The E2 Building Controllerp.181.3 The E2 Convenience Store Controllerp.191.4 Networking Overviewp.201.4.1 E2 I/O Networkp.201.4.2 The E2 Echelon Lonworks Networkp.211.4.3 Interconnection With Other E2sp.221.5 Documentation Overviewp.221.6 On-Line Help System Overviewp.231.7 Software Licensingp.242 Hardware Overviewp.252.1 E2 Hardwarep.252.1.1 E2 Main Processor Board (CPU)p.262.1.2 E2 Processor Interface Board (PIB)p.262.1.3 E2 Keypadp.262.1.4 LEDsp.262.1.5 PC-104 Peripherals: The Internal Modem (Previous Generation Processor Board)p.272.2 I/O Network Boards and Peripheralsp.272.2.1 The Gateway Boardp.272.2.2 MultiFlex Boardsp.282.2.2.1 MultiFlex 16 Input Boardp.282.2.2.2 MultiFlex Combination Input/ Output Boardsp.292.2.2.3 MultiFlex CUBp.312.2.2.4 MultiFlex RTU (BX and CX Only)p.312.2.2.5 MultiFlex Rooftop Control Board (RCB) (BX and CX Only)p.312.2.2.6 MultiFlex PAK Boardp.312.2.3 The MultiFlex ESR Boardp.322.2.4 Hand-held Terminal (P/N 814-3110)p.322.2.5 The 8RO and 8ROSMT Relay Boardsp.332.2.6 4AO Analog Output Boardp.342.2.7 8DO Digital Output Board and PMAC II Anti-Sweat Controllerp.342.3 Echelon Network Boards and Peripheralsp.352.3.1 The 16AIe (Discontinued)p.352.3.2 The 8ROe (Discontinued)p.352.3.3 EC-2sp.352.3.4 CC-100 Case Controllers and CS-100 Case Circuit Controllersp.362.3.5 The ESR8 (Discontinued)p.362.3.6 TD3 Temperature Displayp.372.3.7 Facility Status Display (FSD)p.373 Mountingp.393.1 Mounting the E2p.393.1.1 Standard Mountp.393.1.2 Recessed Mountp.393.1.3 Retrofit Mountingp.403.1.4 Blank Facep.413.2 Mounting I/O Boardsp.413.2.1 Single/Double Enclosuresp.413.2.2 Boards Without Enclosures (Snap Track)p.423.3 Echelon Devicesp.423.3.1 16AIe and 8ROep.423.3.2 CC-100 Case Controller and CS-100 Case Circuit Controllerp.433.3.3 ESR8 (Discontinued)p.433.3.4 MultiFlex ESRp.433.3.5 TD3p.433.4 Modem/Communication Expansion Card Mounting (New Processor Board)p.433.4.1 Mounting PC-104 Cards in E2 (Previous Generation Processor Board)p.443.4.1.1 The Internal Modemp.443.4.2 Two-Channel and FourChannel Repeatersp.443.4.2.1 Mounting Repeaters Overviewp.443.4.2.2 Mounting the Two-Channel Repeaterp.443.4.2.3 Mounting the Four-Channel Repeaterp.453.5 Sensors and Transducersp.453.5.1 Pressure Transducersp.453.5.1.1 Mountingp.453.5.2 Inside Temperature Sensorp.453.5.2.1 Locationp.453.5.2.2 Mountingp.463.5.3 Outside Temperature Sensorp.463.5.3.1 Locationp.463.5.3.2 Mountingp.463.5.4 Insertion Temperature Probep.463.5.4.1 Locationp.463.5.4.2 Mountingp.463.5.5 Supply and Return Air Sensorsp.463.5.6 Refrigeration System Temperature Probes and Sensorsp.473.5.6.1 Locationp.473.5.6.2 Mounting Bullet and Pipe Mount Sensorsp.473.5.7 Product Temperature Probesp.473.5.8 Humidity Sensors and Humidistatsp.473.5.8.1 Indoor RH Sensorp.473.5.8.2 Outdoor RH Sensorsp.48The outdoor RH sensor (P/N 203-5761)p.483.5.8.3 Duct-mounted Insertion RH Probep.483.5.9 Dewpoint Probep.493.5.9.1 Locationp.493.5.9.2 Mountingp.493.5.10 Light Level Sensorp.493.5.10.1 Locationp.493.5.10.2 Mountingp.493.5.11 Liquid Level Sensorsp.493.5.12 Refrigerant Leak Detectorsp.494 E2 Hardware Setupp.514.1 Setting up the E2p.514.1.1 Enclosurep.514.1.2 Main Processor Boardp.514.1.3 Main Processor Board (Previous Version)p.524.1.4 Power Interface Boardp.524.2 Powering the E2p.524.2.1 RS485 Portsp.524.2.2 RS485 Jumpersp.524.2.3 Echelon Network Connectp.524.2.4 Echelon Jumpersp.524.3 Add-On E2 Peripheralsp.534.3.1 Echelon Card Plug-In (P/N 537-4860) with mounting screw (P/N 101-4201)p.534.3.2 Modem/Communication Expansion Card (New Processor Board)p.544.3.3 Plug-In Modem Card (P/N 537-4870) with mounting screws (P/N 101-4038) and standoffs (P/N 107-9440) (Previous Generation Processor Board)p.544.3.4 Plug-In Digital I/O Network Card (P/N 537-4880)p.544.3.4.1 LEDsp.554.3.5 E2 RS485 Port Card (P/N 537-4890)p.554.3.5.1 LEDsp.554.3.6 Plug-In Four-Channel Internal Repeaterp.554.4 Battery Testing and Replacementp.554.4.1 Low Battery Notificationp.564.4.2 The Battery Enable Switchp.564.4.3 Battery Testp.564.4.4 Battery Replacement - Qualified Technicians Onlyp.565 Serial Configurationp.595.1 Overviewp.595.2 COM Portsp.59Pre-Setsp.595.3 Serial Device and Software Setupp.596 The RS485 Network and Hardware Setupp.616.1 The I/O Networkp.616.1.1 I/O Board Names and Terminologyp.616.1.2 MultiFlex-Plus (+) Boardp.626.1.2.1 Board Designationp.626.1.2.2 Board Calculationsp.626.1.3 Wiring Typesp.626.1.4 The I/O Network Structure (Daisy Chains)p.626.1.5 Network Noise Minimizationp.626.1.6 Network ID Numbers (Board Numbers)p.63Numbering the MultiFlex Combination I/O Boardsp.63Addressing the MultiFlex Boardsp.63Addressing the MultiFlex ESR Boardsp.636.1.7 Setting the Baud Ratep.63Baud Rate for the E2p.63Baud Rate for the Gatewayp.63Baud Rate for the 8IO, 8DO, and ARTCp.63Baud Rate for MultiFlex Boardsp.64Baud Rate for the MultiFlex ESRp.64Recommended Baud Ratep.646.1.8 Setting the Terminating and Biasing Jumpersp.646.1.9 Powering the I/O Boardsp.646.1.9.1 Wiring Typesp.656.1.10 Board Installationp.656.2 IMC/Prodigy Rooftop Unit Controllersp.656.3 ECT MODBUSp.666.3.1 Control Techniques Drive (VSD)p.666.3.2 Copeland Discus with CoreSense Diagnostics (ISD)p.666.3.3 XR35CX, XR75CX, and XEV22 Case Controllersp.666.3.3.1 XR75CX-Case Displayp.666.3.4 iPro DACp.676.3.5 Energy Meterp.676.3.5.1 Overviewp.676.3.5.2 Supported System Typesp.676.3.6 Modular Refrigerant Leak Detection Sensor (MRLDS)p.676.3.7 Copeland Discus with CoreSense Protectionp.686.3.8 Light Commercial Thermostatp.686.3.8.1 Thermostat Inputsp.686.3.8.2 Advisory and Alarmsp.686.3.9 Refrigerant Leak Detection System (RLDS)p.716.3.9.1 Diagnostic Alarmsp.716.3.10 Copeland Scroll — K5 Refrigeration Compressorp.716.3.11 XM Series of Case Controllersp.726.3.11.1 XM670p.726.3.11.2 XM679p.726.3.11.3 XM678p.727 E2 Ethernet Peer Communicationsp.837.1 Ethernet IP Configurationsp.837.2 Hardware Specificationsp.837.2.1 Componentsp.837.3 Software Specificationsp.847.4 Ethernet Network Layoutsp.847.4.1 Closed Network Layoutp.847.4.2 Open Network Layoutp.857.5 Software Setupp.857.6 Troubleshootingp.868 Echelon Network and Hardware Setupp.878.1 Overviewp.878.2 Wiring Typep.878.3 Echelon Network Structuring (Daisy-Chains)p.878.3.1 Maximum Number of Echelon Devicesp.888.4 Device Terminationp.888.4.1 Using a Termination Block (P/N 535-2715) to Terminate a Daisy Chainp.898.5 Wire Restrictionsp.89Maximum Total Segment Lengthp.898.6 Installing Echelon Devicesp.898.6.1 Powering Echelon Devicesp.898.7 LEDsp.908.8 Open Echelon Device Connectivityp.908.8.1 Configuring Echelon Devicesp.908.8.1.1 Troubleshootingp.919 Input and Output Setupp.959.1 The 16AI, 8IO, and MultiFlex Inputsp.959.1.1 Connecting Sensors to Input Boardsp.959.1.1.1 Wiringp.95MultiFlex Boardsp.9516AI Boardsp.958IO and ARTC Boardsp.959.1.1.2 Sensor Wiring Typesp.95All Analog Temperature Sensors and Air Flow Sensorsp.95All Pressure Transducers, Humidity Sensors, and Refrigeration Transducersp.95Dewpoint and Light Level Sensorsp.959.1.1.3 Input Type Dip Switchesp.959.1.2 Power Connectionp.969.1.3 Input Setup in E2p.1009.1.3.1 Configuring a Point from the Input Definitions/Status Screenp.1009.1.3.2 Using the Input Definitions/Status Screenp.1011. Board Type (read-only)p.1012. Brd (read-only)p.1013. Pt (read-only)p.1014. Type (read-only)p.1015. Applicationp.1016. Associationp.1017. Value (read-only)p.1019.1.3.3 Setting Up Analog Inputsp.1019.1.3.4 Setting Up Digital Inputsp.1039.2 The 8RO, 8ROe, 8IO, and MultiFlex Outputsp.1049.2.1 Wiring Form C Contactsp.1049.2.2 MultiFlex Relay Outputsp.1049.2.3 Setting the Fail-Safe Dip Switchp.1049.2.4 Wiring Outputs to Pointsp.105Old 8ROsp.105New 8ROs and 8RO-FCsp.1059.2.5 The Output LEDp.1059.2.6 Output Setup in E2p.1059.2.6.1 Configuring a Point from the Output Definitions/Status Screenp.1059.2.6.2 Using the Output Definitions/Status Screenp.1051. Board Type (read-only)p.1062. Brd (read-only)p.1063. Pt (read-only)p.1064. Type (read-only)p.1065. Applicationp.1066. Associationp.1067. Value (read-only)p.1069.2.6.3 Setting Up Digital Outputsp.1069.2.6.4 Setting Up Analog Outputsp.1079.3 CC-100 Case Controllersp.1089.3.1 Inputsp.108Temperature and Digital Sensorsp.108Connectionp.108Auxiliary Analog Inputp.109Hand-Held Terminal Jackp.1099.3.2 Power Module Wiringp.1099.3.3 Valve Cablep.109P/N 335-3263 (Pulse Valve)p.110P/N 335-3261 (Sporlan SEI and Emerson Flow Controls ESR Stepper Valve)p.110P/N 335-3260 (Generic Stepper and Emerson Flow Controls ESV Valve)p.1109.4 ESR8 Valve Output Wiringp.11010 Quick Startp.11310.1 Logging Onp.11310.2 Cleaning Out the Controllerp.113Performing a Clean Outp.11310.3 Setting Number of Network Devicesp.114Boards on the I/O Networkp.114Unit Controllers (Echelon)p.11410.4 Setting Number of Applicationsp.11510.5 The Main Status (Home) Screenp.11510.5.1 Customizing the Home Screenp.11510.6 Common Screen Elementsp.11610.6.1 The Headerp.11610.6.1.1 Header Iconsp.11610.6.2 The Function Keysp.11610.6.3 The Help Linep.11610.7 Screen Typesp.11710.7.1 The Main Menup.11710.7.2 Status Screensp.11710.7.3 The Actions Menup.11810.7.4 The Setup Screensp.11910.7.5 System Configuration Menup.11910.7.6 The System Information Menup.12010.8 Time/Date Setupp.12110.8.1 Setting the Time and Datep.121Active Datep.121Active Timep.121Time Zonep.121Time Serverp.121Primary Time Serverp.122Secondary Time Serverp.122Date Formatp.122Daylight Savings Datesp.122Daylight Savings Time uses GMTp.122Unit Location Fromp.122Sundownp.12210.9 Set Up Modemp.12210.10 Set Up TCP/IPp.12310.11 Set Up Network Baud Ratesp.12410.11.1 COM1 Serial (RS232) Baud Ratep.12410.11.2 I/O Network Baud Ratep.12410.12 Set Up User Accessp.12510.12.1 Changing Required User Access Levelsp.12610.12.2 Creating a New User Accountp.12610.12.3 Deleting a Userp.12610.13 Set Up I/O Networkp.12710.13.1 Specify Number of Boardsp.127Boards on the I/O Networkp.12710.13.2 Checking Online Statusp.12810.14 Set Up Echelon Networkp.12810.14.1 Specifying Number of Devicesp.128Unit Controllers (Echelon)p.12810.14.2 Commissioning a Devicep.129How Echelon Commissioning Worksp.129MODBUS Commissioningp.12910.14.2.1 The Service Button Methodp.129The CC-100’s Service Buttonp.130The TD3’s Service Buttonp.130The ESR8’s Service Buttonp.130Commissioning the EC-2p.13010.14.2.2 The Manual ID Entry Methodp.13110.15 License Managementp.13110.15.1 Web Servicesp.13210.16 Set Up Alarmingp.13310.16.1 Specifying Alarm Reporting Typesp.13410.16.1.1 The Display Linep.13410.16.1.2 The Alarm Outputp.13410.16.1.3 Dial-Outp.13410.16.1.4 The Echelon Network (The Alarm Annunciator)p.13410.16.2 Setting up an E2 to be an Alarm Annunciatorp.13410.16.3 Alarm Dial-Outp.13510.16.4 Introduction: Alarm Reportingp.1351. The E2 Display Headerp.1352. The Advisory Outputp.1353. Dial-Outp.1354. The LonWorks Network (The Alarm Annunciator)p.13510.17 Set Up Global Datap.13610.17.1 Priority Settingsp.136Example: Setting Up an Outdoor Temperature Sensorp.13710.18 Set Up Applicationsp.13710.18.1 Add/Delete an Applicationp.13810.18.2 Using and Configuring a Setup Screenp.13810.18.2.1 The Edit Menup.13910.18.2.2 Entering Setpointsp.13910.18.2.3 Navigating the Setup Screenp.139Index Tabsp.140The Help Linep.140The Function Keys For Setupp.14010.18.3 Using the Help Key to get Property Helpp.14111 Software Overviewp.14311.1 Suction Groupsp.14311.1.1 Introductionp.14311.1.2 The (Standard) Suction Group Applicationp.14311.1.2.1 Overview of PID Control Strategyp.14311.1.2.2 Variable-Speed Compressorsp.14311.1.2.3 Floating Setpoint Controlp.14311.1.3 The Enhanced Suction Group Applicationp.14311.1.3.1 Learning Modep.14411.1.3.2 Circuit Load Analysisp.14411.1.3.3 The Control/Cycles Parameterp.14411.1.3.4 Variable-Speed, Digital Scroll, and Digital Discus Compressor Supportp.14411.1.3.5 Floating Suction Controlp.14411.1.4 Hardware Overviewp.14411.2 Condenser Controlp.14511.2.1 Air Cooled Condensersp.14511.2.1.1 Air Cooled Strategyp.14511.2.1.2 Temperature Differential Strategyp.14511.2.2 Evaporative Condensersp.14611.2.3 Fan Controlp.14611.2.4 Condenser Split Modep.14611.2.5 Fast Recoveryp.14611.2.6 Hardware Overviewp.14611.3 Standard Circuitsp.14711.3.1 Refrigeration Controlp.14711.3.1.1 Temperature Monitorp.14811.3.1.2 Temperature Controlp.14811.3.1.3 Line Up(ESR)/Defrostp.14811.3.1.4 Line Up(MFESR)/Defrostp.14811.3.2 Defrost Controlp.14811.3.2.1 Defrost Statesp.14811.3.2.2 Defrost Typesp.148Timed and Reverse Airp.148Hot Gas and Reversed Cycle Hot Gasp.148Electric Defrostp.14811.3.2.3 Defrost Terminationp.149Pulsed Defrostp.14911.3.2.4 Emergency Defrostp.14911.3.2.5 Hot Gas Defrost with ESR8 and MultiFlex ESRp.14911.3.3 Clean and Door Switchesp.14911.3.3.1 Clean Switchesp.14911.3.3.2 Door Switchesp.14911.3.4 Fan Controlp.15011.3.5 The TD3 Temperature Displayp.15011.3.6 The Control Link CD Case Displayp.15011.3.7 Wiringp.15011.4 Case Control Circuitsp.15211.4.1 Overviewp.15211.4.2 Case Circuit Control Software Overviewp.15211.4.2.1 Valve Controlp.153Pulse Valvesp.153Stepper Valvesp.15311.4.3 Refrigeration Controlp.15311.4.3.1 EEVs (Liquid Pulse and Liquid Stepper)p.153Temperature Controlp.153Superheat Controlp.153Recovery Modep.153Thermostatic Expansion Valves (TXVs)p.15411.4.3.2 EEPRs (Suction Stepper)p.154Recovery Modep.15411.4.4 Defrost Controlp.15411.4.4.1 Defrost Statesp.15411.4.4.2 Defrost Typesp.154Off Cycle (Timed)p.154Hot Gas and Reversed Cycle Hot Gasp.154Electric Defrostp.15511.4.4.3 Defrost Terminationp.155Temperature Terminationp.155Pulsed Defrostp.15511.4.4.4 Demand Defrostp.155Demand Fail-Safe Timep.15511.4.4.5 Emergency Defrostp.15511.4.4.6 The WAIT Statep.15511.4.5 Anti-Sweat Controlp.15511.4.5.1 Dewpoint Input Sourcesp.15611.4.6 Dual Temp Controlp.15611.4.7 Fan Controlp.15611.4.8 Light Controlp.15611.4.9 Clean/Wash Modep.156End of Mode Warningp.15711.4.10 Walk-In Freezer Controlp.15711.4.11 Fail-Safe Modep.157Actions Taken During Fail-Safe Modep.15711.4.11.1 Recoverable Sensor Failuresp.157Coil In or Coil Out Failurep.157Discharge/Return Airp.15711.4.12 Wiringp.15811.4.13 Setting Up An Individual Case Controllerp.15811.4.14 Associating Case Controllers with Case Circuit Control Applicationsp.15811.5 Logging Groupsp.15811.5.1 Possible Data Errorsp.15911.5.2 Data Compressionp.15911.5.2.1 Clippingp.15911.5.2.2 Incompressible Data Typesp.15911.5.3 Base Log Groupp.15911.5.4 Setting Up Loggingp.16011.5.5 Logging Group Status Screenp.16111.5.6 Log Reportsp.16111.5.6.1 Logging Group Reportp.16211.5.6.2 Application Log Reportp.16211.5.6.3 System Log Reportp.16211.6 Air Handling Units (AHU)p.16311.6.1 Overviewp.16311.6.2 Temperature Controlp.16311.6.3 Alternate Setpointsp.16311.6.4 Fan Controlp.16311.6.4.1 Single-Speed Fansp.16311.6.4.2 Two-Speed Fansp.164Continuous Two-Speed Fan Operation When All Stages Are OFFp.16411.6.4.3 Variable-Speed Fansp.164Variable-Speed Fan Operationp.164Dehumidification with VS Fansp.16411.6.5 Economizer Controlp.16411.6.5.1 Economization Enablep.16411.6.5.2 Economization Lockout Featuresp.165Max Outside Air Humidityp.165Minimum Supply Tempp.16511.6.6 Digital Economizer Controlp.16511.6.7 Analog Economizer Controlp.16511.6.8 Dehumidification Controlp.16511.6.9 Curtailmentp.16511.6.10 Optimum Start/Stop (OSS)p.165Intelligent Pre-Starts and Pre-Stopsp.16611.6.11 Separate Setpointsp.16611.6.12 AHU Zone Controlp.16611.6.13 Hardware Overviewp.16611.7 Zone Controlp.16711.7.1 Overviewp.16711.7.2 How Zones Workp.16811.7.3 Applications That May Be Connected To Zonesp.16811.7.3.1 MultiFlex RTU Boardp.16811.7.3.2 MultiFlex RCB Boardp.16811.7.3.3 AHUsp.16811.7.4 Temperature Controlp.16911.7.5 Zone Temperaturep.16911.7.6 Economizer Controlp.16911.7.7 Economization Enablep.16911.7.8 The Effect of Enabling Economizationp.17011.7.9 Dehumidification Controlp.17011.7.10 The Zone Humidity Inputp.17011.7.11 The Effect of Enabling Dehumidificationp.17011.7.11.1 MultiFlex RTUs and RCBsp.17011.7.11.2 AHUsp.17011.7.12 Optimum Start/Stop (OSS)p.170Intelligent Pre-Starts and Pre-Stopsp.17111.7.13 Losing Contact With Zone Applicationsp.17111.7.14 Stand-Alone MultiFlex RTUsp.17111.7.15 MultiFlex RTU/ARTC and AHU Zone Associationp.17111.8 MultiFlex CUB Boardp.17211.9 MultiFlex PAK Boardp.17211.10 Lighting Schedulesp.17211.10.1 Overviewp.17211.10.2 Functions of the Lighting Schedule Applicationp.17311.10.3 Control Method Selectp.17311.10.4 Standard Controlp.17311.10.4.1 The Light Level Interface Cell (LLEV INTERFACE)p.173Logical Combination Strategiesp.173Occupied/Unoccupied and Alternate Settingsp.17411.10.4.2 The Schedule Interface Cell (SCHEDIF)p.174Logical Combinationsp.174Alternate Schedule Interface Combinationsp.17411.10.5 Alternate Controlp.17411.10.5.1 Multi-Logic Combinerp.17411.10.5.2 Offset Solar Controlp.17511.10.6 The Basic Schedule Cellp.17511.10.6.1 Slave Schedulingp.17511.10.7 The Min ON/OFF Cellp.17511.10.8 The Proof Cellp.17511.10.9 Output Light Dimmingp.17611.11 Demand Controlp.17611.11.1 Introduction to Demand Limit Controlp.17611.11.2 Demand Monitoringp.17611.11.3 Load Sheddingp.17711.11.3.1 Definitionp.17711.11.4 Shedding Levelsp.17711.11.5 Priority Levelsp.1771. First Shedp.1772. Rotational Shedp.1783. Last Shedp.178Other Notes About Priority Levelsp.17811.11.6 How Demand Control Uses Load Sheddingp.179Mode 1: KW Input Is Greater Than Setpointp.179Mode 2: KW Input Has Been Greater Than Setpoint for 1/4 Demand Window And Is Still Going Upp.179Mode 3: Integral Error Approaching Zerop.17911.11.6.1 Power Monitoring Inputp.180Settingsp.18011.12 Sensor Controlp.18011.12.1 Overviewp.18011.12.2 Analog Sensor Controlp.18011.12.3 Cut In/Cut Out Setpoint Controlp.18011.12.4 Digital Sensor Controlp.18011.12.5 Logical Combinationp.18111.13 Loop/Sequence Controlp.18111.13.1 Layout of the Loop/ Sequence Control Applicationp.18111.13.1.1 Control Cellsp.18111.13.1.2 Output Cellsp.18211.13.1.3 Diagramp.18211.13.2 Loop/Sequence Control Cell Descriptionsp.18211.13.2.1 The Select Cellp.18211.13.2.2 The Setpoint Float Cellp.18311.13.2.3 The PID Control Cellp.183Bypassing PIDp.18311.13.2.4 The Filter Cellp.18311.13.2.5 The Override Cellp.18311.13.3 Output Cell Descriptionsp.18311.13.3.1 The Sequencer Cellp.18311.13.3.2 The PWM Cellp.18311.14 Time Scheduling and Holidaysp.18411.14.1 How Schedules Workp.18411.14.1.1 Eventsp.18411.14.1.2 Absolute and Relative Eventsp.18411.14.1.3 Temporary Schedule Eventsp.18411.14.1.4 Overlappingp.18511.14.1.5 Rangesp.18511.14.2 Holiday Schedulesp.18511.15 Power Monitoringp.18511.15.1 Overviewp.185Explanation of “Demand”p.185How Power Monitoring Calculates Demandp.185Shed Modep.18511.15.2 Loggingp.186Hourlyp.186Dailyp.186Monthlyp.186Definition of Heat and Cool Degree Daysp.18611.15.2.1 Power Monitoring Inputp.186Settingsp.18611.16 Anti-Sweat Setupp.18711.16.1 How Anti-Sweat Worksp.18711.17 Heat/Cool Controlp.18711.17.1 Temperature Controlp.18711.17.2 Unoccupied Hysteresisp.18711.17.3 Optimum Start/Stop (OSS)p.188Intelligent Pre-Starts and Pre-Stopsp.18811.17.4 Setpoint Resetp.18811.17.5 Lead/Lagp.18911.18 Analog and Digital Combinersp.18911.19 TD Controlp.19011.19.1 Overviewp.19011.19.2 Temperature Differential (TD) Strategyp.19011.19.3 TD Control Fail-Safesp.190Drop Leg Temperature Above Maximum Drop Leg Setpointp.19011.19.4 Configurationp.19011.19.5 Setpointsp.19011.19.6 Inputsp.19111.19.7 Alarmsp.19111.20 Pulse Accumulationp.19111.20.1 Overviewp.19111.20.2 Configurationp.19111.20.3 Outputsp.19111.20.4 Accumulator Reset Typesp.19211.20.5 Loggingp.19211.20.6 High Tripp.19211.21 Irrigation Controlp.19211.21.1 Overviewp.19211.21.2 Zones and Cyclesp.19211.21.2.1 Cycle Control Typesp.19311.21.2.2 Timedp.19311.21.2.3 Volumep.19311.21.3 Cycle Schedulingp.19311.21.4 Zone Inhibitp.19311.21.4.1 Timedp.19311.21.4.2 Volumep.19311.21.4.3 Rain Delayp.19311.21.4.4 Freeze Lockoutp.19311.21.4.5 Alarmp.19311.21.5 Zone Bypass Inputsp.19311.21.5.1 Bypass Failsafep.19411.21.6 Flow Sensor-Related Testsp.19411.21.6.1 Leak Testp.19411.21.6.2 Obstructed Zone Testp.19411.21.7 Service Modesp.19411.21.8 Heat Cut In/Cut Out Setpoints For Each Stagep.19411.21.9 Cool Cut In/Cut Out Setpoints For Each Stagep.19411.21.10 Dehumidification Controlp.19411.21.11 Two Speed Fan Controlp.19411.21.12 Configurationp.19511.22 Flexible Combinerp.19511.23 Modular Chiller Control (MCC)p.19511.23.1 Overviewp.19511.23.2 Learning Modep.19611.23.3 The Control/Cycles Parameterp.19611.23.4 Compressor Controlp.19611.23.4.1 Digital Scroll Compressorp.19711.23.4.2 Variable Frequency Drive Compressorp.19711.23.4.3 Unequal Capacity Compressorsp.19711.23.5 Bypass Valve Controlp.19711.24 Boilerp.19711.24.1 Overviewp.19711.24.2 Alarmsp.19711.25 Refrigerant Monitoring System (RMS)p.19811.25.1 RMS Assetp.19811.25.2 RMS Scalep.19811.25.2.1 Device Constraintsp.19811.26 Detailed Setpoint Change Loggingp.19811.26.1 Log Informationp.19811.26.2 Logged Changesp.19911.26.3 Unlogged Changesp.19912 Operator’s Guide to Using the E2p.20112.1 The E2 Home Screenp.20112.1.1 RX Home Screenp.201Suction Groups Sectionp.201Circuit Status Sectionp.201Condenser Sectionp.201Sensor Controlp.20112.1.2 BX Home Screenp.201OAT Sectionp.201Demand Control Sectionp.201Power Monitoring Sectionp.202Light Schedules Sectionp.202Air Handling Units Sectionp.202Zones Sectionp.202Sensor Control Sectionp.20212.1.3 CX Home Screenp.202Lighting Control Sectionp.202HVAC Control Sectionp.202Refrigeration Control Sectionp.202Demand Control Sectionp.202Anti-Sweat Control Sectionp.202Sensor Control Sectionp.202Time Schedules Sectionp.20212.2 Logging On and Access Levelsp.20212.3 Toggling Full Optionsp.20312.4 Navigationp.20312.4.1 Menusp.203Main Menup.203The System Configuration Menup.203The System Information Menup.204Actions Menup.20412.4.2 Screen Typesp.205Summary Screensp.205Status Screensp.205Setup Screensp.20512.4.3 The E2 Keypadp.206The Cursorp.206The Tab Keyp.207The Enter Keyp.207Keypadp.207The Log In/Out Keyp.208Four Directional Arrow Keysp.208Page Up/Page Down Keysp.208Ctrl Page Up/Ctrl Page Down Keysp.208Numeric Keypadp.208Hot Keysp.20812.5 Customizing the Home Screenp.20912.6 Manual Defrost and Clean Modep.20912.7 Overridesp.21012.8 Checking Boards Onlinep.21112.9 Checking Status Screensp.211Suction Group Status Screenp.211Condenser Status Screenp.211Circuit Status Screenp.211Sensor Status Screenp.211AHU Status Screenp.212Zones Status Screenp.212Lighting Status Screenp.212Sensors Status Screenp.212Other Status Screensp.21212.10 Alarmsp.21212.10.1 Accessing the Alarm Advisory Logp.21212.10.2 Viewing the Controller Advisory Logp.21212.10.3 Date and Timep.21212.10.4 Statep.21212.10.5 Ack/Reset Statep.21312.10.6 Area Ctrl: Application: Propertyp.21312.10.7 Advisory Messagep.21312.10.8 Acknowledging, Resetting, and Clearing Log Entriesp.21312.10.8.1 Acknowledgingp.21312.10.8.2 Resettingp.21412.10.8.3 Clearingp.214Property or Board/Pointp.214Advisory Messagep.214Acknowledge Statusp.214Report Priorityp.214Return To Normalp.21412.10.9 Facility Status Display (FSD) Alarmsp.21512.11 Viewing Logs and Graphsp.21512.11.1 Locating Logged Inputs/ Outputsp.21512.11.1.1 Home/Status Screensp.21512.11.1.2 Setup Screensp.21612.11.1.3 Setting Up Input and Output Pointersp.21612.11.2 Log Viewp.21712.11.3 The Graph Viewp.21712.11.4 Zooming In and Outp.21712.12 Low Battery Notificationp.21812.13 Naming Conventions for E2 Controllers, Applications, and Pointsp.218Appendix A: Case Type Defaultsp.219High Alarm, Low Alarm, and Delayp.219Defrost Typep.219Appendix B: Pressure/Voltage and Temperature/Resistance Charts for Eclipse Transducers & Retail Solutions Temp Sensorsp.221Appendix C: Alarm Advisory Messagesp.223Appendix D: PID Controlp.237Introduction to PID Controlp.237Proportional (“P”) Modep.237Throttling Rangep.237Proportional Constant (Kp)p.238Integral Modep.238Why “I” Mode is Necessaryp.238Proportional Offsetp.238Saturationp.239The “I” Mode Calculationp.239Derivative Modep.239The “D” Mode Calculationp.240How Condenser Control and HVAC PID Differs From The Othersp.240Output at Setpointp.240Output at Setpoint for Non-Condenser/ HVAC PIDp.240Output at Setpoint for Condenser/HVAC PID Controlp.241Changing the Output at Setpointp.241Other PID Featuresp.241Output at Minimum / Output at Maximump.241Minimum Accumulated Errorp.242Applicationp.242Filteringp.242Applicationp.242Appendix E: Compressed Point Log Sample Limits and Precision Tabp.245Appendix F: Troubleshootingp.249Appendix G: Revision Logp.259Indexp.261
Page 1 of the Emerson E2 RX user manual — E2 Installation and Operation Manual for RX Refrigeration,
Page 1 · click to enlarge
Page 1

026-1610 Rev 13 14-SEP-2011

Emerson E2 RX — 026-1610 Rev 13 14-SEP-2011 diagram (page 1)
Fig. 1 · 026-1610 Rev 13 14-SEP-2011

E2 Installation and Operation Manual for RX Refrigeration,

BX HVAC, and CX Convenience Store Controllers

Emerson E2 RX — E2 Installation and Operation Manual for RX Refrigeration, diagram (page 1)
Fig. 2 · E2 Installation and Operation Manual for RX Refriger…
Emerson E2 RX — E2 Installation and Operation Manual for RX Refrigeration, diagram (page 1)
Fig. 3 · E2 Installation and Operation Manual for RX Refriger…
Page 2 of the Emerson E2 RX user manual — E2 Installation and Operation Manual for RX Refrigeration, BX HVAC, and CX Convenience Store Controllers
Page 2 · click to enlarge
Page 2
Page 2 of the Emerson E2 RX user manual — E2 Installation and Operation Manual for RX Refrigeration, BX HVAC, and CX Convenience Store Controllers
Page 3 of the Emerson E2 RX user manual — CE COMPLIANCE NOTICE
Page 3 · click to enlarge
Page 3

Retail Solutions 3240 Town Point Drive NW, Suite 100 Kennesaw, GA 30144, USA

FCC COMPLIANCE NOTICE

This device complies with Part 15 of the FCC Rules. Operation is subject to the fol- lowing two conditions: (1) this device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation.

CE COMPLIANCE NOTICE

Class A Product Information for Einstein, E2 Controllers:

The Retail Solutions Einstein and E2 controllers are Class A products. In a domestic environment this product may cause radio interference in which case the user may be required to take adequate measures. This covers:

  • All Einstein family product types: RX - Refrigeration Controller (830-xxxx), BX - Building/HVAC Controller (831-xxxx), and all version models: (300, 400, 500).
  • All E2 family product types: RX - Refrigeration Controller (834-xxxx), BX - Building/HVAC Controller (835-xxxx), CXConvenience Store Controller (836-xxxx), and all version models: (300, 400, 500).

Phone 770-425-2724 · Fax 770-425-9319

Page 4 of the Emerson E2 RX user manual — E2 Installation and Operation Manual for RX Refrigeration, BX HVAC, and CX Convenience Store Controllers
Page 4 · click to enlarge
Page 4
Page 4 of the Emerson E2 RX user manual — E2 Installation and Operation Manual for RX Refrigeration, BX HVAC, and CX Convenience Store Controllers
Page 5 of the Emerson E2 RX user manual — Table of Contents
Page 5 · Contents
Contents

Contents

E2 Installation and Operation Manual for RX Refrigeration, BX HVAC, and CX Convenience Store Controllersp.1Table of Contentsp.51 Introductionp.171.1 The E2 Refrigeration Controllerp.171.2 The E2 Building Controllerp.181.3 The E2 Convenience Store Controllerp.191.4 Networking Overviewp.201.4.1 E2 I/O Networkp.201.4.2 The E2 Echelon Lonworks Networkp.211.4.3 Interconnection With Other E2sp.221.5 Documentation Overviewp.221.6 On-Line Help System Overviewp.231.7 Software Licensingp.242 Hardware Overviewp.252.1 E2 Hardwarep.252.1.1 E2 Main Processor Board (CPU)p.262.1.2 E2 Processor Interface Board (PIB)p.262.1.3 E2 Keypadp.262.1.4 LEDsp.262.1.5 PC-104 Peripherals: The Internal Modem (Previous Generation Processor Board)p.272.2 I/O Network Boards and Peripheralsp.272.2.1 The Gateway Boardp.272.2.2 MultiFlex Boardsp.282.2.2.1 MultiFlex 16 Input Boardp.282.2.2.2 MultiFlex Combination Input/ Output Boardsp.292.2.2.3 MultiFlex CUBp.312.2.2.4 MultiFlex RTU (BX and CX Only)p.312.2.2.5 MultiFlex Rooftop Control Board (RCB) (BX and CX Only)p.312.2.2.6 MultiFlex PAK Boardp.312.2.3 The MultiFlex ESR Boardp.322.2.4 Hand-held Terminal (P/N 814-3110)p.322.2.5 The 8RO and 8ROSMT Relay Boardsp.332.2.6 4AO Analog Output Boardp.342.2.7 8DO Digital Output Board and PMAC II Anti-Sweat Controllerp.342.3 Echelon Network Boards and Peripheralsp.352.3.1 The 16AIe (Discontinued)p.352.3.2 The 8ROe (Discontinued)p.352.3.3 EC-2sp.352.3.4 CC-100 Case Controllers and CS-100 Case Circuit Controllersp.362.3.5 The ESR8 (Discontinued)p.362.3.6 TD3 Temperature Displayp.372.3.7 Facility Status Display (FSD)p.373 Mountingp.393.1 Mounting the E2p.393.1.1 Standard Mountp.393.1.2 Recessed Mountp.393.1.3 Retrofit Mountingp.403.1.4 Blank Facep.413.2 Mounting I/O Boardsp.413.2.1 Single/Double Enclosuresp.413.2.2 Boards Without Enclosures (Snap Track)p.423.3 Echelon Devicesp.423.3.1 16AIe and 8ROep.423.3.2 CC-100 Case Controller and CS-100 Case Circuit Controllerp.433.3.3 ESR8 (Discontinued)p.433.3.4 MultiFlex ESRp.433.3.5 TD3p.433.4 Modem/Communication Expansion Card Mounting (New Processor Board)p.433.4.1 Mounting PC-104 Cards in E2 (Previous Generation Processor Board)p.443.4.1.1 The Internal Modemp.443.4.2 Two-Channel and FourChannel Repeatersp.443.4.2.1 Mounting Repeaters Overviewp.443.4.2.2 Mounting the Two-Channel Repeaterp.443.4.2.3 Mounting the Four-Channel Repeaterp.453.5 Sensors and Transducersp.453.5.1 Pressure Transducersp.453.5.1.1 Mountingp.453.5.2 Inside Temperature Sensorp.453.5.2.1 Locationp.453.5.2.2 Mountingp.463.5.3 Outside Temperature Sensorp.463.5.3.1 Locationp.463.5.3.2 Mountingp.463.5.4 Insertion Temperature Probep.463.5.4.1 Locationp.463.5.4.2 Mountingp.463.5.5 Supply and Return Air Sensorsp.463.5.6 Refrigeration System Temperature Probes and Sensorsp.473.5.6.1 Locationp.473.5.6.2 Mounting Bullet and Pipe Mount Sensorsp.473.5.7 Product Temperature Probesp.473.5.8 Humidity Sensors and Humidistatsp.473.5.8.1 Indoor RH Sensorp.473.5.8.2 Outdoor RH Sensorsp.48The outdoor RH sensor (P/N 203-5761)p.483.5.8.3 Duct-mounted Insertion RH Probep.483.5.9 Dewpoint Probep.493.5.9.1 Locationp.493.5.9.2 Mountingp.493.5.10 Light Level Sensorp.493.5.10.1 Locationp.493.5.10.2 Mountingp.493.5.11 Liquid Level Sensorsp.493.5.12 Refrigerant Leak Detectorsp.494 E2 Hardware Setupp.514.1 Setting up the E2p.514.1.1 Enclosurep.514.1.2 Main Processor Boardp.514.1.3 Main Processor Board (Previous Version)p.524.1.4 Power Interface Boardp.524.2 Powering the E2p.524.2.1 RS485 Portsp.524.2.2 RS485 Jumpersp.524.2.3 Echelon Network Connectp.524.2.4 Echelon Jumpersp.524.3 Add-On E2 Peripheralsp.534.3.1 Echelon Card Plug-In (P/N 537-4860) with mounting screw (P/N 101-4201)p.534.3.2 Modem/Communication Expansion Card (New Processor Board)p.544.3.3 Plug-In Modem Card (P/N 537-4870) with mounting screws (P/N 101-4038) and standoffs (P/N 107-9440) (Previous Generation Processor Board)p.544.3.4 Plug-In Digital I/O Network Card (P/N 537-4880)p.544.3.4.1 LEDsp.554.3.5 E2 RS485 Port Card (P/N 537-4890)p.554.3.5.1 LEDsp.554.3.6 Plug-In Four-Channel Internal Repeaterp.554.4 Battery Testing and Replacementp.554.4.1 Low Battery Notificationp.564.4.2 The Battery Enable Switchp.564.4.3 Battery Testp.564.4.4 Battery Replacement - Qualified Technicians Onlyp.565 Serial Configurationp.595.1 Overviewp.595.2 COM Portsp.59Pre-Setsp.595.3 Serial Device and Software Setupp.596 The RS485 Network and Hardware Setupp.616.1 The I/O Networkp.616.1.1 I/O Board Names and Terminologyp.616.1.2 MultiFlex-Plus (+) Boardp.626.1.2.1 Board Designationp.626.1.2.2 Board Calculationsp.626.1.3 Wiring Typesp.626.1.4 The I/O Network Structure (Daisy Chains)p.626.1.5 Network Noise Minimizationp.626.1.6 Network ID Numbers (Board Numbers)p.63Numbering the MultiFlex Combination I/O Boardsp.63Addressing the MultiFlex Boardsp.63Addressing the MultiFlex ESR Boardsp.636.1.7 Setting the Baud Ratep.63Baud Rate for the E2p.63Baud Rate for the Gatewayp.63Baud Rate for the 8IO, 8DO, and ARTCp.63Baud Rate for MultiFlex Boardsp.64Baud Rate for the MultiFlex ESRp.64Recommended Baud Ratep.646.1.8 Setting the Terminating and Biasing Jumpersp.646.1.9 Powering the I/O Boardsp.646.1.9.1 Wiring Typesp.656.1.10 Board Installationp.656.2 IMC/Prodigy Rooftop Unit Controllersp.656.3 ECT MODBUSp.666.3.1 Control Techniques Drive (VSD)p.666.3.2 Copeland Discus with CoreSense Diagnostics (ISD)p.666.3.3 XR35CX, XR75CX, and XEV22 Case Controllersp.666.3.3.1 XR75CX-Case Displayp.666.3.4 iPro DACp.676.3.5 Energy Meterp.676.3.5.1 Overviewp.676.3.5.2 Supported System Typesp.676.3.6 Modular Refrigerant Leak Detection Sensor (MRLDS)p.676.3.7 Copeland Discus with CoreSense Protectionp.686.3.8 Light Commercial Thermostatp.686.3.8.1 Thermostat Inputsp.686.3.8.2 Advisory and Alarmsp.686.3.9 Refrigerant Leak Detection System (RLDS)p.716.3.9.1 Diagnostic Alarmsp.716.3.10 Copeland Scroll — K5 Refrigeration Compressorp.716.3.11 XM Series of Case Controllersp.726.3.11.1 XM670p.726.3.11.2 XM679p.726.3.11.3 XM678p.727 E2 Ethernet Peer Communicationsp.837.1 Ethernet IP Configurationsp.837.2 Hardware Specificationsp.837.2.1 Componentsp.837.3 Software Specificationsp.847.4 Ethernet Network Layoutsp.847.4.1 Closed Network Layoutp.847.4.2 Open Network Layoutp.857.5 Software Setupp.857.6 Troubleshootingp.868 Echelon Network and Hardware Setupp.878.1 Overviewp.878.2 Wiring Typep.878.3 Echelon Network Structuring (Daisy-Chains)p.878.3.1 Maximum Number of Echelon Devicesp.888.4 Device Terminationp.888.4.1 Using a Termination Block (P/N 535-2715) to Terminate a Daisy Chainp.898.5 Wire Restrictionsp.89Maximum Total Segment Lengthp.898.6 Installing Echelon Devicesp.898.6.1 Powering Echelon Devicesp.898.7 LEDsp.908.8 Open Echelon Device Connectivityp.908.8.1 Configuring Echelon Devicesp.908.8.1.1 Troubleshootingp.919 Input and Output Setupp.959.1 The 16AI, 8IO, and MultiFlex Inputsp.959.1.1 Connecting Sensors to Input Boardsp.959.1.1.1 Wiringp.95MultiFlex Boardsp.9516AI Boardsp.958IO and ARTC Boardsp.959.1.1.2 Sensor Wiring Typesp.95All Analog Temperature Sensors and Air Flow Sensorsp.95All Pressure Transducers, Humidity Sensors, and Refrigeration Transducersp.95Dewpoint and Light Level Sensorsp.959.1.1.3 Input Type Dip Switchesp.959.1.2 Power Connectionp.969.1.3 Input Setup in E2p.1009.1.3.1 Configuring a Point from the Input Definitions/Status Screenp.1009.1.3.2 Using the Input Definitions/Status Screenp.1011. Board Type (read-only)p.1012. Brd (read-only)p.1013. Pt (read-only)p.1014. Type (read-only)p.1015. Applicationp.1016. Associationp.1017. Value (read-only)p.1019.1.3.3 Setting Up Analog Inputsp.1019.1.3.4 Setting Up Digital Inputsp.1039.2 The 8RO, 8ROe, 8IO, and MultiFlex Outputsp.1049.2.1 Wiring Form C Contactsp.1049.2.2 MultiFlex Relay Outputsp.1049.2.3 Setting the Fail-Safe Dip Switchp.1049.2.4 Wiring Outputs to Pointsp.105Old 8ROsp.105New 8ROs and 8RO-FCsp.1059.2.5 The Output LEDp.1059.2.6 Output Setup in E2p.1059.2.6.1 Configuring a Point from the Output Definitions/Status Screenp.1059.2.6.2 Using the Output Definitions/Status Screenp.1051. Board Type (read-only)p.1062. Brd (read-only)p.1063. Pt (read-only)p.1064. Type (read-only)p.1065. Applicationp.1066. Associationp.1067. Value (read-only)p.1069.2.6.3 Setting Up Digital Outputsp.1069.2.6.4 Setting Up Analog Outputsp.1079.3 CC-100 Case Controllersp.1089.3.1 Inputsp.108Temperature and Digital Sensorsp.108Connectionp.108Auxiliary Analog Inputp.109Hand-Held Terminal Jackp.1099.3.2 Power Module Wiringp.1099.3.3 Valve Cablep.109P/N 335-3263 (Pulse Valve)p.110P/N 335-3261 (Sporlan SEI and Emerson Flow Controls ESR Stepper Valve)p.110P/N 335-3260 (Generic Stepper and Emerson Flow Controls ESV Valve)p.1109.4 ESR8 Valve Output Wiringp.11010 Quick Startp.11310.1 Logging Onp.11310.2 Cleaning Out the Controllerp.113Performing a Clean Outp.11310.3 Setting Number of Network Devicesp.114Boards on the I/O Networkp.114Unit Controllers (Echelon)p.11410.4 Setting Number of Applicationsp.11510.5 The Main Status (Home) Screenp.11510.5.1 Customizing the Home Screenp.11510.6 Common Screen Elementsp.11610.6.1 The Headerp.11610.6.1.1 Header Iconsp.11610.6.2 The Function Keysp.11610.6.3 The Help Linep.11610.7 Screen Typesp.11710.7.1 The Main Menup.11710.7.2 Status Screensp.11710.7.3 The Actions Menup.11810.7.4 The Setup Screensp.11910.7.5 System Configuration Menup.11910.7.6 The System Information Menup.12010.8 Time/Date Setupp.12110.8.1 Setting the Time and Datep.121Active Datep.121Active Timep.121Time Zonep.121Time Serverp.121Primary Time Serverp.122Secondary Time Serverp.122Date Formatp.122Daylight Savings Datesp.122Daylight Savings Time uses GMTp.122Unit Location Fromp.122Sundownp.12210.9 Set Up Modemp.12210.10 Set Up TCP/IPp.12310.11 Set Up Network Baud Ratesp.12410.11.1 COM1 Serial (RS232) Baud Ratep.12410.11.2 I/O Network Baud Ratep.12410.12 Set Up User Accessp.12510.12.1 Changing Required User Access Levelsp.12610.12.2 Creating a New User Accountp.12610.12.3 Deleting a Userp.12610.13 Set Up I/O Networkp.12710.13.1 Specify Number of Boardsp.127Boards on the I/O Networkp.12710.13.2 Checking Online Statusp.12810.14 Set Up Echelon Networkp.12810.14.1 Specifying Number of Devicesp.128Unit Controllers (Echelon)p.12810.14.2 Commissioning a Devicep.129How Echelon Commissioning Worksp.129MODBUS Commissioningp.12910.14.2.1 The Service Button Methodp.129The CC-100’s Service Buttonp.130The TD3’s Service Buttonp.130The ESR8’s Service Buttonp.130Commissioning the EC-2p.13010.14.2.2 The Manual ID Entry Methodp.13110.15 License Managementp.13110.15.1 Web Servicesp.13210.16 Set Up Alarmingp.13310.16.1 Specifying Alarm Reporting Typesp.13410.16.1.1 The Display Linep.13410.16.1.2 The Alarm Outputp.13410.16.1.3 Dial-Outp.13410.16.1.4 The Echelon Network (The Alarm Annunciator)p.13410.16.2 Setting up an E2 to be an Alarm Annunciatorp.13410.16.3 Alarm Dial-Outp.13510.16.4 Introduction: Alarm Reportingp.1351. The E2 Display Headerp.1352. The Advisory Outputp.1353. Dial-Outp.1354. The LonWorks Network (The Alarm Annunciator)p.13510.17 Set Up Global Datap.13610.17.1 Priority Settingsp.136Example: Setting Up an Outdoor Temperature Sensorp.13710.18 Set Up Applicationsp.13710.18.1 Add/Delete an Applicationp.13810.18.2 Using and Configuring a Setup Screenp.13810.18.2.1 The Edit Menup.13910.18.2.2 Entering Setpointsp.13910.18.2.3 Navigating the Setup Screenp.139Index Tabsp.140The Help Linep.140The Function Keys For Setupp.14010.18.3 Using the Help Key to get Property Helpp.14111 Software Overviewp.14311.1 Suction Groupsp.14311.1.1 Introductionp.14311.1.2 The (Standard) Suction Group Applicationp.14311.1.2.1 Overview of PID Control Strategyp.14311.1.2.2 Variable-Speed Compressorsp.14311.1.2.3 Floating Setpoint Controlp.14311.1.3 The Enhanced Suction Group Applicationp.14311.1.3.1 Learning Modep.14411.1.3.2 Circuit Load Analysisp.14411.1.3.3 The Control/Cycles Parameterp.14411.1.3.4 Variable-Speed, Digital Scroll, and Digital Discus Compressor Supportp.14411.1.3.5 Floating Suction Controlp.14411.1.4 Hardware Overviewp.14411.2 Condenser Controlp.14511.2.1 Air Cooled Condensersp.14511.2.1.1 Air Cooled Strategyp.14511.2.1.2 Temperature Differential Strategyp.14511.2.2 Evaporative Condensersp.14611.2.3 Fan Controlp.14611.2.4 Condenser Split Modep.14611.2.5 Fast Recoveryp.14611.2.6 Hardware Overviewp.14611.3 Standard Circuitsp.14711.3.1 Refrigeration Controlp.14711.3.1.1 Temperature Monitorp.14811.3.1.2 Temperature Controlp.14811.3.1.3 Line Up(ESR)/Defrostp.14811.3.1.4 Line Up(MFESR)/Defrostp.14811.3.2 Defrost Controlp.14811.3.2.1 Defrost Statesp.14811.3.2.2 Defrost Typesp.148Timed and Reverse Airp.148Hot Gas and Reversed Cycle Hot Gasp.148Electric Defrostp.14811.3.2.3 Defrost Terminationp.149Pulsed Defrostp.14911.3.2.4 Emergency Defrostp.14911.3.2.5 Hot Gas Defrost with ESR8 and MultiFlex ESRp.14911.3.3 Clean and Door Switchesp.14911.3.3.1 Clean Switchesp.14911.3.3.2 Door Switchesp.14911.3.4 Fan Controlp.15011.3.5 The TD3 Temperature Displayp.15011.3.6 The Control Link CD Case Displayp.15011.3.7 Wiringp.15011.4 Case Control Circuitsp.15211.4.1 Overviewp.15211.4.2 Case Circuit Control Software Overviewp.15211.4.2.1 Valve Controlp.153Pulse Valvesp.153Stepper Valvesp.15311.4.3 Refrigeration Controlp.15311.4.3.1 EEVs (Liquid Pulse and Liquid Stepper)p.153Temperature Controlp.153Superheat Controlp.153Recovery Modep.153Thermostatic Expansion Valves (TXVs)p.15411.4.3.2 EEPRs (Suction Stepper)p.154Recovery Modep.15411.4.4 Defrost Controlp.15411.4.4.1 Defrost Statesp.15411.4.4.2 Defrost Typesp.154Off Cycle (Timed)p.154Hot Gas and Reversed Cycle Hot Gasp.154Electric Defrostp.15511.4.4.3 Defrost Terminationp.155Temperature Terminationp.155Pulsed Defrostp.15511.4.4.4 Demand Defrostp.155Demand Fail-Safe Timep.15511.4.4.5 Emergency Defrostp.15511.4.4.6 The WAIT Statep.15511.4.5 Anti-Sweat Controlp.15511.4.5.1 Dewpoint Input Sourcesp.15611.4.6 Dual Temp Controlp.15611.4.7 Fan Controlp.15611.4.8 Light Controlp.15611.4.9 Clean/Wash Modep.156End of Mode Warningp.15711.4.10 Walk-In Freezer Controlp.15711.4.11 Fail-Safe Modep.157Actions Taken During Fail-Safe Modep.15711.4.11.1 Recoverable Sensor Failuresp.157Coil In or Coil Out Failurep.157Discharge/Return Airp.15711.4.12 Wiringp.15811.4.13 Setting Up An Individual Case Controllerp.15811.4.14 Associating Case Controllers with Case Circuit Control Applicationsp.15811.5 Logging Groupsp.15811.5.1 Possible Data Errorsp.15911.5.2 Data Compressionp.15911.5.2.1 Clippingp.15911.5.2.2 Incompressible Data Typesp.15911.5.3 Base Log Groupp.15911.5.4 Setting Up Loggingp.16011.5.5 Logging Group Status Screenp.16111.5.6 Log Reportsp.16111.5.6.1 Logging Group Reportp.16211.5.6.2 Application Log Reportp.16211.5.6.3 System Log Reportp.16211.6 Air Handling Units (AHU)p.16311.6.1 Overviewp.16311.6.2 Temperature Controlp.16311.6.3 Alternate Setpointsp.16311.6.4 Fan Controlp.16311.6.4.1 Single-Speed Fansp.16311.6.4.2 Two-Speed Fansp.164Continuous Two-Speed Fan Operation When All Stages Are OFFp.16411.6.4.3 Variable-Speed Fansp.164Variable-Speed Fan Operationp.164Dehumidification with VS Fansp.16411.6.5 Economizer Controlp.16411.6.5.1 Economization Enablep.16411.6.5.2 Economization Lockout Featuresp.165Max Outside Air Humidityp.165Minimum Supply Tempp.16511.6.6 Digital Economizer Controlp.16511.6.7 Analog Economizer Controlp.16511.6.8 Dehumidification Controlp.16511.6.9 Curtailmentp.16511.6.10 Optimum Start/Stop (OSS)p.165Intelligent Pre-Starts and Pre-Stopsp.16611.6.11 Separate Setpointsp.16611.6.12 AHU Zone Controlp.16611.6.13 Hardware Overviewp.16611.7 Zone Controlp.16711.7.1 Overviewp.16711.7.2 How Zones Workp.16811.7.3 Applications That May Be Connected To Zonesp.16811.7.3.1 MultiFlex RTU Boardp.16811.7.3.2 MultiFlex RCB Boardp.16811.7.3.3 AHUsp.16811.7.4 Temperature Controlp.16911.7.5 Zone Temperaturep.16911.7.6 Economizer Controlp.16911.7.7 Economization Enablep.16911.7.8 The Effect of Enabling Economizationp.17011.7.9 Dehumidification Controlp.17011.7.10 The Zone Humidity Inputp.17011.7.11 The Effect of Enabling Dehumidificationp.17011.7.11.1 MultiFlex RTUs and RCBsp.17011.7.11.2 AHUsp.17011.7.12 Optimum Start/Stop (OSS)p.170Intelligent Pre-Starts and Pre-Stopsp.17111.7.13 Losing Contact With Zone Applicationsp.17111.7.14 Stand-Alone MultiFlex RTUsp.17111.7.15 MultiFlex RTU/ARTC and AHU Zone Associationp.17111.8 MultiFlex CUB Boardp.17211.9 MultiFlex PAK Boardp.17211.10 Lighting Schedulesp.17211.10.1 Overviewp.17211.10.2 Functions of the Lighting Schedule Applicationp.17311.10.3 Control Method Selectp.17311.10.4 Standard Controlp.17311.10.4.1 The Light Level Interface Cell (LLEV INTERFACE)p.173Logical Combination Strategiesp.173Occupied/Unoccupied and Alternate Settingsp.17411.10.4.2 The Schedule Interface Cell (SCHEDIF)p.174Logical Combinationsp.174Alternate Schedule Interface Combinationsp.17411.10.5 Alternate Controlp.17411.10.5.1 Multi-Logic Combinerp.17411.10.5.2 Offset Solar Controlp.17511.10.6 The Basic Schedule Cellp.17511.10.6.1 Slave Schedulingp.17511.10.7 The Min ON/OFF Cellp.17511.10.8 The Proof Cellp.17511.10.9 Output Light Dimmingp.17611.11 Demand Controlp.17611.11.1 Introduction to Demand Limit Controlp.17611.11.2 Demand Monitoringp.17611.11.3 Load Sheddingp.17711.11.3.1 Definitionp.17711.11.4 Shedding Levelsp.17711.11.5 Priority Levelsp.1771. First Shedp.1772. Rotational Shedp.1783. Last Shedp.178Other Notes About Priority Levelsp.17811.11.6 How Demand Control Uses Load Sheddingp.179Mode 1: KW Input Is Greater Than Setpointp.179Mode 2: KW Input Has Been Greater Than Setpoint for 1/4 Demand Window And Is Still Going Upp.179Mode 3: Integral Error Approaching Zerop.17911.11.6.1 Power Monitoring Inputp.180Settingsp.18011.12 Sensor Controlp.18011.12.1 Overviewp.18011.12.2 Analog Sensor Controlp.18011.12.3 Cut In/Cut Out Setpoint Controlp.18011.12.4 Digital Sensor Controlp.18011.12.5 Logical Combinationp.18111.13 Loop/Sequence Controlp.18111.13.1 Layout of the Loop/ Sequence Control Applicationp.18111.13.1.1 Control Cellsp.18111.13.1.2 Output Cellsp.18211.13.1.3 Diagramp.18211.13.2 Loop/Sequence Control Cell Descriptionsp.18211.13.2.1 The Select Cellp.18211.13.2.2 The Setpoint Float Cellp.18311.13.2.3 The PID Control Cellp.183Bypassing PIDp.18311.13.2.4 The Filter Cellp.18311.13.2.5 The Override Cellp.18311.13.3 Output Cell Descriptionsp.18311.13.3.1 The Sequencer Cellp.18311.13.3.2 The PWM Cellp.18311.14 Time Scheduling and Holidaysp.18411.14.1 How Schedules Workp.18411.14.1.1 Eventsp.18411.14.1.2 Absolute and Relative Eventsp.18411.14.1.3 Temporary Schedule Eventsp.18411.14.1.4 Overlappingp.18511.14.1.5 Rangesp.18511.14.2 Holiday Schedulesp.18511.15 Power Monitoringp.18511.15.1 Overviewp.185Explanation of “Demand”p.185How Power Monitoring Calculates Demandp.185Shed Modep.18511.15.2 Loggingp.186Hourlyp.186Dailyp.186Monthlyp.186Definition of Heat and Cool Degree Daysp.18611.15.2.1 Power Monitoring Inputp.186Settingsp.18611.16 Anti-Sweat Setupp.18711.16.1 How Anti-Sweat Worksp.18711.17 Heat/Cool Controlp.18711.17.1 Temperature Controlp.18711.17.2 Unoccupied Hysteresisp.18711.17.3 Optimum Start/Stop (OSS)p.188Intelligent Pre-Starts and Pre-Stopsp.18811.17.4 Setpoint Resetp.18811.17.5 Lead/Lagp.18911.18 Analog and Digital Combinersp.18911.19 TD Controlp.19011.19.1 Overviewp.19011.19.2 Temperature Differential (TD) Strategyp.19011.19.3 TD Control Fail-Safesp.190Drop Leg Temperature Above Maximum Drop Leg Setpointp.19011.19.4 Configurationp.19011.19.5 Setpointsp.19011.19.6 Inputsp.19111.19.7 Alarmsp.19111.20 Pulse Accumulationp.19111.20.1 Overviewp.19111.20.2 Configurationp.19111.20.3 Outputsp.19111.20.4 Accumulator Reset Typesp.19211.20.5 Loggingp.19211.20.6 High Tripp.19211.21 Irrigation Controlp.19211.21.1 Overviewp.19211.21.2 Zones and Cyclesp.19211.21.2.1 Cycle Control Typesp.19311.21.2.2 Timedp.19311.21.2.3 Volumep.19311.21.3 Cycle Schedulingp.19311.21.4 Zone Inhibitp.19311.21.4.1 Timedp.19311.21.4.2 Volumep.19311.21.4.3 Rain Delayp.19311.21.4.4 Freeze Lockoutp.19311.21.4.5 Alarmp.19311.21.5 Zone Bypass Inputsp.19311.21.5.1 Bypass Failsafep.19411.21.6 Flow Sensor-Related Testsp.19411.21.6.1 Leak Testp.19411.21.6.2 Obstructed Zone Testp.19411.21.7 Service Modesp.19411.21.8 Heat Cut In/Cut Out Setpoints For Each Stagep.19411.21.9 Cool Cut In/Cut Out Setpoints For Each Stagep.19411.21.10 Dehumidification Controlp.19411.21.11 Two Speed Fan Controlp.19411.21.12 Configurationp.19511.22 Flexible Combinerp.19511.23 Modular Chiller Control (MCC)p.19511.23.1 Overviewp.19511.23.2 Learning Modep.19611.23.3 The Control/Cycles Parameterp.19611.23.4 Compressor Controlp.19611.23.4.1 Digital Scroll Compressorp.19711.23.4.2 Variable Frequency Drive Compressorp.19711.23.4.3 Unequal Capacity Compressorsp.19711.23.5 Bypass Valve Controlp.19711.24 Boilerp.19711.24.1 Overviewp.19711.24.2 Alarmsp.19711.25 Refrigerant Monitoring System (RMS)p.19811.25.1 RMS Assetp.19811.25.2 RMS Scalep.19811.25.2.1 Device Constraintsp.19811.26 Detailed Setpoint Change Loggingp.19811.26.1 Log Informationp.19811.26.2 Logged Changesp.19911.26.3 Unlogged Changesp.19912 Operator’s Guide to Using the E2p.20112.1 The E2 Home Screenp.20112.1.1 RX Home Screenp.201Suction Groups Sectionp.201Circuit Status Sectionp.201Condenser Sectionp.201Sensor Controlp.20112.1.2 BX Home Screenp.201OAT Sectionp.201Demand Control Sectionp.201Power Monitoring Sectionp.202Light Schedules Sectionp.202Air Handling Units Sectionp.202Zones Sectionp.202Sensor Control Sectionp.20212.1.3 CX Home Screenp.202Lighting Control Sectionp.202HVAC Control Sectionp.202Refrigeration Control Sectionp.202Demand Control Sectionp.202Anti-Sweat Control Sectionp.202Sensor Control Sectionp.202Time Schedules Sectionp.20212.2 Logging On and Access Levelsp.20212.3 Toggling Full Optionsp.20312.4 Navigationp.20312.4.1 Menusp.203Main Menup.203The System Configuration Menup.203The System Information Menup.204Actions Menup.20412.4.2 Screen Typesp.205Summary Screensp.205Status Screensp.205Setup Screensp.20512.4.3 The E2 Keypadp.206The Cursorp.206The Tab Keyp.207The Enter Keyp.207Keypadp.207The Log In/Out Keyp.208Four Directional Arrow Keysp.208Page Up/Page Down Keysp.208Ctrl Page Up/Ctrl Page Down Keysp.208Numeric Keypadp.208Hot Keysp.20812.5 Customizing the Home Screenp.20912.6 Manual Defrost and Clean Modep.20912.7 Overridesp.21012.8 Checking Boards Onlinep.21112.9 Checking Status Screensp.211Suction Group Status Screenp.211Condenser Status Screenp.211Circuit Status Screenp.211Sensor Status Screenp.211AHU Status Screenp.212Zones Status Screenp.212Lighting Status Screenp.212Sensors Status Screenp.212Other Status Screensp.21212.10 Alarmsp.21212.10.1 Accessing the Alarm Advisory Logp.21212.10.2 Viewing the Controller Advisory Logp.21212.10.3 Date and Timep.21212.10.4 Statep.21212.10.5 Ack/Reset Statep.21312.10.6 Area Ctrl: Application: Propertyp.21312.10.7 Advisory Messagep.21312.10.8 Acknowledging, Resetting, and Clearing Log Entriesp.21312.10.8.1 Acknowledgingp.21312.10.8.2 Resettingp.21412.10.8.3 Clearingp.214Property or Board/Pointp.214Advisory Messagep.214Acknowledge Statusp.214Report Priorityp.214Return To Normalp.21412.10.9 Facility Status Display (FSD) Alarmsp.21512.11 Viewing Logs and Graphsp.21512.11.1 Locating Logged Inputs/ Outputsp.21512.11.1.1 Home/Status Screensp.21512.11.1.2 Setup Screensp.21612.11.1.3 Setting Up Input and Output Pointersp.21612.11.2 Log Viewp.21712.11.3 The Graph Viewp.21712.11.4 Zooming In and Outp.21712.12 Low Battery Notificationp.21812.13 Naming Conventions for E2 Controllers, Applications, and Pointsp.218Appendix A: Case Type Defaultsp.219High Alarm, Low Alarm, and Delayp.219Defrost Typep.219Appendix B: Pressure/Voltage and Temperature/Resistance Charts for Eclipse Transducers & Retail Solutions Temp Sensorsp.221Appendix C: Alarm Advisory Messagesp.223Appendix D: PID Controlp.237Introduction to PID Controlp.237Proportional (“P”) Modep.237Throttling Rangep.237Proportional Constant (Kp)p.238Integral Modep.238Why “I” Mode is Necessaryp.238Proportional Offsetp.238Saturationp.239The “I” Mode Calculationp.239Derivative Modep.239The “D” Mode Calculationp.240How Condenser Control and HVAC PID Differs From The Othersp.240Output at Setpointp.240Output at Setpoint for Non-Condenser/ HVAC PIDp.240Output at Setpoint for Condenser/HVAC PID Controlp.241Changing the Output at Setpointp.241Other PID Featuresp.241Output at Minimum / Output at Maximump.241Minimum Accumulated Errorp.242Applicationp.242Filteringp.242Applicationp.242Appendix E: Compressed Point Log Sample Limits and Precision Tabp.245Appendix F: Troubleshootingp.249Appendix G: Revision Logp.259Indexp.261
Page 6 of the Emerson E2 RX user manual — Table of contents
Page 6 · click to enlarge
Page 6

Table of contents

E2 Installation and Operation Manual for RX Refrigeration, BX HVAC, and CX Convenience Store Controllersp.1Table of Contentsp.51 Introductionp.171.1 The E2 Refrigeration Controllerp.171.2 The E2 Building Controllerp.181.3 The E2 Convenience Store Controllerp.191.4 Networking Overviewp.201.4.1 E2 I/O Networkp.201.4.2 The E2 Echelon Lonworks Networkp.211.4.3 Interconnection With Other E2sp.221.5 Documentation Overviewp.221.6 On-Line Help System Overviewp.231.7 Software Licensingp.242 Hardware Overviewp.252.1 E2 Hardwarep.252.1.1 E2 Main Processor Board (CPU)p.262.1.2 E2 Processor Interface Board (PIB)p.262.1.3 E2 Keypadp.262.1.4 LEDsp.262.1.5 PC-104 Peripherals: The Internal Modem (Previous Generation Processor Board)p.272.2 I/O Network Boards and Peripheralsp.272.2.1 The Gateway Boardp.272.2.2 MultiFlex Boardsp.282.2.2.1 MultiFlex 16 Input Boardp.282.2.2.2 MultiFlex Combination Input/ Output Boardsp.292.2.2.3 MultiFlex CUBp.312.2.2.4 MultiFlex RTU (BX and CX Only)p.312.2.2.5 MultiFlex Rooftop Control Board (RCB) (BX and CX Only)p.312.2.2.6 MultiFlex PAK Boardp.312.2.3 The MultiFlex ESR Boardp.322.2.4 Hand-held Terminal (P/N 814-3110)p.322.2.5 The 8RO and 8ROSMT Relay Boardsp.332.2.6 4AO Analog Output Boardp.342.2.7 8DO Digital Output Board and PMAC II Anti-Sweat Controllerp.342.3 Echelon Network Boards and Peripheralsp.352.3.1 The 16AIe (Discontinued)p.352.3.2 The 8ROe (Discontinued)p.352.3.3 EC-2sp.352.3.4 CC-100 Case Controllers and CS-100 Case Circuit Controllersp.362.3.5 The ESR8 (Discontinued)p.362.3.6 TD3 Temperature Displayp.372.3.7 Facility Status Display (FSD)p.373 Mountingp.393.1 Mounting the E2p.393.1.1 Standard Mountp.393.1.2 Recessed Mountp.393.1.3 Retrofit Mountingp.403.1.4 Blank Facep.413.2 Mounting I/O Boardsp.413.2.1 Single/Double Enclosuresp.413.2.2 Boards Without Enclosures (Snap Track)p.423.3 Echelon Devicesp.423.3.1 16AIe and 8ROep.423.3.2 CC-100 Case Controller and CS-100 Case Circuit Controllerp.433.3.3 ESR8 (Discontinued)p.433.3.4 MultiFlex ESRp.433.3.5 TD3p.433.4 Modem/Communication Expansion Card Mounting (New Processor Board)p.433.4.1 Mounting PC-104 Cards in E2 (Previous Generation Processor Board)p.443.4.1.1 The Internal Modemp.443.4.2 Two-Channel and FourChannel Repeatersp.443.4.2.1 Mounting Repeaters Overviewp.443.4.2.2 Mounting the Two-Channel Repeaterp.443.4.2.3 Mounting the Four-Channel Repeaterp.453.5 Sensors and Transducersp.453.5.1 Pressure Transducersp.453.5.1.1 Mountingp.453.5.2 Inside Temperature Sensorp.453.5.2.1 Locationp.453.5.2.2 Mountingp.463.5.3 Outside Temperature Sensorp.463.5.3.1 Locationp.463.5.3.2 Mountingp.463.5.4 Insertion Temperature Probep.463.5.4.1 Locationp.463.5.4.2 Mountingp.463.5.5 Supply and Return Air Sensorsp.463.5.6 Refrigeration System Temperature Probes and Sensorsp.473.5.6.1 Locationp.473.5.6.2 Mounting Bullet and Pipe Mount Sensorsp.473.5.7 Product Temperature Probesp.473.5.8 Humidity Sensors and Humidistatsp.473.5.8.1 Indoor RH Sensorp.473.5.8.2 Outdoor RH Sensorsp.48The outdoor RH sensor (P/N 203-5761)p.483.5.8.3 Duct-mounted Insertion RH Probep.483.5.9 Dewpoint Probep.493.5.9.1 Locationp.493.5.9.2 Mountingp.493.5.10 Light Level Sensorp.493.5.10.1 Locationp.493.5.10.2 Mountingp.493.5.11 Liquid Level Sensorsp.493.5.12 Refrigerant Leak Detectorsp.494 E2 Hardware Setupp.514.1 Setting up the E2p.514.1.1 Enclosurep.514.1.2 Main Processor Boardp.514.1.3 Main Processor Board (Previous Version)p.524.1.4 Power Interface Boardp.524.2 Powering the E2p.524.2.1 RS485 Portsp.524.2.2 RS485 Jumpersp.524.2.3 Echelon Network Connectp.524.2.4 Echelon Jumpersp.524.3 Add-On E2 Peripheralsp.534.3.1 Echelon Card Plug-In (P/N 537-4860) with mounting screw (P/N 101-4201)p.534.3.2 Modem/Communication Expansion Card (New Processor Board)p.544.3.3 Plug-In Modem Card (P/N 537-4870) with mounting screws (P/N 101-4038) and standoffs (P/N 107-9440) (Previous Generation Processor Board)p.544.3.4 Plug-In Digital I/O Network Card (P/N 537-4880)p.544.3.4.1 LEDsp.554.3.5 E2 RS485 Port Card (P/N 537-4890)p.554.3.5.1 LEDsp.554.3.6 Plug-In Four-Channel Internal Repeaterp.554.4 Battery Testing and Replacementp.554.4.1 Low Battery Notificationp.564.4.2 The Battery Enable Switchp.564.4.3 Battery Testp.564.4.4 Battery Replacement - Qualified Technicians Onlyp.565 Serial Configurationp.595.1 Overviewp.595.2 COM Portsp.59Pre-Setsp.595.3 Serial Device and Software Setupp.596 The RS485 Network and Hardware Setupp.616.1 The I/O Networkp.616.1.1 I/O Board Names and Terminologyp.616.1.2 MultiFlex-Plus (+) Boardp.626.1.2.1 Board Designationp.626.1.2.2 Board Calculationsp.626.1.3 Wiring Typesp.626.1.4 The I/O Network Structure (Daisy Chains)p.626.1.5 Network Noise Minimizationp.626.1.6 Network ID Numbers (Board Numbers)p.63Numbering the MultiFlex Combination I/O Boardsp.63Addressing the MultiFlex Boardsp.63Addressing the MultiFlex ESR Boardsp.636.1.7 Setting the Baud Ratep.63Baud Rate for the E2p.63Baud Rate for the Gatewayp.63Baud Rate for the 8IO, 8DO, and ARTCp.63Baud Rate for MultiFlex Boardsp.64Baud Rate for the MultiFlex ESRp.64Recommended Baud Ratep.646.1.8 Setting the Terminating and Biasing Jumpersp.646.1.9 Powering the I/O Boardsp.646.1.9.1 Wiring Typesp.656.1.10 Board Installationp.656.2 IMC/Prodigy Rooftop Unit Controllersp.656.3 ECT MODBUSp.666.3.1 Control Techniques Drive (VSD)p.666.3.2 Copeland Discus with CoreSense Diagnostics (ISD)p.666.3.3 XR35CX, XR75CX, and XEV22 Case Controllersp.666.3.3.1 XR75CX-Case Displayp.666.3.4 iPro DACp.676.3.5 Energy Meterp.676.3.5.1 Overviewp.676.3.5.2 Supported System Typesp.676.3.6 Modular Refrigerant Leak Detection Sensor (MRLDS)p.676.3.7 Copeland Discus with CoreSense Protectionp.686.3.8 Light Commercial Thermostatp.686.3.8.1 Thermostat Inputsp.686.3.8.2 Advisory and Alarmsp.686.3.9 Refrigerant Leak Detection System (RLDS)p.716.3.9.1 Diagnostic Alarmsp.716.3.10 Copeland Scroll — K5 Refrigeration Compressorp.716.3.11 XM Series of Case Controllersp.726.3.11.1 XM670p.726.3.11.2 XM679p.726.3.11.3 XM678p.727 E2 Ethernet Peer Communicationsp.837.1 Ethernet IP Configurationsp.837.2 Hardware Specificationsp.837.2.1 Componentsp.837.3 Software Specificationsp.847.4 Ethernet Network Layoutsp.847.4.1 Closed Network Layoutp.847.4.2 Open Network Layoutp.857.5 Software Setupp.857.6 Troubleshootingp.868 Echelon Network and Hardware Setupp.878.1 Overviewp.878.2 Wiring Typep.878.3 Echelon Network Structuring (Daisy-Chains)p.878.3.1 Maximum Number of Echelon Devicesp.888.4 Device Terminationp.888.4.1 Using a Termination Block (P/N 535-2715) to Terminate a Daisy Chainp.898.5 Wire Restrictionsp.89Maximum Total Segment Lengthp.898.6 Installing Echelon Devicesp.898.6.1 Powering Echelon Devicesp.898.7 LEDsp.908.8 Open Echelon Device Connectivityp.908.8.1 Configuring Echelon Devicesp.908.8.1.1 Troubleshootingp.919 Input and Output Setupp.959.1 The 16AI, 8IO, and MultiFlex Inputsp.959.1.1 Connecting Sensors to Input Boardsp.959.1.1.1 Wiringp.95MultiFlex Boardsp.9516AI Boardsp.958IO and ARTC Boardsp.959.1.1.2 Sensor Wiring Typesp.95All Analog Temperature Sensors and Air Flow Sensorsp.95All Pressure Transducers, Humidity Sensors, and Refrigeration Transducersp.95Dewpoint and Light Level Sensorsp.959.1.1.3 Input Type Dip Switchesp.959.1.2 Power Connectionp.969.1.3 Input Setup in E2p.1009.1.3.1 Configuring a Point from the Input Definitions/Status Screenp.1009.1.3.2 Using the Input Definitions/Status Screenp.1011. Board Type (read-only)p.1012. Brd (read-only)p.1013. Pt (read-only)p.1014. Type (read-only)p.1015. Applicationp.1016. Associationp.1017. Value (read-only)p.1019.1.3.3 Setting Up Analog Inputsp.1019.1.3.4 Setting Up Digital Inputsp.1039.2 The 8RO, 8ROe, 8IO, and MultiFlex Outputsp.1049.2.1 Wiring Form C Contactsp.1049.2.2 MultiFlex Relay Outputsp.1049.2.3 Setting the Fail-Safe Dip Switchp.1049.2.4 Wiring Outputs to Pointsp.105Old 8ROsp.105New 8ROs and 8RO-FCsp.1059.2.5 The Output LEDp.1059.2.6 Output Setup in E2p.1059.2.6.1 Configuring a Point from the Output Definitions/Status Screenp.1059.2.6.2 Using the Output Definitions/Status Screenp.1051. Board Type (read-only)p.1062. Brd (read-only)p.1063. Pt (read-only)p.1064. Type (read-only)p.1065. Applicationp.1066. Associationp.1067. Value (read-only)p.1069.2.6.3 Setting Up Digital Outputsp.1069.2.6.4 Setting Up Analog Outputsp.1079.3 CC-100 Case Controllersp.1089.3.1 Inputsp.108Temperature and Digital Sensorsp.108Connectionp.108Auxiliary Analog Inputp.109Hand-Held Terminal Jackp.1099.3.2 Power Module Wiringp.1099.3.3 Valve Cablep.109P/N 335-3263 (Pulse Valve)p.110P/N 335-3261 (Sporlan SEI and Emerson Flow Controls ESR Stepper Valve)p.110P/N 335-3260 (Generic Stepper and Emerson Flow Controls ESV Valve)p.1109.4 ESR8 Valve Output Wiringp.11010 Quick Startp.11310.1 Logging Onp.11310.2 Cleaning Out the Controllerp.113Performing a Clean Outp.11310.3 Setting Number of Network Devicesp.114Boards on the I/O Networkp.114Unit Controllers (Echelon)p.11410.4 Setting Number of Applicationsp.11510.5 The Main Status (Home) Screenp.11510.5.1 Customizing the Home Screenp.11510.6 Common Screen Elementsp.11610.6.1 The Headerp.11610.6.1.1 Header Iconsp.11610.6.2 The Function Keysp.11610.6.3 The Help Linep.11610.7 Screen Typesp.11710.7.1 The Main Menup.11710.7.2 Status Screensp.11710.7.3 The Actions Menup.11810.7.4 The Setup Screensp.11910.7.5 System Configuration Menup.11910.7.6 The System Information Menup.12010.8 Time/Date Setupp.12110.8.1 Setting the Time and Datep.121Active Datep.121Active Timep.121Time Zonep.121Time Serverp.121Primary Time Serverp.122Secondary Time Serverp.122Date Formatp.122Daylight Savings Datesp.122Daylight Savings Time uses GMTp.122Unit Location Fromp.122Sundownp.12210.9 Set Up Modemp.12210.10 Set Up TCP/IPp.12310.11 Set Up Network Baud Ratesp.12410.11.1 COM1 Serial (RS232) Baud Ratep.12410.11.2 I/O Network Baud Ratep.12410.12 Set Up User Accessp.12510.12.1 Changing Required User Access Levelsp.12610.12.2 Creating a New User Accountp.12610.12.3 Deleting a Userp.12610.13 Set Up I/O Networkp.12710.13.1 Specify Number of Boardsp.127Boards on the I/O Networkp.12710.13.2 Checking Online Statusp.12810.14 Set Up Echelon Networkp.12810.14.1 Specifying Number of Devicesp.128Unit Controllers (Echelon)p.12810.14.2 Commissioning a Devicep.129How Echelon Commissioning Worksp.129MODBUS Commissioningp.12910.14.2.1 The Service Button Methodp.129The CC-100’s Service Buttonp.130The TD3’s Service Buttonp.130The ESR8’s Service Buttonp.130Commissioning the EC-2p.13010.14.2.2 The Manual ID Entry Methodp.13110.15 License Managementp.13110.15.1 Web Servicesp.13210.16 Set Up Alarmingp.13310.16.1 Specifying Alarm Reporting Typesp.13410.16.1.1 The Display Linep.13410.16.1.2 The Alarm Outputp.13410.16.1.3 Dial-Outp.13410.16.1.4 The Echelon Network (The Alarm Annunciator)p.13410.16.2 Setting up an E2 to be an Alarm Annunciatorp.13410.16.3 Alarm Dial-Outp.13510.16.4 Introduction: Alarm Reportingp.1351. The E2 Display Headerp.1352. The Advisory Outputp.1353. Dial-Outp.1354. The LonWorks Network (The Alarm Annunciator)p.13510.17 Set Up Global Datap.13610.17.1 Priority Settingsp.136Example: Setting Up an Outdoor Temperature Sensorp.13710.18 Set Up Applicationsp.13710.18.1 Add/Delete an Applicationp.13810.18.2 Using and Configuring a Setup Screenp.13810.18.2.1 The Edit Menup.13910.18.2.2 Entering Setpointsp.13910.18.2.3 Navigating the Setup Screenp.139Index Tabsp.140The Help Linep.140The Function Keys For Setupp.14010.18.3 Using the Help Key to get Property Helpp.14111 Software Overviewp.14311.1 Suction Groupsp.14311.1.1 Introductionp.14311.1.2 The (Standard) Suction Group Applicationp.14311.1.2.1 Overview of PID Control Strategyp.14311.1.2.2 Variable-Speed Compressorsp.14311.1.2.3 Floating Setpoint Controlp.14311.1.3 The Enhanced Suction Group Applicationp.14311.1.3.1 Learning Modep.14411.1.3.2 Circuit Load Analysisp.14411.1.3.3 The Control/Cycles Parameterp.14411.1.3.4 Variable-Speed, Digital Scroll, and Digital Discus Compressor Supportp.14411.1.3.5 Floating Suction Controlp.14411.1.4 Hardware Overviewp.14411.2 Condenser Controlp.14511.2.1 Air Cooled Condensersp.14511.2.1.1 Air Cooled Strategyp.14511.2.1.2 Temperature Differential Strategyp.14511.2.2 Evaporative Condensersp.14611.2.3 Fan Controlp.14611.2.4 Condenser Split Modep.14611.2.5 Fast Recoveryp.14611.2.6 Hardware Overviewp.14611.3 Standard Circuitsp.14711.3.1 Refrigeration Controlp.14711.3.1.1 Temperature Monitorp.14811.3.1.2 Temperature Controlp.14811.3.1.3 Line Up(ESR)/Defrostp.14811.3.1.4 Line Up(MFESR)/Defrostp.14811.3.2 Defrost Controlp.14811.3.2.1 Defrost Statesp.14811.3.2.2 Defrost Typesp.148Timed and Reverse Airp.148Hot Gas and Reversed Cycle Hot Gasp.148Electric Defrostp.14811.3.2.3 Defrost Terminationp.149Pulsed Defrostp.14911.3.2.4 Emergency Defrostp.14911.3.2.5 Hot Gas Defrost with ESR8 and MultiFlex ESRp.14911.3.3 Clean and Door Switchesp.14911.3.3.1 Clean Switchesp.14911.3.3.2 Door Switchesp.14911.3.4 Fan Controlp.15011.3.5 The TD3 Temperature Displayp.15011.3.6 The Control Link CD Case Displayp.15011.3.7 Wiringp.15011.4 Case Control Circuitsp.15211.4.1 Overviewp.15211.4.2 Case Circuit Control Software Overviewp.15211.4.2.1 Valve Controlp.153Pulse Valvesp.153Stepper Valvesp.15311.4.3 Refrigeration Controlp.15311.4.3.1 EEVs (Liquid Pulse and Liquid Stepper)p.153Temperature Controlp.153Superheat Controlp.153Recovery Modep.153Thermostatic Expansion Valves (TXVs)p.15411.4.3.2 EEPRs (Suction Stepper)p.154Recovery Modep.15411.4.4 Defrost Controlp.15411.4.4.1 Defrost Statesp.15411.4.4.2 Defrost Typesp.154Off Cycle (Timed)p.154Hot Gas and Reversed Cycle Hot Gasp.154Electric Defrostp.15511.4.4.3 Defrost Terminationp.155Temperature Terminationp.155Pulsed Defrostp.15511.4.4.4 Demand Defrostp.155Demand Fail-Safe Timep.15511.4.4.5 Emergency Defrostp.15511.4.4.6 The WAIT Statep.15511.4.5 Anti-Sweat Controlp.15511.4.5.1 Dewpoint Input Sourcesp.15611.4.6 Dual Temp Controlp.15611.4.7 Fan Controlp.15611.4.8 Light Controlp.15611.4.9 Clean/Wash Modep.156End of Mode Warningp.15711.4.10 Walk-In Freezer Controlp.15711.4.11 Fail-Safe Modep.157Actions Taken During Fail-Safe Modep.15711.4.11.1 Recoverable Sensor Failuresp.157Coil In or Coil Out Failurep.157Discharge/Return Airp.15711.4.12 Wiringp.15811.4.13 Setting Up An Individual Case Controllerp.15811.4.14 Associating Case Controllers with Case Circuit Control Applicationsp.15811.5 Logging Groupsp.15811.5.1 Possible Data Errorsp.15911.5.2 Data Compressionp.15911.5.2.1 Clippingp.15911.5.2.2 Incompressible Data Typesp.15911.5.3 Base Log Groupp.15911.5.4 Setting Up Loggingp.16011.5.5 Logging Group Status Screenp.16111.5.6 Log Reportsp.16111.5.6.1 Logging Group Reportp.16211.5.6.2 Application Log Reportp.16211.5.6.3 System Log Reportp.16211.6 Air Handling Units (AHU)p.16311.6.1 Overviewp.16311.6.2 Temperature Controlp.16311.6.3 Alternate Setpointsp.16311.6.4 Fan Controlp.16311.6.4.1 Single-Speed Fansp.16311.6.4.2 Two-Speed Fansp.164Continuous Two-Speed Fan Operation When All Stages Are OFFp.16411.6.4.3 Variable-Speed Fansp.164Variable-Speed Fan Operationp.164Dehumidification with VS Fansp.16411.6.5 Economizer Controlp.16411.6.5.1 Economization Enablep.16411.6.5.2 Economization Lockout Featuresp.165Max Outside Air Humidityp.165Minimum Supply Tempp.16511.6.6 Digital Economizer Controlp.16511.6.7 Analog Economizer Controlp.16511.6.8 Dehumidification Controlp.16511.6.9 Curtailmentp.16511.6.10 Optimum Start/Stop (OSS)p.165Intelligent Pre-Starts and Pre-Stopsp.16611.6.11 Separate Setpointsp.16611.6.12 AHU Zone Controlp.16611.6.13 Hardware Overviewp.16611.7 Zone Controlp.16711.7.1 Overviewp.16711.7.2 How Zones Workp.16811.7.3 Applications That May Be Connected To Zonesp.16811.7.3.1 MultiFlex RTU Boardp.16811.7.3.2 MultiFlex RCB Boardp.16811.7.3.3 AHUsp.16811.7.4 Temperature Controlp.16911.7.5 Zone Temperaturep.16911.7.6 Economizer Controlp.16911.7.7 Economization Enablep.16911.7.8 The Effect of Enabling Economizationp.17011.7.9 Dehumidification Controlp.17011.7.10 The Zone Humidity Inputp.17011.7.11 The Effect of Enabling Dehumidificationp.17011.7.11.1 MultiFlex RTUs and RCBsp.17011.7.11.2 AHUsp.17011.7.12 Optimum Start/Stop (OSS)p.170Intelligent Pre-Starts and Pre-Stopsp.17111.7.13 Losing Contact With Zone Applicationsp.17111.7.14 Stand-Alone MultiFlex RTUsp.17111.7.15 MultiFlex RTU/ARTC and AHU Zone Associationp.17111.8 MultiFlex CUB Boardp.17211.9 MultiFlex PAK Boardp.17211.10 Lighting Schedulesp.17211.10.1 Overviewp.17211.10.2 Functions of the Lighting Schedule Applicationp.17311.10.3 Control Method Selectp.17311.10.4 Standard Controlp.17311.10.4.1 The Light Level Interface Cell (LLEV INTERFACE)p.173Logical Combination Strategiesp.173Occupied/Unoccupied and Alternate Settingsp.17411.10.4.2 The Schedule Interface Cell (SCHEDIF)p.174Logical Combinationsp.174Alternate Schedule Interface Combinationsp.17411.10.5 Alternate Controlp.17411.10.5.1 Multi-Logic Combinerp.17411.10.5.2 Offset Solar Controlp.17511.10.6 The Basic Schedule Cellp.17511.10.6.1 Slave Schedulingp.17511.10.7 The Min ON/OFF Cellp.17511.10.8 The Proof Cellp.17511.10.9 Output Light Dimmingp.17611.11 Demand Controlp.17611.11.1 Introduction to Demand Limit Controlp.17611.11.2 Demand Monitoringp.17611.11.3 Load Sheddingp.17711.11.3.1 Definitionp.17711.11.4 Shedding Levelsp.17711.11.5 Priority Levelsp.1771. First Shedp.1772. Rotational Shedp.1783. Last Shedp.178Other Notes About Priority Levelsp.17811.11.6 How Demand Control Uses Load Sheddingp.179Mode 1: KW Input Is Greater Than Setpointp.179Mode 2: KW Input Has Been Greater Than Setpoint for 1/4 Demand Window And Is Still Going Upp.179Mode 3: Integral Error Approaching Zerop.17911.11.6.1 Power Monitoring Inputp.180Settingsp.18011.12 Sensor Controlp.18011.12.1 Overviewp.18011.12.2 Analog Sensor Controlp.18011.12.3 Cut In/Cut Out Setpoint Controlp.18011.12.4 Digital Sensor Controlp.18011.12.5 Logical Combinationp.18111.13 Loop/Sequence Controlp.18111.13.1 Layout of the Loop/ Sequence Control Applicationp.18111.13.1.1 Control Cellsp.18111.13.1.2 Output Cellsp.18211.13.1.3 Diagramp.18211.13.2 Loop/Sequence Control Cell Descriptionsp.18211.13.2.1 The Select Cellp.18211.13.2.2 The Setpoint Float Cellp.18311.13.2.3 The PID Control Cellp.183Bypassing PIDp.18311.13.2.4 The Filter Cellp.18311.13.2.5 The Override Cellp.18311.13.3 Output Cell Descriptionsp.18311.13.3.1 The Sequencer Cellp.18311.13.3.2 The PWM Cellp.18311.14 Time Scheduling and Holidaysp.18411.14.1 How Schedules Workp.18411.14.1.1 Eventsp.18411.14.1.2 Absolute and Relative Eventsp.18411.14.1.3 Temporary Schedule Eventsp.18411.14.1.4 Overlappingp.18511.14.1.5 Rangesp.18511.14.2 Holiday Schedulesp.18511.15 Power Monitoringp.18511.15.1 Overviewp.185Explanation of “Demand”p.185How Power Monitoring Calculates Demandp.185Shed Modep.18511.15.2 Loggingp.186Hourlyp.186Dailyp.186Monthlyp.186Definition of Heat and Cool Degree Daysp.18611.15.2.1 Power Monitoring Inputp.186Settingsp.18611.16 Anti-Sweat Setupp.18711.16.1 How Anti-Sweat Worksp.18711.17 Heat/Cool Controlp.18711.17.1 Temperature Controlp.18711.17.2 Unoccupied Hysteresisp.18711.17.3 Optimum Start/Stop (OSS)p.188Intelligent Pre-Starts and Pre-Stopsp.18811.17.4 Setpoint Resetp.18811.17.5 Lead/Lagp.18911.18 Analog and Digital Combinersp.18911.19 TD Controlp.19011.19.1 Overviewp.19011.19.2 Temperature Differential (TD) Strategyp.19011.19.3 TD Control Fail-Safesp.190Drop Leg Temperature Above Maximum Drop Leg Setpointp.19011.19.4 Configurationp.19011.19.5 Setpointsp.19011.19.6 Inputsp.19111.19.7 Alarmsp.19111.20 Pulse Accumulationp.19111.20.1 Overviewp.19111.20.2 Configurationp.19111.20.3 Outputsp.19111.20.4 Accumulator Reset Typesp.19211.20.5 Loggingp.19211.20.6 High Tripp.19211.21 Irrigation Controlp.19211.21.1 Overviewp.19211.21.2 Zones and Cyclesp.19211.21.2.1 Cycle Control Typesp.19311.21.2.2 Timedp.19311.21.2.3 Volumep.19311.21.3 Cycle Schedulingp.19311.21.4 Zone Inhibitp.19311.21.4.1 Timedp.19311.21.4.2 Volumep.19311.21.4.3 Rain Delayp.19311.21.4.4 Freeze Lockoutp.19311.21.4.5 Alarmp.19311.21.5 Zone Bypass Inputsp.19311.21.5.1 Bypass Failsafep.19411.21.6 Flow Sensor-Related Testsp.19411.21.6.1 Leak Testp.19411.21.6.2 Obstructed Zone Testp.19411.21.7 Service Modesp.19411.21.8 Heat Cut In/Cut Out Setpoints For Each Stagep.19411.21.9 Cool Cut In/Cut Out Setpoints For Each Stagep.19411.21.10 Dehumidification Controlp.19411.21.11 Two Speed Fan Controlp.19411.21.12 Configurationp.19511.22 Flexible Combinerp.19511.23 Modular Chiller Control (MCC)p.19511.23.1 Overviewp.19511.23.2 Learning Modep.19611.23.3 The Control/Cycles Parameterp.19611.23.4 Compressor Controlp.19611.23.4.1 Digital Scroll Compressorp.19711.23.4.2 Variable Frequency Drive Compressorp.19711.23.4.3 Unequal Capacity Compressorsp.19711.23.5 Bypass Valve Controlp.19711.24 Boilerp.19711.24.1 Overviewp.19711.24.2 Alarmsp.19711.25 Refrigerant Monitoring System (RMS)p.19811.25.1 RMS Assetp.19811.25.2 RMS Scalep.19811.25.2.1 Device Constraintsp.19811.26 Detailed Setpoint Change Loggingp.19811.26.1 Log Informationp.19811.26.2 Logged Changesp.19911.26.3 Unlogged Changesp.19912 Operator’s Guide to Using the E2p.20112.1 The E2 Home Screenp.20112.1.1 RX Home Screenp.201Suction Groups Sectionp.201Circuit Status Sectionp.201Condenser Sectionp.201Sensor Controlp.20112.1.2 BX Home Screenp.201OAT Sectionp.201Demand Control Sectionp.201Power Monitoring Sectionp.202Light Schedules Sectionp.202Air Handling Units Sectionp.202Zones Sectionp.202Sensor Control Sectionp.20212.1.3 CX Home Screenp.202Lighting Control Sectionp.202HVAC Control Sectionp.202Refrigeration Control Sectionp.202Demand Control Sectionp.202Anti-Sweat Control Sectionp.202Sensor Control Sectionp.202Time Schedules Sectionp.20212.2 Logging On and Access Levelsp.20212.3 Toggling Full Optionsp.20312.4 Navigationp.20312.4.1 Menusp.203Main Menup.203The System Configuration Menup.203The System Information Menup.204Actions Menup.20412.4.2 Screen Typesp.205Summary Screensp.205Status Screensp.205Setup Screensp.20512.4.3 The E2 Keypadp.206The Cursorp.206The Tab Keyp.207The Enter Keyp.207Keypadp.207The Log In/Out Keyp.208Four Directional Arrow Keysp.208Page Up/Page Down Keysp.208Ctrl Page Up/Ctrl Page Down Keysp.208Numeric Keypadp.208Hot Keysp.20812.5 Customizing the Home Screenp.20912.6 Manual Defrost and Clean Modep.20912.7 Overridesp.21012.8 Checking Boards Onlinep.21112.9 Checking Status Screensp.211Suction Group Status Screenp.211Condenser Status Screenp.211Circuit Status Screenp.211Sensor Status Screenp.211AHU Status Screenp.212Zones Status Screenp.212Lighting Status Screenp.212Sensors Status Screenp.212Other Status Screensp.21212.10 Alarmsp.21212.10.1 Accessing the Alarm Advisory Logp.21212.10.2 Viewing the Controller Advisory Logp.21212.10.3 Date and Timep.21212.10.4 Statep.21212.10.5 Ack/Reset Statep.21312.10.6 Area Ctrl: Application: Propertyp.21312.10.7 Advisory Messagep.21312.10.8 Acknowledging, Resetting, and Clearing Log Entriesp.21312.10.8.1 Acknowledgingp.21312.10.8.2 Resettingp.21412.10.8.3 Clearingp.214Property or Board/Pointp.214Advisory Messagep.214Acknowledge Statusp.214Report Priorityp.214Return To Normalp.21412.10.9 Facility Status Display (FSD) Alarmsp.21512.11 Viewing Logs and Graphsp.21512.11.1 Locating Logged Inputs/ Outputsp.21512.11.1.1 Home/Status Screensp.21512.11.1.2 Setup Screensp.21612.11.1.3 Setting Up Input and Output Pointersp.21612.11.2 Log Viewp.21712.11.3 The Graph Viewp.21712.11.4 Zooming In and Outp.21712.12 Low Battery Notificationp.21812.13 Naming Conventions for E2 Controllers, Applications, and Pointsp.218Appendix A: Case Type Defaultsp.219High Alarm, Low Alarm, and Delayp.219Defrost Typep.219Appendix B: Pressure/Voltage and Temperature/Resistance Charts for Eclipse Transducers & Retail Solutions Temp Sensorsp.221Appendix C: Alarm Advisory Messagesp.223Appendix D: PID Controlp.237Introduction to PID Controlp.237Proportional (“P”) Modep.237Throttling Rangep.237Proportional Constant (Kp)p.238Integral Modep.238Why “I” Mode is Necessaryp.238Proportional Offsetp.238Saturationp.239The “I” Mode Calculationp.239Derivative Modep.239The “D” Mode Calculationp.240How Condenser Control and HVAC PID Differs From The Othersp.240Output at Setpointp.240Output at Setpoint for Non-Condenser/ HVAC PIDp.240Output at Setpoint for Condenser/HVAC PID Controlp.241Changing the Output at Setpointp.241Other PID Featuresp.241Output at Minimum / Output at Maximump.241Minimum Accumulated Errorp.242Applicationp.242Filteringp.242Applicationp.242Appendix E: Compressed Point Log Sample Limits and Precision Tabp.245Appendix F: Troubleshootingp.249Appendix G: Revision Logp.259Indexp.261
Page 7 of the Emerson E2 RX user manual — Table of contents
Page 7 · click to enlarge
Page 7

Table of contents

E2 Installation and Operation Manual for RX Refrigeration, BX HVAC, and CX Convenience Store Controllersp.1Table of Contentsp.51 Introductionp.171.1 The E2 Refrigeration Controllerp.171.2 The E2 Building Controllerp.181.3 The E2 Convenience Store Controllerp.191.4 Networking Overviewp.201.4.1 E2 I/O Networkp.201.4.2 The E2 Echelon Lonworks Networkp.211.4.3 Interconnection With Other E2sp.221.5 Documentation Overviewp.221.6 On-Line Help System Overviewp.231.7 Software Licensingp.242 Hardware Overviewp.252.1 E2 Hardwarep.252.1.1 E2 Main Processor Board (CPU)p.262.1.2 E2 Processor Interface Board (PIB)p.262.1.3 E2 Keypadp.262.1.4 LEDsp.262.1.5 PC-104 Peripherals: The Internal Modem (Previous Generation Processor Board)p.272.2 I/O Network Boards and Peripheralsp.272.2.1 The Gateway Boardp.272.2.2 MultiFlex Boardsp.282.2.2.1 MultiFlex 16 Input Boardp.282.2.2.2 MultiFlex Combination Input/ Output Boardsp.292.2.2.3 MultiFlex CUBp.312.2.2.4 MultiFlex RTU (BX and CX Only)p.312.2.2.5 MultiFlex Rooftop Control Board (RCB) (BX and CX Only)p.312.2.2.6 MultiFlex PAK Boardp.312.2.3 The MultiFlex ESR Boardp.322.2.4 Hand-held Terminal (P/N 814-3110)p.322.2.5 The 8RO and 8ROSMT Relay Boardsp.332.2.6 4AO Analog Output Boardp.342.2.7 8DO Digital Output Board and PMAC II Anti-Sweat Controllerp.342.3 Echelon Network Boards and Peripheralsp.352.3.1 The 16AIe (Discontinued)p.352.3.2 The 8ROe (Discontinued)p.352.3.3 EC-2sp.352.3.4 CC-100 Case Controllers and CS-100 Case Circuit Controllersp.362.3.5 The ESR8 (Discontinued)p.362.3.6 TD3 Temperature Displayp.372.3.7 Facility Status Display (FSD)p.373 Mountingp.393.1 Mounting the E2p.393.1.1 Standard Mountp.393.1.2 Recessed Mountp.393.1.3 Retrofit Mountingp.403.1.4 Blank Facep.413.2 Mounting I/O Boardsp.413.2.1 Single/Double Enclosuresp.413.2.2 Boards Without Enclosures (Snap Track)p.423.3 Echelon Devicesp.423.3.1 16AIe and 8ROep.423.3.2 CC-100 Case Controller and CS-100 Case Circuit Controllerp.433.3.3 ESR8 (Discontinued)p.433.3.4 MultiFlex ESRp.433.3.5 TD3p.433.4 Modem/Communication Expansion Card Mounting (New Processor Board)p.433.4.1 Mounting PC-104 Cards in E2 (Previous Generation Processor Board)p.443.4.1.1 The Internal Modemp.443.4.2 Two-Channel and FourChannel Repeatersp.443.4.2.1 Mounting Repeaters Overviewp.443.4.2.2 Mounting the Two-Channel Repeaterp.443.4.2.3 Mounting the Four-Channel Repeaterp.453.5 Sensors and Transducersp.453.5.1 Pressure Transducersp.453.5.1.1 Mountingp.453.5.2 Inside Temperature Sensorp.453.5.2.1 Locationp.453.5.2.2 Mountingp.463.5.3 Outside Temperature Sensorp.463.5.3.1 Locationp.463.5.3.2 Mountingp.463.5.4 Insertion Temperature Probep.463.5.4.1 Locationp.463.5.4.2 Mountingp.463.5.5 Supply and Return Air Sensorsp.463.5.6 Refrigeration System Temperature Probes and Sensorsp.473.5.6.1 Locationp.473.5.6.2 Mounting Bullet and Pipe Mount Sensorsp.473.5.7 Product Temperature Probesp.473.5.8 Humidity Sensors and Humidistatsp.473.5.8.1 Indoor RH Sensorp.473.5.8.2 Outdoor RH Sensorsp.48The outdoor RH sensor (P/N 203-5761)p.483.5.8.3 Duct-mounted Insertion RH Probep.483.5.9 Dewpoint Probep.493.5.9.1 Locationp.493.5.9.2 Mountingp.493.5.10 Light Level Sensorp.493.5.10.1 Locationp.493.5.10.2 Mountingp.493.5.11 Liquid Level Sensorsp.493.5.12 Refrigerant Leak Detectorsp.494 E2 Hardware Setupp.514.1 Setting up the E2p.514.1.1 Enclosurep.514.1.2 Main Processor Boardp.514.1.3 Main Processor Board (Previous Version)p.524.1.4 Power Interface Boardp.524.2 Powering the E2p.524.2.1 RS485 Portsp.524.2.2 RS485 Jumpersp.524.2.3 Echelon Network Connectp.524.2.4 Echelon Jumpersp.524.3 Add-On E2 Peripheralsp.534.3.1 Echelon Card Plug-In (P/N 537-4860) with mounting screw (P/N 101-4201)p.534.3.2 Modem/Communication Expansion Card (New Processor Board)p.544.3.3 Plug-In Modem Card (P/N 537-4870) with mounting screws (P/N 101-4038) and standoffs (P/N 107-9440) (Previous Generation Processor Board)p.544.3.4 Plug-In Digital I/O Network Card (P/N 537-4880)p.544.3.4.1 LEDsp.554.3.5 E2 RS485 Port Card (P/N 537-4890)p.554.3.5.1 LEDsp.554.3.6 Plug-In Four-Channel Internal Repeaterp.554.4 Battery Testing and Replacementp.554.4.1 Low Battery Notificationp.564.4.2 The Battery Enable Switchp.564.4.3 Battery Testp.564.4.4 Battery Replacement - Qualified Technicians Onlyp.565 Serial Configurationp.595.1 Overviewp.595.2 COM Portsp.59Pre-Setsp.595.3 Serial Device and Software Setupp.596 The RS485 Network and Hardware Setupp.616.1 The I/O Networkp.616.1.1 I/O Board Names and Terminologyp.616.1.2 MultiFlex-Plus (+) Boardp.626.1.2.1 Board Designationp.626.1.2.2 Board Calculationsp.626.1.3 Wiring Typesp.626.1.4 The I/O Network Structure (Daisy Chains)p.626.1.5 Network Noise Minimizationp.626.1.6 Network ID Numbers (Board Numbers)p.63Numbering the MultiFlex Combination I/O Boardsp.63Addressing the MultiFlex Boardsp.63Addressing the MultiFlex ESR Boardsp.636.1.7 Setting the Baud Ratep.63Baud Rate for the E2p.63Baud Rate for the Gatewayp.63Baud Rate for the 8IO, 8DO, and ARTCp.63Baud Rate for MultiFlex Boardsp.64Baud Rate for the MultiFlex ESRp.64Recommended Baud Ratep.646.1.8 Setting the Terminating and Biasing Jumpersp.646.1.9 Powering the I/O Boardsp.646.1.9.1 Wiring Typesp.656.1.10 Board Installationp.656.2 IMC/Prodigy Rooftop Unit Controllersp.656.3 ECT MODBUSp.666.3.1 Control Techniques Drive (VSD)p.666.3.2 Copeland Discus with CoreSense Diagnostics (ISD)p.666.3.3 XR35CX, XR75CX, and XEV22 Case Controllersp.666.3.3.1 XR75CX-Case Displayp.666.3.4 iPro DACp.676.3.5 Energy Meterp.676.3.5.1 Overviewp.676.3.5.2 Supported System Typesp.676.3.6 Modular Refrigerant Leak Detection Sensor (MRLDS)p.676.3.7 Copeland Discus with CoreSense Protectionp.686.3.8 Light Commercial Thermostatp.686.3.8.1 Thermostat Inputsp.686.3.8.2 Advisory and Alarmsp.686.3.9 Refrigerant Leak Detection System (RLDS)p.716.3.9.1 Diagnostic Alarmsp.716.3.10 Copeland Scroll — K5 Refrigeration Compressorp.716.3.11 XM Series of Case Controllersp.726.3.11.1 XM670p.726.3.11.2 XM679p.726.3.11.3 XM678p.727 E2 Ethernet Peer Communicationsp.837.1 Ethernet IP Configurationsp.837.2 Hardware Specificationsp.837.2.1 Componentsp.837.3 Software Specificationsp.847.4 Ethernet Network Layoutsp.847.4.1 Closed Network Layoutp.847.4.2 Open Network Layoutp.857.5 Software Setupp.857.6 Troubleshootingp.868 Echelon Network and Hardware Setupp.878.1 Overviewp.878.2 Wiring Typep.878.3 Echelon Network Structuring (Daisy-Chains)p.878.3.1 Maximum Number of Echelon Devicesp.888.4 Device Terminationp.888.4.1 Using a Termination Block (P/N 535-2715) to Terminate a Daisy Chainp.898.5 Wire Restrictionsp.89Maximum Total Segment Lengthp.898.6 Installing Echelon Devicesp.898.6.1 Powering Echelon Devicesp.898.7 LEDsp.908.8 Open Echelon Device Connectivityp.908.8.1 Configuring Echelon Devicesp.908.8.1.1 Troubleshootingp.919 Input and Output Setupp.959.1 The 16AI, 8IO, and MultiFlex Inputsp.959.1.1 Connecting Sensors to Input Boardsp.959.1.1.1 Wiringp.95MultiFlex Boardsp.9516AI Boardsp.958IO and ARTC Boardsp.959.1.1.2 Sensor Wiring Typesp.95All Analog Temperature Sensors and Air Flow Sensorsp.95All Pressure Transducers, Humidity Sensors, and Refrigeration Transducersp.95Dewpoint and Light Level Sensorsp.959.1.1.3 Input Type Dip Switchesp.959.1.2 Power Connectionp.969.1.3 Input Setup in E2p.1009.1.3.1 Configuring a Point from the Input Definitions/Status Screenp.1009.1.3.2 Using the Input Definitions/Status Screenp.1011. Board Type (read-only)p.1012. Brd (read-only)p.1013. Pt (read-only)p.1014. Type (read-only)p.1015. Applicationp.1016. Associationp.1017. Value (read-only)p.1019.1.3.3 Setting Up Analog Inputsp.1019.1.3.4 Setting Up Digital Inputsp.1039.2 The 8RO, 8ROe, 8IO, and MultiFlex Outputsp.1049.2.1 Wiring Form C Contactsp.1049.2.2 MultiFlex Relay Outputsp.1049.2.3 Setting the Fail-Safe Dip Switchp.1049.2.4 Wiring Outputs to Pointsp.105Old 8ROsp.105New 8ROs and 8RO-FCsp.1059.2.5 The Output LEDp.1059.2.6 Output Setup in E2p.1059.2.6.1 Configuring a Point from the Output Definitions/Status Screenp.1059.2.6.2 Using the Output Definitions/Status Screenp.1051. Board Type (read-only)p.1062. Brd (read-only)p.1063. Pt (read-only)p.1064. Type (read-only)p.1065. Applicationp.1066. Associationp.1067. Value (read-only)p.1069.2.6.3 Setting Up Digital Outputsp.1069.2.6.4 Setting Up Analog Outputsp.1079.3 CC-100 Case Controllersp.1089.3.1 Inputsp.108Temperature and Digital Sensorsp.108Connectionp.108Auxiliary Analog Inputp.109Hand-Held Terminal Jackp.1099.3.2 Power Module Wiringp.1099.3.3 Valve Cablep.109P/N 335-3263 (Pulse Valve)p.110P/N 335-3261 (Sporlan SEI and Emerson Flow Controls ESR Stepper Valve)p.110P/N 335-3260 (Generic Stepper and Emerson Flow Controls ESV Valve)p.1109.4 ESR8 Valve Output Wiringp.11010 Quick Startp.11310.1 Logging Onp.11310.2 Cleaning Out the Controllerp.113Performing a Clean Outp.11310.3 Setting Number of Network Devicesp.114Boards on the I/O Networkp.114Unit Controllers (Echelon)p.11410.4 Setting Number of Applicationsp.11510.5 The Main Status (Home) Screenp.11510.5.1 Customizing the Home Screenp.11510.6 Common Screen Elementsp.11610.6.1 The Headerp.11610.6.1.1 Header Iconsp.11610.6.2 The Function Keysp.11610.6.3 The Help Linep.11610.7 Screen Typesp.11710.7.1 The Main Menup.11710.7.2 Status Screensp.11710.7.3 The Actions Menup.11810.7.4 The Setup Screensp.11910.7.5 System Configuration Menup.11910.7.6 The System Information Menup.12010.8 Time/Date Setupp.12110.8.1 Setting the Time and Datep.121Active Datep.121Active Timep.121Time Zonep.121Time Serverp.121Primary Time Serverp.122Secondary Time Serverp.122Date Formatp.122Daylight Savings Datesp.122Daylight Savings Time uses GMTp.122Unit Location Fromp.122Sundownp.12210.9 Set Up Modemp.12210.10 Set Up TCP/IPp.12310.11 Set Up Network Baud Ratesp.12410.11.1 COM1 Serial (RS232) Baud Ratep.12410.11.2 I/O Network Baud Ratep.12410.12 Set Up User Accessp.12510.12.1 Changing Required User Access Levelsp.12610.12.2 Creating a New User Accountp.12610.12.3 Deleting a Userp.12610.13 Set Up I/O Networkp.12710.13.1 Specify Number of Boardsp.127Boards on the I/O Networkp.12710.13.2 Checking Online Statusp.12810.14 Set Up Echelon Networkp.12810.14.1 Specifying Number of Devicesp.128Unit Controllers (Echelon)p.12810.14.2 Commissioning a Devicep.129How Echelon Commissioning Worksp.129MODBUS Commissioningp.12910.14.2.1 The Service Button Methodp.129The CC-100’s Service Buttonp.130The TD3’s Service Buttonp.130The ESR8’s Service Buttonp.130Commissioning the EC-2p.13010.14.2.2 The Manual ID Entry Methodp.13110.15 License Managementp.13110.15.1 Web Servicesp.13210.16 Set Up Alarmingp.13310.16.1 Specifying Alarm Reporting Typesp.13410.16.1.1 The Display Linep.13410.16.1.2 The Alarm Outputp.13410.16.1.3 Dial-Outp.13410.16.1.4 The Echelon Network (The Alarm Annunciator)p.13410.16.2 Setting up an E2 to be an Alarm Annunciatorp.13410.16.3 Alarm Dial-Outp.13510.16.4 Introduction: Alarm Reportingp.1351. The E2 Display Headerp.1352. The Advisory Outputp.1353. Dial-Outp.1354. The LonWorks Network (The Alarm Annunciator)p.13510.17 Set Up Global Datap.13610.17.1 Priority Settingsp.136Example: Setting Up an Outdoor Temperature Sensorp.13710.18 Set Up Applicationsp.13710.18.1 Add/Delete an Applicationp.13810.18.2 Using and Configuring a Setup Screenp.13810.18.2.1 The Edit Menup.13910.18.2.2 Entering Setpointsp.13910.18.2.3 Navigating the Setup Screenp.139Index Tabsp.140The Help Linep.140The Function Keys For Setupp.14010.18.3 Using the Help Key to get Property Helpp.14111 Software Overviewp.14311.1 Suction Groupsp.14311.1.1 Introductionp.14311.1.2 The (Standard) Suction Group Applicationp.14311.1.2.1 Overview of PID Control Strategyp.14311.1.2.2 Variable-Speed Compressorsp.14311.1.2.3 Floating Setpoint Controlp.14311.1.3 The Enhanced Suction Group Applicationp.14311.1.3.1 Learning Modep.14411.1.3.2 Circuit Load Analysisp.14411.1.3.3 The Control/Cycles Parameterp.14411.1.3.4 Variable-Speed, Digital Scroll, and Digital Discus Compressor Supportp.14411.1.3.5 Floating Suction Controlp.14411.1.4 Hardware Overviewp.14411.2 Condenser Controlp.14511.2.1 Air Cooled Condensersp.14511.2.1.1 Air Cooled Strategyp.14511.2.1.2 Temperature Differential Strategyp.14511.2.2 Evaporative Condensersp.14611.2.3 Fan Controlp.14611.2.4 Condenser Split Modep.14611.2.5 Fast Recoveryp.14611.2.6 Hardware Overviewp.14611.3 Standard Circuitsp.14711.3.1 Refrigeration Controlp.14711.3.1.1 Temperature Monitorp.14811.3.1.2 Temperature Controlp.14811.3.1.3 Line Up(ESR)/Defrostp.14811.3.1.4 Line Up(MFESR)/Defrostp.14811.3.2 Defrost Controlp.14811.3.2.1 Defrost Statesp.14811.3.2.2 Defrost Typesp.148Timed and Reverse Airp.148Hot Gas and Reversed Cycle Hot Gasp.148Electric Defrostp.14811.3.2.3 Defrost Terminationp.149Pulsed Defrostp.14911.3.2.4 Emergency Defrostp.14911.3.2.5 Hot Gas Defrost with ESR8 and MultiFlex ESRp.14911.3.3 Clean and Door Switchesp.14911.3.3.1 Clean Switchesp.14911.3.3.2 Door Switchesp.14911.3.4 Fan Controlp.15011.3.5 The TD3 Temperature Displayp.15011.3.6 The Control Link CD Case Displayp.15011.3.7 Wiringp.15011.4 Case Control Circuitsp.15211.4.1 Overviewp.15211.4.2 Case Circuit Control Software Overviewp.15211.4.2.1 Valve Controlp.153Pulse Valvesp.153Stepper Valvesp.15311.4.3 Refrigeration Controlp.15311.4.3.1 EEVs (Liquid Pulse and Liquid Stepper)p.153Temperature Controlp.153Superheat Controlp.153Recovery Modep.153Thermostatic Expansion Valves (TXVs)p.15411.4.3.2 EEPRs (Suction Stepper)p.154Recovery Modep.15411.4.4 Defrost Controlp.15411.4.4.1 Defrost Statesp.15411.4.4.2 Defrost Typesp.154Off Cycle (Timed)p.154Hot Gas and Reversed Cycle Hot Gasp.154Electric Defrostp.15511.4.4.3 Defrost Terminationp.155Temperature Terminationp.155Pulsed Defrostp.15511.4.4.4 Demand Defrostp.155Demand Fail-Safe Timep.15511.4.4.5 Emergency Defrostp.15511.4.4.6 The WAIT Statep.15511.4.5 Anti-Sweat Controlp.15511.4.5.1 Dewpoint Input Sourcesp.15611.4.6 Dual Temp Controlp.15611.4.7 Fan Controlp.15611.4.8 Light Controlp.15611.4.9 Clean/Wash Modep.156End of Mode Warningp.15711.4.10 Walk-In Freezer Controlp.15711.4.11 Fail-Safe Modep.157Actions Taken During Fail-Safe Modep.15711.4.11.1 Recoverable Sensor Failuresp.157Coil In or Coil Out Failurep.157Discharge/Return Airp.15711.4.12 Wiringp.15811.4.13 Setting Up An Individual Case Controllerp.15811.4.14 Associating Case Controllers with Case Circuit Control Applicationsp.15811.5 Logging Groupsp.15811.5.1 Possible Data Errorsp.15911.5.2 Data Compressionp.15911.5.2.1 Clippingp.15911.5.2.2 Incompressible Data Typesp.15911.5.3 Base Log Groupp.15911.5.4 Setting Up Loggingp.16011.5.5 Logging Group Status Screenp.16111.5.6 Log Reportsp.16111.5.6.1 Logging Group Reportp.16211.5.6.2 Application Log Reportp.16211.5.6.3 System Log Reportp.16211.6 Air Handling Units (AHU)p.16311.6.1 Overviewp.16311.6.2 Temperature Controlp.16311.6.3 Alternate Setpointsp.16311.6.4 Fan Controlp.16311.6.4.1 Single-Speed Fansp.16311.6.4.2 Two-Speed Fansp.164Continuous Two-Speed Fan Operation When All Stages Are OFFp.16411.6.4.3 Variable-Speed Fansp.164Variable-Speed Fan Operationp.164Dehumidification with VS Fansp.16411.6.5 Economizer Controlp.16411.6.5.1 Economization Enablep.16411.6.5.2 Economization Lockout Featuresp.165Max Outside Air Humidityp.165Minimum Supply Tempp.16511.6.6 Digital Economizer Controlp.16511.6.7 Analog Economizer Controlp.16511.6.8 Dehumidification Controlp.16511.6.9 Curtailmentp.16511.6.10 Optimum Start/Stop (OSS)p.165Intelligent Pre-Starts and Pre-Stopsp.16611.6.11 Separate Setpointsp.16611.6.12 AHU Zone Controlp.16611.6.13 Hardware Overviewp.16611.7 Zone Controlp.16711.7.1 Overviewp.16711.7.2 How Zones Workp.16811.7.3 Applications That May Be Connected To Zonesp.16811.7.3.1 MultiFlex RTU Boardp.16811.7.3.2 MultiFlex RCB Boardp.16811.7.3.3 AHUsp.16811.7.4 Temperature Controlp.16911.7.5 Zone Temperaturep.16911.7.6 Economizer Controlp.16911.7.7 Economization Enablep.16911.7.8 The Effect of Enabling Economizationp.17011.7.9 Dehumidification Controlp.17011.7.10 The Zone Humidity Inputp.17011.7.11 The Effect of Enabling Dehumidificationp.17011.7.11.1 MultiFlex RTUs and RCBsp.17011.7.11.2 AHUsp.17011.7.12 Optimum Start/Stop (OSS)p.170Intelligent Pre-Starts and Pre-Stopsp.17111.7.13 Losing Contact With Zone Applicationsp.17111.7.14 Stand-Alone MultiFlex RTUsp.17111.7.15 MultiFlex RTU/ARTC and AHU Zone Associationp.17111.8 MultiFlex CUB Boardp.17211.9 MultiFlex PAK Boardp.17211.10 Lighting Schedulesp.17211.10.1 Overviewp.17211.10.2 Functions of the Lighting Schedule Applicationp.17311.10.3 Control Method Selectp.17311.10.4 Standard Controlp.17311.10.4.1 The Light Level Interface Cell (LLEV INTERFACE)p.173Logical Combination Strategiesp.173Occupied/Unoccupied and Alternate Settingsp.17411.10.4.2 The Schedule Interface Cell (SCHEDIF)p.174Logical Combinationsp.174Alternate Schedule Interface Combinationsp.17411.10.5 Alternate Controlp.17411.10.5.1 Multi-Logic Combinerp.17411.10.5.2 Offset Solar Controlp.17511.10.6 The Basic Schedule Cellp.17511.10.6.1 Slave Schedulingp.17511.10.7 The Min ON/OFF Cellp.17511.10.8 The Proof Cellp.17511.10.9 Output Light Dimmingp.17611.11 Demand Controlp.17611.11.1 Introduction to Demand Limit Controlp.17611.11.2 Demand Monitoringp.17611.11.3 Load Sheddingp.17711.11.3.1 Definitionp.17711.11.4 Shedding Levelsp.17711.11.5 Priority Levelsp.1771. First Shedp.1772. Rotational Shedp.1783. Last Shedp.178Other Notes About Priority Levelsp.17811.11.6 How Demand Control Uses Load Sheddingp.179Mode 1: KW Input Is Greater Than Setpointp.179Mode 2: KW Input Has Been Greater Than Setpoint for 1/4 Demand Window And Is Still Going Upp.179Mode 3: Integral Error Approaching Zerop.17911.11.6.1 Power Monitoring Inputp.180Settingsp.18011.12 Sensor Controlp.18011.12.1 Overviewp.18011.12.2 Analog Sensor Controlp.18011.12.3 Cut In/Cut Out Setpoint Controlp.18011.12.4 Digital Sensor Controlp.18011.12.5 Logical Combinationp.18111.13 Loop/Sequence Controlp.18111.13.1 Layout of the Loop/ Sequence Control Applicationp.18111.13.1.1 Control Cellsp.18111.13.1.2 Output Cellsp.18211.13.1.3 Diagramp.18211.13.2 Loop/Sequence Control Cell Descriptionsp.18211.13.2.1 The Select Cellp.18211.13.2.2 The Setpoint Float Cellp.18311.13.2.3 The PID Control Cellp.183Bypassing PIDp.18311.13.2.4 The Filter Cellp.18311.13.2.5 The Override Cellp.18311.13.3 Output Cell Descriptionsp.18311.13.3.1 The Sequencer Cellp.18311.13.3.2 The PWM Cellp.18311.14 Time Scheduling and Holidaysp.18411.14.1 How Schedules Workp.18411.14.1.1 Eventsp.18411.14.1.2 Absolute and Relative Eventsp.18411.14.1.3 Temporary Schedule Eventsp.18411.14.1.4 Overlappingp.18511.14.1.5 Rangesp.18511.14.2 Holiday Schedulesp.18511.15 Power Monitoringp.18511.15.1 Overviewp.185Explanation of “Demand”p.185How Power Monitoring Calculates Demandp.185Shed Modep.18511.15.2 Loggingp.186Hourlyp.186Dailyp.186Monthlyp.186Definition of Heat and Cool Degree Daysp.18611.15.2.1 Power Monitoring Inputp.186Settingsp.18611.16 Anti-Sweat Setupp.18711.16.1 How Anti-Sweat Worksp.18711.17 Heat/Cool Controlp.18711.17.1 Temperature Controlp.18711.17.2 Unoccupied Hysteresisp.18711.17.3 Optimum Start/Stop (OSS)p.188Intelligent Pre-Starts and Pre-Stopsp.18811.17.4 Setpoint Resetp.18811.17.5 Lead/Lagp.18911.18 Analog and Digital Combinersp.18911.19 TD Controlp.19011.19.1 Overviewp.19011.19.2 Temperature Differential (TD) Strategyp.19011.19.3 TD Control Fail-Safesp.190Drop Leg Temperature Above Maximum Drop Leg Setpointp.19011.19.4 Configurationp.19011.19.5 Setpointsp.19011.19.6 Inputsp.19111.19.7 Alarmsp.19111.20 Pulse Accumulationp.19111.20.1 Overviewp.19111.20.2 Configurationp.19111.20.3 Outputsp.19111.20.4 Accumulator Reset Typesp.19211.20.5 Loggingp.19211.20.6 High Tripp.19211.21 Irrigation Controlp.19211.21.1 Overviewp.19211.21.2 Zones and Cyclesp.19211.21.2.1 Cycle Control Typesp.19311.21.2.2 Timedp.19311.21.2.3 Volumep.19311.21.3 Cycle Schedulingp.19311.21.4 Zone Inhibitp.19311.21.4.1 Timedp.19311.21.4.2 Volumep.19311.21.4.3 Rain Delayp.19311.21.4.4 Freeze Lockoutp.19311.21.4.5 Alarmp.19311.21.5 Zone Bypass Inputsp.19311.21.5.1 Bypass Failsafep.19411.21.6 Flow Sensor-Related Testsp.19411.21.6.1 Leak Testp.19411.21.6.2 Obstructed Zone Testp.19411.21.7 Service Modesp.19411.21.8 Heat Cut In/Cut Out Setpoints For Each Stagep.19411.21.9 Cool Cut In/Cut Out Setpoints For Each Stagep.19411.21.10 Dehumidification Controlp.19411.21.11 Two Speed Fan Controlp.19411.21.12 Configurationp.19511.22 Flexible Combinerp.19511.23 Modular Chiller Control (MCC)p.19511.23.1 Overviewp.19511.23.2 Learning Modep.19611.23.3 The Control/Cycles Parameterp.19611.23.4 Compressor Controlp.19611.23.4.1 Digital Scroll Compressorp.19711.23.4.2 Variable Frequency Drive Compressorp.19711.23.4.3 Unequal Capacity Compressorsp.19711.23.5 Bypass Valve Controlp.19711.24 Boilerp.19711.24.1 Overviewp.19711.24.2 Alarmsp.19711.25 Refrigerant Monitoring System (RMS)p.19811.25.1 RMS Assetp.19811.25.2 RMS Scalep.19811.25.2.1 Device Constraintsp.19811.26 Detailed Setpoint Change Loggingp.19811.26.1 Log Informationp.19811.26.2 Logged Changesp.19911.26.3 Unlogged Changesp.19912 Operator’s Guide to Using the E2p.20112.1 The E2 Home Screenp.20112.1.1 RX Home Screenp.201Suction Groups Sectionp.201Circuit Status Sectionp.201Condenser Sectionp.201Sensor Controlp.20112.1.2 BX Home Screenp.201OAT Sectionp.201Demand Control Sectionp.201Power Monitoring Sectionp.202Light Schedules Sectionp.202Air Handling Units Sectionp.202Zones Sectionp.202Sensor Control Sectionp.20212.1.3 CX Home Screenp.202Lighting Control Sectionp.202HVAC Control Sectionp.202Refrigeration Control Sectionp.202Demand Control Sectionp.202Anti-Sweat Control Sectionp.202Sensor Control Sectionp.202Time Schedules Sectionp.20212.2 Logging On and Access Levelsp.20212.3 Toggling Full Optionsp.20312.4 Navigationp.20312.4.1 Menusp.203Main Menup.203The System Configuration Menup.203The System Information Menup.204Actions Menup.20412.4.2 Screen Typesp.205Summary Screensp.205Status Screensp.205Setup Screensp.20512.4.3 The E2 Keypadp.206The Cursorp.206The Tab Keyp.207The Enter Keyp.207Keypadp.207The Log In/Out Keyp.208Four Directional Arrow Keysp.208Page Up/Page Down Keysp.208Ctrl Page Up/Ctrl Page Down Keysp.208Numeric Keypadp.208Hot Keysp.20812.5 Customizing the Home Screenp.20912.6 Manual Defrost and Clean Modep.20912.7 Overridesp.21012.8 Checking Boards Onlinep.21112.9 Checking Status Screensp.211Suction Group Status Screenp.211Condenser Status Screenp.211Circuit Status Screenp.211Sensor Status Screenp.211AHU Status Screenp.212Zones Status Screenp.212Lighting Status Screenp.212Sensors Status Screenp.212Other Status Screensp.21212.10 Alarmsp.21212.10.1 Accessing the Alarm Advisory Logp.21212.10.2 Viewing the Controller Advisory Logp.21212.10.3 Date and Timep.21212.10.4 Statep.21212.10.5 Ack/Reset Statep.21312.10.6 Area Ctrl: Application: Propertyp.21312.10.7 Advisory Messagep.21312.10.8 Acknowledging, Resetting, and Clearing Log Entriesp.21312.10.8.1 Acknowledgingp.21312.10.8.2 Resettingp.21412.10.8.3 Clearingp.214Property or Board/Pointp.214Advisory Messagep.214Acknowledge Statusp.214Report Priorityp.214Return To Normalp.21412.10.9 Facility Status Display (FSD) Alarmsp.21512.11 Viewing Logs and Graphsp.21512.11.1 Locating Logged Inputs/ Outputsp.21512.11.1.1 Home/Status Screensp.21512.11.1.2 Setup Screensp.21612.11.1.3 Setting Up Input and Output Pointersp.21612.11.2 Log Viewp.21712.11.3 The Graph Viewp.21712.11.4 Zooming In and Outp.21712.12 Low Battery Notificationp.21812.13 Naming Conventions for E2 Controllers, Applications, and Pointsp.218Appendix A: Case Type Defaultsp.219High Alarm, Low Alarm, and Delayp.219Defrost Typep.219Appendix B: Pressure/Voltage and Temperature/Resistance Charts for Eclipse Transducers & Retail Solutions Temp Sensorsp.221Appendix C: Alarm Advisory Messagesp.223Appendix D: PID Controlp.237Introduction to PID Controlp.237Proportional (“P”) Modep.237Throttling Rangep.237Proportional Constant (Kp)p.238Integral Modep.238Why “I” Mode is Necessaryp.238Proportional Offsetp.238Saturationp.239The “I” Mode Calculationp.239Derivative Modep.239The “D” Mode Calculationp.240How Condenser Control and HVAC PID Differs From The Othersp.240Output at Setpointp.240Output at Setpoint for Non-Condenser/ HVAC PIDp.240Output at Setpoint for Condenser/HVAC PID Controlp.241Changing the Output at Setpointp.241Other PID Featuresp.241Output at Minimum / Output at Maximump.241Minimum Accumulated Errorp.242Applicationp.242Filteringp.242Applicationp.242Appendix E: Compressed Point Log Sample Limits and Precision Tabp.245Appendix F: Troubleshootingp.249Appendix G: Revision Logp.259Indexp.261
Page 8 of the Emerson E2 RX user manual — Table of contents
Page 8 · click to enlarge
Page 8

Table of contents

E2 Installation and Operation Manual for RX Refrigeration, BX HVAC, and CX Convenience Store Controllersp.1Table of Contentsp.51 Introductionp.171.1 The E2 Refrigeration Controllerp.171.2 The E2 Building Controllerp.181.3 The E2 Convenience Store Controllerp.191.4 Networking Overviewp.201.4.1 E2 I/O Networkp.201.4.2 The E2 Echelon Lonworks Networkp.211.4.3 Interconnection With Other E2sp.221.5 Documentation Overviewp.221.6 On-Line Help System Overviewp.231.7 Software Licensingp.242 Hardware Overviewp.252.1 E2 Hardwarep.252.1.1 E2 Main Processor Board (CPU)p.262.1.2 E2 Processor Interface Board (PIB)p.262.1.3 E2 Keypadp.262.1.4 LEDsp.262.1.5 PC-104 Peripherals: The Internal Modem (Previous Generation Processor Board)p.272.2 I/O Network Boards and Peripheralsp.272.2.1 The Gateway Boardp.272.2.2 MultiFlex Boardsp.282.2.2.1 MultiFlex 16 Input Boardp.282.2.2.2 MultiFlex Combination Input/ Output Boardsp.292.2.2.3 MultiFlex CUBp.312.2.2.4 MultiFlex RTU (BX and CX Only)p.312.2.2.5 MultiFlex Rooftop Control Board (RCB) (BX and CX Only)p.312.2.2.6 MultiFlex PAK Boardp.312.2.3 The MultiFlex ESR Boardp.322.2.4 Hand-held Terminal (P/N 814-3110)p.322.2.5 The 8RO and 8ROSMT Relay Boardsp.332.2.6 4AO Analog Output Boardp.342.2.7 8DO Digital Output Board and PMAC II Anti-Sweat Controllerp.342.3 Echelon Network Boards and Peripheralsp.352.3.1 The 16AIe (Discontinued)p.352.3.2 The 8ROe (Discontinued)p.352.3.3 EC-2sp.352.3.4 CC-100 Case Controllers and CS-100 Case Circuit Controllersp.362.3.5 The ESR8 (Discontinued)p.362.3.6 TD3 Temperature Displayp.372.3.7 Facility Status Display (FSD)p.373 Mountingp.393.1 Mounting the E2p.393.1.1 Standard Mountp.393.1.2 Recessed Mountp.393.1.3 Retrofit Mountingp.403.1.4 Blank Facep.413.2 Mounting I/O Boardsp.413.2.1 Single/Double Enclosuresp.413.2.2 Boards Without Enclosures (Snap Track)p.423.3 Echelon Devicesp.423.3.1 16AIe and 8ROep.423.3.2 CC-100 Case Controller and CS-100 Case Circuit Controllerp.433.3.3 ESR8 (Discontinued)p.433.3.4 MultiFlex ESRp.433.3.5 TD3p.433.4 Modem/Communication Expansion Card Mounting (New Processor Board)p.433.4.1 Mounting PC-104 Cards in E2 (Previous Generation Processor Board)p.443.4.1.1 The Internal Modemp.443.4.2 Two-Channel and FourChannel Repeatersp.443.4.2.1 Mounting Repeaters Overviewp.443.4.2.2 Mounting the Two-Channel Repeaterp.443.4.2.3 Mounting the Four-Channel Repeaterp.453.5 Sensors and Transducersp.453.5.1 Pressure Transducersp.453.5.1.1 Mountingp.453.5.2 Inside Temperature Sensorp.453.5.2.1 Locationp.453.5.2.2 Mountingp.463.5.3 Outside Temperature Sensorp.463.5.3.1 Locationp.463.5.3.2 Mountingp.463.5.4 Insertion Temperature Probep.463.5.4.1 Locationp.463.5.4.2 Mountingp.463.5.5 Supply and Return Air Sensorsp.463.5.6 Refrigeration System Temperature Probes and Sensorsp.473.5.6.1 Locationp.473.5.6.2 Mounting Bullet and Pipe Mount Sensorsp.473.5.7 Product Temperature Probesp.473.5.8 Humidity Sensors and Humidistatsp.473.5.8.1 Indoor RH Sensorp.473.5.8.2 Outdoor RH Sensorsp.48The outdoor RH sensor (P/N 203-5761)p.483.5.8.3 Duct-mounted Insertion RH Probep.483.5.9 Dewpoint Probep.493.5.9.1 Locationp.493.5.9.2 Mountingp.493.5.10 Light Level Sensorp.493.5.10.1 Locationp.493.5.10.2 Mountingp.493.5.11 Liquid Level Sensorsp.493.5.12 Refrigerant Leak Detectorsp.494 E2 Hardware Setupp.514.1 Setting up the E2p.514.1.1 Enclosurep.514.1.2 Main Processor Boardp.514.1.3 Main Processor Board (Previous Version)p.524.1.4 Power Interface Boardp.524.2 Powering the E2p.524.2.1 RS485 Portsp.524.2.2 RS485 Jumpersp.524.2.3 Echelon Network Connectp.524.2.4 Echelon Jumpersp.524.3 Add-On E2 Peripheralsp.534.3.1 Echelon Card Plug-In (P/N 537-4860) with mounting screw (P/N 101-4201)p.534.3.2 Modem/Communication Expansion Card (New Processor Board)p.544.3.3 Plug-In Modem Card (P/N 537-4870) with mounting screws (P/N 101-4038) and standoffs (P/N 107-9440) (Previous Generation Processor Board)p.544.3.4 Plug-In Digital I/O Network Card (P/N 537-4880)p.544.3.4.1 LEDsp.554.3.5 E2 RS485 Port Card (P/N 537-4890)p.554.3.5.1 LEDsp.554.3.6 Plug-In Four-Channel Internal Repeaterp.554.4 Battery Testing and Replacementp.554.4.1 Low Battery Notificationp.564.4.2 The Battery Enable Switchp.564.4.3 Battery Testp.564.4.4 Battery Replacement - Qualified Technicians Onlyp.565 Serial Configurationp.595.1 Overviewp.595.2 COM Portsp.59Pre-Setsp.595.3 Serial Device and Software Setupp.596 The RS485 Network and Hardware Setupp.616.1 The I/O Networkp.616.1.1 I/O Board Names and Terminologyp.616.1.2 MultiFlex-Plus (+) Boardp.626.1.2.1 Board Designationp.626.1.2.2 Board Calculationsp.626.1.3 Wiring Typesp.626.1.4 The I/O Network Structure (Daisy Chains)p.626.1.5 Network Noise Minimizationp.626.1.6 Network ID Numbers (Board Numbers)p.63Numbering the MultiFlex Combination I/O Boardsp.63Addressing the MultiFlex Boardsp.63Addressing the MultiFlex ESR Boardsp.636.1.7 Setting the Baud Ratep.63Baud Rate for the E2p.63Baud Rate for the Gatewayp.63Baud Rate for the 8IO, 8DO, and ARTCp.63Baud Rate for MultiFlex Boardsp.64Baud Rate for the MultiFlex ESRp.64Recommended Baud Ratep.646.1.8 Setting the Terminating and Biasing Jumpersp.646.1.9 Powering the I/O Boardsp.646.1.9.1 Wiring Typesp.656.1.10 Board Installationp.656.2 IMC/Prodigy Rooftop Unit Controllersp.656.3 ECT MODBUSp.666.3.1 Control Techniques Drive (VSD)p.666.3.2 Copeland Discus with CoreSense Diagnostics (ISD)p.666.3.3 XR35CX, XR75CX, and XEV22 Case Controllersp.666.3.3.1 XR75CX-Case Displayp.666.3.4 iPro DACp.676.3.5 Energy Meterp.676.3.5.1 Overviewp.676.3.5.2 Supported System Typesp.676.3.6 Modular Refrigerant Leak Detection Sensor (MRLDS)p.676.3.7 Copeland Discus with CoreSense Protectionp.686.3.8 Light Commercial Thermostatp.686.3.8.1 Thermostat Inputsp.686.3.8.2 Advisory and Alarmsp.686.3.9 Refrigerant Leak Detection System (RLDS)p.716.3.9.1 Diagnostic Alarmsp.716.3.10 Copeland Scroll — K5 Refrigeration Compressorp.716.3.11 XM Series of Case Controllersp.726.3.11.1 XM670p.726.3.11.2 XM679p.726.3.11.3 XM678p.727 E2 Ethernet Peer Communicationsp.837.1 Ethernet IP Configurationsp.837.2 Hardware Specificationsp.837.2.1 Componentsp.837.3 Software Specificationsp.847.4 Ethernet Network Layoutsp.847.4.1 Closed Network Layoutp.847.4.2 Open Network Layoutp.857.5 Software Setupp.857.6 Troubleshootingp.868 Echelon Network and Hardware Setupp.878.1 Overviewp.878.2 Wiring Typep.878.3 Echelon Network Structuring (Daisy-Chains)p.878.3.1 Maximum Number of Echelon Devicesp.888.4 Device Terminationp.888.4.1 Using a Termination Block (P/N 535-2715) to Terminate a Daisy Chainp.898.5 Wire Restrictionsp.89Maximum Total Segment Lengthp.898.6 Installing Echelon Devicesp.898.6.1 Powering Echelon Devicesp.898.7 LEDsp.908.8 Open Echelon Device Connectivityp.908.8.1 Configuring Echelon Devicesp.908.8.1.1 Troubleshootingp.919 Input and Output Setupp.959.1 The 16AI, 8IO, and MultiFlex Inputsp.959.1.1 Connecting Sensors to Input Boardsp.959.1.1.1 Wiringp.95MultiFlex Boardsp.9516AI Boardsp.958IO and ARTC Boardsp.959.1.1.2 Sensor Wiring Typesp.95All Analog Temperature Sensors and Air Flow Sensorsp.95All Pressure Transducers, Humidity Sensors, and Refrigeration Transducersp.95Dewpoint and Light Level Sensorsp.959.1.1.3 Input Type Dip Switchesp.959.1.2 Power Connectionp.969.1.3 Input Setup in E2p.1009.1.3.1 Configuring a Point from the Input Definitions/Status Screenp.1009.1.3.2 Using the Input Definitions/Status Screenp.1011. Board Type (read-only)p.1012. Brd (read-only)p.1013. Pt (read-only)p.1014. Type (read-only)p.1015. Applicationp.1016. Associationp.1017. Value (read-only)p.1019.1.3.3 Setting Up Analog Inputsp.1019.1.3.4 Setting Up Digital Inputsp.1039.2 The 8RO, 8ROe, 8IO, and MultiFlex Outputsp.1049.2.1 Wiring Form C Contactsp.1049.2.2 MultiFlex Relay Outputsp.1049.2.3 Setting the Fail-Safe Dip Switchp.1049.2.4 Wiring Outputs to Pointsp.105Old 8ROsp.105New 8ROs and 8RO-FCsp.1059.2.5 The Output LEDp.1059.2.6 Output Setup in E2p.1059.2.6.1 Configuring a Point from the Output Definitions/Status Screenp.1059.2.6.2 Using the Output Definitions/Status Screenp.1051. Board Type (read-only)p.1062. Brd (read-only)p.1063. Pt (read-only)p.1064. Type (read-only)p.1065. Applicationp.1066. Associationp.1067. Value (read-only)p.1069.2.6.3 Setting Up Digital Outputsp.1069.2.6.4 Setting Up Analog Outputsp.1079.3 CC-100 Case Controllersp.1089.3.1 Inputsp.108Temperature and Digital Sensorsp.108Connectionp.108Auxiliary Analog Inputp.109Hand-Held Terminal Jackp.1099.3.2 Power Module Wiringp.1099.3.3 Valve Cablep.109P/N 335-3263 (Pulse Valve)p.110P/N 335-3261 (Sporlan SEI and Emerson Flow Controls ESR Stepper Valve)p.110P/N 335-3260 (Generic Stepper and Emerson Flow Controls ESV Valve)p.1109.4 ESR8 Valve Output Wiringp.11010 Quick Startp.11310.1 Logging Onp.11310.2 Cleaning Out the Controllerp.113Performing a Clean Outp.11310.3 Setting Number of Network Devicesp.114Boards on the I/O Networkp.114Unit Controllers (Echelon)p.11410.4 Setting Number of Applicationsp.11510.5 The Main Status (Home) Screenp.11510.5.1 Customizing the Home Screenp.11510.6 Common Screen Elementsp.11610.6.1 The Headerp.11610.6.1.1 Header Iconsp.11610.6.2 The Function Keysp.11610.6.3 The Help Linep.11610.7 Screen Typesp.11710.7.1 The Main Menup.11710.7.2 Status Screensp.11710.7.3 The Actions Menup.11810.7.4 The Setup Screensp.11910.7.5 System Configuration Menup.11910.7.6 The System Information Menup.12010.8 Time/Date Setupp.12110.8.1 Setting the Time and Datep.121Active Datep.121Active Timep.121Time Zonep.121Time Serverp.121Primary Time Serverp.122Secondary Time Serverp.122Date Formatp.122Daylight Savings Datesp.122Daylight Savings Time uses GMTp.122Unit Location Fromp.122Sundownp.12210.9 Set Up Modemp.12210.10 Set Up TCP/IPp.12310.11 Set Up Network Baud Ratesp.12410.11.1 COM1 Serial (RS232) Baud Ratep.12410.11.2 I/O Network Baud Ratep.12410.12 Set Up User Accessp.12510.12.1 Changing Required User Access Levelsp.12610.12.2 Creating a New User Accountp.12610.12.3 Deleting a Userp.12610.13 Set Up I/O Networkp.12710.13.1 Specify Number of Boardsp.127Boards on the I/O Networkp.12710.13.2 Checking Online Statusp.12810.14 Set Up Echelon Networkp.12810.14.1 Specifying Number of Devicesp.128Unit Controllers (Echelon)p.12810.14.2 Commissioning a Devicep.129How Echelon Commissioning Worksp.129MODBUS Commissioningp.12910.14.2.1 The Service Button Methodp.129The CC-100’s Service Buttonp.130The TD3’s Service Buttonp.130The ESR8’s Service Buttonp.130Commissioning the EC-2p.13010.14.2.2 The Manual ID Entry Methodp.13110.15 License Managementp.13110.15.1 Web Servicesp.13210.16 Set Up Alarmingp.13310.16.1 Specifying Alarm Reporting Typesp.13410.16.1.1 The Display Linep.13410.16.1.2 The Alarm Outputp.13410.16.1.3 Dial-Outp.13410.16.1.4 The Echelon Network (The Alarm Annunciator)p.13410.16.2 Setting up an E2 to be an Alarm Annunciatorp.13410.16.3 Alarm Dial-Outp.13510.16.4 Introduction: Alarm Reportingp.1351. The E2 Display Headerp.1352. The Advisory Outputp.1353. Dial-Outp.1354. The LonWorks Network (The Alarm Annunciator)p.13510.17 Set Up Global Datap.13610.17.1 Priority Settingsp.136Example: Setting Up an Outdoor Temperature Sensorp.13710.18 Set Up Applicationsp.13710.18.1 Add/Delete an Applicationp.13810.18.2 Using and Configuring a Setup Screenp.13810.18.2.1 The Edit Menup.13910.18.2.2 Entering Setpointsp.13910.18.2.3 Navigating the Setup Screenp.139Index Tabsp.140The Help Linep.140The Function Keys For Setupp.14010.18.3 Using the Help Key to get Property Helpp.14111 Software Overviewp.14311.1 Suction Groupsp.14311.1.1 Introductionp.14311.1.2 The (Standard) Suction Group Applicationp.14311.1.2.1 Overview of PID Control Strategyp.14311.1.2.2 Variable-Speed Compressorsp.14311.1.2.3 Floating Setpoint Controlp.14311.1.3 The Enhanced Suction Group Applicationp.14311.1.3.1 Learning Modep.14411.1.3.2 Circuit Load Analysisp.14411.1.3.3 The Control/Cycles Parameterp.14411.1.3.4 Variable-Speed, Digital Scroll, and Digital Discus Compressor Supportp.14411.1.3.5 Floating Suction Controlp.14411.1.4 Hardware Overviewp.14411.2 Condenser Controlp.14511.2.1 Air Cooled Condensersp.14511.2.1.1 Air Cooled Strategyp.14511.2.1.2 Temperature Differential Strategyp.14511.2.2 Evaporative Condensersp.14611.2.3 Fan Controlp.14611.2.4 Condenser Split Modep.14611.2.5 Fast Recoveryp.14611.2.6 Hardware Overviewp.14611.3 Standard Circuitsp.14711.3.1 Refrigeration Controlp.14711.3.1.1 Temperature Monitorp.14811.3.1.2 Temperature Controlp.14811.3.1.3 Line Up(ESR)/Defrostp.14811.3.1.4 Line Up(MFESR)/Defrostp.14811.3.2 Defrost Controlp.14811.3.2.1 Defrost Statesp.14811.3.2.2 Defrost Typesp.148Timed and Reverse Airp.148Hot Gas and Reversed Cycle Hot Gasp.148Electric Defrostp.14811.3.2.3 Defrost Terminationp.149Pulsed Defrostp.14911.3.2.4 Emergency Defrostp.14911.3.2.5 Hot Gas Defrost with ESR8 and MultiFlex ESRp.14911.3.3 Clean and Door Switchesp.14911.3.3.1 Clean Switchesp.14911.3.3.2 Door Switchesp.14911.3.4 Fan Controlp.15011.3.5 The TD3 Temperature Displayp.15011.3.6 The Control Link CD Case Displayp.15011.3.7 Wiringp.15011.4 Case Control Circuitsp.15211.4.1 Overviewp.15211.4.2 Case Circuit Control Software Overviewp.15211.4.2.1 Valve Controlp.153Pulse Valvesp.153Stepper Valvesp.15311.4.3 Refrigeration Controlp.15311.4.3.1 EEVs (Liquid Pulse and Liquid Stepper)p.153Temperature Controlp.153Superheat Controlp.153Recovery Modep.153Thermostatic Expansion Valves (TXVs)p.15411.4.3.2 EEPRs (Suction Stepper)p.154Recovery Modep.15411.4.4 Defrost Controlp.15411.4.4.1 Defrost Statesp.15411.4.4.2 Defrost Typesp.154Off Cycle (Timed)p.154Hot Gas and Reversed Cycle Hot Gasp.154Electric Defrostp.15511.4.4.3 Defrost Terminationp.155Temperature Terminationp.155Pulsed Defrostp.15511.4.4.4 Demand Defrostp.155Demand Fail-Safe Timep.15511.4.4.5 Emergency Defrostp.15511.4.4.6 The WAIT Statep.15511.4.5 Anti-Sweat Controlp.15511.4.5.1 Dewpoint Input Sourcesp.15611.4.6 Dual Temp Controlp.15611.4.7 Fan Controlp.15611.4.8 Light Controlp.15611.4.9 Clean/Wash Modep.156End of Mode Warningp.15711.4.10 Walk-In Freezer Controlp.15711.4.11 Fail-Safe Modep.157Actions Taken During Fail-Safe Modep.15711.4.11.1 Recoverable Sensor Failuresp.157Coil In or Coil Out Failurep.157Discharge/Return Airp.15711.4.12 Wiringp.15811.4.13 Setting Up An Individual Case Controllerp.15811.4.14 Associating Case Controllers with Case Circuit Control Applicationsp.15811.5 Logging Groupsp.15811.5.1 Possible Data Errorsp.15911.5.2 Data Compressionp.15911.5.2.1 Clippingp.15911.5.2.2 Incompressible Data Typesp.15911.5.3 Base Log Groupp.15911.5.4 Setting Up Loggingp.16011.5.5 Logging Group Status Screenp.16111.5.6 Log Reportsp.16111.5.6.1 Logging Group Reportp.16211.5.6.2 Application Log Reportp.16211.5.6.3 System Log Reportp.16211.6 Air Handling Units (AHU)p.16311.6.1 Overviewp.16311.6.2 Temperature Controlp.16311.6.3 Alternate Setpointsp.16311.6.4 Fan Controlp.16311.6.4.1 Single-Speed Fansp.16311.6.4.2 Two-Speed Fansp.164Continuous Two-Speed Fan Operation When All Stages Are OFFp.16411.6.4.3 Variable-Speed Fansp.164Variable-Speed Fan Operationp.164Dehumidification with VS Fansp.16411.6.5 Economizer Controlp.16411.6.5.1 Economization Enablep.16411.6.5.2 Economization Lockout Featuresp.165Max Outside Air Humidityp.165Minimum Supply Tempp.16511.6.6 Digital Economizer Controlp.16511.6.7 Analog Economizer Controlp.16511.6.8 Dehumidification Controlp.16511.6.9 Curtailmentp.16511.6.10 Optimum Start/Stop (OSS)p.165Intelligent Pre-Starts and Pre-Stopsp.16611.6.11 Separate Setpointsp.16611.6.12 AHU Zone Controlp.16611.6.13 Hardware Overviewp.16611.7 Zone Controlp.16711.7.1 Overviewp.16711.7.2 How Zones Workp.16811.7.3 Applications That May Be Connected To Zonesp.16811.7.3.1 MultiFlex RTU Boardp.16811.7.3.2 MultiFlex RCB Boardp.16811.7.3.3 AHUsp.16811.7.4 Temperature Controlp.16911.7.5 Zone Temperaturep.16911.7.6 Economizer Controlp.16911.7.7 Economization Enablep.16911.7.8 The Effect of Enabling Economizationp.17011.7.9 Dehumidification Controlp.17011.7.10 The Zone Humidity Inputp.17011.7.11 The Effect of Enabling Dehumidificationp.17011.7.11.1 MultiFlex RTUs and RCBsp.17011.7.11.2 AHUsp.17011.7.12 Optimum Start/Stop (OSS)p.170Intelligent Pre-Starts and Pre-Stopsp.17111.7.13 Losing Contact With Zone Applicationsp.17111.7.14 Stand-Alone MultiFlex RTUsp.17111.7.15 MultiFlex RTU/ARTC and AHU Zone Associationp.17111.8 MultiFlex CUB Boardp.17211.9 MultiFlex PAK Boardp.17211.10 Lighting Schedulesp.17211.10.1 Overviewp.17211.10.2 Functions of the Lighting Schedule Applicationp.17311.10.3 Control Method Selectp.17311.10.4 Standard Controlp.17311.10.4.1 The Light Level Interface Cell (LLEV INTERFACE)p.173Logical Combination Strategiesp.173Occupied/Unoccupied and Alternate Settingsp.17411.10.4.2 The Schedule Interface Cell (SCHEDIF)p.174Logical Combinationsp.174Alternate Schedule Interface Combinationsp.17411.10.5 Alternate Controlp.17411.10.5.1 Multi-Logic Combinerp.17411.10.5.2 Offset Solar Controlp.17511.10.6 The Basic Schedule Cellp.17511.10.6.1 Slave Schedulingp.17511.10.7 The Min ON/OFF Cellp.17511.10.8 The Proof Cellp.17511.10.9 Output Light Dimmingp.17611.11 Demand Controlp.17611.11.1 Introduction to Demand Limit Controlp.17611.11.2 Demand Monitoringp.17611.11.3 Load Sheddingp.17711.11.3.1 Definitionp.17711.11.4 Shedding Levelsp.17711.11.5 Priority Levelsp.1771. First Shedp.1772. Rotational Shedp.1783. Last Shedp.178Other Notes About Priority Levelsp.17811.11.6 How Demand Control Uses Load Sheddingp.179Mode 1: KW Input Is Greater Than Setpointp.179Mode 2: KW Input Has Been Greater Than Setpoint for 1/4 Demand Window And Is Still Going Upp.179Mode 3: Integral Error Approaching Zerop.17911.11.6.1 Power Monitoring Inputp.180Settingsp.18011.12 Sensor Controlp.18011.12.1 Overviewp.18011.12.2 Analog Sensor Controlp.18011.12.3 Cut In/Cut Out Setpoint Controlp.18011.12.4 Digital Sensor Controlp.18011.12.5 Logical Combinationp.18111.13 Loop/Sequence Controlp.18111.13.1 Layout of the Loop/ Sequence Control Applicationp.18111.13.1.1 Control Cellsp.18111.13.1.2 Output Cellsp.18211.13.1.3 Diagramp.18211.13.2 Loop/Sequence Control Cell Descriptionsp.18211.13.2.1 The Select Cellp.18211.13.2.2 The Setpoint Float Cellp.18311.13.2.3 The PID Control Cellp.183Bypassing PIDp.18311.13.2.4 The Filter Cellp.18311.13.2.5 The Override Cellp.18311.13.3 Output Cell Descriptionsp.18311.13.3.1 The Sequencer Cellp.18311.13.3.2 The PWM Cellp.18311.14 Time Scheduling and Holidaysp.18411.14.1 How Schedules Workp.18411.14.1.1 Eventsp.18411.14.1.2 Absolute and Relative Eventsp.18411.14.1.3 Temporary Schedule Eventsp.18411.14.1.4 Overlappingp.18511.14.1.5 Rangesp.18511.14.2 Holiday Schedulesp.18511.15 Power Monitoringp.18511.15.1 Overviewp.185Explanation of “Demand”p.185How Power Monitoring Calculates Demandp.185Shed Modep.18511.15.2 Loggingp.186Hourlyp.186Dailyp.186Monthlyp.186Definition of Heat and Cool Degree Daysp.18611.15.2.1 Power Monitoring Inputp.186Settingsp.18611.16 Anti-Sweat Setupp.18711.16.1 How Anti-Sweat Worksp.18711.17 Heat/Cool Controlp.18711.17.1 Temperature Controlp.18711.17.2 Unoccupied Hysteresisp.18711.17.3 Optimum Start/Stop (OSS)p.188Intelligent Pre-Starts and Pre-Stopsp.18811.17.4 Setpoint Resetp.18811.17.5 Lead/Lagp.18911.18 Analog and Digital Combinersp.18911.19 TD Controlp.19011.19.1 Overviewp.19011.19.2 Temperature Differential (TD) Strategyp.19011.19.3 TD Control Fail-Safesp.190Drop Leg Temperature Above Maximum Drop Leg Setpointp.19011.19.4 Configurationp.19011.19.5 Setpointsp.19011.19.6 Inputsp.19111.19.7 Alarmsp.19111.20 Pulse Accumulationp.19111.20.1 Overviewp.19111.20.2 Configurationp.19111.20.3 Outputsp.19111.20.4 Accumulator Reset Typesp.19211.20.5 Loggingp.19211.20.6 High Tripp.19211.21 Irrigation Controlp.19211.21.1 Overviewp.19211.21.2 Zones and Cyclesp.19211.21.2.1 Cycle Control Typesp.19311.21.2.2 Timedp.19311.21.2.3 Volumep.19311.21.3 Cycle Schedulingp.19311.21.4 Zone Inhibitp.19311.21.4.1 Timedp.19311.21.4.2 Volumep.19311.21.4.3 Rain Delayp.19311.21.4.4 Freeze Lockoutp.19311.21.4.5 Alarmp.19311.21.5 Zone Bypass Inputsp.19311.21.5.1 Bypass Failsafep.19411.21.6 Flow Sensor-Related Testsp.19411.21.6.1 Leak Testp.19411.21.6.2 Obstructed Zone Testp.19411.21.7 Service Modesp.19411.21.8 Heat Cut In/Cut Out Setpoints For Each Stagep.19411.21.9 Cool Cut In/Cut Out Setpoints For Each Stagep.19411.21.10 Dehumidification Controlp.19411.21.11 Two Speed Fan Controlp.19411.21.12 Configurationp.19511.22 Flexible Combinerp.19511.23 Modular Chiller Control (MCC)p.19511.23.1 Overviewp.19511.23.2 Learning Modep.19611.23.3 The Control/Cycles Parameterp.19611.23.4 Compressor Controlp.19611.23.4.1 Digital Scroll Compressorp.19711.23.4.2 Variable Frequency Drive Compressorp.19711.23.4.3 Unequal Capacity Compressorsp.19711.23.5 Bypass Valve Controlp.19711.24 Boilerp.19711.24.1 Overviewp.19711.24.2 Alarmsp.19711.25 Refrigerant Monitoring System (RMS)p.19811.25.1 RMS Assetp.19811.25.2 RMS Scalep.19811.25.2.1 Device Constraintsp.19811.26 Detailed Setpoint Change Loggingp.19811.26.1 Log Informationp.19811.26.2 Logged Changesp.19911.26.3 Unlogged Changesp.19912 Operator’s Guide to Using the E2p.20112.1 The E2 Home Screenp.20112.1.1 RX Home Screenp.201Suction Groups Sectionp.201Circuit Status Sectionp.201Condenser Sectionp.201Sensor Controlp.20112.1.2 BX Home Screenp.201OAT Sectionp.201Demand Control Sectionp.201Power Monitoring Sectionp.202Light Schedules Sectionp.202Air Handling Units Sectionp.202Zones Sectionp.202Sensor Control Sectionp.20212.1.3 CX Home Screenp.202Lighting Control Sectionp.202HVAC Control Sectionp.202Refrigeration Control Sectionp.202Demand Control Sectionp.202Anti-Sweat Control Sectionp.202Sensor Control Sectionp.202Time Schedules Sectionp.20212.2 Logging On and Access Levelsp.20212.3 Toggling Full Optionsp.20312.4 Navigationp.20312.4.1 Menusp.203Main Menup.203The System Configuration Menup.203The System Information Menup.204Actions Menup.20412.4.2 Screen Typesp.205Summary Screensp.205Status Screensp.205Setup Screensp.20512.4.3 The E2 Keypadp.206The Cursorp.206The Tab Keyp.207The Enter Keyp.207Keypadp.207The Log In/Out Keyp.208Four Directional Arrow Keysp.208Page Up/Page Down Keysp.208Ctrl Page Up/Ctrl Page Down Keysp.208Numeric Keypadp.208Hot Keysp.20812.5 Customizing the Home Screenp.20912.6 Manual Defrost and Clean Modep.20912.7 Overridesp.21012.8 Checking Boards Onlinep.21112.9 Checking Status Screensp.211Suction Group Status Screenp.211Condenser Status Screenp.211Circuit Status Screenp.211Sensor Status Screenp.211AHU Status Screenp.212Zones Status Screenp.212Lighting Status Screenp.212Sensors Status Screenp.212Other Status Screensp.21212.10 Alarmsp.21212.10.1 Accessing the Alarm Advisory Logp.21212.10.2 Viewing the Controller Advisory Logp.21212.10.3 Date and Timep.21212.10.4 Statep.21212.10.5 Ack/Reset Statep.21312.10.6 Area Ctrl: Application: Propertyp.21312.10.7 Advisory Messagep.21312.10.8 Acknowledging, Resetting, and Clearing Log Entriesp.21312.10.8.1 Acknowledgingp.21312.10.8.2 Resettingp.21412.10.8.3 Clearingp.214Property or Board/Pointp.214Advisory Messagep.214Acknowledge Statusp.214Report Priorityp.214Return To Normalp.21412.10.9 Facility Status Display (FSD) Alarmsp.21512.11 Viewing Logs and Graphsp.21512.11.1 Locating Logged Inputs/ Outputsp.21512.11.1.1 Home/Status Screensp.21512.11.1.2 Setup Screensp.21612.11.1.3 Setting Up Input and Output Pointersp.21612.11.2 Log Viewp.21712.11.3 The Graph Viewp.21712.11.4 Zooming In and Outp.21712.12 Low Battery Notificationp.21812.13 Naming Conventions for E2 Controllers, Applications, and Pointsp.218Appendix A: Case Type Defaultsp.219High Alarm, Low Alarm, and Delayp.219Defrost Typep.219Appendix B: Pressure/Voltage and Temperature/Resistance Charts for Eclipse Transducers & Retail Solutions Temp Sensorsp.221Appendix C: Alarm Advisory Messagesp.223Appendix D: PID Controlp.237Introduction to PID Controlp.237Proportional (“P”) Modep.237Throttling Rangep.237Proportional Constant (Kp)p.238Integral Modep.238Why “I” Mode is Necessaryp.238Proportional Offsetp.238Saturationp.239The “I” Mode Calculationp.239Derivative Modep.239The “D” Mode Calculationp.240How Condenser Control and HVAC PID Differs From The Othersp.240Output at Setpointp.240Output at Setpoint for Non-Condenser/ HVAC PIDp.240Output at Setpoint for Condenser/HVAC PID Controlp.241Changing the Output at Setpointp.241Other PID Featuresp.241Output at Minimum / Output at Maximump.241Minimum Accumulated Errorp.242Applicationp.242Filteringp.242Applicationp.242Appendix E: Compressed Point Log Sample Limits and Precision Tabp.245Appendix F: Troubleshootingp.249Appendix G: Revision Logp.259Indexp.261
Page 9 of the Emerson E2 RX user manual — Table of contents
Page 9 · click to enlarge
Page 9

Table of contents

E2 Installation and Operation Manual for RX Refrigeration, BX HVAC, and CX Convenience Store Controllersp.1Table of Contentsp.51 Introductionp.171.1 The E2 Refrigeration Controllerp.171.2 The E2 Building Controllerp.181.3 The E2 Convenience Store Controllerp.191.4 Networking Overviewp.201.4.1 E2 I/O Networkp.201.4.2 The E2 Echelon Lonworks Networkp.211.4.3 Interconnection With Other E2sp.221.5 Documentation Overviewp.221.6 On-Line Help System Overviewp.231.7 Software Licensingp.242 Hardware Overviewp.252.1 E2 Hardwarep.252.1.1 E2 Main Processor Board (CPU)p.262.1.2 E2 Processor Interface Board (PIB)p.262.1.3 E2 Keypadp.262.1.4 LEDsp.262.1.5 PC-104 Peripherals: The Internal Modem (Previous Generation Processor Board)p.272.2 I/O Network Boards and Peripheralsp.272.2.1 The Gateway Boardp.272.2.2 MultiFlex Boardsp.282.2.2.1 MultiFlex 16 Input Boardp.282.2.2.2 MultiFlex Combination Input/ Output Boardsp.292.2.2.3 MultiFlex CUBp.312.2.2.4 MultiFlex RTU (BX and CX Only)p.312.2.2.5 MultiFlex Rooftop Control Board (RCB) (BX and CX Only)p.312.2.2.6 MultiFlex PAK Boardp.312.2.3 The MultiFlex ESR Boardp.322.2.4 Hand-held Terminal (P/N 814-3110)p.322.2.5 The 8RO and 8ROSMT Relay Boardsp.332.2.6 4AO Analog Output Boardp.342.2.7 8DO Digital Output Board and PMAC II Anti-Sweat Controllerp.342.3 Echelon Network Boards and Peripheralsp.352.3.1 The 16AIe (Discontinued)p.352.3.2 The 8ROe (Discontinued)p.352.3.3 EC-2sp.352.3.4 CC-100 Case Controllers and CS-100 Case Circuit Controllersp.362.3.5 The ESR8 (Discontinued)p.362.3.6 TD3 Temperature Displayp.372.3.7 Facility Status Display (FSD)p.373 Mountingp.393.1 Mounting the E2p.393.1.1 Standard Mountp.393.1.2 Recessed Mountp.393.1.3 Retrofit Mountingp.403.1.4 Blank Facep.413.2 Mounting I/O Boardsp.413.2.1 Single/Double Enclosuresp.413.2.2 Boards Without Enclosures (Snap Track)p.423.3 Echelon Devicesp.423.3.1 16AIe and 8ROep.423.3.2 CC-100 Case Controller and CS-100 Case Circuit Controllerp.433.3.3 ESR8 (Discontinued)p.433.3.4 MultiFlex ESRp.433.3.5 TD3p.433.4 Modem/Communication Expansion Card Mounting (New Processor Board)p.433.4.1 Mounting PC-104 Cards in E2 (Previous Generation Processor Board)p.443.4.1.1 The Internal Modemp.443.4.2 Two-Channel and FourChannel Repeatersp.443.4.2.1 Mounting Repeaters Overviewp.443.4.2.2 Mounting the Two-Channel Repeaterp.443.4.2.3 Mounting the Four-Channel Repeaterp.453.5 Sensors and Transducersp.453.5.1 Pressure Transducersp.453.5.1.1 Mountingp.453.5.2 Inside Temperature Sensorp.453.5.2.1 Locationp.453.5.2.2 Mountingp.463.5.3 Outside Temperature Sensorp.463.5.3.1 Locationp.463.5.3.2 Mountingp.463.5.4 Insertion Temperature Probep.463.5.4.1 Locationp.463.5.4.2 Mountingp.463.5.5 Supply and Return Air Sensorsp.463.5.6 Refrigeration System Temperature Probes and Sensorsp.473.5.6.1 Locationp.473.5.6.2 Mounting Bullet and Pipe Mount Sensorsp.473.5.7 Product Temperature Probesp.473.5.8 Humidity Sensors and Humidistatsp.473.5.8.1 Indoor RH Sensorp.473.5.8.2 Outdoor RH Sensorsp.48The outdoor RH sensor (P/N 203-5761)p.483.5.8.3 Duct-mounted Insertion RH Probep.483.5.9 Dewpoint Probep.493.5.9.1 Locationp.493.5.9.2 Mountingp.493.5.10 Light Level Sensorp.493.5.10.1 Locationp.493.5.10.2 Mountingp.493.5.11 Liquid Level Sensorsp.493.5.12 Refrigerant Leak Detectorsp.494 E2 Hardware Setupp.514.1 Setting up the E2p.514.1.1 Enclosurep.514.1.2 Main Processor Boardp.514.1.3 Main Processor Board (Previous Version)p.524.1.4 Power Interface Boardp.524.2 Powering the E2p.524.2.1 RS485 Portsp.524.2.2 RS485 Jumpersp.524.2.3 Echelon Network Connectp.524.2.4 Echelon Jumpersp.524.3 Add-On E2 Peripheralsp.534.3.1 Echelon Card Plug-In (P/N 537-4860) with mounting screw (P/N 101-4201)p.534.3.2 Modem/Communication Expansion Card (New Processor Board)p.544.3.3 Plug-In Modem Card (P/N 537-4870) with mounting screws (P/N 101-4038) and standoffs (P/N 107-9440) (Previous Generation Processor Board)p.544.3.4 Plug-In Digital I/O Network Card (P/N 537-4880)p.544.3.4.1 LEDsp.554.3.5 E2 RS485 Port Card (P/N 537-4890)p.554.3.5.1 LEDsp.554.3.6 Plug-In Four-Channel Internal Repeaterp.554.4 Battery Testing and Replacementp.554.4.1 Low Battery Notificationp.564.4.2 The Battery Enable Switchp.564.4.3 Battery Testp.564.4.4 Battery Replacement - Qualified Technicians Onlyp.565 Serial Configurationp.595.1 Overviewp.595.2 COM Portsp.59Pre-Setsp.595.3 Serial Device and Software Setupp.596 The RS485 Network and Hardware Setupp.616.1 The I/O Networkp.616.1.1 I/O Board Names and Terminologyp.616.1.2 MultiFlex-Plus (+) Boardp.626.1.2.1 Board Designationp.626.1.2.2 Board Calculationsp.626.1.3 Wiring Typesp.626.1.4 The I/O Network Structure (Daisy Chains)p.626.1.5 Network Noise Minimizationp.626.1.6 Network ID Numbers (Board Numbers)p.63Numbering the MultiFlex Combination I/O Boardsp.63Addressing the MultiFlex Boardsp.63Addressing the MultiFlex ESR Boardsp.636.1.7 Setting the Baud Ratep.63Baud Rate for the E2p.63Baud Rate for the Gatewayp.63Baud Rate for the 8IO, 8DO, and ARTCp.63Baud Rate for MultiFlex Boardsp.64Baud Rate for the MultiFlex ESRp.64Recommended Baud Ratep.646.1.8 Setting the Terminating and Biasing Jumpersp.646.1.9 Powering the I/O Boardsp.646.1.9.1 Wiring Typesp.656.1.10 Board Installationp.656.2 IMC/Prodigy Rooftop Unit Controllersp.656.3 ECT MODBUSp.666.3.1 Control Techniques Drive (VSD)p.666.3.2 Copeland Discus with CoreSense Diagnostics (ISD)p.666.3.3 XR35CX, XR75CX, and XEV22 Case Controllersp.666.3.3.1 XR75CX-Case Displayp.666.3.4 iPro DACp.676.3.5 Energy Meterp.676.3.5.1 Overviewp.676.3.5.2 Supported System Typesp.676.3.6 Modular Refrigerant Leak Detection Sensor (MRLDS)p.676.3.7 Copeland Discus with CoreSense Protectionp.686.3.8 Light Commercial Thermostatp.686.3.8.1 Thermostat Inputsp.686.3.8.2 Advisory and Alarmsp.686.3.9 Refrigerant Leak Detection System (RLDS)p.716.3.9.1 Diagnostic Alarmsp.716.3.10 Copeland Scroll — K5 Refrigeration Compressorp.716.3.11 XM Series of Case Controllersp.726.3.11.1 XM670p.726.3.11.2 XM679p.726.3.11.3 XM678p.727 E2 Ethernet Peer Communicationsp.837.1 Ethernet IP Configurationsp.837.2 Hardware Specificationsp.837.2.1 Componentsp.837.3 Software Specificationsp.847.4 Ethernet Network Layoutsp.847.4.1 Closed Network Layoutp.847.4.2 Open Network Layoutp.857.5 Software Setupp.857.6 Troubleshootingp.868 Echelon Network and Hardware Setupp.878.1 Overviewp.878.2 Wiring Typep.878.3 Echelon Network Structuring (Daisy-Chains)p.878.3.1 Maximum Number of Echelon Devicesp.888.4 Device Terminationp.888.4.1 Using a Termination Block (P/N 535-2715) to Terminate a Daisy Chainp.898.5 Wire Restrictionsp.89Maximum Total Segment Lengthp.898.6 Installing Echelon Devicesp.898.6.1 Powering Echelon Devicesp.898.7 LEDsp.908.8 Open Echelon Device Connectivityp.908.8.1 Configuring Echelon Devicesp.908.8.1.1 Troubleshootingp.919 Input and Output Setupp.959.1 The 16AI, 8IO, and MultiFlex Inputsp.959.1.1 Connecting Sensors to Input Boardsp.959.1.1.1 Wiringp.95MultiFlex Boardsp.9516AI Boardsp.958IO and ARTC Boardsp.959.1.1.2 Sensor Wiring Typesp.95All Analog Temperature Sensors and Air Flow Sensorsp.95All Pressure Transducers, Humidity Sensors, and Refrigeration Transducersp.95Dewpoint and Light Level Sensorsp.959.1.1.3 Input Type Dip Switchesp.959.1.2 Power Connectionp.969.1.3 Input Setup in E2p.1009.1.3.1 Configuring a Point from the Input Definitions/Status Screenp.1009.1.3.2 Using the Input Definitions/Status Screenp.1011. Board Type (read-only)p.1012. Brd (read-only)p.1013. Pt (read-only)p.1014. Type (read-only)p.1015. Applicationp.1016. Associationp.1017. Value (read-only)p.1019.1.3.3 Setting Up Analog Inputsp.1019.1.3.4 Setting Up Digital Inputsp.1039.2 The 8RO, 8ROe, 8IO, and MultiFlex Outputsp.1049.2.1 Wiring Form C Contactsp.1049.2.2 MultiFlex Relay Outputsp.1049.2.3 Setting the Fail-Safe Dip Switchp.1049.2.4 Wiring Outputs to Pointsp.105Old 8ROsp.105New 8ROs and 8RO-FCsp.1059.2.5 The Output LEDp.1059.2.6 Output Setup in E2p.1059.2.6.1 Configuring a Point from the Output Definitions/Status Screenp.1059.2.6.2 Using the Output Definitions/Status Screenp.1051. Board Type (read-only)p.1062. Brd (read-only)p.1063. Pt (read-only)p.1064. Type (read-only)p.1065. Applicationp.1066. Associationp.1067. Value (read-only)p.1069.2.6.3 Setting Up Digital Outputsp.1069.2.6.4 Setting Up Analog Outputsp.1079.3 CC-100 Case Controllersp.1089.3.1 Inputsp.108Temperature and Digital Sensorsp.108Connectionp.108Auxiliary Analog Inputp.109Hand-Held Terminal Jackp.1099.3.2 Power Module Wiringp.1099.3.3 Valve Cablep.109P/N 335-3263 (Pulse Valve)p.110P/N 335-3261 (Sporlan SEI and Emerson Flow Controls ESR Stepper Valve)p.110P/N 335-3260 (Generic Stepper and Emerson Flow Controls ESV Valve)p.1109.4 ESR8 Valve Output Wiringp.11010 Quick Startp.11310.1 Logging Onp.11310.2 Cleaning Out the Controllerp.113Performing a Clean Outp.11310.3 Setting Number of Network Devicesp.114Boards on the I/O Networkp.114Unit Controllers (Echelon)p.11410.4 Setting Number of Applicationsp.11510.5 The Main Status (Home) Screenp.11510.5.1 Customizing the Home Screenp.11510.6 Common Screen Elementsp.11610.6.1 The Headerp.11610.6.1.1 Header Iconsp.11610.6.2 The Function Keysp.11610.6.3 The Help Linep.11610.7 Screen Typesp.11710.7.1 The Main Menup.11710.7.2 Status Screensp.11710.7.3 The Actions Menup.11810.7.4 The Setup Screensp.11910.7.5 System Configuration Menup.11910.7.6 The System Information Menup.12010.8 Time/Date Setupp.12110.8.1 Setting the Time and Datep.121Active Datep.121Active Timep.121Time Zonep.121Time Serverp.121Primary Time Serverp.122Secondary Time Serverp.122Date Formatp.122Daylight Savings Datesp.122Daylight Savings Time uses GMTp.122Unit Location Fromp.122Sundownp.12210.9 Set Up Modemp.12210.10 Set Up TCP/IPp.12310.11 Set Up Network Baud Ratesp.12410.11.1 COM1 Serial (RS232) Baud Ratep.12410.11.2 I/O Network Baud Ratep.12410.12 Set Up User Accessp.12510.12.1 Changing Required User Access Levelsp.12610.12.2 Creating a New User Accountp.12610.12.3 Deleting a Userp.12610.13 Set Up I/O Networkp.12710.13.1 Specify Number of Boardsp.127Boards on the I/O Networkp.12710.13.2 Checking Online Statusp.12810.14 Set Up Echelon Networkp.12810.14.1 Specifying Number of Devicesp.128Unit Controllers (Echelon)p.12810.14.2 Commissioning a Devicep.129How Echelon Commissioning Worksp.129MODBUS Commissioningp.12910.14.2.1 The Service Button Methodp.129The CC-100’s Service Buttonp.130The TD3’s Service Buttonp.130The ESR8’s Service Buttonp.130Commissioning the EC-2p.13010.14.2.2 The Manual ID Entry Methodp.13110.15 License Managementp.13110.15.1 Web Servicesp.13210.16 Set Up Alarmingp.13310.16.1 Specifying Alarm Reporting Typesp.13410.16.1.1 The Display Linep.13410.16.1.2 The Alarm Outputp.13410.16.1.3 Dial-Outp.13410.16.1.4 The Echelon Network (The Alarm Annunciator)p.13410.16.2 Setting up an E2 to be an Alarm Annunciatorp.13410.16.3 Alarm Dial-Outp.13510.16.4 Introduction: Alarm Reportingp.1351. The E2 Display Headerp.1352. The Advisory Outputp.1353. Dial-Outp.1354. The LonWorks Network (The Alarm Annunciator)p.13510.17 Set Up Global Datap.13610.17.1 Priority Settingsp.136Example: Setting Up an Outdoor Temperature Sensorp.13710.18 Set Up Applicationsp.13710.18.1 Add/Delete an Applicationp.13810.18.2 Using and Configuring a Setup Screenp.13810.18.2.1 The Edit Menup.13910.18.2.2 Entering Setpointsp.13910.18.2.3 Navigating the Setup Screenp.139Index Tabsp.140The Help Linep.140The Function Keys For Setupp.14010.18.3 Using the Help Key to get Property Helpp.14111 Software Overviewp.14311.1 Suction Groupsp.14311.1.1 Introductionp.14311.1.2 The (Standard) Suction Group Applicationp.14311.1.2.1 Overview of PID Control Strategyp.14311.1.2.2 Variable-Speed Compressorsp.14311.1.2.3 Floating Setpoint Controlp.14311.1.3 The Enhanced Suction Group Applicationp.14311.1.3.1 Learning Modep.14411.1.3.2 Circuit Load Analysisp.14411.1.3.3 The Control/Cycles Parameterp.14411.1.3.4 Variable-Speed, Digital Scroll, and Digital Discus Compressor Supportp.14411.1.3.5 Floating Suction Controlp.14411.1.4 Hardware Overviewp.14411.2 Condenser Controlp.14511.2.1 Air Cooled Condensersp.14511.2.1.1 Air Cooled Strategyp.14511.2.1.2 Temperature Differential Strategyp.14511.2.2 Evaporative Condensersp.14611.2.3 Fan Controlp.14611.2.4 Condenser Split Modep.14611.2.5 Fast Recoveryp.14611.2.6 Hardware Overviewp.14611.3 Standard Circuitsp.14711.3.1 Refrigeration Controlp.14711.3.1.1 Temperature Monitorp.14811.3.1.2 Temperature Controlp.14811.3.1.3 Line Up(ESR)/Defrostp.14811.3.1.4 Line Up(MFESR)/Defrostp.14811.3.2 Defrost Controlp.14811.3.2.1 Defrost Statesp.14811.3.2.2 Defrost Typesp.148Timed and Reverse Airp.148Hot Gas and Reversed Cycle Hot Gasp.148Electric Defrostp.14811.3.2.3 Defrost Terminationp.149Pulsed Defrostp.14911.3.2.4 Emergency Defrostp.14911.3.2.5 Hot Gas Defrost with ESR8 and MultiFlex ESRp.14911.3.3 Clean and Door Switchesp.14911.3.3.1 Clean Switchesp.14911.3.3.2 Door Switchesp.14911.3.4 Fan Controlp.15011.3.5 The TD3 Temperature Displayp.15011.3.6 The Control Link CD Case Displayp.15011.3.7 Wiringp.15011.4 Case Control Circuitsp.15211.4.1 Overviewp.15211.4.2 Case Circuit Control Software Overviewp.15211.4.2.1 Valve Controlp.153Pulse Valvesp.153Stepper Valvesp.15311.4.3 Refrigeration Controlp.15311.4.3.1 EEVs (Liquid Pulse and Liquid Stepper)p.153Temperature Controlp.153Superheat Controlp.153Recovery Modep.153Thermostatic Expansion Valves (TXVs)p.15411.4.3.2 EEPRs (Suction Stepper)p.154Recovery Modep.15411.4.4 Defrost Controlp.15411.4.4.1 Defrost Statesp.15411.4.4.2 Defrost Typesp.154Off Cycle (Timed)p.154Hot Gas and Reversed Cycle Hot Gasp.154Electric Defrostp.15511.4.4.3 Defrost Terminationp.155Temperature Terminationp.155Pulsed Defrostp.15511.4.4.4 Demand Defrostp.155Demand Fail-Safe Timep.15511.4.4.5 Emergency Defrostp.15511.4.4.6 The WAIT Statep.15511.4.5 Anti-Sweat Controlp.15511.4.5.1 Dewpoint Input Sourcesp.15611.4.6 Dual Temp Controlp.15611.4.7 Fan Controlp.15611.4.8 Light Controlp.15611.4.9 Clean/Wash Modep.156End of Mode Warningp.15711.4.10 Walk-In Freezer Controlp.15711.4.11 Fail-Safe Modep.157Actions Taken During Fail-Safe Modep.15711.4.11.1 Recoverable Sensor Failuresp.157Coil In or Coil Out Failurep.157Discharge/Return Airp.15711.4.12 Wiringp.15811.4.13 Setting Up An Individual Case Controllerp.15811.4.14 Associating Case Controllers with Case Circuit Control Applicationsp.15811.5 Logging Groupsp.15811.5.1 Possible Data Errorsp.15911.5.2 Data Compressionp.15911.5.2.1 Clippingp.15911.5.2.2 Incompressible Data Typesp.15911.5.3 Base Log Groupp.15911.5.4 Setting Up Loggingp.16011.5.5 Logging Group Status Screenp.16111.5.6 Log Reportsp.16111.5.6.1 Logging Group Reportp.16211.5.6.2 Application Log Reportp.16211.5.6.3 System Log Reportp.16211.6 Air Handling Units (AHU)p.16311.6.1 Overviewp.16311.6.2 Temperature Controlp.16311.6.3 Alternate Setpointsp.16311.6.4 Fan Controlp.16311.6.4.1 Single-Speed Fansp.16311.6.4.2 Two-Speed Fansp.164Continuous Two-Speed Fan Operation When All Stages Are OFFp.16411.6.4.3 Variable-Speed Fansp.164Variable-Speed Fan Operationp.164Dehumidification with VS Fansp.16411.6.5 Economizer Controlp.16411.6.5.1 Economization Enablep.16411.6.5.2 Economization Lockout Featuresp.165Max Outside Air Humidityp.165Minimum Supply Tempp.16511.6.6 Digital Economizer Controlp.16511.6.7 Analog Economizer Controlp.16511.6.8 Dehumidification Controlp.16511.6.9 Curtailmentp.16511.6.10 Optimum Start/Stop (OSS)p.165Intelligent Pre-Starts and Pre-Stopsp.16611.6.11 Separate Setpointsp.16611.6.12 AHU Zone Controlp.16611.6.13 Hardware Overviewp.16611.7 Zone Controlp.16711.7.1 Overviewp.16711.7.2 How Zones Workp.16811.7.3 Applications That May Be Connected To Zonesp.16811.7.3.1 MultiFlex RTU Boardp.16811.7.3.2 MultiFlex RCB Boardp.16811.7.3.3 AHUsp.16811.7.4 Temperature Controlp.16911.7.5 Zone Temperaturep.16911.7.6 Economizer Controlp.16911.7.7 Economization Enablep.16911.7.8 The Effect of Enabling Economizationp.17011.7.9 Dehumidification Controlp.17011.7.10 The Zone Humidity Inputp.17011.7.11 The Effect of Enabling Dehumidificationp.17011.7.11.1 MultiFlex RTUs and RCBsp.17011.7.11.2 AHUsp.17011.7.12 Optimum Start/Stop (OSS)p.170Intelligent Pre-Starts and Pre-Stopsp.17111.7.13 Losing Contact With Zone Applicationsp.17111.7.14 Stand-Alone MultiFlex RTUsp.17111.7.15 MultiFlex RTU/ARTC and AHU Zone Associationp.17111.8 MultiFlex CUB Boardp.17211.9 MultiFlex PAK Boardp.17211.10 Lighting Schedulesp.17211.10.1 Overviewp.17211.10.2 Functions of the Lighting Schedule Applicationp.17311.10.3 Control Method Selectp.17311.10.4 Standard Controlp.17311.10.4.1 The Light Level Interface Cell (LLEV INTERFACE)p.173Logical Combination Strategiesp.173Occupied/Unoccupied and Alternate Settingsp.17411.10.4.2 The Schedule Interface Cell (SCHEDIF)p.174Logical Combinationsp.174Alternate Schedule Interface Combinationsp.17411.10.5 Alternate Controlp.17411.10.5.1 Multi-Logic Combinerp.17411.10.5.2 Offset Solar Controlp.17511.10.6 The Basic Schedule Cellp.17511.10.6.1 Slave Schedulingp.17511.10.7 The Min ON/OFF Cellp.17511.10.8 The Proof Cellp.17511.10.9 Output Light Dimmingp.17611.11 Demand Controlp.17611.11.1 Introduction to Demand Limit Controlp.17611.11.2 Demand Monitoringp.17611.11.3 Load Sheddingp.17711.11.3.1 Definitionp.17711.11.4 Shedding Levelsp.17711.11.5 Priority Levelsp.1771. First Shedp.1772. Rotational Shedp.1783. Last Shedp.178Other Notes About Priority Levelsp.17811.11.6 How Demand Control Uses Load Sheddingp.179Mode 1: KW Input Is Greater Than Setpointp.179Mode 2: KW Input Has Been Greater Than Setpoint for 1/4 Demand Window And Is Still Going Upp.179Mode 3: Integral Error Approaching Zerop.17911.11.6.1 Power Monitoring Inputp.180Settingsp.18011.12 Sensor Controlp.18011.12.1 Overviewp.18011.12.2 Analog Sensor Controlp.18011.12.3 Cut In/Cut Out Setpoint Controlp.18011.12.4 Digital Sensor Controlp.18011.12.5 Logical Combinationp.18111.13 Loop/Sequence Controlp.18111.13.1 Layout of the Loop/ Sequence Control Applicationp.18111.13.1.1 Control Cellsp.18111.13.1.2 Output Cellsp.18211.13.1.3 Diagramp.18211.13.2 Loop/Sequence Control Cell Descriptionsp.18211.13.2.1 The Select Cellp.18211.13.2.2 The Setpoint Float Cellp.18311.13.2.3 The PID Control Cellp.183Bypassing PIDp.18311.13.2.4 The Filter Cellp.18311.13.2.5 The Override Cellp.18311.13.3 Output Cell Descriptionsp.18311.13.3.1 The Sequencer Cellp.18311.13.3.2 The PWM Cellp.18311.14 Time Scheduling and Holidaysp.18411.14.1 How Schedules Workp.18411.14.1.1 Eventsp.18411.14.1.2 Absolute and Relative Eventsp.18411.14.1.3 Temporary Schedule Eventsp.18411.14.1.4 Overlappingp.18511.14.1.5 Rangesp.18511.14.2 Holiday Schedulesp.18511.15 Power Monitoringp.18511.15.1 Overviewp.185Explanation of “Demand”p.185How Power Monitoring Calculates Demandp.185Shed Modep.18511.15.2 Loggingp.186Hourlyp.186Dailyp.186Monthlyp.186Definition of Heat and Cool Degree Daysp.18611.15.2.1 Power Monitoring Inputp.186Settingsp.18611.16 Anti-Sweat Setupp.18711.16.1 How Anti-Sweat Worksp.18711.17 Heat/Cool Controlp.18711.17.1 Temperature Controlp.18711.17.2 Unoccupied Hysteresisp.18711.17.3 Optimum Start/Stop (OSS)p.188Intelligent Pre-Starts and Pre-Stopsp.18811.17.4 Setpoint Resetp.18811.17.5 Lead/Lagp.18911.18 Analog and Digital Combinersp.18911.19 TD Controlp.19011.19.1 Overviewp.19011.19.2 Temperature Differential (TD) Strategyp.19011.19.3 TD Control Fail-Safesp.190Drop Leg Temperature Above Maximum Drop Leg Setpointp.19011.19.4 Configurationp.19011.19.5 Setpointsp.19011.19.6 Inputsp.19111.19.7 Alarmsp.19111.20 Pulse Accumulationp.19111.20.1 Overviewp.19111.20.2 Configurationp.19111.20.3 Outputsp.19111.20.4 Accumulator Reset Typesp.19211.20.5 Loggingp.19211.20.6 High Tripp.19211.21 Irrigation Controlp.19211.21.1 Overviewp.19211.21.2 Zones and Cyclesp.19211.21.2.1 Cycle Control Typesp.19311.21.2.2 Timedp.19311.21.2.3 Volumep.19311.21.3 Cycle Schedulingp.19311.21.4 Zone Inhibitp.19311.21.4.1 Timedp.19311.21.4.2 Volumep.19311.21.4.3 Rain Delayp.19311.21.4.4 Freeze Lockoutp.19311.21.4.5 Alarmp.19311.21.5 Zone Bypass Inputsp.19311.21.5.1 Bypass Failsafep.19411.21.6 Flow Sensor-Related Testsp.19411.21.6.1 Leak Testp.19411.21.6.2 Obstructed Zone Testp.19411.21.7 Service Modesp.19411.21.8 Heat Cut In/Cut Out Setpoints For Each Stagep.19411.21.9 Cool Cut In/Cut Out Setpoints For Each Stagep.19411.21.10 Dehumidification Controlp.19411.21.11 Two Speed Fan Controlp.19411.21.12 Configurationp.19511.22 Flexible Combinerp.19511.23 Modular Chiller Control (MCC)p.19511.23.1 Overviewp.19511.23.2 Learning Modep.19611.23.3 The Control/Cycles Parameterp.19611.23.4 Compressor Controlp.19611.23.4.1 Digital Scroll Compressorp.19711.23.4.2 Variable Frequency Drive Compressorp.19711.23.4.3 Unequal Capacity Compressorsp.19711.23.5 Bypass Valve Controlp.19711.24 Boilerp.19711.24.1 Overviewp.19711.24.2 Alarmsp.19711.25 Refrigerant Monitoring System (RMS)p.19811.25.1 RMS Assetp.19811.25.2 RMS Scalep.19811.25.2.1 Device Constraintsp.19811.26 Detailed Setpoint Change Loggingp.19811.26.1 Log Informationp.19811.26.2 Logged Changesp.19911.26.3 Unlogged Changesp.19912 Operator’s Guide to Using the E2p.20112.1 The E2 Home Screenp.20112.1.1 RX Home Screenp.201Suction Groups Sectionp.201Circuit Status Sectionp.201Condenser Sectionp.201Sensor Controlp.20112.1.2 BX Home Screenp.201OAT Sectionp.201Demand Control Sectionp.201Power Monitoring Sectionp.202Light Schedules Sectionp.202Air Handling Units Sectionp.202Zones Sectionp.202Sensor Control Sectionp.20212.1.3 CX Home Screenp.202Lighting Control Sectionp.202HVAC Control Sectionp.202Refrigeration Control Sectionp.202Demand Control Sectionp.202Anti-Sweat Control Sectionp.202Sensor Control Sectionp.202Time Schedules Sectionp.20212.2 Logging On and Access Levelsp.20212.3 Toggling Full Optionsp.20312.4 Navigationp.20312.4.1 Menusp.203Main Menup.203The System Configuration Menup.203The System Information Menup.204Actions Menup.20412.4.2 Screen Typesp.205Summary Screensp.205Status Screensp.205Setup Screensp.20512.4.3 The E2 Keypadp.206The Cursorp.206The Tab Keyp.207The Enter Keyp.207Keypadp.207The Log In/Out Keyp.208Four Directional Arrow Keysp.208Page Up/Page Down Keysp.208Ctrl Page Up/Ctrl Page Down Keysp.208Numeric Keypadp.208Hot Keysp.20812.5 Customizing the Home Screenp.20912.6 Manual Defrost and Clean Modep.20912.7 Overridesp.21012.8 Checking Boards Onlinep.21112.9 Checking Status Screensp.211Suction Group Status Screenp.211Condenser Status Screenp.211Circuit Status Screenp.211Sensor Status Screenp.211AHU Status Screenp.212Zones Status Screenp.212Lighting Status Screenp.212Sensors Status Screenp.212Other Status Screensp.21212.10 Alarmsp.21212.10.1 Accessing the Alarm Advisory Logp.21212.10.2 Viewing the Controller Advisory Logp.21212.10.3 Date and Timep.21212.10.4 Statep.21212.10.5 Ack/Reset Statep.21312.10.6 Area Ctrl: Application: Propertyp.21312.10.7 Advisory Messagep.21312.10.8 Acknowledging, Resetting, and Clearing Log Entriesp.21312.10.8.1 Acknowledgingp.21312.10.8.2 Resettingp.21412.10.8.3 Clearingp.214Property or Board/Pointp.214Advisory Messagep.214Acknowledge Statusp.214Report Priorityp.214Return To Normalp.21412.10.9 Facility Status Display (FSD) Alarmsp.21512.11 Viewing Logs and Graphsp.21512.11.1 Locating Logged Inputs/ Outputsp.21512.11.1.1 Home/Status Screensp.21512.11.1.2 Setup Screensp.21612.11.1.3 Setting Up Input and Output Pointersp.21612.11.2 Log Viewp.21712.11.3 The Graph Viewp.21712.11.4 Zooming In and Outp.21712.12 Low Battery Notificationp.21812.13 Naming Conventions for E2 Controllers, Applications, and Pointsp.218Appendix A: Case Type Defaultsp.219High Alarm, Low Alarm, and Delayp.219Defrost Typep.219Appendix B: Pressure/Voltage and Temperature/Resistance Charts for Eclipse Transducers & Retail Solutions Temp Sensorsp.221Appendix C: Alarm Advisory Messagesp.223Appendix D: PID Controlp.237Introduction to PID Controlp.237Proportional (“P”) Modep.237Throttling Rangep.237Proportional Constant (Kp)p.238Integral Modep.238Why “I” Mode is Necessaryp.238Proportional Offsetp.238Saturationp.239The “I” Mode Calculationp.239Derivative Modep.239The “D” Mode Calculationp.240How Condenser Control and HVAC PID Differs From The Othersp.240Output at Setpointp.240Output at Setpoint for Non-Condenser/ HVAC PIDp.240Output at Setpoint for Condenser/HVAC PID Controlp.241Changing the Output at Setpointp.241Other PID Featuresp.241Output at Minimum / Output at Maximump.241Minimum Accumulated Errorp.242Applicationp.242Filteringp.242Applicationp.242Appendix E: Compressed Point Log Sample Limits and Precision Tabp.245Appendix F: Troubleshootingp.249Appendix G: Revision Logp.259Indexp.261
Page 10 of the Emerson E2 RX user manual — Table of contents
Page 10 · click to enlarge
Page 10

Table of contents

E2 Installation and Operation Manual for RX Refrigeration, BX HVAC, and CX Convenience Store Controllersp.1Table of Contentsp.51 Introductionp.171.1 The E2 Refrigeration Controllerp.171.2 The E2 Building Controllerp.181.3 The E2 Convenience Store Controllerp.191.4 Networking Overviewp.201.4.1 E2 I/O Networkp.201.4.2 The E2 Echelon Lonworks Networkp.211.4.3 Interconnection With Other E2sp.221.5 Documentation Overviewp.221.6 On-Line Help System Overviewp.231.7 Software Licensingp.242 Hardware Overviewp.252.1 E2 Hardwarep.252.1.1 E2 Main Processor Board (CPU)p.262.1.2 E2 Processor Interface Board (PIB)p.262.1.3 E2 Keypadp.262.1.4 LEDsp.262.1.5 PC-104 Peripherals: The Internal Modem (Previous Generation Processor Board)p.272.2 I/O Network Boards and Peripheralsp.272.2.1 The Gateway Boardp.272.2.2 MultiFlex Boardsp.282.2.2.1 MultiFlex 16 Input Boardp.282.2.2.2 MultiFlex Combination Input/ Output Boardsp.292.2.2.3 MultiFlex CUBp.312.2.2.4 MultiFlex RTU (BX and CX Only)p.312.2.2.5 MultiFlex Rooftop Control Board (RCB) (BX and CX Only)p.312.2.2.6 MultiFlex PAK Boardp.312.2.3 The MultiFlex ESR Boardp.322.2.4 Hand-held Terminal (P/N 814-3110)p.322.2.5 The 8RO and 8ROSMT Relay Boardsp.332.2.6 4AO Analog Output Boardp.342.2.7 8DO Digital Output Board and PMAC II Anti-Sweat Controllerp.342.3 Echelon Network Boards and Peripheralsp.352.3.1 The 16AIe (Discontinued)p.352.3.2 The 8ROe (Discontinued)p.352.3.3 EC-2sp.352.3.4 CC-100 Case Controllers and CS-100 Case Circuit Controllersp.362.3.5 The ESR8 (Discontinued)p.362.3.6 TD3 Temperature Displayp.372.3.7 Facility Status Display (FSD)p.373 Mountingp.393.1 Mounting the E2p.393.1.1 Standard Mountp.393.1.2 Recessed Mountp.393.1.3 Retrofit Mountingp.403.1.4 Blank Facep.413.2 Mounting I/O Boardsp.413.2.1 Single/Double Enclosuresp.413.2.2 Boards Without Enclosures (Snap Track)p.423.3 Echelon Devicesp.423.3.1 16AIe and 8ROep.423.3.2 CC-100 Case Controller and CS-100 Case Circuit Controllerp.433.3.3 ESR8 (Discontinued)p.433.3.4 MultiFlex ESRp.433.3.5 TD3p.433.4 Modem/Communication Expansion Card Mounting (New Processor Board)p.433.4.1 Mounting PC-104 Cards in E2 (Previous Generation Processor Board)p.443.4.1.1 The Internal Modemp.443.4.2 Two-Channel and FourChannel Repeatersp.443.4.2.1 Mounting Repeaters Overviewp.443.4.2.2 Mounting the Two-Channel Repeaterp.443.4.2.3 Mounting the Four-Channel Repeaterp.453.5 Sensors and Transducersp.453.5.1 Pressure Transducersp.453.5.1.1 Mountingp.453.5.2 Inside Temperature Sensorp.453.5.2.1 Locationp.453.5.2.2 Mountingp.463.5.3 Outside Temperature Sensorp.463.5.3.1 Locationp.463.5.3.2 Mountingp.463.5.4 Insertion Temperature Probep.463.5.4.1 Locationp.463.5.4.2 Mountingp.463.5.5 Supply and Return Air Sensorsp.463.5.6 Refrigeration System Temperature Probes and Sensorsp.473.5.6.1 Locationp.473.5.6.2 Mounting Bullet and Pipe Mount Sensorsp.473.5.7 Product Temperature Probesp.473.5.8 Humidity Sensors and Humidistatsp.473.5.8.1 Indoor RH Sensorp.473.5.8.2 Outdoor RH Sensorsp.48The outdoor RH sensor (P/N 203-5761)p.483.5.8.3 Duct-mounted Insertion RH Probep.483.5.9 Dewpoint Probep.493.5.9.1 Locationp.493.5.9.2 Mountingp.493.5.10 Light Level Sensorp.493.5.10.1 Locationp.493.5.10.2 Mountingp.493.5.11 Liquid Level Sensorsp.493.5.12 Refrigerant Leak Detectorsp.494 E2 Hardware Setupp.514.1 Setting up the E2p.514.1.1 Enclosurep.514.1.2 Main Processor Boardp.514.1.3 Main Processor Board (Previous Version)p.524.1.4 Power Interface Boardp.524.2 Powering the E2p.524.2.1 RS485 Portsp.524.2.2 RS485 Jumpersp.524.2.3 Echelon Network Connectp.524.2.4 Echelon Jumpersp.524.3 Add-On E2 Peripheralsp.534.3.1 Echelon Card Plug-In (P/N 537-4860) with mounting screw (P/N 101-4201)p.534.3.2 Modem/Communication Expansion Card (New Processor Board)p.544.3.3 Plug-In Modem Card (P/N 537-4870) with mounting screws (P/N 101-4038) and standoffs (P/N 107-9440) (Previous Generation Processor Board)p.544.3.4 Plug-In Digital I/O Network Card (P/N 537-4880)p.544.3.4.1 LEDsp.554.3.5 E2 RS485 Port Card (P/N 537-4890)p.554.3.5.1 LEDsp.554.3.6 Plug-In Four-Channel Internal Repeaterp.554.4 Battery Testing and Replacementp.554.4.1 Low Battery Notificationp.564.4.2 The Battery Enable Switchp.564.4.3 Battery Testp.564.4.4 Battery Replacement - Qualified Technicians Onlyp.565 Serial Configurationp.595.1 Overviewp.595.2 COM Portsp.59Pre-Setsp.595.3 Serial Device and Software Setupp.596 The RS485 Network and Hardware Setupp.616.1 The I/O Networkp.616.1.1 I/O Board Names and Terminologyp.616.1.2 MultiFlex-Plus (+) Boardp.626.1.2.1 Board Designationp.626.1.2.2 Board Calculationsp.626.1.3 Wiring Typesp.626.1.4 The I/O Network Structure (Daisy Chains)p.626.1.5 Network Noise Minimizationp.626.1.6 Network ID Numbers (Board Numbers)p.63Numbering the MultiFlex Combination I/O Boardsp.63Addressing the MultiFlex Boardsp.63Addressing the MultiFlex ESR Boardsp.636.1.7 Setting the Baud Ratep.63Baud Rate for the E2p.63Baud Rate for the Gatewayp.63Baud Rate for the 8IO, 8DO, and ARTCp.63Baud Rate for MultiFlex Boardsp.64Baud Rate for the MultiFlex ESRp.64Recommended Baud Ratep.646.1.8 Setting the Terminating and Biasing Jumpersp.646.1.9 Powering the I/O Boardsp.646.1.9.1 Wiring Typesp.656.1.10 Board Installationp.656.2 IMC/Prodigy Rooftop Unit Controllersp.656.3 ECT MODBUSp.666.3.1 Control Techniques Drive (VSD)p.666.3.2 Copeland Discus with CoreSense Diagnostics (ISD)p.666.3.3 XR35CX, XR75CX, and XEV22 Case Controllersp.666.3.3.1 XR75CX-Case Displayp.666.3.4 iPro DACp.676.3.5 Energy Meterp.676.3.5.1 Overviewp.676.3.5.2 Supported System Typesp.676.3.6 Modular Refrigerant Leak Detection Sensor (MRLDS)p.676.3.7 Copeland Discus with CoreSense Protectionp.686.3.8 Light Commercial Thermostatp.686.3.8.1 Thermostat Inputsp.686.3.8.2 Advisory and Alarmsp.686.3.9 Refrigerant Leak Detection System (RLDS)p.716.3.9.1 Diagnostic Alarmsp.716.3.10 Copeland Scroll — K5 Refrigeration Compressorp.716.3.11 XM Series of Case Controllersp.726.3.11.1 XM670p.726.3.11.2 XM679p.726.3.11.3 XM678p.727 E2 Ethernet Peer Communicationsp.837.1 Ethernet IP Configurationsp.837.2 Hardware Specificationsp.837.2.1 Componentsp.837.3 Software Specificationsp.847.4 Ethernet Network Layoutsp.847.4.1 Closed Network Layoutp.847.4.2 Open Network Layoutp.857.5 Software Setupp.857.6 Troubleshootingp.868 Echelon Network and Hardware Setupp.878.1 Overviewp.878.2 Wiring Typep.878.3 Echelon Network Structuring (Daisy-Chains)p.878.3.1 Maximum Number of Echelon Devicesp.888.4 Device Terminationp.888.4.1 Using a Termination Block (P/N 535-2715) to Terminate a Daisy Chainp.898.5 Wire Restrictionsp.89Maximum Total Segment Lengthp.898.6 Installing Echelon Devicesp.898.6.1 Powering Echelon Devicesp.898.7 LEDsp.908.8 Open Echelon Device Connectivityp.908.8.1 Configuring Echelon Devicesp.908.8.1.1 Troubleshootingp.919 Input and Output Setupp.959.1 The 16AI, 8IO, and MultiFlex Inputsp.959.1.1 Connecting Sensors to Input Boardsp.959.1.1.1 Wiringp.95MultiFlex Boardsp.9516AI Boardsp.958IO and ARTC Boardsp.959.1.1.2 Sensor Wiring Typesp.95All Analog Temperature Sensors and Air Flow Sensorsp.95All Pressure Transducers, Humidity Sensors, and Refrigeration Transducersp.95Dewpoint and Light Level Sensorsp.959.1.1.3 Input Type Dip Switchesp.959.1.2 Power Connectionp.969.1.3 Input Setup in E2p.1009.1.3.1 Configuring a Point from the Input Definitions/Status Screenp.1009.1.3.2 Using the Input Definitions/Status Screenp.1011. Board Type (read-only)p.1012. Brd (read-only)p.1013. Pt (read-only)p.1014. Type (read-only)p.1015. Applicationp.1016. Associationp.1017. Value (read-only)p.1019.1.3.3 Setting Up Analog Inputsp.1019.1.3.4 Setting Up Digital Inputsp.1039.2 The 8RO, 8ROe, 8IO, and MultiFlex Outputsp.1049.2.1 Wiring Form C Contactsp.1049.2.2 MultiFlex Relay Outputsp.1049.2.3 Setting the Fail-Safe Dip Switchp.1049.2.4 Wiring Outputs to Pointsp.105Old 8ROsp.105New 8ROs and 8RO-FCsp.1059.2.5 The Output LEDp.1059.2.6 Output Setup in E2p.1059.2.6.1 Configuring a Point from the Output Definitions/Status Screenp.1059.2.6.2 Using the Output Definitions/Status Screenp.1051. Board Type (read-only)p.1062. Brd (read-only)p.1063. Pt (read-only)p.1064. Type (read-only)p.1065. Applicationp.1066. Associationp.1067. Value (read-only)p.1069.2.6.3 Setting Up Digital Outputsp.1069.2.6.4 Setting Up Analog Outputsp.1079.3 CC-100 Case Controllersp.1089.3.1 Inputsp.108Temperature and Digital Sensorsp.108Connectionp.108Auxiliary Analog Inputp.109Hand-Held Terminal Jackp.1099.3.2 Power Module Wiringp.1099.3.3 Valve Cablep.109P/N 335-3263 (Pulse Valve)p.110P/N 335-3261 (Sporlan SEI and Emerson Flow Controls ESR Stepper Valve)p.110P/N 335-3260 (Generic Stepper and Emerson Flow Controls ESV Valve)p.1109.4 ESR8 Valve Output Wiringp.11010 Quick Startp.11310.1 Logging Onp.11310.2 Cleaning Out the Controllerp.113Performing a Clean Outp.11310.3 Setting Number of Network Devicesp.114Boards on the I/O Networkp.114Unit Controllers (Echelon)p.11410.4 Setting Number of Applicationsp.11510.5 The Main Status (Home) Screenp.11510.5.1 Customizing the Home Screenp.11510.6 Common Screen Elementsp.11610.6.1 The Headerp.11610.6.1.1 Header Iconsp.11610.6.2 The Function Keysp.11610.6.3 The Help Linep.11610.7 Screen Typesp.11710.7.1 The Main Menup.11710.7.2 Status Screensp.11710.7.3 The Actions Menup.11810.7.4 The Setup Screensp.11910.7.5 System Configuration Menup.11910.7.6 The System Information Menup.12010.8 Time/Date Setupp.12110.8.1 Setting the Time and Datep.121Active Datep.121Active Timep.121Time Zonep.121Time Serverp.121Primary Time Serverp.122Secondary Time Serverp.122Date Formatp.122Daylight Savings Datesp.122Daylight Savings Time uses GMTp.122Unit Location Fromp.122Sundownp.12210.9 Set Up Modemp.12210.10 Set Up TCP/IPp.12310.11 Set Up Network Baud Ratesp.12410.11.1 COM1 Serial (RS232) Baud Ratep.12410.11.2 I/O Network Baud Ratep.12410.12 Set Up User Accessp.12510.12.1 Changing Required User Access Levelsp.12610.12.2 Creating a New User Accountp.12610.12.3 Deleting a Userp.12610.13 Set Up I/O Networkp.12710.13.1 Specify Number of Boardsp.127Boards on the I/O Networkp.12710.13.2 Checking Online Statusp.12810.14 Set Up Echelon Networkp.12810.14.1 Specifying Number of Devicesp.128Unit Controllers (Echelon)p.12810.14.2 Commissioning a Devicep.129How Echelon Commissioning Worksp.129MODBUS Commissioningp.12910.14.2.1 The Service Button Methodp.129The CC-100’s Service Buttonp.130The TD3’s Service Buttonp.130The ESR8’s Service Buttonp.130Commissioning the EC-2p.13010.14.2.2 The Manual ID Entry Methodp.13110.15 License Managementp.13110.15.1 Web Servicesp.13210.16 Set Up Alarmingp.13310.16.1 Specifying Alarm Reporting Typesp.13410.16.1.1 The Display Linep.13410.16.1.2 The Alarm Outputp.13410.16.1.3 Dial-Outp.13410.16.1.4 The Echelon Network (The Alarm Annunciator)p.13410.16.2 Setting up an E2 to be an Alarm Annunciatorp.13410.16.3 Alarm Dial-Outp.13510.16.4 Introduction: Alarm Reportingp.1351. The E2 Display Headerp.1352. The Advisory Outputp.1353. Dial-Outp.1354. The LonWorks Network (The Alarm Annunciator)p.13510.17 Set Up Global Datap.13610.17.1 Priority Settingsp.136Example: Setting Up an Outdoor Temperature Sensorp.13710.18 Set Up Applicationsp.13710.18.1 Add/Delete an Applicationp.13810.18.2 Using and Configuring a Setup Screenp.13810.18.2.1 The Edit Menup.13910.18.2.2 Entering Setpointsp.13910.18.2.3 Navigating the Setup Screenp.139Index Tabsp.140The Help Linep.140The Function Keys For Setupp.14010.18.3 Using the Help Key to get Property Helpp.14111 Software Overviewp.14311.1 Suction Groupsp.14311.1.1 Introductionp.14311.1.2 The (Standard) Suction Group Applicationp.14311.1.2.1 Overview of PID Control Strategyp.14311.1.2.2 Variable-Speed Compressorsp.14311.1.2.3 Floating Setpoint Controlp.14311.1.3 The Enhanced Suction Group Applicationp.14311.1.3.1 Learning Modep.14411.1.3.2 Circuit Load Analysisp.14411.1.3.3 The Control/Cycles Parameterp.14411.1.3.4 Variable-Speed, Digital Scroll, and Digital Discus Compressor Supportp.14411.1.3.5 Floating Suction Controlp.14411.1.4 Hardware Overviewp.14411.2 Condenser Controlp.14511.2.1 Air Cooled Condensersp.14511.2.1.1 Air Cooled Strategyp.14511.2.1.2 Temperature Differential Strategyp.14511.2.2 Evaporative Condensersp.14611.2.3 Fan Controlp.14611.2.4 Condenser Split Modep.14611.2.5 Fast Recoveryp.14611.2.6 Hardware Overviewp.14611.3 Standard Circuitsp.14711.3.1 Refrigeration Controlp.14711.3.1.1 Temperature Monitorp.14811.3.1.2 Temperature Controlp.14811.3.1.3 Line Up(ESR)/Defrostp.14811.3.1.4 Line Up(MFESR)/Defrostp.14811.3.2 Defrost Controlp.14811.3.2.1 Defrost Statesp.14811.3.2.2 Defrost Typesp.148Timed and Reverse Airp.148Hot Gas and Reversed Cycle Hot Gasp.148Electric Defrostp.14811.3.2.3 Defrost Terminationp.149Pulsed Defrostp.14911.3.2.4 Emergency Defrostp.14911.3.2.5 Hot Gas Defrost with ESR8 and MultiFlex ESRp.14911.3.3 Clean and Door Switchesp.14911.3.3.1 Clean Switchesp.14911.3.3.2 Door Switchesp.14911.3.4 Fan Controlp.15011.3.5 The TD3 Temperature Displayp.15011.3.6 The Control Link CD Case Displayp.15011.3.7 Wiringp.15011.4 Case Control Circuitsp.15211.4.1 Overviewp.15211.4.2 Case Circuit Control Software Overviewp.15211.4.2.1 Valve Controlp.153Pulse Valvesp.153Stepper Valvesp.15311.4.3 Refrigeration Controlp.15311.4.3.1 EEVs (Liquid Pulse and Liquid Stepper)p.153Temperature Controlp.153Superheat Controlp.153Recovery Modep.153Thermostatic Expansion Valves (TXVs)p.15411.4.3.2 EEPRs (Suction Stepper)p.154Recovery Modep.15411.4.4 Defrost Controlp.15411.4.4.1 Defrost Statesp.15411.4.4.2 Defrost Typesp.154Off Cycle (Timed)p.154Hot Gas and Reversed Cycle Hot Gasp.154Electric Defrostp.15511.4.4.3 Defrost Terminationp.155Temperature Terminationp.155Pulsed Defrostp.15511.4.4.4 Demand Defrostp.155Demand Fail-Safe Timep.15511.4.4.5 Emergency Defrostp.15511.4.4.6 The WAIT Statep.15511.4.5 Anti-Sweat Controlp.15511.4.5.1 Dewpoint Input Sourcesp.15611.4.6 Dual Temp Controlp.15611.4.7 Fan Controlp.15611.4.8 Light Controlp.15611.4.9 Clean/Wash Modep.156End of Mode Warningp.15711.4.10 Walk-In Freezer Controlp.15711.4.11 Fail-Safe Modep.157Actions Taken During Fail-Safe Modep.15711.4.11.1 Recoverable Sensor Failuresp.157Coil In or Coil Out Failurep.157Discharge/Return Airp.15711.4.12 Wiringp.15811.4.13 Setting Up An Individual Case Controllerp.15811.4.14 Associating Case Controllers with Case Circuit Control Applicationsp.15811.5 Logging Groupsp.15811.5.1 Possible Data Errorsp.15911.5.2 Data Compressionp.15911.5.2.1 Clippingp.15911.5.2.2 Incompressible Data Typesp.15911.5.3 Base Log Groupp.15911.5.4 Setting Up Loggingp.16011.5.5 Logging Group Status Screenp.16111.5.6 Log Reportsp.16111.5.6.1 Logging Group Reportp.16211.5.6.2 Application Log Reportp.16211.5.6.3 System Log Reportp.16211.6 Air Handling Units (AHU)p.16311.6.1 Overviewp.16311.6.2 Temperature Controlp.16311.6.3 Alternate Setpointsp.16311.6.4 Fan Controlp.16311.6.4.1 Single-Speed Fansp.16311.6.4.2 Two-Speed Fansp.164Continuous Two-Speed Fan Operation When All Stages Are OFFp.16411.6.4.3 Variable-Speed Fansp.164Variable-Speed Fan Operationp.164Dehumidification with VS Fansp.16411.6.5 Economizer Controlp.16411.6.5.1 Economization Enablep.16411.6.5.2 Economization Lockout Featuresp.165Max Outside Air Humidityp.165Minimum Supply Tempp.16511.6.6 Digital Economizer Controlp.16511.6.7 Analog Economizer Controlp.16511.6.8 Dehumidification Controlp.16511.6.9 Curtailmentp.16511.6.10 Optimum Start/Stop (OSS)p.165Intelligent Pre-Starts and Pre-Stopsp.16611.6.11 Separate Setpointsp.16611.6.12 AHU Zone Controlp.16611.6.13 Hardware Overviewp.16611.7 Zone Controlp.16711.7.1 Overviewp.16711.7.2 How Zones Workp.16811.7.3 Applications That May Be Connected To Zonesp.16811.7.3.1 MultiFlex RTU Boardp.16811.7.3.2 MultiFlex RCB Boardp.16811.7.3.3 AHUsp.16811.7.4 Temperature Controlp.16911.7.5 Zone Temperaturep.16911.7.6 Economizer Controlp.16911.7.7 Economization Enablep.16911.7.8 The Effect of Enabling Economizationp.17011.7.9 Dehumidification Controlp.17011.7.10 The Zone Humidity Inputp.17011.7.11 The Effect of Enabling Dehumidificationp.17011.7.11.1 MultiFlex RTUs and RCBsp.17011.7.11.2 AHUsp.17011.7.12 Optimum Start/Stop (OSS)p.170Intelligent Pre-Starts and Pre-Stopsp.17111.7.13 Losing Contact With Zone Applicationsp.17111.7.14 Stand-Alone MultiFlex RTUsp.17111.7.15 MultiFlex RTU/ARTC and AHU Zone Associationp.17111.8 MultiFlex CUB Boardp.17211.9 MultiFlex PAK Boardp.17211.10 Lighting Schedulesp.17211.10.1 Overviewp.17211.10.2 Functions of the Lighting Schedule Applicationp.17311.10.3 Control Method Selectp.17311.10.4 Standard Controlp.17311.10.4.1 The Light Level Interface Cell (LLEV INTERFACE)p.173Logical Combination Strategiesp.173Occupied/Unoccupied and Alternate Settingsp.17411.10.4.2 The Schedule Interface Cell (SCHEDIF)p.174Logical Combinationsp.174Alternate Schedule Interface Combinationsp.17411.10.5 Alternate Controlp.17411.10.5.1 Multi-Logic Combinerp.17411.10.5.2 Offset Solar Controlp.17511.10.6 The Basic Schedule Cellp.17511.10.6.1 Slave Schedulingp.17511.10.7 The Min ON/OFF Cellp.17511.10.8 The Proof Cellp.17511.10.9 Output Light Dimmingp.17611.11 Demand Controlp.17611.11.1 Introduction to Demand Limit Controlp.17611.11.2 Demand Monitoringp.17611.11.3 Load Sheddingp.17711.11.3.1 Definitionp.17711.11.4 Shedding Levelsp.17711.11.5 Priority Levelsp.1771. First Shedp.1772. Rotational Shedp.1783. Last Shedp.178Other Notes About Priority Levelsp.17811.11.6 How Demand Control Uses Load Sheddingp.179Mode 1: KW Input Is Greater Than Setpointp.179Mode 2: KW Input Has Been Greater Than Setpoint for 1/4 Demand Window And Is Still Going Upp.179Mode 3: Integral Error Approaching Zerop.17911.11.6.1 Power Monitoring Inputp.180Settingsp.18011.12 Sensor Controlp.18011.12.1 Overviewp.18011.12.2 Analog Sensor Controlp.18011.12.3 Cut In/Cut Out Setpoint Controlp.18011.12.4 Digital Sensor Controlp.18011.12.5 Logical Combinationp.18111.13 Loop/Sequence Controlp.18111.13.1 Layout of the Loop/ Sequence Control Applicationp.18111.13.1.1 Control Cellsp.18111.13.1.2 Output Cellsp.18211.13.1.3 Diagramp.18211.13.2 Loop/Sequence Control Cell Descriptionsp.18211.13.2.1 The Select Cellp.18211.13.2.2 The Setpoint Float Cellp.18311.13.2.3 The PID Control Cellp.183Bypassing PIDp.18311.13.2.4 The Filter Cellp.18311.13.2.5 The Override Cellp.18311.13.3 Output Cell Descriptionsp.18311.13.3.1 The Sequencer Cellp.18311.13.3.2 The PWM Cellp.18311.14 Time Scheduling and Holidaysp.18411.14.1 How Schedules Workp.18411.14.1.1 Eventsp.18411.14.1.2 Absolute and Relative Eventsp.18411.14.1.3 Temporary Schedule Eventsp.18411.14.1.4 Overlappingp.18511.14.1.5 Rangesp.18511.14.2 Holiday Schedulesp.18511.15 Power Monitoringp.18511.15.1 Overviewp.185Explanation of “Demand”p.185How Power Monitoring Calculates Demandp.185Shed Modep.18511.15.2 Loggingp.186Hourlyp.186Dailyp.186Monthlyp.186Definition of Heat and Cool Degree Daysp.18611.15.2.1 Power Monitoring Inputp.186Settingsp.18611.16 Anti-Sweat Setupp.18711.16.1 How Anti-Sweat Worksp.18711.17 Heat/Cool Controlp.18711.17.1 Temperature Controlp.18711.17.2 Unoccupied Hysteresisp.18711.17.3 Optimum Start/Stop (OSS)p.188Intelligent Pre-Starts and Pre-Stopsp.18811.17.4 Setpoint Resetp.18811.17.5 Lead/Lagp.18911.18 Analog and Digital Combinersp.18911.19 TD Controlp.19011.19.1 Overviewp.19011.19.2 Temperature Differential (TD) Strategyp.19011.19.3 TD Control Fail-Safesp.190Drop Leg Temperature Above Maximum Drop Leg Setpointp.19011.19.4 Configurationp.19011.19.5 Setpointsp.19011.19.6 Inputsp.19111.19.7 Alarmsp.19111.20 Pulse Accumulationp.19111.20.1 Overviewp.19111.20.2 Configurationp.19111.20.3 Outputsp.19111.20.4 Accumulator Reset Typesp.19211.20.5 Loggingp.19211.20.6 High Tripp.19211.21 Irrigation Controlp.19211.21.1 Overviewp.19211.21.2 Zones and Cyclesp.19211.21.2.1 Cycle Control Typesp.19311.21.2.2 Timedp.19311.21.2.3 Volumep.19311.21.3 Cycle Schedulingp.19311.21.4 Zone Inhibitp.19311.21.4.1 Timedp.19311.21.4.2 Volumep.19311.21.4.3 Rain Delayp.19311.21.4.4 Freeze Lockoutp.19311.21.4.5 Alarmp.19311.21.5 Zone Bypass Inputsp.19311.21.5.1 Bypass Failsafep.19411.21.6 Flow Sensor-Related Testsp.19411.21.6.1 Leak Testp.19411.21.6.2 Obstructed Zone Testp.19411.21.7 Service Modesp.19411.21.8 Heat Cut In/Cut Out Setpoints For Each Stagep.19411.21.9 Cool Cut In/Cut Out Setpoints For Each Stagep.19411.21.10 Dehumidification Controlp.19411.21.11 Two Speed Fan Controlp.19411.21.12 Configurationp.19511.22 Flexible Combinerp.19511.23 Modular Chiller Control (MCC)p.19511.23.1 Overviewp.19511.23.2 Learning Modep.19611.23.3 The Control/Cycles Parameterp.19611.23.4 Compressor Controlp.19611.23.4.1 Digital Scroll Compressorp.19711.23.4.2 Variable Frequency Drive Compressorp.19711.23.4.3 Unequal Capacity Compressorsp.19711.23.5 Bypass Valve Controlp.19711.24 Boilerp.19711.24.1 Overviewp.19711.24.2 Alarmsp.19711.25 Refrigerant Monitoring System (RMS)p.19811.25.1 RMS Assetp.19811.25.2 RMS Scalep.19811.25.2.1 Device Constraintsp.19811.26 Detailed Setpoint Change Loggingp.19811.26.1 Log Informationp.19811.26.2 Logged Changesp.19911.26.3 Unlogged Changesp.19912 Operator’s Guide to Using the E2p.20112.1 The E2 Home Screenp.20112.1.1 RX Home Screenp.201Suction Groups Sectionp.201Circuit Status Sectionp.201Condenser Sectionp.201Sensor Controlp.20112.1.2 BX Home Screenp.201OAT Sectionp.201Demand Control Sectionp.201Power Monitoring Sectionp.202Light Schedules Sectionp.202Air Handling Units Sectionp.202Zones Sectionp.202Sensor Control Sectionp.20212.1.3 CX Home Screenp.202Lighting Control Sectionp.202HVAC Control Sectionp.202Refrigeration Control Sectionp.202Demand Control Sectionp.202Anti-Sweat Control Sectionp.202Sensor Control Sectionp.202Time Schedules Sectionp.20212.2 Logging On and Access Levelsp.20212.3 Toggling Full Optionsp.20312.4 Navigationp.20312.4.1 Menusp.203Main Menup.203The System Configuration Menup.203The System Information Menup.204Actions Menup.20412.4.2 Screen Typesp.205Summary Screensp.205Status Screensp.205Setup Screensp.20512.4.3 The E2 Keypadp.206The Cursorp.206The Tab Keyp.207The Enter Keyp.207Keypadp.207The Log In/Out Keyp.208Four Directional Arrow Keysp.208Page Up/Page Down Keysp.208Ctrl Page Up/Ctrl Page Down Keysp.208Numeric Keypadp.208Hot Keysp.20812.5 Customizing the Home Screenp.20912.6 Manual Defrost and Clean Modep.20912.7 Overridesp.21012.8 Checking Boards Onlinep.21112.9 Checking Status Screensp.211Suction Group Status Screenp.211Condenser Status Screenp.211Circuit Status Screenp.211Sensor Status Screenp.211AHU Status Screenp.212Zones Status Screenp.212Lighting Status Screenp.212Sensors Status Screenp.212Other Status Screensp.21212.10 Alarmsp.21212.10.1 Accessing the Alarm Advisory Logp.21212.10.2 Viewing the Controller Advisory Logp.21212.10.3 Date and Timep.21212.10.4 Statep.21212.10.5 Ack/Reset Statep.21312.10.6 Area Ctrl: Application: Propertyp.21312.10.7 Advisory Messagep.21312.10.8 Acknowledging, Resetting, and Clearing Log Entriesp.21312.10.8.1 Acknowledgingp.21312.10.8.2 Resettingp.21412.10.8.3 Clearingp.214Property or Board/Pointp.214Advisory Messagep.214Acknowledge Statusp.214Report Priorityp.214Return To Normalp.21412.10.9 Facility Status Display (FSD) Alarmsp.21512.11 Viewing Logs and Graphsp.21512.11.1 Locating Logged Inputs/ Outputsp.21512.11.1.1 Home/Status Screensp.21512.11.1.2 Setup Screensp.21612.11.1.3 Setting Up Input and Output Pointersp.21612.11.2 Log Viewp.21712.11.3 The Graph Viewp.21712.11.4 Zooming In and Outp.21712.12 Low Battery Notificationp.21812.13 Naming Conventions for E2 Controllers, Applications, and Pointsp.218Appendix A: Case Type Defaultsp.219High Alarm, Low Alarm, and Delayp.219Defrost Typep.219Appendix B: Pressure/Voltage and Temperature/Resistance Charts for Eclipse Transducers & Retail Solutions Temp Sensorsp.221Appendix C: Alarm Advisory Messagesp.223Appendix D: PID Controlp.237Introduction to PID Controlp.237Proportional (“P”) Modep.237Throttling Rangep.237Proportional Constant (Kp)p.238Integral Modep.238Why “I” Mode is Necessaryp.238Proportional Offsetp.238Saturationp.239The “I” Mode Calculationp.239Derivative Modep.239The “D” Mode Calculationp.240How Condenser Control and HVAC PID Differs From The Othersp.240Output at Setpointp.240Output at Setpoint for Non-Condenser/ HVAC PIDp.240Output at Setpoint for Condenser/HVAC PID Controlp.241Changing the Output at Setpointp.241Other PID Featuresp.241Output at Minimum / Output at Maximump.241Minimum Accumulated Errorp.242Applicationp.242Filteringp.242Applicationp.242Appendix E: Compressed Point Log Sample Limits and Precision Tabp.245Appendix F: Troubleshootingp.249Appendix G: Revision Logp.259Indexp.261
Page 11 of the Emerson E2 RX user manual — Table of contents
Page 11 · click to enlarge
Page 11

Table of contents

E2 Installation and Operation Manual for RX Refrigeration, BX HVAC, and CX Convenience Store Controllersp.1Table of Contentsp.51 Introductionp.171.1 The E2 Refrigeration Controllerp.171.2 The E2 Building Controllerp.181.3 The E2 Convenience Store Controllerp.191.4 Networking Overviewp.201.4.1 E2 I/O Networkp.201.4.2 The E2 Echelon Lonworks Networkp.211.4.3 Interconnection With Other E2sp.221.5 Documentation Overviewp.221.6 On-Line Help System Overviewp.231.7 Software Licensingp.242 Hardware Overviewp.252.1 E2 Hardwarep.252.1.1 E2 Main Processor Board (CPU)p.262.1.2 E2 Processor Interface Board (PIB)p.262.1.3 E2 Keypadp.262.1.4 LEDsp.262.1.5 PC-104 Peripherals: The Internal Modem (Previous Generation Processor Board)p.272.2 I/O Network Boards and Peripheralsp.272.2.1 The Gateway Boardp.272.2.2 MultiFlex Boardsp.282.2.2.1 MultiFlex 16 Input Boardp.282.2.2.2 MultiFlex Combination Input/ Output Boardsp.292.2.2.3 MultiFlex CUBp.312.2.2.4 MultiFlex RTU (BX and CX Only)p.312.2.2.5 MultiFlex Rooftop Control Board (RCB) (BX and CX Only)p.312.2.2.6 MultiFlex PAK Boardp.312.2.3 The MultiFlex ESR Boardp.322.2.4 Hand-held Terminal (P/N 814-3110)p.322.2.5 The 8RO and 8ROSMT Relay Boardsp.332.2.6 4AO Analog Output Boardp.342.2.7 8DO Digital Output Board and PMAC II Anti-Sweat Controllerp.342.3 Echelon Network Boards and Peripheralsp.352.3.1 The 16AIe (Discontinued)p.352.3.2 The 8ROe (Discontinued)p.352.3.3 EC-2sp.352.3.4 CC-100 Case Controllers and CS-100 Case Circuit Controllersp.362.3.5 The ESR8 (Discontinued)p.362.3.6 TD3 Temperature Displayp.372.3.7 Facility Status Display (FSD)p.373 Mountingp.393.1 Mounting the E2p.393.1.1 Standard Mountp.393.1.2 Recessed Mountp.393.1.3 Retrofit Mountingp.403.1.4 Blank Facep.413.2 Mounting I/O Boardsp.413.2.1 Single/Double Enclosuresp.413.2.2 Boards Without Enclosures (Snap Track)p.423.3 Echelon Devicesp.423.3.1 16AIe and 8ROep.423.3.2 CC-100 Case Controller and CS-100 Case Circuit Controllerp.433.3.3 ESR8 (Discontinued)p.433.3.4 MultiFlex ESRp.433.3.5 TD3p.433.4 Modem/Communication Expansion Card Mounting (New Processor Board)p.433.4.1 Mounting PC-104 Cards in E2 (Previous Generation Processor Board)p.443.4.1.1 The Internal Modemp.443.4.2 Two-Channel and FourChannel Repeatersp.443.4.2.1 Mounting Repeaters Overviewp.443.4.2.2 Mounting the Two-Channel Repeaterp.443.4.2.3 Mounting the Four-Channel Repeaterp.453.5 Sensors and Transducersp.453.5.1 Pressure Transducersp.453.5.1.1 Mountingp.453.5.2 Inside Temperature Sensorp.453.5.2.1 Locationp.453.5.2.2 Mountingp.463.5.3 Outside Temperature Sensorp.463.5.3.1 Locationp.463.5.3.2 Mountingp.463.5.4 Insertion Temperature Probep.463.5.4.1 Locationp.463.5.4.2 Mountingp.463.5.5 Supply and Return Air Sensorsp.463.5.6 Refrigeration System Temperature Probes and Sensorsp.473.5.6.1 Locationp.473.5.6.2 Mounting Bullet and Pipe Mount Sensorsp.473.5.7 Product Temperature Probesp.473.5.8 Humidity Sensors and Humidistatsp.473.5.8.1 Indoor RH Sensorp.473.5.8.2 Outdoor RH Sensorsp.48The outdoor RH sensor (P/N 203-5761)p.483.5.8.3 Duct-mounted Insertion RH Probep.483.5.9 Dewpoint Probep.493.5.9.1 Locationp.493.5.9.2 Mountingp.493.5.10 Light Level Sensorp.493.5.10.1 Locationp.493.5.10.2 Mountingp.493.5.11 Liquid Level Sensorsp.493.5.12 Refrigerant Leak Detectorsp.494 E2 Hardware Setupp.514.1 Setting up the E2p.514.1.1 Enclosurep.514.1.2 Main Processor Boardp.514.1.3 Main Processor Board (Previous Version)p.524.1.4 Power Interface Boardp.524.2 Powering the E2p.524.2.1 RS485 Portsp.524.2.2 RS485 Jumpersp.524.2.3 Echelon Network Connectp.524.2.4 Echelon Jumpersp.524.3 Add-On E2 Peripheralsp.534.3.1 Echelon Card Plug-In (P/N 537-4860) with mounting screw (P/N 101-4201)p.534.3.2 Modem/Communication Expansion Card (New Processor Board)p.544.3.3 Plug-In Modem Card (P/N 537-4870) with mounting screws (P/N 101-4038) and standoffs (P/N 107-9440) (Previous Generation Processor Board)p.544.3.4 Plug-In Digital I/O Network Card (P/N 537-4880)p.544.3.4.1 LEDsp.554.3.5 E2 RS485 Port Card (P/N 537-4890)p.554.3.5.1 LEDsp.554.3.6 Plug-In Four-Channel Internal Repeaterp.554.4 Battery Testing and Replacementp.554.4.1 Low Battery Notificationp.564.4.2 The Battery Enable Switchp.564.4.3 Battery Testp.564.4.4 Battery Replacement - Qualified Technicians Onlyp.565 Serial Configurationp.595.1 Overviewp.595.2 COM Portsp.59Pre-Setsp.595.3 Serial Device and Software Setupp.596 The RS485 Network and Hardware Setupp.616.1 The I/O Networkp.616.1.1 I/O Board Names and Terminologyp.616.1.2 MultiFlex-Plus (+) Boardp.626.1.2.1 Board Designationp.626.1.2.2 Board Calculationsp.626.1.3 Wiring Typesp.626.1.4 The I/O Network Structure (Daisy Chains)p.626.1.5 Network Noise Minimizationp.626.1.6 Network ID Numbers (Board Numbers)p.63Numbering the MultiFlex Combination I/O Boardsp.63Addressing the MultiFlex Boardsp.63Addressing the MultiFlex ESR Boardsp.636.1.7 Setting the Baud Ratep.63Baud Rate for the E2p.63Baud Rate for the Gatewayp.63Baud Rate for the 8IO, 8DO, and ARTCp.63Baud Rate for MultiFlex Boardsp.64Baud Rate for the MultiFlex ESRp.64Recommended Baud Ratep.646.1.8 Setting the Terminating and Biasing Jumpersp.646.1.9 Powering the I/O Boardsp.646.1.9.1 Wiring Typesp.656.1.10 Board Installationp.656.2 IMC/Prodigy Rooftop Unit Controllersp.656.3 ECT MODBUSp.666.3.1 Control Techniques Drive (VSD)p.666.3.2 Copeland Discus with CoreSense Diagnostics (ISD)p.666.3.3 XR35CX, XR75CX, and XEV22 Case Controllersp.666.3.3.1 XR75CX-Case Displayp.666.3.4 iPro DACp.676.3.5 Energy Meterp.676.3.5.1 Overviewp.676.3.5.2 Supported System Typesp.676.3.6 Modular Refrigerant Leak Detection Sensor (MRLDS)p.676.3.7 Copeland Discus with CoreSense Protectionp.686.3.8 Light Commercial Thermostatp.686.3.8.1 Thermostat Inputsp.686.3.8.2 Advisory and Alarmsp.686.3.9 Refrigerant Leak Detection System (RLDS)p.716.3.9.1 Diagnostic Alarmsp.716.3.10 Copeland Scroll — K5 Refrigeration Compressorp.716.3.11 XM Series of Case Controllersp.726.3.11.1 XM670p.726.3.11.2 XM679p.726.3.11.3 XM678p.727 E2 Ethernet Peer Communicationsp.837.1 Ethernet IP Configurationsp.837.2 Hardware Specificationsp.837.2.1 Componentsp.837.3 Software Specificationsp.847.4 Ethernet Network Layoutsp.847.4.1 Closed Network Layoutp.847.4.2 Open Network Layoutp.857.5 Software Setupp.857.6 Troubleshootingp.868 Echelon Network and Hardware Setupp.878.1 Overviewp.878.2 Wiring Typep.878.3 Echelon Network Structuring (Daisy-Chains)p.878.3.1 Maximum Number of Echelon Devicesp.888.4 Device Terminationp.888.4.1 Using a Termination Block (P/N 535-2715) to Terminate a Daisy Chainp.898.5 Wire Restrictionsp.89Maximum Total Segment Lengthp.898.6 Installing Echelon Devicesp.898.6.1 Powering Echelon Devicesp.898.7 LEDsp.908.8 Open Echelon Device Connectivityp.908.8.1 Configuring Echelon Devicesp.908.8.1.1 Troubleshootingp.919 Input and Output Setupp.959.1 The 16AI, 8IO, and MultiFlex Inputsp.959.1.1 Connecting Sensors to Input Boardsp.959.1.1.1 Wiringp.95MultiFlex Boardsp.9516AI Boardsp.958IO and ARTC Boardsp.959.1.1.2 Sensor Wiring Typesp.95All Analog Temperature Sensors and Air Flow Sensorsp.95All Pressure Transducers, Humidity Sensors, and Refrigeration Transducersp.95Dewpoint and Light Level Sensorsp.959.1.1.3 Input Type Dip Switchesp.959.1.2 Power Connectionp.969.1.3 Input Setup in E2p.1009.1.3.1 Configuring a Point from the Input Definitions/Status Screenp.1009.1.3.2 Using the Input Definitions/Status Screenp.1011. Board Type (read-only)p.1012. Brd (read-only)p.1013. Pt (read-only)p.1014. Type (read-only)p.1015. Applicationp.1016. Associationp.1017. Value (read-only)p.1019.1.3.3 Setting Up Analog Inputsp.1019.1.3.4 Setting Up Digital Inputsp.1039.2 The 8RO, 8ROe, 8IO, and MultiFlex Outputsp.1049.2.1 Wiring Form C Contactsp.1049.2.2 MultiFlex Relay Outputsp.1049.2.3 Setting the Fail-Safe Dip Switchp.1049.2.4 Wiring Outputs to Pointsp.105Old 8ROsp.105New 8ROs and 8RO-FCsp.1059.2.5 The Output LEDp.1059.2.6 Output Setup in E2p.1059.2.6.1 Configuring a Point from the Output Definitions/Status Screenp.1059.2.6.2 Using the Output Definitions/Status Screenp.1051. Board Type (read-only)p.1062. Brd (read-only)p.1063. Pt (read-only)p.1064. Type (read-only)p.1065. Applicationp.1066. Associationp.1067. Value (read-only)p.1069.2.6.3 Setting Up Digital Outputsp.1069.2.6.4 Setting Up Analog Outputsp.1079.3 CC-100 Case Controllersp.1089.3.1 Inputsp.108Temperature and Digital Sensorsp.108Connectionp.108Auxiliary Analog Inputp.109Hand-Held Terminal Jackp.1099.3.2 Power Module Wiringp.1099.3.3 Valve Cablep.109P/N 335-3263 (Pulse Valve)p.110P/N 335-3261 (Sporlan SEI and Emerson Flow Controls ESR Stepper Valve)p.110P/N 335-3260 (Generic Stepper and Emerson Flow Controls ESV Valve)p.1109.4 ESR8 Valve Output Wiringp.11010 Quick Startp.11310.1 Logging Onp.11310.2 Cleaning Out the Controllerp.113Performing a Clean Outp.11310.3 Setting Number of Network Devicesp.114Boards on the I/O Networkp.114Unit Controllers (Echelon)p.11410.4 Setting Number of Applicationsp.11510.5 The Main Status (Home) Screenp.11510.5.1 Customizing the Home Screenp.11510.6 Common Screen Elementsp.11610.6.1 The Headerp.11610.6.1.1 Header Iconsp.11610.6.2 The Function Keysp.11610.6.3 The Help Linep.11610.7 Screen Typesp.11710.7.1 The Main Menup.11710.7.2 Status Screensp.11710.7.3 The Actions Menup.11810.7.4 The Setup Screensp.11910.7.5 System Configuration Menup.11910.7.6 The System Information Menup.12010.8 Time/Date Setupp.12110.8.1 Setting the Time and Datep.121Active Datep.121Active Timep.121Time Zonep.121Time Serverp.121Primary Time Serverp.122Secondary Time Serverp.122Date Formatp.122Daylight Savings Datesp.122Daylight Savings Time uses GMTp.122Unit Location Fromp.122Sundownp.12210.9 Set Up Modemp.12210.10 Set Up TCP/IPp.12310.11 Set Up Network Baud Ratesp.12410.11.1 COM1 Serial (RS232) Baud Ratep.12410.11.2 I/O Network Baud Ratep.12410.12 Set Up User Accessp.12510.12.1 Changing Required User Access Levelsp.12610.12.2 Creating a New User Accountp.12610.12.3 Deleting a Userp.12610.13 Set Up I/O Networkp.12710.13.1 Specify Number of Boardsp.127Boards on the I/O Networkp.12710.13.2 Checking Online Statusp.12810.14 Set Up Echelon Networkp.12810.14.1 Specifying Number of Devicesp.128Unit Controllers (Echelon)p.12810.14.2 Commissioning a Devicep.129How Echelon Commissioning Worksp.129MODBUS Commissioningp.12910.14.2.1 The Service Button Methodp.129The CC-100’s Service Buttonp.130The TD3’s Service Buttonp.130The ESR8’s Service Buttonp.130Commissioning the EC-2p.13010.14.2.2 The Manual ID Entry Methodp.13110.15 License Managementp.13110.15.1 Web Servicesp.13210.16 Set Up Alarmingp.13310.16.1 Specifying Alarm Reporting Typesp.13410.16.1.1 The Display Linep.13410.16.1.2 The Alarm Outputp.13410.16.1.3 Dial-Outp.13410.16.1.4 The Echelon Network (The Alarm Annunciator)p.13410.16.2 Setting up an E2 to be an Alarm Annunciatorp.13410.16.3 Alarm Dial-Outp.13510.16.4 Introduction: Alarm Reportingp.1351. The E2 Display Headerp.1352. The Advisory Outputp.1353. Dial-Outp.1354. The LonWorks Network (The Alarm Annunciator)p.13510.17 Set Up Global Datap.13610.17.1 Priority Settingsp.136Example: Setting Up an Outdoor Temperature Sensorp.13710.18 Set Up Applicationsp.13710.18.1 Add/Delete an Applicationp.13810.18.2 Using and Configuring a Setup Screenp.13810.18.2.1 The Edit Menup.13910.18.2.2 Entering Setpointsp.13910.18.2.3 Navigating the Setup Screenp.139Index Tabsp.140The Help Linep.140The Function Keys For Setupp.14010.18.3 Using the Help Key to get Property Helpp.14111 Software Overviewp.14311.1 Suction Groupsp.14311.1.1 Introductionp.14311.1.2 The (Standard) Suction Group Applicationp.14311.1.2.1 Overview of PID Control Strategyp.14311.1.2.2 Variable-Speed Compressorsp.14311.1.2.3 Floating Setpoint Controlp.14311.1.3 The Enhanced Suction Group Applicationp.14311.1.3.1 Learning Modep.14411.1.3.2 Circuit Load Analysisp.14411.1.3.3 The Control/Cycles Parameterp.14411.1.3.4 Variable-Speed, Digital Scroll, and Digital Discus Compressor Supportp.14411.1.3.5 Floating Suction Controlp.14411.1.4 Hardware Overviewp.14411.2 Condenser Controlp.14511.2.1 Air Cooled Condensersp.14511.2.1.1 Air Cooled Strategyp.14511.2.1.2 Temperature Differential Strategyp.14511.2.2 Evaporative Condensersp.14611.2.3 Fan Controlp.14611.2.4 Condenser Split Modep.14611.2.5 Fast Recoveryp.14611.2.6 Hardware Overviewp.14611.3 Standard Circuitsp.14711.3.1 Refrigeration Controlp.14711.3.1.1 Temperature Monitorp.14811.3.1.2 Temperature Controlp.14811.3.1.3 Line Up(ESR)/Defrostp.14811.3.1.4 Line Up(MFESR)/Defrostp.14811.3.2 Defrost Controlp.14811.3.2.1 Defrost Statesp.14811.3.2.2 Defrost Typesp.148Timed and Reverse Airp.148Hot Gas and Reversed Cycle Hot Gasp.148Electric Defrostp.14811.3.2.3 Defrost Terminationp.149Pulsed Defrostp.14911.3.2.4 Emergency Defrostp.14911.3.2.5 Hot Gas Defrost with ESR8 and MultiFlex ESRp.14911.3.3 Clean and Door Switchesp.14911.3.3.1 Clean Switchesp.14911.3.3.2 Door Switchesp.14911.3.4 Fan Controlp.15011.3.5 The TD3 Temperature Displayp.15011.3.6 The Control Link CD Case Displayp.15011.3.7 Wiringp.15011.4 Case Control Circuitsp.15211.4.1 Overviewp.15211.4.2 Case Circuit Control Software Overviewp.15211.4.2.1 Valve Controlp.153Pulse Valvesp.153Stepper Valvesp.15311.4.3 Refrigeration Controlp.15311.4.3.1 EEVs (Liquid Pulse and Liquid Stepper)p.153Temperature Controlp.153Superheat Controlp.153Recovery Modep.153Thermostatic Expansion Valves (TXVs)p.15411.4.3.2 EEPRs (Suction Stepper)p.154Recovery Modep.15411.4.4 Defrost Controlp.15411.4.4.1 Defrost Statesp.15411.4.4.2 Defrost Typesp.154Off Cycle (Timed)p.154Hot Gas and Reversed Cycle Hot Gasp.154Electric Defrostp.15511.4.4.3 Defrost Terminationp.155Temperature Terminationp.155Pulsed Defrostp.15511.4.4.4 Demand Defrostp.155Demand Fail-Safe Timep.15511.4.4.5 Emergency Defrostp.15511.4.4.6 The WAIT Statep.15511.4.5 Anti-Sweat Controlp.15511.4.5.1 Dewpoint Input Sourcesp.15611.4.6 Dual Temp Controlp.15611.4.7 Fan Controlp.15611.4.8 Light Controlp.15611.4.9 Clean/Wash Modep.156End of Mode Warningp.15711.4.10 Walk-In Freezer Controlp.15711.4.11 Fail-Safe Modep.157Actions Taken During Fail-Safe Modep.15711.4.11.1 Recoverable Sensor Failuresp.157Coil In or Coil Out Failurep.157Discharge/Return Airp.15711.4.12 Wiringp.15811.4.13 Setting Up An Individual Case Controllerp.15811.4.14 Associating Case Controllers with Case Circuit Control Applicationsp.15811.5 Logging Groupsp.15811.5.1 Possible Data Errorsp.15911.5.2 Data Compressionp.15911.5.2.1 Clippingp.15911.5.2.2 Incompressible Data Typesp.15911.5.3 Base Log Groupp.15911.5.4 Setting Up Loggingp.16011.5.5 Logging Group Status Screenp.16111.5.6 Log Reportsp.16111.5.6.1 Logging Group Reportp.16211.5.6.2 Application Log Reportp.16211.5.6.3 System Log Reportp.16211.6 Air Handling Units (AHU)p.16311.6.1 Overviewp.16311.6.2 Temperature Controlp.16311.6.3 Alternate Setpointsp.16311.6.4 Fan Controlp.16311.6.4.1 Single-Speed Fansp.16311.6.4.2 Two-Speed Fansp.164Continuous Two-Speed Fan Operation When All Stages Are OFFp.16411.6.4.3 Variable-Speed Fansp.164Variable-Speed Fan Operationp.164Dehumidification with VS Fansp.16411.6.5 Economizer Controlp.16411.6.5.1 Economization Enablep.16411.6.5.2 Economization Lockout Featuresp.165Max Outside Air Humidityp.165Minimum Supply Tempp.16511.6.6 Digital Economizer Controlp.16511.6.7 Analog Economizer Controlp.16511.6.8 Dehumidification Controlp.16511.6.9 Curtailmentp.16511.6.10 Optimum Start/Stop (OSS)p.165Intelligent Pre-Starts and Pre-Stopsp.16611.6.11 Separate Setpointsp.16611.6.12 AHU Zone Controlp.16611.6.13 Hardware Overviewp.16611.7 Zone Controlp.16711.7.1 Overviewp.16711.7.2 How Zones Workp.16811.7.3 Applications That May Be Connected To Zonesp.16811.7.3.1 MultiFlex RTU Boardp.16811.7.3.2 MultiFlex RCB Boardp.16811.7.3.3 AHUsp.16811.7.4 Temperature Controlp.16911.7.5 Zone Temperaturep.16911.7.6 Economizer Controlp.16911.7.7 Economization Enablep.16911.7.8 The Effect of Enabling Economizationp.17011.7.9 Dehumidification Controlp.17011.7.10 The Zone Humidity Inputp.17011.7.11 The Effect of Enabling Dehumidificationp.17011.7.11.1 MultiFlex RTUs and RCBsp.17011.7.11.2 AHUsp.17011.7.12 Optimum Start/Stop (OSS)p.170Intelligent Pre-Starts and Pre-Stopsp.17111.7.13 Losing Contact With Zone Applicationsp.17111.7.14 Stand-Alone MultiFlex RTUsp.17111.7.15 MultiFlex RTU/ARTC and AHU Zone Associationp.17111.8 MultiFlex CUB Boardp.17211.9 MultiFlex PAK Boardp.17211.10 Lighting Schedulesp.17211.10.1 Overviewp.17211.10.2 Functions of the Lighting Schedule Applicationp.17311.10.3 Control Method Selectp.17311.10.4 Standard Controlp.17311.10.4.1 The Light Level Interface Cell (LLEV INTERFACE)p.173Logical Combination Strategiesp.173Occupied/Unoccupied and Alternate Settingsp.17411.10.4.2 The Schedule Interface Cell (SCHEDIF)p.174Logical Combinationsp.174Alternate Schedule Interface Combinationsp.17411.10.5 Alternate Controlp.17411.10.5.1 Multi-Logic Combinerp.17411.10.5.2 Offset Solar Controlp.17511.10.6 The Basic Schedule Cellp.17511.10.6.1 Slave Schedulingp.17511.10.7 The Min ON/OFF Cellp.17511.10.8 The Proof Cellp.17511.10.9 Output Light Dimmingp.17611.11 Demand Controlp.17611.11.1 Introduction to Demand Limit Controlp.17611.11.2 Demand Monitoringp.17611.11.3 Load Sheddingp.17711.11.3.1 Definitionp.17711.11.4 Shedding Levelsp.17711.11.5 Priority Levelsp.1771. First Shedp.1772. Rotational Shedp.1783. Last Shedp.178Other Notes About Priority Levelsp.17811.11.6 How Demand Control Uses Load Sheddingp.179Mode 1: KW Input Is Greater Than Setpointp.179Mode 2: KW Input Has Been Greater Than Setpoint for 1/4 Demand Window And Is Still Going Upp.179Mode 3: Integral Error Approaching Zerop.17911.11.6.1 Power Monitoring Inputp.180Settingsp.18011.12 Sensor Controlp.18011.12.1 Overviewp.18011.12.2 Analog Sensor Controlp.18011.12.3 Cut In/Cut Out Setpoint Controlp.18011.12.4 Digital Sensor Controlp.18011.12.5 Logical Combinationp.18111.13 Loop/Sequence Controlp.18111.13.1 Layout of the Loop/ Sequence Control Applicationp.18111.13.1.1 Control Cellsp.18111.13.1.2 Output Cellsp.18211.13.1.3 Diagramp.18211.13.2 Loop/Sequence Control Cell Descriptionsp.18211.13.2.1 The Select Cellp.18211.13.2.2 The Setpoint Float Cellp.18311.13.2.3 The PID Control Cellp.183Bypassing PIDp.18311.13.2.4 The Filter Cellp.18311.13.2.5 The Override Cellp.18311.13.3 Output Cell Descriptionsp.18311.13.3.1 The Sequencer Cellp.18311.13.3.2 The PWM Cellp.18311.14 Time Scheduling and Holidaysp.18411.14.1 How Schedules Workp.18411.14.1.1 Eventsp.18411.14.1.2 Absolute and Relative Eventsp.18411.14.1.3 Temporary Schedule Eventsp.18411.14.1.4 Overlappingp.18511.14.1.5 Rangesp.18511.14.2 Holiday Schedulesp.18511.15 Power Monitoringp.18511.15.1 Overviewp.185Explanation of “Demand”p.185How Power Monitoring Calculates Demandp.185Shed Modep.18511.15.2 Loggingp.186Hourlyp.186Dailyp.186Monthlyp.186Definition of Heat and Cool Degree Daysp.18611.15.2.1 Power Monitoring Inputp.186Settingsp.18611.16 Anti-Sweat Setupp.18711.16.1 How Anti-Sweat Worksp.18711.17 Heat/Cool Controlp.18711.17.1 Temperature Controlp.18711.17.2 Unoccupied Hysteresisp.18711.17.3 Optimum Start/Stop (OSS)p.188Intelligent Pre-Starts and Pre-Stopsp.18811.17.4 Setpoint Resetp.18811.17.5 Lead/Lagp.18911.18 Analog and Digital Combinersp.18911.19 TD Controlp.19011.19.1 Overviewp.19011.19.2 Temperature Differential (TD) Strategyp.19011.19.3 TD Control Fail-Safesp.190Drop Leg Temperature Above Maximum Drop Leg Setpointp.19011.19.4 Configurationp.19011.19.5 Setpointsp.19011.19.6 Inputsp.19111.19.7 Alarmsp.19111.20 Pulse Accumulationp.19111.20.1 Overviewp.19111.20.2 Configurationp.19111.20.3 Outputsp.19111.20.4 Accumulator Reset Typesp.19211.20.5 Loggingp.19211.20.6 High Tripp.19211.21 Irrigation Controlp.19211.21.1 Overviewp.19211.21.2 Zones and Cyclesp.19211.21.2.1 Cycle Control Typesp.19311.21.2.2 Timedp.19311.21.2.3 Volumep.19311.21.3 Cycle Schedulingp.19311.21.4 Zone Inhibitp.19311.21.4.1 Timedp.19311.21.4.2 Volumep.19311.21.4.3 Rain Delayp.19311.21.4.4 Freeze Lockoutp.19311.21.4.5 Alarmp.19311.21.5 Zone Bypass Inputsp.19311.21.5.1 Bypass Failsafep.19411.21.6 Flow Sensor-Related Testsp.19411.21.6.1 Leak Testp.19411.21.6.2 Obstructed Zone Testp.19411.21.7 Service Modesp.19411.21.8 Heat Cut In/Cut Out Setpoints For Each Stagep.19411.21.9 Cool Cut In/Cut Out Setpoints For Each Stagep.19411.21.10 Dehumidification Controlp.19411.21.11 Two Speed Fan Controlp.19411.21.12 Configurationp.19511.22 Flexible Combinerp.19511.23 Modular Chiller Control (MCC)p.19511.23.1 Overviewp.19511.23.2 Learning Modep.19611.23.3 The Control/Cycles Parameterp.19611.23.4 Compressor Controlp.19611.23.4.1 Digital Scroll Compressorp.19711.23.4.2 Variable Frequency Drive Compressorp.19711.23.4.3 Unequal Capacity Compressorsp.19711.23.5 Bypass Valve Controlp.19711.24 Boilerp.19711.24.1 Overviewp.19711.24.2 Alarmsp.19711.25 Refrigerant Monitoring System (RMS)p.19811.25.1 RMS Assetp.19811.25.2 RMS Scalep.19811.25.2.1 Device Constraintsp.19811.26 Detailed Setpoint Change Loggingp.19811.26.1 Log Informationp.19811.26.2 Logged Changesp.19911.26.3 Unlogged Changesp.19912 Operator’s Guide to Using the E2p.20112.1 The E2 Home Screenp.20112.1.1 RX Home Screenp.201Suction Groups Sectionp.201Circuit Status Sectionp.201Condenser Sectionp.201Sensor Controlp.20112.1.2 BX Home Screenp.201OAT Sectionp.201Demand Control Sectionp.201Power Monitoring Sectionp.202Light Schedules Sectionp.202Air Handling Units Sectionp.202Zones Sectionp.202Sensor Control Sectionp.20212.1.3 CX Home Screenp.202Lighting Control Sectionp.202HVAC Control Sectionp.202Refrigeration Control Sectionp.202Demand Control Sectionp.202Anti-Sweat Control Sectionp.202Sensor Control Sectionp.202Time Schedules Sectionp.20212.2 Logging On and Access Levelsp.20212.3 Toggling Full Optionsp.20312.4 Navigationp.20312.4.1 Menusp.203Main Menup.203The System Configuration Menup.203The System Information Menup.204Actions Menup.20412.4.2 Screen Typesp.205Summary Screensp.205Status Screensp.205Setup Screensp.20512.4.3 The E2 Keypadp.206The Cursorp.206The Tab Keyp.207The Enter Keyp.207Keypadp.207The Log In/Out Keyp.208Four Directional Arrow Keysp.208Page Up/Page Down Keysp.208Ctrl Page Up/Ctrl Page Down Keysp.208Numeric Keypadp.208Hot Keysp.20812.5 Customizing the Home Screenp.20912.6 Manual Defrost and Clean Modep.20912.7 Overridesp.21012.8 Checking Boards Onlinep.21112.9 Checking Status Screensp.211Suction Group Status Screenp.211Condenser Status Screenp.211Circuit Status Screenp.211Sensor Status Screenp.211AHU Status Screenp.212Zones Status Screenp.212Lighting Status Screenp.212Sensors Status Screenp.212Other Status Screensp.21212.10 Alarmsp.21212.10.1 Accessing the Alarm Advisory Logp.21212.10.2 Viewing the Controller Advisory Logp.21212.10.3 Date and Timep.21212.10.4 Statep.21212.10.5 Ack/Reset Statep.21312.10.6 Area Ctrl: Application: Propertyp.21312.10.7 Advisory Messagep.21312.10.8 Acknowledging, Resetting, and Clearing Log Entriesp.21312.10.8.1 Acknowledgingp.21312.10.8.2 Resettingp.21412.10.8.3 Clearingp.214Property or Board/Pointp.214Advisory Messagep.214Acknowledge Statusp.214Report Priorityp.214Return To Normalp.21412.10.9 Facility Status Display (FSD) Alarmsp.21512.11 Viewing Logs and Graphsp.21512.11.1 Locating Logged Inputs/ Outputsp.21512.11.1.1 Home/Status Screensp.21512.11.1.2 Setup Screensp.21612.11.1.3 Setting Up Input and Output Pointersp.21612.11.2 Log Viewp.21712.11.3 The Graph Viewp.21712.11.4 Zooming In and Outp.21712.12 Low Battery Notificationp.21812.13 Naming Conventions for E2 Controllers, Applications, and Pointsp.218Appendix A: Case Type Defaultsp.219High Alarm, Low Alarm, and Delayp.219Defrost Typep.219Appendix B: Pressure/Voltage and Temperature/Resistance Charts for Eclipse Transducers & Retail Solutions Temp Sensorsp.221Appendix C: Alarm Advisory Messagesp.223Appendix D: PID Controlp.237Introduction to PID Controlp.237Proportional (“P”) Modep.237Throttling Rangep.237Proportional Constant (Kp)p.238Integral Modep.238Why “I” Mode is Necessaryp.238Proportional Offsetp.238Saturationp.239The “I” Mode Calculationp.239Derivative Modep.239The “D” Mode Calculationp.240How Condenser Control and HVAC PID Differs From The Othersp.240Output at Setpointp.240Output at Setpoint for Non-Condenser/ HVAC PIDp.240Output at Setpoint for Condenser/HVAC PID Controlp.241Changing the Output at Setpointp.241Other PID Featuresp.241Output at Minimum / Output at Maximump.241Minimum Accumulated Errorp.242Applicationp.242Filteringp.242Applicationp.242Appendix E: Compressed Point Log Sample Limits and Precision Tabp.245Appendix F: Troubleshootingp.249Appendix G: Revision Logp.259Indexp.261
Page 12 of the Emerson E2 RX user manual — Table of contents
Page 12 · click to enlarge
Page 12

Table of contents

E2 Installation and Operation Manual for RX Refrigeration, BX HVAC, and CX Convenience Store Controllersp.1Table of Contentsp.51 Introductionp.171.1 The E2 Refrigeration Controllerp.171.2 The E2 Building Controllerp.181.3 The E2 Convenience Store Controllerp.191.4 Networking Overviewp.201.4.1 E2 I/O Networkp.201.4.2 The E2 Echelon Lonworks Networkp.211.4.3 Interconnection With Other E2sp.221.5 Documentation Overviewp.221.6 On-Line Help System Overviewp.231.7 Software Licensingp.242 Hardware Overviewp.252.1 E2 Hardwarep.252.1.1 E2 Main Processor Board (CPU)p.262.1.2 E2 Processor Interface Board (PIB)p.262.1.3 E2 Keypadp.262.1.4 LEDsp.262.1.5 PC-104 Peripherals: The Internal Modem (Previous Generation Processor Board)p.272.2 I/O Network Boards and Peripheralsp.272.2.1 The Gateway Boardp.272.2.2 MultiFlex Boardsp.282.2.2.1 MultiFlex 16 Input Boardp.282.2.2.2 MultiFlex Combination Input/ Output Boardsp.292.2.2.3 MultiFlex CUBp.312.2.2.4 MultiFlex RTU (BX and CX Only)p.312.2.2.5 MultiFlex Rooftop Control Board (RCB) (BX and CX Only)p.312.2.2.6 MultiFlex PAK Boardp.312.2.3 The MultiFlex ESR Boardp.322.2.4 Hand-held Terminal (P/N 814-3110)p.322.2.5 The 8RO and 8ROSMT Relay Boardsp.332.2.6 4AO Analog Output Boardp.342.2.7 8DO Digital Output Board and PMAC II Anti-Sweat Controllerp.342.3 Echelon Network Boards and Peripheralsp.352.3.1 The 16AIe (Discontinued)p.352.3.2 The 8ROe (Discontinued)p.352.3.3 EC-2sp.352.3.4 CC-100 Case Controllers and CS-100 Case Circuit Controllersp.362.3.5 The ESR8 (Discontinued)p.362.3.6 TD3 Temperature Displayp.372.3.7 Facility Status Display (FSD)p.373 Mountingp.393.1 Mounting the E2p.393.1.1 Standard Mountp.393.1.2 Recessed Mountp.393.1.3 Retrofit Mountingp.403.1.4 Blank Facep.413.2 Mounting I/O Boardsp.413.2.1 Single/Double Enclosuresp.413.2.2 Boards Without Enclosures (Snap Track)p.423.3 Echelon Devicesp.423.3.1 16AIe and 8ROep.423.3.2 CC-100 Case Controller and CS-100 Case Circuit Controllerp.433.3.3 ESR8 (Discontinued)p.433.3.4 MultiFlex ESRp.433.3.5 TD3p.433.4 Modem/Communication Expansion Card Mounting (New Processor Board)p.433.4.1 Mounting PC-104 Cards in E2 (Previous Generation Processor Board)p.443.4.1.1 The Internal Modemp.443.4.2 Two-Channel and FourChannel Repeatersp.443.4.2.1 Mounting Repeaters Overviewp.443.4.2.2 Mounting the Two-Channel Repeaterp.443.4.2.3 Mounting the Four-Channel Repeaterp.453.5 Sensors and Transducersp.453.5.1 Pressure Transducersp.453.5.1.1 Mountingp.453.5.2 Inside Temperature Sensorp.453.5.2.1 Locationp.453.5.2.2 Mountingp.463.5.3 Outside Temperature Sensorp.463.5.3.1 Locationp.463.5.3.2 Mountingp.463.5.4 Insertion Temperature Probep.463.5.4.1 Locationp.463.5.4.2 Mountingp.463.5.5 Supply and Return Air Sensorsp.463.5.6 Refrigeration System Temperature Probes and Sensorsp.473.5.6.1 Locationp.473.5.6.2 Mounting Bullet and Pipe Mount Sensorsp.473.5.7 Product Temperature Probesp.473.5.8 Humidity Sensors and Humidistatsp.473.5.8.1 Indoor RH Sensorp.473.5.8.2 Outdoor RH Sensorsp.48The outdoor RH sensor (P/N 203-5761)p.483.5.8.3 Duct-mounted Insertion RH Probep.483.5.9 Dewpoint Probep.493.5.9.1 Locationp.493.5.9.2 Mountingp.493.5.10 Light Level Sensorp.493.5.10.1 Locationp.493.5.10.2 Mountingp.493.5.11 Liquid Level Sensorsp.493.5.12 Refrigerant Leak Detectorsp.494 E2 Hardware Setupp.514.1 Setting up the E2p.514.1.1 Enclosurep.514.1.2 Main Processor Boardp.514.1.3 Main Processor Board (Previous Version)p.524.1.4 Power Interface Boardp.524.2 Powering the E2p.524.2.1 RS485 Portsp.524.2.2 RS485 Jumpersp.524.2.3 Echelon Network Connectp.524.2.4 Echelon Jumpersp.524.3 Add-On E2 Peripheralsp.534.3.1 Echelon Card Plug-In (P/N 537-4860) with mounting screw (P/N 101-4201)p.534.3.2 Modem/Communication Expansion Card (New Processor Board)p.544.3.3 Plug-In Modem Card (P/N 537-4870) with mounting screws (P/N 101-4038) and standoffs (P/N 107-9440) (Previous Generation Processor Board)p.544.3.4 Plug-In Digital I/O Network Card (P/N 537-4880)p.544.3.4.1 LEDsp.554.3.5 E2 RS485 Port Card (P/N 537-4890)p.554.3.5.1 LEDsp.554.3.6 Plug-In Four-Channel Internal Repeaterp.554.4 Battery Testing and Replacementp.554.4.1 Low Battery Notificationp.564.4.2 The Battery Enable Switchp.564.4.3 Battery Testp.564.4.4 Battery Replacement - Qualified Technicians Onlyp.565 Serial Configurationp.595.1 Overviewp.595.2 COM Portsp.59Pre-Setsp.595.3 Serial Device and Software Setupp.596 The RS485 Network and Hardware Setupp.616.1 The I/O Networkp.616.1.1 I/O Board Names and Terminologyp.616.1.2 MultiFlex-Plus (+) Boardp.626.1.2.1 Board Designationp.626.1.2.2 Board Calculationsp.626.1.3 Wiring Typesp.626.1.4 The I/O Network Structure (Daisy Chains)p.626.1.5 Network Noise Minimizationp.626.1.6 Network ID Numbers (Board Numbers)p.63Numbering the MultiFlex Combination I/O Boardsp.63Addressing the MultiFlex Boardsp.63Addressing the MultiFlex ESR Boardsp.636.1.7 Setting the Baud Ratep.63Baud Rate for the E2p.63Baud Rate for the Gatewayp.63Baud Rate for the 8IO, 8DO, and ARTCp.63Baud Rate for MultiFlex Boardsp.64Baud Rate for the MultiFlex ESRp.64Recommended Baud Ratep.646.1.8 Setting the Terminating and Biasing Jumpersp.646.1.9 Powering the I/O Boardsp.646.1.9.1 Wiring Typesp.656.1.10 Board Installationp.656.2 IMC/Prodigy Rooftop Unit Controllersp.656.3 ECT MODBUSp.666.3.1 Control Techniques Drive (VSD)p.666.3.2 Copeland Discus with CoreSense Diagnostics (ISD)p.666.3.3 XR35CX, XR75CX, and XEV22 Case Controllersp.666.3.3.1 XR75CX-Case Displayp.666.3.4 iPro DACp.676.3.5 Energy Meterp.676.3.5.1 Overviewp.676.3.5.2 Supported System Typesp.676.3.6 Modular Refrigerant Leak Detection Sensor (MRLDS)p.676.3.7 Copeland Discus with CoreSense Protectionp.686.3.8 Light Commercial Thermostatp.686.3.8.1 Thermostat Inputsp.686.3.8.2 Advisory and Alarmsp.686.3.9 Refrigerant Leak Detection System (RLDS)p.716.3.9.1 Diagnostic Alarmsp.716.3.10 Copeland Scroll — K5 Refrigeration Compressorp.716.3.11 XM Series of Case Controllersp.726.3.11.1 XM670p.726.3.11.2 XM679p.726.3.11.3 XM678p.727 E2 Ethernet Peer Communicationsp.837.1 Ethernet IP Configurationsp.837.2 Hardware Specificationsp.837.2.1 Componentsp.837.3 Software Specificationsp.847.4 Ethernet Network Layoutsp.847.4.1 Closed Network Layoutp.847.4.2 Open Network Layoutp.857.5 Software Setupp.857.6 Troubleshootingp.868 Echelon Network and Hardware Setupp.878.1 Overviewp.878.2 Wiring Typep.878.3 Echelon Network Structuring (Daisy-Chains)p.878.3.1 Maximum Number of Echelon Devicesp.888.4 Device Terminationp.888.4.1 Using a Termination Block (P/N 535-2715) to Terminate a Daisy Chainp.898.5 Wire Restrictionsp.89Maximum Total Segment Lengthp.898.6 Installing Echelon Devicesp.898.6.1 Powering Echelon Devicesp.898.7 LEDsp.908.8 Open Echelon Device Connectivityp.908.8.1 Configuring Echelon Devicesp.908.8.1.1 Troubleshootingp.919 Input and Output Setupp.959.1 The 16AI, 8IO, and MultiFlex Inputsp.959.1.1 Connecting Sensors to Input Boardsp.959.1.1.1 Wiringp.95MultiFlex Boardsp.9516AI Boardsp.958IO and ARTC Boardsp.959.1.1.2 Sensor Wiring Typesp.95All Analog Temperature Sensors and Air Flow Sensorsp.95All Pressure Transducers, Humidity Sensors, and Refrigeration Transducersp.95Dewpoint and Light Level Sensorsp.959.1.1.3 Input Type Dip Switchesp.959.1.2 Power Connectionp.969.1.3 Input Setup in E2p.1009.1.3.1 Configuring a Point from the Input Definitions/Status Screenp.1009.1.3.2 Using the Input Definitions/Status Screenp.1011. Board Type (read-only)p.1012. Brd (read-only)p.1013. Pt (read-only)p.1014. Type (read-only)p.1015. Applicationp.1016. Associationp.1017. Value (read-only)p.1019.1.3.3 Setting Up Analog Inputsp.1019.1.3.4 Setting Up Digital Inputsp.1039.2 The 8RO, 8ROe, 8IO, and MultiFlex Outputsp.1049.2.1 Wiring Form C Contactsp.1049.2.2 MultiFlex Relay Outputsp.1049.2.3 Setting the Fail-Safe Dip Switchp.1049.2.4 Wiring Outputs to Pointsp.105Old 8ROsp.105New 8ROs and 8RO-FCsp.1059.2.5 The Output LEDp.1059.2.6 Output Setup in E2p.1059.2.6.1 Configuring a Point from the Output Definitions/Status Screenp.1059.2.6.2 Using the Output Definitions/Status Screenp.1051. Board Type (read-only)p.1062. Brd (read-only)p.1063. Pt (read-only)p.1064. Type (read-only)p.1065. Applicationp.1066. Associationp.1067. Value (read-only)p.1069.2.6.3 Setting Up Digital Outputsp.1069.2.6.4 Setting Up Analog Outputsp.1079.3 CC-100 Case Controllersp.1089.3.1 Inputsp.108Temperature and Digital Sensorsp.108Connectionp.108Auxiliary Analog Inputp.109Hand-Held Terminal Jackp.1099.3.2 Power Module Wiringp.1099.3.3 Valve Cablep.109P/N 335-3263 (Pulse Valve)p.110P/N 335-3261 (Sporlan SEI and Emerson Flow Controls ESR Stepper Valve)p.110P/N 335-3260 (Generic Stepper and Emerson Flow Controls ESV Valve)p.1109.4 ESR8 Valve Output Wiringp.11010 Quick Startp.11310.1 Logging Onp.11310.2 Cleaning Out the Controllerp.113Performing a Clean Outp.11310.3 Setting Number of Network Devicesp.114Boards on the I/O Networkp.114Unit Controllers (Echelon)p.11410.4 Setting Number of Applicationsp.11510.5 The Main Status (Home) Screenp.11510.5.1 Customizing the Home Screenp.11510.6 Common Screen Elementsp.11610.6.1 The Headerp.11610.6.1.1 Header Iconsp.11610.6.2 The Function Keysp.11610.6.3 The Help Linep.11610.7 Screen Typesp.11710.7.1 The Main Menup.11710.7.2 Status Screensp.11710.7.3 The Actions Menup.11810.7.4 The Setup Screensp.11910.7.5 System Configuration Menup.11910.7.6 The System Information Menup.12010.8 Time/Date Setupp.12110.8.1 Setting the Time and Datep.121Active Datep.121Active Timep.121Time Zonep.121Time Serverp.121Primary Time Serverp.122Secondary Time Serverp.122Date Formatp.122Daylight Savings Datesp.122Daylight Savings Time uses GMTp.122Unit Location Fromp.122Sundownp.12210.9 Set Up Modemp.12210.10 Set Up TCP/IPp.12310.11 Set Up Network Baud Ratesp.12410.11.1 COM1 Serial (RS232) Baud Ratep.12410.11.2 I/O Network Baud Ratep.12410.12 Set Up User Accessp.12510.12.1 Changing Required User Access Levelsp.12610.12.2 Creating a New User Accountp.12610.12.3 Deleting a Userp.12610.13 Set Up I/O Networkp.12710.13.1 Specify Number of Boardsp.127Boards on the I/O Networkp.12710.13.2 Checking Online Statusp.12810.14 Set Up Echelon Networkp.12810.14.1 Specifying Number of Devicesp.128Unit Controllers (Echelon)p.12810.14.2 Commissioning a Devicep.129How Echelon Commissioning Worksp.129MODBUS Commissioningp.12910.14.2.1 The Service Button Methodp.129The CC-100’s Service Buttonp.130The TD3’s Service Buttonp.130The ESR8’s Service Buttonp.130Commissioning the EC-2p.13010.14.2.2 The Manual ID Entry Methodp.13110.15 License Managementp.13110.15.1 Web Servicesp.13210.16 Set Up Alarmingp.13310.16.1 Specifying Alarm Reporting Typesp.13410.16.1.1 The Display Linep.13410.16.1.2 The Alarm Outputp.13410.16.1.3 Dial-Outp.13410.16.1.4 The Echelon Network (The Alarm Annunciator)p.13410.16.2 Setting up an E2 to be an Alarm Annunciatorp.13410.16.3 Alarm Dial-Outp.13510.16.4 Introduction: Alarm Reportingp.1351. The E2 Display Headerp.1352. The Advisory Outputp.1353. Dial-Outp.1354. The LonWorks Network (The Alarm Annunciator)p.13510.17 Set Up Global Datap.13610.17.1 Priority Settingsp.136Example: Setting Up an Outdoor Temperature Sensorp.13710.18 Set Up Applicationsp.13710.18.1 Add/Delete an Applicationp.13810.18.2 Using and Configuring a Setup Screenp.13810.18.2.1 The Edit Menup.13910.18.2.2 Entering Setpointsp.13910.18.2.3 Navigating the Setup Screenp.139Index Tabsp.140The Help Linep.140The Function Keys For Setupp.14010.18.3 Using the Help Key to get Property Helpp.14111 Software Overviewp.14311.1 Suction Groupsp.14311.1.1 Introductionp.14311.1.2 The (Standard) Suction Group Applicationp.14311.1.2.1 Overview of PID Control Strategyp.14311.1.2.2 Variable-Speed Compressorsp.14311.1.2.3 Floating Setpoint Controlp.14311.1.3 The Enhanced Suction Group Applicationp.14311.1.3.1 Learning Modep.14411.1.3.2 Circuit Load Analysisp.14411.1.3.3 The Control/Cycles Parameterp.14411.1.3.4 Variable-Speed, Digital Scroll, and Digital Discus Compressor Supportp.14411.1.3.5 Floating Suction Controlp.14411.1.4 Hardware Overviewp.14411.2 Condenser Controlp.14511.2.1 Air Cooled Condensersp.14511.2.1.1 Air Cooled Strategyp.14511.2.1.2 Temperature Differential Strategyp.14511.2.2 Evaporative Condensersp.14611.2.3 Fan Controlp.14611.2.4 Condenser Split Modep.14611.2.5 Fast Recoveryp.14611.2.6 Hardware Overviewp.14611.3 Standard Circuitsp.14711.3.1 Refrigeration Controlp.14711.3.1.1 Temperature Monitorp.14811.3.1.2 Temperature Controlp.14811.3.1.3 Line Up(ESR)/Defrostp.14811.3.1.4 Line Up(MFESR)/Defrostp.14811.3.2 Defrost Controlp.14811.3.2.1 Defrost Statesp.14811.3.2.2 Defrost Typesp.148Timed and Reverse Airp.148Hot Gas and Reversed Cycle Hot Gasp.148Electric Defrostp.14811.3.2.3 Defrost Terminationp.149Pulsed Defrostp.14911.3.2.4 Emergency Defrostp.14911.3.2.5 Hot Gas Defrost with ESR8 and MultiFlex ESRp.14911.3.3 Clean and Door Switchesp.14911.3.3.1 Clean Switchesp.14911.3.3.2 Door Switchesp.14911.3.4 Fan Controlp.15011.3.5 The TD3 Temperature Displayp.15011.3.6 The Control Link CD Case Displayp.15011.3.7 Wiringp.15011.4 Case Control Circuitsp.15211.4.1 Overviewp.15211.4.2 Case Circuit Control Software Overviewp.15211.4.2.1 Valve Controlp.153Pulse Valvesp.153Stepper Valvesp.15311.4.3 Refrigeration Controlp.15311.4.3.1 EEVs (Liquid Pulse and Liquid Stepper)p.153Temperature Controlp.153Superheat Controlp.153Recovery Modep.153Thermostatic Expansion Valves (TXVs)p.15411.4.3.2 EEPRs (Suction Stepper)p.154Recovery Modep.15411.4.4 Defrost Controlp.15411.4.4.1 Defrost Statesp.15411.4.4.2 Defrost Typesp.154Off Cycle (Timed)p.154Hot Gas and Reversed Cycle Hot Gasp.154Electric Defrostp.15511.4.4.3 Defrost Terminationp.155Temperature Terminationp.155Pulsed Defrostp.15511.4.4.4 Demand Defrostp.155Demand Fail-Safe Timep.15511.4.4.5 Emergency Defrostp.15511.4.4.6 The WAIT Statep.15511.4.5 Anti-Sweat Controlp.15511.4.5.1 Dewpoint Input Sourcesp.15611.4.6 Dual Temp Controlp.15611.4.7 Fan Controlp.15611.4.8 Light Controlp.15611.4.9 Clean/Wash Modep.156End of Mode Warningp.15711.4.10 Walk-In Freezer Controlp.15711.4.11 Fail-Safe Modep.157Actions Taken During Fail-Safe Modep.15711.4.11.1 Recoverable Sensor Failuresp.157Coil In or Coil Out Failurep.157Discharge/Return Airp.15711.4.12 Wiringp.15811.4.13 Setting Up An Individual Case Controllerp.15811.4.14 Associating Case Controllers with Case Circuit Control Applicationsp.15811.5 Logging Groupsp.15811.5.1 Possible Data Errorsp.15911.5.2 Data Compressionp.15911.5.2.1 Clippingp.15911.5.2.2 Incompressible Data Typesp.15911.5.3 Base Log Groupp.15911.5.4 Setting Up Loggingp.16011.5.5 Logging Group Status Screenp.16111.5.6 Log Reportsp.16111.5.6.1 Logging Group Reportp.16211.5.6.2 Application Log Reportp.16211.5.6.3 System Log Reportp.16211.6 Air Handling Units (AHU)p.16311.6.1 Overviewp.16311.6.2 Temperature Controlp.16311.6.3 Alternate Setpointsp.16311.6.4 Fan Controlp.16311.6.4.1 Single-Speed Fansp.16311.6.4.2 Two-Speed Fansp.164Continuous Two-Speed Fan Operation When All Stages Are OFFp.16411.6.4.3 Variable-Speed Fansp.164Variable-Speed Fan Operationp.164Dehumidification with VS Fansp.16411.6.5 Economizer Controlp.16411.6.5.1 Economization Enablep.16411.6.5.2 Economization Lockout Featuresp.165Max Outside Air Humidityp.165Minimum Supply Tempp.16511.6.6 Digital Economizer Controlp.16511.6.7 Analog Economizer Controlp.16511.6.8 Dehumidification Controlp.16511.6.9 Curtailmentp.16511.6.10 Optimum Start/Stop (OSS)p.165Intelligent Pre-Starts and Pre-Stopsp.16611.6.11 Separate Setpointsp.16611.6.12 AHU Zone Controlp.16611.6.13 Hardware Overviewp.16611.7 Zone Controlp.16711.7.1 Overviewp.16711.7.2 How Zones Workp.16811.7.3 Applications That May Be Connected To Zonesp.16811.7.3.1 MultiFlex RTU Boardp.16811.7.3.2 MultiFlex RCB Boardp.16811.7.3.3 AHUsp.16811.7.4 Temperature Controlp.16911.7.5 Zone Temperaturep.16911.7.6 Economizer Controlp.16911.7.7 Economization Enablep.16911.7.8 The Effect of Enabling Economizationp.17011.7.9 Dehumidification Controlp.17011.7.10 The Zone Humidity Inputp.17011.7.11 The Effect of Enabling Dehumidificationp.17011.7.11.1 MultiFlex RTUs and RCBsp.17011.7.11.2 AHUsp.17011.7.12 Optimum Start/Stop (OSS)p.170Intelligent Pre-Starts and Pre-Stopsp.17111.7.13 Losing Contact With Zone Applicationsp.17111.7.14 Stand-Alone MultiFlex RTUsp.17111.7.15 MultiFlex RTU/ARTC and AHU Zone Associationp.17111.8 MultiFlex CUB Boardp.17211.9 MultiFlex PAK Boardp.17211.10 Lighting Schedulesp.17211.10.1 Overviewp.17211.10.2 Functions of the Lighting Schedule Applicationp.17311.10.3 Control Method Selectp.17311.10.4 Standard Controlp.17311.10.4.1 The Light Level Interface Cell (LLEV INTERFACE)p.173Logical Combination Strategiesp.173Occupied/Unoccupied and Alternate Settingsp.17411.10.4.2 The Schedule Interface Cell (SCHEDIF)p.174Logical Combinationsp.174Alternate Schedule Interface Combinationsp.17411.10.5 Alternate Controlp.17411.10.5.1 Multi-Logic Combinerp.17411.10.5.2 Offset Solar Controlp.17511.10.6 The Basic Schedule Cellp.17511.10.6.1 Slave Schedulingp.17511.10.7 The Min ON/OFF Cellp.17511.10.8 The Proof Cellp.17511.10.9 Output Light Dimmingp.17611.11 Demand Controlp.17611.11.1 Introduction to Demand Limit Controlp.17611.11.2 Demand Monitoringp.17611.11.3 Load Sheddingp.17711.11.3.1 Definitionp.17711.11.4 Shedding Levelsp.17711.11.5 Priority Levelsp.1771. First Shedp.1772. Rotational Shedp.1783. Last Shedp.178Other Notes About Priority Levelsp.17811.11.6 How Demand Control Uses Load Sheddingp.179Mode 1: KW Input Is Greater Than Setpointp.179Mode 2: KW Input Has Been Greater Than Setpoint for 1/4 Demand Window And Is Still Going Upp.179Mode 3: Integral Error Approaching Zerop.17911.11.6.1 Power Monitoring Inputp.180Settingsp.18011.12 Sensor Controlp.18011.12.1 Overviewp.18011.12.2 Analog Sensor Controlp.18011.12.3 Cut In/Cut Out Setpoint Controlp.18011.12.4 Digital Sensor Controlp.18011.12.5 Logical Combinationp.18111.13 Loop/Sequence Controlp.18111.13.1 Layout of the Loop/ Sequence Control Applicationp.18111.13.1.1 Control Cellsp.18111.13.1.2 Output Cellsp.18211.13.1.3 Diagramp.18211.13.2 Loop/Sequence Control Cell Descriptionsp.18211.13.2.1 The Select Cellp.18211.13.2.2 The Setpoint Float Cellp.18311.13.2.3 The PID Control Cellp.183Bypassing PIDp.18311.13.2.4 The Filter Cellp.18311.13.2.5 The Override Cellp.18311.13.3 Output Cell Descriptionsp.18311.13.3.1 The Sequencer Cellp.18311.13.3.2 The PWM Cellp.18311.14 Time Scheduling and Holidaysp.18411.14.1 How Schedules Workp.18411.14.1.1 Eventsp.18411.14.1.2 Absolute and Relative Eventsp.18411.14.1.3 Temporary Schedule Eventsp.18411.14.1.4 Overlappingp.18511.14.1.5 Rangesp.18511.14.2 Holiday Schedulesp.18511.15 Power Monitoringp.18511.15.1 Overviewp.185Explanation of “Demand”p.185How Power Monitoring Calculates Demandp.185Shed Modep.18511.15.2 Loggingp.186Hourlyp.186Dailyp.186Monthlyp.186Definition of Heat and Cool Degree Daysp.18611.15.2.1 Power Monitoring Inputp.186Settingsp.18611.16 Anti-Sweat Setupp.18711.16.1 How Anti-Sweat Worksp.18711.17 Heat/Cool Controlp.18711.17.1 Temperature Controlp.18711.17.2 Unoccupied Hysteresisp.18711.17.3 Optimum Start/Stop (OSS)p.188Intelligent Pre-Starts and Pre-Stopsp.18811.17.4 Setpoint Resetp.18811.17.5 Lead/Lagp.18911.18 Analog and Digital Combinersp.18911.19 TD Controlp.19011.19.1 Overviewp.19011.19.2 Temperature Differential (TD) Strategyp.19011.19.3 TD Control Fail-Safesp.190Drop Leg Temperature Above Maximum Drop Leg Setpointp.19011.19.4 Configurationp.19011.19.5 Setpointsp.19011.19.6 Inputsp.19111.19.7 Alarmsp.19111.20 Pulse Accumulationp.19111.20.1 Overviewp.19111.20.2 Configurationp.19111.20.3 Outputsp.19111.20.4 Accumulator Reset Typesp.19211.20.5 Loggingp.19211.20.6 High Tripp.19211.21 Irrigation Controlp.19211.21.1 Overviewp.19211.21.2 Zones and Cyclesp.19211.21.2.1 Cycle Control Typesp.19311.21.2.2 Timedp.19311.21.2.3 Volumep.19311.21.3 Cycle Schedulingp.19311.21.4 Zone Inhibitp.19311.21.4.1 Timedp.19311.21.4.2 Volumep.19311.21.4.3 Rain Delayp.19311.21.4.4 Freeze Lockoutp.19311.21.4.5 Alarmp.19311.21.5 Zone Bypass Inputsp.19311.21.5.1 Bypass Failsafep.19411.21.6 Flow Sensor-Related Testsp.19411.21.6.1 Leak Testp.19411.21.6.2 Obstructed Zone Testp.19411.21.7 Service Modesp.19411.21.8 Heat Cut In/Cut Out Setpoints For Each Stagep.19411.21.9 Cool Cut In/Cut Out Setpoints For Each Stagep.19411.21.10 Dehumidification Controlp.19411.21.11 Two Speed Fan Controlp.19411.21.12 Configurationp.19511.22 Flexible Combinerp.19511.23 Modular Chiller Control (MCC)p.19511.23.1 Overviewp.19511.23.2 Learning Modep.19611.23.3 The Control/Cycles Parameterp.19611.23.4 Compressor Controlp.19611.23.4.1 Digital Scroll Compressorp.19711.23.4.2 Variable Frequency Drive Compressorp.19711.23.4.3 Unequal Capacity Compressorsp.19711.23.5 Bypass Valve Controlp.19711.24 Boilerp.19711.24.1 Overviewp.19711.24.2 Alarmsp.19711.25 Refrigerant Monitoring System (RMS)p.19811.25.1 RMS Assetp.19811.25.2 RMS Scalep.19811.25.2.1 Device Constraintsp.19811.26 Detailed Setpoint Change Loggingp.19811.26.1 Log Informationp.19811.26.2 Logged Changesp.19911.26.3 Unlogged Changesp.19912 Operator’s Guide to Using the E2p.20112.1 The E2 Home Screenp.20112.1.1 RX Home Screenp.201Suction Groups Sectionp.201Circuit Status Sectionp.201Condenser Sectionp.201Sensor Controlp.20112.1.2 BX Home Screenp.201OAT Sectionp.201Demand Control Sectionp.201Power Monitoring Sectionp.202Light Schedules Sectionp.202Air Handling Units Sectionp.202Zones Sectionp.202Sensor Control Sectionp.20212.1.3 CX Home Screenp.202Lighting Control Sectionp.202HVAC Control Sectionp.202Refrigeration Control Sectionp.202Demand Control Sectionp.202Anti-Sweat Control Sectionp.202Sensor Control Sectionp.202Time Schedules Sectionp.20212.2 Logging On and Access Levelsp.20212.3 Toggling Full Optionsp.20312.4 Navigationp.20312.4.1 Menusp.203Main Menup.203The System Configuration Menup.203The System Information Menup.204Actions Menup.20412.4.2 Screen Typesp.205Summary Screensp.205Status Screensp.205Setup Screensp.20512.4.3 The E2 Keypadp.206The Cursorp.206The Tab Keyp.207The Enter Keyp.207Keypadp.207The Log In/Out Keyp.208Four Directional Arrow Keysp.208Page Up/Page Down Keysp.208Ctrl Page Up/Ctrl Page Down Keysp.208Numeric Keypadp.208Hot Keysp.20812.5 Customizing the Home Screenp.20912.6 Manual Defrost and Clean Modep.20912.7 Overridesp.21012.8 Checking Boards Onlinep.21112.9 Checking Status Screensp.211Suction Group Status Screenp.211Condenser Status Screenp.211Circuit Status Screenp.211Sensor Status Screenp.211AHU Status Screenp.212Zones Status Screenp.212Lighting Status Screenp.212Sensors Status Screenp.212Other Status Screensp.21212.10 Alarmsp.21212.10.1 Accessing the Alarm Advisory Logp.21212.10.2 Viewing the Controller Advisory Logp.21212.10.3 Date and Timep.21212.10.4 Statep.21212.10.5 Ack/Reset Statep.21312.10.6 Area Ctrl: Application: Propertyp.21312.10.7 Advisory Messagep.21312.10.8 Acknowledging, Resetting, and Clearing Log Entriesp.21312.10.8.1 Acknowledgingp.21312.10.8.2 Resettingp.21412.10.8.3 Clearingp.214Property or Board/Pointp.214Advisory Messagep.214Acknowledge Statusp.214Report Priorityp.214Return To Normalp.21412.10.9 Facility Status Display (FSD) Alarmsp.21512.11 Viewing Logs and Graphsp.21512.11.1 Locating Logged Inputs/ Outputsp.21512.11.1.1 Home/Status Screensp.21512.11.1.2 Setup Screensp.21612.11.1.3 Setting Up Input and Output Pointersp.21612.11.2 Log Viewp.21712.11.3 The Graph Viewp.21712.11.4 Zooming In and Outp.21712.12 Low Battery Notificationp.21812.13 Naming Conventions for E2 Controllers, Applications, and Pointsp.218Appendix A: Case Type Defaultsp.219High Alarm, Low Alarm, and Delayp.219Defrost Typep.219Appendix B: Pressure/Voltage and Temperature/Resistance Charts for Eclipse Transducers & Retail Solutions Temp Sensorsp.221Appendix C: Alarm Advisory Messagesp.223Appendix D: PID Controlp.237Introduction to PID Controlp.237Proportional (“P”) Modep.237Throttling Rangep.237Proportional Constant (Kp)p.238Integral Modep.238Why “I” Mode is Necessaryp.238Proportional Offsetp.238Saturationp.239The “I” Mode Calculationp.239Derivative Modep.239The “D” Mode Calculationp.240How Condenser Control and HVAC PID Differs From The Othersp.240Output at Setpointp.240Output at Setpoint for Non-Condenser/ HVAC PIDp.240Output at Setpoint for Condenser/HVAC PID Controlp.241Changing the Output at Setpointp.241Other PID Featuresp.241Output at Minimum / Output at Maximump.241Minimum Accumulated Errorp.242Applicationp.242Filteringp.242Applicationp.242Appendix E: Compressed Point Log Sample Limits and Precision Tabp.245Appendix F: Troubleshootingp.249Appendix G: Revision Logp.259Indexp.261
Page 13 of the Emerson E2 RX user manual — Table of contents
Page 13 · click to enlarge
Page 13

Table of contents

E2 Installation and Operation Manual for RX Refrigeration, BX HVAC, and CX Convenience Store Controllersp.1Table of Contentsp.51 Introductionp.171.1 The E2 Refrigeration Controllerp.171.2 The E2 Building Controllerp.181.3 The E2 Convenience Store Controllerp.191.4 Networking Overviewp.201.4.1 E2 I/O Networkp.201.4.2 The E2 Echelon Lonworks Networkp.211.4.3 Interconnection With Other E2sp.221.5 Documentation Overviewp.221.6 On-Line Help System Overviewp.231.7 Software Licensingp.242 Hardware Overviewp.252.1 E2 Hardwarep.252.1.1 E2 Main Processor Board (CPU)p.262.1.2 E2 Processor Interface Board (PIB)p.262.1.3 E2 Keypadp.262.1.4 LEDsp.262.1.5 PC-104 Peripherals: The Internal Modem (Previous Generation Processor Board)p.272.2 I/O Network Boards and Peripheralsp.272.2.1 The Gateway Boardp.272.2.2 MultiFlex Boardsp.282.2.2.1 MultiFlex 16 Input Boardp.282.2.2.2 MultiFlex Combination Input/ Output Boardsp.292.2.2.3 MultiFlex CUBp.312.2.2.4 MultiFlex RTU (BX and CX Only)p.312.2.2.5 MultiFlex Rooftop Control Board (RCB) (BX and CX Only)p.312.2.2.6 MultiFlex PAK Boardp.312.2.3 The MultiFlex ESR Boardp.322.2.4 Hand-held Terminal (P/N 814-3110)p.322.2.5 The 8RO and 8ROSMT Relay Boardsp.332.2.6 4AO Analog Output Boardp.342.2.7 8DO Digital Output Board and PMAC II Anti-Sweat Controllerp.342.3 Echelon Network Boards and Peripheralsp.352.3.1 The 16AIe (Discontinued)p.352.3.2 The 8ROe (Discontinued)p.352.3.3 EC-2sp.352.3.4 CC-100 Case Controllers and CS-100 Case Circuit Controllersp.362.3.5 The ESR8 (Discontinued)p.362.3.6 TD3 Temperature Displayp.372.3.7 Facility Status Display (FSD)p.373 Mountingp.393.1 Mounting the E2p.393.1.1 Standard Mountp.393.1.2 Recessed Mountp.393.1.3 Retrofit Mountingp.403.1.4 Blank Facep.413.2 Mounting I/O Boardsp.413.2.1 Single/Double Enclosuresp.413.2.2 Boards Without Enclosures (Snap Track)p.423.3 Echelon Devicesp.423.3.1 16AIe and 8ROep.423.3.2 CC-100 Case Controller and CS-100 Case Circuit Controllerp.433.3.3 ESR8 (Discontinued)p.433.3.4 MultiFlex ESRp.433.3.5 TD3p.433.4 Modem/Communication Expansion Card Mounting (New Processor Board)p.433.4.1 Mounting PC-104 Cards in E2 (Previous Generation Processor Board)p.443.4.1.1 The Internal Modemp.443.4.2 Two-Channel and FourChannel Repeatersp.443.4.2.1 Mounting Repeaters Overviewp.443.4.2.2 Mounting the Two-Channel Repeaterp.443.4.2.3 Mounting the Four-Channel Repeaterp.453.5 Sensors and Transducersp.453.5.1 Pressure Transducersp.453.5.1.1 Mountingp.453.5.2 Inside Temperature Sensorp.453.5.2.1 Locationp.453.5.2.2 Mountingp.463.5.3 Outside Temperature Sensorp.463.5.3.1 Locationp.463.5.3.2 Mountingp.463.5.4 Insertion Temperature Probep.463.5.4.1 Locationp.463.5.4.2 Mountingp.463.5.5 Supply and Return Air Sensorsp.463.5.6 Refrigeration System Temperature Probes and Sensorsp.473.5.6.1 Locationp.473.5.6.2 Mounting Bullet and Pipe Mount Sensorsp.473.5.7 Product Temperature Probesp.473.5.8 Humidity Sensors and Humidistatsp.473.5.8.1 Indoor RH Sensorp.473.5.8.2 Outdoor RH Sensorsp.48The outdoor RH sensor (P/N 203-5761)p.483.5.8.3 Duct-mounted Insertion RH Probep.483.5.9 Dewpoint Probep.493.5.9.1 Locationp.493.5.9.2 Mountingp.493.5.10 Light Level Sensorp.493.5.10.1 Locationp.493.5.10.2 Mountingp.493.5.11 Liquid Level Sensorsp.493.5.12 Refrigerant Leak Detectorsp.494 E2 Hardware Setupp.514.1 Setting up the E2p.514.1.1 Enclosurep.514.1.2 Main Processor Boardp.514.1.3 Main Processor Board (Previous Version)p.524.1.4 Power Interface Boardp.524.2 Powering the E2p.524.2.1 RS485 Portsp.524.2.2 RS485 Jumpersp.524.2.3 Echelon Network Connectp.524.2.4 Echelon Jumpersp.524.3 Add-On E2 Peripheralsp.534.3.1 Echelon Card Plug-In (P/N 537-4860) with mounting screw (P/N 101-4201)p.534.3.2 Modem/Communication Expansion Card (New Processor Board)p.544.3.3 Plug-In Modem Card (P/N 537-4870) with mounting screws (P/N 101-4038) and standoffs (P/N 107-9440) (Previous Generation Processor Board)p.544.3.4 Plug-In Digital I/O Network Card (P/N 537-4880)p.544.3.4.1 LEDsp.554.3.5 E2 RS485 Port Card (P/N 537-4890)p.554.3.5.1 LEDsp.554.3.6 Plug-In Four-Channel Internal Repeaterp.554.4 Battery Testing and Replacementp.554.4.1 Low Battery Notificationp.564.4.2 The Battery Enable Switchp.564.4.3 Battery Testp.564.4.4 Battery Replacement - Qualified Technicians Onlyp.565 Serial Configurationp.595.1 Overviewp.595.2 COM Portsp.59Pre-Setsp.595.3 Serial Device and Software Setupp.596 The RS485 Network and Hardware Setupp.616.1 The I/O Networkp.616.1.1 I/O Board Names and Terminologyp.616.1.2 MultiFlex-Plus (+) Boardp.626.1.2.1 Board Designationp.626.1.2.2 Board Calculationsp.626.1.3 Wiring Typesp.626.1.4 The I/O Network Structure (Daisy Chains)p.626.1.5 Network Noise Minimizationp.626.1.6 Network ID Numbers (Board Numbers)p.63Numbering the MultiFlex Combination I/O Boardsp.63Addressing the MultiFlex Boardsp.63Addressing the MultiFlex ESR Boardsp.636.1.7 Setting the Baud Ratep.63Baud Rate for the E2p.63Baud Rate for the Gatewayp.63Baud Rate for the 8IO, 8DO, and ARTCp.63Baud Rate for MultiFlex Boardsp.64Baud Rate for the MultiFlex ESRp.64Recommended Baud Ratep.646.1.8 Setting the Terminating and Biasing Jumpersp.646.1.9 Powering the I/O Boardsp.646.1.9.1 Wiring Typesp.656.1.10 Board Installationp.656.2 IMC/Prodigy Rooftop Unit Controllersp.656.3 ECT MODBUSp.666.3.1 Control Techniques Drive (VSD)p.666.3.2 Copeland Discus with CoreSense Diagnostics (ISD)p.666.3.3 XR35CX, XR75CX, and XEV22 Case Controllersp.666.3.3.1 XR75CX-Case Displayp.666.3.4 iPro DACp.676.3.5 Energy Meterp.676.3.5.1 Overviewp.676.3.5.2 Supported System Typesp.676.3.6 Modular Refrigerant Leak Detection Sensor (MRLDS)p.676.3.7 Copeland Discus with CoreSense Protectionp.686.3.8 Light Commercial Thermostatp.686.3.8.1 Thermostat Inputsp.686.3.8.2 Advisory and Alarmsp.686.3.9 Refrigerant Leak Detection System (RLDS)p.716.3.9.1 Diagnostic Alarmsp.716.3.10 Copeland Scroll — K5 Refrigeration Compressorp.716.3.11 XM Series of Case Controllersp.726.3.11.1 XM670p.726.3.11.2 XM679p.726.3.11.3 XM678p.727 E2 Ethernet Peer Communicationsp.837.1 Ethernet IP Configurationsp.837.2 Hardware Specificationsp.837.2.1 Componentsp.837.3 Software Specificationsp.847.4 Ethernet Network Layoutsp.847.4.1 Closed Network Layoutp.847.4.2 Open Network Layoutp.857.5 Software Setupp.857.6 Troubleshootingp.868 Echelon Network and Hardware Setupp.878.1 Overviewp.878.2 Wiring Typep.878.3 Echelon Network Structuring (Daisy-Chains)p.878.3.1 Maximum Number of Echelon Devicesp.888.4 Device Terminationp.888.4.1 Using a Termination Block (P/N 535-2715) to Terminate a Daisy Chainp.898.5 Wire Restrictionsp.89Maximum Total Segment Lengthp.898.6 Installing Echelon Devicesp.898.6.1 Powering Echelon Devicesp.898.7 LEDsp.908.8 Open Echelon Device Connectivityp.908.8.1 Configuring Echelon Devicesp.908.8.1.1 Troubleshootingp.919 Input and Output Setupp.959.1 The 16AI, 8IO, and MultiFlex Inputsp.959.1.1 Connecting Sensors to Input Boardsp.959.1.1.1 Wiringp.95MultiFlex Boardsp.9516AI Boardsp.958IO and ARTC Boardsp.959.1.1.2 Sensor Wiring Typesp.95All Analog Temperature Sensors and Air Flow Sensorsp.95All Pressure Transducers, Humidity Sensors, and Refrigeration Transducersp.95Dewpoint and Light Level Sensorsp.959.1.1.3 Input Type Dip Switchesp.959.1.2 Power Connectionp.969.1.3 Input Setup in E2p.1009.1.3.1 Configuring a Point from the Input Definitions/Status Screenp.1009.1.3.2 Using the Input Definitions/Status Screenp.1011. Board Type (read-only)p.1012. Brd (read-only)p.1013. Pt (read-only)p.1014. Type (read-only)p.1015. Applicationp.1016. Associationp.1017. Value (read-only)p.1019.1.3.3 Setting Up Analog Inputsp.1019.1.3.4 Setting Up Digital Inputsp.1039.2 The 8RO, 8ROe, 8IO, and MultiFlex Outputsp.1049.2.1 Wiring Form C Contactsp.1049.2.2 MultiFlex Relay Outputsp.1049.2.3 Setting the Fail-Safe Dip Switchp.1049.2.4 Wiring Outputs to Pointsp.105Old 8ROsp.105New 8ROs and 8RO-FCsp.1059.2.5 The Output LEDp.1059.2.6 Output Setup in E2p.1059.2.6.1 Configuring a Point from the Output Definitions/Status Screenp.1059.2.6.2 Using the Output Definitions/Status Screenp.1051. Board Type (read-only)p.1062. Brd (read-only)p.1063. Pt (read-only)p.1064. Type (read-only)p.1065. Applicationp.1066. Associationp.1067. Value (read-only)p.1069.2.6.3 Setting Up Digital Outputsp.1069.2.6.4 Setting Up Analog Outputsp.1079.3 CC-100 Case Controllersp.1089.3.1 Inputsp.108Temperature and Digital Sensorsp.108Connectionp.108Auxiliary Analog Inputp.109Hand-Held Terminal Jackp.1099.3.2 Power Module Wiringp.1099.3.3 Valve Cablep.109P/N 335-3263 (Pulse Valve)p.110P/N 335-3261 (Sporlan SEI and Emerson Flow Controls ESR Stepper Valve)p.110P/N 335-3260 (Generic Stepper and Emerson Flow Controls ESV Valve)p.1109.4 ESR8 Valve Output Wiringp.11010 Quick Startp.11310.1 Logging Onp.11310.2 Cleaning Out the Controllerp.113Performing a Clean Outp.11310.3 Setting Number of Network Devicesp.114Boards on the I/O Networkp.114Unit Controllers (Echelon)p.11410.4 Setting Number of Applicationsp.11510.5 The Main Status (Home) Screenp.11510.5.1 Customizing the Home Screenp.11510.6 Common Screen Elementsp.11610.6.1 The Headerp.11610.6.1.1 Header Iconsp.11610.6.2 The Function Keysp.11610.6.3 The Help Linep.11610.7 Screen Typesp.11710.7.1 The Main Menup.11710.7.2 Status Screensp.11710.7.3 The Actions Menup.11810.7.4 The Setup Screensp.11910.7.5 System Configuration Menup.11910.7.6 The System Information Menup.12010.8 Time/Date Setupp.12110.8.1 Setting the Time and Datep.121Active Datep.121Active Timep.121Time Zonep.121Time Serverp.121Primary Time Serverp.122Secondary Time Serverp.122Date Formatp.122Daylight Savings Datesp.122Daylight Savings Time uses GMTp.122Unit Location Fromp.122Sundownp.12210.9 Set Up Modemp.12210.10 Set Up TCP/IPp.12310.11 Set Up Network Baud Ratesp.12410.11.1 COM1 Serial (RS232) Baud Ratep.12410.11.2 I/O Network Baud Ratep.12410.12 Set Up User Accessp.12510.12.1 Changing Required User Access Levelsp.12610.12.2 Creating a New User Accountp.12610.12.3 Deleting a Userp.12610.13 Set Up I/O Networkp.12710.13.1 Specify Number of Boardsp.127Boards on the I/O Networkp.12710.13.2 Checking Online Statusp.12810.14 Set Up Echelon Networkp.12810.14.1 Specifying Number of Devicesp.128Unit Controllers (Echelon)p.12810.14.2 Commissioning a Devicep.129How Echelon Commissioning Worksp.129MODBUS Commissioningp.12910.14.2.1 The Service Button Methodp.129The CC-100’s Service Buttonp.130The TD3’s Service Buttonp.130The ESR8’s Service Buttonp.130Commissioning the EC-2p.13010.14.2.2 The Manual ID Entry Methodp.13110.15 License Managementp.13110.15.1 Web Servicesp.13210.16 Set Up Alarmingp.13310.16.1 Specifying Alarm Reporting Typesp.13410.16.1.1 The Display Linep.13410.16.1.2 The Alarm Outputp.13410.16.1.3 Dial-Outp.13410.16.1.4 The Echelon Network (The Alarm Annunciator)p.13410.16.2 Setting up an E2 to be an Alarm Annunciatorp.13410.16.3 Alarm Dial-Outp.13510.16.4 Introduction: Alarm Reportingp.1351. The E2 Display Headerp.1352. The Advisory Outputp.1353. Dial-Outp.1354. The LonWorks Network (The Alarm Annunciator)p.13510.17 Set Up Global Datap.13610.17.1 Priority Settingsp.136Example: Setting Up an Outdoor Temperature Sensorp.13710.18 Set Up Applicationsp.13710.18.1 Add/Delete an Applicationp.13810.18.2 Using and Configuring a Setup Screenp.13810.18.2.1 The Edit Menup.13910.18.2.2 Entering Setpointsp.13910.18.2.3 Navigating the Setup Screenp.139Index Tabsp.140The Help Linep.140The Function Keys For Setupp.14010.18.3 Using the Help Key to get Property Helpp.14111 Software Overviewp.14311.1 Suction Groupsp.14311.1.1 Introductionp.14311.1.2 The (Standard) Suction Group Applicationp.14311.1.2.1 Overview of PID Control Strategyp.14311.1.2.2 Variable-Speed Compressorsp.14311.1.2.3 Floating Setpoint Controlp.14311.1.3 The Enhanced Suction Group Applicationp.14311.1.3.1 Learning Modep.14411.1.3.2 Circuit Load Analysisp.14411.1.3.3 The Control/Cycles Parameterp.14411.1.3.4 Variable-Speed, Digital Scroll, and Digital Discus Compressor Supportp.14411.1.3.5 Floating Suction Controlp.14411.1.4 Hardware Overviewp.14411.2 Condenser Controlp.14511.2.1 Air Cooled Condensersp.14511.2.1.1 Air Cooled Strategyp.14511.2.1.2 Temperature Differential Strategyp.14511.2.2 Evaporative Condensersp.14611.2.3 Fan Controlp.14611.2.4 Condenser Split Modep.14611.2.5 Fast Recoveryp.14611.2.6 Hardware Overviewp.14611.3 Standard Circuitsp.14711.3.1 Refrigeration Controlp.14711.3.1.1 Temperature Monitorp.14811.3.1.2 Temperature Controlp.14811.3.1.3 Line Up(ESR)/Defrostp.14811.3.1.4 Line Up(MFESR)/Defrostp.14811.3.2 Defrost Controlp.14811.3.2.1 Defrost Statesp.14811.3.2.2 Defrost Typesp.148Timed and Reverse Airp.148Hot Gas and Reversed Cycle Hot Gasp.148Electric Defrostp.14811.3.2.3 Defrost Terminationp.149Pulsed Defrostp.14911.3.2.4 Emergency Defrostp.14911.3.2.5 Hot Gas Defrost with ESR8 and MultiFlex ESRp.14911.3.3 Clean and Door Switchesp.14911.3.3.1 Clean Switchesp.14911.3.3.2 Door Switchesp.14911.3.4 Fan Controlp.15011.3.5 The TD3 Temperature Displayp.15011.3.6 The Control Link CD Case Displayp.15011.3.7 Wiringp.15011.4 Case Control Circuitsp.15211.4.1 Overviewp.15211.4.2 Case Circuit Control Software Overviewp.15211.4.2.1 Valve Controlp.153Pulse Valvesp.153Stepper Valvesp.15311.4.3 Refrigeration Controlp.15311.4.3.1 EEVs (Liquid Pulse and Liquid Stepper)p.153Temperature Controlp.153Superheat Controlp.153Recovery Modep.153Thermostatic Expansion Valves (TXVs)p.15411.4.3.2 EEPRs (Suction Stepper)p.154Recovery Modep.15411.4.4 Defrost Controlp.15411.4.4.1 Defrost Statesp.15411.4.4.2 Defrost Typesp.154Off Cycle (Timed)p.154Hot Gas and Reversed Cycle Hot Gasp.154Electric Defrostp.15511.4.4.3 Defrost Terminationp.155Temperature Terminationp.155Pulsed Defrostp.15511.4.4.4 Demand Defrostp.155Demand Fail-Safe Timep.15511.4.4.5 Emergency Defrostp.15511.4.4.6 The WAIT Statep.15511.4.5 Anti-Sweat Controlp.15511.4.5.1 Dewpoint Input Sourcesp.15611.4.6 Dual Temp Controlp.15611.4.7 Fan Controlp.15611.4.8 Light Controlp.15611.4.9 Clean/Wash Modep.156End of Mode Warningp.15711.4.10 Walk-In Freezer Controlp.15711.4.11 Fail-Safe Modep.157Actions Taken During Fail-Safe Modep.15711.4.11.1 Recoverable Sensor Failuresp.157Coil In or Coil Out Failurep.157Discharge/Return Airp.15711.4.12 Wiringp.15811.4.13 Setting Up An Individual Case Controllerp.15811.4.14 Associating Case Controllers with Case Circuit Control Applicationsp.15811.5 Logging Groupsp.15811.5.1 Possible Data Errorsp.15911.5.2 Data Compressionp.15911.5.2.1 Clippingp.15911.5.2.2 Incompressible Data Typesp.15911.5.3 Base Log Groupp.15911.5.4 Setting Up Loggingp.16011.5.5 Logging Group Status Screenp.16111.5.6 Log Reportsp.16111.5.6.1 Logging Group Reportp.16211.5.6.2 Application Log Reportp.16211.5.6.3 System Log Reportp.16211.6 Air Handling Units (AHU)p.16311.6.1 Overviewp.16311.6.2 Temperature Controlp.16311.6.3 Alternate Setpointsp.16311.6.4 Fan Controlp.16311.6.4.1 Single-Speed Fansp.16311.6.4.2 Two-Speed Fansp.164Continuous Two-Speed Fan Operation When All Stages Are OFFp.16411.6.4.3 Variable-Speed Fansp.164Variable-Speed Fan Operationp.164Dehumidification with VS Fansp.16411.6.5 Economizer Controlp.16411.6.5.1 Economization Enablep.16411.6.5.2 Economization Lockout Featuresp.165Max Outside Air Humidityp.165Minimum Supply Tempp.16511.6.6 Digital Economizer Controlp.16511.6.7 Analog Economizer Controlp.16511.6.8 Dehumidification Controlp.16511.6.9 Curtailmentp.16511.6.10 Optimum Start/Stop (OSS)p.165Intelligent Pre-Starts and Pre-Stopsp.16611.6.11 Separate Setpointsp.16611.6.12 AHU Zone Controlp.16611.6.13 Hardware Overviewp.16611.7 Zone Controlp.16711.7.1 Overviewp.16711.7.2 How Zones Workp.16811.7.3 Applications That May Be Connected To Zonesp.16811.7.3.1 MultiFlex RTU Boardp.16811.7.3.2 MultiFlex RCB Boardp.16811.7.3.3 AHUsp.16811.7.4 Temperature Controlp.16911.7.5 Zone Temperaturep.16911.7.6 Economizer Controlp.16911.7.7 Economization Enablep.16911.7.8 The Effect of Enabling Economizationp.17011.7.9 Dehumidification Controlp.17011.7.10 The Zone Humidity Inputp.17011.7.11 The Effect of Enabling Dehumidificationp.17011.7.11.1 MultiFlex RTUs and RCBsp.17011.7.11.2 AHUsp.17011.7.12 Optimum Start/Stop (OSS)p.170Intelligent Pre-Starts and Pre-Stopsp.17111.7.13 Losing Contact With Zone Applicationsp.17111.7.14 Stand-Alone MultiFlex RTUsp.17111.7.15 MultiFlex RTU/ARTC and AHU Zone Associationp.17111.8 MultiFlex CUB Boardp.17211.9 MultiFlex PAK Boardp.17211.10 Lighting Schedulesp.17211.10.1 Overviewp.17211.10.2 Functions of the Lighting Schedule Applicationp.17311.10.3 Control Method Selectp.17311.10.4 Standard Controlp.17311.10.4.1 The Light Level Interface Cell (LLEV INTERFACE)p.173Logical Combination Strategiesp.173Occupied/Unoccupied and Alternate Settingsp.17411.10.4.2 The Schedule Interface Cell (SCHEDIF)p.174Logical Combinationsp.174Alternate Schedule Interface Combinationsp.17411.10.5 Alternate Controlp.17411.10.5.1 Multi-Logic Combinerp.17411.10.5.2 Offset Solar Controlp.17511.10.6 The Basic Schedule Cellp.17511.10.6.1 Slave Schedulingp.17511.10.7 The Min ON/OFF Cellp.17511.10.8 The Proof Cellp.17511.10.9 Output Light Dimmingp.17611.11 Demand Controlp.17611.11.1 Introduction to Demand Limit Controlp.17611.11.2 Demand Monitoringp.17611.11.3 Load Sheddingp.17711.11.3.1 Definitionp.17711.11.4 Shedding Levelsp.17711.11.5 Priority Levelsp.1771. First Shedp.1772. Rotational Shedp.1783. Last Shedp.178Other Notes About Priority Levelsp.17811.11.6 How Demand Control Uses Load Sheddingp.179Mode 1: KW Input Is Greater Than Setpointp.179Mode 2: KW Input Has Been Greater Than Setpoint for 1/4 Demand Window And Is Still Going Upp.179Mode 3: Integral Error Approaching Zerop.17911.11.6.1 Power Monitoring Inputp.180Settingsp.18011.12 Sensor Controlp.18011.12.1 Overviewp.18011.12.2 Analog Sensor Controlp.18011.12.3 Cut In/Cut Out Setpoint Controlp.18011.12.4 Digital Sensor Controlp.18011.12.5 Logical Combinationp.18111.13 Loop/Sequence Controlp.18111.13.1 Layout of the Loop/ Sequence Control Applicationp.18111.13.1.1 Control Cellsp.18111.13.1.2 Output Cellsp.18211.13.1.3 Diagramp.18211.13.2 Loop/Sequence Control Cell Descriptionsp.18211.13.2.1 The Select Cellp.18211.13.2.2 The Setpoint Float Cellp.18311.13.2.3 The PID Control Cellp.183Bypassing PIDp.18311.13.2.4 The Filter Cellp.18311.13.2.5 The Override Cellp.18311.13.3 Output Cell Descriptionsp.18311.13.3.1 The Sequencer Cellp.18311.13.3.2 The PWM Cellp.18311.14 Time Scheduling and Holidaysp.18411.14.1 How Schedules Workp.18411.14.1.1 Eventsp.18411.14.1.2 Absolute and Relative Eventsp.18411.14.1.3 Temporary Schedule Eventsp.18411.14.1.4 Overlappingp.18511.14.1.5 Rangesp.18511.14.2 Holiday Schedulesp.18511.15 Power Monitoringp.18511.15.1 Overviewp.185Explanation of “Demand”p.185How Power Monitoring Calculates Demandp.185Shed Modep.18511.15.2 Loggingp.186Hourlyp.186Dailyp.186Monthlyp.186Definition of Heat and Cool Degree Daysp.18611.15.2.1 Power Monitoring Inputp.186Settingsp.18611.16 Anti-Sweat Setupp.18711.16.1 How Anti-Sweat Worksp.18711.17 Heat/Cool Controlp.18711.17.1 Temperature Controlp.18711.17.2 Unoccupied Hysteresisp.18711.17.3 Optimum Start/Stop (OSS)p.188Intelligent Pre-Starts and Pre-Stopsp.18811.17.4 Setpoint Resetp.18811.17.5 Lead/Lagp.18911.18 Analog and Digital Combinersp.18911.19 TD Controlp.19011.19.1 Overviewp.19011.19.2 Temperature Differential (TD) Strategyp.19011.19.3 TD Control Fail-Safesp.190Drop Leg Temperature Above Maximum Drop Leg Setpointp.19011.19.4 Configurationp.19011.19.5 Setpointsp.19011.19.6 Inputsp.19111.19.7 Alarmsp.19111.20 Pulse Accumulationp.19111.20.1 Overviewp.19111.20.2 Configurationp.19111.20.3 Outputsp.19111.20.4 Accumulator Reset Typesp.19211.20.5 Loggingp.19211.20.6 High Tripp.19211.21 Irrigation Controlp.19211.21.1 Overviewp.19211.21.2 Zones and Cyclesp.19211.21.2.1 Cycle Control Typesp.19311.21.2.2 Timedp.19311.21.2.3 Volumep.19311.21.3 Cycle Schedulingp.19311.21.4 Zone Inhibitp.19311.21.4.1 Timedp.19311.21.4.2 Volumep.19311.21.4.3 Rain Delayp.19311.21.4.4 Freeze Lockoutp.19311.21.4.5 Alarmp.19311.21.5 Zone Bypass Inputsp.19311.21.5.1 Bypass Failsafep.19411.21.6 Flow Sensor-Related Testsp.19411.21.6.1 Leak Testp.19411.21.6.2 Obstructed Zone Testp.19411.21.7 Service Modesp.19411.21.8 Heat Cut In/Cut Out Setpoints For Each Stagep.19411.21.9 Cool Cut In/Cut Out Setpoints For Each Stagep.19411.21.10 Dehumidification Controlp.19411.21.11 Two Speed Fan Controlp.19411.21.12 Configurationp.19511.22 Flexible Combinerp.19511.23 Modular Chiller Control (MCC)p.19511.23.1 Overviewp.19511.23.2 Learning Modep.19611.23.3 The Control/Cycles Parameterp.19611.23.4 Compressor Controlp.19611.23.4.1 Digital Scroll Compressorp.19711.23.4.2 Variable Frequency Drive Compressorp.19711.23.4.3 Unequal Capacity Compressorsp.19711.23.5 Bypass Valve Controlp.19711.24 Boilerp.19711.24.1 Overviewp.19711.24.2 Alarmsp.19711.25 Refrigerant Monitoring System (RMS)p.19811.25.1 RMS Assetp.19811.25.2 RMS Scalep.19811.25.2.1 Device Constraintsp.19811.26 Detailed Setpoint Change Loggingp.19811.26.1 Log Informationp.19811.26.2 Logged Changesp.19911.26.3 Unlogged Changesp.19912 Operator’s Guide to Using the E2p.20112.1 The E2 Home Screenp.20112.1.1 RX Home Screenp.201Suction Groups Sectionp.201Circuit Status Sectionp.201Condenser Sectionp.201Sensor Controlp.20112.1.2 BX Home Screenp.201OAT Sectionp.201Demand Control Sectionp.201Power Monitoring Sectionp.202Light Schedules Sectionp.202Air Handling Units Sectionp.202Zones Sectionp.202Sensor Control Sectionp.20212.1.3 CX Home Screenp.202Lighting Control Sectionp.202HVAC Control Sectionp.202Refrigeration Control Sectionp.202Demand Control Sectionp.202Anti-Sweat Control Sectionp.202Sensor Control Sectionp.202Time Schedules Sectionp.20212.2 Logging On and Access Levelsp.20212.3 Toggling Full Optionsp.20312.4 Navigationp.20312.4.1 Menusp.203Main Menup.203The System Configuration Menup.203The System Information Menup.204Actions Menup.20412.4.2 Screen Typesp.205Summary Screensp.205Status Screensp.205Setup Screensp.20512.4.3 The E2 Keypadp.206The Cursorp.206The Tab Keyp.207The Enter Keyp.207Keypadp.207The Log In/Out Keyp.208Four Directional Arrow Keysp.208Page Up/Page Down Keysp.208Ctrl Page Up/Ctrl Page Down Keysp.208Numeric Keypadp.208Hot Keysp.20812.5 Customizing the Home Screenp.20912.6 Manual Defrost and Clean Modep.20912.7 Overridesp.21012.8 Checking Boards Onlinep.21112.9 Checking Status Screensp.211Suction Group Status Screenp.211Condenser Status Screenp.211Circuit Status Screenp.211Sensor Status Screenp.211AHU Status Screenp.212Zones Status Screenp.212Lighting Status Screenp.212Sensors Status Screenp.212Other Status Screensp.21212.10 Alarmsp.21212.10.1 Accessing the Alarm Advisory Logp.21212.10.2 Viewing the Controller Advisory Logp.21212.10.3 Date and Timep.21212.10.4 Statep.21212.10.5 Ack/Reset Statep.21312.10.6 Area Ctrl: Application: Propertyp.21312.10.7 Advisory Messagep.21312.10.8 Acknowledging, Resetting, and Clearing Log Entriesp.21312.10.8.1 Acknowledgingp.21312.10.8.2 Resettingp.21412.10.8.3 Clearingp.214Property or Board/Pointp.214Advisory Messagep.214Acknowledge Statusp.214Report Priorityp.214Return To Normalp.21412.10.9 Facility Status Display (FSD) Alarmsp.21512.11 Viewing Logs and Graphsp.21512.11.1 Locating Logged Inputs/ Outputsp.21512.11.1.1 Home/Status Screensp.21512.11.1.2 Setup Screensp.21612.11.1.3 Setting Up Input and Output Pointersp.21612.11.2 Log Viewp.21712.11.3 The Graph Viewp.21712.11.4 Zooming In and Outp.21712.12 Low Battery Notificationp.21812.13 Naming Conventions for E2 Controllers, Applications, and Pointsp.218Appendix A: Case Type Defaultsp.219High Alarm, Low Alarm, and Delayp.219Defrost Typep.219Appendix B: Pressure/Voltage and Temperature/Resistance Charts for Eclipse Transducers & Retail Solutions Temp Sensorsp.221Appendix C: Alarm Advisory Messagesp.223Appendix D: PID Controlp.237Introduction to PID Controlp.237Proportional (“P”) Modep.237Throttling Rangep.237Proportional Constant (Kp)p.238Integral Modep.238Why “I” Mode is Necessaryp.238Proportional Offsetp.238Saturationp.239The “I” Mode Calculationp.239Derivative Modep.239The “D” Mode Calculationp.240How Condenser Control and HVAC PID Differs From The Othersp.240Output at Setpointp.240Output at Setpoint for Non-Condenser/ HVAC PIDp.240Output at Setpoint for Condenser/HVAC PID Controlp.241Changing the Output at Setpointp.241Other PID Featuresp.241Output at Minimum / Output at Maximump.241Minimum Accumulated Errorp.242Applicationp.242Filteringp.242Applicationp.242Appendix E: Compressed Point Log Sample Limits and Precision Tabp.245Appendix F: Troubleshootingp.249Appendix G: Revision Logp.259Indexp.261
Page 14 of the Emerson E2 RX user manual — Table of contents
Page 14 · click to enlarge
Page 14

Table of contents

E2 Installation and Operation Manual for RX Refrigeration, BX HVAC, and CX Convenience Store Controllersp.1Table of Contentsp.51 Introductionp.171.1 The E2 Refrigeration Controllerp.171.2 The E2 Building Controllerp.181.3 The E2 Convenience Store Controllerp.191.4 Networking Overviewp.201.4.1 E2 I/O Networkp.201.4.2 The E2 Echelon Lonworks Networkp.211.4.3 Interconnection With Other E2sp.221.5 Documentation Overviewp.221.6 On-Line Help System Overviewp.231.7 Software Licensingp.242 Hardware Overviewp.252.1 E2 Hardwarep.252.1.1 E2 Main Processor Board (CPU)p.262.1.2 E2 Processor Interface Board (PIB)p.262.1.3 E2 Keypadp.262.1.4 LEDsp.262.1.5 PC-104 Peripherals: The Internal Modem (Previous Generation Processor Board)p.272.2 I/O Network Boards and Peripheralsp.272.2.1 The Gateway Boardp.272.2.2 MultiFlex Boardsp.282.2.2.1 MultiFlex 16 Input Boardp.282.2.2.2 MultiFlex Combination Input/ Output Boardsp.292.2.2.3 MultiFlex CUBp.312.2.2.4 MultiFlex RTU (BX and CX Only)p.312.2.2.5 MultiFlex Rooftop Control Board (RCB) (BX and CX Only)p.312.2.2.6 MultiFlex PAK Boardp.312.2.3 The MultiFlex ESR Boardp.322.2.4 Hand-held Terminal (P/N 814-3110)p.322.2.5 The 8RO and 8ROSMT Relay Boardsp.332.2.6 4AO Analog Output Boardp.342.2.7 8DO Digital Output Board and PMAC II Anti-Sweat Controllerp.342.3 Echelon Network Boards and Peripheralsp.352.3.1 The 16AIe (Discontinued)p.352.3.2 The 8ROe (Discontinued)p.352.3.3 EC-2sp.352.3.4 CC-100 Case Controllers and CS-100 Case Circuit Controllersp.362.3.5 The ESR8 (Discontinued)p.362.3.6 TD3 Temperature Displayp.372.3.7 Facility Status Display (FSD)p.373 Mountingp.393.1 Mounting the E2p.393.1.1 Standard Mountp.393.1.2 Recessed Mountp.393.1.3 Retrofit Mountingp.403.1.4 Blank Facep.413.2 Mounting I/O Boardsp.413.2.1 Single/Double Enclosuresp.413.2.2 Boards Without Enclosures (Snap Track)p.423.3 Echelon Devicesp.423.3.1 16AIe and 8ROep.423.3.2 CC-100 Case Controller and CS-100 Case Circuit Controllerp.433.3.3 ESR8 (Discontinued)p.433.3.4 MultiFlex ESRp.433.3.5 TD3p.433.4 Modem/Communication Expansion Card Mounting (New Processor Board)p.433.4.1 Mounting PC-104 Cards in E2 (Previous Generation Processor Board)p.443.4.1.1 The Internal Modemp.443.4.2 Two-Channel and FourChannel Repeatersp.443.4.2.1 Mounting Repeaters Overviewp.443.4.2.2 Mounting the Two-Channel Repeaterp.443.4.2.3 Mounting the Four-Channel Repeaterp.453.5 Sensors and Transducersp.453.5.1 Pressure Transducersp.453.5.1.1 Mountingp.453.5.2 Inside Temperature Sensorp.453.5.2.1 Locationp.453.5.2.2 Mountingp.463.5.3 Outside Temperature Sensorp.463.5.3.1 Locationp.463.5.3.2 Mountingp.463.5.4 Insertion Temperature Probep.463.5.4.1 Locationp.463.5.4.2 Mountingp.463.5.5 Supply and Return Air Sensorsp.463.5.6 Refrigeration System Temperature Probes and Sensorsp.473.5.6.1 Locationp.473.5.6.2 Mounting Bullet and Pipe Mount Sensorsp.473.5.7 Product Temperature Probesp.473.5.8 Humidity Sensors and Humidistatsp.473.5.8.1 Indoor RH Sensorp.473.5.8.2 Outdoor RH Sensorsp.48The outdoor RH sensor (P/N 203-5761)p.483.5.8.3 Duct-mounted Insertion RH Probep.483.5.9 Dewpoint Probep.493.5.9.1 Locationp.493.5.9.2 Mountingp.493.5.10 Light Level Sensorp.493.5.10.1 Locationp.493.5.10.2 Mountingp.493.5.11 Liquid Level Sensorsp.493.5.12 Refrigerant Leak Detectorsp.494 E2 Hardware Setupp.514.1 Setting up the E2p.514.1.1 Enclosurep.514.1.2 Main Processor Boardp.514.1.3 Main Processor Board (Previous Version)p.524.1.4 Power Interface Boardp.524.2 Powering the E2p.524.2.1 RS485 Portsp.524.2.2 RS485 Jumpersp.524.2.3 Echelon Network Connectp.524.2.4 Echelon Jumpersp.524.3 Add-On E2 Peripheralsp.534.3.1 Echelon Card Plug-In (P/N 537-4860) with mounting screw (P/N 101-4201)p.534.3.2 Modem/Communication Expansion Card (New Processor Board)p.544.3.3 Plug-In Modem Card (P/N 537-4870) with mounting screws (P/N 101-4038) and standoffs (P/N 107-9440) (Previous Generation Processor Board)p.544.3.4 Plug-In Digital I/O Network Card (P/N 537-4880)p.544.3.4.1 LEDsp.554.3.5 E2 RS485 Port Card (P/N 537-4890)p.554.3.5.1 LEDsp.554.3.6 Plug-In Four-Channel Internal Repeaterp.554.4 Battery Testing and Replacementp.554.4.1 Low Battery Notificationp.564.4.2 The Battery Enable Switchp.564.4.3 Battery Testp.564.4.4 Battery Replacement - Qualified Technicians Onlyp.565 Serial Configurationp.595.1 Overviewp.595.2 COM Portsp.59Pre-Setsp.595.3 Serial Device and Software Setupp.596 The RS485 Network and Hardware Setupp.616.1 The I/O Networkp.616.1.1 I/O Board Names and Terminologyp.616.1.2 MultiFlex-Plus (+) Boardp.626.1.2.1 Board Designationp.626.1.2.2 Board Calculationsp.626.1.3 Wiring Typesp.626.1.4 The I/O Network Structure (Daisy Chains)p.626.1.5 Network Noise Minimizationp.626.1.6 Network ID Numbers (Board Numbers)p.63Numbering the MultiFlex Combination I/O Boardsp.63Addressing the MultiFlex Boardsp.63Addressing the MultiFlex ESR Boardsp.636.1.7 Setting the Baud Ratep.63Baud Rate for the E2p.63Baud Rate for the Gatewayp.63Baud Rate for the 8IO, 8DO, and ARTCp.63Baud Rate for MultiFlex Boardsp.64Baud Rate for the MultiFlex ESRp.64Recommended Baud Ratep.646.1.8 Setting the Terminating and Biasing Jumpersp.646.1.9 Powering the I/O Boardsp.646.1.9.1 Wiring Typesp.656.1.10 Board Installationp.656.2 IMC/Prodigy Rooftop Unit Controllersp.656.3 ECT MODBUSp.666.3.1 Control Techniques Drive (VSD)p.666.3.2 Copeland Discus with CoreSense Diagnostics (ISD)p.666.3.3 XR35CX, XR75CX, and XEV22 Case Controllersp.666.3.3.1 XR75CX-Case Displayp.666.3.4 iPro DACp.676.3.5 Energy Meterp.676.3.5.1 Overviewp.676.3.5.2 Supported System Typesp.676.3.6 Modular Refrigerant Leak Detection Sensor (MRLDS)p.676.3.7 Copeland Discus with CoreSense Protectionp.686.3.8 Light Commercial Thermostatp.686.3.8.1 Thermostat Inputsp.686.3.8.2 Advisory and Alarmsp.686.3.9 Refrigerant Leak Detection System (RLDS)p.716.3.9.1 Diagnostic Alarmsp.716.3.10 Copeland Scroll — K5 Refrigeration Compressorp.716.3.11 XM Series of Case Controllersp.726.3.11.1 XM670p.726.3.11.2 XM679p.726.3.11.3 XM678p.727 E2 Ethernet Peer Communicationsp.837.1 Ethernet IP Configurationsp.837.2 Hardware Specificationsp.837.2.1 Componentsp.837.3 Software Specificationsp.847.4 Ethernet Network Layoutsp.847.4.1 Closed Network Layoutp.847.4.2 Open Network Layoutp.857.5 Software Setupp.857.6 Troubleshootingp.868 Echelon Network and Hardware Setupp.878.1 Overviewp.878.2 Wiring Typep.878.3 Echelon Network Structuring (Daisy-Chains)p.878.3.1 Maximum Number of Echelon Devicesp.888.4 Device Terminationp.888.4.1 Using a Termination Block (P/N 535-2715) to Terminate a Daisy Chainp.898.5 Wire Restrictionsp.89Maximum Total Segment Lengthp.898.6 Installing Echelon Devicesp.898.6.1 Powering Echelon Devicesp.898.7 LEDsp.908.8 Open Echelon Device Connectivityp.908.8.1 Configuring Echelon Devicesp.908.8.1.1 Troubleshootingp.919 Input and Output Setupp.959.1 The 16AI, 8IO, and MultiFlex Inputsp.959.1.1 Connecting Sensors to Input Boardsp.959.1.1.1 Wiringp.95MultiFlex Boardsp.9516AI Boardsp.958IO and ARTC Boardsp.959.1.1.2 Sensor Wiring Typesp.95All Analog Temperature Sensors and Air Flow Sensorsp.95All Pressure Transducers, Humidity Sensors, and Refrigeration Transducersp.95Dewpoint and Light Level Sensorsp.959.1.1.3 Input Type Dip Switchesp.959.1.2 Power Connectionp.969.1.3 Input Setup in E2p.1009.1.3.1 Configuring a Point from the Input Definitions/Status Screenp.1009.1.3.2 Using the Input Definitions/Status Screenp.1011. Board Type (read-only)p.1012. Brd (read-only)p.1013. Pt (read-only)p.1014. Type (read-only)p.1015. Applicationp.1016. Associationp.1017. Value (read-only)p.1019.1.3.3 Setting Up Analog Inputsp.1019.1.3.4 Setting Up Digital Inputsp.1039.2 The 8RO, 8ROe, 8IO, and MultiFlex Outputsp.1049.2.1 Wiring Form C Contactsp.1049.2.2 MultiFlex Relay Outputsp.1049.2.3 Setting the Fail-Safe Dip Switchp.1049.2.4 Wiring Outputs to Pointsp.105Old 8ROsp.105New 8ROs and 8RO-FCsp.1059.2.5 The Output LEDp.1059.2.6 Output Setup in E2p.1059.2.6.1 Configuring a Point from the Output Definitions/Status Screenp.1059.2.6.2 Using the Output Definitions/Status Screenp.1051. Board Type (read-only)p.1062. Brd (read-only)p.1063. Pt (read-only)p.1064. Type (read-only)p.1065. Applicationp.1066. Associationp.1067. Value (read-only)p.1069.2.6.3 Setting Up Digital Outputsp.1069.2.6.4 Setting Up Analog Outputsp.1079.3 CC-100 Case Controllersp.1089.3.1 Inputsp.108Temperature and Digital Sensorsp.108Connectionp.108Auxiliary Analog Inputp.109Hand-Held Terminal Jackp.1099.3.2 Power Module Wiringp.1099.3.3 Valve Cablep.109P/N 335-3263 (Pulse Valve)p.110P/N 335-3261 (Sporlan SEI and Emerson Flow Controls ESR Stepper Valve)p.110P/N 335-3260 (Generic Stepper and Emerson Flow Controls ESV Valve)p.1109.4 ESR8 Valve Output Wiringp.11010 Quick Startp.11310.1 Logging Onp.11310.2 Cleaning Out the Controllerp.113Performing a Clean Outp.11310.3 Setting Number of Network Devicesp.114Boards on the I/O Networkp.114Unit Controllers (Echelon)p.11410.4 Setting Number of Applicationsp.11510.5 The Main Status (Home) Screenp.11510.5.1 Customizing the Home Screenp.11510.6 Common Screen Elementsp.11610.6.1 The Headerp.11610.6.1.1 Header Iconsp.11610.6.2 The Function Keysp.11610.6.3 The Help Linep.11610.7 Screen Typesp.11710.7.1 The Main Menup.11710.7.2 Status Screensp.11710.7.3 The Actions Menup.11810.7.4 The Setup Screensp.11910.7.5 System Configuration Menup.11910.7.6 The System Information Menup.12010.8 Time/Date Setupp.12110.8.1 Setting the Time and Datep.121Active Datep.121Active Timep.121Time Zonep.121Time Serverp.121Primary Time Serverp.122Secondary Time Serverp.122Date Formatp.122Daylight Savings Datesp.122Daylight Savings Time uses GMTp.122Unit Location Fromp.122Sundownp.12210.9 Set Up Modemp.12210.10 Set Up TCP/IPp.12310.11 Set Up Network Baud Ratesp.12410.11.1 COM1 Serial (RS232) Baud Ratep.12410.11.2 I/O Network Baud Ratep.12410.12 Set Up User Accessp.12510.12.1 Changing Required User Access Levelsp.12610.12.2 Creating a New User Accountp.12610.12.3 Deleting a Userp.12610.13 Set Up I/O Networkp.12710.13.1 Specify Number of Boardsp.127Boards on the I/O Networkp.12710.13.2 Checking Online Statusp.12810.14 Set Up Echelon Networkp.12810.14.1 Specifying Number of Devicesp.128Unit Controllers (Echelon)p.12810.14.2 Commissioning a Devicep.129How Echelon Commissioning Worksp.129MODBUS Commissioningp.12910.14.2.1 The Service Button Methodp.129The CC-100’s Service Buttonp.130The TD3’s Service Buttonp.130The ESR8’s Service Buttonp.130Commissioning the EC-2p.13010.14.2.2 The Manual ID Entry Methodp.13110.15 License Managementp.13110.15.1 Web Servicesp.13210.16 Set Up Alarmingp.13310.16.1 Specifying Alarm Reporting Typesp.13410.16.1.1 The Display Linep.13410.16.1.2 The Alarm Outputp.13410.16.1.3 Dial-Outp.13410.16.1.4 The Echelon Network (The Alarm Annunciator)p.13410.16.2 Setting up an E2 to be an Alarm Annunciatorp.13410.16.3 Alarm Dial-Outp.13510.16.4 Introduction: Alarm Reportingp.1351. The E2 Display Headerp.1352. The Advisory Outputp.1353. Dial-Outp.1354. The LonWorks Network (The Alarm Annunciator)p.13510.17 Set Up Global Datap.13610.17.1 Priority Settingsp.136Example: Setting Up an Outdoor Temperature Sensorp.13710.18 Set Up Applicationsp.13710.18.1 Add/Delete an Applicationp.13810.18.2 Using and Configuring a Setup Screenp.13810.18.2.1 The Edit Menup.13910.18.2.2 Entering Setpointsp.13910.18.2.3 Navigating the Setup Screenp.139Index Tabsp.140The Help Linep.140The Function Keys For Setupp.14010.18.3 Using the Help Key to get Property Helpp.14111 Software Overviewp.14311.1 Suction Groupsp.14311.1.1 Introductionp.14311.1.2 The (Standard) Suction Group Applicationp.14311.1.2.1 Overview of PID Control Strategyp.14311.1.2.2 Variable-Speed Compressorsp.14311.1.2.3 Floating Setpoint Controlp.14311.1.3 The Enhanced Suction Group Applicationp.14311.1.3.1 Learning Modep.14411.1.3.2 Circuit Load Analysisp.14411.1.3.3 The Control/Cycles Parameterp.14411.1.3.4 Variable-Speed, Digital Scroll, and Digital Discus Compressor Supportp.14411.1.3.5 Floating Suction Controlp.14411.1.4 Hardware Overviewp.14411.2 Condenser Controlp.14511.2.1 Air Cooled Condensersp.14511.2.1.1 Air Cooled Strategyp.14511.2.1.2 Temperature Differential Strategyp.14511.2.2 Evaporative Condensersp.14611.2.3 Fan Controlp.14611.2.4 Condenser Split Modep.14611.2.5 Fast Recoveryp.14611.2.6 Hardware Overviewp.14611.3 Standard Circuitsp.14711.3.1 Refrigeration Controlp.14711.3.1.1 Temperature Monitorp.14811.3.1.2 Temperature Controlp.14811.3.1.3 Line Up(ESR)/Defrostp.14811.3.1.4 Line Up(MFESR)/Defrostp.14811.3.2 Defrost Controlp.14811.3.2.1 Defrost Statesp.14811.3.2.2 Defrost Typesp.148Timed and Reverse Airp.148Hot Gas and Reversed Cycle Hot Gasp.148Electric Defrostp.14811.3.2.3 Defrost Terminationp.149Pulsed Defrostp.14911.3.2.4 Emergency Defrostp.14911.3.2.5 Hot Gas Defrost with ESR8 and MultiFlex ESRp.14911.3.3 Clean and Door Switchesp.14911.3.3.1 Clean Switchesp.14911.3.3.2 Door Switchesp.14911.3.4 Fan Controlp.15011.3.5 The TD3 Temperature Displayp.15011.3.6 The Control Link CD Case Displayp.15011.3.7 Wiringp.15011.4 Case Control Circuitsp.15211.4.1 Overviewp.15211.4.2 Case Circuit Control Software Overviewp.15211.4.2.1 Valve Controlp.153Pulse Valvesp.153Stepper Valvesp.15311.4.3 Refrigeration Controlp.15311.4.3.1 EEVs (Liquid Pulse and Liquid Stepper)p.153Temperature Controlp.153Superheat Controlp.153Recovery Modep.153Thermostatic Expansion Valves (TXVs)p.15411.4.3.2 EEPRs (Suction Stepper)p.154Recovery Modep.15411.4.4 Defrost Controlp.15411.4.4.1 Defrost Statesp.15411.4.4.2 Defrost Typesp.154Off Cycle (Timed)p.154Hot Gas and Reversed Cycle Hot Gasp.154Electric Defrostp.15511.4.4.3 Defrost Terminationp.155Temperature Terminationp.155Pulsed Defrostp.15511.4.4.4 Demand Defrostp.155Demand Fail-Safe Timep.15511.4.4.5 Emergency Defrostp.15511.4.4.6 The WAIT Statep.15511.4.5 Anti-Sweat Controlp.15511.4.5.1 Dewpoint Input Sourcesp.15611.4.6 Dual Temp Controlp.15611.4.7 Fan Controlp.15611.4.8 Light Controlp.15611.4.9 Clean/Wash Modep.156End of Mode Warningp.15711.4.10 Walk-In Freezer Controlp.15711.4.11 Fail-Safe Modep.157Actions Taken During Fail-Safe Modep.15711.4.11.1 Recoverable Sensor Failuresp.157Coil In or Coil Out Failurep.157Discharge/Return Airp.15711.4.12 Wiringp.15811.4.13 Setting Up An Individual Case Controllerp.15811.4.14 Associating Case Controllers with Case Circuit Control Applicationsp.15811.5 Logging Groupsp.15811.5.1 Possible Data Errorsp.15911.5.2 Data Compressionp.15911.5.2.1 Clippingp.15911.5.2.2 Incompressible Data Typesp.15911.5.3 Base Log Groupp.15911.5.4 Setting Up Loggingp.16011.5.5 Logging Group Status Screenp.16111.5.6 Log Reportsp.16111.5.6.1 Logging Group Reportp.16211.5.6.2 Application Log Reportp.16211.5.6.3 System Log Reportp.16211.6 Air Handling Units (AHU)p.16311.6.1 Overviewp.16311.6.2 Temperature Controlp.16311.6.3 Alternate Setpointsp.16311.6.4 Fan Controlp.16311.6.4.1 Single-Speed Fansp.16311.6.4.2 Two-Speed Fansp.164Continuous Two-Speed Fan Operation When All Stages Are OFFp.16411.6.4.3 Variable-Speed Fansp.164Variable-Speed Fan Operationp.164Dehumidification with VS Fansp.16411.6.5 Economizer Controlp.16411.6.5.1 Economization Enablep.16411.6.5.2 Economization Lockout Featuresp.165Max Outside Air Humidityp.165Minimum Supply Tempp.16511.6.6 Digital Economizer Controlp.16511.6.7 Analog Economizer Controlp.16511.6.8 Dehumidification Controlp.16511.6.9 Curtailmentp.16511.6.10 Optimum Start/Stop (OSS)p.165Intelligent Pre-Starts and Pre-Stopsp.16611.6.11 Separate Setpointsp.16611.6.12 AHU Zone Controlp.16611.6.13 Hardware Overviewp.16611.7 Zone Controlp.16711.7.1 Overviewp.16711.7.2 How Zones Workp.16811.7.3 Applications That May Be Connected To Zonesp.16811.7.3.1 MultiFlex RTU Boardp.16811.7.3.2 MultiFlex RCB Boardp.16811.7.3.3 AHUsp.16811.7.4 Temperature Controlp.16911.7.5 Zone Temperaturep.16911.7.6 Economizer Controlp.16911.7.7 Economization Enablep.16911.7.8 The Effect of Enabling Economizationp.17011.7.9 Dehumidification Controlp.17011.7.10 The Zone Humidity Inputp.17011.7.11 The Effect of Enabling Dehumidificationp.17011.7.11.1 MultiFlex RTUs and RCBsp.17011.7.11.2 AHUsp.17011.7.12 Optimum Start/Stop (OSS)p.170Intelligent Pre-Starts and Pre-Stopsp.17111.7.13 Losing Contact With Zone Applicationsp.17111.7.14 Stand-Alone MultiFlex RTUsp.17111.7.15 MultiFlex RTU/ARTC and AHU Zone Associationp.17111.8 MultiFlex CUB Boardp.17211.9 MultiFlex PAK Boardp.17211.10 Lighting Schedulesp.17211.10.1 Overviewp.17211.10.2 Functions of the Lighting Schedule Applicationp.17311.10.3 Control Method Selectp.17311.10.4 Standard Controlp.17311.10.4.1 The Light Level Interface Cell (LLEV INTERFACE)p.173Logical Combination Strategiesp.173Occupied/Unoccupied and Alternate Settingsp.17411.10.4.2 The Schedule Interface Cell (SCHEDIF)p.174Logical Combinationsp.174Alternate Schedule Interface Combinationsp.17411.10.5 Alternate Controlp.17411.10.5.1 Multi-Logic Combinerp.17411.10.5.2 Offset Solar Controlp.17511.10.6 The Basic Schedule Cellp.17511.10.6.1 Slave Schedulingp.17511.10.7 The Min ON/OFF Cellp.17511.10.8 The Proof Cellp.17511.10.9 Output Light Dimmingp.17611.11 Demand Controlp.17611.11.1 Introduction to Demand Limit Controlp.17611.11.2 Demand Monitoringp.17611.11.3 Load Sheddingp.17711.11.3.1 Definitionp.17711.11.4 Shedding Levelsp.17711.11.5 Priority Levelsp.1771. First Shedp.1772. Rotational Shedp.1783. Last Shedp.178Other Notes About Priority Levelsp.17811.11.6 How Demand Control Uses Load Sheddingp.179Mode 1: KW Input Is Greater Than Setpointp.179Mode 2: KW Input Has Been Greater Than Setpoint for 1/4 Demand Window And Is Still Going Upp.179Mode 3: Integral Error Approaching Zerop.17911.11.6.1 Power Monitoring Inputp.180Settingsp.18011.12 Sensor Controlp.18011.12.1 Overviewp.18011.12.2 Analog Sensor Controlp.18011.12.3 Cut In/Cut Out Setpoint Controlp.18011.12.4 Digital Sensor Controlp.18011.12.5 Logical Combinationp.18111.13 Loop/Sequence Controlp.18111.13.1 Layout of the Loop/ Sequence Control Applicationp.18111.13.1.1 Control Cellsp.18111.13.1.2 Output Cellsp.18211.13.1.3 Diagramp.18211.13.2 Loop/Sequence Control Cell Descriptionsp.18211.13.2.1 The Select Cellp.18211.13.2.2 The Setpoint Float Cellp.18311.13.2.3 The PID Control Cellp.183Bypassing PIDp.18311.13.2.4 The Filter Cellp.18311.13.2.5 The Override Cellp.18311.13.3 Output Cell Descriptionsp.18311.13.3.1 The Sequencer Cellp.18311.13.3.2 The PWM Cellp.18311.14 Time Scheduling and Holidaysp.18411.14.1 How Schedules Workp.18411.14.1.1 Eventsp.18411.14.1.2 Absolute and Relative Eventsp.18411.14.1.3 Temporary Schedule Eventsp.18411.14.1.4 Overlappingp.18511.14.1.5 Rangesp.18511.14.2 Holiday Schedulesp.18511.15 Power Monitoringp.18511.15.1 Overviewp.185Explanation of “Demand”p.185How Power Monitoring Calculates Demandp.185Shed Modep.18511.15.2 Loggingp.186Hourlyp.186Dailyp.186Monthlyp.186Definition of Heat and Cool Degree Daysp.18611.15.2.1 Power Monitoring Inputp.186Settingsp.18611.16 Anti-Sweat Setupp.18711.16.1 How Anti-Sweat Worksp.18711.17 Heat/Cool Controlp.18711.17.1 Temperature Controlp.18711.17.2 Unoccupied Hysteresisp.18711.17.3 Optimum Start/Stop (OSS)p.188Intelligent Pre-Starts and Pre-Stopsp.18811.17.4 Setpoint Resetp.18811.17.5 Lead/Lagp.18911.18 Analog and Digital Combinersp.18911.19 TD Controlp.19011.19.1 Overviewp.19011.19.2 Temperature Differential (TD) Strategyp.19011.19.3 TD Control Fail-Safesp.190Drop Leg Temperature Above Maximum Drop Leg Setpointp.19011.19.4 Configurationp.19011.19.5 Setpointsp.19011.19.6 Inputsp.19111.19.7 Alarmsp.19111.20 Pulse Accumulationp.19111.20.1 Overviewp.19111.20.2 Configurationp.19111.20.3 Outputsp.19111.20.4 Accumulator Reset Typesp.19211.20.5 Loggingp.19211.20.6 High Tripp.19211.21 Irrigation Controlp.19211.21.1 Overviewp.19211.21.2 Zones and Cyclesp.19211.21.2.1 Cycle Control Typesp.19311.21.2.2 Timedp.19311.21.2.3 Volumep.19311.21.3 Cycle Schedulingp.19311.21.4 Zone Inhibitp.19311.21.4.1 Timedp.19311.21.4.2 Volumep.19311.21.4.3 Rain Delayp.19311.21.4.4 Freeze Lockoutp.19311.21.4.5 Alarmp.19311.21.5 Zone Bypass Inputsp.19311.21.5.1 Bypass Failsafep.19411.21.6 Flow Sensor-Related Testsp.19411.21.6.1 Leak Testp.19411.21.6.2 Obstructed Zone Testp.19411.21.7 Service Modesp.19411.21.8 Heat Cut In/Cut Out Setpoints For Each Stagep.19411.21.9 Cool Cut In/Cut Out Setpoints For Each Stagep.19411.21.10 Dehumidification Controlp.19411.21.11 Two Speed Fan Controlp.19411.21.12 Configurationp.19511.22 Flexible Combinerp.19511.23 Modular Chiller Control (MCC)p.19511.23.1 Overviewp.19511.23.2 Learning Modep.19611.23.3 The Control/Cycles Parameterp.19611.23.4 Compressor Controlp.19611.23.4.1 Digital Scroll Compressorp.19711.23.4.2 Variable Frequency Drive Compressorp.19711.23.4.3 Unequal Capacity Compressorsp.19711.23.5 Bypass Valve Controlp.19711.24 Boilerp.19711.24.1 Overviewp.19711.24.2 Alarmsp.19711.25 Refrigerant Monitoring System (RMS)p.19811.25.1 RMS Assetp.19811.25.2 RMS Scalep.19811.25.2.1 Device Constraintsp.19811.26 Detailed Setpoint Change Loggingp.19811.26.1 Log Informationp.19811.26.2 Logged Changesp.19911.26.3 Unlogged Changesp.19912 Operator’s Guide to Using the E2p.20112.1 The E2 Home Screenp.20112.1.1 RX Home Screenp.201Suction Groups Sectionp.201Circuit Status Sectionp.201Condenser Sectionp.201Sensor Controlp.20112.1.2 BX Home Screenp.201OAT Sectionp.201Demand Control Sectionp.201Power Monitoring Sectionp.202Light Schedules Sectionp.202Air Handling Units Sectionp.202Zones Sectionp.202Sensor Control Sectionp.20212.1.3 CX Home Screenp.202Lighting Control Sectionp.202HVAC Control Sectionp.202Refrigeration Control Sectionp.202Demand Control Sectionp.202Anti-Sweat Control Sectionp.202Sensor Control Sectionp.202Time Schedules Sectionp.20212.2 Logging On and Access Levelsp.20212.3 Toggling Full Optionsp.20312.4 Navigationp.20312.4.1 Menusp.203Main Menup.203The System Configuration Menup.203The System Information Menup.204Actions Menup.20412.4.2 Screen Typesp.205Summary Screensp.205Status Screensp.205Setup Screensp.20512.4.3 The E2 Keypadp.206The Cursorp.206The Tab Keyp.207The Enter Keyp.207Keypadp.207The Log In/Out Keyp.208Four Directional Arrow Keysp.208Page Up/Page Down Keysp.208Ctrl Page Up/Ctrl Page Down Keysp.208Numeric Keypadp.208Hot Keysp.20812.5 Customizing the Home Screenp.20912.6 Manual Defrost and Clean Modep.20912.7 Overridesp.21012.8 Checking Boards Onlinep.21112.9 Checking Status Screensp.211Suction Group Status Screenp.211Condenser Status Screenp.211Circuit Status Screenp.211Sensor Status Screenp.211AHU Status Screenp.212Zones Status Screenp.212Lighting Status Screenp.212Sensors Status Screenp.212Other Status Screensp.21212.10 Alarmsp.21212.10.1 Accessing the Alarm Advisory Logp.21212.10.2 Viewing the Controller Advisory Logp.21212.10.3 Date and Timep.21212.10.4 Statep.21212.10.5 Ack/Reset Statep.21312.10.6 Area Ctrl: Application: Propertyp.21312.10.7 Advisory Messagep.21312.10.8 Acknowledging, Resetting, and Clearing Log Entriesp.21312.10.8.1 Acknowledgingp.21312.10.8.2 Resettingp.21412.10.8.3 Clearingp.214Property or Board/Pointp.214Advisory Messagep.214Acknowledge Statusp.214Report Priorityp.214Return To Normalp.21412.10.9 Facility Status Display (FSD) Alarmsp.21512.11 Viewing Logs and Graphsp.21512.11.1 Locating Logged Inputs/ Outputsp.21512.11.1.1 Home/Status Screensp.21512.11.1.2 Setup Screensp.21612.11.1.3 Setting Up Input and Output Pointersp.21612.11.2 Log Viewp.21712.11.3 The Graph Viewp.21712.11.4 Zooming In and Outp.21712.12 Low Battery Notificationp.21812.13 Naming Conventions for E2 Controllers, Applications, and Pointsp.218Appendix A: Case Type Defaultsp.219High Alarm, Low Alarm, and Delayp.219Defrost Typep.219Appendix B: Pressure/Voltage and Temperature/Resistance Charts for Eclipse Transducers & Retail Solutions Temp Sensorsp.221Appendix C: Alarm Advisory Messagesp.223Appendix D: PID Controlp.237Introduction to PID Controlp.237Proportional (“P”) Modep.237Throttling Rangep.237Proportional Constant (Kp)p.238Integral Modep.238Why “I” Mode is Necessaryp.238Proportional Offsetp.238Saturationp.239The “I” Mode Calculationp.239Derivative Modep.239The “D” Mode Calculationp.240How Condenser Control and HVAC PID Differs From The Othersp.240Output at Setpointp.240Output at Setpoint for Non-Condenser/ HVAC PIDp.240Output at Setpoint for Condenser/HVAC PID Controlp.241Changing the Output at Setpointp.241Other PID Featuresp.241Output at Minimum / Output at Maximump.241Minimum Accumulated Errorp.242Applicationp.242Filteringp.242Applicationp.242Appendix E: Compressed Point Log Sample Limits and Precision Tabp.245Appendix F: Troubleshootingp.249Appendix G: Revision Logp.259Indexp.261
Page 15 of the Emerson E2 RX user manual — Table of contents
Page 15 · click to enlarge
Page 15

Table of contents

E2 Installation and Operation Manual for RX Refrigeration, BX HVAC, and CX Convenience Store Controllersp.1Table of Contentsp.51 Introductionp.171.1 The E2 Refrigeration Controllerp.171.2 The E2 Building Controllerp.181.3 The E2 Convenience Store Controllerp.191.4 Networking Overviewp.201.4.1 E2 I/O Networkp.201.4.2 The E2 Echelon Lonworks Networkp.211.4.3 Interconnection With Other E2sp.221.5 Documentation Overviewp.221.6 On-Line Help System Overviewp.231.7 Software Licensingp.242 Hardware Overviewp.252.1 E2 Hardwarep.252.1.1 E2 Main Processor Board (CPU)p.262.1.2 E2 Processor Interface Board (PIB)p.262.1.3 E2 Keypadp.262.1.4 LEDsp.262.1.5 PC-104 Peripherals: The Internal Modem (Previous Generation Processor Board)p.272.2 I/O Network Boards and Peripheralsp.272.2.1 The Gateway Boardp.272.2.2 MultiFlex Boardsp.282.2.2.1 MultiFlex 16 Input Boardp.282.2.2.2 MultiFlex Combination Input/ Output Boardsp.292.2.2.3 MultiFlex CUBp.312.2.2.4 MultiFlex RTU (BX and CX Only)p.312.2.2.5 MultiFlex Rooftop Control Board (RCB) (BX and CX Only)p.312.2.2.6 MultiFlex PAK Boardp.312.2.3 The MultiFlex ESR Boardp.322.2.4 Hand-held Terminal (P/N 814-3110)p.322.2.5 The 8RO and 8ROSMT Relay Boardsp.332.2.6 4AO Analog Output Boardp.342.2.7 8DO Digital Output Board and PMAC II Anti-Sweat Controllerp.342.3 Echelon Network Boards and Peripheralsp.352.3.1 The 16AIe (Discontinued)p.352.3.2 The 8ROe (Discontinued)p.352.3.3 EC-2sp.352.3.4 CC-100 Case Controllers and CS-100 Case Circuit Controllersp.362.3.5 The ESR8 (Discontinued)p.362.3.6 TD3 Temperature Displayp.372.3.7 Facility Status Display (FSD)p.373 Mountingp.393.1 Mounting the E2p.393.1.1 Standard Mountp.393.1.2 Recessed Mountp.393.1.3 Retrofit Mountingp.403.1.4 Blank Facep.413.2 Mounting I/O Boardsp.413.2.1 Single/Double Enclosuresp.413.2.2 Boards Without Enclosures (Snap Track)p.423.3 Echelon Devicesp.423.3.1 16AIe and 8ROep.423.3.2 CC-100 Case Controller and CS-100 Case Circuit Controllerp.433.3.3 ESR8 (Discontinued)p.433.3.4 MultiFlex ESRp.433.3.5 TD3p.433.4 Modem/Communication Expansion Card Mounting (New Processor Board)p.433.4.1 Mounting PC-104 Cards in E2 (Previous Generation Processor Board)p.443.4.1.1 The Internal Modemp.443.4.2 Two-Channel and FourChannel Repeatersp.443.4.2.1 Mounting Repeaters Overviewp.443.4.2.2 Mounting the Two-Channel Repeaterp.443.4.2.3 Mounting the Four-Channel Repeaterp.453.5 Sensors and Transducersp.453.5.1 Pressure Transducersp.453.5.1.1 Mountingp.453.5.2 Inside Temperature Sensorp.453.5.2.1 Locationp.453.5.2.2 Mountingp.463.5.3 Outside Temperature Sensorp.463.5.3.1 Locationp.463.5.3.2 Mountingp.463.5.4 Insertion Temperature Probep.463.5.4.1 Locationp.463.5.4.2 Mountingp.463.5.5 Supply and Return Air Sensorsp.463.5.6 Refrigeration System Temperature Probes and Sensorsp.473.5.6.1 Locationp.473.5.6.2 Mounting Bullet and Pipe Mount Sensorsp.473.5.7 Product Temperature Probesp.473.5.8 Humidity Sensors and Humidistatsp.473.5.8.1 Indoor RH Sensorp.473.5.8.2 Outdoor RH Sensorsp.48The outdoor RH sensor (P/N 203-5761)p.483.5.8.3 Duct-mounted Insertion RH Probep.483.5.9 Dewpoint Probep.493.5.9.1 Locationp.493.5.9.2 Mountingp.493.5.10 Light Level Sensorp.493.5.10.1 Locationp.493.5.10.2 Mountingp.493.5.11 Liquid Level Sensorsp.493.5.12 Refrigerant Leak Detectorsp.494 E2 Hardware Setupp.514.1 Setting up the E2p.514.1.1 Enclosurep.514.1.2 Main Processor Boardp.514.1.3 Main Processor Board (Previous Version)p.524.1.4 Power Interface Boardp.524.2 Powering the E2p.524.2.1 RS485 Portsp.524.2.2 RS485 Jumpersp.524.2.3 Echelon Network Connectp.524.2.4 Echelon Jumpersp.524.3 Add-On E2 Peripheralsp.534.3.1 Echelon Card Plug-In (P/N 537-4860) with mounting screw (P/N 101-4201)p.534.3.2 Modem/Communication Expansion Card (New Processor Board)p.544.3.3 Plug-In Modem Card (P/N 537-4870) with mounting screws (P/N 101-4038) and standoffs (P/N 107-9440) (Previous Generation Processor Board)p.544.3.4 Plug-In Digital I/O Network Card (P/N 537-4880)p.544.3.4.1 LEDsp.554.3.5 E2 RS485 Port Card (P/N 537-4890)p.554.3.5.1 LEDsp.554.3.6 Plug-In Four-Channel Internal Repeaterp.554.4 Battery Testing and Replacementp.554.4.1 Low Battery Notificationp.564.4.2 The Battery Enable Switchp.564.4.3 Battery Testp.564.4.4 Battery Replacement - Qualified Technicians Onlyp.565 Serial Configurationp.595.1 Overviewp.595.2 COM Portsp.59Pre-Setsp.595.3 Serial Device and Software Setupp.596 The RS485 Network and Hardware Setupp.616.1 The I/O Networkp.616.1.1 I/O Board Names and Terminologyp.616.1.2 MultiFlex-Plus (+) Boardp.626.1.2.1 Board Designationp.626.1.2.2 Board Calculationsp.626.1.3 Wiring Typesp.626.1.4 The I/O Network Structure (Daisy Chains)p.626.1.5 Network Noise Minimizationp.626.1.6 Network ID Numbers (Board Numbers)p.63Numbering the MultiFlex Combination I/O Boardsp.63Addressing the MultiFlex Boardsp.63Addressing the MultiFlex ESR Boardsp.636.1.7 Setting the Baud Ratep.63Baud Rate for the E2p.63Baud Rate for the Gatewayp.63Baud Rate for the 8IO, 8DO, and ARTCp.63Baud Rate for MultiFlex Boardsp.64Baud Rate for the MultiFlex ESRp.64Recommended Baud Ratep.646.1.8 Setting the Terminating and Biasing Jumpersp.646.1.9 Powering the I/O Boardsp.646.1.9.1 Wiring Typesp.656.1.10 Board Installationp.656.2 IMC/Prodigy Rooftop Unit Controllersp.656.3 ECT MODBUSp.666.3.1 Control Techniques Drive (VSD)p.666.3.2 Copeland Discus with CoreSense Diagnostics (ISD)p.666.3.3 XR35CX, XR75CX, and XEV22 Case Controllersp.666.3.3.1 XR75CX-Case Displayp.666.3.4 iPro DACp.676.3.5 Energy Meterp.676.3.5.1 Overviewp.676.3.5.2 Supported System Typesp.676.3.6 Modular Refrigerant Leak Detection Sensor (MRLDS)p.676.3.7 Copeland Discus with CoreSense Protectionp.686.3.8 Light Commercial Thermostatp.686.3.8.1 Thermostat Inputsp.686.3.8.2 Advisory and Alarmsp.686.3.9 Refrigerant Leak Detection System (RLDS)p.716.3.9.1 Diagnostic Alarmsp.716.3.10 Copeland Scroll — K5 Refrigeration Compressorp.716.3.11 XM Series of Case Controllersp.726.3.11.1 XM670p.726.3.11.2 XM679p.726.3.11.3 XM678p.727 E2 Ethernet Peer Communicationsp.837.1 Ethernet IP Configurationsp.837.2 Hardware Specificationsp.837.2.1 Componentsp.837.3 Software Specificationsp.847.4 Ethernet Network Layoutsp.847.4.1 Closed Network Layoutp.847.4.2 Open Network Layoutp.857.5 Software Setupp.857.6 Troubleshootingp.868 Echelon Network and Hardware Setupp.878.1 Overviewp.878.2 Wiring Typep.878.3 Echelon Network Structuring (Daisy-Chains)p.878.3.1 Maximum Number of Echelon Devicesp.888.4 Device Terminationp.888.4.1 Using a Termination Block (P/N 535-2715) to Terminate a Daisy Chainp.898.5 Wire Restrictionsp.89Maximum Total Segment Lengthp.898.6 Installing Echelon Devicesp.898.6.1 Powering Echelon Devicesp.898.7 LEDsp.908.8 Open Echelon Device Connectivityp.908.8.1 Configuring Echelon Devicesp.908.8.1.1 Troubleshootingp.919 Input and Output Setupp.959.1 The 16AI, 8IO, and MultiFlex Inputsp.959.1.1 Connecting Sensors to Input Boardsp.959.1.1.1 Wiringp.95MultiFlex Boardsp.9516AI Boardsp.958IO and ARTC Boardsp.959.1.1.2 Sensor Wiring Typesp.95All Analog Temperature Sensors and Air Flow Sensorsp.95All Pressure Transducers, Humidity Sensors, and Refrigeration Transducersp.95Dewpoint and Light Level Sensorsp.959.1.1.3 Input Type Dip Switchesp.959.1.2 Power Connectionp.969.1.3 Input Setup in E2p.1009.1.3.1 Configuring a Point from the Input Definitions/Status Screenp.1009.1.3.2 Using the Input Definitions/Status Screenp.1011. Board Type (read-only)p.1012. Brd (read-only)p.1013. Pt (read-only)p.1014. Type (read-only)p.1015. Applicationp.1016. Associationp.1017. Value (read-only)p.1019.1.3.3 Setting Up Analog Inputsp.1019.1.3.4 Setting Up Digital Inputsp.1039.2 The 8RO, 8ROe, 8IO, and MultiFlex Outputsp.1049.2.1 Wiring Form C Contactsp.1049.2.2 MultiFlex Relay Outputsp.1049.2.3 Setting the Fail-Safe Dip Switchp.1049.2.4 Wiring Outputs to Pointsp.105Old 8ROsp.105New 8ROs and 8RO-FCsp.1059.2.5 The Output LEDp.1059.2.6 Output Setup in E2p.1059.2.6.1 Configuring a Point from the Output Definitions/Status Screenp.1059.2.6.2 Using the Output Definitions/Status Screenp.1051. Board Type (read-only)p.1062. Brd (read-only)p.1063. Pt (read-only)p.1064. Type (read-only)p.1065. Applicationp.1066. Associationp.1067. Value (read-only)p.1069.2.6.3 Setting Up Digital Outputsp.1069.2.6.4 Setting Up Analog Outputsp.1079.3 CC-100 Case Controllersp.1089.3.1 Inputsp.108Temperature and Digital Sensorsp.108Connectionp.108Auxiliary Analog Inputp.109Hand-Held Terminal Jackp.1099.3.2 Power Module Wiringp.1099.3.3 Valve Cablep.109P/N 335-3263 (Pulse Valve)p.110P/N 335-3261 (Sporlan SEI and Emerson Flow Controls ESR Stepper Valve)p.110P/N 335-3260 (Generic Stepper and Emerson Flow Controls ESV Valve)p.1109.4 ESR8 Valve Output Wiringp.11010 Quick Startp.11310.1 Logging Onp.11310.2 Cleaning Out the Controllerp.113Performing a Clean Outp.11310.3 Setting Number of Network Devicesp.114Boards on the I/O Networkp.114Unit Controllers (Echelon)p.11410.4 Setting Number of Applicationsp.11510.5 The Main Status (Home) Screenp.11510.5.1 Customizing the Home Screenp.11510.6 Common Screen Elementsp.11610.6.1 The Headerp.11610.6.1.1 Header Iconsp.11610.6.2 The Function Keysp.11610.6.3 The Help Linep.11610.7 Screen Typesp.11710.7.1 The Main Menup.11710.7.2 Status Screensp.11710.7.3 The Actions Menup.11810.7.4 The Setup Screensp.11910.7.5 System Configuration Menup.11910.7.6 The System Information Menup.12010.8 Time/Date Setupp.12110.8.1 Setting the Time and Datep.121Active Datep.121Active Timep.121Time Zonep.121Time Serverp.121Primary Time Serverp.122Secondary Time Serverp.122Date Formatp.122Daylight Savings Datesp.122Daylight Savings Time uses GMTp.122Unit Location Fromp.122Sundownp.12210.9 Set Up Modemp.12210.10 Set Up TCP/IPp.12310.11 Set Up Network Baud Ratesp.12410.11.1 COM1 Serial (RS232) Baud Ratep.12410.11.2 I/O Network Baud Ratep.12410.12 Set Up User Accessp.12510.12.1 Changing Required User Access Levelsp.12610.12.2 Creating a New User Accountp.12610.12.3 Deleting a Userp.12610.13 Set Up I/O Networkp.12710.13.1 Specify Number of Boardsp.127Boards on the I/O Networkp.12710.13.2 Checking Online Statusp.12810.14 Set Up Echelon Networkp.12810.14.1 Specifying Number of Devicesp.128Unit Controllers (Echelon)p.12810.14.2 Commissioning a Devicep.129How Echelon Commissioning Worksp.129MODBUS Commissioningp.12910.14.2.1 The Service Button Methodp.129The CC-100’s Service Buttonp.130The TD3’s Service Buttonp.130The ESR8’s Service Buttonp.130Commissioning the EC-2p.13010.14.2.2 The Manual ID Entry Methodp.13110.15 License Managementp.13110.15.1 Web Servicesp.13210.16 Set Up Alarmingp.13310.16.1 Specifying Alarm Reporting Typesp.13410.16.1.1 The Display Linep.13410.16.1.2 The Alarm Outputp.13410.16.1.3 Dial-Outp.13410.16.1.4 The Echelon Network (The Alarm Annunciator)p.13410.16.2 Setting up an E2 to be an Alarm Annunciatorp.13410.16.3 Alarm Dial-Outp.13510.16.4 Introduction: Alarm Reportingp.1351. The E2 Display Headerp.1352. The Advisory Outputp.1353. Dial-Outp.1354. The LonWorks Network (The Alarm Annunciator)p.13510.17 Set Up Global Datap.13610.17.1 Priority Settingsp.136Example: Setting Up an Outdoor Temperature Sensorp.13710.18 Set Up Applicationsp.13710.18.1 Add/Delete an Applicationp.13810.18.2 Using and Configuring a Setup Screenp.13810.18.2.1 The Edit Menup.13910.18.2.2 Entering Setpointsp.13910.18.2.3 Navigating the Setup Screenp.139Index Tabsp.140The Help Linep.140The Function Keys For Setupp.14010.18.3 Using the Help Key to get Property Helpp.14111 Software Overviewp.14311.1 Suction Groupsp.14311.1.1 Introductionp.14311.1.2 The (Standard) Suction Group Applicationp.14311.1.2.1 Overview of PID Control Strategyp.14311.1.2.2 Variable-Speed Compressorsp.14311.1.2.3 Floating Setpoint Controlp.14311.1.3 The Enhanced Suction Group Applicationp.14311.1.3.1 Learning Modep.14411.1.3.2 Circuit Load Analysisp.14411.1.3.3 The Control/Cycles Parameterp.14411.1.3.4 Variable-Speed, Digital Scroll, and Digital Discus Compressor Supportp.14411.1.3.5 Floating Suction Controlp.14411.1.4 Hardware Overviewp.14411.2 Condenser Controlp.14511.2.1 Air Cooled Condensersp.14511.2.1.1 Air Cooled Strategyp.14511.2.1.2 Temperature Differential Strategyp.14511.2.2 Evaporative Condensersp.14611.2.3 Fan Controlp.14611.2.4 Condenser Split Modep.14611.2.5 Fast Recoveryp.14611.2.6 Hardware Overviewp.14611.3 Standard Circuitsp.14711.3.1 Refrigeration Controlp.14711.3.1.1 Temperature Monitorp.14811.3.1.2 Temperature Controlp.14811.3.1.3 Line Up(ESR)/Defrostp.14811.3.1.4 Line Up(MFESR)/Defrostp.14811.3.2 Defrost Controlp.14811.3.2.1 Defrost Statesp.14811.3.2.2 Defrost Typesp.148Timed and Reverse Airp.148Hot Gas and Reversed Cycle Hot Gasp.148Electric Defrostp.14811.3.2.3 Defrost Terminationp.149Pulsed Defrostp.14911.3.2.4 Emergency Defrostp.14911.3.2.5 Hot Gas Defrost with ESR8 and MultiFlex ESRp.14911.3.3 Clean and Door Switchesp.14911.3.3.1 Clean Switchesp.14911.3.3.2 Door Switchesp.14911.3.4 Fan Controlp.15011.3.5 The TD3 Temperature Displayp.15011.3.6 The Control Link CD Case Displayp.15011.3.7 Wiringp.15011.4 Case Control Circuitsp.15211.4.1 Overviewp.15211.4.2 Case Circuit Control Software Overviewp.15211.4.2.1 Valve Controlp.153Pulse Valvesp.153Stepper Valvesp.15311.4.3 Refrigeration Controlp.15311.4.3.1 EEVs (Liquid Pulse and Liquid Stepper)p.153Temperature Controlp.153Superheat Controlp.153Recovery Modep.153Thermostatic Expansion Valves (TXVs)p.15411.4.3.2 EEPRs (Suction Stepper)p.154Recovery Modep.15411.4.4 Defrost Controlp.15411.4.4.1 Defrost Statesp.15411.4.4.2 Defrost Typesp.154Off Cycle (Timed)p.154Hot Gas and Reversed Cycle Hot Gasp.154Electric Defrostp.15511.4.4.3 Defrost Terminationp.155Temperature Terminationp.155Pulsed Defrostp.15511.4.4.4 Demand Defrostp.155Demand Fail-Safe Timep.15511.4.4.5 Emergency Defrostp.15511.4.4.6 The WAIT Statep.15511.4.5 Anti-Sweat Controlp.15511.4.5.1 Dewpoint Input Sourcesp.15611.4.6 Dual Temp Controlp.15611.4.7 Fan Controlp.15611.4.8 Light Controlp.15611.4.9 Clean/Wash Modep.156End of Mode Warningp.15711.4.10 Walk-In Freezer Controlp.15711.4.11 Fail-Safe Modep.157Actions Taken During Fail-Safe Modep.15711.4.11.1 Recoverable Sensor Failuresp.157Coil In or Coil Out Failurep.157Discharge/Return Airp.15711.4.12 Wiringp.15811.4.13 Setting Up An Individual Case Controllerp.15811.4.14 Associating Case Controllers with Case Circuit Control Applicationsp.15811.5 Logging Groupsp.15811.5.1 Possible Data Errorsp.15911.5.2 Data Compressionp.15911.5.2.1 Clippingp.15911.5.2.2 Incompressible Data Typesp.15911.5.3 Base Log Groupp.15911.5.4 Setting Up Loggingp.16011.5.5 Logging Group Status Screenp.16111.5.6 Log Reportsp.16111.5.6.1 Logging Group Reportp.16211.5.6.2 Application Log Reportp.16211.5.6.3 System Log Reportp.16211.6 Air Handling Units (AHU)p.16311.6.1 Overviewp.16311.6.2 Temperature Controlp.16311.6.3 Alternate Setpointsp.16311.6.4 Fan Controlp.16311.6.4.1 Single-Speed Fansp.16311.6.4.2 Two-Speed Fansp.164Continuous Two-Speed Fan Operation When All Stages Are OFFp.16411.6.4.3 Variable-Speed Fansp.164Variable-Speed Fan Operationp.164Dehumidification with VS Fansp.16411.6.5 Economizer Controlp.16411.6.5.1 Economization Enablep.16411.6.5.2 Economization Lockout Featuresp.165Max Outside Air Humidityp.165Minimum Supply Tempp.16511.6.6 Digital Economizer Controlp.16511.6.7 Analog Economizer Controlp.16511.6.8 Dehumidification Controlp.16511.6.9 Curtailmentp.16511.6.10 Optimum Start/Stop (OSS)p.165Intelligent Pre-Starts and Pre-Stopsp.16611.6.11 Separate Setpointsp.16611.6.12 AHU Zone Controlp.16611.6.13 Hardware Overviewp.16611.7 Zone Controlp.16711.7.1 Overviewp.16711.7.2 How Zones Workp.16811.7.3 Applications That May Be Connected To Zonesp.16811.7.3.1 MultiFlex RTU Boardp.16811.7.3.2 MultiFlex RCB Boardp.16811.7.3.3 AHUsp.16811.7.4 Temperature Controlp.16911.7.5 Zone Temperaturep.16911.7.6 Economizer Controlp.16911.7.7 Economization Enablep.16911.7.8 The Effect of Enabling Economizationp.17011.7.9 Dehumidification Controlp.17011.7.10 The Zone Humidity Inputp.17011.7.11 The Effect of Enabling Dehumidificationp.17011.7.11.1 MultiFlex RTUs and RCBsp.17011.7.11.2 AHUsp.17011.7.12 Optimum Start/Stop (OSS)p.170Intelligent Pre-Starts and Pre-Stopsp.17111.7.13 Losing Contact With Zone Applicationsp.17111.7.14 Stand-Alone MultiFlex RTUsp.17111.7.15 MultiFlex RTU/ARTC and AHU Zone Associationp.17111.8 MultiFlex CUB Boardp.17211.9 MultiFlex PAK Boardp.17211.10 Lighting Schedulesp.17211.10.1 Overviewp.17211.10.2 Functions of the Lighting Schedule Applicationp.17311.10.3 Control Method Selectp.17311.10.4 Standard Controlp.17311.10.4.1 The Light Level Interface Cell (LLEV INTERFACE)p.173Logical Combination Strategiesp.173Occupied/Unoccupied and Alternate Settingsp.17411.10.4.2 The Schedule Interface Cell (SCHEDIF)p.174Logical Combinationsp.174Alternate Schedule Interface Combinationsp.17411.10.5 Alternate Controlp.17411.10.5.1 Multi-Logic Combinerp.17411.10.5.2 Offset Solar Controlp.17511.10.6 The Basic Schedule Cellp.17511.10.6.1 Slave Schedulingp.17511.10.7 The Min ON/OFF Cellp.17511.10.8 The Proof Cellp.17511.10.9 Output Light Dimmingp.17611.11 Demand Controlp.17611.11.1 Introduction to Demand Limit Controlp.17611.11.2 Demand Monitoringp.17611.11.3 Load Sheddingp.17711.11.3.1 Definitionp.17711.11.4 Shedding Levelsp.17711.11.5 Priority Levelsp.1771. First Shedp.1772. Rotational Shedp.1783. Last Shedp.178Other Notes About Priority Levelsp.17811.11.6 How Demand Control Uses Load Sheddingp.179Mode 1: KW Input Is Greater Than Setpointp.179Mode 2: KW Input Has Been Greater Than Setpoint for 1/4 Demand Window And Is Still Going Upp.179Mode 3: Integral Error Approaching Zerop.17911.11.6.1 Power Monitoring Inputp.180Settingsp.18011.12 Sensor Controlp.18011.12.1 Overviewp.18011.12.2 Analog Sensor Controlp.18011.12.3 Cut In/Cut Out Setpoint Controlp.18011.12.4 Digital Sensor Controlp.18011.12.5 Logical Combinationp.18111.13 Loop/Sequence Controlp.18111.13.1 Layout of the Loop/ Sequence Control Applicationp.18111.13.1.1 Control Cellsp.18111.13.1.2 Output Cellsp.18211.13.1.3 Diagramp.18211.13.2 Loop/Sequence Control Cell Descriptionsp.18211.13.2.1 The Select Cellp.18211.13.2.2 The Setpoint Float Cellp.18311.13.2.3 The PID Control Cellp.183Bypassing PIDp.18311.13.2.4 The Filter Cellp.18311.13.2.5 The Override Cellp.18311.13.3 Output Cell Descriptionsp.18311.13.3.1 The Sequencer Cellp.18311.13.3.2 The PWM Cellp.18311.14 Time Scheduling and Holidaysp.18411.14.1 How Schedules Workp.18411.14.1.1 Eventsp.18411.14.1.2 Absolute and Relative Eventsp.18411.14.1.3 Temporary Schedule Eventsp.18411.14.1.4 Overlappingp.18511.14.1.5 Rangesp.18511.14.2 Holiday Schedulesp.18511.15 Power Monitoringp.18511.15.1 Overviewp.185Explanation of “Demand”p.185How Power Monitoring Calculates Demandp.185Shed Modep.18511.15.2 Loggingp.186Hourlyp.186Dailyp.186Monthlyp.186Definition of Heat and Cool Degree Daysp.18611.15.2.1 Power Monitoring Inputp.186Settingsp.18611.16 Anti-Sweat Setupp.18711.16.1 How Anti-Sweat Worksp.18711.17 Heat/Cool Controlp.18711.17.1 Temperature Controlp.18711.17.2 Unoccupied Hysteresisp.18711.17.3 Optimum Start/Stop (OSS)p.188Intelligent Pre-Starts and Pre-Stopsp.18811.17.4 Setpoint Resetp.18811.17.5 Lead/Lagp.18911.18 Analog and Digital Combinersp.18911.19 TD Controlp.19011.19.1 Overviewp.19011.19.2 Temperature Differential (TD) Strategyp.19011.19.3 TD Control Fail-Safesp.190Drop Leg Temperature Above Maximum Drop Leg Setpointp.19011.19.4 Configurationp.19011.19.5 Setpointsp.19011.19.6 Inputsp.19111.19.7 Alarmsp.19111.20 Pulse Accumulationp.19111.20.1 Overviewp.19111.20.2 Configurationp.19111.20.3 Outputsp.19111.20.4 Accumulator Reset Typesp.19211.20.5 Loggingp.19211.20.6 High Tripp.19211.21 Irrigation Controlp.19211.21.1 Overviewp.19211.21.2 Zones and Cyclesp.19211.21.2.1 Cycle Control Typesp.19311.21.2.2 Timedp.19311.21.2.3 Volumep.19311.21.3 Cycle Schedulingp.19311.21.4 Zone Inhibitp.19311.21.4.1 Timedp.19311.21.4.2 Volumep.19311.21.4.3 Rain Delayp.19311.21.4.4 Freeze Lockoutp.19311.21.4.5 Alarmp.19311.21.5 Zone Bypass Inputsp.19311.21.5.1 Bypass Failsafep.19411.21.6 Flow Sensor-Related Testsp.19411.21.6.1 Leak Testp.19411.21.6.2 Obstructed Zone Testp.19411.21.7 Service Modesp.19411.21.8 Heat Cut In/Cut Out Setpoints For Each Stagep.19411.21.9 Cool Cut In/Cut Out Setpoints For Each Stagep.19411.21.10 Dehumidification Controlp.19411.21.11 Two Speed Fan Controlp.19411.21.12 Configurationp.19511.22 Flexible Combinerp.19511.23 Modular Chiller Control (MCC)p.19511.23.1 Overviewp.19511.23.2 Learning Modep.19611.23.3 The Control/Cycles Parameterp.19611.23.4 Compressor Controlp.19611.23.4.1 Digital Scroll Compressorp.19711.23.4.2 Variable Frequency Drive Compressorp.19711.23.4.3 Unequal Capacity Compressorsp.19711.23.5 Bypass Valve Controlp.19711.24 Boilerp.19711.24.1 Overviewp.19711.24.2 Alarmsp.19711.25 Refrigerant Monitoring System (RMS)p.19811.25.1 RMS Assetp.19811.25.2 RMS Scalep.19811.25.2.1 Device Constraintsp.19811.26 Detailed Setpoint Change Loggingp.19811.26.1 Log Informationp.19811.26.2 Logged Changesp.19911.26.3 Unlogged Changesp.19912 Operator’s Guide to Using the E2p.20112.1 The E2 Home Screenp.20112.1.1 RX Home Screenp.201Suction Groups Sectionp.201Circuit Status Sectionp.201Condenser Sectionp.201Sensor Controlp.20112.1.2 BX Home Screenp.201OAT Sectionp.201Demand Control Sectionp.201Power Monitoring Sectionp.202Light Schedules Sectionp.202Air Handling Units Sectionp.202Zones Sectionp.202Sensor Control Sectionp.20212.1.3 CX Home Screenp.202Lighting Control Sectionp.202HVAC Control Sectionp.202Refrigeration Control Sectionp.202Demand Control Sectionp.202Anti-Sweat Control Sectionp.202Sensor Control Sectionp.202Time Schedules Sectionp.20212.2 Logging On and Access Levelsp.20212.3 Toggling Full Optionsp.20312.4 Navigationp.20312.4.1 Menusp.203Main Menup.203The System Configuration Menup.203The System Information Menup.204Actions Menup.20412.4.2 Screen Typesp.205Summary Screensp.205Status Screensp.205Setup Screensp.20512.4.3 The E2 Keypadp.206The Cursorp.206The Tab Keyp.207The Enter Keyp.207Keypadp.207The Log In/Out Keyp.208Four Directional Arrow Keysp.208Page Up/Page Down Keysp.208Ctrl Page Up/Ctrl Page Down Keysp.208Numeric Keypadp.208Hot Keysp.20812.5 Customizing the Home Screenp.20912.6 Manual Defrost and Clean Modep.20912.7 Overridesp.21012.8 Checking Boards Onlinep.21112.9 Checking Status Screensp.211Suction Group Status Screenp.211Condenser Status Screenp.211Circuit Status Screenp.211Sensor Status Screenp.211AHU Status Screenp.212Zones Status Screenp.212Lighting Status Screenp.212Sensors Status Screenp.212Other Status Screensp.21212.10 Alarmsp.21212.10.1 Accessing the Alarm Advisory Logp.21212.10.2 Viewing the Controller Advisory Logp.21212.10.3 Date and Timep.21212.10.4 Statep.21212.10.5 Ack/Reset Statep.21312.10.6 Area Ctrl: Application: Propertyp.21312.10.7 Advisory Messagep.21312.10.8 Acknowledging, Resetting, and Clearing Log Entriesp.21312.10.8.1 Acknowledgingp.21312.10.8.2 Resettingp.21412.10.8.3 Clearingp.214Property or Board/Pointp.214Advisory Messagep.214Acknowledge Statusp.214Report Priorityp.214Return To Normalp.21412.10.9 Facility Status Display (FSD) Alarmsp.21512.11 Viewing Logs and Graphsp.21512.11.1 Locating Logged Inputs/ Outputsp.21512.11.1.1 Home/Status Screensp.21512.11.1.2 Setup Screensp.21612.11.1.3 Setting Up Input and Output Pointersp.21612.11.2 Log Viewp.21712.11.3 The Graph Viewp.21712.11.4 Zooming In and Outp.21712.12 Low Battery Notificationp.21812.13 Naming Conventions for E2 Controllers, Applications, and Pointsp.218Appendix A: Case Type Defaultsp.219High Alarm, Low Alarm, and Delayp.219Defrost Typep.219Appendix B: Pressure/Voltage and Temperature/Resistance Charts for Eclipse Transducers & Retail Solutions Temp Sensorsp.221Appendix C: Alarm Advisory Messagesp.223Appendix D: PID Controlp.237Introduction to PID Controlp.237Proportional (“P”) Modep.237Throttling Rangep.237Proportional Constant (Kp)p.238Integral Modep.238Why “I” Mode is Necessaryp.238Proportional Offsetp.238Saturationp.239The “I” Mode Calculationp.239Derivative Modep.239The “D” Mode Calculationp.240How Condenser Control and HVAC PID Differs From The Othersp.240Output at Setpointp.240Output at Setpoint for Non-Condenser/ HVAC PIDp.240Output at Setpoint for Condenser/HVAC PID Controlp.241Changing the Output at Setpointp.241Other PID Featuresp.241Output at Minimum / Output at Maximump.241Minimum Accumulated Errorp.242Applicationp.242Filteringp.242Applicationp.242Appendix E: Compressed Point Log Sample Limits and Precision Tabp.245Appendix F: Troubleshootingp.249Appendix G: Revision Logp.259Indexp.261
Page 16 of the Emerson E2 RX user manual — Table of Contents
Page 16 · click to enlarge
Page 16
Page 16 of the Emerson E2 RX user manual — Table of Contents
Page 17 of the Emerson E2 RX user manual — 1.1 The E2 Refrigeration Controller
Page 17 · click to enlarge
Page 17

1 Introduction

The E2 controller is a microprocessor-based control system designed to provide complete control of compres- sor groups, condensers, refrigerated cases, and other com- ponents related to refrigeration and building control. The E2 is the controlling component of a three-network config- uration (RS485 I/O, Echelon® Lonworks™ Networks, and Ethernet) that includes input and output communication boards, remote communication software, and a variety of sensors, probes, and transducers.

for the RX-300 and RX-400.

Capabilities RX-

100 RX-

300 RX-

Analog Combiner 0 128 128

Analog Import Point 0 64 64

The E2 efficiently operates all systems that support refrigeration (including compressor racks and condensers) and other components not directly related to refrigeration control, such as HVAC systems, anti-sweat heaters, and sensor control modules.

Analog Sensor Control 24 64 72

Anti-Sweat 8 16 64

Case Control Circuit 0 48 64

CC100 Case Suction 0 99 99

Emerson E2 RX — Capabilities RX- diagram (page 17)
Fig. 4 · Capabilities RX-

CC100 Liquid Control 0 99 99

CCB 0 99 99

Condenser 1 1 2

Control Link ACC 16 63 63

Control Link Case Disp 0 99 99

Control Link RSC 0 99 99

CS100 Ckt Suction 0 99 99

Figure 1-1 - E2 Controller

CT Drive 0 16 16

1.1 The E2 Refrigeration Controller

Digital Combiner 0 128 128

Digital Sensor Control 24 64 72

Discus 0 63 63

The E2 RX is available in three models: the RX-300, RX-400, and RX-100. The E2 RX-300 is capable of con- trolling a single refrigeration system (including one con- denser and up to four suction groups). The E2 RX-400 is capable of controlling two separate refrigeration systems (including two condensers and up to four suction groups). The RX-100 is a low-cost alternative to the RX-300 with fewer capabilities and a monochrome display.

E2 Alarm Panel 7 7 7

Energy Meter 30 30 30

Enhanced Suction Group 4 4 4

ESR8 ESR Control 0 99 99

The E2 RX is primarily designed to control tempera- ture and defrost in refrigerated cases using either direct control (connected to the E2 via I/O boards or ESR8 lineup control boards) or by using CC-100 case control boards (connected via the LonWorks Network).

Flexible Combiner 64 128 128

Heat/Cool Control 0 16 16

Holiday Schedule 4 64 64

Table 1-1 shows the differences between capabilities

Table 1-1 - RX-100, RX-300, and RX-400 Comparison

The E2 Refrigeration Controller Introduction • 1-1

Page 18 of the Emerson E2 RX user manual — 1.2 The E2 Building Controller
Page 18 · click to enlarge
Page 18

consumption low.

Capabilities RX-

100 RX-

300 RX-

The E2 BX is available in two models: the BX-300 and BX-400. The only significant difference between the E2 BX-300 and the E2 BX-400 is the total number of building control devices that may be operated by a single controller. Table 1-2 shows the differences between capabilities for the BX-300 and BX-400.

Impulse 0 48 64

Infrared Leak Detection 1 16 16

Logging Group 8 32 32

Capabilities BX-300 BX-400

Loop/Sequence Control 4 16 24

K5 Ref Scroll 0 31 31

Modular Chiller Control 0 1 2

AHU 6 8

MultiFlex ESR 0 31 31

Analog Combiner 128 128

MRLDS 24 24 24

Analog Import Point 64 64

Performance Alert 0 63 63

Analog Sensor Control 64 72

Power Monitoring 1 16 16

Pulse Accumulator 0 16 16

RMS Asset 99 99 99

Control Link ACC 16 48

Standard Circuit 48 48 64

Control Link Case Disp 99 99

Suction Group 4 4 4

Control Link RSC 99 99

TD Condenser Fan Con- trol

CT Drive 16 16

Demand Control 2 2

TD3 Controller 0 99 99

Digital Combiner 128 128

Time Schedule 4 64 64

Digital Sensor Control 64 72

Table 1-1 - RX-100, RX-300, and RX-400 Comparison

E2 Alarm Panel 7 7

1.2 The E2 Building Controller

Energy Meter 30 30

Flexible Combiner 128 128

The counterpart to the E2 RX is the E2 BX, which con- trols HVAC systems for low-rise retail, industrial, and commercial buildings. The BX’s primary function is to provide energy-efficient control of air handling units (AHUs), rooftop units (RTUs), and other systems related to environment control. In addition, the BX provides extensive sensor control, logging, and graphing features that allow the user to view accurate real-time information about system conditions. The BX is equipped with many power monitoring and demand control features that give you the information you need to keep your site’s energy

Heat/Cool Control 16 32

Holiday Schedule 64 64

HVAC Zone 32 40

Table 1-2 - BX-300 vs. BX-400 Comparison

Show 5 more labels / short text on this page
Advanced Rooftop Control · Anti-Sweat 16 48 · Boiler 2 2 · 4 64 64 · Infrared Leak Detec- tion
Page 19 of the Emerson E2 RX user manual — CCB 0 99 99
Page 19 · click to enlarge
Page 19

Capabilities BX-300 BX-400

Lighting Control 24 48

Logging Group 32 32

Loop/Sequence Control 16 28

MRLDS 24 24

Power Monitoring 32 64

Pulse Accumulator 32 64

Capabilities CX-

100 CX-

300 CX-

RMS Asset 99 99

RCB Controller 64 64

TD Condenser Fan Control

AHU 4 6 8

Time Schedule 64 64

Analog Combiner 64 128 128

Table 1-2 - BX-300 vs. BX-400 Comparison

Analog Sensor Control 12 24 48

1.3 The E2 Convenience Store Controller

Anti-Sweat 4 8 16

Case Control Circuit 0 12 24

CC100 Case Suction 0 99 99

The CX controls HVAC, lighting, and refrigeration systems for convenience store and small-box retail facili- ties. The CX’s primary function is to provide energy-effi- cient control of rooftop units as well as refrigeration and defrost control of display cases and walk-in boxes. In addition, the CX provides extensive sensor control, log- ging, and graphing features that allow the user to view accurate real-time information about system conditions. The CX is equipped with many power monitoring and demand control features that give you the information you need to keep your site’s energy consumption low.

CC100 Liquid Control 0 99 99

CCB 0 99 99

Condenser 0 0 1

Control Link ACC 8 16 16

Control Link Case Disp 6 99 99

Control Link RSC 10 99 99

The E2 CX is available in three models: the CX-300, CX-400, and CX-100. The only significant difference between the E2 CX-300 and the E2 CX-400 is the amount of C-Store equipment that may be operated by a single controller. The CX-100 is a low-cost alternative to the CX- 300 with fewer capabilities and a monochrome display. Table 1-3 shows the differences between capabilities for the CX-300 and CX-400.

CS100 Ckt Suction 0 99 99

CT Drive 0 16 16

Demand Control 1 1 1

Digital Combiner 64 128 128

Digital Sensor Control 12 24 48

Discus 0 0 63

Table 1-3 - CX-100, CX-300, and CX-400 Comparison

The E2 Convenience Store Controller Introduction • 1-3

Advanced Rooftop Control · 0 32 32

Page 20 of the Emerson E2 RX user manual — MRLDS 24 24 24
Page 20 · click to enlarge
Page 20

Capabilities CX-

100 CX-

300 CX-

Capabilities CX-

100 CX-

300 CX-

E2 Alarm Panel 7 7 7

Time Schedule 8 16 32

Energy Meter 30 30 30

Table 1-3 - CX-100, CX-300, and CX-400 Comparison

1.4 Networking Overview

1.4.1 E2 I/O Network

ESR8 ESR Control 0 99 99

Flexible Combiner 64 128 128

Most of the general purpose input and output commu- nications devices required by the E2 to control refrigera- tion systems are connected to the E2 via the I/O Network. The I/O Network is a simple RS485 three-wire connection that allows data interchange between input boards (which read sensor values and digital closures), output boards (which carry out commands from E2’s control applica- tions), and the E2 itself.

Heat/Cool Control 4 6 8

Holiday Schedule 8 16 32

HVAC Zone 4 6 12

The I/O Network is the same thing as the COM A and COM D Networks found on Retail Solutions’ previous generation of controllers, REFLECS. This allows current owners of Retail Solutions’ Refrigeration Monitor and Control (RMC) or Refrigeration Monitor and Case Control (RMCC) controllers to easily retrofit with an E2 RX with- out need for re-wiring.

Irrigation 2 2 2

Lighting Control 6 24 48

Logging Group 8 32 32

Loop/Sequence Control 8 16 28

K5 Ref Scroll 0 0 31

MultiFlex ESR 0 31 31

MRLDS 24 24 24

Performance Alert 0 0 63

Power Monitoring 2 8 16

Pulse Accumulator 4 8 16

RCB Controller 0 32 32

RMS Asset 99 99 99

Standard Circuit 6 12 32

Suction Group 0 0 4

TD Condenser Fan Control

TD3 Controller 0 99 99

Table 1-3 - CX-100, CX-300, and CX-400 Comparison

Show 4 more labels / short text on this page
Enhanced Suction Group · Infrared Leak Detec- tion · 1 16 16 · 8 16 28
Page 21 of the Emerson E2 RX user manual — 1.4.2 The E2 Echelon Lonworks Network
Page 21 · click to enlarge
Page 21

tion and system control, but they communicate with other E2s to provide logging, alarm control, and other functions. In addition to these, Retail Solutions also offers Echelon- compatible input and output boards similar to those avail- able for the RS485 Network.

Emerson E2 RX — 1.4.2 The E2 Echelon Lonworks Network diagram (page 21)
Fig. 5 · 1.4.2 The E2 Echelon Lonworks Network
Emerson E2 RX — 1.4.2 The E2 Echelon Lonworks Network diagram (page 21)
Fig. 6 · 1.4.2 The E2 Echelon Lonworks Network

Figure 1-2 - E2 RX/BX I/O Network Diagram

Figure 1-2 shows the peripherals that make up the I/O Network:

  • MultiFlex - The MultiFlex line of control system boards provide a wide variety of input, output, and smart control solutions, all of which are based on a single universal hardware platform.

Figure 1-3 - E2 RX Echelon Network Diagram

Figure 1-3 shows the E2 RX peripherals that commu- nicate across the Echelon Network:

  • CC-100 - Case control board - controls all lights, fans, defrost, and refrigeration for a single case. The CC-100 controls pulse or stepper valves to provide precise evaporator control, resulting in better temperature maintenance and energy efficiency.
  • 8ROSMT - Relay output board - activates and deactivates up to eight devices.
  • Previous-generation I/O boards, such as 8RO, 8DO, and 4AO - are all still compatible with E2 I/O Network. 1.4.2 The E2 Echelon Lonworks Network
  • ESR8 - Evaporator stepper regulator - the analog outputs on this board allow the E2 to control circuit temperature in up to eight circuits using suctionside mounted electronic evaporator pressure regulators (EEPRs).

The E2 is also compatible with a network platform called Lonworks. This is most commonly referred to as “the Echelon Network,” after the company who invented the platform, the Echelon Corporation.

  • TD3 - Temperature display - has three inputs that monitor case temperature, product temperature and defrost status.

In general, peripherals with control functions — such as case controllers, rooftop HVAC controllers, and other E2 RX and BX units — are interconnected on the Echelon Network. These controllers do most of their own computa-

  • Third Party Echelon Devices - Echelon® LONMARK® devices communicate with E2 through its "Open Echelon" networking feature, and require a license key and a description file that is loaded into

Networking Overview Introduction • 1-5

Page 22 of the Emerson E2 RX user manual — CAT5 CABLE
Page 22 · click to enlarge
Page 22

1.5 Documentation Overview

the E2 that enables communication. 1.4.3 Interconnection With Other E2s

The E2 RX and BX controllers are among the most versatile and customizable control system products avail- able on the market. Because of the enhanced capabilities of the E2s, programming, installation, and operation of E2 and its accompanying peripherals are supported by several different Retail Solutions publications. All of the publica- tions listed below can be ordered by contacting Retail Solutions:

In large installations where more than one refrigeration system is present, or where E2s are controlling both refrig- eration and building HVAC systems in the same site, the E2s share information with each other across either the Echelon Network or via Ethernet.

Echelon Box-To-Box

  • E2 Installation and Operation Manual for RX Refrigeration, BX HVAC, and CX Convenience Store Controllers (026-1610) - The manual you are currently reading. The Installation and Operation Manual covers hardware installation, network setup, and important operator functions such as viewing status screens or logs, and performing manual defrosts.

ECHELON CABLE (daisy chain)

The Quick Start section (Chapter 8) is designed to guide you quickly through setup of the most simple and vital refrigeration control applications (such as suction groups and condensers). More detailed information is included in the online help.

Ethernet Box-To-Box

  • Router and Repeater Installation Guide (P/N 0261605) - If you have a large site with 64 or more devices on the Echelon Network, you might require the use of a router or repeater to properly set up your Echelon Network. The Router and Repeater Installation Guide will help you determine when a router or repeater should be used, how and where to set it up, and how to configure the E2(s) on the network to interact with the router or repeater.

CAT5 CABLE

Figure 1-4 - E2 RX/BX Network

  • Emerson Retail Solutions Product Technical Sheet Binder (P/N 026-1904) - The product sheet binder gives important installation information about sensors, transducers, thermostats, and other essential items that are a part of every Retail Solutions control network. The product sheet binder is not necessary for field installation instructions; however, it may be a useful reference for contractors and OEMs who require more information about a specific peripheral.
  • MultiFlex ESR Installation and Operation Manual (P/N 026-1720) - From general information to details on mounting, wiring, and heat dissipation, the MultiFlex ESR manual provides the information you need to install and operate the MultiFlex ESR board, in addition to valuable information on software setup and valve control.

Switch

Page 23 of the Emerson E2 RX user manual — 1.6 On-Line Help System Overview
Page 23 · click to enlarge
Page 23
  • MultiFlex I/O Board Installation and Operation Manual (P/N 026-1704) - Installation and operation manual for the MultiFlex 16 and all versions of the MultiFlex combination input/output board, excluding unit controllers such as the CUB and RTU.

flipped from OFF to ON and from ON to OFF by commands sent from E2 through MODBUS or a Square D Smart Breaker Gateway board. Refer to this manual for more information on the Square D Breaker Panel application.

  • Eaton Breaker Control Manual (P/N 026-1709) - E2 can communicate directly with Eaton's Breaker Control Bus (BCB) modules. Communication with the E2 (minimum E2 firmware rev. 2.82) will enable users to access features such as Time Schedules, Enhanced Lighting, and Logging, with the the added capabilities of dial-out on failure and offsite remote connection, specifically with UltraSite32 and Site Manager to the breaker panel. The Eaton Breaker Panel controller is a licensed application available in the E2 300 and 400 model controllers. Refer to this manual for more information on the Square D Breaker Panel application.
  • MultiFlex CUB/CUB II Condensing Unit Board Installation and Operation Manual (P/N 0261705) - Installation and operation manual for the MultiFlex CUB (old style) and the MultiFlex CUBII family, which includes the CUB-II and CUB-TD.
  • MultiFlex RTU Rooftop Controller Installation and Operation Manual (P/N 026-1706) - Installation and operation guide for the MultiFlex RTU (replacement for ARTC).
  • MultiFlex RCB Rooftop Controller Installation and Operation Manual (P/N 026-1707) - An improved version of the MultiFlex RTU, the RCB has 16 fully configurable analog and digital input points. The RCB also has four analog outputs for use in controlling variable speed fans, economizers, or modulating heating and/or cooling valves. The RCB also features a more sophisticated HHT interface and updated algorithms for controlling heating, cooling, dehumidification, and air quality. Refer to this manual for more information on the MultiFlex RCB Rooftop Controller.
  • Energy Meter Manual (P/N 026-1726) - The Energy Meter provides a solution for measuring energy data with a single device. Inputs include Control Power, CT, and 3-phase voltage. The Energy Meter supports multiple output options, including solid state relay contacts, Modbus (with or without data logging), and pulse. The LCD screen on the faceplate allows instant output viewing.
  • iPro DAC (P/N 026-1727) - The iPro DAC is a packaged HVAC control board for use either as a stand-alone controller or in zone control applications using a Retail Solutions E2 BX building control system. The iPro DAC is capable of controlling heat and cool stages, fans, humidification and dehumidification devices and economizers using onboard I/O and control algorithms, as well as monitor and interact with other building control systems and peripherals (such as smoke alarms and CO2 sensors).
  • E2 User’s Manual Supplement for Flexible Combiner Programming ( P/N 026-1620 ) - The Flexible Combiner application is an advanced I/O control program used to combine multiple analog and digital input values using programmed equations similar to those used in spreadsheets, and is a new feature of E2 versions 2.20 and above. Refer to this manual for more information on the Flexible Combiner application.
  • Facility Status Display (FSD) Installation and Operation Manual (P/N 026-1400) - The FSD reports alarm information and more, (such as temperatures, occupancy, case status, and setpoints) and provides a centralized device for store personnel to review information by communicating with the E2 via Ethernet connectivity (minimum E2 firmware rev. 2.68F01). Refer to this manual for more information on the Status Display application.

1.6 On-Line Help System Overview

The E2 On-Line Help is the primary source front- panel/interface users will have to consult when seeking instruction on properties, screens, menus, and trouble- shooting of hardware/software problems. The on-line help topics are designed to minimize the time the user would otherwise have to spend searching through the manual to find information. Press + keys to open the General Help menu.

  • Square D Smart Breaker Control Manual (P/N 026-1711) - The Smart Breaker products are designed to allow the Retail Solutions family of site controllers to command control panels (minimum E2 firmware rev. 2.71F01). A breaker panel generally consists of a series of circuit breakers that are

On-Line Help System Overview Introduction • 1-7

Page 24 of the Emerson E2 RX user manual — 1.7 Software Licensing
Page 24 · click to enlarge
Page 24

To use on-line help from any screen in the E2 front panel interface, simply press the E2’s permanent Help key. This opens a pop-up window containing either information about the screen or menu you are currently on, or information about the input, output, or setpoint you have highlighted with the cursor (if available). After the Help key has been pressed, will open the Gen- eral Help menu containing Troubleshooting options.

1.7 Software Licensing

Some applications in the E2 are available only when activated with a unique license key that is obtained through Retail Solutions. Software licensing (see Section 10.15, License Management) allows the user to activate certain features in the E2, such as Web Services and third- party controllers. Call your Retail Solutions sales repre- sentative at 770-425-2724 for more information about software licensing.

Page 25 of the Emerson E2 RX user manual — 5% - 100% RH
Page 25 · click to enlarge
Page 25

2 Hardware Overview

This section gives an overview of the E2, the hard- ware, and how it communicates across the I/O and Eche- lon Networks to control an entire system.

Emerson E2 RX — 2 Hardware Overview diagram (page 25)
Fig. 7 · 2 Hardware Overview

2.1 E2 Hardware

The E2 controller is programmed to monitor and com- mand all aspects of a refrigeration or building environ- mental control system. The E2 uses both an RS485 I/O Network and a LonWorks Network to gather data from input devices, communicate with other E2s, and activate or deactivate loads.

In general, an E2 control network will consist of the following components:

1. E2 - The “brain” of the control network, which performs all necessary computations and sends commands to the output devices that control the system.

Figure 2-1 - E2 Front Panel

2. Input Boards - Transfer readings to the E2.
Dimensions Standard Mount9.06” W x 12.06” H x 3.75” D
3. Output Boards - Banks of relays, digital pulse outputs, or analog outputs, which the E2 may use to control loads.

Recessed Mount: 9.06” W x 10.56” H x 2.0” D Base: 10.56” W x 10.56” H x 3.75” D

4. Smart Boards - Boards such as case controllers (for refrigeration) or rooftop controllers (for building control) that perform control functions for an individual case or rooftop unit, and send the data to the E2 for logging and alarm purposes.

-40°F to 149°F (-40°C to 65°C)

Storage Temp -40°F to 158°F (-40°C to 70°C)

5. Modem - For remote communication via phone, if necessary.

5% - 95% RH non-condensing at 90°F

6. Network Wiring - Wiring that connects the E2 to other E2s, and all the input, output, and smart boards.

5% - 100% RH

Power 24 VAC ±20%, 50/60 Hz, Class 2

7. Sensors and Loads - The “eyes” and “hands” of the control network. Sensors “see” what needs to be controlled on the network, and Loads are what can be controlled, or more specifically, be turned on and off, such as compressors, condensers, lights, and fans.

Table 2-1 - E2 Specifications

E2 Hardware Hardware Overview • 2-1

Show 6 more labels / short text on this page
Operating · Temp · Operating · Humidity · Storage Humidity · VA Load 50
Page 26 of the Emerson E2 RX user manual — 2.1.1 E2 Main Processor Board (CPU)
Page 26 · click to enlarge
Page 26

2.1.1 E2 Main Processor Board (CPU)

2.1.3 E2 Keypad

Emerson E2 RX — 2.1.1 E2 Main Processor Board (CPU) diagram (page 26)
Fig. 8 · 2.1.1 E2 Main Processor Board (CPU)
Emerson E2 RX — 2.1.1 E2 Main Processor Board (CPU) diagram (page 26)
Fig. 9 · 2.1.1 E2 Main Processor Board (CPU)

Figure 2-4 - E2 Keyboard

The E2 has a QWERTY style keyboard layout with two rows of function keys. The first row (-) is comprised of screen-specific function keys, and the sec- ond row has designated icon keys. The five icon keys are Help , Alarms , Home , Menu , and Back . 2.1.4 LEDs

Figure 2-2 - E2 CPU (RX-100 Version Shown)

The E2 CPU or main processor board (Figure 2-2) contains the CPU, Ethernet port, and memory used for log- ging. The 3.6V battery for the E2 is located on this board and protects log and alarm data during power loss. The main processor board connects to the PIB via a ribbon cable. The RX- and CX-100 versions support mono- chrome display only. For optimum viewing, backlight and contrast adjusts are available for customizing the mono- chrome display depending on the user’s needs. 2.1.2 E2 Processor Interface Board (PIB)

The PIB, main processor board, and keyboard (located behind the main board) LEDs can be used to determine the status of normal operating parameters for the unit.

Green (14) ONPower is being applied to the PIB
Yellow (RX1) ONCommunication is being received on RS485 Port 1A
Yellow (RX2) ONCommunication is being received on RS485 Port 1B
Emerson E2 RX — 2.1.1 E2 Main Processor Board (CPU) diagram (page 26)
Fig. 10 · 2.1.1 E2 Main Processor Board (CPU)
Red (TX) ONCommunication is being sent on RS485 Port 1A and 1B

Table 2-2 - PIB LED’s Status

Figure 2-3 - E2 PIB

The E2 Processor Interface Board (PIB) interfaces the power and most all communications with the main proces- sor board, and contains all field wiring connections. The PIB allows you to connect an external keyboard, accessory cards, and an external computer. All RS485 and Echelon Network connectors are located on the PIB.

PIB LEDs Status

Page 27 of the Emerson E2 RX user manual — 2.1.5 PC-104 Peripherals: The Internal Modem (Previous Generation Processor Board)
Page 27 · click to enlarge
Page 27
Emerson E2 RX — 2.1.5 PC-104 Peripherals: The Internal Modem (Previous Generation Processor Board) diagram (page 27)
Fig. 11 · 2.1.5 PC-104 Peripherals: The Internal Modem (Previo…
Emerson E2 RX — 2.1.5 PC-104 Peripherals: The Internal Modem (Previous Generation Processor Board) diagram (page 27)
Fig. 12 · 2.1.5 PC-104 Peripherals: The Internal Modem (Previo…

1 blink every two seconds (1 sec- ond ON, 1 second OFF): Main board is operating normally. Solid ON: E2 is booting up. Faster blinks per second: Indi- cates an error condition with the hardware or firmware.

Table 2-3 - Main Board (CPU) LED’s Status

Emerson E2 RX — 2.1.5 PC-104 Peripherals: The Internal Modem (Previous Generation Processor Board) diagram (page 27)
Fig. 13 · 2.1.5 PC-104 Peripherals: The Internal Modem (Previo…

Figure 2-5 - Mounting the Internal Modem Board

1 blink every two seconds (1 sec- ond ON, 1 second OFF): Status is normal. 4 blinks per second: A flash and/ or crystal problem has been de- tected. Board should be replaced.

2.2 I/O Network Boards and Peripherals

2.2.1 The Gateway Board

Table 2-4 - Keyboard LED’s Status

2.1.5 PC-104 Peripherals: The Internal Modem (Previous Generation Processor Board)

Emerson E2 RX — 2.1.5 PC-104 Peripherals: The Internal Modem (Previous Generation Processor Board) diagram (page 27)
Fig. 14 · 2.1.5 PC-104 Peripherals: The Internal Modem (Previo…

The E2’s internal modem mounts in the PC-104 slot located at the top left of the E2 main board (See Figure 2- 5). Disconnect power to the unit, and carefully plug the male pins on the back of the modem card into the E2’s PC- 104 slot. Use the standoffs and screws supplied with the modem card to secure the card to the main board, as shown in Figure 2-5. When finished, restore power to the E2.

Figure 2-6 - Gateway Board

I/O Network Boards and Peripherals Hardware Overview • 2-3

Page 28 of the Emerson E2 RX user manual — 2.2.2 MultiFlex Boards
Page 28 · click to enlarge
Page 28

2.2.2.1 MultiFlex 16 Input Board

The Gateway board is an RS485 to RS485 converter. One side of the Gateway is always connected to the Retail Solutions I/O Network. The other side of the Gateway is the receiver bus (RS485). The receiver bus is connected to one or more RS485 devices depending on which type of Gateway is being used. The Gateway interfaces devices to the Einstein/E2 and legacy Retail Solutions controller (REFLECS) by simulating 16AI and 8RO boards using Retail Solutions standard I/O board protocol. The Gate- way can also convert third-party controller protocols to Retail Solutions protocol for custom cells created in the Einstein/E2 to interface with third-party controllers (Dan- foss, Woodley, etc.).

Emerson E2 RX — 2.2.2.1 MultiFlex 16 Input Board diagram (page 28)
Fig. 15 · 2.2.2.1 MultiFlex 16 Input Board

The Gateway performs one of two basic functions:

1. It allows control of and/or status of a device using I/O board simulation
2. Converts a third-party protocol to Retail Solutions I/O Net protocol and interfaces to a custom cell in Einstein/E2

Figure 2-7 - MultiFlex 16 Input Board

The MultiFlex 16 input board offers sixteen combina- tion analog/digital input points for use by Retail Solutions E2, Einstein, and REFLECS control systems. The Multi- Flex 16 may be used in retrofits with no additional hard- ware or software setup or upgrades.

Emerson E2 RX — 2.2.2.1 MultiFlex 16 Input Board diagram (page 28)
Fig. 16 · 2.2.2.1 MultiFlex 16 Input Board

The MultiFlex 16 is designed to be 100% compatible with the previous generation of Retail Solutions input boards (the 16AI), communicates with the site controller via an RS485 connection to a REFLECS COM A&D Net- work or an E2 I/O Network. Dip switches on the board set the network ID (board number) and baud rate.

The board also provides both +5VDC and +12VDC output voltage points for use in powering transducers or other input devices that require power.

The MultiFlex 16 has a Hand-held Terminal interface Section 2.2.4, Hand-held Terminal (P/N 814-3110) that may be used by technicians to view the input voltage and engineering unit values for each input point without need of a voltmeter or front panel controller display.

Table 2-5 - Gateway Board Models

2.2.2 MultiFlex Boards

Table 2-6 shows the part number of the MultiFlex 16.

The MultiFlex line of control system boards provides a wide variety of input, output, and smart control solutions, all of which are based on a single universal hardware plat- form. The board design uses flash-uploadable firmware and plug-in expansion boards to configure the base plat- form board and apply it for use as an input board, relay output board, analog output board, or a combination I/O board.

P/N Model Name Description

810-3013 MultiFlex 16 16 analog/digital in- puts, no outputs

Table 2-6 - MultiFlex 16 Input Board Model

Page 29 of the Emerson E2 RX user manual — 2.2.2.2 MultiFlex Combination Input/ Output Boards
Page 29 · click to enlarge
Page 29

The MultiFlex 16 is designed with several features that make it easy to install, wire, and configure. These main user interface features are shown in Figure 2-7. 2.2.2.2 MultiFlex Combination Input/ Output Boards

The MultiFlex combination I/O boards consist of up to 16 combination digital/analog inputs, and a combina- tion of relay outputs, digital outputs, and analog outputs.

All boards feature both +5VDC and +12VDC output voltage points for use in powering transducers or other input devices that require power.

On the RS485 Network, the MultiFlex combination input/output boards present themselves to Einstein, E2, or REFLECS site controllers as 16AI Analog Input Boards, 8RO Relay Output Boards, 8DO Digital Output Boards, and/or 4AO Analog Output Boards, depending on what type of inputs or outputs are equipped. Dip switches are used to assign network ID numbers to each board type.

Emerson E2 RX — 2.2.2.2 MultiFlex Combination Input/ Output Boards diagram (page 29)
Fig. 17 · 2.2.2.2 MultiFlex Combination Input/ Output Boards

The MultiFlex combination input/output boards also support a Hand-held Terminal interface, Section 2.2.4, Hand-held Terminal (P/N 814-3110) which allows techni- cians to view input values, check relay and analog output states, and override output points with fixed digital or ana- log values. For more information on MultiFlex I/O boards, refer to the MultiFlex I/O Board Installation and Opera- tion Manual (P/N 026-1704).

Figure 2-8 - MultiFlex Combination Input/Output Board (Side View)

Table 2-7 shows the available models of MultiFlex combination input/output boards with description and part numbers.

Emerson E2 RX — 2.2.2.2 MultiFlex Combination Input/ Output Boards diagram (page 29)
Fig. 18 · 2.2.2.2 MultiFlex Combination Input/ Output Boards
Emerson E2 RX — 2.2.2.2 MultiFlex Combination Input/ Output Boards diagram (page 29)
Fig. 19 · 2.2.2.2 MultiFlex Combination Input/ Output Boards

810-3063 MultiFlex 88AO 8 analog/digital inputs, 8 relay outputs, 4 analog out- puts

810-3064 MultiFlex 88 8 analog/digital inputs, 8 relay outputs

810-3065 MultiFlex 168AO 16 analog/digital inputs, 8 relay outputs, 4 analog out- puts

Table 2-7 - MultiFlex Combination Input/Output Board Models

Figure 2-9 - MultiFlex Combination Input/Output Board (Top View)

There are several models of the MultiFlex board that combine the functionalities of input boards, relay output boards, digital output boards, and analog output boards. The MultiFlex combination input/output boards are designed to be replacements for the 8IO Combination Input/Output Board, but the MultiFlex board provides sev- eral new hardware options and software features.

I/O Network Boards and Peripherals Hardware Overview • 2-5

Page 30 of the Emerson E2 RX user manual — 2.2.2.2 MultiFlex Combination Input/ Output Boards
Page 30 · click to enlarge
Page 30

810-3066 MultiFlex 168 16 analog/digital inputs, 8 relay outputs.

810-3067 MultiFlex 168DO 16 analog/digital inputs, 8 relay outputs, 4 digital out- puts

810-3072 MultiFlex 1616L 16 analog/digital inputs, 16 low-voltage (24VAC rated) relay outputs

810-3073 MultiFlex 1616LAO 16 analog/digital inputs, 16 low-voltage (24VAC rated) relay outputs, and 4 analog outputs.

810-3077 MultiFlex 1616LDO 16 analog/digital inputs, 16 low-voltage (24VAC rated) relay outputs, and 4 pulse-width modulating digital outputs

Table 2-7 - MultiFlex Combination Input/Output Board Models

Page 31 of the Emerson E2 RX user manual — 2.2.2.6 MultiFlex PAK Board
Page 31 · click to enlarge
Page 31

2.2.2.3 MultiFlex CUB

The RCB is an improved version of the MultiFlex RTU. The RCB has sixteen fully configurable analog and digital input points, whereas the RTU has only eight inputs, two of which are configurable. The RCB has four analog outputs for use in controlling variable speed fans, economizers or modulating heating and/or cooling valves, whereas the RTU has only two analog outputs for use only with VS fans and economizers. The RCB also features a more sophisticated HHT interface and updated algorithms for controlling heating, cooling, dehumidification, and air quality.

The MultiFlex Condensing Unit Board (CUB) is a “smart” input/output board designed to control single con- densing units. A single condensing unit is a self-contained compressor and condenser bearing unit which controls refrigeration in a single case line-up or walk-in cooler.

The MultiFlex CUB uses the same general hardware configuration as a MultiFlex 168AO. It is equipped with a processor and extra memory to allow it to control com- pressors, condensers, refrigeration, and defrost for a single condensing unit using on-board I/O and control algo- rithms.

The MultiFlex RCB has its own installation and opera- tion manual, (P/N 026-1707).

The MultiFlex CUB has its own installation and opera- tion manual, (P/N 026-1706). 2.2.2.4 MultiFlex RTU (BX and CX Only)

Emerson E2 RX — 2.2.2.3 MultiFlex CUB diagram (page 31)
Fig. 20 · 2.2.2.3 MultiFlex CUB

Similar in design to the MultiFlex combination input/ output boards, the MultiFlex RTU board is designed spe- cifically for operating package rooftop HVAC units as part of an E2 BX or REFLECS BCU building control system. The MultiFlex RTU is designed to be a replacement for the previous generation ARTC, and is 100% compatible with all legacy E2 BX and BCU systems.

The MultiFlex RTU board has 16 analog inputs, 8 relay outputs and 4 analog outputs. Most of these I/O points are reserved for sensors and input devices required to read environmental data (such as space and supply air temperature) and control all output devices that control the environment (such as heat/cool stages and dampers). The RTU relay outputs are rated for line voltage (240VAC).

LEGEND

Emerson E2 RX — LEGEND diagram (page 31)
Fig. 21

The RTU board controls the rooftop unit directly with its built-in heating, cooling, and humidity control algo- rithms. It may operate in stand-alone mode, or it may interface with an E2 BX or BCU to control the store envi- ronment in zones and pass along logging and alarm infor- mation.

4 RCB INPUTS 9-16 12 RELAY OUTPUT FUSES (2A rated, 250V slow- blow)

The MultiFlex RTU has its own installation and opera- tion manual, (P/N 026-1705). 2.2.2.5 MultiFlex Rooftop Control Board (RCB) (BX and CX Only)

7 BOARD STATUS LEDs (Code A, Code B, General Status)

8 DC POWER OUTPUTS (3 at +5VDC, 1 at +12VDC)

The MultiFlex Rooftop Control Board (RCB) (P/N 810-3062) is a rooftop HVAC control board for use either as a stand-alone controller or in zone control appli- cations using a Retail Solutions E2 BX building control system. The MultiFlex RCB is capable of controlling heat and cool stages, fans, humidification and dehumidification devices, economizers using on-board I/O and control algo- rithms, as well as monitor and interact with other building control systems and peripherals (such as smoke alarms and CO2 sensors).

Table 2-8 - MultiFlex RCB

2.2.2.6 MultiFlex PAK Board

The PAK is a distributed pack (rack) controller that controls compressors and condenser fans. The PAK can control up to 8 compressor groups containing up to 16 compressors. The compressor control strategy is Fixed Steps with setpoint/deadband using ON and OFF delays. Up to 20 Fixed Steps can be configured.

I/O Network Boards and Peripherals Hardware Overview • 2-7

Page 32 of the Emerson E2 RX user manual — LEGEND
Page 32 · click to enlarge
Page 32

2.2.3 The MultiFlex ESR Board

The PAK can control up to 4 condenser fan groups containing up to 8 total condenser fans. The PAK con- denser control strategy is sequential TD control with set- point/deadband using ON and OFF delays.

The MultiFlex ESR Valve Regulator board (P/N 810- 3199), shown in Figure 2-1, is an RS485 I/O Network electronic stepper valve regulator capable of driving up to eight stepper motor valves, which are typically used to control temperature.

The PAK has a compressor/condenser interlock fea- ture that will override TD control and force the condenser fans to stage off using the TD control OFF delay when all compressors are off. This feature can be disabled with an Enable/Disable setpoint or when the discharge pressure is above a configurable setpoint.

Emerson E2 RX — 2.2.3 The MultiFlex ESR Board diagram (page 32)
Fig. 22 · 2.2.3 The MultiFlex ESR Board

The MultiFlex PAK boards consist of two circuit boards: a bottom layer with 16 combination digital/analog inputs, and a plug-in top layer which contains a combina- tion of 8 relay outputs and 4 digital DC voltage outputs.

The analog outputs on the Multiflex PAK drive solid state relays to control the fan stages. The relays control the compressor groups.

The communication interface is RS485 I/O using the Standard Extended Address Form for Retail Solutions Dis- tributed Controllers. Currently, the PAK is designed to interface with the Retail Solutions E2 controller.

24VAC CT 75 VAC Power Input Valve Connectors (8)

Emerson E2 RX — 2.2.3 The MultiFlex ESR Board diagram (page 32)
Fig. 23 · 2.2.3 The MultiFlex ESR Board

Figure 2-1 - MultiFlex ESR Board Layout

The MultiFlex ESR uses suction side variable-position evaporator regulators (ESRs) to vary evaporator pressure for an entire circuit and is an alternative to mechanical EPR control.

The MultiFlex ESR receives input data from a Retail Solutions E2 controller (via the I/O Network) and then regulates the stepper valves according to the data from the E2.

LEGEND

Emerson E2 RX — LEGEND diagram (page 32)
Fig. 24

Each MultiFlex ESR board requires a Class 2, 80VA 24VAC center-tapped transformer for power. Retail Solu- tions transformer (P/N 640-0080) is a multi-tapped pri- mary transformer that may be used with the MultiFlex ESR board. 2.2.4 Hand-held Terminal (P/N 814-3110)

4 PAK INPUTS 9-16 12 RELAY OUTPUT FUSES (2A rated, 250V slow- blow)

The Hand-held Terminal (HHT) is used by manufac- turers and service technicians to diagnose and test several of Retail Solutions' existing and legacy products. The HHT can be used on any Retail Solutions product with an RJ-11 connector. The most common applications include:

7 BOARD STATUS LEDs (Code A, Code B, General Status)

  • All MultiFlex I/O boards and the 8ROSMT

8 DC POWER OUTPUTS (3 at +5VDC, 1 at +12VDC)

  • All Gateway boards

Table 2-9 - MultiFlex PAK

  • Stand-alone MultiFlex boards (RTU, RCB, PAK, CUB)
Page 33 of the Emerson E2 RX user manual — 2.2.5 The 8RO and 8ROSMT Relay Boards
Page 33 · click to enlarge
Page 33
  • CCB and CC-100 case controllers

with any refrigeration system or environmental control component.

The HHT does not require a separate power source. The unit is powered from the RJ-11 connector on the peripheral equipment. The HHT includes a standard male RJ-11 to male RJ-11 cable.

The 8RO board is the direct link between the E2 and component operation. Information gathered by the con- troller from the input boards is checked against current stored setpoints. If differences in the received input data and the setpoint information are detected, a signal is either sent to the proper 8RO relay, or an existing signal is dis- continued. Through the use of this relay signal, control functions that can be properly maintained by a simple con- tact closure sequence are effectively operated by the E2.

The 8RO board is easily installed and operated within the Retail Solutions Network environment because of its straightforward design. Several of these features are shown in Figure 2-11.

Emerson E2 RX — 2.2.5 The 8RO and 8ROSMT Relay Boards diagram (page 33)
Fig. 25 · 2.2.5 The 8RO and 8ROSMT Relay Boards
Emerson E2 RX — 2.2.5 The 8RO and 8ROSMT Relay Boards diagram (page 33)
Fig. 26 · 2.2.5 The 8RO and 8ROSMT Relay Boards

LEGEND

The power switch determines if the HHT is in self-powered mode (BATT), ext power (EXT), or if powered from a target device (HOST)

Scrolls list selections and scrolls through ASCII characters if in a text field

Figure 2-11 - 8RO Relay Output Board

External Power Connector (9-12 VDC)

Cancel - clears/erases text in editable field; cancels overrides

Up Arrow - moves to previous screen, editable field, or top of screen

Down Arrow - moves to next screen, editable field, end of screen, or advances

Right Arrow - selects last editable field starting from bottom of screen; selects last editable field from bottom to top

Left Arrow - selects first editable field from top of screen, and next editable field from top to bottom

Emerson E2 RX — LEGEND diagram (page 33)
Fig. 27

Enter - save into memory

F1 - Home Screen

LCD - four lines of 16 characters Numeric keypad

Figure 2-10 - Hand-held Terminal (814-3110)

2.2.5 The 8RO and 8ROSMT Relay Boards

The 8RO (P/N 810-3005) board is a general-purpose board used to connect an E2 to any of eight standard con- trol relay outputs, but is now obsolete and has been replaced by the 8ROSMT (P/N 810-3006) board.

Figure 2-12 - 8ROSMT Relay Output Board

To function, the 8RO board must be connected through either the Echelon Network or the RS485 I/O Network to the E2. When properly installed, the 8RO receives an elec- trical impulse from the E2, which either opens or closes any of eight contact relays. Output definitions within the E2 allow the user to configure the 8RO board to interact

I/O Network Boards and Peripherals Hardware Overview • 2-9

RS-485 Connector · F2- Main Menu

Page 34 of the Emerson E2 RX user manual — 2.2.6 4AO Analog Output Board
Page 34 · click to enlarge
Page 34

2.2.6 4AO Analog Output Board

2.2.7 8DO Digital Output Board and PMAC II Anti-Sweat Controller

The 4AO Analog Output Board (P/N 815-3030) (Fig- ure 2-13) is configured with four analog output connec- tions that provide a variable voltage signal to any of four analog devices that may be controlled by a single E2. Two 4-20mA outputs are provided for channels 1 and 2. The 4-20mA outputs provide a variable current for applications that are either externally powered or that require power from the 4AO board.

For control of anti-sweat heaters, Retail Solutions sup- plies the 8DO Digital Output board (P/N 810-3050). The 8DO has eight outputs which may pulse up to 150mA at 12VDC.

Since the 8DO is primarily designed to control anti- sweat heaters, the 8DO is the heart of Retail Solutions’ Pulse Modulated Anti-Sweat Control (PMAC II) panel. The PMAC II (P/N 851-1000) provides 16 channels of anti-sweat control circuitry. The PMAC II panel combines the 8DO with high-capacity relays in a single enclosure, providing 256 total amps of anti-sweat heater operation.

Emerson E2 RX — 2.2.6 4AO Analog Output Board diagram (page 34)
Fig. 28 · 2.2.6 4AO Analog Output Board

The 8DO is shown in Figure 2-15. The PMAC II is shown in Figure 2-16.

Emerson E2 RX — 2.2.6 4AO Analog Output Board diagram (page 34)
Fig. 29 · 2.2.6 4AO Analog Output Board

Figure 2-13 - 4AO Analog Output Board (P/N 815-3030)

The previous generation 4AO Analog Output Board, (P/N 810-3030) (Figure 2-14) is configured with four ana- log output connections that provide a variable voltage sig- nal to any of four analog devices that may be controlled by a single E2.

Figure 2-15 - 8DO Digital Output Board

Emerson E2 RX — 2.2.6 4AO Analog Output Board diagram (page 34)
Fig. 30 · 2.2.6 4AO Analog Output Board
Emerson E2 RX — 2.2.6 4AO Analog Output Board diagram (page 34)
Fig. 31 · 2.2.6 4AO Analog Output Board

Figure 2-16 - PMAC II Anti-Sweat Control Panel

Figure 2-14 - 4AO Analog Output Board - DISCONTINUED

Page 35 of the Emerson E2 RX user manual — 2.3.1 The 16AIe (Discontinued)
Page 35 · click to enlarge
Page 35

2.3 Echelon Network Boards and Peripherals

board similar in function to its I/O Network counterpart, the 8RO. The 8ROe board is the direct link between the E2 and component operation. Information gathered by the controller from the input boards is checked against current stored setpoints. If differences in the received input data and the setpoint information are detected, a signal is either sent to the proper 8ROe relay, or an existing signal is dis- continued. Through the use of this relay signal, control functions that can be properly maintained by a simple con- tact closure sequence are effectively operated by the E2.

2.3.1 The 16AIe (Discontinued)

Emerson E2 RX — 2.3.1 The 16AIe (Discontinued) diagram (page 35)
Fig. 32 · 2.3.1 The 16AIe (Discontinued)

The 8ROe features Form C contacts for wiring outputs as either normally open or normally closed. Fail-safe dip switches on the 8ROe allow the installation technician to specify the desired state of each relay in case of communi- cations loss.

This board has been discontinued and is no longer available for sale. 2.3.3 EC-2s

Emerson E2 RX — 2.3.1 The 16AIe (Discontinued) diagram (page 35)
Fig. 33 · 2.3.1 The 16AIe (Discontinued)

Figure 2-17 - 16AIe

The 16AIe (P/N 810-4000) is an Echelon-based input board similar in function to its I/O Network counterpart, the MultiFlex 16 (see Section 2.2.2). The 16AIe receives input signals through any of 16 two-wire connections. The board receives either digital or analog data from sensors wired to any of the 16 input connections located on the board.

This board has been discontinued and is no longer available for sale. 2.3.2 The 8ROe (Discontinued)

Figure 2-19 - EC-2

Emerson E2 RX — 2.3.1 The 16AIe (Discontinued) diagram (page 35)
Fig. 34 · 2.3.1 The 16AIe (Discontinued)

The EC-2 is an advanced refrigerated case controller that doubles as a temperature and case status indicator. During refrigeration and defrost, the EC-2 controls most typical case functions, including fans, defrost, and a pulse valve on the liquid side of the evaporator to regulate super- heat.

The EC-2 29x version controls the refrigeration sole- noid valve to allow the passage of refrigerant to the TXV valve. The EC-2 39x version controls a pulse valve on the liquid side of the evaporator to regulate Superheat control.

The EC-2 relies on a parent E2 to handle logging, alarm control, defrost scheduling, and other case control functions.

The EC-2 is designed to be mounted on the front of a refrigerated case. The LED display shows the current case temperature with one-tenths of a degree's accuracy. The display can also show alarm codes to immediately notify

Figure 2-18 - 8ROe

The 8ROe (P/N 810-4010) is an Echelon-based input

Echelon Network Boards and Peripherals Hardware Overview • 2-11

Page 36 of the Emerson E2 RX user manual — 2.3.5 The ESR8 (Discontinued)
Page 36 · click to enlarge
Page 36

floor managers of alarms and notices. Other lights on the display show the ON/OFF status of refrigeration, defrost, and fans.

Emerson E2 RX — 2.3.4 CC-100 Case Controllers and CS-100 Case Circuit Controllers diagram (page 36)
Fig. 35 · 2.3.4 CC-100 Case Controllers and CS-100 Case Circui…

The EC-2 can be easily programmed using either the four front-panel buttons or an optional infrared remote control. For security, the buttons can be disabled to pre- vent tampering.

2.3.4 CC-100 Case Controllers and CS-100 Case Circuit Controllers

A CC-100 case control board is a “smart” board capa- ble of controlling all functions for a single case, including lights, fans, defrost, anti-sweat, and suction side or liquid side valve control. CC-100s perform these functions inde- pendently from the E2 RX controllers, but it does rely on a parent E2 for logging, alarming, providing supplemental I/ O values, and coordinating defrost times among circuits.

Figure 2-20 - Case Controller (CC-100P shown)

2.3.5 The ESR8 (Discontinued)

The ESR8 electronic suction regulator (P/N 810-3195) is an Echelon Network-based control board that controls up to eight separate electronic suction regulator (ESR) stepper valves. The ESR8 uses suction-side variable posi- tion ESRs to vary evaporator pressure and control temper- ature for an entire circuit. The ESR8 offers an economical, more efficient alternative to TXV control.

There are four different models of the CC-100, each of which controls a different type of valve.

1. CC-100P (P/N 810-3160)— Case controller for liquid-side pulse valves (also called electronic expansion valves, or EEVs). This model is capable of controlling up to two pulse valves simultaneously (for use in dual-evaporator applications such as walk-in boxes).

The board can be used with either Emerson Flow Con- trols ESR12 or ESR20 valves as well as a number of com- mercially available ESR stepper valves. Note that Emerson Flow Controls supplies both a 24 Volt and a 12 Volt version of the valve. The ESR board is only compati- ble with the 12 Volt version of the valve.

2. CC-100LS (P/N 810-3170) — Case controller for liquid-side stepper valves (EEVs).

The board features two LEDs for each valve which indicate movement and direction. A status LED indicates the general status of the board.

3. CS-100 (P/N 810-3177) — Case circuit controller for suction-side stepper valves (also called electronic evaporator pressure regulators, or EEPRs).

The ESR8 board is shown in Figure 2-21.

4. CC-100H (P/N 810-3171)— A special version of the CC-100 that is used by a particular manufacturer. This board controls temperature in a case using suction-side stepper valves that regulate pressure in the evaporator.

The CC-100/CS-100 board is shown in Figure 2-20.

Page 37 of the Emerson E2 RX user manual — 2.3.6 TD3 Temperature Display
Page 37 · click to enlarge
Page 37

2.3.7 Facility Status Display (FSD)

Emerson E2 RX — 2.3.7 Facility Status Display (FSD) diagram (page 37)
Fig. 36 · 2.3.7 Facility Status Display (FSD)
Emerson E2 RX — 2.3.7 Facility Status Display (FSD) diagram (page 37)
Fig. 37 · 2.3.7 Facility Status Display (FSD)

Figure 2-21 - ESR8 Board Layout

2.3.6 TD3 Temperature Display

Figure 2-23 - Facility Status Display

The TD3 is a digital display unit designed to show both case temperature and product temperature for a refriger- ated store case or walk-in freezer. The TD3 mounts on the front of a case and connects to up to three input devices (a case temperature sensor, a product temperature probe, and either a defrost termination probe or thermostat). The real- time input values of these probes can be viewed on the TD3’s digital display by pressing the function button on the front panel to cycle through the temperatures.

The FSD reports alarm information and more, (such as temperatures, occupancy, case status, and setpoints) and provides a centralized device for store personnel to review information by communicating with the E2 via Ethernet connectivity (minimum E2 firmware rev. 2.68F01).

The FSD has a touch screen color display for quick navigation and can be mounted in a separate, remote loca- tion from the E2 controller, which enables alarms and other relevant store information to be viewed from where it is most convenient for the user.

The TD3 is connected to a central E2 RX controller via the Echelon Network. Input values are sent to the E2 from the TD3 for use in case circuit control.

The FSD can be configured to filter out notices and/or return-to-normal alarms, and provides a quick review of all advisories and detailed advisory information. The FSD also receives alerts and provides annunciated alarms and alarm information directly to store and department manag- ers. This compact unit can be installed virtually anywhere with a standard Ethernet connection and 120V power source.

A diagram of the TD3 layout is shown in Figure 2-22.

Emerson E2 RX — 2.3.6 TD3 Temperature Display diagram (page 37)
Fig. 38 · 2.3.6 TD3 Temperature Display

If more than one E2 controller is at a site, one E2 must be set up as the alarm annunciator for that site. The FSD will receive alarms from that alarm-annunciator E2 for the entire site. The FSD will point only to a single E2 at a site (it will not poll multiple controllers for alarms).

For more information, refer to the FSD Manual (P/N 026-1400).

Figure 2-22 - TD3 Temperature Display Layout

Echelon Network Boards and Peripherals Hardware Overview • 2-13

Page 38 of the Emerson E2 RX user manual — 2.3.6 TD3 Temperature Display
Page 38 · click to enlarge
Page 38
Page 38 of the Emerson E2 RX user manual — 2.3.6 TD3 Temperature Display
Page 39 of the Emerson E2 RX user manual — 3.1 Mounting the E2
Page 39 · click to enlarge
Page 39

3 Mounting

This section gives mounting instructions and dimen- sions for all controllers and peripherals in the E2 system.

Emerson E2 RX — 3 Mounting diagram (page 39)
Fig. 39 · 3 Mounting

9.0"

3.1 Mounting the E2

The E2’s box body style is designed to be mounted against or inside a wall or panel. If mounted against a sur- face, the controller will be 3.75” off the mounting surface. If mounted inside a surface, the door and front section of the back panel will rest 2.0” off the mounting surface. See Figure 3-1, and Figure 3-2. 3.1.1 Standard Mount

10.5"

The standard mount is meant for the controller to be mounted against a wall using the four mounting holes at the rear of the enclosure shown in Figure 3-3. These holes are accessible without any removal of boards inside the enclosure. 3.1.2 Recessed Mount

12.0"

The recessed mount is meant for the controller to be bolted against a surface using the eight mounting holes. The unit may be mounted with the recessed back portion of the unit inside the wall, and the front portion of the unit visible through the hole in the wall (Figure 3-1 and Fig- ure 3-4).

Figure 3-1 - E2 Front and Top Dimensions

Emerson E2 RX — 3.1 Mounting the E2 diagram (page 39)
Fig. 40 · 3.1 Mounting the E2

3.75"

For a recessed mount, you will need to cut a rectangu- lar hole into the mounting surface 9.0” wide by 10.5” high (22.86 cm wide by 26.67 cm high). Once this hole is cut, mount the unit as desired using the eight outer mounting holes shown in Figure 3-1 and Figure 3-4.

1.75"

10.5"

Figure 3-2 - E2 Side Dimensions

Mounting the E2 Mounting • 3-1

Page 40 of the Emerson E2 RX user manual — 3.1.3 Retrofit Mounting
Page 40 · click to enlarge
Page 40

to the cut out (four screws and four nuts are included), but the plate is equipped with a total of 14 holes for the best possible fit.

Emerson E2 RX — 3.1.3 Retrofit Mounting diagram (page 40)
Fig. 41 · 3.1.3 Retrofit Mounting
Emerson E2 RX — 3.1.3 Retrofit Mounting diagram (page 40)
Fig. 42 · 3.1.3 Retrofit Mounting

Figure 3-3 - Standard Mount (Inside Rear of Enclosure)

Figure 3-5 - Conversion Plate for Flush Mount

Emerson E2 RX — 3.1.3 Retrofit Mounting diagram (page 40)
Fig. 43 · 3.1.3 Retrofit Mounting
Emerson E2 RX — 3.1.3 Retrofit Mounting diagram (page 40)
Fig. 44 · 3.1.3 Retrofit Mounting

Figure 3-6 - Conversion Bracket for REFLECS Side Mount

Figure 3-4 - E2 Recess Mount Hole Locations

Figure 3-6 shows the conversion bracket that allows a side-mounted REFLECS to be converted to a side- mounted E2. The conversion bracket is attached to the back of the E2 using the two holes at the top and bottom of the bracket, and aligning the oval openings with the oval cut-outs in the back of the E2 case. Once the E2 is attached to the conversion bracket, use the two holes in either side of the conversion bracket (depending on which side is needed) to mount the E2 to the wall and replace the REFLECS controller.

3.1.3 Retrofit Mounting

The retrofit mounting plate and bracket allow the E2 to be mounted where previous generation controllers (Ein- stein or REFLECS) were. These two options allow con- version of the flush-mounted Einstein and the side- mounted REFLECS.

Figure 3-5 shows the low-profile conversion mount plate that allows a flush-mounted Einstein to be converted to a low-profile mount. The plate slides over the back of the E2 and is attached using the four holes pictured closest

Page 41 of the Emerson E2 RX user manual — 3.2 Mounting I/O Boards
Page 41 · click to enlarge
Page 41

3.1.4 Blank Face

for the MultiFlex, 16AI, 8RO, and the 8DO.

Blank face control is designed to be used in a system with more than one E2. It has no screen or keyboard and is logged into remotely from another E2 on the Echelon net- work. The green General Status LED transmits status information to the user. See Table 2-3 on page 2-3 for more information on main board (CPU) status LEDs. Blank face mounting dimensions are identical to the stan- dard and recessed mount boxes. See Figure 3-3 and Fig- ure 3-4.

Emerson E2 RX — 3.1.4 Blank Face diagram (page 41)
Fig. 45 · 3.1.4 Blank Face

3.2 Mounting I/O Boards

The 16AI, 8RO, 8DO, 4AO, 8IO, and MultiFlex boards are usually installed by the refrigeration or building equipment manufacturer. Therefore, the installer need only make the necessary connections between the E2 and the cases, condenser boards, and/or HVAC units.

Figure 3-7 - Single Enclosure Mounting Dimensions

In some instances, an installer may be required to mount an I/O board. There are no restrictions on the loca- tion of these boards; however, for ease of network config- uration, it is recommended that the boards be located adjacent to the E2. I/O boards may be mounted without an enclosure, but they should be mounted in a location that is not easily accessible to avoid tampering or damage. 3.2.1 Single/Double Enclosures

Emerson E2 RX — 3.2 Mounting I/O Boards diagram (page 41)
Fig. 46 · 3.2 Mounting I/O Boards

The Single enclosure and Double enclosure are sup- plied with four mounting holes in the rear panel of the enclosure. The mounting holes can be accessed without removing any of the boards inside the enclosure. Figure 3- 7 shows the dimensions and weight for the Single enclo- sure. Figure 3-8 shows mounting dimensions for the Dou- ble enclosure. When mounting boards inside the enclosure, refer to Figure 3-9 for mounting dimensions

Figure 3-8 - Double Enclosure Mounting Dimensions

Mounting I/O Boards Mounting • 3-3

Page 42 of the Emerson E2 RX user manual — 3.3.1 16AIe and 8ROe
Page 42 · click to enlarge
Page 42

3.2.2 Boards Without Enclosures (Snap Track)

Emerson E2 RX — 3.2.2 Boards Without Enclosures (Snap Track) diagram (page 42)
Fig. 47 · 3.2.2 Boards Without Enclosures (Snap Track)

16AI, 8RO, 8DO, and Gateway boards not supplied with an enclosure are supplied with a snap-track for easy installation. The insulation sheet and I/O board must be removed from the track before the track is mounted. The snap-track is mounted using the 0.1875” mounting slots. Figure 3-10 shows this installation procedure.

Figure 3-9 provides mounting dimensions for the Mul- tiFlex, 16AI, 8RO, and the 8DO boards. Figure 3-11 pro- vides mounting dimensions for the 4AO.

Emerson E2 RX — 3.2.2 Boards Without Enclosures (Snap Track) diagram (page 42)
Fig. 48 · 3.2.2 Boards Without Enclosures (Snap Track)

Figure 3-11 - 4AO Mounting Dimensions

The Gateway is typically mounted in the same area as the site controller, near the controller’s 16AI, 8RO, and other RS485 Network peripherals. The Gateway is designed to fit into a standard 3" snap track (supplied with the board) or may be mounted in a panel or on stand-offs. Follow the dimensions in Figure 3-12 for panel mounting.

Emerson E2 RX — 3.2.2 Boards Without Enclosures (Snap Track) diagram (page 42)
Fig. 49 · 3.2.2 Boards Without Enclosures (Snap Track)

Figure 3-9 - 16AI/8RO/8DO Mounting Dimensions

Emerson E2 RX — 3.2.2 Boards Without Enclosures (Snap Track) diagram (page 42)
Fig. 50 · 3.2.2 Boards Without Enclosures (Snap Track)

Figure 3-12 - Gateway Board Mounting Dimensions

The Gateway should be mounted in an environment with ambient temperature between -40°F and 150°F, with a non-condensing relative humidity between 5% and 95%.

3.3 Echelon Devices

3.3.1 16AIe and 8ROe

The 16AIe and 8ROe boards have the same mounting dimensions as their I/O counterparts, the 16AI and 8RO boards. For mounting dimensions and instructions, see Section 3.2.2, Boards Without Enclosures (Snap Track), and refer to Figure 3-9.

Figure 3-10 - 4AO, 8RO, or MultiFlex Snap-Track Installation

Page 43 of the Emerson E2 RX user manual — 3.3.4 MultiFlex ESR
Page 43 · click to enlarge
Page 43

3.3.2 CC-100 Case Controller and CS-100 Case Circuit Controller

Emerson E2 RX — 3.3.2 CC-100 Case Controller and CS-100 Case Circuit Controller diagram (page 43)
Fig. 51 · 3.3.2 CC-100 Case Controller and CS-100 Case Circuit…

Generally, the case controller will be mounted within the raceway or on top of the case. If a controller must be replaced or installed in the field, it should be located based on the specific design of the case.

Emerson E2 RX — 3.3.2 CC-100 Case Controller and CS-100 Case Circuit Controller diagram (page 43)
Fig. 52 · 3.3.2 CC-100 Case Controller and CS-100 Case Circuit…

Figure 3-15 - Mounting Dimensions for the MultiFlex ESR

3.3.5 TD3

The TD3 temperature display is almost always mounted by the OEM as part of the construction of the refrigerated cases. As such, field installations of TD3s are rare.

TD3s are typically flush mounted on the front of a refrigerated case in such a way as to be fully visible from the sales floor. A hole one inch in diameter must be drilled into the case to allow the TD3’s wiring harness to extend into the case and connect to the network, the power source, and the case-mounted probes. Figure 3-16 shows the mounting dimensions of the TD3.

Figure 3-13 - CCB Mounting Dimensions

3.3.3 ESR8 (Discontinued)

The ESR8 board is slightly larger than the 16AI and 8RO boards, and is not supplied with a snap-track. If the ESR8 is supplied without an enclosure, it is supplied with 0.500” long metal stand-off dowels which are pressed into the mounting holes in the board (See Figure 3-14).

Emerson E2 RX — 3.3.3 ESR8 (Discontinued) diagram (page 43)
Fig. 53 · 3.3.3 ESR8 (Discontinued)
Emerson E2 RX — 3.3.3 ESR8 (Discontinued) diagram (page 43)
Fig. 54 · 3.3.3 ESR8 (Discontinued)

Figure 3-16 - TD3 Mounting Dimensions

3.4 Modem/Communication Expansion Card Mounting (New Processor Board)

Figure 3-14 - Mounting Dimensions for the ESR8

3.3.4 MultiFlex ESR

The E2’s modem/communication expansion card mounts above the PIB in the back of the enclosure box as shown in Figure 3-17. The standoffs and mounting holes are located above the PIB in the back of the enclosure box. Use the mounting screws and standoffs to secure the card in place. The ribbon cable plugs into the "Modem/Com 6" slot on the motherboard. For more information on the modem/communication expansion card, see Section 4.3.2, Modem/Communication Expansion Card (New Proces-

The MultiFlex ESR is supplied with a snap-track. If the ESR8 is supplied without an enclosure, it is supplied with 0.500” long metal stand-off dowels that are pressed into the mounting holes in the board.

Modem/Communication Expansion Card Mounting (New Processor Board) Mounting • 3-5

Page 44 of the Emerson E2 RX user manual — 3.4.1.1 The Internal Modem
Page 44 · click to enlarge
Page 44

sor Board).

Emerson E2 RX — 3.4.1 Mounting PC-104 Cards in E2 (Previous Generation Processor Board) diagram (page 44)
Fig. 55 · 3.4.1 Mounting PC-104 Cards in E2 (Previous Generati…
Emerson E2 RX — 3.4.1 Mounting PC-104 Cards in E2 (Previous Generation Processor Board) diagram (page 44)
Fig. 56 · 3.4.1 Mounting PC-104 Cards in E2 (Previous Generati…

Figure 3-17 - Modem/Comm Card Mounting in E2

Figure 3-18 - Mounting the Internal Modem Board

3.4.2 Two-Channel and FourChannel Repeaters

3.4.2.1 Mounting Repeaters Overview

Repeaters are used to extend the maximum length of a segment of Echelon cable, or to act as a bridge between two devices that are farther apart than the cable’s maxi- mum node-to-node distance. Retail Solutions offers two versions of repeaters for the E2 controller: an external two-way repeater that comes in an enclosure (P/N 832- 1010), and a four-channel repeater mounted in the E2 (P/N 832-4830).

3.4.1 Mounting PC-104 Cards in E2 (Previous Generation Processor Board)

3.4.1.1 The Internal Modem

For more information about installing repeaters and routers, please refer to the Repeater and Router Installa- tion and Networking Guide (P/N 026-1605). 3.4.2.2 Mounting the Two-Channel Repeater

The external repeater (P/N 832-1010) is externally mounted within its own enclosure.

The E2’s internal modem mounts in the PC-104 slot located at the top left of the E2 main board (See Figure 3- 18). Disconnect power to the unit, and carefully plug the male pins on the back of the modem card into the E2’s PC- 104 slot. Use the standoffs and screws supplied with the modem card to secure the card to the main board, as shown in Figure 3-18. When finished, restore power to the E2.

Page 45 of the Emerson E2 RX user manual — 3.5.2.1 Location
Page 45 · click to enlarge
Page 45
Emerson E2 RX — 3.4.2.3 Mounting the Four-Channel Repeater diagram (page 45)
Fig. 57 · 3.4.2.3 Mounting the Four-Channel Repeater
Emerson E2 RX — 3.4.2.3 Mounting the Four-Channel Repeater diagram (page 45)
Fig. 58 · 3.4.2.3 Mounting the Four-Channel Repeater

Figure 3-19 - External Repeater Mounting

For external repeaters, the mounting bracket at the bot- tom of the enclosure has two 0.156” bolt holes on either side. Use the bolt holes to mount these repeaters in the field as necessary (see Figure 3-19).

Figure 3-20 - E2 Repeater Mounting

3.5 Sensors and Transducers

When mounting external repeaters, keep in mind that they require a 24VAC Class 2 power source in order to operate. This will likely require a transformer such as P/N 640-0041 (110V) or P/N 640-0042 (220V) to be mounted near the external repeater enclosure. Make sure there will be enough space next to the repeater to mount the trans- former. 3.4.2.3 Mounting the Four-Channel Repeater

3.5.1 Pressure Transducers

Retail Solutions transducers convert pressure readings to proportional electrical signals between 0.5 and 4.5 volts. The transducer is designed with a 1/8-inch male FPT fitting for connection to a standard access fitting. If the fit- ting is configured with a Schrader valve, this fitting will have to be removed and replaced with a 1/8-inch female fitting. Each pressure transducer is supplied with 20 feet of cable for connection to a 16AI input board. 3.5.1.1 Mounting

The four-channel repeater (P/N 832-4830) serves the same basic function as the two-channel repeater: boosting signal strength. However, the four-channel repeater is also useful as a means of connecting the E2 to its associated devices using more than one daisy chain.

The pressure transducers should be mounted in a verti- cal position (pressure port down) above crank case oil level to prevent drainage of oil into transducer port. 3.5.2 Inside Temperature Sensor

With a four-channel repeater mounted in the E2, you can run as many as three daisy chain segments out into the field, each of which can be as long as the prescribed Eche- lon maximum wire length. The fourth channel of the repeater can be used to connect other E2s in a separate daisy-chain, eliminating the need to run cable from the field back to the next E2.

3.5.2.1 Location

Inside temperature sensors are supplied within a wall- mounted enclosure for attachment to a standard switch plate.

The standoffs and mounting holes are located above the PIB in the back of the enclosure box. Use the mounting screws and standoffs to secure the four-channel repeater in place, and connect the repeater to the PIB with the two-pin power connector located next to the battery.

The temperature sensor should be located in a central location—within the zone to be measured—away from doors, windows, vents, heaters, and outside walls that could affect temperature readings. In addition, the sensor

Sensors and Transducers Mounting • 3-7

Page 46 of the Emerson E2 RX user manual — 3.5.5 Supply and Return Air Sensors
Page 46 · click to enlarge
Page 46

should not be mounted above other sensors that generate heat during operation (such as relative humidity sensors).

Emerson E2 RX — 3.5.2.2 Mounting diagram (page 46)
Fig. 59 · 3.5.2.2 Mounting

The indoor temperature sensor should be between four and six feet from the floor. 3.5.2.2 Mounting

Mount the sensor using the screws provided as shown in Figure 3-21.

Emerson E2 RX — 3.5.2.2 Mounting diagram (page 46)
Fig. 60 · 3.5.2.2 Mounting

Figure 3-22 - Outside Temperature Sensor with Cover and Clamp

3.5.4 Insertion Temperature Probe

3.5.4.1 Location

The 12-inch insertion temperature probe may be used to monitor temperature in either the supply or return air ducts of the AHU or RTU. 3.5.4.2 Mounting

Figure 3-21 - Inside Temperature Sensor Mounting

3.5.3 Outside Temperature Sensor

The insertion probe may be mounted in any orientation within the duct as long as the probe is in the air flow of the duct. The probe housing should be secured using self-tap- ping screws. A 0.250” diameter hole is required for the probe. Figure 3-23 shows the installation of the insertion probe (self-tapping screws are not provided).

3.5.3.1 Location

The outside or ambient temperature sensor should be located on the north side of the building, preferably under an eave to prevent sun-heated air from affecting the tem- perature of the sensor. 3.5.3.2 Mounting

Emerson E2 RX — 3.5.3.1 Location diagram (page 46)
Fig. 61 · 3.5.3.1 Location

The temperature sensor may be mounted using any standard tubing clamp. Retail Solutions also offers an alu- minum cover and clamp (P/N 303-1111) which may be mounted as shown in Figure 3-22 (fasteners are not pro- vided).

Figure 3-23 - 12-Inch Insertion Probe Mounting

3.5.5 Supply and Return Air Sensors

In addition to the 12-inch insertion temperature probe, Retail Solutions uses the same temperature sensor used for

Page 47 of the Emerson E2 RX user manual — 3.5.6.2 Mounting Bullet and Pipe Mount Sensors
Page 47 · click to enlarge
Page 47

outside and inside temperature to monitor supply and return air temperature. When used in this application, the sensors are supplied without enclosure covers. The sensors should be mounted directly in the air stream of the supply or return air duct. The sensors are not supplied with any mounting hardware for this application. 3.5.6 Refrigeration System Tem- perature Probes and Sensors

Emerson E2 RX — 3.5.6 Refrigeration System Temperature Probes and Sensors diagram (page 47)
Fig. 62 · 3.5.6 Refrigeration System Temperature Probes and Se…

3.5.6.1 Location

Retail Solutions supplies several temperature monitor- ing devices including bullet sensors, pipe mount sensors, immersion probes, insertion probes, and sensors for high temperature applications. Each of these sensors is gener- ally installed on the system by the equipment manufac- turer. If a device must be added to the system, refer to the information supplied with the device and consult the refrigeration equipment manufacturer. Table 3-1 lists some typical sensor applications and the sensor or probe most suited for that purpose.

Figure 3-24 - Sensor Orientation

3.5.7 Product Temperature Probes

The product temperature probe is designed to be used alongside food products in a refrigeration case or freezer. The product probe uses a thermistor type temperature sen- sor in a sealed, cylindrical container (approximately 16 oz.). A magnet is contained at the bottom the probe’s enclosure to allow easy attachment to a side or bottom of a refrigeration case. 3.5.8 Humidity Sensors and Humidistats

Emerson E2 RX — 3.5.7 Product Temperature Probes diagram (page 47)
Fig. 63 · 3.5.7 Product Temperature Probes

3.5.8.1 Indoor RH Sensor

The indoor relative humidity sensor should be mounted in a central location within the zone to be mea- sured, away from doors, windows, vents, heaters, and out- side walls that could affect temperature readings. The sensor should be between four and six feet from the floor. Note that this sensor generates a small amount of heat; therefore, do not mount temperature sensors directly above RH sensors.

Table 3-1 - Sensor Application and Type

3.5.6.2 Mounting Bullet and Pipe Mount Sensors

Bullet or pipe mount sensors mounted on refrigerant lines should be secured with a Panduit low temperature cable tie, number PLT2S-M120, or equivalent. For pipe mount sensors, the curved surface should be placed against the pipe and the tie should be positioned in the groove on the top surface of the sensor. A second tie should be used to secure the lead to the pipe for additional support.

Mount RH sensor (P/N 203-5751) as follows:

1. With a flat-head screwdriver, push down the middle tab on the top of the sensor case and pop the lid off to expose the circuit board.

Sensors located on refrigerant lines should be insulated to eliminate the influence of the surrounding air. A self- adhering insulation that will not absorb moisture is recom- mended to prevent ice logging at the sensor location.

2. Insert the flat-head screwdriver into the two slots on either side of the top of the sensor case and twist to separate the back plate from the case.
3. Remove the knock-outs from the back plate before mounting so wires may be threaded through.

The sensor should be positioned on the side of the line as shown in Figure 3-24.

Sensors and Transducers Mounting • 3-9

Page 48 of the Emerson E2 RX user manual — 3.5.8.2 Outdoor RH Sensors
Page 48 · click to enlarge
Page 48
4. Mount the back plate to the wall using the two open mounting holes on the top and bottom of the plate.
Emerson E2 RX — 3.5.8.2 Outdoor RH Sensors diagram (page 48)
Fig. 64 · 3.5.8.2 Outdoor RH Sensors
5. Replace the cover on top of the back plate by lining up the tabs, and snap the lid back into place.
Emerson E2 RX — 3.5.8.2 Outdoor RH Sensors diagram (page 48)
Fig. 65 · 3.5.8.2 Outdoor RH Sensors

Figure 3-26 - Outdoor RH Sensor - Exploded View

3.5.8.3 Duct-mounted Insertion RH Probe

Retail Solutions specs a duct-mounted relative humid- ity (RH) sensor (P/N 203-5771) with a 0-5VDC output for use in building control and anti-sweat control applications using Retail Solutions input boards.

1. Cut a small circular hole in the duct large enough for the sensor tube to fit through.

Figure 3-25 - Indoor RH Mounting Dimensions

3.5.8.2 Outdoor RH Sensors

2. Bolt the sensor enclosure against the outside of the duct wall so that the sensor element fits through the hole and into the duct. The enclosure may be mounted horizontally, as shown in Figure 3-27 or vertically. The screws should be tight enough for the foam gasket around the bottom of the sensor to form an airtight seal between the hole in the duct wall and the outside air.

The outdoor RH sensor (P/N 203-5761)

The outdoor RH sensor (P/N 203-5761) should always be mounted on the north side of the building if in the Northern Hemisphere, or on the south side if in the South- ern Hemisphere. The sensor should be mounted under an overhang or otherwise out of direct sunlight (if possible).

Mount the RH sensor (P/N 203-5761) as follows:

Emerson E2 RX — 3.5.8.2 Outdoor RH Sensors diagram (page 48)
Fig. 66 · 3.5.8.2 Outdoor RH Sensors
1. Secure the rear side of the enclosure to the outside wall using the two mounting brackets, as shown in Figure 3-26 . The tube holding the sensor element should point straight down.
2. If you will be running the sensor cable through the wall behind the sensor, cut or drill a hole in the wall through the hole in the enclosure.

Figure 3-27 - Duct-mounted RH Sensor - Exploded View

Page 49 of the Emerson E2 RX user manual — 3.5.10.1 Location
Page 49 · click to enlarge
Page 49

3.5.9 Dewpoint Probe

3.5.9.1 Location

Emerson E2 RX — 3.5.9.1 Location diagram (page 49)
Fig. 67 · 3.5.9.1 Location

The Dewpoint Probe (P/N 203-1902) should be located 4 to 6 feet from the floor with the probe pointing up. It is recommended that the Dewpoint Probe be mounted in an area where it will be exposed only to minimal amounts of dust. 3.5.9.2 Mounting

Mount the probe using the standard switch cover sup- plied with the unit as shown inFigure 3-28.

Emerson E2 RX — 3.5.9.1 Location diagram (page 49)
Fig. 68 · 3.5.9.1 Location

Figure 3-29 - Light Level Sensor Typical Mounting

3.5.11 Liquid Level Sensors

Retail Solutions’ probe type liquid level sensor (P/N 207-1000) is usually installed by the refrigeration and equipment manufacturer. If a replacement sensor must be installed in the field, refer to the instructions supplied with the device, or consult the equipment manufacturer. 3.5.12 Refrigerant Leak Detectors

Retail Solutions supplies the Refrigerant Leak Detec- tor System as a stand-alone unit that monitors refrigeration leaks in up to sixteen zones. Consult the Refrigerant Leak Detector Installation and Operation Manual (P/N 026- 1309) for mounting and installation instructions.

Figure 3-28 - Dewpoint Probe Mounting

3.5.10 Light Level Sensor

3.5.10.1 Location

The Light Level Sensor (P/N 206-0002) should be located facing away from direct sunlight, preferably facing north in the Northern Hemisphere or south in the Southern Hemisphere. 3.5.10.2 Mounting

The light level sensor is not supplied with mounting hardware. The sensor should be mounted horizontally through the knockout of a standard weather-resistant junc- tion box. Figure 3-29 shows a typical mounting configu- ration.

Sensors and Transducers Mounting • 3-11

Page 50 of the Emerson E2 RX user manual — 3.5.9 Dewpoint Probe
Page 50 · click to enlarge
Page 50
Page 50 of the Emerson E2 RX user manual — 3.5.9 Dewpoint Probe
Page 51 of the Emerson E2 RX user manual — 4.1.2 Main Processor Board
Page 51 · click to enlarge
Page 51

4 E2 Hardware Setup

4.1 Setting up the E2

4.1.2 Main Processor Board

4.1.1 Enclosure

Emerson E2 RX — 4.1.2 Main Processor Board diagram (page 51)
Fig. 69 · 4.1.2 Main Processor Board
Emerson E2 RX — 4.1.2 Main Processor Board diagram (page 51)
Fig. 70 · 4.1.2 Main Processor Board

LCD Connector Echelon Plug-In Power Interface Board Connector TCP/IP Ethernet Connector External Keyboard Connector Lithium Battery Battery Enable Switch

Reset and Clean Out Buttons Test Button 10 9

14 Backlight Dim Adjust (E2 100 Ver. Only) Contrast Adjust (E2 100 Ver. Only) Backlight Inverter

Figure 4-1 - E2 Inside Enclosure

Open the door and expose the main processor board. The main processor board and power interface board (PIB) are mounted side by side, one on each side of the box enclosure.

Figure 4-2 - E2 Main Board (RX-100 Board Shown)

The main processor board is mounted on the hinged door part of the enclosure, directly behind the keyboard.

Setting up the E2 E2 Hardware Setup • 4-1

General Status LED · Boot Status LED

Page 52 of the Emerson E2 RX user manual — 4.1.4 Power Interface Board
Page 52 · click to enlarge
Page 52

4.1.3 Main Processor Board (Previous Version)

4.2 Powering the E2

Starting at the lower right side of the PIB, the first plug is the 24VAC input. This must terminate into the power supply transformer.

Emerson E2 RX — 4.1.3 Main Processor Board (Previous Version) diagram (page 52)
Fig. 71 · 4.1.3 Main Processor Board (Previous Version)

E2 requires 24VAC Class 2 power, which is supplied by a non-center-tapped Class 2 transformer.

Retail Solutions supplies two transformers that may be used to power E2s: one for use with 110VAC (P/N 640- 0041), and one for use with 220VAC (P/N 640-0042). Both transformers are rated at 50VA, and each will power one E2 unit. 4.2.1 RS485 Ports

On the lower left side of the PIB are two RS485 Net- work connector ports. This is where all I/O boards (except the case controllers, TD3, ESR8, and Echelon I/O boards) are connected. 4.2.2 RS485 Jumpers

There is one set of RS485 jumpers for each RS485 port. Jumpers JP1-3 are located directly above the first connector port, and jumpers JP4-6 are located directly above the second connector port. The RS485 termination jumpers (JP1, JP2, JP3, JP4, JP5, and JP6) are used to ter- minate the devices at the beginning and end of an RS485 Network. If the E2 is the beginning of all RS485 I/O Networks, all three of these jumpers should be set to the UP position. 4.2.3 Echelon Network Connect

Figure 4-3 - E2 Main Board (Previous Version P/N 237-4800)

4.1.4 Power Interface Board

Emerson E2 RX — 4.1.4 Power Interface Board diagram (page 52)
Fig. 72 · 4.1.4 Power Interface Board

The next connector is the Echelon Network plug. The one connector handles both input and output connections. The input and output cables are connected directly to the Echelon plug. This plug is the connection to the Case Con- troller (CC-100), the Evaporator Stepper Regulator board (ESR8), TD3s, and other E2s. 4.2.4 Echelon Jumpers

The two Echelon jumpers (JP7 and JP8) are located next to the Echelon Network port.

Additional information about Echelon Networking and terminating the network can be found in Section 8.3, Ech- elon Network Structuring (Daisy-Chains).

Figure 4-4 - Power Interface Board

The PIB interfaces the power and most all communica- tions with the main board, and contains all field wiring connections.

Page 53 of the Emerson E2 RX user manual — 4.3 Add-On E2 Peripherals
Page 53 · click to enlarge
Page 53

4.3 Add-On E2 Peripherals

The E2 has many plug-in card options to choose from:

  • Plug-in Echelon card with mounting screw
  • RS485 Modem/communication expansion card
  • Plug-in digital I/O Network card
  • RS485 port card
  • Plug-in Four-Channel Internal Repeater
  • Plug-in modem with mounting screws and standoffs (previous generation processor board only) 4.3.1 Echelon Card Plug-In (P/N 537-4860) with mounting screw (P/N 101-4201)

Echelon is a two-conductor network that interconnects E2s and other associated devices. All Echelon devices are wired together using the daisy-chain method of network structuring. For the E2 to communicate on the Echelon Network, the plug-in card must be connected. No Echelon Network communication can occur without the card.

The plug-in Echelon card connects to the main proces- sor board on the far right side of the board just above the Power Interface Board (PIB) connector. The connector for the plug-in Echelon card is labeled Echelon Plug-In so it is easy to find.

Emerson E2 RX — 4.3 Add-On E2 Peripherals diagram (page 53)
Fig. 73 · 4.3 Add-On E2 Peripherals

Figure 4-5 - Echelon Card

Add-On E2 Peripherals E2 Hardware Setup • 4-3

Page 54 of the Emerson E2 RX user manual — COM6 RS232
Page 54 · click to enlarge
Page 54

4.3.2 Modem/Communication Expansion Card (New Processor Board)

637-4871 Modem/com expansion card with modem and RS485 serial communication port plug-in.

The E2’s modem/communication expansion card mounts above the PIB in the back of the enclosure box as shown in Figure 4-6. See Table 4-1 for modem expansion card types and descriptions.

COM6 RS232

COM6 RS485

COM3

637-4872 Modem/com expansion card with an RS232 plug-in (COM3) that can interface with an external modem, and an RS485 serial communication port plug-in. This model comes with a cable that has a male DB-9 header and a DB-9 to DB-25 converter (not shown) to support the standard external modem interface.

COM6 RS232

Emerson E2 RX — COM6 RS232 diagram (page 54)
Fig. 74

COM6 RS485

COM3 RS232 Plug-In for External Modem

637-4873 Com expansion card with RS485 serial communication port. Note that the RS232 and RS485 ports are counted as one port (COM6); only one connector at a time may be used. The COM6 RS232 will be selectable in future versions of E2.

COM6 RS232

COM6 RS485

Table 4-1 - Modem/Com Card Part Numbers and Descriptions

4.3.3 Plug-In Modem Card (P/N 537-4870) with mounting screws (P/N 101-4038) and standoffs (P/N 107-9440) (Previous Generation Pro- cessor Board)

The E2’s internal modem mounts in the PC-104 slot located at the top left edge of the E2 main processor board (See Figure 3-18 on page 3-6). Disconnect power to the unit, and carefully plug the male pins on the back of the modem card into the E2’s PC-104 slot. Use the standoffs and screws supplied with the modem card to secure the card to the main processor board, as shown in Figure 3-18 on page 3-6). When finished, restore power to the E2. 4.3.4 Plug-In Digital I/O Network Card (P/N 537-4880)

Figure 4-6 - Modem/Com Expansion Card Layout and Mounting

This card adds two user-programmable digital outputs and two digital inputs to enable connection of switches and relays (relay contacts are rated at 3A up to 24 VAC).

The plug-in Digital I/O Network card connects to the power interface board to the right of the two fixed RS485 I/O Network connectors.

Modem P/N Description · Plug-In Modem

Page 55 of the Emerson E2 RX user manual — 4.4 Battery Testing and Replacement
Page 55 · click to enlarge
Page 55
Emerson E2 RX — 4.3.4.1 LEDs diagram (page 55)
Fig. 75 · 4.3.4.1 LEDs
Emerson E2 RX — 4.3.4.1 LEDs diagram (page 55)
Fig. 76 · 4.3.4.1 LEDs
Yellow D5 (RX1) ONCommunication is being received on RS485 Port 2A
Yellow D2 (RX2) ONCommunication is being received on RS485 Port 2B
Red D1 (TX) ONCommunication is being sent on RS485 Port 2A and 2B

Figure 4-7 - E2 Digital I/O Network Card Install and Wiring

4.3.4.1 LEDs

Table 4-3 - LED Status for RS485 Plug-In Card

The plug-in Digital I/O Network card LEDs can be used to determine the status of normal operating parame- ters for the card.

4.3.6 Plug-In Four-Channel Internal Repeater

The four-channel repeater (P/N 832-4830) boosts sig- nal strength on Echelon Networks. However, the four- channel repeater is also useful as a means of connecting the E2 to its associated devices using more than one daisy chain.

Red D1 (Out 1) ONRelay Output 1 is On
Red D4 (Out 2) ONRelay Output 2 is On

With a four-channel repeater mounted in the E2, you can run as many as three daisy chain segments out into the field, each of which can be as long as the prescribed Eche- lon maximum wire length. The fourth channel of the repeater can be used to connect other E2s in a separate daisy-chain, eliminating the need to run cable from the field back to the next E2.

Table 4-2 - LED Status for Plug-In Digital I/O Card

4.3.5 E2 RS485 Port Card (P/N 537-4890)

The E2 main board has two RS485 Network channels, allowing you to connect input and/or output boards via the RS485 Network. This optional card adds a second RS485 port (COM4) to the E2, allowing a connection to the ISD compressors, Control Link devices, and other supported MODBUS devices.

The plug-in Four Channel Internal Repeater card con- nects above the power interface board on the case mounts using standoffs and screws.

See Section 3.4.2.3, Mounting the Four-Channel Repeater for more information.

The plug-in RS485 Network card connects to the power interface board between the two fixed RS485 I/O Network connectors and the battery. 4.3.5.1 LEDs

4.4 Battery Testing and Replacement

The plug-in RS485 Network card LEDs can be used to determine the status of normal operating parameters for the card.

Emerson E2 RX — 4.4 Battery Testing and Replacement diagram (page 55)
Fig. 77 · 4.4 Battery Testing and Replacement

Battery replacement should only be performed by a qualified, trained technician.

The 3.6V battery located on the E2 processor board protects log and alarm data during power loss. It is very important that each active E2 unit have a battery, and therefore the E2 has several features that warn you of low

Battery Testing and Replacement E2 Hardware Setup • 4-5

Plug-In Digital I/O · Status · Card LEDs

Page 56 of the Emerson E2 RX user manual — 4.4.1 Low Battery Notification
Page 56 · click to enlarge
Page 56

battery conditions and allow you to test and replace the battery. 4.4.1 Low Battery Notification

and replace it with an identical 3.6V battery obtained from or approved by Retail Solutions. DO NOT USE AA BAT- TERIES IN THIS BATTERY SLOT.

After replacing the battery, you must tell E2 the battery has been replaced so it can reset its battery life counter.

The E2 keeps track of how long the E2 battery has been active, and will display a battery icon at the top of the E2 screen whenever the battery is reaching the end of its recommended battery life. If a battery has less than 30% of its battery life left, a yellow battery icon will appear at the top of the screen. If the battery has less than 10% life left, or if the battery switch is currently disabled, a red battery icon will appear. 4.4.2 The Battery Enable Switch

1. Log in to E2 (level 4 password or higher).
2. Press , followed by - - - to navigate to the System Tests screen.
3. Move the cursor to the Replace Battery field.

Press for Yes, then press .

4. Make sure the new battery is in place, and

press .

The battery enable switch is located near the battery clip on the processor board. This switch should be set to OFF whenever the E2 unit is not being used to preserve battery life. If the E2 unit is powered up with this switch set to OFF, a red battery icon will appear at the top of the screen. Check the position of this switch, and set it to the ON position. You will have to perform a battery test to clear the battery icon from the screen. See Section 4.4.3, Battery Test below: 4.4.3 Battery Test

If successful, the battery icon should disappear from the top of the screen. If it is still there, check for proper battery placement, verify the battery enable switch posi- tion, and repeat this procedure.

E2’s automatic calculation of battery life is based on the number of hours it has been active, not its voltage. If you wish to know for certain if the battery is good, you can perform a battery voltage test from the E2 front panel. You will need to perform this test to remove a yellow or red battery icon from the screen. If you are replacing the bat- tery and wish to remove the battery icon from the screen, see the instructions under Section 4.4.4, Battery Replace- ment - Qualified Technicians Only.

To perform a battery test:

1. Log in to the controller (level 4 password or higher).
2. Press , followed by - - - to navigate to the System Tests screen.
3. Move the cursor to the Battery Test field. Press for Yes and press .

The dialog box that appears will show the CPU Battery status (OK or FAIL) and the Battery Switch position (ON or OFF). If the CPU Battery is OK and the switch position is ON, the battery icon will disappear. Otherwise, the bat- tery should be replaced or the switch set to ON. 4.4.4 Battery Replacement - Qual- ified Technicians Only

To replace the battery, remove it from the battery clip

Page 57 of the Emerson E2 RX user manual — JP7
Page 57 · click to enlarge
Page 57

1.Connect the I/O or MODBUS Network to one or both of the E2 RS485 I/O or MODBUS Network ports. (A maximum of 31 devices can be wired to each I/O or MODBUS Network port.) 2. For each I/O or MODBUS Network port, set RS485 termination jumpers UP if at either end of a daisy chain. Otherwise, set jumpers DOWN. 3. Connect the E2 to the Echelon Network. If possible, connect shield wires to a separate earth ground outside of the E2 enclosure. 4. Set the Echelon Network jumper UP (Terminated) if the E2 is at either end of an Echelon daisy-chain. Otherwise, set the jumper DOWN (Not Terminated). 5. Connect earth ground to one of the two ground terminals provided. Use 12 AWG (preferred) or 14 AWG wire and keep as short as possible (less than 12 inches preferred). 6. Connect 24VAC to the power terminals. 7. Flip the power switch to the ON position. When 24VAC has been applied to the board, the green LED will illuminate.

I/O or MODBUS Network

_ 0V +

WHITE

SHIELD

BLACK

TO OTHER RS485 DEVICES

OBSERVE WIRE COLOR POLARITY

RS485 I/O or MODBUS Net

TO OTHER ECHELON DEVICES

LON

NOT TERMINATED TERMINATED

Level IV, 22 AWG, Shielded Max Daisy Chain Length: Feet: 4592 Meters: 1400 P/N 135-2300 Non-Plenum

LON

SHIELD

TO OTHER

ECHELON

(1 Pair, 1000 Feet)

DEVICES

(1 Pair, 1000 Feet)

JP7

TERMINATED

12 or 14 AWG

JP7

NOT TERMINATED

AC1

AC1

24VAC 24VAC

AC2

AC2

Battery Testing and Replacement E2 Hardware Setup • 4-7

Show 5 more labels / short text on this page
Echelon · Earth Ground · P/N 135-2301 Plenum · Echelon · Earth Ground Connector
Page 58 of the Emerson E2 RX user manual — 4.4.1 Low Battery Notification
Page 58 · click to enlarge
Page 58
Page 58 of the Emerson E2 RX user manual — 4.4.1 Low Battery Notification
Page 59 of the Emerson E2 RX user manual — 2. - System Information
Page 59 · click to enlarge
Page 59

5 Serial Configura-

5.3 Serial Device and Software Setup

tion

After the COM card has been connected to the E2, set up the associated COM port in the Serial Connection Man- ager:

5.1 Overview

E2’s Serial Configuration is the centralized location where all communication ports (COM ports) may be set up in the E2 controller. To support the increasing number of third-party devices that E2 can communicate with, E2 has the expanded flexibility of dynamic COM ports that will support different types of communication protocols to meet the specific needs of the user.

Emerson E2 RX — 5.1 Overview diagram (page 59)
Fig. 78 · 5.1 Overview

Previously, all COM ports were pre-defined to support a specific type of serial device. E2 now has five configu- rable COM ports that can communicate with different devices on the network.

5.2 COM Ports

The Serial Connection Manager is located in General Setup under the Serial tab. To access Serial connections to set up the COM ports, press Alt + M, or from the E2 Main Menu:

Figure 5-1 - Serial Configuration Screen

1. - System Configuration

2. - System Information

3. - General Controller Info

4. C3: Serial tab

To begin, first select the COM port you wish to set up, choose the protocol, and set the baud rate.

The user associates the various hardware devices with the COM ports listed under the Serial tab. Five COM ports have user-configurable values such as baud rate and con- nection type settings.

COM1 is pre-set for serial connection. COM3 is pre- set with a modem-only connection type. The COM5 con- nection is a non-configurable E2 keyboard port.

Overview Serial Configuration • 5-1

Pre-Sets

Page 60 of the Emerson E2 RX user manual — RS232
Page 60 · click to enlarge
Page 60
Emerson E2 RX — 5 Serial Configuration diagram (page 60)
Fig. 79 · 5 Serial Configuration

RS485 COM Card (2 Connectors) Serial Device RS232 Port

Figure 5-2 - Associated Device Connections and COM Ports

E2 COM# ASSOCIATIONS CONNECTOR

COM1 COM1 is a pre-set serial connection type (for a PC or laptop) and is located on the RS232 port on the PIB. The baud rate is configurable.

COM1

Serial Device RS232 Port

COM2 COM2 may be configured to the type of serial devices you are connecting: I/O Net (default), ISD 1.0, IMC/Prodigy, or MODBUS 1-3. These devices are connected via the RS485 connectors (for wiring convenience, two connectors are available) on the PIB. The connection type and baud rate are configurable.

Serial Device RS485 COM Port (2 Connectors)

COM2

COM3 COM3 is a pre-set connection type for modems only (optional). The E2 modem/expansion communication card (P/N 637-4871) has a plug-in modem that uses the phone line jack (RJ- 11). The 637-4872 version has a plug-in for an external modem. Configure the baud rate and modem type for either the internal modem or the external modem.

COM3

COM4 COM4 is located on the optional RS485 COM card for configurable devices. Configure COM4 to the type of device you are connecting: I/O Net, ISD 1.0 (RX unit default), IMC/ Prodigy (BX/CX unit default), or MODBUS 1-3. The RS485 COM card is connected above the COM2 dual RS485 connectors on the PIB. The connection type is configurable.

RS485 COM Card (2 Connectors)

COM4

COM6 COM6 is located on E2's optional modem/expansion communication card, which can be configured for RS485 operation. Configure COM6 to the type of device you are connecting: I/O Net, ISD 1.0 (RX unit default), IMC/Prodigy (BX/CX unit default), or MODBUS 1-3. (RS232 operation will be available in future versions of E2.) Both connectors cannot be used at the same time. Configure the connection type, baud rate, and parity. (The expansion card mounts onto the four standoffs located on the back of the E2 enclosure above the PIB, and is compatible with E2 processor board version 237-4801 only). For more information on this card, refer to Section 4.3.2 of this manual.

COM6 E2 Modem/Expansion COM Card Mounted Above PIB

RS232

RS485

Table 5-1 - COM Ports with Associated PIB and Card Connections - Refer to Figure 5-2

Plug-In Modem Card(s)

Page 61 of the Emerson E2 RX user manual — ARTC/ RTU
Page 61 · click to enlarge
Page 61

6 The RS485 Network and Hardware Setup

Previous versions of E2 hardware and firmware before version 2.30F01 only supported one I/O network port, with an optional expansion card that could be used for connection to Copeland ISD compressors or IMC/Prodigy S-Bus rooftop unit controllers. Beginning with E2 version 2.30F01, E2s now have up to three RS485 network ports, each of which may be configured as an I/O network, IMC/ Prodigy, ISD, or ECT MODBUS port.

Type Max # Translation Boards That Match Board Type

16AI 16 Any I/O board that has digital and ana- log inputs. The inputs of a combina- tion I/O board (8IO or MultiFlex combo board) are by them- selves treated as one 16AI.

  • 16AI (discontinued)
  • 8IO (discontinued)
  • MultiFlex 16

Section 5, Serial Configuration of this manual covers how to assign COM ports COM2, COM4, and COM6 to different RS485 network types. Section 6 (this section) explains the network types, the hardware that may be con- nected to each type, and how to configure the devices.

  • The inputs on all MultiFlex combo boards (88, 88AO, 168, 168AO, and 1616)
  • All versions of the Gateway board (some versions behave like as multiple 16AIs)

6.1 The I/O Network

8RO 31 Any I/O board with relay outputs. The relay outputs of a combination I/O board (8IO or Multi- Flex combo board) are by themselves treated as one 8RO.

  • 8RO

All boards and controllers manufactured by Retail Solutions for communication with E2 via RS485 are gen- erally referred to as I/O boards, and the network they are connected to is referred to as the I/O network (or I/O Net).

  • 8ROSMT
  • The relay outputs on all MultiFlex combo boards (88, 88AO, 168, 168AO, and 1616 (which behaves as two 8RO boards)

A COM port configured as I/O Net may connect with up to 127 I/O boards. This network is used by the E2 to read data from the input boards and to send commands to the analog and digital output boards. Some unit control- lers, such as CCB case controllers and MultiFlex RCBs, also communicate with the E2 via the I/O Network. 6.1.1 I/O Board Names and Termi- nology

  • 8IO (discontinued)

4AO 16 Any I/O board with analog outputs. The analog outputs of a combination I/O board (8IO or Multi- Flex combo board) are by themselves treated as one 8RO.

  • 4AO
  • 8IO (discontinued)
  • The analog outputs on the MultiFlex 88AO and 168AO

There are many input, relay output, analog output, and combination I/O boards available from Retail Solutions for use with the E2. However, separate from the various MultiFlex unit controller models, E2 only recognizes four different types of I/O boards: 16AI, 8RO, 4AO, and 8DO. All E2-compatible I/O boards communicate with E2 as if they are one or more of these types of boards.

8DO 16 Any I/O board with +12VDC digital pulse outputs.

  • 8DO (including all versions of the PMAC and PMAC II anti-sweat controller)

In this manual and in the E2 interface, when you encounter these board names, bear in mind that they are terms that represent many types of boards. Table 6-1 describes all the actual boards or board components for each E2 “board type.”

  • Digital outputs on the MultiFlex 168DO

ARTC/ RTU

32 Rooftop HVAC con- troller board

MultiFlex RTU and ARTC (discontinued)

RCB 32 MultiFlex RCB advanced rooftop unit controller

Table 6-1 - Board Types and Boards Included in Each Type

The I/O Network The RS485 Network and Hardware Setup • 6-1

Board · MultiFlex RCB

Page 62 of the Emerson E2 RX user manual — 6.1.5 Network Noise Minimization
Page 62 · click to enlarge
Page 62
Emerson E2 RX — 6.1.2 MultiFlex-Plus (+) Board diagram (page 62)
Fig. 80 · 6.1.2 MultiFlex-Plus (+) Board

Type Max # Translation Boards That Match Board Type

Retail Solutions specifies all RS485 I/O and MOD- BUS wiring used by the E2 must be Belden 8641 (24AWG, 300V, Retail Solutions P/N 135-8641); Belden 8761 (22 AWG, 300V not stocked by Retail Solutions); or a 600V-shielded 22AWG equivalent stocked by Retail Solutions (P/N 135-0600). These are two-connector shielded twisted pair cables that support a maximum daisy chain cable distance of 4000 feet (1219 m) between the E2 and the end device on the network. 6.1.4 The I/O Network Structure (Daisy Chains)

32 Single condensing unit controller (one compressor and up to 4 condenser fans)

Table 6-1 - Board Types and Boards Included in Each Type

6.1.2 MultiFlex-Plus (+) Board

The MultiFlex-plus board contains a replacement RS485 transceiver chip that presents less of a load on the network than a non-plus board. This increases the maxi- mum number of devices that can be placed on the network, but not the number of board types an Einstein controller can communicate with.

The RS485 Input/Output (I/O) Network connects all input and output communication boards together in a sin- gle open communications loop. This loop, or “daisy chain,” connects the E2 to multiple input and output com- munication boards, and terminates at the last input or out- put board on the network. A diagram of this network arrangement is shown in Figure 6-1.

The MultiFlex-plus board now accounts for only 1/8 the load of a non-plus board with 32 total devices on the network (one Einstein controller + 31 boards). This new conversion allows for the placement of 256 devices on the network (one Einstein controller + 255 boards). The num- ber of boards an Einstein controller can support is increased from 31 up to 255 using MultiFlex-plus boards only. In other words, the number of I/O net devices are no longer restricted by the I/O net 31-node limitation.

Emerson E2 RX — 6.1.2 MultiFlex-Plus (+) Board diagram (page 62)
Fig. 81 · 6.1.2 MultiFlex-Plus (+) Board

Plus boards are always identified with a plus (+) sign that appears on the plastic insulating cover on the top of the board, after the board name. 6.1.2.2 Board Calculations

Figure 6-1 - I/O Network Configurations

6.1.5 Network Noise Minimization

With X as the number of plus boards and Y as the num- ber of non-plus boards, use the following equation to ensure that the number of devices on your network has not exceeded the maximum load limitation of the network. For example, if the total number of devices is less than 256, the maximum load limitation has not been exceeded.

Site environments will frequently have numerous sources of high EMI, or “noise,” that must be accounted for when routing RS485 network cable. Although the cable is shielded against noise, the installer must follow best practices for minimizing network noise.

In general, installers should follow these guidelines when installing RS485 networks:

Page 63 of the Emerson E2 RX user manual — 6.1.6 Network ID Numbers (Board Numbers)
Page 63 · click to enlarge
Page 63
  • Avoid running cable next to noise-generating devices, such as motor starters, contactors, inverters, fluorescent light ballasts, arc welders, etc. If possible, keep cable less than 1 foot away from noise-generating devices (ideally, at least 5 feet).

combination of three types of Retail Solutions boards: the inputs are configured like a 16AI, the relay outputs are configured like an 8RO, and the analog outputs are config- ured like a 4AO.

When a MultiFlex combo board is present on the net- work, it must be addressed like all three board types. Therefore, when numbering these boards, you must set a unique number for both the 16AI, 8RO, and 4AO compo- nents of the board.

  • Do not run RS485 cable in the same conduit as high-voltage wiring, such as 120VAC or 240VAC power wiring. Keep RS485 cable a minimum of 3 inches away from high-voltage wiring (ideally, at least 12 inches). If RS485 must cross paths with high-voltage wiring, cross them perpendicular — running RS485 and high-voltage wire in parallel increases the amount of noise induced on the network.

Addressing the MultiFlex Boards

For MultiFlex boards, set positions 1 to 5 on S3 for the 16AI component and positions 1 to 5 on S4 for the 8RO component. Set positions 6 to 8 on S4 for the 4AO or 4DO segment. For MultiFlex board controllers, use positions 1 to 5 on S3 to set the address.

  • Ensure you are grounding each input device’s 0V power terminal to a separate earth ground, and setting the termination and biasing jumpers as instructed in Section 6.1.8, Setting the Terminating and Biasing Jumpers .

Addressing the MultiFlex ESR Boards

The MultiFlex ESR uses standard Retail Solutions I/O Network addressing. Set positions 1 to 5 on S1 to set the network ID (address) of the MultiFlex ESR from 1 to 31. 6.1.7 Setting the Baud Rate

For more instructions on best practices for minimizing noise, refer to publication 026-1903, E2 Controller Wir- ing Practices, available in the Product Manuals section of the Emerson Climate Technologies Web site: www.emersonclimate.com 6.1.6 Network ID Numbers (Board Numbers)

All I/O boards have dip switches that determine the baud rate at which they communicate. Currently, the baud rate dip switch in network components may be set at either 4800, 9600, 19200, and 38400. Setting of the baud rate is accomplished using dip switches (refer to the board’s installation sheets at the end of this section for specific dip switch settings).

Each device on an RS485 segment has either a network dip switch or rotary dials that must be used to assign the board a unique network ID number.

Baud Rate for the E2

The baud rate default for E2 is 9600.

The network ID number makes a board unique from other boards on the network of the same type. This allows E2 to find it and communicate with it easily.

Baud Rate for the Gateway

The Gateway can be set to either 9600 baud or 19.2K baud by dip switch #6. “ON” places the rate at 9600 baud while “OFF” sets it at 19.2K baud.

Boards of the same type should be numbered in sequence, starting with one and continuing with two, three, and so forth. For example, if a segment contains four 16AI boards and five 8RO boards, you should num- ber the 16AIs one, two, three, and four; and the 8ROs one, two, three, four, and five. The same should be done with multiple 4AO and 8DO boards, and IRLDS leak detection units.

Dip switches 6 and 7 control the baud rate at which the Gateway communicates with the site controller on the RS485RS485 Network. These switches must be set to the same baud rate setting as the E2 or REFLECS (usually 9600 baud).

Dip switch 8 controls the baud rate at which the Gate- way communicates with the other devices on the Receiver Bus Network. This baud rate may only be set to either 9600 baud (switch DOWN) or 19200 baud (switch UP). All Gateways and receivers on the Receiver Bus Network must have the same baud rate dip switch setting. It is rec- ommended you use 9600 baud as the Receiver Bus Net- work baud rate.

For all boards, except 8IO and 8DO boards, the net- work dip switch labeled S1 (or S3 for the 16AI board) is used to set the unique board number of the unit and the baud rate. The 8IO and 8DO uses rotary dials to set the board number of the unit.

Numbering the MultiFlex Combination I/O Boards

When it comes to network numbering, the MultiFlex Combination Input/Output boards (88, 88AO, 168, 168AO, and 168DO) are special cases. They are actually a

Baud Rate for the 8IO, 8DO, and ARTC

There are three I/O devices that do not have baud rates determined by dip switches. They are as follows:

The I/O Network The RS485 Network and Hardware Setup • 6-3

Page 64 of the Emerson E2 RX user manual — 6.1.9 Powering the I/O Boards
Page 64 · click to enlarge
Page 64
1. The 8IO - this board automatically detects the baud rate being used by the I/O devices on the network, and adjusts to match their baud rate.

and biased by placing all three jumpers in the UP position. All other devices on the daisy chain must have all three jumpers set to the DOWN position. Figure 6-2 shows the proper terminating jumper settings for the E2 and for all I/ O boards.

2. The 8DO - this board automatically detects the baud rate being used by the I/O devices on the network, and adjusts to match their baud rate.
3. The ARTC - this board is fixed at 9600 baud.
Emerson E2 RX — Baud Rate for MultiFlex Boards diagram (page 64)
Fig. 82 · Baud Rate for MultiFlex Boards

Baud Rate for MultiFlex Boards

On all MultiFlex boards, switches 6 and 7 on S3 are used to set the baud rate. To communicate at 9600 baud, set switch #6 to the UP position and #7 to DOWN. For 19200 baud, set switch #6 to the DOWN position and #7 to UP.

THE TERMINATING JUMPERS MUST BE IN THE UP POSITION IF AT THE BEGINNING OR END OF THE NETWORK.

Baud Rate for the MultiFlex ESR

Set the baud rate on the MultiFlex ESR board by set- ting switches 6 and 7 on the network address terminal (labeled S1).

THE TERMINATING JUMPERS MUST BE IN THE DOWN POSITION IF NOT AT THE BEGINNING OR END OF THE NETWORK.

To communicate at 9600 baud, set switch #6 to the UP position, and switch #7 to DOWN. For 19200 baud, set switch #6 to the DOWN position and switch #7 to UP. (Currently, 9600 baud is recommended).

Figure 6-2 - I/O Network Termination Jumper Settings

The baud rate should be set to 9600 baud in all cases. 6.1.8 Setting the Terminating and Biasing Jumpers

6.1.9 Powering the I/O Boards

All models of E2-compatible I/O boards require 24VAC Class 2 input power. Some boards such as the 16AI, 8RO, 4AO, 8DO, MultiFlex ESR, and MultiFlex 16 use a center-tapped power source. All other models, such as the 8IO and MultiFlex Combination I/O boards, may use non-center tapped power sources.

The I/O Network connector, for all I/O boards and the E2, has a set of three terminating jumpers. They are the jumpers positioned closest to the I/O Network connector. The E2 has jumpers next to each of the COM ports that can be configured as an I/O network (COM2, COM4, and COM6).

Retail Solutions supplies a wide variety of 24VAC transformers with varying sizes and either with or without center taps. Table 6-2 shows the transformer sizes and whether they are center-tapped or non-center-tapped. Table 6-3 lists each board, the board’s rating, and whether or not the board must use center-tapped power.

The purpose of the jumpers is to provide network ter- mination resistance and network biasing to the two ends, or termination points, of the daisy chain. One device at the beginning and one device on the end must be terminated

Emerson E2 RX — 6.1.9 Powering the I/O Boards diagram (page 64)
Fig. 83 · 6.1.9 Powering the I/O Boards

Table 6-2 - Transformers Compatible with I/O Network Boards

Recommended Baud Rate

Page 65 of the Emerson E2 RX user manual — 6.2 IMC/Prodigy Rooftop Unit Controllers
Page 65 · click to enlarge
Page 65

Unit Amps VA VAC Center- tapped?

center-tapped transformer, also connect the center tap to the earth grounded third conductor.

16AI 0.25 5.0 24 Yes

8RO/SMT 0.75 15.0 24 Yes

14 AWG Belden 9495

4AO 0.5 10.0 24 Yes

18 AWG Belden 9493

8DO 1.5 18 24 Yes

Table 6-4 - Power Wiring Types

8IO/ARTC 0.75 18 24 No

IRLDS N/A N/A 120/240 N/A

The wire length from the transformer and the number of boards connected to the same wire determines the type wire gauge used. In most cases, the distance between the I/ O boards and the transformer that supplies power to them is not enough to be concerned with. But it is very impor- tant not exceed this maximum wire length or the boards will malfunction.

RLDS N/A N/A 120/240 N/A

3.3 80 24 Yes

ESR

16 0.25 6 24 Yes

MultiFlex 88, 88AO, 168, and 168AO

0.75 15 24 No

Use these formulas to determine if the wire gauge you are using fits within specification:

14 AWG:

1.0 20 24 No

1616L, 1616LAO, 1616LDO

18 AWG:

Table 6-3 - Device Power Requirements

(VA is the total VA rating of the I/O boards)

For example, if you had an 80 VA load:

To select a power transformer for a board or a series of boards:

14 AWG24 ft
18 AWG9 ft (rounded down)
1. Determine what the total VA is for the boards that will be powered by the transformer (see Table 6-3 ) .

Figure 6-3 - Power Wire Lengths

Sensors requiring 24VAC can be powered from the same transformer powering the input board as long as the resulting total load of both the input board(s) and the sen- sor(s) connected to the transformer does not exceed the transformer’s VA rating. Consult Section 6.1.9, Powering the I/O Boards, and Section 8.6.1, Powering Echelon Devices for more information. 6.1.10 Board Installation

Example: Two MultiFlex 168AOs (15 VA each), and one 8DO (18 VA) boards are to be powered by one transformer. The total VA is:

2 15VA 1 18VA + 48VA =

2. Use a transformer that has a power rating higher than the total calculated VA (see Table 6-2 ). Example: For boards totalling 48VA, a 56VA transformer is sufficient, since 56VA is greater than 48VA.

The following pages give step-by-step graphical instructions on all steps necessary to install each I/O Net- work device so that it is powered up and able to communi- cate with E2. If these devices have not yet been mounted, refer to Section 3.2, Mounting I/O Boards for mounting instructions for these devices.

I/O Board Transformers should be located within 10 feet of the board it is powering, preferably within the board enclosure. 6.1.9.1 Wiring Types

6.2 IMC/Prodigy Rooftop Unit Controllers

For powering I/O boards, use only the listed wire types from Table 6-4. Three-conductor non-shielded cables are the recommended wire for connecting between the center tapped transformer and the I/O boards. The third conduc- tor should be connected to earth ground. If boards use a

All E2 Building Controller (BX) versions 2.21F01 and

IMC/Prodigy Rooftop Unit Controllers The RS485 Network and Hardware Setup • 6-5

Show 6 more labels / short text on this page
Power Wiring Types · MultiFlex · MultiFlex · MultiFlex · Feet = 1920/VA · Feet = 739/VA
Page 66 of the Emerson E2 RX user manual — 6.3 ECT MODBUS
Page 66 · click to enlarge
Page 66

above may communicate with IMC/Prodigy rooftop units equipped with IMC/Prodigy control boards version M4-1 or higher. E2 controllers version 2.30F01 and above may use any of the RS485 I/O ports (COM2, COM4, or COM6) as a IMC/Prodigy communication port. Version 2.21F01 E2 units may only connect IMC/Prodigys to an RS485 Expansion Card. Connectivity to IMC/Prodigy is a licensed feature and must be purchased from Retail Solu- tions.

figuration.

The Control Techniques VSD has its own technical bulletin that explains interfacing with E2 (P/N 026-4122). The installation and operation manual explaining the VSD is maintained by Control Techniques. Contact your Con- trol Techniques representative for a copy of this manual.

6.3.2 Copeland Discus with CoreSense Diagnostics (ISD)

The IMC/Prodigy interface has its own technical bulle- tin explaining installation, network setup, and E2 configu- ration. Refer to Technical Bulletin 026-4117.

E2 controllers version 2.21F01 and above may com- municate with Copeland ISD compressors using the ECT MODBUS network. E2 controllers version 2.30F01 and above may use any of the RS485 I/O ports (COM2, COM4, or COM6) as a Copeland ISD communication port. Version 2.21F01 E2 units may only connect Cope- land ISD compressors to an RS485 Expansion Card.

6.3 ECT MODBUS

E2 controllers version 2.30F01 or greater may select ECT MODBUS as a network type. The E2 communicates with MODBUS devices including but not limited to Con- trol Link CD, Control Link RSC, and Control Link ACC.

The installation and operation manual explaining the Copeland ISD interface is maintained by Copeland. Con- tact your Copeland representative for a copy of this man- ual. 6.3.3 XR35CX, XR75CX, and XEV22 Case Controllers

The Control Link products have their own documents explaining device configuration, networking, and E2 setup:

  • 026-4600 - Control Link RSC Installation Instructions

E2 controllers version 2.84 or greater communicate with the XR and XEV controllers. The XR and XEV con- trol compressor regulation, defrost, light, and evaporator fans in refrigeration systems on normal, low, or medium temperatures, control a wide variety of stepper electronic expansion valves and anti-sweat heaters (if present), and measure and regulate the superheat of the refrigerant in the system.

  • 026-4601 - Control Link CD Installation Instructions
  • 026-4703 - Control Link ACC Installation Instructions
  • 026-4602 - Control Link ECT MODBUS Networking to E2s (covers MODBUS installation for all Control Link models) 6.3.1 Control Techniques Drive (VSD)

If the case controller is configured with a Real Time Clock (RTC), it can be programmed with up to 6 daily defrosts and an energy saving function. Without the RTC, the E2 can coordinate defrost cycles and the energy-saving function.

Using the MODBUS network type, E2 controllers can communicate with the Control Techniques variable-speed drive (VSD). There are three different VSD models the E2 communicates with: Commander SE, Commander SK, and Unidrive SP drive types.

Several parameters of the Emerson controllers (such as inputs, outputs, setpoints, and alarms) can be configured directly in E2 and sent to the appropriate Emerson control- ler, depending on the controller model. 6.3.3.1 XR75CX-Case Display

E2 controllers version 3.02 or greater communicate with the XR75CX-Case Display controller. The XR75CX- Case Display is a microprocessor-based controller, suit- able for applications on medium or low temperature venti- lated refrigeration units. It has up to four (4) analog inputs: discharge air temperature, product temperature, defrost temperature and coil out temperature, four (4) relay out- puts, and up to two (2) digital inputs. For more informa- tion on the XR75CX-Case Display, refer to the XR75CX-

Configure the COM port the CT drive will connect to by pressing Alt + M to open the serial configuration man- ager. Set the COM port to MODBUS and the baud rate (match the baud rate on the CT drive). For more informa- tion on setting up serial ports, go to Section 5, Serial Con-

Page 67 of the Emerson E2 RX user manual — 6.3.5.1 Overview
Page 67 · click to enlarge
Page 67

Case Display manual P/N 026-1217 . 6.3.4 iPro DAC

installation on T35 DIN rail according to EN50022. The Energy Meter can be mounted with any orientation over the entire ambient temperature range, either on a DIN rail or in a panel. The meter is not sensitive to CT orientation to reduce installation errors. 6.3.5.2 Supported System Types

Emerson E2 RX — Case Display manual P/N 026-1217 . 6.3.4 iPro DAC diagram (page 67)
Fig. 84 · Case Display manual P/N 026-1217 . 6.3.4 iPro DAC

The Energy Meter Series has a number of different possible system wiring configurations. To configure the meter, set the System Type via the User Interface or Mod- bus register 130 (if so equipped). The System Type tells the meter which of its current and voltage inputs are valid, which are to be ignored, and if neutral is connected. Set- ting the correct System Type prevents unwanted energy accumulation on unused inputs, selects the formula to cal- culate the Theoretical Maximum System Power, and deter- mines which phase loss algorithm is to be used. The phase loss algorithm is configured as a percent of the Line-to- Line System Voltage (except when in System Type 10) and also calculates the expected Line to Neutral voltages for system types that have Neutral (12 & 40).

Figure 6-4 - iPro DAC

The iPro DAC is a packaged HVAC control board for use either as a stand-alone controller or in zone control applications using a Retail Solutions E2 BX building con- trol system. The iPro DAC is capable of controlling heat and cool stages, fans, humidification and dehumidification devices and economizers using on-board I/O and control algorithms, as well as monitor and interact with other building control systems and peripherals (such as smoke alarms and CO2 sensors). 6.3.5 Energy Meter

For more information about this application, see the Energy Meter manual (P/N 026-1726). 6.3.6 Modular Refrigerant Leak Detection Sensor (MRLDS)

Emerson E2 RX — Case Display manual P/N 026-1217 . 6.3.4 iPro DAC diagram (page 67)
Fig. 85 · Case Display manual P/N 026-1217 . 6.3.4 iPro DAC
Emerson E2 RX — Case Display manual P/N 026-1217 . 6.3.4 iPro DAC diagram (page 67)
Fig. 86 · Case Display manual P/N 026-1217 . 6.3.4 iPro DAC

Figure 6-6 - MRLDS

Figure 6-5 - Energy Meter

Modular Refrigerant Leak Detection Sensor (MRLDS) that continuously monitors for low levels of refrigerants most commonly used in commercial refrigeration systems

6.3.5.1 Overview

The Energy Meter provides a solution for measuring energy data with a single device. Inputs include Control Power, CT, and 3-phase voltage. The Energy Meter sup- ports multiple output options, including solid state relay contacts, Modbus (with or without data logging), and pulse. The LCD screen on the faceplate allows instant out- put viewing.

The MRLDS communicates with the E2 controller via MODBUS. The E2 will just provide an interface while the MRLDS will provide the leak monitoring functionality

The meter is housed in a plastic enclosure suitable for

ECT MODBUS The RS485 Network and Hardware Setup • 6-7

Page 68 of the Emerson E2 RX user manual — 6.3.7 Copeland Discus with CoreSense Protection
Page 68 · click to enlarge
Page 68

6.3.7 Copeland Discus with CoreSense Protection

The Light Commercial Thermostat communicates with the E2 using the MODBUS network. The thermostat will enable the E2 to read status information from the device as well as send operational setpoints to the device. The ther- mostat is available on E2 versions 3.02 and above. 6.3.8.1 Thermostat Inputs

Emerson E2 RX — 6.3.7 Copeland Discus with CoreSense Protection diagram (page 68)
Fig. 87 · 6.3.7 Copeland Discus with CoreSense Protection

The E2 application will provide support for external real time inputs to the thermostat. These inputs are:

  • Zone Temperature
  • Minimum Damper Position
  • Outside Air Temperature
  • Inside Humidity

If these inputs are connected to valid values, they are sent to the thermostat to be used in place of any locally connected sensors of the same type. If local sensors are present and meant to be used, the associated inputs on the E2 application should be left disconnected. 6.3.8.2 Advisory and Alarms

Figure 6-7 - Copeland Discus Compressor

The Discus application can monitor semi-hermetic compressors using the MODBUS network on E2 versions 3.01 and above. The E2 monitors and records semi-her- metic compressor information. The Discus application has extensive logging capabilities that record a compressor’s Run History, Fault History, and Alarm Status.

The Light Commercial Thermostat also supports diag- nostic functions. When a diagnostic code is sent to the E2 from the thermostat, the E2 application will identify the code and generate the corresponding advisories in the advisory log.

The Copeland Discus is supported on E2 RX-300, CX- 400 and above. 6.3.8 Light Commercial Thermo- stat

Each of these configurable diagnostic alarms in the E2 can be set to Disabled, Failure, Alarm, or Notice with an accompanying priority setting.

The diagnostic alarms supported are:

Diagnostic Alarm Descriptions E2 Advisory

Heating Two Hours Thermostat did not see a rise in supply temperature when heating was called for.

Heat Continuous In heat or backup heat mode, thermostat opens latching relay contacts if temperature is over 10°F above setpoint.

Heat Shutdown – Temp too high

Temperature Sensor Fail If heating or cooling is engaged, and either the indoor temperature sensor reading or the supply air temperature sensor reading starts moving the opposite way faster than it was before the heating or cooling was engaged, the thermostat reports a diagnostic message, and shuts down the operation.

Stuck Key A stuck key (closed) has been detected on the thermostat. Stuck Key Detected

Thermostat has detected a failure of the internal space temperature sensor, or the O/B wiring is incorrect.

Failed Sensor or Bad Wiring

Table 6-5 -Diagnostic Alarm Outputs

Show 4 more labels / short text on this page
Diagnostic Alarms · Heating Problem Detected · Incorrect Sensor Wiring · Unexpected Temperature Rise
Page 69 of the Emerson E2 RX user manual — 6.3.7 Copeland Discus with CoreSense Protection
Page 69 · click to enlarge
Page 69

Diagnostic Alarm Descriptions E2 Advisory

Cool Eight Hours If cool runs for over 8 hours continuously, the thermostat sets anticipator to zero until call for cool is satisfied.

Fan Not Detected If the fan is activated and if the Fan Detect input is enabled, the thermostat checks its status 15 seconds after the fan is energized, and if the fan is not on, it disables any active heat or cool calls, and report an alarm.

Frost Protection Activated The thermostat allows a frost protection menu option. When enabled, frost

protection is enabled in all system modes including OFF, when temperature drops below 42°F (5.5 °C).All other heat / cool calls are disabled, and indoor heat is activated until the temperature rises above the frost protec- tion threshold.

Table 6-5 -Diagnostic Alarm Outputs

discontinue compressor operation if active protection is enabled. The Comfort Alert codes are sent separately from the diag- nostic codes. Just like the diagnostic codes, the Comfort Alert codes are entered as advisories in the E2 advisory log.

The thermostat supports the Emerson Climate Tech- nologies Comfort Alert system. On any alert present on Comfort Alert terminal, the thermostat keeps the informa- tion on the fault available over the network so that the E2 can access this information. On some specific alerts, it will

Comfort Alert Descriptions Cause E2 Advisory

Long Run Time Compressor is running extremely long run cycles (typically for more than 18 hours).

  • Low refrigerant charge.

Compressor run time is long

  • Evaporator blower is not running.
  • Evaporator coil is frozen.
  • Faulty metering device
  • Condenser coil is dirty
  • Thermostat is malfunctioning
  • Compressor Second Stage Cooling Wiring

Discharge or pressure out of lim- its or compressor overloaded.

  • High head pressure.
  • Condenser coil poor air circulation (dirty, blocked, damaged)
  • Condenser fan is not running
  • Return air duct has substantial leakage.

Short Cycling Compressor is running only briefly.

  • Thermostat demand signal is intermittent.
  • Time delay relay or control board is defective.
  • If high pressure switch present, check if there is a System Pressure Trip problem.

Locked Rotor Locked rotor. • Run capacitor has failed.

  • Low line voltage (contact utility if voltage at disconnect is low).
  • Excessive liquid refrigerant in compressor.
  • Compressor bearings have seized.

Table 6-6 -Comfort Alert Outputs

ECT MODBUS The RS485 Network and Hardware Setup • 6-9

Show 8 more labels / short text on this page
Cooling Problem Detected · Proof Fail · Frost Protection · Comfort Alert Codes · System Pressure Trip · System pressure trip · Compressor short cycling · Locked Rotor Trip
Page 70 of the Emerson E2 RX user manual — 6.3.7 Copeland Discus with CoreSense Protection
Page 70 · click to enlarge
Page 70

Comfort Alert Descriptions Cause E2 Advisory

Open Circuit Compressor open circuit. • Outdoor unit power disconnect is open.

  • Compressor circuit breaker or fuse(s) is open.
  • Compressor contactor has failed open.
  • High pressure switch is open and requires manual reset.
  • Open circuit in compressor supply wiring or connections.
  • Unusually long compressor protector reset time due to extreme ambient temperature.
  • Compressor windings are damaged.

Open Start CircuitCompressor current only in run

  • Run capacitor has failed

Compressor open start circuit

circuit.

  • Open circuit in compressor start wiring or connections.
  • Compressor start winding is damaged.

Open Run Circuit Compressor current only in start

  • Open circuit in compressor run wiring or connections.

Compressor open run circuit

circuit.

  • Compressor run winding is damaged.

Welded ContactorCompressor always runs. • Compressor contactor has failed closed

  • Thermostat demand signal is not connected to module.

Low Voltage Control circuit < 17VAC. • Control circuit transformer is overloaded

Compressor Low Volt Trip

  • Low line voltage (contact utility if voltage at disconnect is low)

Protector Trip Thermostat demand signal Y is present, but the compressor is not running.

  • Compressor protector is open.
  • Outdoor unit power disconnect is open.
  • Compressor circuit breaker or fuse(s) is open.
  • Broken wire or connector is not making contact.
  • High pressure switch open if present in system.
  • Compressor contactor has failed open.

Table 6-6 -Comfort Alert Outputs

The Comfort Alert diagnostic alarms are configurable in the E2 as Disabled, Failure, Alarm, or Notice with an accompanying priority setting. All Comfort Alert codes will share the same advisory type and priority parameters.

a failure of the supply temperature probe (if installed). The E2 application will provide this functionality. Advisory type, priority, and delay is provided for the supply sensor fail advisory.

High/Low Occ/Unocc Space Temperature Alarms

Conditions for Return to Normal (RTN) on Diag- nostic Codes

The thermostat does not provide alarming information on either high or low temperatures for the Space tempera- ture sensor. Therefore, the E2 application will provide this functionality.

The E2 application will issue an RTN on an active advisory when the corresponding bit of the diagnostic code goes to zero. If multiple diagnostic advisories are active simultaneously, they will all return to normal when the code reads zero.

Supply Sensor Fail Alarm

The thermostat does not provide alarm information on

Compressor open circuit · Welded Contactor · Protector Trip

Page 71 of the Emerson E2 RX user manual — 6.3.10 Copeland Scroll – K5 Refrigeration Compressor
Page 71 · click to enlarge
Page 71

6.3.9 Refrigerant Leak Detection System (RLDS)

6.3.9.1 Diagnostic Alarms

The RLDS provides for the continuous monitoring of refrigerant gas levels in up to 16 separate test zones or channels. The instrument is programmed to monitor a variety of gases and independent leak (small), spill (medium), and evacuation (large) levels may be desig- nated for each zone. The instrument also retains a log of previous readings that can be accessed for analysis.

Box Temp Fault Chassis temperature is out of range

Bench Temp Fault Sensor temperature is out of range

Manifold Pressure Fault Pressure readings out of range

RS-485 Fault Communication Error

Loop Fault Current loop is open

Config. Fault No zones are enabled

Emerson E2 RX — 6.3.9.1 Diagnostic Alarms diagram (page 71)
Fig. 88 · 6.3.9.1 Diagnostic Alarms

Zero Filter Fault Charcoal filter needs repl.

Gain Set Fault Gain setting is out of range

A2D Fault A/D converter is not working

Zone Flow Fault No flow during sample cycle

Purge Flow Fault No flow during purge cycle

Over Range Fault Conc. above measurable range

Zero Range Fault Sensor voltage outside limits

Clipping Fault Sensor output voltage too high

Table 6-7 -Diagnostic Alarm Outputs

6.3.10 Copeland Scroll – K5 Refrigeration Compressor

Figure 6-8 - RLDS

The Copeland Scroll — K5 Refrigeration Compressor (Lrg Ref Scroll) application can monitor large type com- pressors using the MODBUS network on E2 versions 3.02 and above. The Copeland Scroll — K5 Refrigeration is supported on E2 CX-400, CX-100 and above. The E2 monitors and records compressor information, configura- tion setup, status display, and alarm handling. The Cope- land Scroll — K5 Refrigeration will be associated with the suction group from the Compressor Association screen. The scroll can be associated by pressing - Controller Associations then - Compressor.

The RLDS has alarm level configuration parameters that are synchronized. These will be read first from the device. The E2 will be master of all other parameters. An audible alarm and front panel indicators are provided to signal alarm and fault conditions, and relay contacts are provided that can be used to trigger external alarm devices in the event of a system fault, or if a leak (small), spill (medium), or evacuation (large) level of gas is detected. The system also may be fitted with an optional two-chan- nel 4-20mA current loop board for connection to remote monitoring equipment.

Emerson E2 RX — 6.3.10 Copeland Scroll – K5 Refrigeration Compressor diagram (page 71)
Fig. 89 · 6.3.10 Copeland Scroll – K5 Refrigeration Compressor

The RLDS features full two-way communications via an RS485 interface. MODBUS RTU is the communication protocol standard and can be connected directly to an E2 controller version 3.02 and above. The RLDS is dynami- cally licensed for 15 devices for RX/BX/CX 300-500 and 1 for RX100 and CX100 (same as IRLDS).

Figure 6-9 - Compressor Association Screen

ECT MODBUS The RS485 Network and Hardware Setup • 6-11

Diagnostic Alarm Descriptions

Page 72 of the Emerson E2 RX user manual — 6.3.11 XM Series of Case Controllers
Page 72 · click to enlarge
Page 72

6.3.11 XM Series of Case Controllers

The XM series is a set of digital case controllers for low to medium units. The XM series control refrigeration solenoids and defrost (electric or hot gas), evaporator fans, lights and have an auxiliary output. These devices are available on E2 version 3.02 and above. 6.3.11.1 XM670

The XM670 is high level microprocessor based con- trollers for multiplexed cabinets suitable for applications on medium or low temperature. It can be inserted in a LAN of up to 8 different sections which can operate, depending on the programming, as stand alone controllers or following the commands coming from the other sec- tions. The XM670 is provided with 6 relay outputs to con- trol the solenoid valve, defrost (which can be either electrical or hot gas) the evaporator fans, the lights, an auxiliary output and an alarm output. The devices are also provided with four probe inputs, one for temperature con- trol, one to control the defrost end temperature of the evaporator, the third for the display, and the fourth can be used for application with virtual probe or for inlet/outlet air temperature measurement. Finally, the XM670 is equipped with the three digital inputs (free contact) and are fully configurable. 6.3.11.2 XM679

The XM679 is similar to the XM670, but with one relay output to drive pulsed electronic expansion valves. The XM679 also contains two probes are dedicated for superheat measurement and regulation. 6.3.11.3 XM678

The XM678 is similar to the XM670, but with one stepper valve output to drive an electronic expansion valve. The XM678 also contains two probes that are dedi- cated for superheat measurement and regulation.

Page 73 of the Emerson E2 RX user manual — 6.3.11 XM Series of Case Controllers
Page 73 · click to enlarge
Page 73
Emerson E2 RX — 6.3.11 XM Series of Case Controllers diagram (page 73)
Fig. 90 · 6.3.11 XM Series of Case Controllers

ECT MODBUS The RS485 Network and Hardware Setup • 6-13

Page 74 of the Emerson E2 RX user manual — 6.3.11 XM Series of Case Controllers
Page 74 · click to enlarge
Page 74
Emerson E2 RX — 6.3.11 XM Series of Case Controllers diagram (page 74)
Fig. 91 · 6.3.11 XM Series of Case Controllers
Page 75 of the Emerson E2 RX user manual — AC1
Page 75 · click to enlarge
Page 75

1. Connect the 4AO board to the RS485 I/O Network. 2. Set the network address on the first five rockers of dip switch S1. 3. Set the network baud rate using rockers 6 and 7 of dip switch S1. 4. Set RS485 termination jumpers UP (terminated) if at either end of a daisy chain. Otherwise, set jumpers DOWN (not terminated). 5. Optionally, connect the 4-20mA outputs in either a 2-wire or 4-wire hookup as illustrated in Step 5, or if a 4-20mA is not used, it may be left unconnected. 6. Connect board to the 24VAC secondary of the power transformer.

V IN

15-K

+ V OUT

15-K

SHIELDED TWISTED PAIR BELDEN #8761. FOR PLENUM, USE BELDEN #82761 OR #88761 OR EQUIV.

BAUD RATE

I/O NET

WIRE + to + (same color) WIRE 0V to 0V WIRE - to - (same color)

J9 J10 J11 J9 J10 J11

(Terminated) (Not Terminated) (Term) (Term)

“4-wire” 4-20mA (Internally Powered) Hookup example. (Not Isolated) +12V +4-20 4-20 OUT 0V _+ 250 ohms

“2-wire” 4-20mA (Externally Powered) Hookup example. (Isolated)

+12V +4-20 4-20 OUT 0V

WIRING FOR 640-0056, 56VA Transformer,

120/208/240 VAC

Three-conductor non-shielded cables are the recommended wire for connecting between the center-tapped transformer and I/O boards.

AC1

and 640-0080, 80VA Transformer 24VAC Center-Tapped Transformer

(HOT)

(NEUTRAL)

AC2

Power Wiring Types14 AWG Belden 9495 18 AWG Belden 9493

AC1

AC2

240 208 C

24V CT 24V

PRIMARY SIDE

SECONDARY SIDE

ECT MODBUS The RS485 Network and Hardware Setup • 6-15

Show 13 more labels / short text on this page
center-tapped · + · 4-20mA Analog Output · 4-20mA Analog Output · + · Jumper · Not Used · _ · + · _ · Not Used · 250 ohms · Grounded
Page 76 of the Emerson E2 RX user manual — 6.3.11 XM Series of Case Controllers
Page 76 · click to enlarge
Page 76
Emerson E2 RX — 6.3.11 XM Series of Case Controllers diagram (page 76)
Fig. 92 · 6.3.11 XM Series of Case Controllers
Page 77 of the Emerson E2 RX user manual — 6.3.11 XM Series of Case Controllers
Page 77 · click to enlarge
Page 77
Emerson E2 RX — 6.3.11 XM Series of Case Controllers diagram (page 77)
Fig. 93 · 6.3.11 XM Series of Case Controllers

SHIELDED TWISTED PAIR BELDEN #8761. FOR PLENUM, USE BELDEN #82761 OR #88761 OR EQUIV.

WIRE + to + (same color) WIRE 0V to 0V WIRE - to - (same color)

  • P/N 640-0041, 120VAC Primary, 50VA
  • P/N 640-0050, 120VAC Primary, 75VA

ECT MODBUS The RS485 Network and Hardware Setup • 6-17

Page 78 of the Emerson E2 RX user manual — 240 208 C
Page 78 · click to enlarge
Page 78

16AI INSTALLATION GUIDE

1. Connect 16A1 to the RS485 I/O Network.
2. Set the network address on the first five rockers of dip switch S3.
3. Set the network baud rate using rockers 6 and 7 of dip switch S3.
4. Set RS485 termination jumpers UP (term) if at either end of a daisy chain. Otherwise, set jumpers DOWN (not term).
5. Connect board to the 24VAC secondary of the power transformer.

BAUD RATE

SHIELDED TWISTED PAIR BELDEN #8761. FOR PLENUM, USE BELDEN #82761 OR #88761 OR EQUIV.

ADDRESS

TO OTHER

RS485 DEVICES

BOARD 1 BOARD 2 BOARD 3 BOARD 4

2 3 4 5 6 7 8 1 ON 2

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

ON

BOARD 5 BOARD 6 BOARD 7 BOARD 8

2 3 4 5 6 7 8 1 ON 2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

TO OTHER RS485 DEVICES

2 3 4 5 6 7 8 1 ON 2 3 4 5 6 7 8 1 ON

BOARD 9 BOARD 10 BOARD 11 BOARD 12

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

WIRE + to + (same color) WIRE 0V to 0V WIRE - to - (same color)

2 3 4 5 6 7 8 1 ON 2 3 4 5 6 7 8 1 ON

BOARD 13 BOARD 14 BOARD 15 BOARD 16

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

DAISY CHAIN CONFIGURATION

SET TERMINATING JUMPERS:

JU1 JU2 JU3 JU1 JU2 JU3

UP DOWN

(Terminated) (Not Terminated) (Term) (Term)

UP DOWN DOWN UP

WIRING FOR 640-0056, 56VA Transformer,

120/208/240 VAC

and 640-0080, 80VA Transformer

24VAC Center-Tapped Transformer 24VAC Center-Tapped L2 L1 Three-conductor non-shielded cables are the recommended wire for connecting between the center-tapped transformer and I/O boards.

AC1

(NEUTRAL)

(HOT)

AC2

Power Wiring Types14 AWG Belden 9495 18 AWG Belden 9493

AC1

AC2

Earth ground the 0V (center-tapped) terminal of each board

240 208 C

24V CT 24V

PRIMARY SIDE

SECONDARY SIDE

center-tapped · 9600 baud · 19200 baud

Page 79 of the Emerson E2 RX user manual — SECONDARY SIDE
Page 79 · click to enlarge
Page 79

MultiFlex ESR INSTALLATION GUIDE

POWER

1. Connect the MultiFlex ESR to the I/O Network.

VALVE 1 VALVE 2 VALVE 3 VALVE 7 VALVE 4 VALVE 5 VALVE 6 VALVE 8

AC2 AC1 GND

2. Set the network address on the first five rockers of the dip switch (labeled S1) on the MultiFlex ESR board.
3. Set the network baud rate using rockers 6 and 7.
4. Set the termination jumpers UP (terminated) if at either end of a daisy chain. Otherwise, set jumpers DOWN (no termination).

I/O NET

5. Wire each stepper valve by connecting the stepper valve harness to one of the eight connectors along the top of the board.

JP2 JP3 JP4

S1

6. Connect the MultiFlex ESR to a Class 2, 80VA 24VAC power transformer. (One MultiFlex ESR board per transformer.) For more information on transformer wiring, refer to the MultiFlex ESR manual ( ).

NETWORK 2

P/N 026-1720

Set the network address using the first 5 rockers of dip switch S1. Valid address range 1-31.

SHIELDED TWISTED PAIR BELDEN #8761. FOR PLENUM, USE BELDEN #82761, 88761, OR EQUIV.

S1

2 3 4 5 6 7 8 1 ON 2 3 4 5 6 7 8 1 ON

BOARD 1 BOARD 2 BOARD 3 BOARD 4

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

BOARD 5 BOARD 6 BOARD 7 BOARD 8

2 3 4 5 6 7 8 1 ON 2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

I/O NET

2 3 4 5 6 7 8 1 ON 2 3 4 5 6 7 8 1 ON

BOARD 9 BOARD 10 BOARD 11 BOARD 12

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON 2 3 4 5 6 7 8 1 ON

BOARD 13 BOARD 14 BOARD 15 BOARD 16

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON 2 3 4 5 6 7 8 1 ON

BOARD 17 BOARD 18 BOARD 19 BOARD 20

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON 2 3 4 5 6 7 8 1 ON

BOARD 21 BOARD 22 BOARD 23

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

BOARD 24

2 3 4 5 6 7 8 1 ON 2 3 4 5 6 7 8 1 ON

BOARD 25 BOARD 26 BOARD 27 BOARD 28

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON

BOARD 29

2 3 4 5 6 7 8 1 ON

2 3 4 5 6 7 8 1 ON BOARD 30 BOARD 31

WIRE + to + (same color) WIRE SHIELD TO CENTER PIN WIRE - to - (same color)

RS485 I/O NET

DAISY CHAIN CONFIGURATION

SET TERMINATING JUMPERS:

JP2 JP3 JP4

JP2 JP3 JP4

TERMINATION (Jumpers in the UP position)

NO TERMINATION (Jumpers in the

Valve 1 connector enlarged to show harness wire color orientation:

Use the cable harnesses that are supplied with the valves. (A valve cable harness may not be longer than 150 feet)

(Match wire colors to silk screen legend on valve connectors)

Wire color legend silk screened on each valve connector (8)

ECT Flow ESR 12 or ESR 20 Valve

Valve connectors on the MultiFlex ESR board (1-8)

For Sporlan valves match all wire colors the green wire. Instead, connect the green wire to the silk screen blue wire legend.

BLU R BLK W

VALVE 4 VALVE 5 VALVE 6 VALVE 7 VALVE 8 VALVE 3 VALVE 2

GND 6

120/208/240 VAC

WIRING FOR 640-0080, 80VA, 24VAC Center-Tapped Transformer

AC1

(HOT)

(NEUTRAL)

AC2

Three-conductor non-shielded cables are the recommended wire for connecting between the center-tapped transformer and MultiFlex ESR boards.

AC1

GND

AC2

Earth ground the GND (center-tapped) terminal of each board

240 208 C

24V CT 24V

Power Wiring Types14 AWG Belden 9495 18 AWG Belden 9493 PRIMARY SIDE

SECONDARY SIDE

ECT MODBUS The RS485 Network and Hardware Setup • 6-19

Show 6 more labels / short text on this page
center-tapped · +485 · DOWN position) · Stepper valve harness · except · 24VAC Center-Tapped
Page 80 of the Emerson E2 RX user manual — (P/N 535-2711)
Page 80 · click to enlarge
Page 80

XEV22D DRIVER TO E2

INSTALLATION GUIDE

1. Connect the MODBUS Network to the RS-485 Connector on the E2 PIB board (Belden 8641 recommended). 2.

13 14 15 16 17 18 19 20 21

XEV22D

3. Position the three termination jumpers to the UP (terminated) position to provide RS-485 termination at the E2. 4. Do not connect the shield of the MODBUS network to the E2 PIB center terminal. Instead, use a 100 ohm ½ watt resistor to connect the MODBUS cable shield to earth ground. 5. At the XEV22 device, wire the MODBUS cable to the RS-485 +/- terminals and connect the MODBUS shield to the pin 16 terminal. 6. Terminate the end of the MODBUS network at the last device on the daisy chain with the MODBUS termination block (P/N 535-2711), or by connecting a 150 ohm resistor between the MODBUS +/- terminals. For more information, please refer to the XVE22D user manual

HOT KEY

1 2 4 5 6 7 8

P/N 026-1206

637-4890 COM4 ON E2 PIB

RS-485 -2A

RS-485

0V +

0V +

637-4890 COM4 ON E2 PIB

RS-485 -2A

RS-485

MODBUS SHIELD TO TERMINAL OF DEVICE

PIN 16

0V +

0V +

RESISTOR

13 14 15 17

13 14 15 17

100 OHM ½ WATT

LAST XEV22D DEVICE

XEV22D

TO DEVICE EARTH GROUND CONNECTION

1 2 4 5 + _

1 2 4 5 + _

WIRE BLACK TO + WIRE WHITE TO _

WIRE BLACK TO + WIRE WHITE TO

REVERSE POLARITY OF +/- ON RS-485 CABLE FROM E2 TO DEVICE

MODBUS TERMINATION BLOCK 150 OHM TERMINATE LAST DEVICE ONLY

FROM E2 PIB BOARD OR OTHER RS-485 MODBUS DEVICE

(P/N 535-2711)

Page 81 of the Emerson E2 RX user manual — MODBUS TERMINAL
Page 81 · click to enlarge
Page 81

XR35CX, XR75CX TO E2

INSTALLATION GUIDE

1. Connect the MODBUS Network to the RS-485 Connector on the E2 PIB board (Belden 8641 recommended). 2.

16 17 18 19 20 21 22 23 24

3. Position the three termination jumpers to the UP (terminated) position to provide RS-485 termination at the E2. 4. Do not connect the shield of the MODBUS network to the E2 PIB center terminal. Instead, use a 100 ohm ½ watt resistor to connect the MODBUS cable shield to earth ground. 5. At each device, wire the MODBUS cable to the RS-485 +/- terminals and connect the MODBUS shield to the pin termi nal. 6. Terminate the end of the MODBUS network at the last device on the daisy chain with the MODBUS termination block (P/N 535-2711), or by connecting a 150 ohm resistor between the MODBUS +/- terminals. For more information, please refer to the XR35CX user manual - and the XR75CX user manual - P/N 026-1203 P/N 026-1210.

XR35CX / XR75CX

DEVICE

1 2 3 4 5 6 7 8

HOT KEY

RS-485 I/O or MODBUS Net

637-4890 COM4 ON E2 PIB

RS-485

COM 4

RS-485 -2A

0V +

0V +

NOT TERMINATED TERMINATED

RESISTOR

100 OHM ½ WATT

BELDEN 8641

EARTH GROUND CONNECTION

TO DEVICE

637-4890 COM4 ON E2 PIB

RS-485 -2A

RS-485

0V +

0V +

WIRE WHITE TO + WIRE BLACK TO _

SHIELDED TWISTED PAIR RECOMMENDED

BELDEN 8641

OBSERVE WIRE COLOR POLARITY

100 OHM ½ WATT

REVERSE POLARITY OF +/- ON RS-485 CABLE FROM E2 TO DEVICE

FROM OTHER RS-485 MODBUS DEVICE

MODBUS TERMINATION BLOCK (P/N 535-2711) 150 OHM TERMINATE LAST DEVICE ONLY

MODBUS TERMINAL

BLOCK

WIRE BLACK TO + WIRE WHITE TO _

XR35CX/XR75CX

TERMINAL XR35CX/XR75CX

ECT MODBUS The RS485 Network and Hardware Setup • 6-21

Page 82 of the Emerson E2 RX user manual — 6.3.11 XM Series of Case Controllers
Page 82 · click to enlarge
Page 82
Page 82 of the Emerson E2 RX user manual — 6.3.11 XM Series of Case Controllers
Page 83 of the Emerson E2 RX user manual — tions
Page 83 · click to enlarge
Page 83

7 E2 Ethernet Peer Communications

Communication between E2 controller version 2.10 or greater may now be implemented through an Ethernet net- work using TCP/IP protocol. To utilize peer connections over Ethernet, the following tasks must be performed:

7.2.1 Components

  • Upgrade the E2 controller firmware to version 2.10 or greater.

Ethernet Five- or Nine-port Switch (may require an additional power supply)

* Industrial grade * Operating/storage temp range: -40°F to 185°F * Vibration: IEC68-2-6 * RH: 5 to 95% * UL 508A, CE approved * Supports 10Base-T crossover cable * Supports all IEEE 802.3 proto- col * Supports Auto Crossover MDI/MDI-X * Screw-terminal power connec- tors

  • Install an industry-standard Ethernet switch(es) or hub(s) in an area or areas nearby the E2 controllers.
  • Install Ethernet straight-through cabling at the site from each E2 to the switch or hub. Installation of RJ-45 connectors may be necessary to achieve this goal. The recommended cabling is CAT 5.

7.1 Ethernet IP Configurations

If using an open network configuration (see Section 7.4.2, Open Network Layout), contact your IT Network Administrator for all IP configuration information (IP Address, Subnet Mask, Primary and Default Gateway set- tings).

Ethernet Surge and Lightning Protector (recom- mended)

* Industrial grade * Surge capacity: 1 kA / line *Operating temp range: -40°F to 185°F *Max frequency: 155 MHz *Clamp and rated: 10V and 5V

7.2 Hardware Specifica-

Room Temperature (0 to 50 C) P/N 570-0100

tions

Standard industry-accepted practices for wiring of Eth- ernet networks are expected. E2 controllers use a star topology, identical to PC deployment. This includes a unique “point-to-point” run from a switch or hub to the controller (see Table 7-1 for hub part numbers for order- ing). This is done with Category5 (or better) cable. Maxi- mum distance for a run of 10BaseT is 328 feet (100 meters) (11.5 dB loss max).

Extended Temperature (-40 to 65 C) P/N 570-0200

Table 7-1 - Equipment for E2 Ethernet Peer Communications

  • The maximum number of controllers allowed on an IP subnet is 20. All E2 controllers that must communicate with each other must be on the same subnet.
  • Recommended Ethernet cabling is CAT 5 (straightthrough cable).
  • 328 feet (100 meters) is the maximum distance allowed between devices before a switch or hub must be added.

Ethernet IP Configurations E2 Ethernet Peer Communications • 7-1

Show 5 more labels / short text on this page
Equipment · Specifications · Type · 10-Base-T/100- Base-TX Hub · 10-Base-T/100- Base-TX Hub
Page 84 of the Emerson E2 RX user manual — 7.4.1 Closed Network Layout
Page 84 · click to enlarge
Page 84

7.3 Software Specifications

TCP/IP

E2 controller versions 2.10 and later communicate between controllers using the TCP/IP protocol. TCP Port 7238 is the default for connections established between the controllers. All peer communications occur over this port.

7.4.1 Closed Network Layout

7.4 Ethernet Network Layouts

Emerson E2 RX — 7.4.1 Closed Network Layout diagram (page 84)
Fig. 94 · 7.4.1 Closed Network Layout

The two types of network options for E2 controllers using Ethernet communications are:

1. “Closed Network” - E2 devices are not connected to a store’s LAN. (The only devices on the network are the E2 controllers themselves.) This network type is used if there is no need to integrate the network into the company’s intranet.
2. “Open Network” - E2 devices are connected to the store’s LAN. (Devices on the network include E2s and other Ethernet-TCP/IP devices.) This network type is used if the network will be connected to the store’s LAN.

Figure 7-1 - Closed Network Layout

The E2 peer Ethernet network facilitates communica- tions between E2 controllers. These include at least the following:

  • Routing of messages between external entities such as UltraSite, InSite, Site Manager, and non-gateway E2 controllers.
  • Distribution of global data and other network variables such as system time, controller identification, etc.
  • Communication between E2 controller applications such as Remote Login and Remote File Services.
Page 85 of the Emerson E2 RX user manual — 7.5 Software Setup
Page 85 · click to enlarge
Page 85

7.4.2 Open Network Layout

Emerson E2 RX — 7.4.2 Open Network Layout diagram (page 85)
Fig. 95 · 7.4.2 Open Network Layout
Emerson E2 RX — 7.4.2 Open Network Layout diagram (page 85)
Fig. 96 · 7.4.2 Open Network Layout

Figure 7-3 TCP/IP Setup Screen

3. Tab over to the Peer Netwrk tab:

Figure 7-2 - Open Network Layout

Emerson E2 RX — 7.4.2 Open Network Layout diagram (page 85)
Fig. 97 · 7.4.2 Open Network Layout

7.5 Software Setup

1. Log on to the E2 controller
2. Navigate to the TCP/IP setup screen ( Alt + T )

NOTE: DHCP does not have to be enabled if you have the IP Address, Subnet Mask, and Primary Gateway settings. (Contact your IT Network Administrator for all IP configuration infor- mation.) If you do not have the IP configuration set- tings, and there is a DHCP server on the network, set DHCP Enabled to Yes and it will retrieve the informa- tion from the server and populate those fields. E2 con- trollers must all have the same Ethernet Subnet in order to communicate box-to-box.

Figure 7-4 Peer Network Tab - Set Network Type

4. Change Network Type to: Ethernet (ETH) and press Enter. The Group Name field is now visible.
5. Once the Ethernet network type is enabled, enter

Software Setup E2 Ethernet Peer Communications • 7-3

Page 86 of the Emerson E2 RX user manual — 7.6 Troubleshooting
Page 86 · click to enlarge
Page 86

a unique site name in the Group Name field.

Emerson E2 RX — 7.6 Troubleshooting diagram (page 86)
Fig. 98 · 7.6 Troubleshooting

Figure 7-5 Peer Network Tab - Set Group Name

All controllers that you would like to appear in this group must all have the same group name and must be using the same network type.

7.6 Troubleshooting

Network troubleshooting is outside the scope of this section (Section 7, E2 Ethernet Peer Communications). Consult your IT Network Administrator for any additional information needed.

Page 87 of the Emerson E2 RX user manual — 8.3 Echelon Network Structuring (Daisy-Chains)
Page 87 · click to enlarge
Page 87

8 Echelon Network and Hardware Setup

8.1 Overview

Echelon is an optional, two-conductor network that interconnects E2s and other associated devices, such as CC-100 case controllers, TD3 temperature displays, and ESR8 evaporator stepper regulator boards. All Echelon devices are wired together using the daisy-chain method of network structuring. If an Echelon network-enabled E2 is required, it must be specifically ordered from Retail Solutions as an Echelon-enabled E2, and equipped with an Echelon plug-in card. See Section 4.3.1, Echelon Card Plug-In (P/N 537-4860) with mounting screw (P/N 101-4201).

8.2 Wiring Type

Retail Solutions specifies one type of cable for Echelon Network wiring. This cable type’s properties are listed in Table 8-1.

Cable Type Level 4, twisted pair, stranded, shielded

Wire Diam./AWG 0.65mm/22AWG

Table 8-1 - Echelon Network Cable Specifications

Cable Type Retail Solutions Part Number

1 pair, non-plenum 135-2300

1 pair, plenum 135-2301

Table 8-2 - Recommended Wiring

8.3 Echelon Network Structuring (Daisy-Chains)

large unbroken chain, called a daisy chain (see Figure 8-2). This allows for all devices in the Eche- lon Network to be hard wired together for trouble free communication.

Echelon devices are networked together into configu- rations called segments. A segment is a group of up to 64 Echelon devices that are connected together on an unbro- ken series of wires.

The recommended way of constructing an Echelon Network is called daisy-chaining. In the daisy-chain net- work configuration, devices are arranged by subnets, which consist of one E2 and all Echelon devices associ- ated with the E2.

First, all devices in a subnet are connected in an unbro- ken chain without branches or “star configurations” (see Figure 8-1). Then, if more than one E2 is present on-site, all chains are connected so that the entire network forms a

Overview Echelon Network and Hardware Setup • 8-1

Loop Resistance 106(ohms/km) · Capacitance 49(nF/km)

Page 88 of the Emerson E2 RX user manual — 8.3.1 Maximum Number of Echelon Devices
Page 88 · click to enlarge
Page 88

multiple routers can be used to extend the network indefi- nitely.

Emerson E2 RX — 8.3.1 Maximum Number of Echelon Devices diagram (page 88)
Fig. 99 · 8.3.1 Maximum Number of Echelon Devices

More information about routers and how they are used in a daisy-chain Echelon Network can be found in the Router and Repeater Installation Guide (P/N 026-1605).

8.4 Device Termination

In a daisy-chain configuration, both ends of the net- work segment must be terminated. Terminate the E2 by setting jumper JP7 to the UP position, as shown in Figure 8-3. Other devices on the Echelon Network are terminated either by jumpers on the control board or by connecting a 102-ohm “terminator block” at the end of the network seg- ment (see Section 8.4.1, Using a Termination Block (P/N 535-2715) to Terminate a Daisy Chain). Refer to the installation guide references at the end of this section for specific device termination instructions.

All other E2s and Echelon devices that aren’t at the end of a daisy-chained network segment must be untermi- nated.

Figure 8-1 - Echelon Wiring - Subnets

If a router or repeater is being used in a network, termi- nation becomes more complicated, because routers and repeaters join multiple daisy-chain segments together. Refer to the Router and Repeater Installation Guide (P/N 026-1605), for specific termination instructions.

Emerson E2 RX — 8.4 Device Termination diagram (page 88)
Fig. 100 · 8.4 Device Termination
Emerson E2 RX — 8.4 Device Termination diagram (page 88)
Fig. 101 · 8.4 Device Termination

Figure 8-2 - Echelon Wiring, pt. 2

8.3.1 Maximum Number of Echelon Devices

A daisy-chained segment may contain no more than 63 total Echelon devices (also called "nodes"). If there are 64 or more Echelon devices at your site, an Echelon-compati- ble router (P/N 572-4200) will be required. A router placed on the Echelon Network allows you to add another 63-node daisy-chain network. For larger installations,

Figure 8-3 - E2 Termination - Daisy Chain

Page 89 of the Emerson E2 RX user manual — 8.5 Wire Restrictions
Page 89 · click to enlarge
Page 89

8.4.1 Using a Termination Block (P/N 535-2715) to Terminate a Daisy Chain

a maximum of 63 more nodes.

Repeaters boost signal strength and are only used in instances where a segment of 63 nodes or less uses more than 4592 feet of Echelon cable.

Some Echelon Network devices, notably TD3s, have no on-board means of terminating. For some other devices, it is inconvenient to use the jumpers supplied for termination (the CC-100/CS-100 case controllers, for example, require the enclosure to be removed to set the jumper).

Refer to the Router and Repeater Installation Guide (P/N 026-1605), for information about router and repeater placement.

8.6 Installing Echelon Devices

To remedy these problems, Retail Solutions supplies termination blocks that can be wired to the end of an Eche- lon cable segment. This termination block uses the same three-pin connector as all other Echelon devices. Wire the two signal wires to the outside terminals, and connect the shield to the middle terminal (see Figure 8-4).

The E2 control system has several types of peripheral control boards that communicate using the Echelon Net- work: the 16AIe analog input board, the 8ROe relay out- put board, the CC-100/CS-100 series of case control and case circuit control boards, and the ESR8 board. 8.6.1 Powering Echelon Devices

Emerson E2 RX — 8.6 Installing Echelon Devices diagram (page 89)
Fig. 102 · 8.6 Installing Echelon Devices
Emerson E2 RX — 8.6 Installing Echelon Devices diagram (page 89)
Fig. 103 · 8.6 Installing Echelon Devices

All Echelon devices require 24VAC Class 2 power. Retail Solutions specs several sizes of transformers to accommodate the full range of Retail Solutions’ Echelon- compatible products. Table 8-3 lists each transformer’s part number and rating.

Emerson E2 RX — 8.6 Installing Echelon Devices diagram (page 89)
Fig. 104 · 8.6 Installing Echelon Devices

Figure 8-4 - Placement and Wiring of the Termination Block

8.5 Wire Restrictions

Table 8-3 - Class 2 Transformers for Echelon Devices

Maximum Total Segment Length

The total amount of wire used to connect all E2s and associated controllers in a single segment (not including devices on the other side of routers) cannot be longer than 4592 feet (1400 meters). If the total length of cable used is longer than 4592 feet, a repeater or router will be required.

To select a power transformer for one or more Echelon devices:

1. Determine what the total VA is for the boards and controllers that will be powered by the transformer (see Table 8-4 ) .

Routers act as communication gateways that reduce the amount of network traffic. They are used when net- works exceed their 63-node limit. Adding a router allows you to add another daisy-chain segment of 4592 feet with

Example: Two TD3 boards (4 VA each), and one E2 (40 VA) board are to be powered by one transformer. The total VA is:

Wire Restrictions Echelon Network and Hardware Setup • 8-3

Page 90 of the Emerson E2 RX user manual — 1. Select (System Configuration)
Page 90 · click to enlarge
Page 90

2 4VA 1 40VA + 48VA =

2. Use a transformer that has a power rating equal to or higher than the total calculated VA (see Table 8-3 ). Example: Boards totaling 48VA can be connected to either a 50VA or 75VA transformer.

Red (D1) (Reset) ON: The Echelon port is being held in reset or if momentary it means the board has gone through reset

Red (Service) During normal operation this LED should be off. If the Ser- vice Pin is pressed, this LED will come on.

Unit amps VA VAC Center tapped?

E2 1.66 40 24 No

ESR8 2.4 75 24 No

If the LED is blinking, the node does not have its Subnet/ Node address set. (E2 should set this during the first power - up sequence where the user will be asked in which Subnet to put the controller (E2 will al- ways be Node = 1 on the net- work).

TD3 0.11 4 24 No

CC-100/

Power supplied by Power Module

CS-100

Table 8-4 - Device Power Requirements

Refer to the installation guides on the next few pages for instructions on how to install these boards on the Eche- lon Network.

If the LED is blinking, then try resetting the E2. If this does not correct the problem, re- place the Echelon board.

8.7 LEDs

The Echelon Board LEDs can be used to determine the status of normal operating parameters for the board.

ON (no blinking): Replace the Echelon board. The Neuron processor has lost its applica- tion program.

Table 8-5 - Echelon LED Status

8.8 Open Echelon Device Connectivity

Open-Echelon E2s must be ordered pre-configured from Retail Solutions. Open-Echelon licenses must be purchased and enabled on units, and are not transferrable to other units without assistance from Retail Solutions. Call 770-425-2724 for technical assistance or your sales representative. Your sales representative will know which devices your unit will connect to. 8.8.1 Configuring Echelon Devices

Login to the controller and enter the desired number of Echelon devices to be added in the Connected I/O screen. From the Main Menu:

1. Select (System Configuration)

2. Select (Network Setup)

Echelon Board Status

Page 91 of the Emerson E2 RX user manual — Network setup menu and select (Controller Setup). Or, from the Main Menu:
Page 91 · click to enlarge
Page 91

3. Select (Connected I/O Boards and Controllers)

Enter the number of Echelon devices you wish to add on the Connected I/O screen:

Emerson E2 RX — 3. Select (Connected I/O Boards and Controllers) diagram (page 91)
Fig. 105 · 3. Select (Connected I/O Boards and Controllers)
Emerson E2 RX — 3. Select (Connected I/O Boards and Controllers) diagram (page 91)
Fig. 106 · 3. Select (Connected I/O Boards and Controllers)

Figure 8-6 - Network Summary Screen (RX Unit Shown)

Highlight the LonMark device on the screen you wish to commission and follow the steps in Section 10.14.2, Commissioning a Device to commission the device. 8.8.1.1 Troubleshooting

Figure 8-5 - Connected I/O Screen (E2 firmware versions 2.81 and above)

After commissioning has been completed, check to make sure the device has been added successfully. From

Navigate to the Open Echelon field under the Third Party Tab section of the Connected I/O screen and enter the number of Echelon devices to be added.

the Main Menu, select (Configured Applications) to open the Configured Applications list. If the device you have commissioned does not appear in this list, the Description File has failed to upload correctly onto the E2. An alarm of No Description File will be generated and can be found in the Alarm Advisory Log. Call Retail Solu- tions at 770-425-2724 to contact your sales representative or technical assistance to obtain the Description File.

Next, commission the Echelon device. Commissioning is done at the Controller Setup screen. If still on the Con- nected I/O screen, hit the back button to go back to the

Network setup menu and select (Controller Setup). Or, from the Main Menu:

1. Select (System Configuration)

2. Select (Network Setup)

3. Select (Network Summary)

Commission the device on the Network Summary screen:

Open Echelon Device Connectivity Echelon Network and Hardware Setup • 8-5

Page 92 of the Emerson E2 RX user manual — 8.8.1.1 Troubleshooting
Page 92 · click to enlarge
Page 92
Emerson E2 RX — 8.8.1.1 Troubleshooting diagram (page 92)
Fig. 107 · 8.8.1.1 Troubleshooting
Page 93 of the Emerson E2 RX user manual — ECHELON CABLE TYPE
Page 93 · click to enlarge
Page 93
1. Connect the ESR8 to the Echelon Network.
2. Set the termination jumper on the ESR8. For daisy chain configurations, the device will need to be terminated only if at either end of a daisy chain.
3. Wire each Emerson Flow Controls ESR12 or ESR20 valve to one of the four-pin connectors on the ESR8. (Refer to the Emerson Flow Controls Valve Field Wiring Guide.) Use Belden #9418 18AWG or equivalent.
4. Connect the ESR8 to a Class 2, 75 VA 24VAC transformer.
5. Use the Service Button to commission the ESR8. Refer to section 8.14.4 in this manual for more information on commissioning a device. Note that dip switches (S2 & S3) are not implemented.

Emerson Flow Controls Valve Field Wiring Guide

1 2 3 4

Red Blue Black White

A1 A2 B1 B2

To other Einsteins/E2s, or Echelon devices

ECHELON CABLE TYPE

Level IV, 22 AWG, Shielded Max Daisy Chain Length: Feet: 4592 Meters: 1400 P/N 135-2300 Non-Plenum

(1 Pair, 1000 Feet)

(1 Pair, 1000 Feet)

Emerson Flow Controls ESR12 or ESR20 Valve #4

(Refer to the Emerson Flow Controls Valve Field Wiring Guide)

Use cable harness supplied with valve OR use 18AWG wire (no longer than 75 ft.) OR 14AWG wire (no longer than 200 ft.)

Open Echelon Device Connectivity Echelon Network and Hardware Setup • 8-7

Pin# Color Phase · P/N 135-2301 Plenum · Pin 1

Page 94 of the Emerson E2 RX user manual — 8.8.1.1 Troubleshooting
Page 94 · click to enlarge
Page 94
Emerson E2 RX — 8.8.1.1 Troubleshooting diagram (page 94)
Fig. 108 · 8.8.1.1 Troubleshooting
Page 95 of the Emerson E2 RX user manual — 9.1.1 Connecting Sensors to Input Boards
Page 95 · click to enlarge
Page 95

9 Input and Output Setup

9.1 The 16AI, 8IO, and MultiFlex Inputs

“+” terminal.

On the ARTC board, the input and output points are predefined and are labeled accordingly. 9.1.1.2 Sensor Wiring Types

9.1.1 Connecting Sensors to Input Boards

Specific wiring types are required for each type of sen- sor used with E2.

There are five network boards that may accept inputs: on the I/O Network, the MultiFlex, 16AI, ARTC, and the 8IO Combination Input/Output Board. Wiring an input to these boards requires three steps:

All Analog Temperature Sensors and Air Flow Sensors

Temperature and air flow sensors are to be wired with shielded, 2 conductor, at least 22 GA wire (Belden # 8761 or equivalent).

1. Connect the sensor’s signal wires to the two terminals of an input point.

All Pressure Transducers, Humidity Sensors, and Refrigeration Transducers

2. Set the input type dip switch that corresponds to the point being connected.

Pressure and refrigeration transducers and humidity sensors are to be wired with shielded, 3 conductor, at least 22 GA wire (Belden #8771 or equivalent).

3. If necessary, connect the power lead of the sensor to one of the 5V or 12V power terminals. 9.1.1.1 Wiring

Dewpoint and Light Level Sensors

These sensors are to be wired with shielded, 4 conduc- tor at least 22 GA wire (Belden # 8729 or equivalent). 9.1.1.3 Input Type Dip Switches

An input point connector on a MultiFlex, 16AI, and 16AIe board consists of two terminals, as shown in Figure 9-1. One of these terminals, labeled “SIG”, reads the sig- nal from the sensor, while the other, labeled “0v” is where sensor’s ground and/or cable shield wire is connected.

An input type dip switch must be set for each input point. Input type dip switches are located in the switch banks labeled S1 and S2 on the MultiFlex, 16AI, and switch bank S4 on the 8IO.

The input type dip switch tells the input board whether or not the sensor connected to the point requires a DC sup- ply voltage in order to operate. If the sensor requires DC voltage, the dip switch should be set to the DOWN posi- tion. If the sensor does not require power, or if it uses AC power, the dip switch should be set to the UP position. Dip switches for unused points should be set to the UP posi- tion.

The dip switch positions for each specific sensor type is shown in Figure 9-2. Figure 9-1 - Input Board Points

On a 16AI, terminals are numbered 1-32, starting with the first terminal of point 1 and ending with the last termi- nal of point 16. The even-numbered terminals of a 16AI are always where the signal voltages are connected. The sensor grounds and cable shields are connected to the odd- numbered terminals.

8IO and ARTC Boards

On an 8IO board, the two terminals of every point are labeled “-” or “+”. The ground wire is always connected to the “-” terminal, and the signal wire is connected to the

The 16AI, 8IO, and MultiFlex Inputs Input and Output Setup • 9-1

MultiFlex Boards · 16AI Boards

Page 96 of the Emerson E2 RX user manual — 9.1.2 Power Connection
Page 96 · click to enlarge
Page 96

9.1.2 Power Connection

Emerson E2 RX — 9.1.2 Power Connection diagram (page 96)
Fig. 109 · 9.1.2 Power Connection

If power is needed to operate the sensor, several termi- nals exist on the 16AI, Multiflex boards, 8IO, that may be used to supply DC power (see Figure 9-3 for 16AI and MultiFlex power connections).

Figure 9-2 - Input Type Dip Switches for MultiFlex 16 and 16AI Boards

Emerson E2 RX — 9.1.2 Power Connection diagram (page 96)
Fig. 110 · 9.1.2 Power Connection

Figure 9-3 - Input Board Power Sources

Input boards may supply 12VDC or 5VDC. To connect to one of the DC power sources, simply connect the sen- sor’s power wire to one of the terminals.

The maximum current that may be drawn from the +12VDC terminal is 100 milliamps. The maximum cur- rent that can be drawn from all three +5VDC terminals COMBINED is 50 milliamps.

Specific wiring instructions for each type of sensor are given in Table 9-1 on page 9-3.

Page 97 of the Emerson E2 RX user manual — 9.1.2 Power Connection
Page 97 · click to enlarge
Page 97
Emerson E2 RX — 9.1.2 Power Connection diagram (page 97)
Fig. 111 · 9.1.2 Power Connection

Up 1. Connect one lead to the odd numbered terminal and the other lead to the even num- bered terminal (polarity insensitive).

Up 1. Connect one lead to the odd numbered terminal and the other lead to the even numbered terminal (polarity insensitive).

1. Connect RED power wire to +5VDC supply on input board.
2. Connect WHITE signal wire to even numbered terminal.
3. Connect BLACK ground wire to odd numbered terminal.
4. Connect the bare SHIELD wire to odd numbered terminal.
1. Wire the “P” sensor terminal to 12VDC supply on board.
2. Wire the “GND” sensor terminal to odd numbered terminal.
3. Wire the “OUT” sensor terminal to even numbered terminal.
4. Jumper sensor terminal “N” to sensor terminal “GND”.

Table 9-1 - Sensor Wiring

The 16AI, 8IO, and MultiFlex Inputs Input and Output Setup • 9-3

Page 98 of the Emerson E2 RX user manual — 9.1.2 Power Connection
Page 98 · click to enlarge
Page 98

P/N Sensor Input Type Dip Switch Wiring

203-5751 Wall-mounted relative humidity (RH) sensor

Down 3. Use Belden #8771 shielded three-conductor cable or equivalent.

4. Connect the RED, BLACK, and WHITE wires to the screw terminals the sensor’s connector as shown in Figure 2 . Clip the SHIELD wire.
5. Connect the SHIELD and BLACK wires to the 0V terminal of the input board. Connect the WHITE wire to the SIG terminal of the input board.
6. Connect the RED wire to the +12V power terminal on the input board.
7. Locate the input dip switch for the sensor point, and set to the OFF position (LEFT for MultiFlex, DOWN for 16AI). Refer to the input board’s user manual for locations of the input dip switches.

206-0002 Light Level Down

1. Wire GREEN ground wire to odd numbered terminal.
2. Wire YELLOW and RED signal wires to even numbered terminal.
3. Wire the POWER wire to a +12VDC source on input board.

207-0100 Analog Liquid Level

1. Connect RED power wire to +12VDC source on input board.
2. Connect BLACK ground wire to odd numbered terminal.
3. Connect GREEN signal wire to even numbered terminal.

Table 9-1 - Sensor Wiring

Down

Page 99 of the Emerson E2 RX user manual — 9.1.2 Power Connection
Page 99 · click to enlarge
Page 99
Emerson E2 RX — 9.1.2 Power Connection diagram (page 99)
Fig. 112 · 9.1.2 Power Connection
1. Wire BLACK ground wire from “GND” sensor terminal to odd numbered board terminal.
2. Wire GREEN signal wire from “SIGNAL” sensor terminal to even numbered board terminal.
3. Wire RED power wire from “POWER” sensor terminal to +12VDC terminal on board.
1. Connect the WHITE and GREEN wires to AC1 and AC2 power terminals.
2. Connect BLACK ground wire to odd numbered board terminal.
3. Connect RED signal wire to even numbered board terminal.

Table 9-1 - Sensor Wiring

The 16AI, 8IO, and MultiFlex Inputs Input and Output Setup • 9-5

Page 100 of the Emerson E2 RX user manual — Press if the input is analog, press if the input is dig-
Page 100 · click to enlarge
Page 100
Emerson E2 RX — 9.1.3 Input Setup in E2 diagram (page 100)
Fig. 113 · 9.1.3 Input Setup in E2
1. Wire positive transducer terminal to positive 24VDC supply.
2. Wire negative transducer terminal to odd numbered input terminal.
3. Wire negative 24VDC supply to even numbered input terminal.
4. Place 250 resistor across odd and even numbered input terminals.
1. If the input board is an 8IO or a 16AI version E.02 or greater, connect the two KWh terminals to the input point (polarity insensitive)
2. If the input board is a 16AI version less than E.02, connect the KWh terminals to board point 1. Set input switch #1 DOWN, and set input switch #8 UP.
3. If the input board is a 16AIe, connect the two KWh terminals to input # 1, 2, 3, or 4 ONLY.

Table 9-1 - Sensor Wiring

9.1.3 Input Setup in E2

Emerson E2 RX — 9.1.3 Input Setup in E2 diagram (page 100)
Fig. 114 · 9.1.3 Input Setup in E2

At this point in the setup process, you should have all sensors, transducers, and other input devices wired to points on MultiFlexes, 16AIs, and all output devices con- nected to 8ROs, 8DOs, or 4AOs outputs. Once the physi- cal wiring is complete, you will need to tell E2 the types of sensors or devices that are connected to each I/O point. This is achieved in the Input and Output Definitions screens. 9.1.3.1 Configuring a Point from the Input Definitions/Status Screen

To configure a point, go to the Input Definitions/Status screen:

1. Press to open the Main Menu

2. Press (System Configuration)

Figure 9-4 - Input Status Screen

3. Press (Input Definitions)

Use the up and down arrow keys to move the cursor to the point you wish to set up, and press (SETUP).

The Input Status screen opens:

A pop-up menu such as the one shown in Figure 9-5 will prompt you to specify the point as analog or digital.

Press if the input is analog, press if the input is dig-

Page 101 of the Emerson E2 RX user manual — 9.1.3.3 Setting Up Analog Inputs
Page 101 · click to enlarge
Page 101

ital, or press to cancel setup.

been identified, a “-” will appear in the field instead.

5. Application
Emerson E2 RX — 9.1.3.2 Using the Input Definitions/Status Screen diagram (page 101)
Fig. 115 · 9.1.3.2 Using the Input Definitions/Status Screen

Select which application you wish to set up inputs to. Pressing (LOOK UP) when on a defined point will open the Application Selection menu--a list of application types currently existing in the box. (CANCEL) will cancel this menu.

6. Association

If a point has already been defined and is currently being used by an application, the name of the input to which the point is connected will be displayed in the Asso- ciation field.

Figure 9-5 - Data Type Pop-Up Menu

Depending upon what type of input you selected, the Analog Input or the Digital Input screen will appear. The analog screen is described in Section 9.1.3.3, while the digital screen is described in Section 9.1.3.4. 9.1.3.2 Using the Input Definitions/Status Screen

Association is the application’s user-defined property that is associated with the point. Multiple applications attached to single input will all be displayed in the Associ- ation field. Pressing (LOOK UP) on a set applica- tion will bring up a list of property selections. (CANCEL) will cancel this menu.

In order for the E2 to properly read an input value from a sensor or transducer hooked to an I/O board, you must first tell the E2 what kinds of devices are hooked into each input board point. This is achieved by using the Input Def- initions/Status screen. (SETUP), (DEL/MOD), (OFFSET), (LOOK UP), and (CAN- CEL) are the function keys along the bottom of the screen available for the Input Definitions/Status screen.

7. Value (read-only)

Value shows the sensor value in the units you select for the input type.

Each record in this screen contains the following infor- mation about a point:

1. Board Type (read-only)

The Board Type column will read 16AI regardless of whether the input board is a 16AI, MultiFlex 16, 8IO, or MultiFlex Combination I/O board.

9.1.3.3 Setting Up Analog Inputs

Open the Analog Input screen by selecting an Analog (A) input from the Input Status screen Figure 9-4 and pressing (SETUP).

The Analog Input screen Figure 9-4 is where sensor types, units, and default values are specified for analog input points.

2. Brd (read-only)

The point’s board number will appear in its point record under the Brd column. All input boards on a con- troller will be displayed.

3. Pt (read-only)

The point number of each point appears in its record under the Pt column.

4. Type (read-only)

The Type field shows the output’s data type. Possible Types are: A (Analog) or D (Digital). If the point has not

The 16AI, 8IO, and MultiFlex Inputs Input and Output Setup • 9-7

Page 102 of the Emerson E2 RX user manual — 9.1.3.2 Using the Input Definitions/Status Screen
Page 102 · click to enlarge
Page 102
Emerson E2 RX — 9.1.3.2 Using the Input Definitions/Status Screen diagram (page 102)
Fig. 116 · 9.1.3.2 Using the Input Definitions/Status Screen

12V-500 LB 12VDC 500 PSI transducer (1-6VDC output) (Discontin- ued)

5V-100 LB 5VDC 100 PSI transducer (0.5-4.5VDC output)

5V-200 LB 5VDC 200 PSI transducer (0.5-4.5VDC output)

5V-500 LB 5VDC 500 PSI transducer (0.5-4.5VDC output)

Refrig. Leak Refrigerant Leak Detector (not IRLDS)

Refrig. Level Refrigerant Liquid Level Probe

Figure 9-6 - Analog Input Screen

Point Name The Point Name is simply a name for

Liquid Level Liquid Level Float Sensor

the point that may be used as a reference.

Light Level Light Level Sensor

Assigning a descriptive name to a point makes setting

up inputs for applications much easier. For example, if you have an inside temperature sensor located in Zone 1 of your building, you may name it “ZONE 1 TEMP”. Then, when programming your HVAC applications, you may easily define Zone 1’s temper- ature sensor input by tying it to ZONE 1 TEMP. This keeps you from having to keep track of which sen- sors are tied to which point numbers.

Linear General purpose linear out- put sensor

Humidity Relative Humidity sensor

Pulse Accum. Kilowatt value from KW transducer pulse accumula- tion readings (see Units Per Pulse on page 9-9)

You are required to enter a point name in the Point Name field. The default name is “:{BOARD NAME}:{BOARD NUMBER}:{POINT NUM- BER}.”

KW Transducer Kilowatt transducer using 4- 20ma/0-5V signal

Board/Point # The Board/Point number will auto- matically be defined if you are configuring the point from the Input Status screen.

LM235 Temp Linear voltage output tem- perature sensor

PT2 Temp Danfoss PT2 temperature sensor

Sensor Type The analog input may come from a number of different sensor types.

CDK Temp CDK 2097MC temperature sensor

20K Pot Adjust Standard temperature sensor with offset adjustment (potentiometer)

Temperature CPC Standard Temp Sensor

ATP Hi Temperature CPC’s 100K High Tempera- ture Sensor (Range 0 - 500 DegF)

12V-100 LB 12VDC 100 PSI transducer (1-6VDC output) (Discontin- ued)

12V-200 LB 12VDC 200 PSI transducer (1-6VDC output) (Discontin- ued)

86K Temp Copeland’s integral dis- charge temperature sensor

Table 9-2 - Sensor Input Types

Table 9-2 - Sensor Input Types

Select Eng. Units The engineering units of the

Sensor Type Description · Dewpoint Dewpoint probe · Sensor Type Description

Page 103 of the Emerson E2 RX user manual — 9.1.3.4 Setting Up Digital Inputs
Page 103 · click to enlarge
Page 103

sensor value are entered in the Select Eng. Units field. This value is set automatically to an appropri- ate default unit whenever the Sensor Type is changed. To select a different engineering unit, press or to scroll through the options or select the unit from the (LOOK-UP).

points, point names, engineering units, and other impor- tant parameters.

Emerson E2 RX — 9.1.3.4 Setting Up Digital Inputs diagram (page 103)
Fig. 117 · 9.1.3.4 Setting Up Digital Inputs

Units Per Pulse The Units Per Pulse field appears

only when “Pulse Accum” is entered in the Sensor Type field.

The E2 is capable of generating an analog KW value by counting the number of pulses from the pulse accumulation outputs of a KW transducer. Each pulse from the transducer signifies that a fixed num- ber of KW has been used.

The number of KWs per pulse varies depending upon the type of transducer being used. Consult the trans- ducer’s documentation for the exact number of KWs per pulse and enter it in this field.

Default on Open The value placed here will deter-

Figure 9-7 - Digital Input Screen

mine the value the unit reports if there is an “open” condition detected in the sensor input connection. An “open” condition could be the result of a broken wire to the sensor or a sensor failure.

Point Name The Point Name is simply a name for

the point that may be used as a reference.

Assigning a descriptive name to a point makes set- ting up inputs for applications much easier. For example, if you are setting up a push-button switch to reset compressor 1 after an oil failure shut down, you may choose to name it “OIL RESET 1”. Then, when programming your Pressure Control applica- tion, you may easily define compressor 1’s reset input by tying it to OIL RESET 1. This keeps you from having to keep track of which contacts are tied to which point numbers.

Default on Short The numeric entry in this param-

eter is the default value the analog input would report if a “short” is detected on the sensor input connec- tion. A “short” could be the result of a damaged wire or a sensor failure.

Default Other The value placed in Default Other is

the value reported if the input is not updated after a certain amount of time. If there is a failure that will not allow the input board to report the value of the sensor, the value placed in this parameter will be reported.

You are required to enter a point name in the Point Name field. The default name is “:{BOARD NAME}:{BOARD NUMBER}:{POINT NUM- BER}.”

Sensor Offset If a sensor needs a numeric value

added or subtracted to the calculated value, enter the

Board/Point Number The Board/Point Number

number here. The value can be positive or negative. Sensors sometimes have to have offsets. The offset that you enter in this field is in the units you selected in the Eng Units field, NOT in millivolts.

will automatically be defined if you are configuring the point from the Input Summary Screen.

Select Eng. Units The Select Eng. Units field is

where you may select how the ON and OFF states of this point are displayed and represented in E2’s setup fields and status screens. By default, digital inputs have ON-OFF engineering units, meaning when the input is ON or OFF, the input will be represented as “ON” or “OFF” in the system software.

Output This field displays the link between the input

and the application(s) they feed into. You do not need to enter anything in this field. You will be able to link applications to this point during the application setup process. 9.1.3.4 Setting Up Digital Inputs

Since the controller looks at only the actual state of the point when it uses the input for control purposes, it is not necessary to define engineering units for dig- ital inputs. However, selecting units that are appro- priate to the input’s function (such as BYP or

Open the Digital Input screen by selecting a Digital (D) input from the Input Status screen Figure 9-4 and pressing (SETUP).

Set up digital inputs in order to assign digital input

The 16AI, 8IO, and MultiFlex Inputs Input and Output Setup • 9-9

Page 104 of the Emerson E2 RX user manual — 9.2.2 MultiFlex Relay Outputs
Page 104 · click to enlarge
Page 104

NO_BYP for inputs that initiate bypasses) will make the input’s state easier to read and understand.

The MultiFlex boards that have relay outputs (all mod- els except the MultiFlex 16) each have eight relays that energize and de-energize to control output loads.

To choose an engineering unit, press (LOOK UP) to select.

When setting up an output on one of these relays, you must make two important decisions:

Push Button Mode? Digital inputs may be set up

as “push button” inputs by changing this field to “YES”.

1. Do you want an ON command from your controller to mean “energize the relay” or “de-energize the relay,” and

Push Button Mode is a method of interpreting a digi- tal state that is used strictly for push buttons. When used, a button press lasting longer than one second will change the state of the input. In other words, if the input is OFF, a button press will change it to ON, and another button press will change it back to OFF, etc.

2. When the relay is de-energized, as is the case when the 8RO or 8IO goes off-line or loses power, do you want the contacts to be OPEN or CLOSED?

Decision #1 is made by setting the fail-safe switch. This is a bank of eight switches labeled S2 on the 8RO, 8ROe, and 8RO-FC, S3 on the 8IO, and S1 on the Multi- Flex plug-in output board. Each switch corresponds to an output on the board (switch #1 = output #1, etc.).

Output This field displays the link between the input

and its application(s). You do not need to enter any- thing in this field. You will be able to link applica- tions to this point during the application setup process.

Decision #2 is made either by setting a fail-safe jumper (for old-style 8ROs) or by wiring the load to either the N.O. or N.C. terminals on the Form C contact (all other output boards).

9.2 The 8RO, 8ROe, 8IO, and MultiFlex Outputs

Table 9-3 shows how the fail-safe switch, jumpers, and/or Form C contacts should be configured based on how you want the output to perform during both normal operation and during network/power loss.

The 8RO, 8ROe, 8IO, and MultiFlex have relay out- puts that close when called to be ON and open when called to be OFF. When an output point is closed (ON), the LED directly above the output terminal glows red. These boards use Form C contacts that determine if the connection will be open or closed during power failure. A fail-safe dip switch is used to determine connection status during net- work failure. 9.2.1 Wiring Form C Contacts

Set Jumper or Wire Form

Controller Command vs.

To:

To:

Figure 9-8 shows how to wire the three-terminal Form C contact.

ON=CLOSED OFF=OPEN

ON UP N.C.

One wire of the two-wire connection should always be connected to the middle terminal. The second wire must be connected to the N.C. terminal (if you want the relay to be closed (ON) during power failure) or the N.O. terminal (if you want the relay to be (OFF) during power failure).

ON=CLOSED OFF=OPEN

OFF UP N.O.

ON=OPEN OFF=CLOSED

ON DOWN N.O.

ON=OPEN OFF=CLOSED

OFF DOWN N.C.

RELAY IS

RELAY IS OPEN ON

CLOSED ON POWER

POWER FAILURE

Table 9-3 - Output Board Fail-Safe and Switch Settings

FAILURE

N.C. N.O. N.C. N.O.

9.2.3 Setting the Fail-Safe Dip Switch

Figure 9-8 - Form C Contact Wiring

9.2.2 MultiFlex Relay Outputs

The fail-safe dip switch determines the sate of the relay when communication is lost between the board and E2.

Show 4 more labels / short text on this page
Set Switch · Fail State · C Contacts · Contact State
Page 105 of the Emerson E2 RX user manual — 2. Press (System Configuration)
Page 105 · click to enlarge
Page 105

3. Press (Output Definitions)

The fail-safe dip switches are labeled S2 on the 8RO, and switch S3 on the 8ROe and 8IO. Each of the eight rockers on the fail-safe dip switch corresponds to an output on the board. Set the rocker UP to close the relay and turn the output ON during network failure. Set the switch DOWN to open the relay and turn the output OFF during network failure. 9.2.4 Wiring Outputs to Points

The Output Status screen opens:

Emerson E2 RX — 3. Press (Output Definitions) diagram (page 105)
Fig. 118 · 3. Press (Output Definitions)

The old design of 8RO (P/N 810-3002) used points with two terminals on them. To connect output devices to these points, wire the point terminals in series with the load, so that the path is closed when the 8RO relay is CLOSED and open when the 8RO relay is OPEN.

New 8ROs and 8RO-FCs

All other E2-compatible output boards, including the new design of 8RO (P/N 810-3005), the 8RO-FC, and have Form C contacts. Figure 9-8 shows how to wire the three-terminal Form C contact.

Figure 9-9 - Output Status Screen

One wire of the two-wire 8RO-FC connection should always be connected to the middle terminal. The second wire must either be connected to the N.C. terminal (if you want the path to be closed when the relay is de-energized) or the N.O. terminal (if you want the path to be open dur- ing power failure. 9.2.5 The Output LED

To configure a point, use the up and down arrow keys to move the cursor to the point you wish to set up, and press (SETUP).

If you press to set up a 4AO output point, the E2 will automatically transfer you to the Analog Output screen Figure 9-6. For all other output board types, press- ing will bring up a pop-up menu such as the one shown in Figure 9-10. This menu will prompt you to spec- ify the output as either Digital, Pulse, or One Shot. Press if the output is Digital, press if the output is Pulse,

Each output point on an output board has an indicator LED that shows the status of the output. This LED is lit to show the output is ON, and unlit to show the output is OFF.

press if the output is One Shot, or press to cancel setup.

The definition of ON and OFF in this case is deter- mined by the position of the fail-safe dip switch (see Table 9-3). Therefore, if the output’s switch is UP, an illuminated LED means the path is CLOSED, but if the switch is DOWN, an illuminated LED means the path is OPEN. 9.2.6 Output Setup in E2

Emerson E2 RX — 3. Press (Output Definitions) diagram (page 105)
Fig. 119 · 3. Press (Output Definitions)

In order for the E2 to properly control devices that are hooked to an I/O board, you must first tell the E2 what type of output the devices require. This is achieved from the Output Definitions/Status screen. 9.2.6.1 Configuring a Point from the Out- put Definitions/Status Screen

Figure 9-10 - Output Data Type Pop-Up Menu

Depending upon what type of output you selected, the Digital Output, (see Section 9.2.6.3, Setting Up Digital Outputs) Pulse Digital Output, or One Shot Digital Output screen will appear. 9.2.6.2 Using the Output Definitions/Sta- tus Screen

To configure a point, go to the Output Definitions/Sta- tus screen:

1. Press to open the Main Menu

2. Press (System Configuration)

The Output Definitions/Status screen serves a dual

The 8RO, 8ROe, 8IO, and MultiFlex Outputs Input and Output Setup • 9-11

Old 8ROs

Page 106 of the Emerson E2 RX user manual — 1. Board Type (read-only)
Page 106 · click to enlarge
Page 106

purpose. It is both an at-a-glance summary of all points on each output board and a menu where output points may be selected and configured.

that is associated with the point. Multiple applications attached to single input will all be displayed in the Associ- ation field. Pressing (LOOK UP) when on a set application will bring up a list of property selections. (CANCEL) will cancel this menu.

In order for the E2 to properly control devices that are hooked to an I/O board, you must first tell the E2 what type of output the devices require. This is achieved by using the Output Definitions/Status screen.

7. Value (read-only)

Value shows the sensor value in the units you select for the output type. 9.2.6.3 Setting Up Digital Outputs

(SETUP), (DEL/MOD), (LOOK UP), and (CANCEL) are the function keys along the bottom of the screen available for the Output Definitions/ Status screen.

Open the Digital Output screen by selecting a Digital (D) input from the Output Status screen Figure 9-9 and pressing (SETUP).

The Output Definitions/Status screen serves a dual purpose. It is both an at-a-glance summary of all points on each output board and a menu where output points may be selected and configured.

Digital Outputs are ON when the E2 calls for them to be ON, and OFF whenever the E2 calls for them to be OFF. Most outputs that directly activate and deactivate output devices will need to be set up as the Digital output type.

Each record in this screen contains the following infor- mation about a point:

1. Board Type (read-only)

Board Type shows which kind of output board the point is on. The Board Type field will read either 8RO, 8DO, or 4AO for I/O Network 16AI boards, E16AI, and 8ROE for Echelon Network 16AIe boards.

Emerson E2 RX — 1. Board Type (read-only) diagram (page 106)
Fig. 120 · 1. Board Type (read-only)

The last character of the Board Type field also shows what type of input the point is defined as. If a point has already been defined as an analog or digital input, this field will signify its input type with an “A” (for analog) or “D” (for digital).

2. Brd (read-only)

The point’s board number appears under the Brd field.

3. Pt (read-only)

The point number of each point appears in its record in the Pt field.

4. Type (read-only)

Figure 9-11 - Digital Output Screen

The Type field shows the output’s data type. Possible Types are: A (Analog), D (Digital), O (One Shot), or P (Pulse). If the point has not been identified, a “-” will appear at the end of the field instead.

Point Name The Point Name is simply a name for

the output point that may be used as a reference.

Assigning a descriptive name to a point makes set- ting up outputs for applications much easier. For example, if you are setting up condenser fan #3 for condenser #2, you may choose to name it “CND #2 FAN #3”. Then, when programming your Condenser Control application, you may easily define the fan output by tying it to CND #2 FAN #3. This keeps you from having to keep track of which contacts are tied to which point numbers.

5. Application

Select which application you wish to set up inputs to. Pressing (LOOK UP) when on a defined point will open the Application Selection menu--a list of application types currently existing in the box. (CANCEL) will cancel this menu.

6. Association

If a point has already been defined and is currently being used by an application, the name of the input to which the point is connected will be displayed in the Asso- ciation field.

You are required to enter a point name in the Point Name field. The default name is “:{BOARD NAME}:{SUBNET NUMBER}:{BOARD NUM- BER}:{POINT NUMBER}”.

Association is the application’s user-defined property

Page 107 of the Emerson E2 RX user manual — 9.2.6.4 Setting Up Analog Outputs
Page 107 · click to enlarge
Page 107

Board/Point # The Board/Point Number will auto-

9.2.6.4 Setting Up Analog Outputs

matically be defined if you are configuring the point from the Output Status screen.

Open the Analog Output screen by selecting an Analog (A) output from the Output Status screen Figure 9-9 and pressing (SETUP).

Select Eng. Units The Select Eng. Units field is

where you may select how the ON and OFF states of this point are displayed and represented in the E2’s setup fields and status screens. By default, digital outputs have ON-OFF engineering units, meaning when the output is ON or OFF, the input will be rep- resented as “ON” or “OFF” in the system software.

This is where output types, units, and default values are specified for analog output points.

In most cases, only the point name will need defining in this screen, unless you wish to change the 0-10V output range or configure a priority override.

Engineering units are only a visual representation of the state of the output point (energized or de-ener- gized). Therefore, it is not necessary to define engi- neering units for digital inputs. However, selecting units that are appropriate to the output’s function (such as BYP or NO_BYP for inputs that initiate bypasses) will make the output’s state easier to read and understand.

Emerson E2 RX — 9.2.6.4 Setting Up Analog Outputs diagram (page 107)
Fig. 121 · 9.2.6.4 Setting Up Analog Outputs

To choose an engineering unit, press (LOOK UP) to select.

Default Value The value that the relay output

should go to if the output is not associated to an application. The default value of the Default Value field is OFF.

Physical On Specifies whether the physical relay

output should energize or de-energize its coil when the logical output is on.

Figure 9-12 - Analog Output Screen

Physical Off Specifies whether the physical relay

Point Name The Point Name is simply a name for

output should energize or de-energize its coil when the logical output is off.

the output point that may be used as a reference.

Assigning a descriptive name to a point makes set- ting up outputs for applications much easier. For example, if you are setting up fan #3 for Zone 1, you may choose to name it “FAN#1 HT#3”. Then, when programming your Condenser Control application, you may easily define the fan output by tying it to FAN#1 HT#3. This keeps you from having to keep track of which contacts are tied to which point num- bers. You are required to enter a point name in the Point Name field. The default name is “:{BOARD NAME}:{SUBNET NUMBER}:{BOARD NUM- BER}:{POINT NUMBER}”.

Physical Null Specifies whether the physical relay

output should energize or de-energize its coil when there is no application associated with the output.

Minimum Physical On Time Specifies the mini-

mum time the physical output must remain on regardless of the logical output state.

Minimum Physical Off Time Specifies the mini-

mum time the physical output must remain off regardless of the logical output state.

PRIORITY OVR When an input is overridden to an

output cell. If this input is not set to NONE, it will be used for the output value instead of the input value, but only for the override timeout period.

Board/Point # The Board/Point Number will auto-

matically be defined if you are configuring the point from the Output Definitions screen.

Priority Override Timeout When an input goes

Output Type The analog output may be either of

on it will override to a value for the timeout period.

two types: Linear and VSComp.

INPUT This field links the output to an application.

Linear means that the output is a standard 0-10VDC

You do not need to enter anything in this field. You will be able to link applications to this point during the application setup process.

linear output.

VSComp means that the output is a percentage (0% -

100%) that is driving an inverter that controls a vari-

The 8RO, 8ROe, 8IO, and MultiFlex Outputs Input and Output Setup • 9-13

Page 108 of the Emerson E2 RX user manual — 9.3.1 Inputs
Page 108 · click to enlarge
Page 108

9.3 CC-100 Case Controllers

able-speed device such as a compressor or fan.

If the output will be driving a variable-speed device,

choose VSComp in this field; otherwise, select Lin- ear. Use (LOOK UP) to select.

9.3.1 Inputs

Select Eng. Units The engineering units of the

output value are entered in the Select Eng. Units field. This value is defaulted to percent (PCT). Use (LOOK UP) to select.

The input connections to the CC-100 are made on the left-hand side of the controller. Figure 9-13 shows the CC-100 input connections.

Default Value The value that the relay output

should go to if the output is not associated to an application. The default value of the Default Value field is OFF.

Emerson E2 RX — 9.3.1 Inputs diagram (page 108)
Fig. 122 · 9.3.1 Inputs

Modify Output Equation Enables the value to be

translated into an output.

Low End Point The output voltage when the

INPUT is at the value specified in the Low Eng. Units field.

High End Point The output voltage when the

INPUT is at the value specified in the High Eng. Units field.

Low Eng. Units The value of the input (in Engi-

Figure 9-13 - Temperature, Auxiliary and HHT Inputs

neering Units) that will produce the output voltage specified in the Low End Point field.

Temperature and Digital Sensors

The six two-pin Molex connectors on the left-hand side of the unit (numbered 1 through 6) are where the case’s temperature probes, coil inlet/coil outlet sensors, and other digital switches and contacts are connected. CPC temperature sensor leads are equipped with male connectors that plug in to these receptacles.

High Eng. Units The value of the input (in Engi-

neering Units) that will produce the output voltage specified in the High End Point field.

PRIORITY OVR When an input is overridden to an

output cell. If this input is not set to NONE, it will be used for the output value instead of the input value, but only for the override timeout period.

For digital switches and sensors such as dual-temp and clean switches, CPC supplies a digital output harness (P/N 335-3264) that consists of a connector with a two-wire pigtail. These wires may be spliced on to the switch or dig- ital sensor leads. The connector is designed to snap in to one of the six inputs.

Priority Override Timeout When an input goes

on it will override to a value for the timeout period.

INPUT This field links the output to an application.

You do not need to enter anything in this field. You will be able to link applications to this point during the application setup process.

In order to function correctly, the CC-100 needs to know the function of each of the sensors plugged into inputs 1 through 6. For example, a CC-100P liquid pulse controller needs to know which of the six sensors is the coil in sensor, which is the coil out sensor, etc.

Each of the six inputs have a default input type assign- ment based on the type of CC-100 (either Liquid, or Suc- tion). If the sensors in your case match the default sensor types, plug each sensor into the appropriate receptacle.

Connection

Page 109 of the Emerson E2 RX user manual — 9.3.3 Valve Cable
Page 109 · click to enlarge
Page 109

override numerous case functions.

The Hand-Held Terminal jack also doubles as a service pin, used when commissioning a CC-100. Plugging the Hand-Held Terminal into a CC-100 sends the special Ech- elon ID number to the E2. 9.3.2 Power Module Wiring

Emerson E2 RX — Auxiliary Analog Input diagram (page 109)
Fig. 123 · Auxiliary Analog Input

CC-100s are powered by 24VAC Class 2 power, which is supplied by a CPC power module.

The case power module should be connected to either a 120 VAC or 240 VAC single phase power source (which- ever is necessary for the model ordered). Complete wiring of the case controller power module, including lights, fans, defrost, and anti-sweat heaters, is diagrammed in Figure 9-15. Follow all local, NEC, and UL wiring practices.

Power is supplied to the CC-100 via the output cable harness.

Table 9-4 - Default Input Assignments

If your case has sensors or switches that are not listed in the defaults above, or if it is otherwise impossible to use all the defaults for the CC-100, the input type can be changed in the system software. Refer to P/N 026-1603, Programmer’s Guide, for instructions on how to do this.

Emerson E2 RX — Auxiliary Analog Input diagram (page 109)
Fig. 124 · Auxiliary Analog Input
Emerson E2 RX — Auxiliary Analog Input diagram (page 109)
Fig. 125 · Auxiliary Analog Input

Figure 9-15 - Case Controller and Defrost Power Module Wiring Schematic

Figure 9-14 - Auxiliary Analog Input

9.3.3 Valve Cable

The four-pin analog input is designed to be connected to a Relative Humidity Sensor (P/N 203-5750). The wiring harness (P/N 335-3252) designed specifically for the input must be used. Wiring for this device is shown in Figure 9- 14.

The six-pin connector on the right-hand side of the CC-100 is where the liquid stepper or suction stepper must be connected. The CC-100 uses this connection to control the stepper motors and change the position of the valve aperture.

The Hand-Held Terminal jack on the left side of the CC-100 is where a CPC Hand-Held Terminal (HHT) may be connected. The HHT may be used to program setpoints and change settings in a CC-100. In addition, you may use an HHT to send a case into defrost (or terminate an exist- ing defrost), force a case into wash mode, and bypass or

All valve cable harnesses have a six-pin male connec- tor that plugs into the CC-100’s VALVE port. Plug this connector in so that the tab on the top of the connector is facing up.

For instructions on connecting the valve cable to the pulse or stepper valve, refer to the instructions below for

CC-100 Case Controllers Input and Output Setup • 9-15

Auxiliary Analog Input · Hand-Held Terminal Jack

Page 110 of the Emerson E2 RX user manual — 9.4 ESR8 Valve Output Wiring
Page 110 · click to enlarge
Page 110

the appropriate cable type.

P/N 335-3263 (Pulse Valve)

Emerson E2 RX — P/N 335-3263 (Pulse Valve) diagram (page 110)
Fig. 126 · P/N 335-3263 (Pulse Valve)

Figure 9-16 shows the connections for pulse valve 1 and pulse valve 2. The pulse valve 2 leads (BLACK/ GREEN) may be clipped if a second evaporator is not present on the case.

Emerson E2 RX — P/N 335-3263 (Pulse Valve) diagram (page 110)
Fig. 127 · P/N 335-3263 (Pulse Valve)

Table 9-5 - 335-3260 to Valve Connection Information

9.4 ESR8 Valve Output Wiring

Figure 9-16 - Wiring the 335-3263 Valve Cable

P/N 335-3261 (Sporlan SEI and Emerson Flow Con- trols ESR Stepper Valve)

The stepper valves are wired to the board by connect- ing the four-conductor wire from the stepper valve to a connector plug and then plugging in to one of eight jacks along the top of the board Figure 9-18. Use the cable har- nesses supplied with the valves or use Belden #9418 four- conductor 18AWG wire.

The 335-3261 valve cable is equipped with a four-pin male connector that plugs into a four-pin female connector on the valve. Plug the valve cable connector into the valve connector.

P/N 335-3260 (Generic Stepper and Emerson Flow Controls ESV Valve)

The 335-3260 valve cable has six flying leads for con- nection to a stepper valve. Four of these leads connect to the stepper motors, while the other two serve as the power wiring (+12VDC and ground).

The pinout for this valve cable is shown in Figure 9- 17. Table 9-5 shows how to hook the flying leads to Emer- son Flow Controls ESR, Emerson Flow Controls ESV, and Sporlan SEI & CDS valves.

If the stepper valves have block-style connectors, cut the ends off and attach the terminal plugs supplied with the ESR8 to the wire ends.

Emerson E2 RX — 9.4 ESR8 Valve Output Wiring diagram (page 110)
Fig. 128 · 9.4 ESR8 Valve Output Wiring

Figure 9-17 - Wiring the 335-3260 Generic Stepper Valve

Page 111 of the Emerson E2 RX user manual — STEPPER
Page 111 · click to enlarge
Page 111

Emerson Flow Controls ESR

STEPPER

WHITE BLACK BLUE RED

VALVE

TOP OF BOARD

Figure 9-18 - ESR8 Valve Wiring

ESR8 Valve Output Wiring Input and Output Setup • 9-17

Pin 1

Page 112 of the Emerson E2 RX user manual — P/N 335-3263 (Pulse Valve)
Page 112 · click to enlarge
Page 112
Page 112 of the Emerson E2 RX user manual — P/N 335-3263 (Pulse Valve)
Page 113 of the Emerson E2 RX user manual — 10.2 Cleaning Out the Controller
Page 113 · click to enlarge
Page 113

10 Quick Start

This section covers what to do when you are program- ming a new E2 for the first time. The section includes log- ging on, specifying information about I/O boards and application types, and other topics related to E2 program- ming and navigation.

Open the E2 controller panel. There are two buttons located midway down on the main board (see Figure 2-2). These buttons are used to perform various hardware func- tions.

Reset Button - The button labeled "RESET" on the main board resets the controller. Pressing and holding this button for one second will cause the E2 to reset and retain all pro- grammed applications, logs, and other data stored in memory.

10.1 Logging On

Emerson E2 RX — 10.1 Logging On diagram (page 113)
Fig. 129 · 10.1 Logging On

Clean Out Button - The button labeled CLEAN OUT on the controller is used to perform a function called clean out. Using this button in conjunction with the Reset But- ton will cause a clean out, which is a reset that erases all data from memory. The E2 will re-boot after a clean out with all programmed applications, logs, and other data erased.

Clean outs are also commonly called Blue “R” resets, named for the key presses required to clean out Retail Solutions’ previous generation of controllers, REFLECS.

Figure 10-1 - User Login Dialog Box

When the E2 is powered up for the first time, the first screen displayed after initialization is the User Login screen.

Performing a Clean Out

1. Enter “USER” in the Username field.
Emerson E2 RX — 10.1 Logging On diagram (page 113)
Fig. 130 · 10.1 Logging On
2. Press .
3. Enter “PASS” in the Password field.
4. Press .

Logging into and out of the E2 controller can be done at any time by pressing the key on the E2 keypad. If

1. Press and RELEASE the Reset Button quickly. The screen will clear.

you are currently logged out, pressing will bring up the User Login dialog box. If you are already logged in, pressing will immediately log you out and return you to the E2 home screen.

2. Press and Hold the Clean Out button.

3.When “CLEANOUT” appears in large text across the screen, RELEASE the Clean Out but- ton.

10.2 Cleaning Out the Controller

Cleaning out the E2 controller needs to be done if:

  • If you are programming your E2 controller for the first time.
  • If all of the settings need to be cleared.
  • If the program settings are unknown.

Logging On Quick Start • 10-1

Page 114 of the Emerson E2 RX user manual — 10.3 Setting Number of Network Devices
Page 114 · click to enlarge
Page 114

10.3 Setting Number of Network Devices

168AOs, and MultiFlex 88AO analog output boards on this E2’s I/O Network.

IRLDS Controllers Enter the number of IRLDS/

RLDS leak detection units on this E2’s I/O Network.

Emerson E2 RX — 10.3 Setting Number of Network Devices diagram (page 114)
Fig. 131 · 10.3 Setting Number of Network Devices

Liquid Ctrls (CC100P/CC100LS) Enter the com-

bined number of pulse valve case controllers (CC100Ps) and liquid-side stepper valve case con- trollers (CC100LSs) in this field.

Suction Controllers (CC100H) Enter the num-

ber of suction stepper case controllers (CC100Hs) in this field.

Circuit Suction (CS100) Enter the number of suc-

tion lineup circuit controllers (CS100s) in this field.

ESR8 Line Up Boards Enter the number of ESR

suction lineup circuit boards (SR100s) in this field.

TD3 Temperature Displays Enter the number of

TD3 temperature display units in this field.

Figure 10-2 - Connected I/O Setup Screen (E2 firmware versions 2.81 and above)

EC-2 Case Controllers Enter the number of EC-2

refrigerated case controllers in this field.

After logging in for the first time, the Connected I/O screen will ask you to specify how many of each type of device will be connected to the E2 you are currently pro- gramming. (Options will vary depending on the type of controller used.)

Echelon 16AI Enter the number of 16AIe analog

input boards in this field.

Echelon 8RO Enter the number of 8ROe analog

input boards in this field.

Unit Number (Echelon Subnet) Each E2 on the

Echelon Network must have a different unit number. This can be any number from 1 to 255, but each E2’s number must be unique. No two E2s on the network may have the same unit number.

When finished, press (NEXT) to move to the next screen.

Enter this number in the Unit Number field. It is rec-

ommended you number the first E2 “1” and number the other E2s on the network sequentially (2, 3, 4, etc.).

Unit Name Type a name for the E2 in the Unit

Name field.

Boards on the I/O Network

16AI Boards Enter the number of 16AIs or Multi- Flex I/O boards on this E2’s I/O Network. If you have any special MultiFlex or Gateway boards that emulate 16AI, also include their total number of boards in this field.

8RO Boards Enter the number of 8ROs and Multi- Flex 168AOs/168s/88AOs relay output boards on this E2’s I/O Network.

8DO Boards Enter the number of 8DO digital out- put boards on this E2’s I/O Network.

4AO Boards Enter the number of 4AOs, MultiFlex

Unit Controllers (Echelon)

Page 115 of the Emerson E2 RX user manual — 10.4 Setting Number of Applications
Page 115 · click to enlarge
Page 115

10.4 Setting Number of Applications

10.5 The Main Status (Home) Screen

Emerson E2 RX — 10.4 Setting Number of Applications diagram (page 115)
Fig. 132 · 10.4 Setting Number of Applications
Emerson E2 RX — 10.4 Setting Number of Applications diagram (page 115)
Fig. 133 · 10.4 Setting Number of Applications

Figure 10-3 - Application Setup (RX version shown)

Figure 10-4 - Home Screen (RX version shown)

The Application Setup screen is where you will enter information about the types of devices on the E2’s control system. If you know how many applications will be needed, this step will save you time and will keep you from having to create new applications during the setup process. (Options will vary depending on the type of con- troller used.)

The Main Status screen is the “home” screen for the E2. When no one is logged in to the controller, this is the screen that will be shown in the display. When a user is logged into the controller, the Home screen is displayed when the user is not performing any actions such as appli- cation setup, viewing other status screens, etc.

The Home screen will vary depending on the configu- ration of the controller. In most cases, the Home screen will show the real-time status of the most fundamental sys- tems being controlled by the E2.

The Home screen is a good place to point out three important common elements of all E2 screens: the screen header, the function key descriptions, and the help line.

Options will vary depending on the type of controller used. For more information on the E2 Home screen including options for both RX and BX versions, see Sec- tion 12.1, The E2 Home Screen. 10.5.1 Customizing the Home Screen

When finished, press (NEXT) to go straight to

the Main Status (Home) screen.

The Home screen can be customized to show different information depending on the user’s needs. There are eight different screen options available. The Device Summary screen is the Default screen. See Section 12.5, Customiz- ing the Home Screen for the steps to customize the Home screen.

Setting Number of Applications Quick Start • 10-3

Page 116 of the Emerson E2 RX user manual — 10.6.2 The Function Keys
Page 116 · click to enlarge
Page 116

10.6 Common Screen Elements

Battery indicator. Yellowless than 30% of battery life left. Red: less than 10% of bat-
Emerson E2 RX — 10.6 Common Screen Elements diagram (page 116)
Fig. 134 · 10.6 Common Screen Elements

tery life left or battery switch is disabled.

Single user is logged in

HEADER

Multi-users are logged in

Terminal mode in use

E2 is connected to Ethernet

Wait, or system is busy

HELP LINE

Disk activity, or saving to disk

Caps lock is ON

FUNCTION KEY DESCRIPTIONS

Table 10-1 - Header Icons and Descriptions

Figure 10-5 - Common Screen Elements (RX version shown)

10.6.2 The Function Keys

10.6.1 The Header

The first two lines at the top of the E2 screen are referred to as the screen header. This area of the screen contains the time and date, controller name, subnet and node number, and alarm and failure notifications. In addi- tion, it contains highlighted indicators and icons to show when a user is operating in a particular mode, such as full options, edit, macro record, or insert mode.

Figure 10-7 - Home Screen Function Keys (RX version shown)

At the very bottom of every screen in the E2, there are five boxes labeled through . These boxes are the function key descriptions. The function key descrip- tions show what each of the five function keys do when pressed. (Options will vary depending on the type of con- troller being used.)

If the E2’s Global Data feature is being used to supply outside air temperature and outside relative humidity val- ues, these values will also be displayed in the header. 10.6.1.1 Header Icons

Function key usage often varies depending on which screen or field E2 is currently in. 10.6.3 The Help Line

At the very top of every screen in the E2, there are icons that indicate various stages of activity, number of users logged into the controller, battery alerts, connectivity status, and more.

The line directly above the function button menu is called the help line. The help line displays information about the currently selected field, such as general descrip- tions, possible ranges, and other information to help a user maneuver around and/or configure the field.

Figure 10-6 - Header Icons

Icon Description

Page 117 of the Emerson E2 RX user manual — 10.7.1 The Main Menu
Page 117 · click to enlarge
Page 117

10.7.2 Status Screens

Emerson E2 RX — 10.7.2 Status Screens diagram (page 117)
Fig. 135 · 10.7.2 Status Screens

10.7 Screen Types

10.7.1 The Main Menu

Figure 10-9 - Status Screen (RX version shown)

Emerson E2 RX — 10.7.1 The Main Menu diagram (page 117)
Fig. 136 · 10.7.1 The Main Menu

Status screens are real-time views of application func- tions. They show the current status of all outputs, the cur- rent values of all inputs, and other important data such as control setpoints, run times, and whether or not bypasses or overrides are active.

Each status screen is specially designed to provide a concise at-a-glance view of how one or more systems are functioning.

TIP: To view the Suction Group Status screen in the RX controller, start from the Home screen. Press the function key (SUC- TION GRP). If more than one Suction Group has been set up, the Suction Group Summary screen opens. Choose which application you wish to view with the cursor and press. The current status, runtime, and HP rating for each compressor are displayed in this screen.

Figure 10-8 - The Main Menu (RX version shown)

The Main Menu is accessed by pressing the key. This menu gives you direct access to applications such as Suction Groups, Condensers, Circuits, Air Han- dling Units, Zones, Light Schedules, and Sensor Controls applications, (depending on which controller type you are using) as well as all configured applications in the control- ler. The Main Menu also allows you to add and delete applications, gives system configuration abilities, and shows status information for inputs and outputs, network, graphs and logs.

To view other application types, use the function keys , , and (see Table 10-2) to see the condenser, circuits, and sensor control status screens.

Screen Types Quick Start • 10-5

Page 118 of the Emerson E2 RX user manual — RX
Page 118 · click to enlarge
Page 118

Actions Menu Item Description

RX

BX

Graph Opens graph view for the selected

Suction Group AHU AHU

value.

Log Opens the Log screen of the

Standard and Case Circuits

selected value.

Override Opens the Override Update win-

dow where the selected input or

output can be overridden to a

user-defined value or state.

Expanded Information Displays detailed information

about the selected value.

Setup Opens the setup screen for the

Table 10-2 - Status Screen Function Keys

selected value.

Detailed Status Special status screen that shows detailed setpoints and input/out-

Status screen functions are explained in more detail in Section 12, Operator’s Guide to Using the E2 of the man- ual. For now, press to access another important screen: the Actions menu. 10.7.3 The Actions Menu

put information with complete

summary of inputs, outputs.

Manual Defrost For circuits only. Opens the Cir- cuit Bypass screen to force a man- ual or emergency defrost, or wash

mode.

Emerson E2 RX — RX diagram (page 118)
Fig. 137

Allows Service Start/End for Irri-

gation and Pulse Accumulation

applications.

  • Opens various log and graph screens for Antisweat and Pulse Accumulation applications.
  • Opens the Circuit Report screen for standard circuits only.

Table 10-3 - Actions Menu Options and Descriptions

One of the more important features of the Actions

Menu is the Setup screen (Setup). The actual setup screen will vary, depending on where the cursor is placed in the Main Status (Home) screen before is pressed. This is the easiest way to edit an existing application.

Figure 10-10 - The Actions Menu

The Actions Menu is available from any status screen by pressing Enter , and may be used to do just about any task in the E2 system software. This screen lists a number of options that can be used to affect a selected field, an entire application, or the E2 in general.

For more information on usage of the Setup screen and how to implement its functions, see Section 12.11.1.2, Setup Screens.

Show 15 more labels / short text on this page
Key Function for · Function for · Function for · Condensers Zones Lighting · Lighting Circuits · Sensor Control · Sensors Sensors · and · Power Monitor- · ing · Setup Setup Setup · Application Com- · mands · Applications Logs/ · Graphs
Page 119 of the Emerson E2 RX user manual — 2. Press (System Configuration)
Page 119 · click to enlarge
Page 119

10.7.4 The Setup Screens

The System Configuration menu contains nine menu items:

Emerson E2 RX — 10.7.4 The Setup Screens diagram (page 119)
Fig. 138 · 10.7.4 The Setup Screens
1. Input Definitions View the status of all input boards, as well as set up individual points on the I/O boards.
2. Output Definitions View the status of all output boards, as well as set up individual points on the I/O boards.
3. System Information Menu that gives access to more E2 setup options and information.
4. Remote Communications

Gives access to modem informa- tion, dial-out setup, and TCP/IP.

Figure 10-11 - Typical Setup Screen

5. Alarm Setup Set up dial-outs and alarm reporting for the current E2.

Setup screens are the interface used to change settings and setpoints, and define inputs and outputs in the E2. Figure 10-11 shows a typical Setup screen and its primary elements. For more details on Setup screens, see Section 10.18.2.3, Navigating the Setup Screen. 10.7.5 System Configuration Menu

6. Logging Setup Enter information about Logging Group applications such as the sampling frequency and total number of samples.
7. Network Setup Opens the Network Setup menu, where options to view network status, add or delete boards and controllers, commission devices, set up a router, and make board associations are available.
Emerson E2 RX — 10.7.4 The Setup Screens diagram (page 119)
Fig. 139 · 10.7.4 The Setup Screens
8. Global Data Configure one or more analog or digital sensors to be used as “global” values by all E2s.
9. Licensing Opens the Licensing Report page with a list of all licensed features on the current E2, and allows additional features, after a password key has been entered by the user, to be enabled.

Table 10-4 - System Configuration Menu Options

Figure 10-12 - System Configuration Menu

The System Configuration Menu is one of the menus used to set up the E2. Included options are Input/Output Definitions, internal system information, remote commu- nications, global data, alarm, logging, and network setup information.

To open the System Configuration menu:

1. Press

2. Press (System Configuration)

Screen Types Quick Start • 10-7

Menu Option Description

Page 120 of the Emerson E2 RX user manual — 2. Press (System Configuration)
Page 120 · click to enlarge
Page 120

10.7.6 The System Information Menu

The System Information menu contains nine items:

1. General Controller Info Edit general information about the E2, such as engineering units, and summer/winter change-over specifications.
Emerson E2 RX — 10.7.6 The System Information Menu diagram (page 120)
Fig. 140 · 10.7.6 The System Information Menu
2. Time and Date Change the current date and time, and specify date formats.
3. Passwords/User Access Set up usernames and passwords, and define security level requirements.
4. Firmware Revision Read-only information screen that contains current system version information
5. Service Actions Set up system diagnostics (memory and execution info), and perform advanced functions (system resets and firmware update).

Figure 10-13 - System Information Menu

6. Note Pad Writable field for technician to make notes about changes made or general information.

The System Information Menu is another menu used to set up the E2. The options in this menu allow setting up time and date, passwords, toggle full options, general information about the controller, and system administrator functions.

7. Display Users Enter information about Logging Group applications such as the sampling frequency and total number of samples.

To open the System Information Menu:

1. Press
8. Toggle Full Options When set to on, FULL will appear at the top right of the screen and gives user full access to options and applications.

2. Press (System Configuration)

3. Press (System Information)

9. Application Default Value Setup

Choose the default values most appropriate to the refrigeration control components in the sys- tem.

Table 10-5 - System Information Menu Options

Menu Option Description

Page 121 of the Emerson E2 RX user manual — 2. Select (System Information)
Page 121 · click to enlarge
Page 121

10.8 Time/Date Setup

10.8.1 Setting the Time and Date

The Time Format field affects how times are displayed and entered throughout the controller. When 24 Hour For- mat is selected in this field, the hours are displayed and entered as a number from 0 to 23. When 12 Hour Format is selected, the hours are displayed and entered as a num- ber from 1 to 12; an A or a P at the end of the time signi- fies whether the time is A.M. or P.M.

Emerson E2 RX — 10.8.1 Setting the Time and Date diagram (page 121)
Fig. 141 · 10.8.1 Setting the Time and Date

Table 10-6 shows some times as how they would appear in both formats.

Time 12 Hour Format 24 Hour Format

7:15 a.m. 7:15:00A 7:15:00

12:00 noon 12:00:00P 12:00:00

11:59 p.m. 11:59:00P 23:59:00

12:00

12:00:00A 0:00:00

Figure 10-14 - System Information Menu

Table 10-6 - Time Formats (12 and 24 hour)

The Time/Date Setup screen is where users may change the time, date, date format, Daylight Savings Dates, and special time synchronization features.

To select a time format, select either 12 or 24 hour using the (LOOK UP) tab.

To get to the Time/Date Setup screen from the Main Menu:

1. Select (System Configuration)

The Active Date shows the current Julian date in the format that was chosen in the Date Format field. For secu- rity reasons, the Active Date cannot be set to a date earlier in time than the current date without assistance from Retail Solutions Technical Service (1-800-829-2724).

2. Select (System Information)

3. Select (Time/Date)

The Time/Date Setup screen (Figure 10-15) is where all time and date changes occur.

The Active Time is the current time in the controller’s internal clock. This time may be changed by entering the new time in the Active Time field.

Emerson E2 RX — 2. Select (System Information) diagram (page 121)
Fig. 142 · 2. Select (System Information)

When a new time is entered in the Active Time field, it is sent across the network and changed on all device clocks so that all devices can remain synchronized.

Time zone is where the time zone of the E2 is entered. Each time zone is represented by a time zone offset that corresponds to the amount each time zone must add or subtract from Greenwich Mean Time (GMT) to get the correct local time. Choose the time zone by using the (LOOK UP) tab.

Set this field to Yes or No depending on whether you would like to use SNTP (simple network time protocol) for synchronizing the E2 clock.

Figure 10-15 - Time/Date Setup Screen (User-Defined Shown)

SNTP ensures accurate synchronization to the milli- second of computer clock times. If the E2 time is off by 5 seconds or greater, the SNTP will update the E2 time if

Time/Date Setup Quick Start • 10-9

Show 5 more labels / short text on this page
midnight · Active Date · Active Time · Time Zone · Time Server
Page 122 of the Emerson E2 RX user manual — 1. Press (System Configuration)
Page 122 · click to enlarge
Page 122

enabled. When the E2 time is updated, an entry in Service Log is added.

Daylight Savings Time uses GMT

This setting is only visible when Daylight Savings Dates is set to User Defined DLT Dates. If set to Yes, Daylight Savings Time uses GMT calculates the time to change from GMT and the current time zone setting. For example, if the start time is at 1:00 AM, and the time zone is +200 GMT, the time change will occur at 3:00 AM local time. Defaults to No.

If this field is set to No, the E2 clock will have to be set manually. If this field is set to Yes, SNTP support is used. Two SNTP servers are supported: Primary Time Server, and an optional Secondary Time Server.

The E2 will call up this primary server first to synchro- nize the E2 time. If the primary server fails to respond, the secondary server is used.

Sunrise and sunset times are calculated based on either zip code or latitude/longitude. If US Zip Code is chosen in the Unit Location From field, enter the zip code in which the controller is located. If outside the United States, choose Lat/Long and enter the latitude and longitude val- ues in which the controller is located. Once a value has been chosen, the controller is able to calculate the sunrise and sunset times. The Sunset output will turn ON at sun- set, and OFF at sunrise and can be connected to a lighting circuit.

Enter the IP address or name of the first server the E2 should use to set the time (up to 40 characters).

The E2 will use this secondary server if no response is received from the primary server, or if the primary server is invalid.

If desired, enter the IP address or name of the second server the E2 should use to set the time (up to 40 charac- ters).

Sundown is an output that calculates when the sun sets based on latitude and longitude, and is ON when the sun sets. The user will select the Board/Controller, Point/ Application, and Input values from the (LOOK UP) menu for each field. (When a Lighting Schedule is config- ured to use Sundown information, the Lighting Schedule application automatically connects to the Sundown out- put.)

Dates may be presented and entered in either of two ways: month-day-year format, and day-month-year for- mat. Choose the most appropriate date format by using the (LOOK UP) tab.

The Daylight Savings Dates type determines how the E2 will make date adjustments for daylight savings time. Use the (LOOK UP) tab to cycle through the options in each of the fields. There are four options:

10.9 Set Up Modem

  • STANDARD US DLT DATES - the E2 will use the standard United States’ method of determining Daylight savings time dates. The Daylight savings time will start on the Sunday of the second week of March ever y year, and will end on the Sunday of the first week of November (Note: these are the dates recently enacted by the U.S. Congress, which went into effect in 2007).
Emerson E2 RX — 10.9 Set Up Modem diagram (page 122)
Fig. 143 · 10.9 Set Up Modem
  • USER DEFINED DLT DATES - when this option is chosen, the user can specify start and end times for daylight savings, including month, week, and day settings.
  • EUROPEAN UNION DLT DATES - the European Union Daylight rules are the same as the Standard US DLT Dates, with the exception that one hour must be added to the time at 1:00AM (GMT), during the last Sunday in March.

Figure 10-16 - Modem Select Screen

  • DLT Not Used - the E2 does not make any adjustments to Active Time for Daylight Savings Time.

From the Main Menu:

1. Press (System Configuration)

Show 6 more labels / short text on this page
Primary Time Server · Unit Location From · Secondary Time Server · Sundown · Date Format · Daylight Savings Dates
Page 123 of the Emerson E2 RX user manual — 1. Press (System Configuration)
Page 123 · click to enlarge
Page 123

2. Press (Remote Communications)

PCs running UltraSite) will communicate with this E2 by sending information to this specified address. Contact your network administrator to determine what IP address to enter.

3. Press (Modem Setup) to advance to the General Services screen

You can choose between an internal modem (one that is mounted directly on to the E2 circuit board (via the PC-104 slot in previous generation E2 circuit boards) or an external modem. If you have a modem, navigate to the COM3 Modem Port field and select Internal Modem. Press (LOOK UP) for the Option List Selection screen.

The IP Address always consists of four numbers from zero to 255, each of which is separated by a period. Enter the address in this format.

Subnet Mask Contact your network administrator

to get the correct subnet mask value, and enter it in this field.

The default value, “255.255.255.0”, is the subnet mask commonly used for small networks.

10.10 Set Up TCP/IP

Primary DNS Contact your network administrator

to see if a Primary DNS value is required for this E2. If so, enter the Primary DNS address supplied by your administrator in this field. If not, leave this field set to “0.0.0.0”.

Emerson E2 RX — 10.10 Set Up TCP/IP diagram (page 123)
Fig. 144 · 10.10 Set Up TCP/IP

Secondary DNS Contact your network administra-

tor to see if a Secondary DNS value is required for this E2. If so, enter the Secondary DNS address sup- plied by your administrator in this field. If not, leave this field set to “0.0.0.0”.

Primary Gateway Contact your network adminis-

trator to see if a Primary Gateway value is required for this E2. If so, enter the Primary Gateway address supplied by your administrator in this field. If not, leave this field set to “0.0.0.0”.

Secondary Gateway Contact your network

administrator to see if a Secondary Gateway value is required for this E2. If so, enter the Secondary Gate- way address supplied by your administrator in this field. If not, leave this field set to “0.0.0.0”.

Figure 10-17 - TCP/IP Addressing

The TCP/IP screen is where you enter the information necessary to allow Ethernet connection to this controller. If this site uses Ethernet box-to-box, you will need to enter a TCP/IP address and a group name to allow all E2s on site to communicate as a group. See Section 7, E2 Ether- net Peer Communications for more information.

DHCP Enabled Dynamic Host Communication

Protocol (DHCP) is a protocol that assigns a dynamic IP address to devices on a network. With dynamic addressing, a device could have a different IP address every time it connects to the network. When set to Yes, DHCP Enabled keeps track of IP addresses and enables a new IP device to be added to a network without having to manually assign it a unique IP address. DHCP supports a mix of static and dynamic IP addresses.

From the Main Menu:

1. Press (System Configuration)

2. Press (Remote Communications)

3. Press (TCP/IP Setup) to advance to the TCP/ IP Setup screen

E2 units may be configured to communicate across an Ethernet computer network using TCP/IP protocol. To enable Ethernet communication, you will need to enter IP address information for the E2 in the Serial IP screen.

IP Address The IP Address field sets the network

address for this E2. Other network devices (such as

Set Up TCP/IP Quick Start • 10-11

Page 124 of the Emerson E2 RX user manual — 10.11.2 I/O Network Baud Rate
Page 124 · click to enlarge
Page 124

10.11 Set Up Network Baud Rates

Emerson E2 RX — 10.11 Set Up Network Baud Rates diagram (page 124)
Fig. 145 · 10.11 Set Up Network Baud Rates

10.11.1 COM1 Serial (RS232) Baud Rate

To access COM1 Serial (RS232) and I/O Network baud rates:

1. Press to open the Main Menu

2. Press (System Configuration)

3. Press (System Information)

Figure 10-18 - COM1 Baud Rate Setup (Serial RS232)

4. Press (General Controller Info) aand navigate to the COM1 Baud rate field

10.11.2 I/O Network Baud Rate

When a comport is set to I/O Net, the I/O Network baud rate is the rate at which the E2 will communicate with input and output boards on the RS485 I/O Network, and is located directly below the RS232 Baud rate field.

The COM1 Baud rate field determines the speed of communications between the E2 and an RS232 device (such as a satellite link or PC).

Press to select the baud rate. The appropriate baud rate is 9600 baud.

The baud rate selected in this field should correspond with the baud rate for the RS232 device. For example, if connecting a PC to this port, the PC’s COM port should be set up to communicate at the same rate as what is set in this field.

Emerson E2 RX — 10.11.2 I/O Network Baud Rate diagram (page 124)
Fig. 146 · 10.11.2 I/O Network Baud Rate

There are multiple options to choose from. Select one of the options below using (LOOK UP) depending on the type of connection.

  • 1200 Baud (devices that operate at 1200)
  • 2400 Baud (devices that operate at 2400)
  • 4800 Baud (devices that operate at 4800)
  • 9600 Baud (recommended for satellite)
  • 19.2 Kbaud (recommended for modem)
  • 38.4 Kbaud (recommended for modem)
  • 57.6 Kbaud (recommended for modem)
  • 115.2 Kbaud (recommended for direct connect)

Figure 10-19 - I/O Network Baud Rate Setup

Page 125 of the Emerson E2 RX user manual — 2. Press (System Configuration)
Page 125 · click to enlarge
Page 125

10.12 Set Up User Access

Access the User Access Setup screen from the System Information menu:

Emerson E2 RX — 10.12 Set Up User Access diagram (page 125)
Fig. 147 · 10.12 Set Up User Access
1. Press to open the Main Menu

2. Press (System Configuration)

3. Press (System Information)

Emerson E2 RX — 2. Press (System Configuration) diagram (page 125)
Fig. 148 · 2. Press (System Configuration)

Figure 10-21 - User Access Setup Screen

An E2 may be programmed with up to 25 different users. A user basically consists of a username, a password, and an access level. Whenever a username and password are entered during login, the E2 searches the user records for the username and password. If found, the E2 will log the user in at the access level chosen for the user in the user records.

The access level determines how many of the E2’s fea- tures the user may use. The E2 uses four access levels, one being the lowest, and four being the highest. Table 10-7 gives a description of each level and the capabilities they have access to.

Figure 10-20 - System Information Menu

In the User Access Setup screen, you may add user names and passwords to the controller with varying levels of security, and customize user access for each security level.

To access this menu, choose option (Passwords/ User Access) from the System Information Menu.

Level 1 Read-only access. Users may generally only view status screens, setpoints, and some system settings.

Level 2 Setpoint and bypass access. Users may perform all the tasks a level 1 user may, plus they may change control setpoints and bypass some devices.

Level 3 Configuration and override access. Users may perform all the tasks a level 2 user may, plus they may override system set- tings, create new cells, and program new applications.

Level 4 System Administrator access. All E2 func- tions are accessible by a level 4 user.

Table 10-7 - User Access Levels

Set Up User Access Quick Start • 10-13

Page 126 of the Emerson E2 RX user manual — 7. Press (BACK). 10.12.3 Deleting a User
Page 126 · click to enlarge
Page 126

10.12.1 Changing Required User Access Levels

(controller login required for acknowledging alarms). Refer to Section 12.10.8.1, Acknowledg- ing, for the definition of “acknowledging alarms.”

The Level Required For table in this screen is used to customize what access level is required to perform certain actions within the E2 unit. There are four rows in this table, each of which corresponds to a different type of E2 function or application.

For each row and column of the Level Required For table, enter the desired minimum priority level that will be required for users to perform actions on each type of appli- cation. E2 will check this table when a user attempts an action to verify the user has the appropriate access level to make the change. If the user’s access level is equal to or above the priority setting in the table, access will be allowed. If not, access will be denied. 10.12.2 Creating a New User Account

  • Refrigeration Control - This category includes changes or actions involving refrigeration applications specific to RX controllers (Suction Groups, Condensers, Circuits, CC-100s, etc.).
  • Building Control - This category includes changes or actions involving building control applications specific to BX controllers (AHUs, Zones, Lighting Control, Time Schedule, Demand Control, etc.).

After entering the User Access Setup screen by press-

ing Passwords/User Access from the System Information menu:

  • Common Control - This category includes control applications common to both RX and BX controllers (Sensor Control, Time Schedules, Conversion Cells, Analog or Digital Combiners, Global Dataetc.).
1. Move the cursor so that it is somewhere in the Users box at the bottom of the screen.
2. Press (ADD USER) to put a blank record at the bottom of the list.
  • Advanced Control - This category includes applications common to both boxes that are only used by advanced users, such as Loop/Sequence Controllers, Refrigeration or HVAC Simulations, etc.
3. Type in the user name ( Username ), and then move to the next field ( Password ) by pressing the right arrow button.
4. Type in a password for the next user, then press the right arrow button to advance to the next field.

Each row has five columns, each of which corresponds to a different category of user actions.

  • Setpoint - This includes all actions that change application setpoints. Also, clearing one or more alarms out of the Alarm Advisory Log is considered a “setpoint” action (refer to Section 12.10.8.3, Clearing , for the definition of “clearing alarms”).
5. The Auto Logout feature determines the maximum time user may be inactive before being logged out. Enter the amount of time for the user and press the right arrow button.
6. Enter the appropriate access level for the user. See Table 10-7 .
  • Bypass - This includes all actions that bypass a device to a certain state, such as initiating a manual defrost, or configuring an application input designated as a “bypass.” Also, resetting one or more alarms in the Alarm Advisory Log is considered a “bypass” operation (refer to Section 12.10.8.2, Resetting , for the definition of “resetting alarms”).

7. Press (BACK). 10.12.3 Deleting a User

To delete a user from the system:

1. Move the cursor so that it is highlighting the record to delete in the Users box at the bottom of the screen, and press (DELETE USER).
  • Override - This includes any user-ordered override of a setpoint, input, or output.
2. A question box will appear to double check the
  • Config - This includes all actions that change an application setting. This includes configuring inputs and outputs.

deletion of the current record. Press if you are sure about the deletion.

  • Alarm Ack - This includes acknowledging one or more alarms in the Alarm Log.. If this field is set to 1, alarms can be acknowledged on the Alarm Advisory Log without a user logging into the controller first. If set to 2, 3, or 4, login is required before a user can acknowledge alarms. The default is set to 3
Page 127 of the Emerson E2 RX user manual — 2. Press (System Configuration)
Page 127 · click to enlarge
Page 127

10.13 Set Up I/O Network

2. Press (System Configuration)

3. Press (Network Setup)

Emerson E2 RX — 2. Press (System Configuration) diagram (page 127)
Fig. 149 · 2. Press (System Configuration)

4. Press (Connected I/O Boards & Controllers)

Figure 10-22 - Network Setup Menu

To start the setup on the I/O Network, access the Net- work Setup menu:

1. Press to open the Main Menu

Figure 10-23 - Connected I/O Setup Screen (E2 firmware versions 2.81 and above)

2. Press (System Configuration)

3. Press (Network Setup)

Boards on the I/O Network

16AI Boards Enter the number of 16AI analog input boards on this E2’s I/O Network.

The Network Setup menu displays four options:

  • Network Summary

8RO Boards Enter the number of 8RO relay output boards on this E2’s I/O Network.

  • Connected I/O Boards & Controllers
  • Router Setup

8DO Boards Enter the number of 8DO digital out- put boards on this E2’s I/O Network.

  • Controller Associations

4AO Boards Enter the number of 4AO analog out- put boards on this E2’s I/O Network.

For the total (E2) devices online or offline, status, setup screens, changing board or controller names, config- uring and commissioning devices, deleting a device, and viewing detailed status screens of controllers, select Net- work Summary.

IRLDS Controllers Enter the number of leak detec-

tor units on this E2’s I/O Network.

(Options will vary depending on the type of controller

For the number of I/O Network devices (16AIs,8ROs, etc.) associated with each controller online and offline, select Connected I/O Boards & Controllers.

used.)

To set up a router, select Router Setup. For more information on routers and repeaters, refer to the Router and Repeater Installation Guide (P/N 026-1605).

For CC-100 circuit associations, select Controller Associations. 10.13.1 Specify Number of Boards

Specify the number of boards from the Connected I/O screen:

1. Press to open the Main Menu

Set Up I/O Network Quick Start • 10-15

Page 128 of the Emerson E2 RX user manual — 10.14.1 Specifying Number of Devices
Page 128 · click to enlarge
Page 128

10.13.2 Checking Online Status

2. Press (System Configuration)

3. Press (Network Setup)

Emerson E2 RX — 10.13.2 Checking Online Status diagram (page 128)
Fig. 150 · 10.13.2 Checking Online Status

4. Press (Connected I/O Boards & Controllers)

Emerson E2 RX — 4. Press (Connected I/O Boards & Controllers) diagram (page 128)
Fig. 151 · 4. Press (Connected I/O Boards & Controllers)

Figure 10-24 - Network Summary Screen

You can check all boards that are on either the Echelon Network (E2 controllers) or the I/O Network from the Net- work Status screen (See Figure 10-24). The Network Summary screen displays information such as the Subnet and Node addresses for each board, and the status of Eche- lon and I/O boards.

Figure 10-25 - Connected I/O Setup Screen (E2 firmware versions 2.81 and above)

After logging in for the first time, the Connected I/O screen will ask you to specify how many of each type of device will be connected to the E2 you are currently pro- gramming. (Options will vary depending on the type of controller used.)

To get to the Network Summary Screen:

1. Press to open the Main Menu

2. Press (System Configuration)

3. Press (Network Setup)

Unit Number (Echelon Subnet) Each E2 on the

Echelon Network must have a different unit number. This can be any number from 1 to 255, but each E2’s number must be unique. No two E2s on the network may have the same unit number.

4. Press (Network Summary)

From the Network Summary screen you can see the total (E2) devices online or offline, status, setup screens, change board or controller names, configure and commis- sion devices, delete a device, and view detailed status screens of controllers.

Enter this number in the Unit Number field. It is rec-

ommended you number the first E2 “1” and number the other E2s on the network sequentially (2, 3, 4, etc.).

After determining if a board is offline, turn to Appen- dix E: Troubleshooting.

Unit Name Type a name for the E2 in the Unit

Name field.

10.14 Set Up Echelon Network

Liquid Ctrls (CC100P/CC100LS) Enter the com-

bined number of pulse valve case controllers (CC100Ps) and liquid-side stepper valve case con- trollers (CC100LSs) in this field.

10.14.1 Specifying Number of Devices

Suction Controllers (CC100H) Enter the num-

ber of suction stepper case controllers (CC100Hs) in this field.

To specify the number of devices on the Echelon Net- work, navigate to the Connected I/O screen:

Circuit Suction (CS100) Enter the number of suc-

1. Press to open the Main Menu

tion lineup circuit controllers (CS100s) in this field.

Unit Controllers (Echelon)

Page 129 of the Emerson E2 RX user manual — 4. Press (Network Summary)
Page 129 · click to enlarge
Page 129

ESR8 Line Up Boards Enter the number of ESR

suction lineup circuit boards (SR100s) in this field.

TD3 Temperature Displays Enter the number of

TD3 temperature display units in this field.

EC2- 29x Case Controllers Enter the number of

EC2-29x refrigerated case controllers in this field.

How Echelon Commissioning Works

EC2-39x Case Controllers Enter the number of

Each device that is capable of communicating on a Echelon Network has a unique 12-digit “Neuron ID” code number that is hard-coded in a chip on the board. In order for the E2 to begin communications with a unit controller or another E2, it must know the device’s ID number.

EC2-39x refrigerated case controllers in this field.

Echelon 16AI Enter the number of 16AIe analog

input boards in this field.

Echelon 8RO Enter the number of 8ROe analog

input boards in this field. 10.14.2 Commissioning a Device

When a device is commissioned, its 12-digit code is either entered by hand into the E2 (via the front panel key- board) or sent across the network to the E2 using the device’s service button. Once the E2 knows the device’s 12-digit ID, it establishes communication and gives the device its user-defined subnet and node address. From that point on, the E2 uses only the subnet and node address to communicate with the device.

Once all records have been created and defined for all devices on the Echelon Network, they must be “commis- sioned.” Commissioning is necessary for the E2 to identify and establish communications with all devices on the net- work.

To start commissioning, open the Network Summary screen:

As mentioned above, there are two ways in which a device may be commissioned. No one way is better than the other in terms of effectiveness, but one of the methods may be less difficult than the other depending on the type of installation.

1. Press to open the Main Menu

2. Press (System Configuration)

3. Press (Network Setup)

If commissioning a MODBUS device and multiple MODBUS ports are available, you will be prompted to select the appropriate network during the commissioning process. 10.14.2.1 The Service Button Method

4. Press (Network Summary)

Emerson E2 RX — 4. Press (Network Summary) diagram (page 129)
Fig. 152 · 4. Press (Network Summary)

To commission a device using the service button, you must first set up the E2 to receive a service button signal, and then press the service button on the device. When the signal is received by the E2, the device will be commis- sioned.

To set up the E2 to receive a service button signal, move the cursor to the Controller Name field of the record you wish to set up, and press (SET ADDRESS).

Figure 10-26 - Network Summary Screen

Set Up Echelon Network Quick Start • 10-17

MODBUS Commissioning

Page 130 of the Emerson E2 RX user manual — The CC-100’s Service Button
Page 130 · click to enlarge
Page 130

missioned.

The CC-100’s Service Button

Emerson E2 RX — The CC-100’s Service Button diagram (page 130)
Fig. 153 · The CC-100’s Service Button

Since the CC-100 is meant to remain in an enclosure, the CC100’s Hand-Held Terminal jack has been config- ured to act as the service button. Plugging a Hand-Held Terminal into the jack simulates a service button press.

The Hand-Held Terminal Jack is on the left side of the case controller next to the power cable harness connec- tion. To send the Neuron ID, plug a Hand-Held Terminal into the jack and hold it in for five seconds.

Figure 10-27 - Commissioning Menu

The TD3’s Service Button

A menu will appear on the screen, giving you the option of either pressing the service button, entering the Neuron ID by hand, or canceling and returning to the main

Emerson E2 RX — The CC-100’s Service Button diagram (page 130)
Fig. 154 · The CC-100’s Service Button

screen. Press to select the service button option.

Emerson E2 RX — The CC-100’s Service Button diagram (page 130)
Fig. 155 · The CC-100’s Service Button

Figure 10-29 - TD3 Service Button Location

The service button on the TD3 is located on the front panel (Figure 10-29). Of the two buttons on the face, the commissioning button is the one on the right. To send the Neuron ID, press and hold this button down for five sec- onds.

Figure 10-28 - Service Button Screen

The E2 will prompt you to enter a wait time in the Wait Time field. The Wait Time is the amount of time the E2 will try to detect a service button press before declaring the attempt unsuccessful and returning to the main screen. To commission the device, the Neuron ID must be sent during the Wait Time duration.

The ESR8’s Service Button

Emerson E2 RX — The CC-100’s Service Button diagram (page 130)
Fig. 156 · The CC-100’s Service Button

After you enter a wait time in hours:minutes:seconds format and press , the Wait Time duration begins. All that is left to do is to press the service button on the device to be commissioned.

Emerson E2 RX — The CC-100’s Service Button diagram (page 130)
Fig. 157 · The CC-100’s Service Button

CAUTION: When the E2’s Wait Time dura- tion begins, the E2 will accept the first Neuron ID code it receives. Be sure that no other ser- vice buttons on any devices on the network are being pressed during the Wait Time. Since the service button on the CC-100 is its Hand-held Terminal jack, be sure that no one has a Hand-held Terminal plugged into a CC-100 other than the one being commissioned.

Figure 10-30 - ESR8 Service Button Location

The service button on the ESR8 is located on the right hand side of the board directly below the termination jumper (Figure 10-30). To send the Neuron ID, press and hold this button down for five seconds.

The location of the service button and the method of pressing it depends on the device or controller being com-

The EC-2 can be commissioned by pressing the UP ARROW key on the EC-2 front panel and holding it for

Commissioning the EC-2

Page 131 of the Emerson E2 RX user manual — 2. Press (Remote Communications)
Page 131 · click to enlarge
Page 131

five seconds. 10.14.2.2 The Manual ID Entry Method

option of either pressing the service button, entering the Neuron ID by hand, or cancelling and returning to the

main screen. Press to select the manual entry option and bring up the dialog box shown in Figure 10-32.

The Manual ID Entry Method involves entering each device’s twelve-digit ID number by hand. When entered, the E2 searches the network and tries to match the ID number to the device. When the E2 finds this device, the commissioning process is completed.

Emerson E2 RX — five seconds. 10.14.2.2 The Manual ID Entry Method diagram (page 131)
Fig. 158 · five seconds. 10.14.2.2 The Manual ID Entry Method

The easiest way to set up a multiple-node store using the Manual ID Entry Method is to arrange all network devices into a list that shows each device’s name, subnet and node address, controller type, and corresponding Neu- ron ID number. Once this list is complete, each device may be commissioned one at a time from the E2 front panel.

Figure 10-32 - Setting Controller Address - Neuron ID

To make a list of network devices, follow the steps below:

Enter the device’s Neuron ID as it appears on the form you created, and press . The E2 will then look for the controller with the Neuron ID you entered. If it is found, the E2 commissions the device, and you may move on to commissioning the next device.

1. For each record set up in the Controller Network Configuration/Status Screen, write down the contents of each device’s Controller Name, Model, Subnet, and Node fields on a sheet of paper. If desired, you may also include the model or serial numbers of the units that will be controlled, as well as a physical location.

If E2 does not find it, the display will read “ERROR - Controller with specified Neuron ID did not respond.” This could be caused by an improperly entered number, or it could be caused by a problem with the device’s network connections or power connections.

2. When step 1 is complete, go to where each device on the list is installed and locate each device’s Neuron ID sticker. Every Echelon-compatible device available from Retail Solutions has a sticker on its enclosure that shows the unit’s Neu- ron ID number. Each sticker also has a perforated tag at the bottom that may be removed and affixed to your form. Tear this tag off and stick it in the Neuron ID blank on the sheet of paper. If the perforated tag has already been removed, write the ID number in the blank.

When all devices are commissioned, keep the form with the Neuron ID stickers in an easily accessible place so that it may be referred to if necessary for board remov- als, replacements, or troubleshooting.

10.15 License Management

Some applications in the E2 are only available when activated with a license key that is obtained through Retail Solutions. Licensing allows the user to activate certain features in the E2.

When all Neuron ID numbers have been collected, return to the E2 and enter the Neuron ID numbers for each device. To commission a device, move the cursor to the device to be commissioned and press (Set Address).

To obtain a license for a feature, go to the TCP/IP setup screen and obtain your E2 controller’s MAC Address. Press + T, or from the Main Menu:

1. Press (System Configuration)

Emerson E2 RX — 1. Press (System Configuration) diagram (page 131)
Fig. 159 · 1. Press (System Configuration)

2. Press (Remote Communications)

3. Press (TCP/IP Setup) to open the TCP/IP Setup screen and locate your E2’s MAC address (circled in Figure 10-33 ):

Figure 10-31 - Commissioning Menu

A menu will appear on the screen, giving you the

License Management Quick Start • 10-19

Page 132 of the Emerson E2 RX user manual — 10.15.1 Web Services
Page 132 · click to enlarge
Page 132
Emerson E2 RX — 10.15.1 Web Services diagram (page 132)
Fig. 160 · 10.15.1 Web Services
Emerson E2 RX — 10.15.1 Web Services diagram (page 132)
Fig. 161 · 10.15.1 Web Services

Figure 10-33 - TCP/IP Screen - Locating the Mac Address

Figure 10-34 - Enter Your Unique License Key

4. Call Retail Solutions Customer Service at 770425-2724 and have your MAC Address ready in order to obtain your unique license key.
4. Reboot the controller and open the License Report screen again to see the license key appear next to the activated feature ( Figure 10-35 ):

Once you have received your unique license key from Customer Service, you can now activate the licensed fea- ture(s) from the License Report screen. The License Report screen displays that E2 controller’s unit type and firmware version, the list of all licensed features on that E2, the current number and maximum number of each of those applications allowed, and which additional features, (that require a license key), have been enabled.

Emerson E2 RX — 10.15.1 Web Services diagram (page 132)
Fig. 162 · 10.15.1 Web Services

From the Main Menu:

1. Press (System Configuration)

2. Press (Licensing)

3. Press (Add Feature)

Enter your license key to activate the desired feature:

Figure 10-35 - License Report Screen (BX-400 version shown)

10.15.1 Web Services

Web Services is a licensed feature that allows the user, once the required license has been obtained and entered, to view and adjust certain parameters in the E2 controller through a Web page. The E2 Web Services feature enables the user to:

  • View site-specific information such site name, site phone, local date and time.
  • View the current version of the E2. This includes the type of unit (e.g., RX-400) and the version of
Page 133 of the Emerson E2 RX user manual — 2. Press (System Configuration)
Page 133 · click to enlarge
Page 133

the firmware.

  • View global data values such as outside air temperature and humidity.
Emerson E2 RX — 10.16 Set Up Alarming diagram (page 133)
Fig. 163 · 10.16 Set Up Alarming
  • View a list of other networked area controllers at the site, including version and controller type information.
  • Connect to the selected E2 for remote configuration changes.
  • Access Terminal Mode.
  • View Alarms.

To access Web Services:

Open a browser window and enter the IP Address of your E2 controller:

Figure 10-37 - Alarm Setup Menu

Emerson E2 RX — 10.16 Set Up Alarming diagram (page 133)
Fig. 164 · 10.16 Set Up Alarming

Figure 10-36 - E2 Web Services Page

10.16 Set Up Alarming

To set up alarms, open the Alarm Setup menu:

1. Press to open the Main Menu

2. Press (System Configuration)

3. Press (Alarm Setup)

Set Up Alarming Quick Start • 10-21

Page 134 of the Emerson E2 RX user manual — 10.16.1.2 The Alarm Output
Page 134 · click to enlarge
Page 134

10.16.1 Specifying Alarm Reporting Types

  • Users can view alarm notifications and alarm logs for all controllers from the Alarm Annunciator.
  • Only the Alarm Annunciator needs to be programmed with alarm filter settings for dial-out, output, and display. All other controllers may be programmed to simply send all alarms to the Alarm Master via the LonWorks Network. 10.16.2 Setting up an E2 to be an Alarm Annunciator

Apart from storing alarms it generates in its own Alarm Advisory Log, E2 can also report alarms it gener- ates or receives in order to notify personnel. E2 can report alarms in several different ways. 10.16.1.1 The Display Line

Alarms that occur within an E2 (or which are received by an Alarm Annunciator from another E2) may be reported to the header display at the top of the screen. When an alarm is reported to the display, the word “*ALARM*” flashes underneath the time at the top of the screen, allowing site managers or supervisors to see that one or more alarms are active for the E2.

Any E2 on the network that has a modem or Ethernet connection can be set up as an alarm annunciator, but only one alarm annunciator per network is allowed. To set up from the Main Menu:

1. Press (System Configuration)

2. Press (System Information)

3. Press (General Controller Info)

4. Set Alarm Annunc field to Yes . Figure 10-38 - Display Line

10.16.1.2 The Alarm Output

Each E2 has a single digital output that reacts to alarm reports. An alarm can be reported to this output, in which case the output turns ON and remains on until the alarm condition has returned to normal. 10.16.1.3 Dial-Out

Alarms may be sent to remote alarm receivers via the modem defined for the controller. Possible dial-out devices include a PC running UltraSite, a printer, a fax machine, and a digital pager. Dial-out sites are configured in Section 10.16.3. 10.16.1.4 The Echelon Network (The Alarm Annunciator)

Emerson E2 RX — 10.16.1.2 The Alarm Output diagram (page 134)
Fig. 165 · 10.16.1.2 The Alarm Output

If multiple E2s exist on a network, you may choose to send alarms from all E2s across the Echelon Network so that they may be picked up by the Alarm Annunciator.

The Alarm Annunciator is the primary alarm reporting device in a multiple-device E2 Network. The Alarm Annunciator gathers all alarms posted by all devices on the Echelon Network, records them in its own advisory log, and applies its own set of alarm filters to determine if the alarms should be dialed out, reported to its display, or sent to its Advisory Output.

Figure 10-39 - Alarm Annunciator

There are several benefits to having an Alarm Annun- ciator:

  • An Alarm Annunciator makes it possible to handle all alarm dial-outs for all controllers with a single modem or network card.
Page 135 of the Emerson E2 RX user manual — 3. Press (Dial-out Setup)
Page 135 · click to enlarge
Page 135

10.16.3 Alarm Dial-Out

This screen and the other screens that follow it are used to set up dial-out sites for both daytime and nighttime operation, including specifying phone numbers and IP addresses. Use the and keys to cycle through the Setup screens. 10.16.4 Introduction: Alarm Report- ing

In general, a controller reports alarms to any or all of four different sources:

1. The E2 Display Header

Alarms that occur within a E2 may be reported to the header display at the top of the screen. When an alarm is reported to the display, the word “*ALARM*” flashes underneath the time at the top of the screen, as shown in the example below:

Figure 10-40 - Alarm Setup Menu

One of the E2’s most important alarm reporting fea- tures is its ability to dial-out to remote sites whenever a serious alarm condition occurs. Each E2 is capable of dial- ing out to up to three sites. The E2 may dial out to a com- puter, a fax machine, a digital pager, or a printer. To set up from the Main Menu:

Figure 10-42 - E2 RX Display Header

2. The Advisory Output

Dial-out devices are set up in the Dial-out Setup screen. To reach this screen:

Each E2 has a single digital output that reacts to alarm reports. When an alarm is reported to this output, the out- put turns ON and remains on until the alarm condition has returned to normal.

1. Press (System Configuration)

2. Press (Alarm Setup)

3. Dial-Out

3. Press (Dial-out Setup)

Alarms may be sent to remote alarm receivers via the modem defined for the controller. Possible dial-out devices include a PC running UltraSite, a printer, a fax machine, and a digital pager.

Emerson E2 RX — 3. Press (Dial-out Setup) diagram (page 135)
Fig. 166 · 3. Press (Dial-out Setup)
4. The LonWorks Network (The Alarm Annunciator)

If multiple E2s exist on a network, you may choose to send alarms across the LonWorks Network so that they may be picked up by the Alarm Annunciator.

Refer to Section 10.16.2 for information on how an Alarm Annunciator works.

Figure 10-41 - Remote Dialout Setup Screen

Set Up Alarming Quick Start • 10-23

Page 136 of the Emerson E2 RX user manual — 1. Press (System Configuration)
Page 136 · click to enlarge
Page 136

10.17 Set Up Global Data

Setup screen.

The Global Data feature is an enhanced method of effectively distributing commonly used input values between multiple E2s. Sensors such as outdoor tempera- ture and outdoor humidity are set up on an E2 as Global Data inputs. This E2 then becomes the “provider” of the global sensor values to all other Global Data applications on the E2.

Emerson E2 RX — 10.17 Set Up Global Data diagram (page 136)
Fig. 167 · 10.17 Set Up Global Data

As a result, a single sensor can be used by any applica- tion in any E2 on the network.

Unless you program it otherwise, the E2 always assumes you will be using Global Data in all your applica- tions. When you create new applications in the E2, it will always automatically connect the appropriate application inputs (except for the spares) to their corresponding Global Data outputs. 10.17.1 Priority Settings

Figure 10-43 - System Configuration Menu

When selecting the priority for a global sensor input, there are four settings to choose from.

In a network with multiple E2s, it is often the case that certain sensors or transducer values will need to be used by all E2s. A good example of this is outside air tempera- ture. There is no real need for every E2 to have its own outside air temperature sensor, and therefore it would be beneficial if a single sensor could be used by all E2s on the network.

Primary Primary inputs are the highest priority

inputs. If a sensor is set up with a primary priority, it is recognized by all Global Data applications on the network as the highest priority. The primary provider sends this input value to the other Global Data appli- cations in the other E2s, and each E2 immediately sends that value to all of its own applications that use the Global Data input.

Emerson E2 RX — 10.17 Set Up Global Data diagram (page 136)
Fig. 168 · 10.17 Set Up Global Data

Only one input of each type may be designated as a

primary on the E2 Network. In other words, if one E2 is acting as the primary provider of the global Out- door Air Temp, no other E2 on the network may have a global Outdoor Air Temp sensor with a “primary” priority.

If using this priority setting, you must enter board and

point settings.

Secondary Sensors that are set up with secondary

priorities are backup sensors that will be used by all Global Data applications if the primary sensor fails.

If a global input is set up on an E2 with a secondary

priority, the E2 will not send its value to the other Global Data applications as long as it is receiving a primary value of that type from another E2 on the network. If a secondary provider does not receive a primary value update at least once every five min- utes, the secondary provider will assume the primary sensor has failed, and it will send the secondary value to all other Global Data applications on the net- work. These applications will then use the secondary value in place of the failed primary value.

Figure 10-44 - Global Data Setup Screen

Navigate to the Global Data screen from the Main Menu:

1. Press (System Configuration)

2. Press (Global Data) to open the Global Data Status screen.
3. Press (Setup) to open the Global Data

Secondary providers will continue to send the input

Page 137 of the Emerson E2 RX user manual — 10.18 Set Up Applications
Page 137 · click to enlarge
Page 137

value until the primary provider again sends a valid update to the other Global Data applications. The secondary provider would then stop sending the sec- ondary value, and all Global Data applications would use the primary value.

each input type, there may be only one secondary for each input type. It is recommended that secondaries be set up on different E2s than primaries; this way, if a single controller fails or loses communication with the other E2s, there will still be a usable input source for the other E2s.

If using this priority setting, you must enter board and

point settings.

User This setting means the E2’s global data will

read (or be a “User” of) all values coming from the network. This setting is for E2s that are not con- nected to the sensor itself, but read the data that comes from it.

ExampleOut of three E2s, an outside air temperature

sensor on E2 A’s I/O Network is set up as the primary provider of the global Outside Air Temp input. A sim- ilar sensor is set up on E2 C with a secondary prior- ity (see Figure 10-45).

If the application in this E2 will be using primary or

As long as E2 A is capable of broadcasting a valid

secondary inputs from other E2s, then set the priority to “USER.”

temperature value, all three E2s would use E2 A’s Outside Air Temperature value in their own Global Data applications.

Local Only This setting specifies that the input to

the global data is read and sent only to within the E2 you are programming. Also, this means that this E2 will not read any Primary or Secondary providers from the network.

However, if E2 A loses contact with the sensor, E2 A no

longer has a valid temperature value to send to the other Global Data applications. After five minutes of no updates from E2 A, E2 C will consider the pri- mary Outside Air Temp source to have failed, and it will begin sending the value of the secondary sensor to the Global Data applications of the other two E2s. All E2s would then use this secondary value as Out- side Air Temperature.

If using this priority setting, you must enter board and

point settings.

ExampleSetting Up an Outdoor Temperature Sensor
1. Press (Global Data) and the Status screen opens.
Emerson E2 RX — Example: Setting Up an Outdoor Temperature Sensor diagram (page 137)
Fig. 169 · Example: Setting Up an Outdoor Temperature Sensor
2. Move the cursor to the Outdoor Air Temperature (OAT) Mode, and then choose the priority by

scrolling with the , keys.

3. Press the down arrow button once to the Board and Point section and enter the board and point locations for the sensor.
4. Press (BACK) to return to the Main Status (Home) screen.

The Outdoor Air Temperature sensor is now set up as a global device in the E2. Other global inputs can be set up using the same method as above.

PRIMARY USED AS GLOBAL OUTSIDE AIR TEMP BY ALL E2s

E2 is now ready to be programmed with applications.

10.18 Set Up Applications

From the Main Status (Home) screen, place the cursor on the application you wish to view and press

(SETUP). You can also press and select (Setup) from the Actions Menu to open the Setup screen for your selected application.

Figure 10-45 - Global Data Priority Example

Just as there may be only one primary provider for

Set Up Applications Quick Start • 10-25

Page 138 of the Emerson E2 RX user manual — 10.18.1 Add/Delete an Application
Page 138 · click to enlarge
Page 138

10.18.1 Add/Delete an Application

10.18.2 Using and Configuring a Setup Screen

Add an Application:

1. Press the key to open the Main Menu screen.

The Setup screen is application-specific depending on where you place the cursor on the Home screen.

2. Select (Add/Delete Application) to open the Add/Delete Application menu.

Press to open the Actions Menu and select (Setup), or press (SETUP) on the Home screen.

3. Select to add an application.

The Setup screen for your selected application will open.

4. Choose an application by pressing (LOOK UP) to open the Option List Selection menu, and choose the application you wish to add.
5. Press to place the application in the Type field.
6. Select the number of applications you wish to add in the How many? field.
7. Press to add.
8. You are then asked if you would like to edit the application now. Press Y (Yes) or N (No).

Delete an Application:

1. Press the key to open the Main Menu screen.
2. Select (Add/Delete Application) to open the Add/Delete Application menu.
3. Select (Delete Application).
4. Press to delete the application if not displayed by default.
5. If not displayed by default, choose the application you wish to delete by selecting (LOOK UP). The Option List Selection menu opens. Choose the application you wish to delete from this list.
6. Press and the application appears in the Type field.
7. Press to delete the application.
8. A dialog box opens asking if you are sure you want to delete the application you have selected. Press Y (Yes) or N (No).
Page 139 of the Emerson E2 RX user manual — 10.18.2.3 Navigating the Setup Screen
Page 139 · click to enlarge
Page 139

10.18.2.1 The Edit Menu

parameter stored inside the controller. Setpoints can be programmed from any application setup screen.

To enter setpoints from a Setup screen:

1. Press (SETUP) from the desired application’s Status screen. (If starting from the Home screen, move the cursor to the desired application’s value and press to open the Actions Menu. Choose Setup . This will take you to the Setup screen.)
Emerson E2 RX — 10.18.2.1 The Edit Menu diagram (page 139)
Fig. 170 · 10.18.2.1 The Edit Menu
2. Once inside the application’s Setup screen, look for the Setpoints option in the index tabs along the top of the screen.
3. Use (NEXT TAB) to tab over and the Setpoints box of your application will open.
Emerson E2 RX — 10.18.2.1 The Edit Menu diagram (page 139)
Fig. 171 · 10.18.2.1 The Edit Menu

Figure 10-46 - Edit Menu

The Edit menu becomes available when you are on a Setup screen and can be opened by pressing (EDIT). Depending on which Setup option (index tabs) is high- lighted, the Edit menu allows you to change field format- ting using these options:

  • Alternate I/O Formats - setting up pointers can change a field to expect a Board:Point , Fixed Value , or Area Ctrl:Application:Property .
  • Set Multiple Outputs - allows you to connect an output pointer to multiple input pointers.
  • Output Change Delta - the +/- change that must occur at the output before the new value is used.

Figure 10-47 - Setpoints Box

  • Generic Alarm Setup - enables the user to customassign alarming parameters in the controller.

10.18.2.3 Navigating the Setup Screen

  • Logging Setup - enables the user to turn logging on for a particular parameter. Note that if “L” appears next to the parameter, default logging has already been enabled for the Logging Group Cell.
  • Bypass Setup - Opens screen for bypass input types, which are “Momentary” or “Level” triggered and remain active for a “Bypass Duration”. For example, Time Schedules have two such inputs.
  • I/O Mode - toggles between displaying board names and board numbers.
  • Setup I/O - allows user to enter an input or output point setup screen. 10.18.2.2 Entering Setpoints

Figure 10-48 - Typical Setup Screen (RX version shown)

An application setpoint is a user-defined control

The Setup utility is the interface used to change set-

Set Up Applications Quick Start • 10-27

Page 141 of the Emerson E2 RX user manual — 10.18.3 Using the Help Key to get Property Help
Page 141 · click to enlarge
Page 141

After all of the functions of E2 are set up, the next step is to set the System Configuration, which is basically how the system is used. 10.18.3 Using the Help Key to get Property Help

Property Help gives an explanation of the parameter, input, or output the user has selected.

Pressing the key while the cursor is pointing to a parameter, input, or output opens the Property Help win- dow. The Property Help window displays documentation specific to the parameter, input, or output the cursor is cur- rently pointing to.

Set Up Applications Quick Start • 10-29

Page 142 of the Emerson E2 RX user manual — 10.18.3 Using the Help Key to get Property Help
Page 142 · click to enlarge
Page 142
Page 142 of the Emerson E2 RX user manual — 10.18.3 Using the Help Key to get Property Help
Page 143 of the Emerson E2 RX user manual — 11.1.2.1 Overview of PID Control Strategy
Page 143 · click to enlarge
Page 143

11 Software Overview

11.1 Suction Groups

should be switched ON or OFF to best fulfill the require- ment. For example, if the application says that 60% of the total compressor rack’s power should be active, and the rack has compressors totaling 50 HP, then E2 will try to switch on compressors totaling 30 HP.

11.1.1 Introduction

The E2 RX refrigeration controller uses suction group applications to cycle compressors in an effort to maintain a constant suction pressure or temperature in a refrigeration system. A suction group may contain up to 16 compressor stages (standard, variable-speed, or unloader).

For more information on PID, see Appendix D: PID Control. 11.1.2.2 Variable-Speed Compressors

Suction Group applications are compatible with vari- able-speed compressors. VS compressors allow Suction Group applications to “fine-tune” the amount of total active rack horsepower to react to small changes in suction pressures or temperatures. As a result, the rack does a bet- ter job of controlling suction, requiring less compressor switches.

There are two different types of suction group applica- tions:

  • Suction Group - The “standard” suction group application that has existed since the first version of E2 firmware. The Suction Group uses PID Control and with proper optimization it can achieve very tight suction pressure or temperature control, but compressor cycling is not based on load analysis and can be inefficient, especially in larger racks. All versions of E2 support the standard Suction Group application.

When a variable-speed compressor is present, it will generally be treated as the primary pressure controlling device, and any other standard compressors in the rack are secondary devices used only if the VS compressor is unable to fully handle the required horsepower. The vari- able-speed compressor will be the first compressor on and the last compressor off. 11.1.2.3 Floating Setpoint Control

  • Enhanced Suction Group - Introduced in E2 version 2.30F01, the Enhanced Suction Group has all of the important features of the older Suction Group application, but instead of employing user-configured PID constants to optimize operation, the Enhanced Suction Group determines optimum control by “learning” the effect each compressor and circuit load has on the suction input. The Enhanced Suction Group is easier to configure and more conservative with compressor cycling than the standard Suction Group. In addition, the Enhanced Suction Group also supports use of the Copeland Digital Scroll and Copeland Digital Discus compressors. 11.1.2 The (Standard) Suction Group Application

The Floating Setpoint strategy within the E2 RX pro- vides a method for varying the suction setpoint of the group based on the temperature within a circuit. When Floating Setpoint Control is enabled, the E2 RX monitors either a circuit temperature or a case temperature from a CC-100 and adjusts the suction setpoint if the temperature is too low or too high.

The user establishes a range outside of which the E2 RX is instructed to make a one PSI adjustment to the suc- tion pressure setpoint to either reduce or increase the case temperature. If the temperature continues to remain out- side of the range for a user-defined period of time, the E2 RX continues to make pressure setpoint adjustments until the temperature is within the established range.

11.1.2.1 Overview of PID Control Strategy

By varying the suction pressure setpoint to match the temperature requirements of the circuit, the E2 RX is able to ensure product integrity while achieving maximum rack efficiency. 11.1.3 The Enhanced Suction Group Application

A Suction Group application looks at suction pressure or suction temperature to determine how many compressor stages should be ON or OFF. The application compares the suction pressure or temperature to its control setpoint using PID control. The result of this comparison is a per- centage from 0% to 100% that corresponds to the total capacity of the compressor rack that should be active.

The Suction Group application then takes that percent- age and determines what combination of compressors

A Suction Group application looks at suction pressure or suction temperature and compares it to the suction set- point to determine whether compressor stages should be

Suction Groups Software Overview • 11-1

Page 144 of the Emerson E2 RX user manual — 11.1.3.1 Learning Mode
Page 144 · click to enlarge
Page 144

cycled ON or OFF. Unlike the Suction Group application, which uses a PID percentage to determine how many stages to turn ON or OFF, the Enhanced Suction Group keeps historical data of the effects each compressor stage has on the suction pressure or temperature, and analyzes that data to determine which stages to cycle.

trol” or “Tightest Control” will increase the application’s reaction to suction changes, resulting in tighter control (usually at the expense of more frequent cycling). If fewer compressor cycles are desired, setting the field to “Less Cycling” or “Least Cycling” will decrease the number of cycles but also increase the amount of fluctuation in the suction pressure. 11.1.3.4 Variable-Speed, Digital Scroll, and Digital Discus Compressor Support

The Enhanced Suction Group application is designed to balance tight control of suction pressure with economic management of compressor cycling to reduce power usage and compressor wear. 11.1.3.1 Learning Mode

The Enhanced Suction Group supports variable-speed compressors similar to the Suction Group application. When a variable-speed compressor is present, it is the first compressor stage ON and the last stage OFF, and its capacity is varied to attempt to correct small fluctuations in the suction pressure or temperature.

When an Enhanced Suction Group application runs for the first time, it undergoes a “Learning Mode” period to collect data on the compressor stages. During Learning Mode, the Enhanced Suction Group will control suction pressure, but it will purposely cycle the compressor stages in different combinations to measure the effect they have on the suction input value.

In addition, the Enhanced Suction Group application supports use of one or multiple Copeland Digital Scroll or Digital Discus compressors for use as a variable-capacity compressor. With several Digital Scroll or Digital Discus compressors, the Enhanced Suction Group will modulate one of those compressors at a time to control suction pres- sure. As compressor capacity is added or removed, the Enhanced Suction Group may modulate another Digital Scroll compressor to distribute compressor resources and solenoid wear.

The Learning Mode lasts for several minutes. After Learning Mode ends, the Enhanced Suction Group will require up to 24 hours of operation before compressor cycling is operating at maximum efficiency. If compressor cycling seems too frequent after 24 hours of operation, you may reduce compressor cycling by changing the Con- trol/Cycles parameter (see Section 11.1.3.3, The Control/ Cycles Parameter). 11.1.3.2 Circuit Load Analysis

The operating capacities of the Copeland Digital Scroll and Copeland Digital Discus compressors are determined in the same way as a variable-speed compressor, except the Copeland Digital Scroll and Copeland Digital Discus controlled by pulse-width modulation (PWM). 11.1.3.5 Floating Suction Control

Unlike the standard Suction Group algorithm, the Enhanced Suction Group includes Circuit Setup where you associate all circuits connected to the suction group. Once the circuits are set up, the suction group will use the circuit states to help determine current loads on the suction group. For example, when one or more circuits go into defrost, the Enhanced Suction Group determines that there is less of a load on the suction group than if all circuits were in refrigeration. With the appropriate circuits associ- ated, the Enhanced Suction Group tailors its capacity to meet the load. Over time, the Enhanced Suction Group will build and store a profile for all the different combina- tions of circuit states encountered in the algorithm. 11.1.3.3 The Control/Cycles Parameter

Floating suction control in the Enhanced Suction Group behaves identically to the way it works in the Suc- tion Group application. Refer to Section 11.1.2.3, Floating Setpoint Control. 11.1.4 Hardware Overview

An overview of the input and output devices that make up a Suction Group is shown in Figure 11-1. These devices should be wired to input and output boards in the manner outlined in Table 11-1 and Table 11-2.

Unlike the standard Suction Group, which used PID constants as a means of optimizing suction control and had limited features for controlling compressor cycle counts, the Enhanced Suction Group has one parameter with five preset settings to allow users to alter suction control per- formance or compressor cycling frequency.

The default setting, “Moderate Control,” seeks to bal- ance good suction pressure control with efficient cycling. If tighter control is needed, setting the field to “Tight Con-

Page 145 of the Emerson E2 RX user manual — 11.2 Condenser Control
Page 145 · click to enlarge
Page 145
Emerson E2 RX — 11.2 Condenser Control diagram (page 145)
Fig. 172 · 11.2 Condenser Control
Emerson E2 RX — 11.2 Condenser Control diagram (page 145)
Fig. 173 · 11.2 Condenser Control

Table 11-1 - Suction Group Inputs

Figure 11-1 - Diagram of a Suction Group

Emerson E2 RX — 11.2 Condenser Control diagram (page 145)
Fig. 174 · 11.2 Condenser Control

Compressor N.C. N.C. (up) If you want a compressor to be OFF during network/power loss, use N.O. failsafes instead.

Unloader N.C. N.O. (down) These fail-safe settings are specifically for unloaders.

N.C. N.C. (up) Keeps solenoid energized during network/power loss.

Electric Defrost N.O. N.O. (down) Keeps contacts de-energized during network/power loss.

Table 11-2 - Suction Group Outputs

11.2 Condenser Control

that compares a single Control In input to a PID setpoint. The resulting percentage is used to activate the condenser fan(s) necessary to bring the input value down below the setpoint.

An E2 RX is capable of controlling air-cooled or evap- orative condensers. The E2 RX-300 may control a single condenser, while the RX-400 may control up to two con- densers. 11.2.1 Air Cooled Condensers

Control inputs for air cooled strategies most commonly come from a pressure transducer mounted on either the discharge line, the condenser inlet, or the condenser outlet. However, temperature sensor values will also be accepted. 11.2.1.2 Temperature Differential Strat- egy

An air-cooled condenser consists of one or more fans that blow air across a manifold of tubing to cool heated refrigerant and condense it into a liquid. The E2 controls condensers by activating or deactivating fans in order to maintain discharge pressure or temperature at or below a chosen setpoint.

The temperature differential strategy attempts to keep a minimum amount of difference between the temperature of the refrigerant and the ambient outside temperature.

A Condenser Control application may use either of two strategies to operate air cooled condensers: an air-cooled strategy, or a temperature differential (T-D) strategy. 11.2.1.1 Air Cooled Strategy

This strategy begins by determining the temperature of the refrigerant coming into the condenser. This can be sup- plied by either a temperature sensor or pressure transducer located near the condenser inlet; if it’s a pressure trans- ducer, its value will automatically be converted to a tem- perature value based upon the type of refrigerant.

The air cooled strategy uses a simple PID control loop

Condenser Control Software Overview • 11-3

Page 146 of the Emerson E2 RX user manual — 11.2.2 Evaporative Condensers
Page 146 · click to enlarge
Page 146

The refrigerant temperature is subtracted from the value of an ambient air temperature sensor. The result is the temperature differential. It is this differential value that is compared to the PID setpoint for the purpose of determining the amount of total fan capacity to activate. 11.2.2 Evaporative Condensers

ation system is being used as reclaim heat by an HVAC unit.

The most common way E2 achieves split mode in an air-cooled condenser with single-speed fans is to lock OFF 50% of the total number of fans. You may choose to lock OFF all odd-numbered fans, even-numbered fans, the first half of all fans, or the last half of all fans.

In an evaporative condenser, water is sprayed across a condenser coil, which cools the refrigerant as water is evaporated. Control of the evaporative condenser is simi- lar in ways to the air cooled strategy in that the Condenser Control application uses PID control to activate or deacti- vate fans (thus increasing or decreasing the amount of evaporative cooling).

Split mode can also be achieved by activating a valve that bypasses a portion of the tubing in the condenser man- ifold. The resulting decrease in surface area results in reduced cooling. 11.2.5 Fast Recovery

Under certain conditions the system pressure may increase too quickly above the condenser setpoint to be reduced effectively by normal condenser control. The E2 provides a user-definable fast recovery rate setpoint at which all the condenser fans are turned ON to reduce sys- tem pressure.

Like air-cooled condensers, evaporative condensers may be controlled by discharge pressure or temperature. They may also be controlled by water sump temperature. In addition, each evaporative condenser may have up to 16 “override” sensors (either temperature or pressure) that allow the condenser to be overridden to fast recovery mode (See Section 11.2.5, Fast Recovery). 11.2.3 Fan Control

For air-cooled and temperature-differential condenser strategies, discharge pressure is always used as the control value that determines fast recovery. You may choose to enable or disable fast recovery, and also to include a delay when transitioning from one mode to the other.

Condenser Control applications can control three dif- ferent kinds of fans: single-speed fans (up to 12 stages), two-speed fans, and variable-speed fans. All fan types are controlled by PID control; in other words, the Condenser Control application generates a percentage from 0% to 100% that corresponds to the amount of total fan power that should be active.

For evaporative condensers, up to 16 “override” tem- perature sensors may be combined to yield a single over- ride value that is used for fast recovery. Fast Recovery is always used in an evaporative condenser. 11.2.6 Hardware Overview

Single-speed fans translate the PID percentage into a percentage of total fan capacity. For example, if the PID percentage is 75%, then 75% of all condenser fan stages will be ON.

An overview of the input and output devices that make up a typical Condenser Control application is shown by Figure 11-2 and Figure 11-3. Figure 11-2 shows the typi- cal layout of an air-cooled condenser. Figure 11-3 shows the typical layout of an evaporative condenser.

Two-speed fans use Cut In/Cut Out setpoints to trans- late the percentage into an OFF, LO, or HI fan state.

Variable-speed fans simply use the percentage to determine the fan speed. Thus, a 51% PID percentage will result in the fan running at 51% maximum speed.

Emerson E2 RX — 11.2.2 Evaporative Condensers diagram (page 146)
Fig. 175 · 11.2.2 Evaporative Condensers

VS-SS combined fan setup is for the combination of a variable-speed fan with single-speed fans. First, under PID control, the variable-speed (VS) fan turns on. Then as the PID percentage rises above VS fan’s maximum speed, the E2 switches on additional single-speed fan stages. 11.2.4 Condenser Split Mode

The E2 is capable of operating condensers in a special mode that reduces its condensing capacity. This special mode is called split mode.

Split mode is most often used in cold climates during periods of low outside air temperature. Split mode is also sometimes used when heated refrigerant from the refriger-

Figure 11-2 - Air Cooled Condenser Diagram

Page 147 of the Emerson E2 RX user manual — 11.3 Standard Circuits
Page 147 · click to enlarge
Page 147
Emerson E2 RX — 11.3 Standard Circuits diagram (page 147)
Fig. 176 · 11.3 Standard Circuits
Emerson E2 RX — 11.3 Standard Circuits diagram (page 147)
Fig. 177 · 11.3 Standard Circuits

Ambient Temp Temperature see Table 9-1 on page 9-3

Table 11-3 - Suction Group Inputs

Figure 11-3 - Evaporative Condenser Diagram

Wire Output Board Contacts

Switch toNotes

to:

N.C. N.C. (up) To ensure condensing during network and power failure, con- denser fans should all be configured normally closed (N.C.)

Condenser Fan Relay (Variable- Speed)

N.C. N.C. (up) The fan should operate at 100% during loss of communication with E2.

Dampers (Evap. only)

N.C. N.C. (up) Dampers should be open during communication loss (N.C.).

Evaporator Pumps (Evap. only)

N.C. (see note) N.C. (see note) Some condensers have dual pumps that cycle at even intervals. One pump should be wired N.C. and the other N.O., so that only one pump runs during communication loss.

Variable-Speed Fan Output (to inverter)

None (analog point) None (analog point) This 4AO or 8IO analog point sends the 0-100% fan speed sig- nal to the inverter.

Table 11-4 - Suction Group Outputs

11.3 Standard Circuits

Emerson E2 RX — 11.3 Standard Circuits diagram (page 147)
Fig. 178 · 11.3 Standard Circuits

Refrigerated cases that do not use case controllers are controlled by Standard Circuit applications. In a Standard Circuit application, the E2 is responsible for all case mon- itoring and control; it uses the RS485 I/O Network to both gather case temperature inputs and activate or deactivate the liquid line solenoids, defrost modes, and fans. Also, circuits that use ESR8s and MultiFlex ESRs are controlled using Standard Circuits. 11.3.1 Refrigeration Control

A Standard Circuit application may apply one of four different control methods to a case circuit: the Tempera- ture Monitor method, the Temperature Control method,

Standard Circuits Software Overview • 11-5

Set Fail-safe Dip · Output Device · Condenser Fan (Single-Speed)

Page 148 of the Emerson E2 RX user manual — 11.3.1.1 Temperature Monitor
Page 148 · click to enlarge
Page 148

and the Line Up(ESR)/Defrost method, and the Lineup(MFESR)/Defrost method. 11.3.1.1 Temperature Monitor

refrigeration solenoid is turned OFF. During the Pump Down phase, the application waits for a user-specific amount of time to elapse before turning on the defrost heat. This allows refriger- ant in the evaporator to be evacuated before defrost heat is activated. The compressor(s) remain ON during Pump Down.

The Temperature Monitor method does not control case temperature. The application will read and record case temperature inputs, but it will not make any attempt to control temperature. The application will still initiate and control defrost, cycle fans, and perform other neces- sary functions. 11.3.1.2 Temperature Control

2. Defrost - During the defrost phase, refrigeration is disabled. If using electric defrost heaters will be ON. If using hot gas, heated refrigerant will be pumped through the coil. This phase will continue until the defrost is terminated (see Section 11.3.2.3 for information on how defrost is terminated).

A Standard Circuit application using the Temperature Control method will pulse the refrigeration liquid line solenoid OPEN and CLOSED so as to control the case temperature to the user-defined setpoint. The application monitors up to six different temperature sensors in the cir- cuit and combines them into a single value that is com- pared to the setpoint. 11.3.1.3 Line Up(ESR)/Defrost

3. Run-Off (Elec & Hot Gas only)- After defrost heat is deactivated, the application waits for the Run-Off time to pass before re-entering refrigeration mode. This allows melted frost on the evaporator to drain from the coil so that it will not refreeze when refrigeration begins again. After the user-specified Run-Off time has passed, the defrost cycle has ended. 11.3.2.2 Defrost Types

In Line Up ESR, circuit temperature is controlled by an electronic evaporator pressure regulator (EEPR). The EEPR is controlled by a PID algorithm that steps the valve open from 0% to 100% based on how far away the circuit temperature is from the setpoint.

There are many different ways used to defrost a refrig- erated case. A Standard Circuit application is capable of employing five different strategies to accommodate five different types of defrost.

This strategy requires the use of the Echelon-based ESR8 stepper regulator output board, which has been dis- continued and replaced by the I/O Network-based Multi- Flex ESR. 11.3.1.4 Line Up(MFESR)/Defrost

Timed and Reverse Air

Timed defrost and Reverse Air defrost are two differ- ent defrost strategies, but both are alike in the way they are controlled by a Standard Circuit application. In both defrost types, no heat is applied to the evaporator. The application simply turns the refrigeration solenoid OFF for the duration of the defrost cycle.

In Line Up MFESR, circuit temperature is controlled by an electronic evaporator pressure regulator (EEPR). The EEPR is controlled by a PID algorithm that steps the valve open from 0% to 100% based on how far away the circuit temperature is from the setpoint.

When these defrost types are used, Pump Down and Run-Off times are not necessary; therefore, they will not be part of the defrost cycle.

This new strategy requires the use of the I/O Network- based MultiFlex ESR and should not be used with the Echelon-based MultiFlex ESR. 11.3.2 Defrost Control

Hot Gas and Reversed Cycle Hot Gas

Hot Gas and Reversed Cycle Hot Gas require the use of hot gas from the refrigeration lines. During these types of defrost, the application will open the circuit’s liquid line solenoid AND will send a command to the refrigeration rack to open the Master Liquid Line Solenoid. As a result, heated refrigerant will be pumped through the evaporator coil.

Defrost cycles in a Standard Circuit application may be initiated in either of three ways: by schedule (at specific times of the day, programmed by the user), by external trigger (a user-initiated signal such as a switch or button), or by manual command (initiated on the E2 front panel by the user). 11.3.2.1 Defrost States

Any user-defined Pump Down and Run-Off times will be observed as normal.

The defrost cycle for a Standard Circuit application consists of three steps.

Electric defrost uses electric heaters to defrost the evaporator coil. During electric defrost, the application

1. Pump Down (Elec & Hot Gas only) - The defrost cycle begins with this step immediately after the

Electric Defrost

Page 149 of the Emerson E2 RX user manual — 11.3.3.1 Clean Switches
Page 149 · click to enlarge
Page 149

will turn the Defrost output ON to activate the heaters con- nected to the output.

OFF until the temperature falls below the setpoint, at which point the heat is turned back ON.

Any user-defined Pump Down and Run-Off times will be observed as normal. 11.3.2.3 Defrost Termination

Defrost heat will continue to be pulsed in this manner until the defrost time has passed. The defrost cycle will then begin the Run-Off period, and then restart refrigera- tion. 11.3.2.4 Emergency Defrost

Both the start and the end times of a defrost cycle are determined by the user. The Pump Down, Defrost, and Run-Off stages all have fixed durations, and when the last stage of the cycle is complete, defrost is terminated.

When necessary, a user can initiate an emergency defrost cycle in a circuit. Emergency defrost cycles are similar to normal defrost cycles, except an emergency defrost cycle will ignore all calls for termination and remain in defrost for the entire programmed defrost time. For cases using a pulsed defrost strategy, this means the defrost heat will not be pulsed during emergency defrost.

However, a Standard Circuit application may be pro- grammed to terminate the Defrost stage of the defrost cycle early if the temperature inside the case rises above a fail-safe temperature setpoint (called the termination set- point). For certain defrost types, defrost heat may also be “pulsed” in order to keep the temperature below the set- point without terminating defrost.

Emergency defrosts are initiated by the user from the Standard Circuit Bypass screen (see Section 12.6, Manual Defrost and Clean Mode). 11.3.2.5 Hot Gas Defrost with ESR8 and MultiFlex ESR

Emerson E2 RX — 11.3.2.3 Defrost Termination diagram (page 149)
Fig. 179 · 11.3.2.3 Defrost Termination

If an ESR8 or MultiFlex ESR is used on a circuit that uses hot gas defrost, values for circuits in defrost are forced OPEN (100%) to allow hot gas to flow through the evaporators. 11.3.3 Clean and Door Switches

11.3.3.1 Clean Switches

A Standard Circuit application may be configured to entirely shut down a case circuit so that it may be cleaned or serviced. A case circuit enters clean mode when it receives a signal from an input called the clean switch.

Clean switches may be set up as either “Switched” or “Timed.” If a clean switch is configured as “switched,” the circuit enters clean mode when the switch is turned ON, and it remains in clean mode until the switch is turned OFF. If a clean switch is configured as “timed,” the circuit enters clean mode when the switch is turned ON, and it remains in clean mode for a fixed user-defined amount of time.

Figure 11-4 - Defrost Termination (Pulsed)

Pulsed Defrost is only available if the circuit is using heated defrost, such as Electric or Hot Gas defrost.

Pulsed Defrost is similar to the Temperature Termina- tion strategy outlined in Section 11.3.2.3, except a defrost cycle always continues for the full programmed duration.

During clean mode, the Fan, Defrost, and Refrigera- tion Solenoid outputs are all turned OFF, and the liquid line solenoid is CLOSED.

When the termination temperature rises above the set- point, defrost does not end. Instead, the defrost heat is turned OFF until the case temperature falls below the set- point, at which time the output will come back ON to con- tinue heating.

If desired, a notice may be sent to the E2’s Alarm Log so that the E2 can keep track of clean modes and times. 11.3.3.2 Door Switches

Walk-In Box freezers are often equipped with door switches that disable the evaporators when the door is open. The E2 is capable of reading a digital door switch input and controlling the freezer appropriately.

Figure 11-4 illustrates what happens in a pulsed defrost cycle. In this example, the case reaches its termina- tion temperature approximately 2/3 of the way into its defrost cycle. Defrost continues, but defrost heat is turned

When a door switch opens, the E2 will shut off the

Standard Circuits Software Overview • 11-7

Pulsed Defrost

Page 150 of the Emerson E2 RX user manual — Fans are locked OFF during clean mode. 11.3.5 The TD3 Temperature Display
Page 150 · click to enlarge
Page 150

refrigeration solenoid and the fans (if active) and turn the lights ON. 11.3.4 Fan Control

Figure 11-5 shows a typical case in a circuit and the devices that must be wired for each. Follow the guidelines below to wire the circuit to the E2 I/O Network:

A circuit’s circulation fan is always ON when the cir- cuit is in refrigeration mode. Its state during defrost is determined entirely by how the application is programmed by the user. You may choose to set the fan either ON or OFF for each phase of a defrost cycle (Pump Down, Defrost, and Run Off). If you choose to keep fans off for the entire defrost cycle, you may also choose to program a delay that will keep the fan from activating for a fixed amount of time after the cycle ends.

Fans are locked OFF during clean mode. 11.3.5 The TD3 Temperature Display

The TD3 is a case display that is designed to monitor three types of temperature sensors. The compact unit is mounted on the face of a refrigeration case and displays, by default, the discharge air temperature. Pressing the function button repeatedly allows you to view the temper- ature of Retail Solutions’ product probe, the defrost termi- nation value, and then back to the discharge air temperature.

The TD3 has a status light that is controlled by the E2 controller. A green status light means that the status is okay while a red status light indicates alarm.

This case display can be configured to show either the discharge air temperature (default), the product probe tem- perature, or the defrost termination temperature.

The TD3 communicates with the E2 controller via the Echelon Network and in turn the E2 adjusts the circuit’s temperature or defrost status. 11.3.6 The Control Link CD Case Display

The Control Link CD is mounted inside the refrigera- tion case and serves as a point to which the sensors are wired. A single RS485 communication cable links the case display back to the E2 controller. Additionally, an optional remote display can be added to the control module to pro- vide a local indication of case temperature and operational mode that is remote from the control module. 11.3.7 Wiring

Wiring a case circuit so that it may be controlled by a Standard Circuit application primarily involves wiring all temperature sensors to 16AI Analog Input Boards and wir- ing the valves and other devices on the case to a relay out- put board such as an 8RO Relay Output Board.

Page 151 of the Emerson E2 RX user manual — 11.3.4 Fan Control
Page 151 · click to enlarge
Page 151
Emerson E2 RX — 11.3.4 Fan Control diagram (page 151)
Fig. 180 · 11.3.4 Fan Control

Figure 11-5 - Typical Case in a Standard Circuit

Emerson E2 RX — 11.3.4 Fan Control diagram (page 151)
Fig. 181 · 11.3.4 Fan Control

Table 11-5 - Suction Group Inputs

Standard Circuits Software Overview • 11-9

Page 152 of the Emerson E2 RX user manual — 11.4.2 Case Circuit Control Software Overview
Page 152 · click to enlarge
Page 152

Wire Output Board contacts

Switch toNotes

to:

Case Fans N.C. N.C. (up) Wire fans to remain ON during comm. loss

N.C. N.C. (up) Wire solenoid to remain energized (OPEN) during comm. loss

Defrost N.O. N.O. (down) Defrost heaters (electric and hot gas) will remain de-energized (CLOSED) during comm. loss

Liquid Line Sole- noid (Hot Gas defrosts only)

N.O. N.O. (down) The liquid line solenoid will remain de-energized (CLOSED) during comm. loss.

EEPR (ESR8 con- trolled circuits only)

None (ESR8 point) None (ESR8 point) The evaporator stepper regulator valve should be plugged in to a point on the ESR8 board.

Table 11-6 - Suction Group Outputs

11.4 Case Control Circuits

11.4.2 Case Circuit Control Software Overview

11.4.1 Overview

There are six different versions of case control soft- ware in the Retail Solutions case control family:

Case circuits that use CC-100s, CS-100s, EC-2s, or CCBs for case control rely on Case Circuit Control appli- cations in the E2 to provide them the necessary setpoints, defrost scheduling, and other control parameters. Unlike Standard Circuit applications, Case Control Circuits do not directly control temperature in the case circuits; instead, the case controller controls temperature for each individual case based on the setpoint(s) supplied to them by their associated E2s.

  • CC-100P - This version controls temperature in a case using a pulse modulated valve, which is pulsed ON for a percentage of a fixed amount of time to achieve the necessary refrigerant flow.
  • CC-100LS - This version controls temperature in a case using a liquid-side stepper valve. This valve is capable of various positions in between 0% and 100%. As a result, the CC-100 is capable of supplying the exact refrigerant flow necessary to achieve the case setpoint.

Setup of a case-controlled refrigerated case system is a two-fold process:

1. For each case circuit in the refrigeration system, a separate Case Control Circuit application is created with its own set of control parameters.
  • CC-100H - This version controls temperature in a case using a suction-side evaporator pressure regulator (EEPR). This valve is capable of various positions in between 0% and 100%. As a result, the CC100 is capable of providing the exact suction pressure necessary to achieve the case setpoint.
2. Each CC-100, CS-100, EC-2, and CCB is associated with a Case Control Circuit application in the E2. Association creates a network link between the case controller and the application which supplies the information necessary to control temperature, defrost, lights, fans, and antisweat heaters.
  • CS-100 - This controller uses suction-side evaporator suction regulators (ESRs) to control suction pressure for an entire circuit. Unlike the CC-100, which controls only one case, the CS-100 controls all cases on an entire circuit.

This section of the manual covers both the program- ming of a Case Circuit Control application and the process of associating a CC-100, CS-100, EC-2, or CCB with a Case Circuit Control application.

  • EC-2s - The EC-2 is a liquid-side pulse valve case controller that doubles as a case temperature and information display. Unlike the CC-100, it is designed to be mounted on the front of the case, and has a push-button front panel interface for program-

Set Fail-safe Dip · Output Device · Refrigeration Sole- noid

Page 153 of the Emerson E2 RX user manual — 11.4.2.1 Valve Control
Page 153 · click to enlarge
Page 153

11.4.3 Refrigeration Control

ming and viewing status. (The EC-2 29x version controls the refrigeration solenoid valve to allow the passage of refrigerant to the TXV valve, whereas the 39x version controls a pulse valve on the liquid side of the evaporator to regulate super- heat.)

11.4.3.1 EEVs (Liquid Pulse and Liquid Stepper)

In CC-100P, CC-100LS, EC2, and CCB (liquid and pulse stepper) case controllers, there are two different con- trol systems that work together to regulate refrigeration: temperature control and superheat control.

  • CCBs - Version 2.3 and above of the E2 software is backward-compatible with the CCB, an I/O Network-based controller used primarily in old RMCC installations. Like the CC-100 family, the CCB was available in several different models that controlled liquid pulse, liquid stepper, suction stepper, and suction lineup.

Temperature Control measures the case temperature and turns refrigeration ON or OFF as required to keep the case within a certain proximity of the user-specified tem- perature setpoint.

The user supplies Temperature Control with the set- point and a deadband, which is the range of case tempera- tures equally above and below the setpoint within which the case temperature will be considered acceptable. When the case temperature is above the setpoint plus one-half the deadband, refrigeration will be turned ON. It will remain ON until the temperature drops to below the temperature setpoint minus one-half the deadband, at which point refrigerant flow will be turned OFF.

11.4.2.1 Valve Control

The CC-100 is capable of supporting two types of valves: pulse and stepper. The CC-100 uses PID control to vary the aperture rates of both valves between 0% and 100% as required by their temperature control algorithms (see Section 11.4.3, below).

Case temperature may be supplied to Temperature Control by a supply air sensor, a return air sensor, or a mixture of both the supply and return air sensor values.

Temperature Control itself does not vary the opening percentage of the pulse or stepper valve; it simply addresses the case’s need for refrigerant flow to maintain its setpoint. Once refrigeration is started, control of the valve is handled by Superheat Control.

A pulse valve is a device capable of being in only two states: fully open or fully closed. To achieve the necessary percentage of refrigerant flow, CC-100s repeatedly “pulse” these valves open for a percentage of an interval called the valve period (which defaults to six seconds).

For example, to achieve a 20% valve output in a CC- 100 with a valve period of six seconds, a pulse valve would be opened for 20% of six seconds (or 1.2 seconds) and closed for the remaining 80% of the valve period (4.6 seconds). This same six-second sequence will repeat for as long as the CC-100 calls for a 20% valve output.

The difference between the temperature of the refriger- ant going in to the evaporator inlet (the coil in tempera- ture) and the refrigerant leaving the evaporator outlet (the coil out temperature) is called Superheat. When refriger- ant is flowing through an evaporator, Superheat Control uses PID Control to keep the Superheat at a user-defined Superheat setpoint. Superheat Control positions the valve to increase or decrease refrigerant flow in an effort to keep the Superheat equal to a user-defined Superheat setpoint.

Stepper valves are devices that may opened to many different positions between fully closed (0%) and fully open (100%). Stepper valves usually have hundreds or thousands of “steps” in between fully closed and fully open. To achieve the desired opening percentage, the CC- 100 moves the valve the required number of steps.

Recovery Mode is a special part of Superheat Control that occurs at the beginning of every refrigeration cycle. When refrigeration has been OFF and Temperature Con- trol calls for refrigeration to be ON, a Recovery Mode begins, during which the valve is fixed to a user-defined percentage (usually 70%) for a fixed amount of time. This floods the previously empty evaporator with refrigerant and gradually establishes a differential between the coil in and coil out temperatures. When the Recovery Mode ends, the superheat will be relatively close to the setpoint; at this

To properly control a stepper valve, the CC-100 must know the operating characteristics of the valve, such as its maximum steps per second change rate, the total number of steps between 0% and 100%, and its hysteresis rate (the number of steps required for the valve to change direc- tion).

Case Control Circuits Software Overview • 11-11

Show 5 more labels / short text on this page
Temperature Control · Pulse Valves · Superheat Control · Stepper Valves · Recovery Mode
Page 154 of the Emerson E2 RX user manual — 11.4.4.1 Defrost States
Page 154 · click to enlarge
Page 154

11.4.4.1 Defrost States

time, Superheat Control will begin.

Recovery Mode always lasts for a specific number of seconds. The case controller determines the duration based on past performance of the evaporator during previous Recovery Modes.

The defrost cycle for a Case Circuit application con- sists of three steps. Of these three, steps #1 and #3 apply only to cases with heated defrosts:

1. Pump Down - The defrost cycle begins with this step immediately after the refrigeration solenoid is turned OFF. During the Pump Down phase, the application waits for a user-specific amount of time to elapse before turning on the defrost heat. This allows refrigerant in the evaporator to be evacuated before defrost heat is activated. The compressor(s) remain ON during Pump Down.

Thermostatic Expansion Valves (TXVs)

As an alternative to regulating superheat using EEVs, case controllers also support cases that use mechanical thermostatic expansion valves (TXVs). When TXVs are being used, the case controllers use only Temperature Control to turn refrigeration ON and OFF. Superheat Control is disabled, since it is assumed the TXV is tak- ing care of the superheat. 11.4.3.2 EEPRs (Suction Stepper)

Pump Down times may only be used for hot gas

and electric type defrosts.

The CC-100H, CS-100, and CCB (suction stepper and lineup) control case temperature from the suction side of the evaporator by using an EEPR to regulate suction pres- sure.

2. Defrost - During the defrost phase, refrigeration is disabled. If using electric defrost heaters will be ON. If using hot gas, heated refrigerant will be pumped through the coil. This phase will continue until the defrost is terminated (see Section 11.3.2.3 for information on how defrost is terminated).

Suction-side control differs from liquid-side control in that Superheat Control is not used. In liquid-side control, the valve aperture is controlled in order to achieve a super- heat setpoint. In suction-side control, the CC-100 changes the valve aperture to achieve the case temperature set- point.

3. Run-Off - After defrost heat is deactivated, the application waits for the Run-Off time to pass before re-entering refrigeration mode. This allows melted frost on the evaporator to drain from the coil so that it will not re-freeze when refrigeration begins again. After the user-specified Run-Off time has passed, the defrost cycle has ended.

Case temperature may be supplied by a supply air sen- sor, return air sensor, or a mixture of the two values.

Temperature Control uses PID control to operate the valve and keep the case temperature input value equal to the case temperature setpoint.

Run-Off times may only be programmed for hot gas and electric type defrosts. 11.4.4.2 Defrost Types

Recovery Mode for suction-side case controllers is slightly different than Recovery Mode for liquid-side controllers. Suction-side case controllers enter Recovery Mode only after a defrost or cleaning cycle, and it does so in order to bring the case temperature down to a level that is controllable by Temperature Control.

There are many different ways used to defrost a refrig- erated case. A case controller is capable of using three dif- ferent types of defrost.

During Recovery Mode, the valve is opened to a fixed percentage until the case temperature falls below the case setpoint. When this occurs, the case controller exits Recovery Mode and begins normal Temperature Con- trol. 11.4.4 Defrost Control

Off Cycle defrost (also known as Timed defrost) is simply a period of time during which refrigeration is sus- pended. No heat is applied to the evaporator. The applica- tion simply turns refrigerant flow OFF for the duration of the defrost cycle.

When these defrost types are used, Pump Down and Run-Off times are not necessary; therefore, they will not be part of the defrost cycle.

The physical aspects of defrost control, such as shut- ting off valves and turning on defrost heat sources, is han- dled by the case controller. When operating on its own, a case controller initiates defrost cycles at programmed time intervals. When connected to a Case Circuit application, the case controllers’ defrost times are coordinated and scheduled by the E2.

Hot Gas and Reversed Cycle Hot Gas

Hot Gas and Reversed Cycle Hot Gas require the use of hot gas from the refrigeration lines. During these types of defrost, the application will open the valve and pump heated refrigerant through the evaporator coil. Any user-

Recovery Mode · Off Cycle (Timed)

Page 155 of the Emerson E2 RX user manual — Electric Defrost
Page 155 · click to enlarge
Page 155

defined Pump Down and Run-Off times will be observed as normal.

are not high enough to require a defrost.

The optical demand defrost sensor may be either an analog or digital type sensor. When this sensor detects no major build-up of frost, the Case Circuit application ignores all scheduled calls for defrost and continues in refrigeration mode. When the sensor detects frost, the defrost inhibit is cancelled, and the case circuit will enter defrost at the next scheduled time.

Electric defrost uses electric heaters to defrost the evaporator coil. During electric defrost, the application will turn the Defrost output ON, which will likewise acti- vate the heaters connected to the power module’s defrost relay.

Any user-defined Pump Down and Run-Off times will be observed as normal. 11.4.4.3 Defrost Termination

A demand defrost inhibit only keeps scheduled defrosts from occurring. Any manual calls for a defrost cycle will occur as normal. CCB demand defrost is cur- rently not supported in E2. Demand sensors, if present on the circuit, will be ignored.

Both the start time and the end time of a defrost cycle are determined by the user. The Pump Down, Defrost, and Run-Off stages all have fixed durations, and when the last stage of the cycle is complete, defrost is terminated.

To protect against demand defrost sensors that may not be working properly, a demand fail-safe time may be set up. Demand fail-safe times limit the amount of time a defrost inhibit may last. If a demand defrost sensor does not detect frost for an amount of time equal to the Demand Fail-Safe Time, the defrost inhibit is lifted and the circuit will enter defrost at the next scheduled time. 11.4.4.5 Emergency Defrost

However, a case controller may be programmed to ter- minate the Defrost stage of the defrost cycle early if the temperature inside the case rises above a fail-safe tempera- ture setpoint. For certain defrost types, defrost heat may also be “pulsed” in order to keep the temperature below the setpoint without terminating defrost.

When necessary, a user can initiate an emergency defrost cycle from a circuit. Emergency defrost cycles are similar to normal defrost cycles, except an emergency defrost cycle will ignore all calls for termination and remain in defrost for the entire programmed defrost time.

One or more temperature sensors in the case circuit may be designated as termination temperature sensors. The values of these sensors are combined into a single control value, and this value is compared to the setpoint. If the termination control value is greater than the user- defined setpoint, defrost will end, and the defrost cycle will begin the Run-Off period (if applicable).

Emergency defrosts are initiated by the user from the Case Control Circuit Bypass screen (see Section 12.6, Manual Defrost and Clean Mode). 11.4.4.6 The WAIT State

Termination sensors may be either analog temperature sensors or digital closures (Klixons). Also, Case Circuit applications may use the value of the analog case tempera- ture sensors for use in temperature termination.

When a Case Control Circuit application enters defrost mode, it sends a message out to all case controllers in the circuit to begin defrost at the same time. However, since each case in a circuit will have its own termination sen- sors, it is possible for some cases to terminate defrost while defrosts in other cases continue.

Pulsed Defrost is only available if the circuit is using Electric or Hot Gas defrost.

Pulsed Defrost is similar to Temperature Termination, except when the termination temperature rises above the setpoint, defrost does not terminate. Instead, the output that applies defrost heat is turned OFF. The output will remain OFF until the temperature falls below the setpoint, at which time the output will come back ON.

When a case controller terminates defrost, it enters a state of operation called “the WAIT state.” While in the WAIT state, all refrigeration and defrost heat will remain OFF. When the Case Control Circuit application detects that all case controllers have entered the WAIT state, the application will consider the defrost cycle completed, and refrigeration will restart. 11.4.5 Anti-Sweat Control

The Case Circuit application will continue to pulse defrost in this manner until the defrost time has passed. The defrost cycle will then begin the Run-Off period. 11.4.4.4 Demand Defrost

A case controller manages its anti-sweat heaters by monitoring the dewpoint in and around the case area. The dewpoint input value is compared to the anti-sweat appli- cation’s control setpoints (the Full ON setpoint and the

If a case is configured with a demand defrost sensor, a case controller may use their inputs as a means of keeping scheduled defrost cycles from occurring when frost levels

Case Control Circuits Software Overview • 11-13

Show 4 more labels / short text on this page
Electric Defrost · Demand Fail-Safe Time · Temperature Termination · Pulsed Defrost
Page 156 of the Emerson E2 RX user manual — 11.4.5.1 Dewpoint Input Sources
Page 156 · click to enlarge
Page 156

11.4.6 Dual Temp Control

Full OFF setpoint). Based on this comparison, the anti- sweat heaters will do one of three things:

A case controller can be configured to change its case temperature, alarm, and superheat setpoints when an exter- nal digital input is switched ON or OFF.

  • If the input is equal to or above the Full ON setpoint, the heaters remain ON 100% of the time.
  • If the input value is equal to or below the Full OFF setpoint, the heaters will be ON 0% of the time (fully OFF).

The user simply connects the digital switch to an input point on the RS485 I/O Network and configures the case controller to read that input as a dual temp switch. When the dual temp switch is ON, the case controller overrides its normal case temperature, alarm, and superheat set- points with a set of user-specified alternate setpoints. 11.4.7 Fan Control

  • If the input value is between the Full ON and Full OFF setpoint, the heaters will be pulsed ON for a percentage of the specified time interval. The percentage is determined by proportionately measuring where the dewpoint falls between the range of values formed by the two setpoints.

A relay on the power module activates the case fans. The fans will be ON while in refrigeration mode, and they may be programmed to be either ON or OFF when the temperature setpoint is satisfied and refrigerant is not flowing.

Figure 11-6 shows an example of how anti-sweat con- trol works. The setpoints (Full ON dewpoint= 80°F, Full OFF dewpoint = 20°F) form the range of dewpoints across which the heaters will be pulsed. When the measured dew- point is 45°F (directly in between both setpoints), the per- centage will be 50%, and the heaters will be pulsed ON for 5 seconds of the defined 10-second interval. If the dew- point drops to 30°F, the percentage will lower to 20%, and the heaters will be on only 2 seconds out of every 10.

When in defrost mode, the fans default to OFF, but they may be programmed by the user to be either ON or OFF.

When a liquid-side CCB is in Recovery Mode (see Recovery Mode, page 9-10), Fan Control may be config- ured to delay the activation of fans for a user-specified amount of time. This delay helps keep the fans from splashing excess moisture that may still be on the coil. 11.4.8 Light Control

Emerson E2 RX — 11.4.6 Dual Temp Control diagram (page 156)
Fig. 182 · 11.4.6 Dual Temp Control

Lights are activated and deactivated by a relay on the power module.

The case controller itself does not have any special control algorithm for the case lights other than to leave the lights ON during normal operation. There are only two cases where the lights are not always ON:

1. An override from an E2 takes over control of the case lights. This override may take the form of a manual switch or a schedule output.
2. If the case controller is set up to use Walk-In Box Control, the case lights default to OFF and only come ON when the door switch is tripped. See Section 11.4.10, Walk-In Freezer Control . 11.4.9 Clean/Wash Mode

Figure 11-6 - Illustration of Anti-Sweat Control

11.4.5.1 Dewpoint Input Sources

Dewpoint control inputs for the case controller’s Anti- Sweat algorithms must come from a dewpoint probe set up on the E2 I/O Network.

Clean Mode is a special kind of case deactivation designed specifically for washing or performing mainte- nance on the case.

Clean Mode is initiated by activation of a cleaning switch input or by a command sent from a Hand-held Ter- minal or an E2. During Clean Mode, refrigerant flow is turned OFF, all fans and anti-sweat heaters are deacti- vated, and the lights are turned either ON or OFF as pro- grammed by the user.

Page 157 of the Emerson E2 RX user manual — 11.4.11.1 Recoverable Sensor Failures
Page 157 · click to enlarge
Page 157

Clean Modes may be either fixed or timed. Fixed Clean Modes begin when the clean switch is turned ON and end when the clean switch is turned OFF. Timed Clean Modes begin when the clean switch is turned ON and ends a specific time afterwards. The user specifies how long the wash mode will last.

Pulse Valve, Stepper Valve Controller will fix the position to the last known good out- put percentage

End of Mode Warning

To warn service personnel that wash mode is about to end, the case controller will blink the case lights for five seconds. After five seconds of blinking, the case fan will activate and refrigeration will restart. 11.4.10 Walk-In Freezer Control

Anti-Sweat Pulse at 50%

CC-100 and CS-100 Alarm LEDs (red)

Flashes at a rate of 2 per second

The CC-100P and CCB (dual-pulse valve model) case controller is used to control walk-in boxes, since it is the only model capable of controlling two valves.

Dual Temp Output Off

Walk-in boxes are controlled the same way as for other cases. The primary difference between walk-in boxes and other cases is the use of the door switch.

Suction Solenoid Valve Open

Liquid Solenoid Valve Open

When the case controller’s door switch input is turned ON, refrigeration is suspended (all pulse valves go to 0%), the fans turn OFF, and the lights turn ON. The walk-in box remains in this state until the door switch turns OFF again.

Table 11-7 - Fail-Safe States

11.4.11.1 Recoverable Sensor Failures

Alarm times can be assigned to the door switch input so that an alarm can be generated when the door is left open for too long.

The CC-100 and CS-100 will be able to cope with some sensor failures without having to enter Fail-Safe Mode.

Also, when temperature alarm setpoints are configured for the case, the case controller will begin refrigeration if a temperature alarm trips with the door open. 11.4.11 Fail-Safe Mode

Coil In or Coil Out Failure

A coil inlet temperature or coil outlet temperature sen- sor will be considered failed if one of two conditions occur:

1. The sensor gives a value outside of its minimum and maximum temperature range (that is, below - 50°F or above 120°F) for two consecutive readings, or

When major system malfunctions occur, the case con- troller enters a Fail-Safe Mode. The Fail-Safe Mode is designed to keep the case functioning as normally as pos- sible under system conditions that would otherwise make case control impossible.

2. The sensor value is 20°F above the control setpoint for longer than ten minutes.

A case controller will enter Fail-Safe Mode whenever one of three conditions occur:

If the coil inlet or coil outlet temperature sensor has failed, the case controller will compensate by “guessing” the inlet or outlet temperature based on the values of the remaining functional coil sensor and the case temperature sensor(s). The case controller will continue to guess the value until the coil inlet or outlet sensor can be fixed.

1. The superheat and/or temperature control setpoint(s) are corrupted (i.e., outside of its programmed minimum/maximum range).
2. The software is corrupted.
3. An unrecoverable sensor failure has occurred (see Operation with Failed Sensors, below).

If both the coil inlet and coil outlet sensors have failed, or if one coil sensor and the case temperature sensor(s) have failed, the case controller will not be able to make the required calculations, and they will go into Fail-Safe Mode.

Actions Taken During Fail-Safe Mode

When a case controller enters Fail-Safe Mode, each output will be set to the fail-safe state described in Table 11-7.

If the sensor or combination of sensors supplying the case temperature to the case controller have failed (i.e., the

Case Control Circuits Software Overview • 11-15

Show 6 more labels / short text on this page
Output Fail-Safe State · Fans ON · Lights ON · Defrost OFF · Satellite Output(s) OFF · Discharge/Return Air
Page 158 of the Emerson E2 RX user manual — 11.5 Logging Groups
Page 158 · click to enlarge
Page 158

case controller has no usable case temperature input value), the case controller will keep the valve percentage at its last known good value and continue operation as nor- mal. For instance, if the valve was at 75% when the case temp sensor(s) failed, the valve will remain at 75% until it the failure is corrected. All other case control functions will continue functioning as normal. 11.4.12 Wiring

Control Circuit application you will be programming.

To access the CC/CS-100 Case Control Association Screen:

1. Press for the Main Menu.
2. Press for System Configuration.
3. Press for the Network Setup menu.
4. Press for Case Control Associations. The Case Control Association screen should look like Figure 11-7 :

Input and output wiring for a case controller is dis- cussed in detail in Section 4, E2 Hardware Setup. Before a Case Control Circuit application may begin functioning, all case controllers must be properly connected to its case inputs and outputs, and each case controller must be com- missioned and properly communication on the Echelon Network (see Section 4, E2 Hardware Setup for instruc- tions on how to do this). 11.4.13 Setting Up An Individual Case Controller

Emerson E2 RX — 11.4.12 Wiring diagram (page 158)
Fig. 183 · 11.4.12 Wiring

Most of the data required for a case controller to begin operation are supplied to it by associating the controller with an E2. However, in some cases, it will be necessary to change some of the parameters in an individual case con- troller. Some instances where it will be necessary are:

  • When the configuration for the inputs needs to be changed (i.e., when the case has a sensor or switch configuration that cannot be satisfied by the default configuration).
  • When a valve other than an Emerson Flow Controls ESR-12, ESR-20, or ESV is being used. Each case controller is programmed by default to operate Emerson Flow Controls brand valves. If the valve type is different, the valve control parameters must be changed in the case controller software.

Figure 11-7 - CC/CS100 Circuit Association Screen (RX-400)

This screen lists all of the CC-100s, CS-100s, EC-2s, and CCBs defined in this E2. Each one is listed with its name, its node number, the application name of the case controller’s application, and the associated circuit name.

To associate a case controller with its circuit, move the cursor into the Circuit field of the controller you wish to associate, and press the key. The Application Selec- tion menu will list all of the Case Control Circuit applica- tions in the E2. Choose the desired circuit and press or to select. Repeat this process until all case con- trollers are associated with Case Control Circuit applica- tions.

  • When the PID settings that determine the valve aperture or closure require alteration.

When necessary, the case controller can be altered in either of two ways. You can change settings in a case con- troller application in E2 via the front screen. Or, you can use a Hand-held Terminal to log in to the CC-100 or CS- 100 directly, and make temporary changes that will not be saved. 11.4.14 Associating Case Controllers with Case Circuit Control Applica- tions

11.5 Logging Groups

A logging group is a set of application property inputs and outputs whose values are recorded (logged) with the same parameters. Parameters include the interval, how often the property values are logged (for example, every 30 seconds, every 5 minutes, etc.), the duration of the log (for example, 2 days, 30 days, 100 days, etc.), and the res-

Before you can program a Case Control Circuit with the necessary parameters, you must associate the appropri- ate CC-100s, CS-100s, EC-2s, and CCBs with the Case

Page 159 of the Emerson E2 RX user manual — 11.5.3 Base Log Group
Page 159 · click to enlarge
Page 159

olution (how precisely the analog values are recorded). 11.5.1 Possible Data Errors

sample value of 609 PSI (refer to Appendix E: Com- pressed Point Log Sample Limits and Precision Tab). Low resolution only allows values up to 609 PSI; there- fore, the sample is said to be “clipped.” If the value that will be logged is anticipated to exceed the high or low range for a particular log resolution, a higher resolution should be chosen.

For point log groups, regardless of the resolution, the following applies when errors occur in log data:

High Clipping occurs when a compressed sample value is above the range allowed by the set resolution. In this case the sample value is considered “high-clipped” and the data recorded will be the high-clipped value and logged at the highest possible valid value.

NO DATA (LOG_DATA_NONE) Actual data value of the out- put is NO_VALUE but out- put status is not CELL_OUT_FAIL or CELL_OUT_INACT

Low Clipping occurs when a compressed sample value is below the range allowed by the set resolution. In this case the sample value is considered “low-clipped” and the data recorded will be the low-clipped value and logged at the lowest possible valid value. 11.5.2.2 Incompressible Data Types

PT FAIL (LOG_PT_FAIL) Data is NO_VALUE and sta- tus of output is CELL_OUT_FAIL -- could occur when point cell has passed one minute update

PT INACT (LOG_PT_DISABLED) Status of output is CELL_OUT_INACT and this appears regardless of the value of the data – this may occur at startup

Points of certain data types cannot be compressed due to the nature of their data values. These points are called Incompressible Points. Refer to the following table for the data types that are considered to be incompressible at cer- tain resolutions:

ERROR Indicates log error type could not be determined but the LOG_ERROR_FLAG was set in the data (this is display only and might indicate cor- rupted data)

Data Type Incompressible at Resolution

Table 11-8 - Data Errors

PULSE_TYPE Low and Medium

A displayed value of DATA N/A (LOG_DATA_NA) is used in medium and low resolution logs when that particu- lar type of data cannot be logged in that resolution. Pulse, one shot, and system list types cannot be logged in medium and low resolution log groups. 11.5.2 Data Compression

ONE_SHOT_TYPE Low and Medium

SYS_LIST_TYPE Low and Medium

Table 11-1 - Incompressible Data Types and Their Resolutions

11.5.3 Base Log Group

The Base Log group is a permanent logging group and cannot be deleted. When a new application is added to the system, the inputs and outputs that are logged by default are associated with the Base Log group.

Because the user may need to log more data than the default logging of the E2 can hold in memory, the user can set the resolution type in the log manager to determine how the desired points will be logged. E2 converts these analog sample values to this lower resolution (Low or Medium) by:

Points are pre-configured to be logged for newly added applications. Many of the most important inputs and out- puts within an application are already pre-configured to be logged, and all of these inputs belong to the Base Log Group. Simply define the inputs and outputs to enable log- ging; no special set up is required. Logging is done auto- matically.

  • Adding/subtracting an offset
  • Multiplying by a scaling factor
  • Rounding to the nearest integer value of the size appropriate for the desired resolution 11.5.2.1 Clipping

When you first create an application in the E2, you can tell which inputs and outputs belong to the Base Log Group: an “L” will be displayed at the right-hand side of their definitions. The “L” is a marker that signifies that the input or output is currently part of a logging group (either the Base Log Group or another group as assigned by the

Clipping occurs whenever the conversion process results in a sample value that falls outside the range of the selected log resolution. For example, converting a value of 750 PSI to low resolution would result in a compressed

Logging Groups Software Overview • 11-17

Displayed · Logged Value Description · Value

Page 160 of the Emerson E2 RX user manual — 11.5.4 Setting Up Logging
Page 160 · click to enlarge
Page 160

user). If there is no “L” beside the definition, the value is not part of a logging group and therefore will not be logged. 11.5.4 Setting Up Logging

Emerson E2 RX — 11.5.4 Setting Up Logging diagram (page 160)
Fig. 184 · 11.5.4 Setting Up Logging

To begin logging setup, go to the Logging Setup menu:

1. Press for the Main Menu.
2. Press System Configuration.
3. Press Logging Setup.
Emerson E2 RX — 11.5.4 Setting Up Logging diagram (page 160)
Fig. 185 · 11.5.4 Setting Up Logging

Figure 11-9 - Summary Screen for Logging Groups

The summary screen for Logging Groups will open where a variety of log parameters can be viewed. Log group name, configured resolution setting, number of days to keep logs, the amount of available logging resources, number of analog and digital points associated with this logging group, status, and more can all be seen from this summary screen. Highlight the desired logging group and press to open the setup screen for that log group:

Figure 11-8 - Logging Setup Menu

From this menu, you can control different logging aspects:

  • Access Log Group summary screen (or Base Log if no additional log groups exist) to set logging parameters
  • Add a new log group and automatically enter edit mode
  • Delete a log group
  • Displays a report of all logged points for the entire system
Emerson E2 RX — 11.5.4 Setting Up Logging diagram (page 160)
Fig. 186 · 11.5.4 Setting Up Logging

For Base Log setup, select 1. Log Groups from this menu:

Figure 11-10 - Logging Setup

From this screen, logging group configuration can be specified. Group name, interval between log records, mode, start date and time, duration of logs, log resolution, points, percentage used, status, and enable/disable logging can be configured. (See the online help for each property

Page 161 of the Emerson E2 RX user manual — 11.5.5 Logging Group Status Screen
Page 161 · click to enlarge
Page 161

for more information on what individual parameters do.) 11.5.5 Logging Group Status Screen

From the Logging Group Summary screen, you can also access the Status screen for any logging group in the list by highlighting the desired group and pressing Enter:

Emerson E2 RX — 11.5.5 Logging Group Status Screen diagram (page 161)
Fig. 187 · 11.5.5 Logging Group Status Screen

Figure 11-11 - Status Screen for Logging Groups

From the Status screen you can:

  • View configuration and usage information for the selected logging group.
  • Display the Logging Group Report (press Enter , 8 , 1 ).
  • Display the Application Log Report (press Enter , 8 , 2 ).
  • Turn off logging for all points associated with that logging group (press Enter , 9 , 1 ).
  • Go back to the Setup screen (press ). 11.5.6 Log Reports

A selection of log reports are available that indicate system resource usage (how much disk space logging con- figurations use), resolution settings, the duration logs are stored, number of analog and digital points, and all the types of logged points that belong to groups, specific applications, or the entire system.

Logging Groups Software Overview • 11-19

Page 162 of the Emerson E2 RX user manual — 11.5.6.2 Application Log Report
Page 162 · click to enlarge
Page 162

11.5.6.1 Logging Group Report

The Logging Group Report provides a summary of the logging group configuration and a complete list of all points associated with that group. To display the Logging Group report:

Emerson E2 RX — 11.5.6.1 Logging Group Report diagram (page 162)
Fig. 188 · 11.5.6.1 Logging Group Report
1. From the Status screen of the desired Logging Group application, press the Enter key to bring up the Actions menu.
2. Press 8. Application Logs/Graphs to bring up the APPLICATION SPECIFIC LOGS AND GRAPHS menu.
3. Press 1. Logging Group Report .
Emerson E2 RX — 11.5.6.1 Logging Group Report diagram (page 162)
Fig. 189 · 11.5.6.1 Logging Group Report

Figure 11-13 - Application Log Report Example

11.5.6.3 System Log Report

The System Log report provides a summary of all logged points for all applications in the system and a com- plete list of logged points for all applications in the sys- tem. Note that depending on the size of the configuration and the number of points logged, this may take a few sec- onds.

To display the System Log Report:

1. Press for the Main Menu.
2. Press for System Configuration.
3. Press Logging Setup.

Figure 11-12 - Logging Group Report Example

11.5.6.2 Application Log Report

4. Press Display Logged Points.

The Application Log report provides a summary of all logged points for the current application and a complete list of all the logged points that belong to that current application. To display the Application Log report:

1. Press the Enter key to bring up the Actions menu from the desired application Status screen.
2. Press 8. Application Logs/Graphs to bring up the APPLICATION SPECIFIC LOGS AND GRAPHS menu.
3. Choose Application Log Report .
Page 163 of the Emerson E2 RX user manual — 11.6.1 Overview
Page 163 · click to enlarge
Page 163

the control source, defining different setpoints for use in occupied, unoccupied, summer, and winter modes, and setting up the operating characteristics of the heating and cooling stages. 11.6.3 Alternate Setpoints

Emerson E2 RX — 11.6 Air Handling Units (AHU) diagram (page 163)
Fig. 190 · 11.6 Air Handling Units (AHU)

For both the heating and cooling setpoints, you may choose to use different setpoints during occupied or unoc- cupied building times, and different setpoints for summer and winter seasons. In other words, AHU Control may have four different pairs of heating and cooling setpoints, as shown in Table 11-9.

SUMMER COOL OCC SUMMER HEAT OCC

SUMMER COOL UOC SUMMER HEAT UOC

WINTER COOL OCC WINTER HEAT OCC

Figure 11-14 - System Log Report Example

WINTER COOL UOC WINTER HEAT UOC

Table 11-9 - Possible Heating/Cooling Setpoints

11.6 Air Handling Units (AHU)

AHU Control looks at the E2’s Global Data parameters to determine whether it should run in summer or winter mode. Refer to Section 10.17, Set Up Global Data, for information on how to set up summer/winter control parameters.

11.6.1 Overview

The E2 BX supports the simultaneous control of up to six air handling units (AHU). AHU Control applications govern all aspects of an AHU’s operations, including heat- ing and cooling, dehumidification, fans, and economizer control.

The AHU chooses occupied or unoccupied mode by reading an occupied state input, which is most commonly tied to the output of a Time Schedule application. 11.6.4 Fan Control

Unlike rooftop control units (RTUs), AHUs are con- trolled directly by the E2 itself and not by a separate unit control board.

The E2 BX can control three different types of AHU fans. However, only one fan can be controlled per AHU. The fan types include: single-speed, two-speed, and vari- able-speed. Controls for all fans are similar in that they operate in either of three modes:

An AHU Control application actually consists of three separate control algorithms. The main control algorithm monitors the indoor temperature and activates heating and cooling stages when necessary to maintain the user- defined temperature setpoint. Another algorithm monitors the indoor humidity and uses a desiccant wheel or addi- tional AHU cool stages to reduce the humidity level. The third loop controls either a two-position (digital) or vari- able-position (analog) economizer damper based on the outside air conditions. 11.6.2 Temperature Control

  • Continuous - The fan is always on, even when the AHU is not in heating, cooling, or dehumidification mode.
  • Auto - The fan is only on when the AHU is in heating, cooling, or dehumidification mode.
  • Summer ON, Winter Auto - This mode allows the AHU fan to operate in Continuous mode during the summer months and in Auto mode during the winter months.

In its most basic form, Temperature Control simply reads a control input value, compares it to the active tem- perature setpoint, and activates or deactivates heating or cooling stages in an effort to satisfy the setpoint. The majority of user setup that must be done in Temperature Control involves specifying which input is to be used as

The operation of the fans during Continuous and Auto modes is largely dependent on the fan type. 11.6.4.1 Single-Speed Fans

Single-speed fans require no advanced control parame-

Air Handling Units (AHU) Software Overview • 11-21

Cooling Heating

Page 164 of the Emerson E2 RX user manual — 11.6.5 Economizer Control
Page 164 · click to enlarge
Page 164

11.6.5 Economizer Control

ters. Whether in Continuous or Auto mode, the fan will be ON when Fan Control calls for it to be ON, and OFF when it calls for it to be OFF. 11.6.4.2 Two-Speed Fans

Economizer dampers on AHUs are used to bring out- side air into the building for use in cooling. When temper- ature and humidity conditions are favorable, the economization dampers are opened, and outside air is allowed to flow into the AHU. Economization is generally used by the AHU just as a cool stage would be in Temper- ature Control; if cooling is needed, and conditions are favorable for economization, the dampers will open and economization will begin. If more cooling is needed, the cooling stages would then cycle on as normal.

Two-speed fans have a LOW and a HIGH speed set- ting. You must specify the number of the stage that, when activated, will switch the fan from LOW to HIGH.

For example, if there are four cooling stages and you wish to have the fan switch from LOW to HIGH when stage 3 becomes active, enter a “3” as the switch-over set- point. This will cause the fan to switch to HIGH speed when stage 3 is activated. Likewise, when stage 3 is deac- tivated, the fan speed will switch from HIGH to LOW.

The E2 supports control of both two-position (digital) and variable-position (analog) economizer dampers. 11.6.5.1 Economization Enable

You may choose a different switch-over setpoint for occupied heating, occupied cooling, unoccupied heating, and unoccupied cooling modes.

Before the AHU Control application may open econo- mization dampers, it must first determine if the outdoor air conditions are favorable for economization. There are six possible ways the AHU Control may do this:

When the AHU is in dehumidification mode, the AHU Control application will ignore the fan speed settings of the active stages and switch to a user-specified dehumidi- fication speed (usually LOW).

1. Enthalpy Switch - An enthalpy switch is a digital device that is pre-set to detect when the temperature and humidity levels are favorable for economization. When the conditions are favorable, this switch sends an OK (ON) signal to the AHU Control application. Otherwise, the switch sends a NOT OK (OFF) signal, and economization is disabled.

Continuous Two-Speed Fan Operation When All Stages Are OFF

When the fan is operating in Continuous mode and all heating and cooling stages are OFF, the fan speed will default to a user-specified speed. You may choose a differ- ent default speed for both occupied and unoccupied opera- tion. 11.6.4.3 Variable-Speed Fans

2. Dewpoint Setpoint - A dewpoint probe measuring the dewpoint of the outside air is compared to a setpoint. If the outside air dewpoint is less than the setpoint, economization is enabled. If it is higher than the setpoint, economization is disabled.

Variable-speed fans may operate at any percentage of its maximum speed. The method AHU Control uses to determine the speed percentage is dependent on whether the heat and cool outputs are staged or modulating.

3. Calculated Enthalpy - The AHU Control application calculates the outside air enthalpy by reading the value of a relative humidity sensor and an outdoor air temperature sensor. If the enthalpy is lower than the setpoint, economization is enabled. If the enthalpy is greater than the setpoint, economization is disabled.

For staged AHU outputs, each stage must be pro- grammed with its own speed percentage setpoint. The AHU Control application looks at all of the active stages, takes the highest speed percentage setpoint, and operates the fan at this speed.

For example, if cool stage 1 is active with a 30% speed percentage setpoint, the fan will likewise operate at 30% speed. If a second stage with a setpoint of 50% were to become active, the fan speed would increase to 50%.

4. Dewpoint Fail-Safe - This is similar to method #2, except an outdoor temperature sensor value is compared to the setpoint instead of a dewpoint probe’s value. This comparison is a poor substitute for actual dewpoint readings and is recommended for use as a fail-safe only. When possible, use humidity or dewpoint sensors.

For each heating and cooling stage, you may specify both occupied and unoccupied speed percentage setpoints.

Dehumidification with VS Fans

When in dehumidification mode, a user-defined slow- down percentage is subtracted from the variable-speed fan percentage. This percentage will continue to be subtracted until the AHU exits dehumidification mode.

5. Temperature Comparison - The AHU Control application simply compares the temperature of the inside air with the temperature of the outside air. If the outside air is cooler than the inside air,

Variable-Speed Fan Operation

Page 165 of the Emerson E2 RX user manual — 11.6.5.2 Economization Lockout Features
Page 165 · click to enlarge
Page 165

economization is enabled.

air.

6. In vs. Out Enthalpy - This strategy requires indoor and outdoor humidity sensors and also indoor and outdoor temperature sensors. The enthalpy of the outdoor air is calculated and compared to the enthalpy of the indoor air. If the outdoor air enthalpy is less than the indoor air enthalpy, economization is enabled. Otherwise, economization is disabled.

The dehumidification setpoint is placed at the 0% end of the dehumidification PID throttling range. In other words, the dehumidification output will start at 0% when the humidity is equal to the setpoint and increase to 100% when the humidity is equal to or above the setpoint plus the throttling range.

The dehumidification output percentage is used much like a heating or cooling output percentage is used in Tem- perature Control. The percentage represents the percent- age of total dehumidification capacity available to the AHU (including cool stages and other dehumidification devices). 11.6.9 Curtailment

You may choose a different economization checking method for use in summer and winter months. 11.6.5.2 Economization Lockout Features

In addition to the methods listed above, there are two economization lockout features that apply to all AHUs using economization.

Some power companies offer curtailment programs that allow participating stores to disable user-defined loads during peak power times in return for discounts on utility rates.

Max Outside Air Humidity

The Max Outside Air Humidity is the highest allow- able humidity level for the outside air. If the outside rela- tive humidity is higher than this setpoint, economization will not be allowed to occur.

If you are participating in a curtailment program, the power company will supply you with a digital curtailment device that must be wired to an input on the RS485 I/O Network.

The Minimum Supply Temp is a user-defined setpoint that locks out economization if the supply air temperature falls below a minimum supply temperature setpoint. This feature ensures that the air coming from outside is not too cold. 11.6.6 Digital Economizer Control

To set up curtailment in the system software, you must designate which specific heating and cooling stages will be subject to curtailment.

When the power company sends a curtail command (i.e., the value of the curtailment device switches to “CLOSED”), all stages that are set up to be curtailed will be shut off and locked out.

Control of digital or two-position economizers is rela- tively simple. When conditions are favorable for econo- mization, the dampers will be opened when cooling is needed. If not favorable, the dampers will be closed. 11.6.7 Analog Economizer Control

Fan control is not directly affected by a call for curtail- ment. The AHU fan will still run at a speed based on the number of active, non-curtailed stages (or, if using modu- lated outputs, the curtailed modulating percentage). If this causes the fan to slow down or shut off during curtailment, there will be energy savings from the fans. 11.6.10 Optimum Start/Stop (OSS)

For variable-position dampers, economization is gen- erally used by the AHU just as a cool stage would be in Temperature Control. If cooling is needed, and conditions are favorable for economization, the dampers will open and economization will begin. If more cooling is needed, the cooling stages would then cycle on as normal.

The position of the analog economizer damper is important only for the purposes of keeping the mixed air temperature (a combination of the outdoor air coming through the dampers and the return air temperature) near the user-specified setpoint. The damper is controlled using PID control. 11.6.8 Dehumidification Control

Optimum Start/Stop (OSS) is a feature that works alongside the AHU Control application’s occupied and unoccupied temperature control modes. OSS takes control of heating and cooling several minutes before the building is scheduled to change occupancy states, and prepares the building for the upcoming change in setpoints. As a result, when the occupancy state changes, the temperature will be

Dehumidification control uses the AHU’s existing cool stages (and a separate dehumidification device such as a desiccant wheel, if available) to remove moisture from the

Air Handling Units (AHU) Software Overview • 11-23

Minimum Supply Temp

Page 166 of the Emerson E2 RX user manual — 11.6.11 Separate Setpoints
Page 166 · click to enlarge
Page 166

11.6.11 Separate Setpoints

comfortably within the range of the new setpoint.

Figure 11-15 shows an example of how pre-starts and pre-stops work in a heating application. From unoccupied mode, the pre-start period ramps the temperature up slowly so that when the scheduled change from unoccu- pied to occupied mode occurs, the temperature will already be at or near the occupied heating setpoint. During the pre-stop, which occurs before AHU Control goes from occupied to unoccupied mode, heating is suspended and the temperature is allowed to “coast” down to the unoccu- pied setpoint.

The Separate Setpoints strategy for AHU allows a Cut In/Cut Out setpoint to be set up for each heat and cool stage instead of just one cool and one heat setpoint set up for each stage (Normal strategy). Dehumidification con- trol can be performed while controlling with separate set- points. 11.6.12 AHU Zone Control

Unlike MultiFlex RTU rooftop controller applications, AHU applications are not required to be grouped into Zone applications (AHUs are usually large enough to be “zones” in and of themselves).

Emerson E2 RX — 11.6.11 Separate Setpoints diagram (page 166)
Fig. 191 · 11.6.11 Separate Setpoints

However, if desired, you may associate an AHU Con- trol application with a Zone application. The AHU will then use the Zone’s Temperature Control setpoints, occu- pancy state, summer/winter state, and economization and dehumidification enable signals. More information on Zone control is available in Section 11.7, Zone Control. 11.6.13 Hardware Overview

Figure 11-15 - Diagram of Pre-Start and Pre-Stop Operation

Intelligent Pre-Starts and Pre-Stops

To set up an AHU for control by an E2, numerous tem- perature and humidity sensors for several different appli- cations must be connected to the I/O Network, as well as fan and cool proof checking devices, economization checking devices, curtailment devices, and all of the heat- ing, cooling, and dehumidification outputs.

OSS is designed to handle pre-starts and pre-stops in the most energy-efficient manner possible. Every time a pre-start or pre-stop occurs, OSS measures the amount of time it takes to bring the temperature from the previous setpoint to within the “comfort zone” of the new setpoint (a user-defined range of values above and below the set- point within which the temperature is considered accept- able). This duration is used to determine the average rate of temperature change, called the K factor.

Listed below are wiring instructions for some of the inputs and outputs that are part of a typical AHU setup.

Emerson E2 RX — 11.6.11 Separate Setpoints diagram (page 166)
Fig. 192 · 11.6.11 Separate Setpoints

The K factor is stored in the memory along with the average value of the outdoor air temperature during the pre-start or pre-stop. Over time, collected K factor data will be sorted and combined into a table. As a result, by constantly observing and recording the results of previous pre-starts and pre-stops, OSS will be able to intelligently guess how much time a pre-start or pre-stop mode should last based on the outside temperature.

Space Temperature Temperature See Table 9-1 on page 9-3

Space Humidity Humidity See Table 9-1 on page 9-3

Supply Air Temp Temperature See Table 9-1 on page 9-3

AHU Control keeps track of three different kinds of K factors:

Return Air Temp Temperature See Table 9-1 on page 9-3

  • Heat K factor - used to guess pre-start durations for AHUs operating in heating mode.

Outdoor Air Temp Temperature Set up as Out- door Air Provider in Global Data (see Section 10.17).

  • Cool K factor - used to guess pre-start durations for AHUs operating in cooling mode.
  • Coast K factor - a measurement of the change in temperature when no heating or cooling is active. This is used to determine pre-stop durations for both heating and cooling AHUs.

Table 11-10 - Suction Group Inputs

Page 167 of the Emerson E2 RX user manual — 11.7.1 Overview
Page 167 · click to enlarge
Page 167

Inputs Sensor Type Wiring Instructions

Outdoor Air Humid Humidity Set up as Out- door Humidity Provider in Global Data (see Section 10.17).

Curtailment Device Digital Set up as Curtail- ment in Global Data (see Sec- tion 10.17).

Fan Proof Digital See Table 9-1 on page 9-3

Fan Proof Reset Digital See Table 9-1 on page 9-3

VS Inverter Alarm Digital See Table 9-1 on page 9-3

Enthalpy Switch (Indoor and/or Out- door)

Digital See Table 9-1 on page 9-3

Dewpoint Probe (for Economization)

Dewpoint See Table 9-1 on page 9-3

Mixed Air Temp (ana- log economizers only)

Temperature See Table 9-1 on page 9-3

Table 11-10 - Suction Group Inputs

Output Device Wire 8RO contacts to:

Switch toNotes

Heat / Cool Staged Outputs

see note see note Set up any stages you want ON when the controller is off-line as N.C. Stages you want OFF should be set as N.O.

Single-Speed Fans see note see note If one or more heat or cool stages will be ON, wire fan N.C. so it will be active during controller off-line times. Otherwise, wire N.O.

Two-Speed Fans (LOW, HIGH, and fan contactor)

see note see note If any heat or cool stages are configured to be ON (N.C.), set the wiring and the switch to N.C., and set either the LOW or HIGH stage output to N.C. (whichever speed you want active). If no heat or cool will be active, set LOW, HIGH, and the fan contac- tor to N.O.

Digital Economizer N.O. N.O.

Table 11-11 - Suction Group Outputs

11.7 Zone Control

volume of space. The primary function of an HVAC Zone is to “manage” the operation of each individual HVAC unit by providing the temperature setpoints that will be used in Temperature Control. Zones are also responsible for ordering HVAC units to dehumidify and determining when outside air conditions are favorable to economize.

11.7.1 Overview

An HVAC Zone is a collection of up to sixteen rooftop units or air handling units that work together to maintain the same temperature and humidity throughout a particular

Zone Control Software Overview • 11-25

Set Fail-safe Dip

Page 168 of the Emerson E2 RX user manual — 11.7.2 How Zones Work
Page 168 · click to enlarge
Page 168

11.7.2 How Zones Work

numerous inputs, relay outputs, and 0-10VDC analog out- puts, and is designed for controlling advanced rooftop units with a large number of heat/cool stages, variable- position economizers, variable-speed fans, etc.

A Zone is built by first creating a Zone application in the E2 BX. Then, all HVAC unit applications that will be a part of the Zone must be connected with the Zone applica- tion. This connection process is known as association.

The E2’s MultiFlex RTU applications serve only two purposes: to act as an interface between the user and the MultiFlex RTU processor, and to allow communications between the MultiFlex RTU board and the Zone applica- tion. The MultiFlex RTU depends on the Zone application to provide temperature setpoints, dehumidification and economization enabling, and other information.

When a rooftop unit or AHU is associated with a Zone, the E2 automatically makes a series of I/O connections between the Zone application and the individual MultiFlex RTU or AHU application. From that point on, the Zone is responsible for passing along the following information to the individual unit:

The MultiFlex RTU board also has the ability to act in stand-alone mode without help from the Zone application. The MultiFlex RTU has its own fallback temperature con- trol strategy, and even has a seven-day fallback occupancy schedule that may be substituted when communications with the Zone is lost. 11.7.3.2 MultiFlex RCB Board

  • The heating and cooling setpoints it will use during occupied and unoccupied building times.
  • A command to operate in either occupied or unoccupied mode (based on the Zone application’s own time schedule input).
  • Outdoor air and outdoor relative humidity values.

The MultiFlex Rooftop Control Board (RCB) (P/N 810-3062) is a rooftop HVAC control board for use either as a stand-alone controller or in zone control applications using a Retail Solutions E2 BX building control system. The MultiFlex RCB is capable of controlling heat and cool stages, fans, humidification and dehumidification devices, economizers using on-board I/O and control algorithms, as well as monitor and interact with other building control systems and peripherals (such as smoke alarms and CO2 sensors).

  • A signal to enable or disable economization (based on the Zone application’s own economization checking method).
  • A signal to begin or end dehumidification (based on the Zone application’s own humidity reading and dehumidification setpoint).
  • A signal indicating the current season is either SUMMER or WINTER.
  • The combined Zone Temperature and Zone humidity (based on a combination of each HVAC unit’s space temperature and space humidity).

Differences Between the MultiFlex RCB and the Mul- tiflex RTU:

The RCB is an improved version of the MultiFlex RTU. The RCB has sixteen fully configurable analog and digital input points, whereas the RTU has only eight inputs, two of which are configurable. The RCB has four analog outputs for use in controlling variable speed fans, economizers or modulating heating and/or cooling valves, whereas the RTU has only two analog outputs for use only with VS fans and economizers. The RCB also features a more sophisticated HHT interface and updated algorithms for controlling heating, cooling, dehumidification, and air quality. 11.7.3.3 AHUs

  • The fallback temperature and humidity setpoints to use in case the unit loses contact with its Zone application. 11.7.3 Applications That May Be Connected To Zones

There are three different HVAC applications that may be associated with a Zone application: a MultiFlex RTU application, a MultiFlex RCB application, and an AHU application. The MultiFlex RTU and RCB applications interface with the MultiFlex RTU and RCB I/O Network boards that control rooftop units. AHU applications use input and output points on the I/O Network to control air handling units. 11.7.3.1 MultiFlex RTU Board

An AHU controls all aspects of an air handling unit, including up to eight stages of auxiliary or reclaim heat, six cooling stages, dehumidification, analog or digital economization, and support for single-, two-, or variable- speed fans.

Normally, since AHUs are designed to cover a wide area of space, AHU Control applications operate on their own and are not associated with Zone applications (they are large enough to be “zones” within themselves). How-

The MultiFlex RTU is a control board on the E2’s I/O Network that controls the operation of a single rooftop HVAC unit. This board has an on-board processor with

Page 169 of the Emerson E2 RX user manual — 11.7.5 Zone Temperature
Page 169 · click to enlarge
Page 169

ever, if desired, an AHU may be associated with a Zone application, which will allow the AHU to use the Zone’s setpoints, occupancy state, summer/winter state, and dehu- midification and economization enabling. 11.7.4 Temperature Control

economization information and open the dampers. 11.7.7 Economization Enable

There are five possible ways a Zone application may determine when conditions are favorable for economiza- tion:

As mentioned, Zone applications do not “control” tem- perature themselves. Zone applications simply pass along the setpoints an HVAC unit will use, and the individual unit is responsible for controlling to the setpoint using its own temperature input.

1. Enthalpy Switch - An enthalpy switch is a digital device that is pre-set to detect when the temperature and humidity levels are favorable for economization. When the conditions are favorable, this switch sends an OK (ON) signal to the Zone application. Otherwise, the switch sends a NOT OK (OFF) signal.

The Zone application passes along eight different set- points, which are shown in Table 11-12. Of these set- points, the application receiving the setpoints will only use one cooling and one heating setpoint. The pair the applica- tion will use is determined by whether the current season is SUMMER or WINTER and whether the building is OCCUPIED or UNOCCUPIED (both of which is supplied by the Zone).

2. Dewpoint Setpoint - A dewpoint probe measuring the dewpoint of the outside air is compared to a setpoint. If the outside air dewpoint is less than the setpoint, economization is enabled. If it is higher than the setpoint, economization is disabled.
3. Calculated Enthalpy - The Zone application calculates the outside air enthalpy by reading the value of a relative humidity sensor and an outdoor air temperature sensor. This calculated enthalpy is compared to a setpoint. If the enthalpy is less than the setpoint, economization is enabled. If greater, economization is disabled.

SUMMER COOL OCC SUMMER HEAT OCC

SUMMER COOL UOC SUMMER HEAT UOC

WINTER COOL OCC WINTER HEAT OCC

WINTER COOL UOC WINTER HEAT UOC

Table 11-12 - Possible Heating/Cooling Setpoints

4. Dewpoint Fail-Safe - This is similar to method #2, except an outdoor temperature sensor value is compared to the setpoint instead of a dewpoint probe’s value. This comparison is a poor substitute for actual dewpoint readings and is recommended for use as a fail-safe only. When possible, use humidity or dewpoint sensors.

11.7.5 Zone Temperature

Each MultiFlex RTU and AHU application has a space temperature output that is equal to the unit’s current Con- trol Temperature. When associated with a Zone applica- tion, this space temperature output is connected to one of sixteen Zone Temperature inputs in the Zone application. These sixteen inputs are then combined using a user- defined combination method to yield the Zone Tempera- ture.

5. Temperature Comparison - The AHU Control application simply compares the temperature of the inside air with the temperature of the outside air. If the outside air is cooler than the inside air, economization is enabled.

Zone Temperature provides an at-a-glance view of how well the units within the Zone are doing in heating and cooling. If desired, Zone Temperature may also be used as a temperature control input by one or all of the Zone’s HVAC applications. 11.7.6 Economizer Control

6. In vs. Out Enthalpy - This strategy requires indoor and outdoor humidity sensors and also indoor and outdoor temperature sensors. The enthalpy of the outdoor air is calculated and compared to the enthalpy of the indoor air. If the outdoor air enthalpy is less than the indoor air enthalpy, economization is enabled. Otherwise, economization is disabled.

A Zone application is responsible for analyzing the outside air conditions and determining if the conditions are favorable for bringing in outside air. If the air condition is favorable, the Zone sends a signal to its associated HVAC units telling them economization is OK. If not, it sends a signal to disable economization.

You may choose a different method for use in summer and winter months. Also, an alternate method may be specified that will be used as a fail-safe when the primary method is not available (due to sensor failure, etc.).

It is up to the associated HVAC unit to process the

Zone Control Software Overview • 11-27

Cooling Heating

Page 170 of the Emerson E2 RX user manual — DEHUM SET POINT
Page 170 · click to enlarge
Page 170

11.7.8 The Effect of Enabling Economization

and tie the Zone application’s Zone Humidity input to the output of the combiner. Refer to Section 11.18, Analog and Digital Combiners for Analog Combiner application programming instructions. 11.7.11 The Effect of Enabling Dehu- midification

Both MultiFlex RTU and AHU applications support the use of both two-position (digital) and variable-position (analog) economizers. Digital economizers, when enabled, behave like a first stage of cool. When analog economizers are enabled, the MultiFlex RTU or AHU will modulate the opening percentage of the dampers based on its own mixed air temperature measurements. 11.7.9 Dehumidification Control

When a Zone application determines that dehumidifi- cation is needed, it sends an ON signal to all its associated controllers, signaling them to begin dehumidification. It is up to the individual MultiFlex RTU, RCB, or AHU to per- form the dehumidification. 11.7.11.1 MultiFlex RTUs and RCBs

A Zone application is responsible for reading the rela- tive humidity level within the Zone, comparing it to a dehumidification setpoint, and sending a command to dehumidify when the humidity is above the setpoint.

Once the MultiFlex RTU and RCB applications acknowledge the signal to begin dehumidification, it will search its outputs for a dehumidification device. If one is configured, this device will be turned ON. Afterwards, cool stages will be cycled ON (up to a user-defined maxi- mum number of stages) until all stages are ON or until the Zone application signals dehumidification is complete. When dehumidification is complete, the stages will cycle OFF followed by the dehumidification device. 11.7.11.2 AHUs

Once the Zone humidity level rises above the setpoint, dehumidification will be active in all the Zone applica- tion’s associated HVAC units until the indoor relative humidity falls below the setpoint minus the dehumidifica- tion hysteresis value. An example of this is shown in Fig- ure 11-16.

AHUs use a special dehumidification algorithm based on the Proportional loop in PID control. When dehumidifi- cation is enabled by the Zone application, the AHU appli- cation will activate a percentage of its total cool stage capacity, the amount of which depends on how close the current relative humidity is to the setpoint. See Section 11.6, Air Handling Units (AHU), for more information. 11.7.12 Optimum Start/Stop (OSS)

DEHUM SET POINT

DEHUM ON

DEHUM HYSTERESIS

Figure 11-16 - Dehumidification Setpoint Control

The need for dehumidification may also be determined by a digital humidistat. In this case, dehumidification is active only when the humidistat input is ON. 11.7.10 The Zone Humidity Input

Optimum Start/Stop (OSS) is a feature that works alongside the Zone application’s occupied and unoccupied temperature control modes. OSS takes control of heating and cooling several minutes before the Zone application is scheduled to change occupancy states, and prepares the area for the upcoming change in setpoints. As a result, when the occupancy state changes, the temperature will be comfortably within the range of the new setpoint.

Note that unlike Zone Temperature, which has 16 inputs that combine into a single value, Zone humidity is designed to be provided by a single input. However, there may be some instances where one or more relative humid- ity sensors exist within a Zone (such as an installation where each MultiFlex RTU has its own humidity sensor for use in Stand-Alone mode). If you have multiple humidity sensors in a Zone and you wish to combine these humidity sensor values to calculate Zone Humidity, use an Analog Combiner application to make the combination,

Figure 11-15 shows an example of how pre-starts and pre-stops work in a heating application. From unoccupied mode, the pre-start period ramps the temperature up slowly so that when the scheduled change from unoccu-

Show 5 more labels / short text on this page
100% · Relative Humidity (%) · 0% · Time (s) · 26512040
Page 171 of the Emerson E2 RX user manual — 11.7.13 Losing Contact With Zone Applications
Page 171 · click to enlarge
Page 171

11.7.13 Losing Contact With Zone Applications

pied to occupied mode occurs, the temperature will already be at or near the occupied heating setpoint. During the pre-stop, which occurs before the Zone application goes from occupied to unoccupied mode, heating is sus- pended and the temperature is allowed to “coast” down to the unoccupied setpoint.

When a MultiFlex RTU or AHU loses contact with the Zone application to which it was assigned, it is forced to operate in Stand-Alone Mode. Each of the different appli- cations have different stand-alone capabilities. 11.7.14 Stand-Alone MultiFlex RTUs

Emerson E2 RX — 11.7.13 Losing Contact With Zone Applications diagram (page 171)
Fig. 193 · 11.7.13 Losing Contact With Zone Applications

The MultiFlex RTU uses its own occupied and unoccu- pied heating and cooling setpoints when it operates in Stand-Alone Mode. These values are programmed through the MultiFlex RTU application and stored in the memory on the MultiFlex RTU board itself. During Stand-Alone Mode, the MultiFlex RTU uses its space temperature sen- sor value as the control input.

Figure 11-17 - Diagram of Pre-Start and Pre-Stop Operation

The MultiFlex RTU also has a seven-day fallback occupancy schedule that it may use to determine occupied or unoccupied building status. Different times may be pro- grammed in the MultiFlex RTU application for Sunday through Saturday. Holiday scheduling is not supported.

Intelligent Pre-Starts and Pre-Stops

OSS is designed to handle pre-starts and pre-stops in the most energy-efficient manner possible. Every time a pre-start or pre-stop occurs, OSS measures the amount of time it takes to bring the temperature from the previous setpoint to within the “comfort zone” of the new setpoint (a user-defined range of values above and below the set- point within which the temperature is considered accept- able). This duration is used to determine the average rate of temperature change, called the K-factor.

Economization control is available if the sensor pro- viding the economization checking is connected to an input on the MultiFlex RTU. Otherwise, economization is disabled.

As it does in Temperature Control, the MultiFlex RTU stores its own occupied and unoccupied dehumidification setpoints. If the MultiFlex RTU has its own humidity sen- sor, it will continue dehumidification using the stored fall- back setpoints. 11.7.15 MultiFlex RTU/ARTC and AHU Zone Association

The K-factor is stored in the memory along with the average value of the outdoor air temperature during the pre-start or pre-stop. Over time, collected K-factor data will be sorted and combined into a table. As a result, by constantly observing and recording the results of previous pre-starts and pre-stops, OSS will be able to intelligently guess how much time a pre-start or pre-stop mode should last based on the outside temperature.

MultiFlex RTUs and AHUs are assigned to Zone appli- cations using the Zone Association screen. To access this screen:

AHU Control keeps track of three different kinds of K- factors:

1. Press for the Main Menu.
  • Heat K-factor - used to guess pre-start durations for AHUs operating in heating mode.
2. Press for System Configuration.
  • Cool K-factor - used to guess pre-start durations for AHUs operating in cooling mode.
3. Press the Network Setup menu.
  • Coast K-factor - a measurement of the change in temperature when no heating or cooling is active. This is used to determine pre-stop durations for both heating and cooling AHUs.
4. Press for Associations.

Zone Control Software Overview • 11-29

Page 172 of the Emerson E2 RX user manual — 11.8 MultiFlex CUB Board
Page 172 · click to enlarge
Page 172

11.9 MultiFlex PAK Board

The PAK is a distributed pack (rack) controller that controls compressors and condenser fans. The PAK can control up to 8 compressor groups containing up to 16 compressors. The compressor control strategy is Fixed Steps with setpoint/deadband using ON and OFF delays. Up to 20 Fixed Steps can be configured.

Emerson E2 RX — 11.9 MultiFlex PAK Board diagram (page 172)
Fig. 194 · 11.9 MultiFlex PAK Board

The PAK can control up to 4 condenser fan groups containing up to 8 total condenser fans. The PAK con- denser control strategy is sequential TD control with set- point/deadband using ON and OFF delays.

The PAK has a compressor/condenser interlock fea- ture that will override TD control and force the condenser fans to stage off using the TD control OFF delay when all compressors are off. This feature can be disabled with an Enable/Disable setpoint or when the discharge pressure is above a configurable setpoint.

Figure 11-18 - Zone Association Screen (BX-400 Unit Shown)

The Zone Association screen lists all RTUs/ARTCs, and AHUs that are set up on the current E2. To make an association, move the cursor to the HVAC Zone field of the RTU/ARTC or AHU you wish to associate, and press (LOOK UP) to open the Application Selection menu and use the arrow keys to scroll to find the desired Zone name. When this menu is open, use and to move quickly to the beginning or end of the list respec- tively.

The MultiFlex PAK boards consist of two circuit boards: a bottom layer with 16 combination digital/analog inputs, and a plug-in top layer which contains a combina- tion of 8 relay outputs and 4 digital DC voltage outputs.

The analog outputs on the Multiflex PAK drive solid state relays to control the fan stages. The relays control the compressor groups.

The communication interface is RS485 I/O using the Standard Extended Address Form for Retail Solutions Dis- tributed Controllers. Currently, the PAK is designed to interface with the Retail Solutions Einstein and E2 con- trollers.

From this screen, you may also choose to jump to the Setup screen to configure an individual RTU/ARTC, AHU or Zone application by using the (SETUP AHU) key or the (SETUP ZONE) key.

The MultiFlex PAK has its own installation and opera- tion manual, P/N 026-1712.

11.8 MultiFlex CUB Board

11.10 Lighting Schedules

The MultiFlex Condensing Unit Board (CUB) is a “smart” input/output board designed to control single con- densing units. A single condensing unit is a self-contained compressor and condenser bearing unit which controls refrigeration in a single case line-up or walk-in cooler.

This section explains the function of E2’s Lighting Schedule application. It includes an overview of how the application works and instructions on how to program it. 11.10.1 Overview

The MultiFlex CUB uses the same general hardware configuration as a MultiFlex 168AO. It is equipped with a processor and extra memory to allow it to control com- pressors, condensers, refrigeration, and defrost for a single condensing unit using on-board I/O and control algo- rithms.

The Lighting Schedule application provides an inter- face for Cut In/Cut Out control based on light level, simple time scheduling with or without use of external Time Schedule applications, proofing, minimum on/off times, solar control, and output dimming control.

The MultiFlex CUB has its own installation and opera- tion manual, (P/N 026-1706).

Generally, the Lighting Schedule application is designed to follow a digital command from a time sched- ule to determine when the lights should be ON or OFF. At the same time, Lighting Schedule looks at the value of a light level sensor, compares it to a set of Cut In/Cut Out

Page 173 of the Emerson E2 RX user manual — DV
Page 173 · click to enlarge
Page 173

setpoints, and overrides the schedule as the real-time light- ing conditions warrant. As a result, the light level sensor and schedule both work to provide adequate light when

needed AND saving energy by keeping lights OFF when they are not necessary.

11.10.2 Functions of the Lighting Schedule Application

DV

AV

DV

LLEV In Logic In

DV

DV

DV

DV

DV

Logic In Sched In

DV

Min On/Off with Delay

DV

Use Alt LLEV Comb

DV

DV DV

DV

DV

DV DV Extern Sched

DV DV

Desired Value Proof Fail

Use Alt Sched Comb

DV

DV

DV

Figure 11-19 - Lighting Schedule Module Cell Diagram

Figure 11-19 shows a flowchart diagram of the Light- ing Schedule application and the eight cells that work together to control the lights. A description of each cell and the functions they perform are given below. 11.10.3 Control Method Select

light level to a set of Cut In/Cut Out setpoints.

From an OFF state, when the light level falls below the Cut In setpoint, the result of the light level comparison will be an ON state. When the light level rises above the cut-out setpoint, the state will transition from ON to OFF.

The ON/OFF state determined by the light level can be logically combined with LOGIC IN, a digital input from an input point or another application in E2. The result of this comparison will be the final ON/OFF light state com- mand that is sent from the Light Level Interface cell to the Schedule Interface cell (explained below).

Control Select determines whether the Multi-Logic Combiner is used or the Light Level Interface and Sched- ule Interface are used for Lighting Control. When Use Alt Control is set to Yes, the Light Level Interface and Sched- ule Interface combination strategies are disabled and are not visible. When Use Alt Control is set to No, the Multi- Logic Combiner matrix is disabled and not visible. 11.10.4 Standard Control

There are several different strategies for combining the light level ON/OFF state with the value of the LOGIC IN input:

Standard control comprises Light Level Interface and Schedule Interface strategies. 11.10.4.1 The Light Level Interface Cell (LLEV INTERFACE)

  • Logic Only - The cell will read only the LOGIC IN input and ignore the light level sensor reading.
  • LLEV Only - The cell will read only the light level sensor and ignore the value of the LOGIC IN input.

The Light Level Interface cell of the Lighting Schedule application translates the value of the light level sensor into an ON or OFF command by comparing the analog

  • Both ON/Both OFF - From an output=OFF

Lighting Schedules Software Overview • 11-31

Show 49 more labels / short text on this page
Lighting Control Module · Use Alt Comb · Multi Logic · Combiner · DV Offset Control · Sunset Today · Use Alt · Rise/Set Offset · Out · Logic1 · Logic2 Logic3 Logic4 · Light Level LLEV · LLev Interface AV · Control Method · Select · Logic In · Out · Schedif · Out · Use Alt Control · LLEV Occup · Use Alt DV · Occup · Invert Output DV · In Out · Output DV · Use Alt · Comb Type · Invert Output DV · Alt Comb · Min On/Off · Cutin/out SPs · On/Off Delay · Comb Type · Alt Comb · Basic Sched · Light Schedule · Out · Proof · Events · Proof DV · Use Ext Sched · Active Days · Actual Value DV · Delay · Bypass · Latch Time · Proof · Logical Combination Strategies
Page 174 of the Emerson E2 RX user manual — Occupied/Unoccupied and Alternate Settings
Page 174 · click to enlarge
Page 174

state, when both the light level state and the LOGIC IN input are ON, the resulting output command will be ON. The output command will remain ON until both the light level state and the LOGIC IN input turn OFF.

Interface cell as its output, ignoring the value passed to it from the Basic Schedule cell.

  • Sched Only - The Schedule Interface cell uses the input from the Basic Schedule cell as its output, ignoring the value passed to it from the Light Level Interface cell.
  • Both ON/LLEV OFF - Like the Both ON/ Both OFF strategy, except only the light level state must turn OFF in order to turn the output from ON to OFF.
  • Both ON/Both OFF - From an output=OFF state, when both the Light Level Interface input and the Basic Schedule input are ON, the resulting output command will be ON. The output command will remain ON until both the Light Level and Basic Schedule inputs turn OFF.
  • LLEV ON/Both OFF - Like the Both ON/ Both OFF strategy, except only the light level state must turn ON in order to turn the output from OFF to ON.
  • Both ON/Any OFF - Like the Both ON/Both OFF strategy, except any of the two states that turn from ON to OFF will result in the output turning OFF.
  • Both ON/Sched OFF - Like the Both ON/ Both OFF strategy, except when the Schedule Interface output is ON, it will turn off only when the Basic Schedule input turns OFF.

The LOGIC IN input should not be used to compare the light level state to a Time Schedule output or a similar digital state that represents OCCUPIED/UNOCCUPIED. Schedule comparisons are handled by the Schedule Inter- face cell. If a schedule input value is the only digital value you will be using to combine with the light level sensor value, choose the “LLEV ONLY” combination for this cell.

  • Sch ON/Both OFF - Like the Both ON/Both OFF strategy, except when the Schedule Interface output is OFF, it will turn ON only when the Basic Schedule input turns ON.
  • Both ON/Any OFF - Like the Both ON/Both OFF strategy, except when the Schedule Interface output is ON, it will turn OFF if any input turns OFF. If desired, the final result of any of the above combinations can be inverted by setting a parameter.

Occupied/Unoccupied and Alternate Settings

If desired, the Light Level Interface cell can be set up with a set of unoccupied Cut In/Cut Out setpoints. To do this, the Light Level Interface cell relies on a separate dig- ital input to tell it when to use occupied or unoccupied set- points.

Alternate Schedule Interface Combinations

If desired, you can specify an alternate means of com- bining the Schedule Interface cell inputs that is used only when the Use Alt Sched Comb input is ON. 11.10.5 Alternate Control

The Light Level Interface cell can also be set up with a set of alternate occupied and unoccupied setpoints, used only when the value of the input called USE ALT LLEV COMB is ON. 11.10.4.2 The Schedule Interface Cell (SCHEDIF)

Alternate control comprises Multi-Logic Combiner and Offset Solar Control strategies. 11.10.5.1 Multi-Logic Combiner

When the Alternate Lighting Control (Use Alt Con- trol) parameter under the General tab in Setup of the application is set to Yes, an alternate lights on/off combi- nation method is then used to turn lights ON and OFF. The user is then presented with a logical matrix where they can select which inputs will turn lights ON and OFF. This matrix is located under the Alt Control tab in Setup of the application.

The Schedule Interface cell is similar in function to the Light Level Interface cell, except it is used to logically combine the output of the Light Level Interface cell with that of the Basic Schedule cell. The Schedule Interface cell allows you to choose how the light level sensor and the time schedule work together to control the lights.

The output of the Schedule Interface cell represents the final ON/OFF state of the lights. It determines this state by performing one of the logical combinations listed below:

The Number of Inputs parameter (Num Inputs), located under General tab in Setup of the application, specifies the number of input sources made available in the matrix. Up to four input sources may be used: Sched- ule, Solar, Light Level, and Logic.

  • LLEV/Logic Only - The Schedule Interface cell uses the input from the Light Level

Logical Combinations

Page 175 of the Emerson E2 RX user manual — 11.10.5.2 Offset Solar Control
Page 175 · click to enlarge
Page 175

11.10.6.1 Slave Scheduling

If you have an external Time Schedule application pro- viding occupied/unoccupied times, but you want to alter this schedule slightly for the Lighting Schedule applica- tion, you can designate the Basic Schedule cell’s schedule as a slave schedule.

11.10.5.2 Offset Solar Control

The Offset Solar Control cell of the Lighting Schedule application uses the Sunrise Offset and Sunset Offset parameters to determine how many minutes before or after sunrise the sun is considered to be risen, or how many minutes before or after sunset the sun is considered to be set. The resulting offset for sunrise and sunset is used by Lighting Control in its logical equations for the Solar state.

A slave schedule differs from a master schedule in that its events are relative to the events of a master schedule. A master schedule’s events are absolute times (like 08:00 ON, 23:00 OFF). A slave schedule contains a set of times that are added to or subtracted from its master schedule’s events (like +00:30 ON, -01:00 OFF). As a result, the behavior of the output of the slave schedule is altered slightly from that of the master schedule.

A positive value is entered if adding to the sunrise time, and a negative value entered if offsetting the sunrise to an earlier time. For example, if the user wanted to turn the lights OFF one hour before sunrise, Sunrise Offset would be set to -60, and if the user wanted to turn the lights ON 45 minutes after sunset, Sunset Offset would be set to 45. 11.10.6 The Basic Schedule Cell

Slave scheduling is most often used in cases where the master schedule represents the occupied/unoccupied times of a building, and slave schedules are used to control loads that need activation or deactivation earlier or later than the occupied/unoccupied times. 11.10.7 The Min ON/OFF Cell

The Minimum ON/OFF cell has three important func- tions:

The Basic Schedule cell has two main functions:

  • If a Time Schedule application is set up in E2 to provide ON/OFF times for the lights, the Basic Schedule cell passes the occupied/ unoccupied state from this time schedule to the Schedule Interface or Multi-Logic Combiner cell.
  • It receives the light state requested by the Schedule Interface cell, and applies this state to a set of minimum ON and OFF times. If the requested light state turns ON the lights before the prescribed minimum ON time, or turns OFF the lights before the prescribed minimum OFF time, the Minimum ON/OFF cell will delay the command until the minimum ON or minimum OFF time has elapsed.
  • If no Time Schedule application is set up in E2 for light scheduling, the Basic Schedule allows you to configure a schedule for the Lighting Schedule application. This custom schedule will pass along a digital occupied/ unoccupied state to the Schedule Interface or Multi-Logic Combiner cell. If an external Time Schedule will be used, you will only need to configure the Basic Schedule by linking the schedule output to the input of the Basic Schedule cell and setting the Use External Schedule parameter to “Yes.”
  • If ON and OFF delays are specified, the cell delays ON/OFF commands it receives from the Schedule Interface cell.
  • It processes commands for manual bypassing of the light state. When the Bypass input is any value other than NONE, the cell ignores the light state command input, all minimum ON/OFF times, and all ON/OFF delays, and bypasses the light state to the digital value of the Bypass input. The digital output of this cell controls the I/O board output point that activates and deactivates the lights. 11.10.8 The Proof Cell

If no external Time Schedule is being used, you may configure a set of schedule events and date ranges to be used by the Lighting Schedule application. Up to 15 ON/ OFF schedule events can be programmed, as well as up to 12 date ranges. Schedule events and date ranges programmed into the Basic Schedule cell are used only by the Lighting Sched- ule application. If more than one Lighting Control applica- tion will be using the same schedule, it is recommended you configure an external Time Schedule application so you won’t have to re-enter event and date information for each lighting application.

The Proof cell verifies that the lights are turning ON and OFF as commanded by the Lighting Schedule applica- tion. The Proof cell compares the digital command sent to the I/O output that controls the lights with a digital input from a proof checking device (like a digital light level sen- sor). If the two inputs are not equal for an amount of time

Lighting Schedules Software Overview • 11-33

Page 176 of the Emerson E2 RX user manual — 11.11 Demand Control
Page 176 · click to enlarge
Page 176

longer than the programmed proof delay, the Proof cell turns its Proof output ON to signify a failure has occurred.

monitoring period is called the demand window. Demand windows are always the same length of time, but they may be measured at any time the power company chooses to.

The Proof cell will deactivate the Proof output if the proof failure has been cleared longer than the programmed proof latch time. 11.10.9 Output Light Dimming

Since Demand Control applications have no way of determining when the power company will start a demand window, they simply assume that the demand window can begin at any time. As new values of the KW input are gathered, Demand Control applications “roll” their demand windows forward and recalculate their load shed- ding algorithms as if the power company were measuring the average power of the new window.

The dimming feature allows the lighting output to be varied based on a light level sensor. Dimming capability can work with both Standard Control and Alternate Con- trol configuration. For setup, the user can:

  • Specify the light levels for the minimum and maximum light output.

For example, if the power company’s demand window lasts for 15 minutes, the Demand Control applications will keep a constant real-time average of all recorded KW val- ues from the previous 15 minutes. If a Demand Control application determines from its calculations that the cur- rent KW usage might cause its demand limit to be exceeded for the current or a future demand window, it will begin shedding loads to bring the KW usage down. A graphic example of the “rolling demand window” used by the Demand Control application is shown in Figure 11-20.

  • Specify the ramp speed that the indoor lighting output changes.

11.11 Demand Control

Demand Control applications are used by E2 to keep the total power usage of the building environmental sys- tem below a specific demand setpoint dictated by the power company. Demand Control applications achieve this by reducing power consumption in one or more appli- cations in the other E2 applications as necessary until the total KW is below the setpoint. This process is called load shedding.

Emerson E2 RX — 11.11 Demand Control diagram (page 176)
Fig. 195 · 11.11 Demand Control

The Demand Control application is designed to calcu- late power usage in much the same way power companies do, which ensures that it will be able to meet the power company’s demand limit accurately. The Demand Control application is also designed with a large amount of flexi- bility in the way load shedding is prioritized, which allows users to maximize power economization with a minimal amount of interference into the normal operations of the building’s HVAC systems. 11.11.1 Introduction to Demand Limit Control

Figure 11-20 - Example of “Rolling Demand Window”

Power companies supply power to consumers at a fixed rate per kilowatt hour until a pre-defined level of energy consumption is reached. This level is called the demand limit. When the demand limit is exceeded, the rate is greatly increased as a penalty for high power demand by the consumer. Typically, once the demand limit is exceeded, the increased rate is charged for the remain- der of the year.

In short, the primary goal of a Demand Control appli- cation is to make sure that every possible interval of time that might be used by the power company as a demand window will be under the set demand limit. This ensures the demand setpoint will never be exceeded. 11.11.2 Demand Monitoring

The E2 either monitors power using an analog KW transducer (which sends the current KW usage via analog signal), or monitors energy consumption using a digital watt-hour transducer (which pulses to signify a fixed amount of watt-hours have been used).

To determine if a consumer has reached the demand limit, the power company arbitrarily monitors a con- sumer’s energy consumption for a fixed period of time (usually anywhere from 15 to 30 minutes with most power companies, although it may be as short as 5 minutes). This

Page 177 of the Emerson E2 RX user manual — 11.11.3.1 Definition
Page 177 · click to enlarge
Page 177

11.11.4 Shedding Levels

As mentioned in Section 11.11.1, Introduction to Demand Limit Control, all KW input values are gathered together and averaged together in a demand window. The demand setpoint is then subtracted from this average. The result of this calculation is called the integral error (or integral) of the demand window. The integral error repre- sents how far below or above the setpoint the input has been for the entire demand window.

Some applications have a single input (usually called DEMAND SHED) that, when ON, sheds the application. Each application is programmed with a specific “demand bump” value that is added or subtracted from the control setpoints when this input comes ON.

Other applications, notably HVAC applications, have two inputs: a primary and a secondary (usually called PRI DEMAND SHED and SEC DEMAND SHED). Each input has its own “demand bump” value, so that when the primary is ON, the primary demand bump is in effect, and when the secondary is ON, the secondary demand bump is in effect. When both of these inputs are ON, the demand bump values are added/subtracted together and applied to the setpoint(s). As a result, two levels of shedding are pos- sible for a single application.

Under non-demand conditions, the integral error will be below zero, since the average KW or watt-hour value will be below the setpoint.

The current value of the integral error and the current value of the KW input are what determine when the Demand Control application will begin load shedding. 11.11.3 Load Shedding

11.11.3.1 Definition

Example: An air conditioner with a cooling setpoint of 70°F has a primary demand bump value of 2 and a sec- ondary demand bump value of 2. In a typical Demand Control application setup, the PRI DEMAND SHED input would be one of the first inputs to go into shed; when this occurs, the bump value is added to the cooling setpoint, raising it to 72°F.

Load shedding is the process of curbing the amount of kilowatt usage within one or more target applications. Most applications that drive mechanical or electronic devices, such as lights, heaters, air conditioners, compres- sors, etc., are configured with special inputs that, when active, “shed” the application.

Physically, when a device is “shed,” its control set- points are altered by a specified amount in a direction that will save energy. For instance, an HVAC unit with heating and cooling stages that is commanded to shed will have its heating setpoints lowered and its cooling setpoints raised. This will cause the HVAC unit to operate at a lower capac- ity, thus saving energy.

The SEC DEMAND SHED would be set up to shed later (if necessary) as a second level of shedding for the air conditioner. When this input is turned ON, the setpoint is raised by the secondary demand bump value. Since the PRI DEMAND SHED input is still ON, both values are added to the setpoint, raising the setpoint to 74°F. 11.11.5 Priority Levels

Table 11-13 lists a number of E2 RX-300 and BX-300 applications and how load shedding affects them.

Each application that you wish to set up for shedding must be assigned a priority level in the Demand Control application. When a Demand Control application sheds loads, it does so by shedding all applications that are in the first priority level, and then continuing to shed higher pri- ority levels until the demand is at an acceptable level or until all levels are shed.

All HVAC applica- tions (RT-100s, Multi- Flex RTUs, AHUs, Heat/Cools)

Raises cooling setpoints, lowers heating setpoints

Priority levels are simply outputs that connect to the demand shedding inputs of one or more applications. When a level is shed, the output comes ON and all appli- cations connected to the output are shed.

Sensor Control and Analog Input I/O Modules

Raises or lowers Cut In/Cut Out setpoints (whichever direction saves energy)

Refrigeration Circuits Raises case temperature setpoints

Suction Groups Raises suction setpoint

There are three types of priority levels:

1. First Shed

Condenser Raises discharge setpoint

Analog Output I/O Modules

Raises or lowers PID setpoint (whichever will save energy)

First Shed levels are the first ones to be shed when demand shedding begins. The Demand Control applica- tion first begins shedding by activating level #1 of the First Shed levels. As needed, each level thereafter is shed in succession (#2, #3, and so on to #20).

Digital Output I/O Modules

Control output is locked OFF.

Table 11-13 - Shedding Effect on Applications

Applications that are part of the First Shed priority lev- els should be non-vital applications that would have no

Demand Control Software Overview • 11-35

Application Shedding Effect

Page 178 of the Emerson E2 RX user manual — 2. Rotational Shed
Page 178 · click to enlarge
Page 178

significant effect on the system if it were to be shed for a prolonged period of time. Examples: motor room exhaust fans, satellite HVAC units and/or lights in low-occupancy rooms.

Emerson E2 RX — 2. Rotational Shed diagram (page 178)
Fig. 196 · 2. Rotational Shed
2. Rotational Shed

The Rotational Shed levels are shed in sequence only if all defined First Shed levels have already been shed and the Demand Control application needs more shedding to lower demand.

Unlike the First Shed priority levels, Rotational Shed levels do not always begin shedding by activating level #1. Instead, it shares the burden of being the first to activate among all the Rotational Shed levels. If, during one demand condition, Rotational Shed level #1 is the first of all the Rotational Shed levels to activate, it “rotates” first activation status to the next level in sequence (in this case, level #2). Thus, the next time a demand condition occurs, level #2 will activate first, and further levels will activate in sequence until it reaches level #1, which will be the last to activate.

Figure 11-21 - Shedding Priority Levels

Other Notes About Priority Levels

Applications that are Rotational Shed priority should be more vital to system performance than the ones config- ured as First Shed priority levels. In addition, all applica- tions assigned to Rotational Shed levels should all be of relatively equal importance, since they each will spend about the same total amount of time in shed.

All priority levels, whether they be First, Rotational, or Last, should be shedding relatively the same number of kilowatts. When the Demand Control application is shed- ding in a non-emergency situation, it usually sheds one or two levels at a time. Therefore, Demand Control would do a much better job of reducing demand quickly if each acti- vated level were reducing the KW by an equivalent amount.

Also, if you will be shedding a small amount of loads that are relatively equal in priority, you may choose to define them all under Rotational Shed levels, leaving the First Shed levels blank. Demand Control would then skip directly to the Rotational Shed levels during load shed- ding, and all loads would share shed time equally.

Also, each priority level has three important user- definable parameters that affect the level’s time in shed:

  • Minimum Shed Duration - the minimum amount of time a level must remain in shed. Demand Control will not restore the level until this minimum time has passed.
3. Last Shed

The Last Shed priority levels are shed in sequence only if all First Shed and Rotational Shed levels have been shed and the Demand Control application still requires demand reduction.

  • Maximum Shed Duration - the maximum amount of time a level will remain in shed. When the level has been shed longer than this duration, it will automatically be restored regardless of the current need for demand shedding.

Like the First Shed priority levels, level #1 is always the first Last Shed level to be activated, followed by #2, #3, #4, and so on up to #20.

  • Minimum Restore Duration - the minimum amount of time a level must be restored from shed before it may be shed again. Demand Control will not reshed this level until this minimum time has passed.

Applications that are assigned to this priority should be the most vital applications to system performance. These applications will be shed only as a last resort, and there- fore will spend the least amount of time in shed.

A diagram of how Demand Control cycles through all of the three different types of priority levels are shown in the diagram in Figure 11-21.

Emerson E2 RX — 2. Rotational Shed diagram (page 178)
Fig. 197 · 2. Rotational Shed
Page 179 of the Emerson E2 RX user manual — 11.11.6 How Demand Control Uses Load Shedding
Page 179 · click to enlarge
Page 179

11.11.6 How Demand Control Uses Load Shedding

requirement. Demand Control does this by reading the KW levels of all applications (which have been defined by the user when the applications were set up) in all the prior- ity levels that have not yet been shed. It then sheds as many levels as necessary to bring the KW input value down (thus saving the demand window from exceeding the setpoint).

Demand Control uses three parameters to perform load shedding: the current KW input value, the current integral error (described in Section 11.11.2, Demand Monitoring), and the active KW setpoint. The active setpoint is chosen from four different setpoint values depending on the sea- son (summer or winter) and occupancy (occupied or unoc- cupied).

Note that though each application has a user-defined Application KW parameter that represents how much total power the application uses, the actual amount of KW used by the application may be significantly lower (especially if it is OFF when Demand Control sheds it). Demand Con- trol compensates for this fact by assuming shedding an application will only lower the KW input value by 75% of the application’s designated KW value. For example, if a priority level contains a single AHU with a user-assigned KW value of 250, Demand Control will only expect to save 75% of this value (187.5 KW) by shedding it.

The Demand Control application is programmed with three different “modes” of operation. Under normal condi- tions, Demand Control operates in the first mode, then proceeds to the second or third mode if the demand is not adequately lowering.

Mode 1KW Input Is Greater Than Setpoint

Mode 1 is usually the first stage of demand shedding used by Demand Control. It begins when the KW input rises above the setpoint.

Example of a Mode 3 operation: A Demand Control application reads an integral error near zero and a KW input 300 KW above the setpoint. Mode 3 begins by deter- mining how many levels it will need to shed to bring the KW input down to the setpoint.

When this occurs, Demand Control begins by shedding one level at a time, starting with First Shed #1, and con- tinuing sequentially through all First, Rotational, and Last levels (as shown in Figure 11-21).

First, since Demand Control assumes it will only save 75% of an application’s KW rating by shedding it, the application determines that it must shed 400 KW worth of levels to achieve the setpoint.

The Demand Control application will continue to shed levels in this sequence until the KW goes below the set- point minus a user-defined hysteresis value and the inte- gral error is less than zero. When both these conditions are met, the shed levels will be restored in last-shed-first- restore order.

Second, Demand Control looks at all the applications in the next few priority levels (assume for purposes of this example that all First and Rotational Shed levels are already shed, and there are six defined Last Shed levels). The applications in the remaining levels are as follows:

Mode 2: KW Input Has Been Greater Than Setpoint for 1/4 Demand Window And Is Still Going Up

Mode 2 begins when the KW input has been above the setpoint for an amount of time equal to 1/4 the demand window duration, and the KW input has not begun to come down. In short, if Mode 1 is not working to lower demand, Mode 2 will take over.

Last Shed 1Total 80 KW
Last Shed 2Total 90 KW
Last Shed 3Total 75 KW
Last Shed 4Total 80 KW

When Mode 2 begins, Demand Control sheds two lev- els at a time, using the same sequence of priorities as Mode 1. Demand Control continues to shed in this manner until the KW goes below the setpoint minus a user-defined hysteresis value and the integral error is less than zero. When both these conditions are met, the shed levels will be restored in last-shed-first-restore order.

Last Shed 5Total 95 KW
Last Shed 6Total 75 KW

Mode 3 will immediately shed stages 1, 2, 3, 4, and 5 for a total of 420KW. If 75% of this total is actually saved by this action, the total KW reduction will be 315 KW, which will bring the input 15KW below the setpoint.

After Mode 3 makes its emergency adjustment, Demand Control will recalculate. If the KW input is still above the setpoint and the integral error is still near zero, it will make another Mode 3 adjustment. If the KW is below the setpoint but not below the setpoint minus the user- defined hysteresis value, it will go back to operating in Mode 1 (shedding levels sequentially). If the KW is below the setpoint minus the hysteresis value and the integral error is below zero, Demand Control will begin restoring

Mode 3Integral Error Approaching Zero

If the integral error is getting too close to zero, this sig- nifies the demand window may soon be above the power company’s demand setpoint. When this occurs, Demand Control switches to Mode 3.

Mode 3 simply calculates the amount of KW differ- ence between the current KW input and the setpoint, and sheds enough levels to meet or exceed the KW shedding

Demand Control Software Overview • 11-37

Page 180 of the Emerson E2 RX user manual — 11.12.1 Overview
Page 180 · click to enlarge
Page 180

11.12.3 Cut In/Cut Out Setpoint Control

loads. 11.11.6.1 Power Monitoring Input

The Input Type Selection parameter defines the way the Power Monitoring input (INPUT under the Inputs tab in application Setup) will be used. The parameter can be set to: KW Analog, or Pulse KWH.

Cut In/Cut Out setpoints work differently depending upon whether the Cut In/Cut Out setpoint is higher.

Cut In Higher Than Cut Out

Emerson E2 RX — loads. 11.11.6.1 Power Monitoring Input diagram (page 180)
Fig. 198 · loads. 11.11.6.1 Power Monitoring Input

When KW Analog is selected, verify the input is con- nected to a board and point that is set up with Engineering Units of KW. When Pulse KWH has been selected, verify the input is connected to a board and point that is set up with Engineering Units of KW.

11.12 Sensor Control

11.12.1 Overview

The E2 is equipped with numerous generic control modules that may be used both for simple monitoring of an analog or digital sensor and for simple Cut In/Cut Out control of a digital output. These modules are called Sen- sor Control modules.

Figure 11-22 - Cut In Setpoint Higher than Cut Out

When the Cut In setpoint is higher than the Cut Out setpoint, the Sensor Control output turns ON when the sensor input goes higher than the Cut In setpoint. The Sen- sor Control output remains ON until the input falls below the Cut Out setpoint, at which time the output turns OFF. (See Figure 11-22 for an illustration).

There are two different Sensor Control Module types. Analog Sensor Control modules read the values from one or more analog sensors, compare them to a set of Cut In/Cut Out setpoints, and operate a digital output (such as a relay) based on the analog input in relation to the set- points.

Cut/In Lower Than Cut/Out

Digital Sensor Control modules read the values from one or more digital sensors, combine them using a series of logical commands, and operate a digital output (such as a relay) based on the result of the logical combination. 11.12.2 Analog Sensor Control

Emerson E2 RX — 11.12.1 Overview diagram (page 180)
Fig. 199 · 11.12.1 Overview

On a basic level, an Analog Sensor Control module performs three functions:

  • COMBINER: Up to four analog inputs are combined into a single analog value.
  • CUT IN/CUT OUT CONTROL: The combined input value is compared to a Cut In/Cut Out setpoint. Based on this comparison, a digital output will be turned ON or OFF.

Figure 11-23 - Cut/In Setpoint Lower Than Cut/Out

When the Cut In setpoint is lower than the Cut Out set- point, the Sensor Control output turns ON when the sensor input goes lower than the Cut In setpoint. The Sensor Con- trol output remains ON until the input rises above the Cut Out setpoint, at which time the output turns OFF. (See Figure 11-23 for an illustration). 11.12.4 Digital Sensor Control

  • ALARMING: Alarms and notices can be generated based on the combined value of the inputs and its relation to a set of high and low alarm and notice setpoints.

The Digital Sensor Control module performs three

Settings

Page 181 of the Emerson E2 RX user manual — 11.13 Loop/Sequence Control
Page 181 · click to enlarge
Page 181

basic functions:

value to a setpoint, and generate a single analog output value. This output value is represented in three different forms: a single analog value from 0% to 100%, up to eight digital stage outputs, and a digital pulse width modulation output.

  • LOGICAL COMBINATION: Up to four inputs may be combined using standard logical combination methods (such as AND, OR, XOR, etc.) The result is the command output value , which can be used to operate a relay.

The output value(s) are generated by a PID Control cell, which takes into account both the input’s instanta- neous value and its rate and direction of change. The PID Control algorithm is similar to the PID algorithm used by Pressure Control, except the Loop Sequence Control application is designed to be used in a wider array of applications. 11.13.1 Layout of the Loop/ Sequence Control Application

  • BYPASS: The command output may be configured to be bypassed to a fixed value by a switch or button press.
  • ALARMING: Alarms and notices can be generated based on the command value of all the digital inputs of the cell, plus occupancy, and schedules. 11.12.5 Logical Combination

A Digital Sensor Control module has four inputs num- bered 1 through 4. The logical combination of the Digital Sensor Control modules follows one of the following strat- egies:

There are two different types of cells in the Loop/ Sequence Control Application: control cells and output cells. The control cells have a part in determining the PID output percentage. The output cells convert this PID per- centage to staged digital and pulse width modulation acti- vations. 11.13.1.1 Control Cells

  • FIRST - The first of the four digital inputs received will be used as the logical input value. This combination first looks at input #1. If the value of this input is undefined, it looks for other valid inputs, starting with #2 and descending in numerical order to #4.

The five control cells in the Loop/Sequence Control application act as “steps” in determining the final PID per- centage.

  • SELECT - The sensor module reads an analog input, which provides a numerical value from 1 to 4. This number determines
1. Select - The Select cell determines whether the occupied setpoint or the unoccupied setpoint will be used by the PID cell. This cell reads in values for both setpoints, chooses the one to use based on the value of an Occupancy input, and sends the appropriate setpoint value to the next cell in line, the Setpt Float cell.
  • AND - The logical input value will be ON only when all sensor control inputs are ON. If one or more of them are OFF, then the logical input value will also be OFF.
2. Setpt Float - The Setpt Float cell allows alteration of the control setpoint provided by the Select cell based on comparison of a “float” input to a range of values. The floating setpoint is then sent to the next cell in line, the PID Control cell.
  • OR - The logical input value will be ON if one or more sensor control inputs are ON. If all of them are OFF, the logical input value will also be OFF.
  • XOR - This combination strategy is exactly the same as OR, except when all sensor control inputs are ON, the logical input value will be OFF instead of ON.
3. PID Control

This cell makes the PID percentage calculation based on the value of the setpoint (received from the Setpt Float cell) compared to the control input, which is fed directly into the PID Control cell. The resulting percentage is sent to the next cell in line, the Filter cell.

  • VOTE - If more than half of the sensor control inputs are ON, the logical input value will be ON. Otherwise, if 50% or less of the sensor control inputs are OFF, the logical input value will be OFF.
4. Filter - The Filter cell limits the rate of change of the PID percentage over time, and is typically used to keep the PID cell from over-compensating when inputs change drastically. The filtered PID percentage is sent to the final control cell, the Override cell.

11.13 Loop/Sequence Control

5. Override - Once the PID percentage is figured, the Override cell provides for overrides of the PID percentage. The Override cell, when activated by a user-initiated manual override, will block the PID percentage from

The Loop Sequence Control application’s main func- tion is to read the value of an analog input, compare the

Loop/Sequence Control Software Overview • 11-39

Page 182 of the Emerson E2 RX user manual — 11.13.2.1 The Select Cell
Page 182 · click to enlarge
Page 182

being sent to the outputs, replacing it with a fixed value specified by the user.

stage outputs. The Sequencer supports up to eight cells, and also provides for minimum on/off times and first-on/ last-off sequencing.

The value from the Override cells is then sent to the Loop/Sequence Control’s PID output, and also to the two output cells for conversion to stages and PWM. 11.13.1.2 Output Cells

PWM - The PWM cell drives a digital output whose ON time per pulse width modulation period is equal to the PID percentage. In other words, if the PWM cell is set with a pulse width of 10 seconds, a PID percentage of 60% turns the output ON for 6 seconds, OFF for 4 seconds, ON for 6 seconds, etc. 11.13.1.3 Diagram

The two output cells make no alteration of the PID per- centage determined by the control cells, but re-interpret them in a way that can be used for systems with multiple stages and/or with pulse width modulation.

Sequencer - The Sequencer cell will use the percent- age to activate an equivalent percentage of its defined

An abstract diagram of the control and output cells is shown in Figure 11-24.

SELECT CELL

FILTER OVERRIDE

Analog PID/PWM Loop Output

AV

In Out In Out

AV

AV AV

AV

DV

AV

SEQUENCER

Digital Stage 1-8 Output

SETPT FLOAT

AV

Stage 1 Stage 2 Stage 3 Stage 4 Stage 5 Stage 6 Stage 7 Stage 8

DV

DV

DV

AV

DV

DV

DV

DV

PID CONTROL

AV

DV

AV AV

PWM

AV

DV

DV AV DV = Digital Value AV = Analog Value

Figure 11-24 - Loop/Sequence Control Application Diagram

11.13.2 Loop/Sequence Control Cell Descriptions

input. If this input is ON (OCC), the occupied setpoint is used. If this input is OFF (UNO), the unoccupied setpoint is used.

11.13.2.1 The Select Cell

If the occupancy input is NONE, the Select cell will assume this application will not use occupancy-based set- points, and will use the occupied setpoint only (no switch- ing).

The Select cell’s function is to provide the control set- point to the PID Control cell, and to switch between occu- pied and unoccupied setpoints based on the current state of occupancy.

To determine whether to use the occupied setpoint or the unoccupied setpoint, the Select cell reads a digital

Show 16 more labels / short text on this page
Occ SP · In 1 · Unoc SP · In 2 · Occupied · Occup · SP In · Input · SP Out · Float · Float · Setpoint · Control Value · Input PID Out · Digital PWM Output · In Out
Page 183 of the Emerson E2 RX user manual — 11.13.2.2 The Setpoint Float Cell
Page 183 · click to enlarge
Page 183

of the Occupancy input. If you wish to follow a schedule for occupancy, this input must be tied to the output of a Time Schedule application. 11.13.2.2 The Setpoint Float Cell

and passes on the value of the control input directly to the Filter cell.

The Setpoint Float cell provides users to raise and lower the control setpoint based on the value of a sensor (called the “float” sensor). The float sensor can be any type of analog sensor, but is typically a temperature sen- sor, since most of the applications for floating setpoints involve HVAC and floating the setpoint based on outdoor air temperature.

The Filter cell’s primary function is to slow the rate of change of the PID cell’s output. The filter reads the differ- ence between the current output value and the value x sec- onds ago, where x = a user-specified period of time. The difference between these two values is multiplied by the filter ratio, which is a percentage between 0% and 100%. The result of this multiplication is the output value. Note that if the filter ratio is at 100%, or if the Filter cell is dis- abled, the input is not modified by the Filter cell. 11.13.2.5 The Override Cell

To set up the Setpoint Float cell, you must provide three values: a High Float Value, a Low Float Value, and an Output Range.

The Output Range is the maximum amount that the PID Setpoint may vary. An Output Range of 4, for exam- ple, means that the control setpoint may only be increased by a maximum of 2 and decreased by a maximum of 2.

The Override cell’s function is to provide a method of overriding the analog output going to the Sequencer and PWM cells to a user-specified value instead of the value called for by the Filter cell. The Override cell can override the output to any value between 0% and 100%, and may be either fixed or timed. A fixed override remains overrid- den until the user deactivates the override, while a timed override remains in effect until a user-specified time has elapsed. 11.13.3 Output Cell Descriptions

The High Float Value and Low Float Value form a range of values that determine what portion of the Output Range is applied to the final control setpoint. For example, suppose a Setpoint Float cell is given a High Float Value of 100, a Low Float Value of 0, and an Output Range of 4. When the float sensor value is at the high float value, the setpoint will be increased by its maximum amount (2). When the float sensor value is at the low float value, the setpoint will be decreased by its minimum amount (2). For all float sensor values in between the High Float and Low Float values, the amount added or subtracted to the control setpoint will vary linearly.

The Loop/Sequence Control application has three con- trol outputs: a standard 0-100% analog output, a set of up to eight staged outputs, and a pulse width modulation (PWM) output. The analog control output comes directly from the Override cell. However, the same control output is fed into the Sequencer and PWM cells for translation into digital staged outputs and pulse width modulation. 11.13.3.1 The Sequencer Cell

If floating setpoint control is not desired, this cell can be effectively disabled by setting the value of the Float Output Range to 0. 11.13.2.3 The PID Control Cell

The PID Control cell uses a PID algorithm to compare the control input value with the control setpoint value. The result of this comparison is a percentage from 0-100%. The PID Control cell repeats this sequence ever few sec- onds, and the result is a PID percentage that adjusts over time to provide the optimum amount of output to achieve the setpoint.

The Sequencer cell simply activates a certain percent- age of the Digital State 1-8 outputs based on the percent- age of the control output. For example, if the control output is 50%, the Sequencer cell will activate 50% of the total number of stages. The Sequencer cell will always round DOWN; that is, if there are four stages in a Sequencer cell and the output is 74%, the Sequencer cell will only activate two stages (or 50% of the stages). When the output climbs above 75%, the third stage will activate.

The 0-100% output from the PID Control cell is passed along to the Filter cell.

If desired, delays may be specified for stage activation and deactivation. Also, the definitions of OFF and ON may be redefined as either ON, OFF, or NONE. 11.13.3.2 The PWM Cell

For users who simply wish to convert an analog output to a pulse width modulation or sequenced (staged) output, a Loop/Sequence Control application can be programmed to bypass PID Control altogether. If this option is selected, the Loop/Sequence Control application completely ignores the Select, Setpoint Float, and PID Control cells,

The PWM cell converts the control output percentage into a periodic ON pulse. A “pulse” in this cell is a con-

Loop/Sequence Control Software Overview • 11-41

Bypassing PID

Page 184 of the Emerson E2 RX user manual — 11.14.1.1 Events
Page 184 · click to enlarge
Page 184

stant period of time that consists of one ON event and one OFF event. The PWM cell takes the PID percentage and turns the output ON for an equivalent percentage of the total pulse period. In other words, if the PID output is 60% and the pulse period is 30 seconds, every 30 seconds the PWM output will be ON for 60% of 30 seconds (18 sec- onds) and OFF for the remaining portion of the 30-second period. Once the period has ended, the PWM Cell reads the PID output again and the process is repeated.

exist within an individual master or slave schedule. Tem- porary schedules are used to temporarily override the ON/ OFF instructions of an individual master or slave sched- ule. Generally, temporary schedules are only used for one- shot applications, such as keeping the lights on an extra hour for a single night. Temporary schedules override all other events within a master or slave schedule, including holidays. 11.14.1 How Schedules Work

11.14 Time Scheduling and Holidays

11.14.1.1 Events

Master schedules and slave schedules consist of up to 15 pairs of events. Events are simple commands to turn the schedule output either ON or OFF at a particular time within a range of days. Events are usually programmed in pairs, so that during a specified range of days the schedule output can be turned ON and OFF at a particular time within the same day. However, events may be pro- grammed singularly (on OFF or one ON command per day). Events may be programmed to take place on any or all days from Sunday to Saturday. In addition, events may take place on any or all of four holiday (or “special”) dates, called HD1, HD2, HD3, and HD4. Holiday sched- ules are used to tell the master or slave schedules when these special dates occur. 11.14.1.2 Absolute and Relative Events

Time Schedules are used for timed activation and deactivation of loads and for providing occupied and unoccupied building times for occupancy-driven systems (such as Sensor Control, Lighting, and HVAC).

There are four different types of schedules used by the E2. Brief description of each of these are given below:

Master schedules are the main scheduling unit used by the E2. A master schedule consists of up to 15 sched- uled ON/OFF event pairs, which may be programmed to occur on any individual date and time or series of dates and times. Master schedules may also drive slave sched- ules.

Slave schedules are similar to master schedules, except their operation is driven by a master schedule. Slave schedules, generally, are alterations of the master schedule’s event times. The ON/OFF times in a slave schedule may take place either at specific defined times of the day or relative to the times given in the master sched- ule. For example, a master schedule may say: “The build- ing is occupied from 8:00 a.m. to 9:00 p.m.” while one of its slave schedules says “Dim the building lights 15 min- utes before the store closes.”

Master schedule events always occur at specific times of the day. In other words, when you program an event pair in a master schedule, you must specify two specific times of the day the events will occur. These types of events are called absolute events.

However, when programming event times in slave schedules, you may choose to enter event times that are relative to its master schedule’s ON and OFF times. These types of events are called relative events. They are pro- grammed not as absolute times but as amounts of time before or after its master schedule’s events.

Slave schedules may also be mastered by other slave schedules to create a series of stacked schedules.

For example, suppose a master schedule is set up to be ON at 8 a.m. and OFF at 9 p.m. every day of the week, and you wish to set up a slave schedule so that its output comes ON 15 minutes before the master comes ON and OFF 15 minutes after the master goes OFF. To do this, you would set up the slave schedule to come ON at -00:15 and OFF at +00:15 every day of the week. The slave schedule will automatically determine the correct ON and OFF times. 11.14.1.3 Temporary Schedule Events

Holiday schedules are used to tell master and slave schedules that a special day or event is occurring. For example, master schedules and their corresponding slave schedules may be programmed with special holiday events, such as “Keep all lights off during Holiday x.” The holiday schedule’s job is to inform the schedules to which it is connected, “Today is Holiday x.”

Although holiday schedules are used exclusively by Time Scheduling applications, they are set up as individual applications separate from Time Scheduling. See Section 11.14.2, Holiday Schedules for more information.

Each schedule may also be given up to three pairs of temporary schedule events. These events start and end at specific days and times and do not continue past those dates (in other words, temporary events cannot be made to

Temporary schedules are technically not schedules but temporary override functions that may be made to

Page 185 of the Emerson E2 RX user manual — 11.15 Power Monitoring
Page 185 · click to enlarge
Page 185

occur weekly or annually). 11.14.1.4 Overlapping

KW usage in a building. 11.15.1 Overview

Events may, and often do overlap within a schedule. When events overlap, the E2 uses the following priority structure, from highest to lowest:

Power companies supply power to consumers at a fixed rate per kilowatt hour until a pre-defined level of energy consumption is reached. This level is called the demand limit. When the demand limit is exceeded, the rate is greatly increased as a penalty for high power demand by the consumer. Generally, once the demand limit is exceeded, the increased rate is charged for the remainder of the year.

1. Temporary Schedule Event #1
2. Temporary Schedule Event #2
3. Temporary Schedule Event #3
4. Events that occur on HD1 (Holiday #1)
5. Events that occur on HD2 (Holiday #2)
6. Events that occur on HD3 (Holiday #3)

To determine if you have reached the demand limit, the power company arbitrarily monitors a consumer’s energy consumption for a fixed period of time. This monitoring period is called a demand window. Power companies can generally tell you how long a demand window period lasts, but you’ll never know when the measurement will take place.

7. Events that occur on HD4 (Holiday #4)
8. Temporary Schedule Events of a slave schedule’s master schedule (if applicable).

9. Standard events within the schedule itself. 11.14.1.5 Ranges

In addition to the 15 events within a master or slave schedule, up to 12 standard ranges may be specified. Ranges are sets of dates that specify which days within the year the schedule’s events will be applied. The E2 checks the list of ranges to see if the current date falls within any of the twelve possibilities; if the date does not fall within a range, none of the schedule’s events will occur.

How Power Monitoring Calculates Demand

To help you make sure you do not use more power than the demand limit, the E2’s Power Monitoring applications determine your current KW usage in much the same way as your power company. Power Monitoring uses a watt- hour transducer input to determine the current KW usage. Multiple KW values are averaged together into “demand windows,” much like the ones power companies use.

When no date ranges are specified, the schedule is con- sidered to be active. All scheduled events will occur nor- mally. 11.14.2 Holiday Schedules

Then, depending on how the application is configured, the most current KW value is compared to a demand set- point. The “current KW value” in this case may be either the instantaneous value read by the power transducer, or it may be the average of all KW transducer readings taken over 1-minute intervals. This setpoint should be equal to or slightly lower than the demand limit set by your power company.

A Holiday Schedule application’s primary function is to pass along the day of the week to one or more master or slave schedules, and to tell these schedules when it is a holiday (HD1 - HD4). A holiday schedule determines hol- idays by cross-referencing the current date with its user- programmed list of holiday date ranges. During the time periods of these date ranges, the holiday schedule tells the schedules to perform the events programmed for one of the four holiday dates (HD1, HD2, HD3, or HD4).

In short, since E2 doesn’t know when the power com- pany’s demand window will begin, the E2 measures power as if the demand window could happen at any time. This way, E2 can more accurately determine when your site is approaching or exceeding the demand limit.

Because multiple E2s on a network would likely use the same holiday schedules for determining special occu- pied and unoccupied building hours, holiday scheduling is handled by Global Data. This means the holiday schedule can be set up in one E2 and shared with all other E2s that use time scheduling.

If the KW usage is higher than the demand setpoint, Power Monitoring goes into Shed Mode. During Shed Mode, Power Monitoring turns on a digital output called SHED OUT. This output may be connected to the demand shed inputs of one or more E2 applications, which will in turn shut down or otherwise curb the power usage of the overall system. The SHED OUT output remains ON until the KW usage falls below the demand setpoint.

11.15 Power Monitoring

A Power Monitoring application is used primarily for monitoring, recording, and to a lesser degree controlling

In short, the purpose of Shed Mode is to get the total KW usage below the demand setpoint as soon as possible.

Power Monitoring Software Overview • 11-43

Explanation of “Demand” · Shed Mode

Page 186 of the Emerson E2 RX user manual — 11.15.2 Logging
Page 186 · click to enlarge
Page 186
  • The highest instantaneous KW reading taken for that month, and the date and time the reading was taken
  • The total number of minutes the Power Monitoring application was in Shed Mode
  • The Heat Degree Days for that month

11.15.2 Logging

  • The Cool Degree Days for that month

Power Monitoring applications are pre-programmed with extensive logging capabilities that record the hourly, daily, and monthly power usage statistics.

Definition of Heat and Cool Degree Days

Heat degree-days and cool degree-days are standard industry measurements of the demand for heating and cooling. This measurement is based on the daily average outdoor air temperature.

The hourly log contains a list of power usage summa- ries of the previous 48 hours. An hourly log entry con- tains:

If the daily average temperature is below 65°F, then the number of heat degree-days for that day is equal to 65 minus the day’s average temperature in degrees Fahren- heit. Example: if the day’s average temperature is 54°F, the number of heat degree-days for that day is 65-54 = 9 heat degree-days.

  • The time and date of the entry
  • The KWh for that hour
  • The maximum average KW that occurred within any demand window for that hour

If the daily average temperature is above 65°F, then the number of cool degree-days for that day is equal to the day’s average temperature in degrees Fahrenheit minus 65. Example: if the day’s average temperature is 71°F, the number of cool degree-days for that day is 71-65= 6 cool degree-days.

  • The highest instantaneous KW reading taken for that hour, and the time that reading was taken

The daily log contains a list of power usage summaries for the previous 48 days. A daily log entry contains:

Larger degree-day numbers indicate a larger demand for heating or cooling. Degree-day totals may be added together to indicate heating and cooling demand for weeks, months, or years. E2 does this to keep monthly logs of heat and cool degree-days. 11.15.2.1 Power Monitoring Input

  • The date of the entry
  • The KWh for that day
  • The maximum average KW within any demand window for that day
  • The highest instantaneous KW reading taken for that day, and the time that reading was taken

The Input Type Selection parameter defines the way the Power Monitoring input (INPUT under the Inputs tab in application Setup) will be used. The parameter can be set to: KW Analog, Pulse KWH, Current (Amps), or Current 3-phase.

  • The total number of minutes the Power Monitoring application was in Shed Mode
  • The Heat Degree Days for that day
  • The Cool Degree Days for that day

When KW Analog is selected, verify the input is con- nected to a board and point that is set up with Engineering Units of KW. When Pulse KWH has been selected, verify the input is connected to a board and point that is set up with Engineering Units of KW. When Current (Amps) has been selected, verify the input is connected to a board and point that is set up with Engineering Units of Amps. When Current (3-phase) has been selected, verify the input is connected to a board and point that is set up with Engineering Units of Amps. Note that for 3-phase, three power monitoring inputs will appear under the Inputs tab of the application. All inputs must be connected to board and points set up with Engineering Units of Amps.

For monthly logging, the day of month can be user- specified so the day of the month on which the utility bill- ing period starts can be accurately compared to the utility bill. The monthly log contains a list of power usage sum- maries for the previous 24 months. A monthly log entry contains:

  • The month and year of the entry
  • The KWh for that month
  • The maximum average KW within any demand window for that month
Show 4 more labels / short text on this page
Hourly · Daily · Settings · Monthly
Page 187 of the Emerson E2 RX user manual — 11.17 Heat/Cool Control
Page 187 · click to enlarge
Page 187

11.16 Anti-Sweat Setup

its relation to the heating or cooling setpoint. Both staged and modulated (0-100%) heating and cooling outputs are supported by Heat/Cool Control.

An anti-sweat application controls one anti-sweat zone. An anti-sweat zone is defined as one or more anti- sweat heaters that use the same dewpoint (or RH and tem- perature) sensors and the same control setpoints. If all the outputs on a 20-channel PMAC panel are going to use the same setpoints and dewpoint device(s), then all the heaters may be set up in a single zone.

Heat/Cool controls are available in RX units, allowing small installations with simple HVAC systems to use one controller for all refrigeration and HVAC systems. 11.17.1 Temperature Control

Heat/Cool applications use PID control to vary the out- put of heating and cooling devices. As is the case with all applications that use PID control, Heat/Cool control makes use of a PID setpoint and a throttling range. Refer to Appendix D: PID Control for more information.

Zones are set up in a single screen called the Anti- Sweat Control Setup screen. 11.16.1 How Anti-Sweat Works

Anti-sweat applications control anti-sweat heaters by monitoring the dewpoint. A dewpoint value may come from a dewpoint probe mounted within the Zone, or it may be calculated automatically by the E2 using a combination of a relative humidity sensor and a temperature sensor.

Unlike normal PID loops that assume a 50% output is required to keep the temperature stabilized on the setpoint, Heat/Cools strive to stabilize the temperature on the set- point with the output at 0%. Thus, when the temperature goes below a heating setpoint or above a cooling setpoint, the heating or cooling outputs climb from 0% to 100% as determined by the throttling range (see Figure 11-25).

The dewpoint value is used to pulse the heaters ON for a certain percentage of a user-defined time interval. The dewpoint is compared to the anti-sweat application’s con- trol setpoints (the Full ON Dewpoint and the Full OFF Dewpoint). Based on this comparison, the anti-sweat heat- ers will do one of three things:

Emerson E2 RX — 11.16 Anti-Sweat Setup diagram (page 187)
Fig. 200 · 11.16 Anti-Sweat Setup
  • If the dewpoint is equal to or above the Full ON Dewpoint, the heaters remain ON 100% of the time.
  • If the dewpoint is equal to or below the Full OFF Dewpoint, the heaters will be ON 0% of the time (fully OFF).
  • If the dewpoint is between the Full ON and Full OFF Dewpoint, the heaters will be pulsed ON for a percentage of the specified time interval. The percentage is determined by proportionately measuring where the dewpoint falls between the range of values formed by the two setpoints.

Figure 11-6 shows an example of an anti-sweat appli- cation. The setpoints (Full ON = 80°F, Full OFF = 20°F) form the range of dewpoints across which the heaters will be pulsed. When the measured dewpoint is 45°F (directly in between both setpoints), the percentage will be 50%, and the heaters will be pulsed ON for five seconds of the defined 10-second interval. If the dewpoint drops to 30°F, the percentage will lower to 20%, and the heaters will be on only two seconds out of every 10.

Figure 11-25 - Example of Heat/Cool PID Control

By default, only the proportional and integral modes of PID control are enabled for Heat/Cools. The user may choose to add the Derivative mode or to get rid of the Inte- gral mode and use strictly Proportional control. 11.17.2 Unoccupied Hysteresis

When the Heat/Cool receives an indication that the building is unoccupied, the control mode changes from the PID method described previously, and uses simple ON/ OFF control of the heating and cooling outputs.

11.17 Heat/Cool Control

The Heat/Cool application in unoccupied mode makes use of a hysteresis value to form a range of temperature values across which the heating and/or cooling will be applied. As shown in Figure 11-26, when the temperature

Heat/Cool Control is a special kind of sensor control that applies to heating and cooling devices. Heat/Cool Control applications use PID control to vary the amount of heating and cooling based on the current temperature and

Anti-Sweat Setup Software Overview • 11-45

Page 188 of the Emerson E2 RX user manual — 11.17.3 Optimum Start/Stop (OSS)
Page 188 · click to enlarge
Page 188

drops to the Unoccupied Heating Setpoint or rises to the Unoccupied Cooling Setpoint, the heat or cool outputs go to 100% ON. They remain in this state until the tempera- ture rises above the heating setpoint plus the hysteresis, or below the cooling setpoint minus the hysteresis, at which time the outputs will go to 0% ON.

pied setpoint.

Emerson E2 RX — 11.17.3 Optimum Start/Stop (OSS) diagram (page 188)
Fig. 201 · 11.17.3 Optimum Start/Stop (OSS)
Emerson E2 RX — 11.17.3 Optimum Start/Stop (OSS) diagram (page 188)
Fig. 202 · 11.17.3 Optimum Start/Stop (OSS)

Figure 11-27 - Diagram of Pre-Start and Pre-Stop Operation

Intelligent Pre-Starts and Pre-Stops

OSS is designed to handle pre-starts and pre-stops in the most energy-efficient manner possible. Every time a pre-start or pre-stop occurs, OSS measures the amount of time it takes to bring the temperature from the previous setpoint to within the “comfort zone” of the new setpoint (a user-defined range of values above and below the set- point within which the temperature is considered accept- able). This duration is used to determine the average rate of temperature change, called the K factor.

Figure 11-26 - Unoccupied Hysteresis Mode

11.17.3 Optimum Start/Stop (OSS)

Emerson E2 RX — 11.17.3 Optimum Start/Stop (OSS) diagram (page 188)
Fig. 203 · 11.17.3 Optimum Start/Stop (OSS)

The K factor is stored in the memory along with the average value of the outdoor air temperature during the pre-start or pre-stop. Over time, collected K factor data will be sorted and combined into a table. As a result, by constantly observing and recording the results of previous pre-starts and pre-stops, OSS will be able to intelligently guess how much time a pre-start or pre-stop mode should last based on the outside temperature.

Optimum Start/Stop (OSS) is a feature that works alongside the Heat/Cool’s occupied and unoccupied tem- perature control modes. OSS takes control of heating and cooling several minutes before the building is scheduled to change occupancy states, and prepares the building for the upcoming change in setpoints. As a result, when the occu- pancy state changes, the temperature will be comfortably within the range of the new setpoint.

Heat/Cools keep track of three different kinds of K fac- tors:

  • Heat K factor - used to guess pre-start durations for Heat/Cools operating in heating mode.

Figure 11-15 shows an example of how pre-starts and pre-stops work in a heating application. From unoccupied mode, the pre-start period ramps the temperature up slowly so that when the scheduled change from unoccu- pied to occupied mode occurs, the temperature will already be at or near the occupied heating setpoint. During the pre-stop, which occurs before the Heat/Cool goes from occupied to unoccupied mode, heating is suspended and the temperature is allowed to “coast” down to the unoccu-

  • Cool K factor - used to guess pre-start durations for Heat/Cools operating in cooling mode.
  • Coast K factor - a measurement of the change in temperature when no heating or cooling is active. This is used to determine pre-stop durations for both heating and cooling Heat/Cools. 11.17.4 Setpoint Reset

If desired, Heat/Cools may be configured with a Set- point Reset that varies the value of the heating and/or cooling setpoints based on an analog value from a reset sensor. This is most often used to vary the value of a heat- ing or cooling setpoint based on the outside air tempera- ture.

To set up a setpoint reset for heating or cooling, the user must specify the minimum and maximum range of reset sensor values, and the maximum range of setpoint

Page 189 of the Emerson E2 RX user manual — 11.18 Analog and Digital Combiners
Page 189 · click to enlarge
Page 189

adjustment.

setpoint and the setpoint delta, the Lead loop alone will control cooling. However, when the temperature is above the setpoint delta, the Lag loop will come on-line, and both Lead and Lag loops will work to bring the tempera- ture down.

As the value of the reset sensor varies within the mini- mum and maximum range, an equivalent portion of the maximum setpoint adjustment will be added or subtracted from the heating or cooling setpoint. When the reset sen- sor value is directly in between the minimum and maxi- mum range values, nothing will be added or subtracted from the setpoint. Between the halfway point and the min- imum value, part of the setpoint adjustment will be sub- tracted from the setpoint. Between the halfway point and the maximum value, part of the setpoint adjustment will be added to the setpoint. An example of this is shown in Fig- ure 11-28.

The Lead/Lag arrangement works similarly in Heating mode, except that the setpoint delta is below the Heating setpoint, and Lead and Lag are both on when the tempera- ture is below the setpoint delta.

TEMPERATURE

SETPT DELTA

SET POINT

LEAD AND

RESET SENSOR

SET POINT CHANGE

LAG ON LEAD AND

LAG ON LEAD ON ONLY LEAD ON ONLY

TIME

RANGE

MAX RANGE

MAX CHANGE Figure 11-29 - Lead/Lag Arrangement

Heat/Cools in a Lead/Lag arrangement take turns act- ing as the Lead loop. The user designates the maximum amount of time a Heat/Cool will act as a Lead loop; after this duration, the current Lead loop will switch places with its Lag loop.

ADD SUBTRACT

Lead/Lag arrangements only work when both Heat/ Cools are in Occupied mode.

MIDPOINT

Dehumidification control uses the AHU’s existing cool stages (and a separate dehumidification device such as a desiccant wheel, if available) to remove moisture from the air.

The dehumidification setpoint is placed at the 0% end of the dehumidification PID throttling range. In other words, the dehumidification output will start at 0% when the humidity is equal to the setpoint and increase to 100% when the humidity is equal to or above the setpoint plus the throttling range.

MAX CHANGE

MIN RANGE

Figure 11-28 - Setpoint Reset Diagram

The dehumidification output percentage is used much like a heating or cooling output percentage is used in Tem- perature Control. The percentage represents the percent- age of total dehumidification capacity available to the AHU (including cool stages and other dehumidification devices).

11.17.5 Lead/Lag

A Heat/Cool application may be linked with another Heat/Cool application in what is called a “Lead/Lag” arrangement. In this arrangement, one Heat/Cool is desig- nated as the Lead loop and used as the primary space tem- perature control device. The other Heat/Cool, the Lag loop, becomes active only to support the Lead loop when it is unable to keep the space temperature within a certain proximity of the setpoint (called the setpoint delta).

11.18 Analog and Digital Combiners

Figure 11-29 shows how a pair of Heat/Cool applica- tions using a Lead/Lag arrangement would operate in Cooling mode. When the temperature is in between the

Instead of using a single output source as an applica- tion input, you may use a combination of up to sixteen input sources. To use multiple inputs, a Multiple Input cell

Analog and Digital Combiners Software Overview • 11-47

26512037 · +0

Page 190 of the Emerson E2 RX user manual — 11.19.1 Overview
Page 190 · click to enlarge
Page 190

11.19.3 TD Control Fail-Safes

must be used.

A Multiple Input cell is a simple application that reads data values from its inputs, combines them using a user- defined combination strategy, and sends the combined value to the desired application input.

TD Control operates as long as plenum and drop leg temperature inputs are available and the drop leg tempera- ture remains within a minimum/maximum range config- ured by the user. Otherwise, TD control uses various fail- safe modes to control the condenser fans.

A common application for this is in HVAC control, where a single heating control value might come from an average of a number of temperature sensors throughout the building.

In the event drop leg temperature is not available (due to probe failure), all fans will be staged on.

Two different types of Multiple Input cells may be used, depending upon whether the inputs to be combined are analog or digital sources.

Drop Leg Temperature Above Maximum Drop Leg Setpoint

If the Drop Leg temperature (Drop Leg Temp) rises above the maximum drop leg temperature setpoint (Drop Leg Max), an increase will be called for until Drop Leg Temp drops below Drop Leg Max. This protects against the possibility of the Drop Leg Temp rising too high as a result of high plenum temperature.

11.19 TD Control

11.19.1 Overview

The TD Control application controls fans sequentially based on the temperature differential (TD) of the con- denser. When an increase is called for, the next fan will turn on when the time since the last fan state change is greater than the Fan On Delay Time setpoint (or will turn on immediately if the last change was more than the Fan On Delay). Additional fans will be staged on at Fan On Delay intervals while an increase in capacity is called for. When a decrease is called for, the next fan will stage off when the time since the last fan state change is greater than the Fan Off Delay Time setpoint (or will turn off immediately if the last change was more than Fan Off Delay). Additional fans will be staged off at Fan Off Delay intervals while a decrease in capacity is called for. 11.19.2 Temperature Differential (TD) Strategy

Drop Leg Temperature Below Minimum Drop Leg Setpoint

If the Drop Leg temperature drops below the mini- mum drop leg temperature setpoint (Drop Leg Min) a decrease will be called for until Drop Leg Temp rises above Drop Leg Min. This protects against the possibility of the Drop Leg Temp falling too low as a result of low plenum temperature.

Plenum Temperature Not Available

If plenum temperature is not available (due to probe or communication failure), control will be based on the Drop Leg Min and Max setpoints. 11.19.4 Configuration

TD Control allows the user to operate a condenser at its designed temperature differential and saves energy by maintaining optimal condenser TD with the least amount of fans on as possible.

TD strategy attempts to maintain a constant difference (i.e., TD setpoint) between the temperature of the refriger- ant and the ambient temperature. The TD setpoint allows you to set the constant that is to be maintained.

Standard discharge pressure control may attempt to operate the condenser below its designed TD and turn on more fans than necessary.

TD strategy uses drop leg temperature for the refriger- ant temperature and plenum temperature for the ambient temperature. The formula for determining the TD control value is:

Set the number of condenser fans to be controlled in the Num Cond Fans field under Setup (4 is the default value). 11.19.5 Setpoints

TD = (dropleg temp) + (dropleg offset*) - plenum temp.

TD setpoints are configured to allow control of the condenser at its designed TD during swings in ambient temperature.

* DropLeg Offset is a user-configured parameter to allow fine-tun-

ing of the drop leg temperature measurement.

In TD condenser control operation, when the TD rises above TD setpoint + (TD deadband / 2), an increase in fan capacity is called for. Similarly, when the TD drops below TD setpoint - (TD deadband / 2), a decrease in fan capac- ity is called for. TD can control up to four condenser fans.

For the Drop Leg Minimum setpoint, if the drop leg temperature falls below this setpoint, condenser fans will be cycled OFF regardless of the value of the TD setpoint.

For the Drop Leg Maximum setpoint, it is the maxi- mum allowable value of the drop leg temperature. If the

Page 191 of the Emerson E2 RX user manual — 11.20.3 Outputs
Page 191 · click to enlarge
Page 191

drop leg temperature rises above this setpoint, the con- denser fans are cycled ON regardless of the value of the TD.

For TD High alarm, the TD alarm setpoint is the value of the TD calculation that, if exceeded, will cause an alarm to be generated. If you wish to generate an alarm for high TD, enter the desired setpoint. Otherwise, to disable this alarm, leave the value set to NONE.

The Drop Leg Offset setpoint is an adjustment entered, if needed, after measuring liquid subcooling dur- ing operation of an individual condensing unit.

For TD Delay, if the TD alarming feature is used, enter the amount of time the TD must be higher than the setpoint before an alarm will be generated (HHH:MM)

The TD setpoint is the optimal difference between the refrigerant drop leg temperature and the ambient (plenum) temperature. When the TD (i.e., drop leg temp + drop leg offset - plenum temp) begins to climb above this setpoint, fans will be cycled ON to bring down the drop leg temper- ature, thus lowering the TD measurement.

11.20 Pulse Accumulation

11.20.1 Overview

The TD deadband setpoint is a range of values around the TD Setpoint within which the value of the TD calcula- tion is acceptable. When the TD rises above the setpoint plus 1/2 the deadband value, fans will begin cycling ON. When the TD falls below the setpoint minus 1/2 the dead- band value, fans will cycle OFF.

The Pulse Accumulation application counts incoming pulses and converts that consumption value into a rate value once per minute. Pulses are user-specified by the Input Type parameter (power, gas, liquid, or volume) to represent what is being measured.

For the Condenser Fan On Delay setpoint, fans are cycled ON when the TD is above the setpoint at the rate set for Condenser Fan On Delay. For example, if this field is set to 30 seconds, each fan is staged ON in 30-second intervals until all fans are ON, or until the TD falls back below the setpoint.

The Pulse Accumulator input can support many types of pulse counting applications, such as flow meters for water and gas applications. In addition, application-spe- cific logging, such as hourly, daily and monthly usages are supported for pulse type inputs. 11.20.2 Configuration

For the Condenser Fan Off Delay setpoint, fans are cycled OFF when the TD is below the setpoint at the rate set for Condenser Fan Off Delay. In other words, if this field is set to 30 seconds, each fan is staged OFF in 30-sec- ond intervals until all fans are OFF, or until the TD rises back above the setpoint. 11.19.6 Inputs

Set the Input Type parameter to the desired measure- ment (power, gas, liquid, or volume).

The Drop Leg Temperature input is the current drop leg temperature used for TD control.

The Plenum Temperature input provides the current value of the ambient temperature used for TD calculation. 11.19.7 Alarms

The analog input connected to the board and point number must be configured as a Pulse Accumulator Type input. The engineering unit of the analog input must match the engineering unit that is being used in the Pulse Accu- mulation application.

For Drop Leg High alarm, the alarm setpoint is the drop leg temperature that, if exceeded, will cause an alarm to be generated. If you wish to generate an alarm for high drop leg temperature, enter the desired setpoint. Other- wise, to disable this alarm, leave the value set to NONE.

For Drop Leg Delay, if the drop leg alarming feature is used, enter the amount of time the drop leg temperature must be higher than the setpoint before an alarm will be generated (HHH:MM).

11.20.3 Outputs

All output information is available from the main Sta- tus screen or from under the Outputs tab in application Setup. Current output status, average output, high trip,

Pulse Accumulation Software Overview • 11-49

Page 192 of the Emerson E2 RX user manual — 11.21.1 Overview
Page 192 · click to enlarge
Page 192

total accumulation, and the last accumulated total informa- tion can be viewed.

trip point output can be controlled by any of three input sources. The output will be turned ON when the input source is equal to or greater than a user-specified value. The total amount of time the application has been in a high trip condition is shown in the Time In Trip Today output.

The current output shows the rate of consumption of the quantity represented by pulses. Average output shows the average rate value accumulated over the period set in the Average Window parameter. The High Limit Trip out- put will turn on if the total accumulation exceeds a user- specified high limit. Total accumulation shows the total accumulated value since the last reset. Last Total output shows the total accumulated value when the last reset occurred. 11.20.4 Accumulator Reset Types

11.21 Irrigation Control

11.21.1 Overview

Irrigation control is an application used for the control- ling of sprinkler systems. This application controls water- ing by duration of time or water usage parameters. Days of the week and times for watering are set by the user with a maximum of two Irrigation applications allowed in the CX controller.

The Pulse Accumulator is a register that is increased by the value of each update of the Quantity Accumulation input. Each time the Accumulator is reset, before clearing, its value is saved to a Last Total output. The type of reset the Accumulator uses can be user-specified with the Accu- mulator Reset Type parameter. The Accumulator can be set to reset at a certain time of day, day of the month, when a high-limit trip occurs, or not to reset at all. 11.20.5 Logging

The master water valve is turned ON and OFF as water is needed for a zone. When disabled, no application con- trol of any outputs will be possible and the System Status output will indicate Disabled.

Under normal control only one zone will be active at a time. 11.21.2 Zones and Cycles

Rate and usage data is logged and stored using applica- tion logging. Data is stored in hourly, daily, and monthly formats. All logged data can be erased from memory by using the Applications Command menu. In addition, appli- cation logs show the total and peak rates of consumption for the last day, hour, and month.

A zone is defined as a single line of irrigation fed from a main water supply valve (i.e., a group of sprinklers that are attached to the same line of irrigation). Up to 16 zones of irrigation per application are supported with six start times for watering. The user will be able to configure each zone to function on different days of the week or odd or even days of the month.

The Hourly log will be updated every hour at the top of the hour and contain data for the last 48 hours. Time, date, total accumulation for that hour, maximum average for that hour, maximum peak value, and time of peak value, are stored in this log.

Zones are turned ON one at a time starting from the first enabled zone. The zone that is ON is considered to be the active zone. Its state is set to ON and its valve output is also set to ON. When the active zone completes its time duration, its state will be set to Done and its valve output set to OFF.

The Daily log will contain data for the last 48 days. Date, total accumulation for that day, maximum average for that day, maximum peak value, time of peak value, and minutes tripped are stored in this log.

For enabled zones that are not active or complete, the states will be set to Pending and the valve output set to OFF.

The Monthly log will contain data for the last 24 months. The log will be updated on a user-specified day of the month. Date, total accumulation for that month, maxi- mum average for that month, maximum peak value, time of peak value, and date of peak value are stored in this log.

A cycle is the sequence of all defined zones irrigating one at a time. A cycle is considered complete when the last defined zone finishes irrigating and shuts OFF. Each zone turns ON one at a time, starting with the first defined zone until the last defined zone in the list turns OFF.

Application graphing generates hourly, daily, and monthly graphs from the application log data. All graphs show the total and max average.

The Number of Zones parameter (with a default value of 4) specifies how many zones the application will use. No two zones are ever ON at the same time; each zone starts and stops independently and waits for the other to finish before another zone starts.

On the main Status screen, consumption for the current hour, day, and month are displayed. 11.20.6 High Trip

A high-trip output can be triggered if the Accumula- tor’s total quantity exceeds a user-defined setpoint. The

Page 193 of the Emerson E2 RX user manual — 11.21.2.1 Cycle Control Types
Page 193 · click to enlarge
Page 193

11.21.2.1 Cycle Control Types

Inhibiting sensors enable a zone to terminate irrigation early when enough water has been dispensed for the cur- rent cycle, or completely removes a zone from the cycle. Each zone is equipped with a digital inhibit input called Zone Inhibit.

By default, Timed cycles are always used unless the user has configured a flow sensor (optional). If a flow sen- sor is configured, a control type parameter will become visible where the user can select either a Timed or Volume cycle control type.

If the inhibit input is ON, the zone status will be set to Inhibit and the valve output will be set to OFF. 11.21.4.1 Timed

During any cycle, the disabled zone states and valve outputs will be set to OFF.

For midnight crossover times, a cycle will be com- pleted if the duration extends into the next day. 11.21.2.2 Timed

If the zone is inhibited for Timed control types, it will be excluded from the cycle. If Zone Inhibit turns ON dur- ing the cycle, control will transfer to the next defined zone. 11.21.4.2 Volume

Instead of start and stop times entered to define the length of time a zone is on, the user enters a duration of time. The default parameter called On Time (with a default value of 2 hours entered in HHH:MM format) is used when a certain length of time is desired for watering. Irrigation begins per cycle start time and lasts for all zone durations that are active for the current day. For example, if a time of 30 minutes (0:30) is entered, that zone will stay ON for 30 minutes and then shut OFF. 11.21.2.3 Volume

For Volume control types, the inhibited zone will be excluded from the cycle only while the inhibit input is ON. If the inhibit input turns off and the cycle is still in prog- ress, the zone’s state will again be set to Pending and will again be included in the cycle. 11.21.4.3 Rain Delay

The rain inhibit input should be connected to a rain sensor and will only function during the ON season. In the event of rain, a programmable rain delay of 0-7 days will prevent irrigation cycles for the user-defined number of days from when the rain sensor has detected rain. Active cycles will not be terminated if the input turns ON; how- ever, Rain Inhibit will begin when the active cycle ends.

Under volume control, enabled zones will be cycled until the set volume of water for each zone has been dis- pensed for the current cycle or an amount of time has elapsed equal to the duration parameter. (This is a feature to prevent water runoff.) When irrigation is stopped for a zone due to elapsed time, control will cycle to the next active zone. 11.21.3 Cycle Scheduling

An entry of 0 days will disable this parameter. 11.21.4.4 Freeze Lockout

An irrigation cycle should be terminated if the current environmental conditions will result in freezing of dis- pensed water. This is to prevent the sheeting of ice on any adjacent paved surfaces or sidewalks, which could create hazardous conditions for motorists and/or pedestrians.

Irrigation cycles can only be started during a user- defined irrigation “season.” The Season Source parameter allows the user to select how to determine the season by either using the Dates parameters or the Summer/Winter input.

Zones are inhibited from watering if the outside air temperature falls below the entered setpoint for Freeze Lockout. 11.21.4.5 Alarm

If the user selects Dates, start and stop day and month parameters will become visible and are used to specify the season. Each zone will have parameters to configure what days of the month it should participate in irrigation cycles. If the user selects Summer/Winter, an input of the same name will become visible under the Inputs tab. The sea- son will be active when this input indicates Summer.

If the zone is inhibited for more than the number of days specified in the Inhibit Alarm setpoint, an Inhibit alarm will be generated for the zone. This alarm will return to normal when the zone is no longer inhibited. 11.21.5 Zone Bypass Inputs

The Summer/Winter input is automatically connected to the Global Data output of the same name.

Each zone has a digital bypass input called Zone Bypass Inputs. A zone can be bypassed to ON at any time while the application is enabled. A zone cannot be bypassed to OFF.

If the season is not active, the System status will be set to Off Season and no normal or manual cycles will be possible. This prevents accidental cycles from occurring after the system has been “winterized.” 11.21.4 Zone Inhibit

When a zone is bypassed to ON, the main water valve will be turned ON immediately.

Irrigation Control Software Overview • 11-51

Page 194 of the Emerson E2 RX user manual — 11.21.6.1 Leak Test
Page 194 · click to enlarge
Page 194

11.21.5.1 Bypass Failsafe

11.21.8 Heat Cut In/Cut Out Setpoints For Each Stage

While each zone is bypassed to ON, a timer is checked. If time has elapsed equal to or greater than the zone’s cycle duration parameter, the bypass input will be ignored and the zone will return to normal operation.

If the current space temperature is greater than or equal to the heat stage Cut Out setpoint, or the individual cool- ing stage is currently ON due to a call for cooling (Cut In setpoint or dehumidification), and the current space tem- perature is greater than the individual COOL stage Cut In setpoint, then begin turning the stage OFF by starting the heat stage Off Delay countdown timer.

For a zone in Bypass Failsafe, its bypass input must be set to OFF or NONE to reset the Bypass Failsafe and to use the bypass input again. 11.21.6 Flow Sensor-Related Tests

Or if the current space temperature is less than or equal to the heat stage Cut In setpoint, begin turning the stage ON by starting the heat stage On Delay countdown timer. 11.21.9 Cool Cut In/Cut Out Set- points For Each Stage

11.21.6.1 Leak Test

For both Timed and Volume control types, if a flow sensor is configured, water flow will be checked via a leak test that is performed at the beginning of the cycle. During the leak test the main water valve will be turned ON and all zone valves will be set to OFF. After an amount of time has elapsed equal to the Flow Alarm Delay, the Water Flow input will be compared to the Minimum Flow for Alarm setpoint. If the water flow is greater than the set- point, the flow alarm output will be set to ON and a Leak alarm will be generated. If a Leak alarm occurs the cycle will terminate. While a Leak alarm is active, no normal cycles will run and the system status will be set to Leak Detected.

If the current space temperature is less than or equal to the cool stage Cut Out setpoint, begin turning the cool stage OFF by starting the cool stage Off Delay countdown timer. If the current space temperature is greater than or equal to the Cut In setpoint, begin turning the cool stage ON by starting the cool stage On Delay countdown timer. 11.21.10 Dehumidification Control

Dehumidification control is implemented on an AHU basis, not individual cooling or heating stages. Because of implementation on an AHU basis, dehumidification con- trol is “woven” throughout the cool Cut In/Cut Out as well as the heating Cut In/Cut Out control algorithms by calling for increases or decreases in heating and cooling capaci- ties. The dehumidification algorithm does not directly change the states of the heating or cooling, instead it “influences” the staging process by calling for more, less, or the same amount of cooling, and limit the amount of heat used if a call for heating is necessary during dehumid- ification.

A Leak alarm must be cleared by the user or the alarm will return to normal after passing a leak test run by a manual cycle. If an enabled zone is overridden to ON dur- ing a leak test, it will cause the test to fail, resulting in a false alarm. 11.21.6.2 Obstructed Zone Test

When a zone becomes active during a cycle, a timer is reset. After time has elapsed equal to the flow alarm delay, the water flow input will be compared to the Min Flow alarm setpoint. If the water flow is less than the setpoint, the flow alarm setpoint output will be set to ON, an Obstructed alarm generated, and the zone will be removed from the current cycle. 11.21.7 Service Modes

If the current space temperature is less than the dehu- midification minimum space temperature, call for the end of dehumidification.

If the current control value used for dehumidification is greater than the dehumidification setpoint plus the dead- band divided by two (2), call for an increase in dehumidi- fication capacity.

The Service Check cycle allows a service technician to visually look for malfunctioning valves and leaks by cycling each zone ON one at a time, starting with the first zone. The active zone uses the Service On Time parame- ter and remains ON for the programmable time period entered for Service On Time.

If the current control value used for dehumidification is less than the dehumidification setpoint minus the dehu- midification deadband divided by two (2), call for a decrease in dehumidification capacity. 11.21.11 Two Speed Fan Control

While in the Service Check cycle, any active irrigation cycles will be terminated. The Service Check cycle will continue looping until stopped by the user or the program- mable value in the Suspnd Failsafe field is reached.

To determine proper fan speed, determine which heat- ing and cooling stages are ON and if the user has set any of the fan speeds for those stages to High. If any of the

Page 195 of the Emerson E2 RX user manual — 11.22 Flexible Combiner
Page 195 · click to enlarge
Page 195

stages have been set to High, then the fan speed should be set to High; otherwise, the fan speed should be set to Low.

biner manual (P/N 026-1620).

If for any reason the algorithm thinks that the high speed and the low speed should both be ON, the high- speed fan should be turned ON only.

11.23 Modular Chiller Control (MCC)

Proper fan speed should be set when there are no heat- ing or cooling stages ON, and the Fan Always On Setpoint is enabled. 11.21.12 Configuration

The Modular Chiller Control is available for the E2 RX model controllers version 2.82 and above. In the RX- 300, a maximum of one MCC is allowed. In the RX-400, a maximum of two MCCs are allowed. 11.23.1 Overview

Set the Strategy type under application Setup under the General tab to Separate Setpoints. Enter the desired val- ues for heating and cooling stages. Cooling, heating, alarm, and miscellaneous setpoints can be edited under additional tabs. Press Control + zero (0) while the More tab is highlighted to bring up the list of additional tabs.

A Modular Chiller is made up of a single compressor connected to a brazed plate heat exchanger that provides a chilled water and glycol mixture for cooling display cases and coolers. Multiple Modular Chillers are connected together to meet the capacity requirements of the system. Modular Chillers are designed to provide cooling by paral- leling the hydronics side of the secondary system instead of the refrigeration side of the system. These units also use a water and glycol mixture as a condensing fluid for com- pressor heat of rejection. This design eliminates the long refrigerant piping runs thereby significantly reducing re- frigerant charge.

11.22 Flexible Combiner

The Flexible Combiner application, a new feature of E2 versions 2.20 and above, is a highly advanced and ver- satile I/O control program used to combine multiple ana- log and digital input values using programmed equations similar to those used in spreadsheets.

A Flexible Combiner application may have up to eight analog outputs and four digital outputs, each of whose val- ues are determined by user-programmed equations that mathematically combine up to eight analog inputs and eight digital inputs. Four of the analog outputs have the ability to remember their output state over an E2 power cycle. Additionally, up to four alarms can be set up whose trigger and alarm delays are equations. Alarm type, prior- ity, and the message for each alarm are user-configurable.

Equations used to calculate output values and time delays may use mathematical combinations of any of the Flexible Combiner's analog and digital inputs, as well as numeric and named constants, operators, functions, and even rudimentary if-then logic functions. For control of digital outputs, the Flexible Combiner also supports sepa- rate equations that determine ON and OFF delays.

For E2 versions 2.40 and above, the user can set up to four alarms whose trigger and alarm delays are equations. The user may also choose the alarm type, priority, and the message for each alarm.

The Flexible Combiner may also be programmed to operate a digital output as a PWM (pulse width modula- tion) output. In this instance, the equation written for a PWM output determines its period and pulse width. A typ- ical Flexible Combiner application consists of three types of components: inputs, equations, and outputs. For more information about this application, see the Flexible Com-

Flexible Combiner Software Overview • 11-53

Page 196 of the Emerson E2 RX user manual — 11.23.2 Learning Mode
Page 196 · click to enlarge
Page 196
Emerson E2 RX — 11.23.2 Learning Mode diagram (page 196)
Fig. 204 · 11.23.2 Learning Mode

Figure 11-1 - Compact Chiller System

11.23.2 Learning Mode

11.23.4 Compressor Control

When an MCC application runs for the first time, it undergoes a "Learning Mode" period to collect data on the chiller stages. During Learning Mode, the MCC will con- trol the chilled water temperature, but it will purposely cycle the chiller stages in different combinations to mea- sure the effect they have on the temperature input value.

MCC can utilize up to 32 compressors for maintaining the chilled supply temperature at a user specified setpoint. This is accomplished by either turning on or off any of the compressors defined in the application. As Supply Tem- perature rises above setpoint, compressors will be turned ON. As Supply Temperature falls below setpoint, com- pressors will be turned OFF. The Chilled Supply Tempera- ture sensor should be located very close to the Compressor Control Unit so no minimal control lag is expected to be present.

The Learning Mode lasts for several minutes. After Learning Mode ends, the MCC will require up to 24 hours of operation before compressor cycling is operating at maximum efficiency. If compressor cycling seems too fre- quent after 24 hours of operation, you may reduce com- pressor cycling by changing the Control/Cycles parameter. 11.23.3 The Control/Cycles Parame- ter

When a compressor has been shut down on an alarm, the compressor will remain out of the active rotation until the alarm has been cleared. Additionally, the user will have the option of specifying that the alarmed compressor be re-tried the next time it comes up in the rotation. To prevent damage to a compressor, the user will have the option of specifying a number of trips per day before the compressor is permanently locked out. Once this condition has occurred, the compressor alarm will require a manual reset to bring it back into the active rotation.

The MCC has one parameter with five preset settings to allow users to alter temperature control performance or compressor cycling frequency. The default setting, "Mod- erate Control," seeks to balance good temperature control with efficient cycling. If tighter control is needed, setting the field to "Tight Control" or "Tightest Control" will increase the application's reaction to temperature changes, resulting in tighter control (usually at the expense of more frequent cycling). If fewer compressor cycles are desired, setting the field to "Less Cycling" or "Least Cycling" will decrease the number of cycles but also increase the amount of fluctuation in the temperature control.

The controller will monitor the Chilled Differential Pressure and if it falls below a user specified threshold, the controller will start to shut down compressors one at a time based on a user specified time delay. This shutdown operation will be suspended if the Chilled Differential Pressure rises above a user defined setpoint.

Page 197 of the Emerson E2 RX user manual — 11.23.4.1 Digital Scroll Compressor
Page 197 · click to enlarge
Page 197

11.23.4.1 Digital Scroll Compressor

11.24 Boiler

MCC can also utilize a single Digital Scroll Compres- sor. The assumption is that one of the Compressor Control Modules in the system may have a digital scroll instead of a standard scroll compressor installed. The Digital Scroll Compressor may not be the same size as the fixed scroll compressors. When a Digital Scroll Compressor is defined in the application, MCC will utilize the compressor con- trol modules with the digital scroll at all times, modulating the capacity of the compressor to maintain the Chilled Supply Temperature setpoint. All other compressor con- trol modules will be turned ON or OFF based on the rota- tion sequence defined above. Based on this strategy, the digital scroll compressor will have the fewest cycle counts and the most runtime of all the compressors in the system. 11.23.4.2 Variable Frequency Drive Com- pressor

The BX-300 and BX-400 will default to a maximum of two Boiler applications. Other models will have to license the Boiler Application. The Boiler will be available only for E2 versions 3.0 and higher. 11.24.1 Overview

The Boiler can be controlled two ways, via the boiler temperature or the boiler pressure. The E2 uses the current outside air temperature to calculate a new boiler control setpoint. If the boiler temperature (or boiler pressure) is less than the setpoint value then the boiler is turned ON. Otherwise it is turned OFF. The algorithm will work in an inverted fashion if the Minimum Outside Air Temperature is greater than the Maximum Outside Air Temperature.

MCC can utilize one compressor with a variable fre- quency drive. The method of control will be similar to the digital compressor strategy. The application will continue to allow only one variable capacity device to be defined in the system, making the Variable Frequency Drive and Dig- ital compressor options mutually exclusive.

Emerson E2 RX — 11.23.4.1 Digital Scroll Compressor diagram (page 197)
Fig. 205 · 11.23.4.1 Digital Scroll Compressor

If a Variable Frequency Drive compressor is to be used and it is a Control Techniques drive using the Modbus communication interface, the Control Techniques Drive association menu will support associating the drive to an MCC. 11.23.4.3 Unequal Capacity Compressors

Figure 11-1 - Temperature Ranges

Optionally, the MCC can support different capacity compressors. When this option is selected, the capacity of each defined compressor will be user specified. The con- troller will evaluate the capacities of all the compressors to determine the appropriate compressor to switch on or off in order to maintain the Supply Temperature at setpoint.

An Outside Air Temperature Boiler On and an Outside Air Temperature Boiler Off can be defined. If the outside air temperature is lower than the Outside Air Temperature Boiler On the boiler is turned ON. If the outside air tem- perature is higher than the Outside Air Temperature Boiler Off the boiler is turned OFF.

When unequal capacity compressors are defined, the controller will not use a simple round robin approach to switching compressors on or off (as with equal capacity compressors) and therefore compressor runtimes may vary significantly over time. However, for those compressors defined with identical capacity, the algorithm will attempt to keep both runtimes and cycle counts as even as possi- ble. 11.23.5 Bypass Valve Control

If defined, the Outside Air Temperature Boiler Off must be greater than the Outside Air Temperature Boiler On. 11.24.2 Alarms

There are four advisory generated by the Boiler Appli- cation:

  • High Temperature
  • Low Temperature

MCC can utilize the Chilled and Condenser Bypass Valves. These valves will be modulated to maintain user defined differential setpoints. For each valve, as the differ- ential pressure rises above the setpoint, the valve will modulate open. When the differential pressure falls below setpoint, the valve will modulate closed.

  • High Pressure
  • Low Pressure

Each advisory will have an associated type, priority, and delay.

Boiler Software Overview • 11-55

Page 198 of the Emerson E2 RX user manual — 11.26 Detailed Setpoint Change Logging
Page 198 · click to enlarge
Page 198

11.25 Refrigerant Monitoring System (RMS)

  • Close Ticket - Select to confirm charging, reclaiming or changing refrigerant. An ending weight, and the total accumulated weight will be displayed. If an RMS Scale is not present, manually input the ending weight and the starting weight of the cylinders. Close Ticket will open the Charge Asset or Reclaim Refrigerant Ticket screen depending on which action is being performed. If adding or removing refrigerant, the refrigerant ticket screen should be filled out. Press F1 to send.

The RMS enables the E2 ability to measure the refrig- erant used to add, remove and repair an asset that has a refrigerant charge. RMS is available for E2 versions 3.01 and above. The RMS comes with two components that are installed together, the RMS asset and the RMS scale. A total of 99 RMS applications can be supported by the E2. The RMS is a licensed application. For licensing instruc- tions, refer to the software licensing section (see Section 10.15, License Management).When an RMS Asset is licensed, this automatically includes one RMS Scale. 11.25.1 RMS Asset

  • Cancel Ticket - Select to cancel the process. An entry for a reason for cancelling the ticket will be required. An entry will be written to the log.

Refrigerant Ticket - When changing, adding, or removing refrigerant, the RMS Ticket screen for charges or reclaims (depending on whether refrigerant is added or removed) is filled out. Press F1 to send. 11.25.2 RMS Scale

There will be one E2 RMS asset instance for each refrigerant charged asset. A refrigerant-charged asset can include HVAC, Rack, and Small Appliance.

The RMS asset can perform the following functions;

The RMS scale used for weighing the refrigerant tank for a specific asset. The RMS scale communicates using MODBUS. The RMS scale will appear as a device in the device summary list and will be consistent with other devices and their online/offline status. 11.25.2.1 Device Constraints

  • Charge Asset - The asset will be filled with refrigerant. The Cylinder Accumulated Weight and the Total Accumulated Weight will be reset to 0.0. If an RMS Scale is not present, manually input the ending weight and the starting weight of the cylinders. (This applies during charging or reclaim, if more than one cylinder is needed.) (Note to cancel charging, press Enter from the Status screen and select Application Commands, 3. Close Ticket . Enter a reason in the Tech Comment field and press F10 to cancel the charge.)

The RMS scale communicates using the ASCII MOD- BUS protocol. It can exist on the same MODBUS route as RTU MODBUS devices as long as the baud rate, and serial settings are the same ( # of bits, Parity, # of Stop Bits). On a mixed network (RTU and ASCII MODBUS) address 58 is not supported. 58 is the ASCII value for a “:”

  • Reclaim Refrigerant - The refrigerant will be removed from the asset. The Cylinder Accumulated Weight and the Total Accumulated Weight will be reset to 0.0. If an RMS Scale is not present, manually input the ending weight and the starting weight of the cylinders. (This applies during charging or reclaim, if more than one cylinder is needed.) (Note to cancel charging, press Enter from the Status screen and select Application Commands, 3. Close Ticket . Enter a reason in the Tech Comment field and press F10 to cancel the charge.)

11.26 Detailed Setpoint Change Logging

Detailed Setpoint Change Logging stores in a log any setpoints that change, when the setpoint was changed, what the original value was, and what the value was changed to.

The log is always enabled except for start-up and restore and cannot be disabled by the user. This data is retrieved and displayed on the E2 front panel. 11.26.1 Log Information

  • Change Cylinder/New Cylinder - The container of refrigerant will be removed and replaced with a new one. If an RMS Scale is not present, manually input the ending weight and the starting weight of the cylinders. (This applies during charging or reclaim, if more than one cylinder is needed.) (Note to cancel charging, press Enter from the Status screen and select Application Commands, 3. Close Ticket . Enter a reason in the Tech Comment field and press F10 to cancel the charge.)

The following information will be stored for detailed setpoint change logging:

  • Time Stamp – the time and date of the setpoint change in local time.
  • Port – the port the change was made through.
Page 199 of the Emerson E2 RX user manual — 11.26.3 Unlogged Changes
Page 199 · click to enlarge
Page 199
  • User – the user name.
  • Application Name – the name of the cell that was changed.
  • Property Name – The name of the property that was changed.
  • From – The value of the setpoint
  • To – The new value of the setpoint 11.26.2 Logged Changes

A log will be appended with changes as they occur:

  • Any setpoints that are directly changed by a user.
  • Custom property values that are changed. These properties are changed by the system as a result of a user changing a value. These will be logged as changed by the user.
  • Application inputs that are set as fixed values and changed by user.
  • User Associations
  • Changes in input/output pointers.

11.26.3 Unlogged Changes

There are some kinds of changes that occur that will not have logs created for them:

  • User overrides – Overrides are input/output changes to the value outside of the setup screen or application control.
  • Real-time value on cell inputs that are connected to other application outputs.

Detailed Setpoint Change Logging Software Overview • 11-57

Page 200 of the Emerson E2 RX user manual — 11.26.2 Logged Changes
Page 200 · click to enlarge
Page 200
Page 200 of the Emerson E2 RX user manual — 11.26.2 Logged Changes
Page 201 of the Emerson E2 RX user manual — 12 Operator’s Guide to Using the E2
Page 201 · click to enlarge
Page 201

12 Operator’s Guide to Using the E2

12.1 The E2 Home Screen

To the right of the Suction Groups section is the Circuit Status section. Both the Standard Circuits and the Case Controllers are listed in this screen. The circuit names, their current status, and temperatures are listed.

The Main Status or Home screen (Figure 12-1 and Figure 12-2) is divided into sections that display the cur- rent status in areas of importance in the system (i.e., for RX: suction groups, compressor stages active, circuits, condensers, sensor control, and for BX: OAT, demand control, power monitoring, light schedules, zones, AHUs, and sensor control). Time, date, and alarm status are dis- played along the top of the screen. The display is backlit, but turns off to save energy after a determined amount of time. Press any key to bring the display back up.

This section is located at the bottom left of the screen and contains information on the status of the condenser, such as the discharge setpoint and individual fan states.

Below the Circuits section at the bottom right of the screen is the Sensor Control section where Control Value and Command information are displayed. 12.1.2 BX Home Screen

The Home screen acts as a master and default screen for all the functions of E2 and can be customized accord- ing to the user’s needs (see Section 12.5, Customizing the Home Screen). 12.1.1 RX Home Screen

Emerson E2 RX — 12 Operator’s Guide to Using the E2 diagram (page 201)
Fig. 206 · 12 Operator’s Guide to Using the E2
Emerson E2 RX — 12 Operator’s Guide to Using the E2 diagram (page 201)
Fig. 207 · 12 Operator’s Guide to Using the E2

Figure 12-1 - RX Home Screen

Figure 12-2 - BX Home Screen

The first section of the RX Home screen is the Suction Groups section located in the top left corner. The large let- ters have the name of Suction Group 1 along with infor- mation on compressor stages active, and the current pressure setpoint. Setpoints, status, percentages of capaci- ties, and which stages are active for each suction group are displayed as well. The suction group that is displayed in the large block at the top left of the screen is the group that is named alphabetically first of the suction groups.

The upper-left hand section of the BX Home screen contains status information for four different values, including outside air temperature, humidity percentage, season, and light level.

Directly below the OAT section is demand control sta- tus information, which shows the number of applications and number of loads being shed.

The E2 Home Screen Operator’s Guide to Using the E2 • 12-1

Show 6 more labels / short text on this page
Circuit Status Section · Condenser Section · Sensor Control · Suction Groups Section · OAT Section · Demand Control Section
Page 202 of the Emerson E2 RX user manual — 12.2 Logging On and Access Levels
Page 202 · click to enlarge
Page 202

current temperature of standard circuits.

In the lowest left-hand corner of the BX Home screen is the power monitoring section, containing active KW and average power information.

The top right-hand corner of the screen shows the sta- tus of the Demand Control application.

In the center of the BX Home screen is ON and OFF status information for light schedules.

The middle right-hand section of the screen shows name and percent ON information for each anti-sweat application.

Air Handling Units Section

Located at the top right-hand corner of the BX Home screen, the AHU section shows the number of AHUs, tem- perature, state, and ASP information for each.

The bottom center section of the screen shows both analog and digital sensor control, name, and command output.

Directly below the AHU section is the Zones section, which shows the number of zones, temperature, whether or not the application is in occupied mode, CSP and HSP.

The lower right-hand section of the screen shows the name and current status of time schedules.

Sensor Control is at the bottom right-hand corner of the BX Home screen and contains analog and digital sen- sors, value, command, and status information. 12.1.3 CX Home Screen

12.2 Logging On and Access Levels

An E2 may be programmed with up to 25 different users. A user basically consists of a username, a password, and an access level. Whenever a username and password are entered during login, the E2 searches the user records for the username and password. If found, the E2 will log the user in at the access level configured for the user in the user records.

Emerson E2 RX — 12.2 Logging On and Access Levels diagram (page 202)
Fig. 208 · 12.2 Logging On and Access Levels

The access level determines how many of the E2’s fea- tures the user may use. The E2 uses four access levels, one being the lowest, and four being the highest. Table 12-1 gives a description of each level and the capabilities they have access to.

Level 1 Read-only access. Users may generally only view status screens, setpoints, and some system settings.

Anti-Sweat Sensor Control Time Schedules

7 HVAC Control Refrigeration

Level 2 Setpoint and bypass access. Users may perform all the tasks a level 1 user may, and they may also change control setpoints and bypass some devices.

Figure 12-3 - CX Home Screen

The lower left-hand corner of the screen shows name and bypass output for the lighting circuits.

Level 3 Configuration and override access. Users may perform all the tasks a level 2 user may, and they may also override system settings, create new cells, and program new applications.

The top left-hand corner of the screen shows whether the fans are ON or OFF, state, and dehumidification status of the first two air handlers in the sequence.

Level 4 System Administrator access. All E2 func- tions are accessible by a level 4 user.

Table 12-1 - User Access Levels

The top center of the screen shows the name, state, and

Show 13 more labels / short text on this page
Power Monitoring Section · Demand Control Section · Light Schedules Section · Anti-Sweat Control Section · Sensor Control Section · Zones Section · Time Schedules Section · Sensor Control Section · Lighting · Demand Control · Lighting Control Section · HVAC Control Section · Refrigeration Control Section
Page 203 of the Emerson E2 RX user manual — 2. Press (System Configuration)
Page 203 · click to enlarge
Page 203

12.3 Toggling Full Options

The System Configuration Menu

Toggling Full Options on allows you to have full access to programming applications. To Toggle Full Options on:

1. Press the key

2. Select (System Configuration)

3. Select (System Information)

4. Select (Toggle Full Options)

FULL will appear in the top right corner of the screen

when Full Options is enabled. Pressing toggles Full Options on and off.

12.4 Navigation

12.4.1 Menus

Figure 12-5 - System Configuration Menu

The Main Menu is accessed by pressing the key. This menu gives you direct access to applications such as Suction Groups, Condensers, Circuits, Air Han- dling Units, Zones, Light Schedules, and Sensor Controls applications, (depending on which controller type you are using) as well as all configured applications in the control- ler. The Main Menu also allows you to add and delete applications, gives system configuration abilities, and shows status information for inputs and outputs, network, graphs and logs.

The System Configuration Menu is one of the menus used to set up the E2. Included options are Input/Output Definitions, internal system information, remote commu- nications, global data, alarm, logging, and network setup information.

To open the System Configuration menu:

1. Press

2. Press (System Configuration)

The System Configuration menu contains nine menu items:

1. Input Definitions View the status of all input boards, as well as set up individual points on the I/O boards.
2. Output Definitions View the status of all output boards, as well as set up individual points on the I/O boards.
3. System Information Menu that gives access to more E2 setup options and information.
4. Remote Communications

Gives access to modem informa- tion, dial-out setup, and TCP/IP.

Table 12-2 - System Configuration Menu Options

Figure 12-4 - Main Menu

Toggling Full Options Operator’s Guide to Using the E2 • 12-3

Main Menu · Menu Option Description

Page 204 of the Emerson E2 RX user manual — 3. Press (System Information)
Page 204 · click to enlarge
Page 204

The System Information Menu is another menu used to set up the E2. The options in this menu allow setting up time and date, passwords, toggle full options, general information about the controller, and other important data.

5. Alarm Setup Set up dial-outs and alarm reporting for the current E2.
6. Logging Setup Enter information about Logging Group applications such as the sampling frequency and total number of samples.

To open the System Information Menu:

1. Press

2. Press (System Configuration)

7. Network Setup Accesses the Network Setup menu where you can view and/or change the configuration of the Echelon and RS485 I/O Networks, set up boards, controllers, routers, and make controller associations.

3. Press (System Information)

The System Information menu contains nine menu items:

8. Global Data Configure one or more analog or digital sensors to be used as “global” values by all E2s.
1. General Controller Info Edit general information about the E2, such as engineering units, and summer/winter change-over specifications.
9. Licensing Select this option to access the License Report screen that lists all the applications in E2 that are currently licensed and the number of each type of applications that are in use. You can also add additional licenses by pressing F1.
2. Time and Date Change the current date and time, and specify date formats.
3. Passwords/User Access Set up usernames and passwords, and define security level requirements.

Table 12-2 - System Configuration Menu Options

4. Firmware Revision Read-only information screen that contains current system version information
5. Service Actions Set up system diagnostics (memory and execution info), and perform advanced functions (system resets and firmware update).

The System Information Menu

6. Note Pad Writable field for technician to make notes about changes made or general information.
7. Display Users Enter information about Logging Group applications such as the sampling frequency and total number of samples.
8. Toggle Full Options When set to on, FULL will appear at the top right of the screen and gives user full access to options and applications.
9. Application Default Value Setup

Choose the default values most appropriate to the refrigeration control components in the sys- tem.

Figure 12-6 - System Information Menu

Table 12-3 - System Information Menu Options

The System Information menu is used to set up the E2. The options in this menu allow setting up time and date, passwords, toggle full options, general information about the controller, and other important data.

Functions such as graphing, point logging, overriding, expanded information, setup, detailed status, and manual

Menu Option Description · Menu Option Description · Actions Menu

Page 205 of the Emerson E2 RX user manual — 12.4.2 Screen Types
Page 205 · click to enlarge
Page 205

defrosting can be initiated from the Actions Menu box by pressing the key from the Home screen or any sta- tus screen. When you press the Enter key, only the options that are appropriate to the current field and application will be displayed; all others will be hidden.

Emerson E2 RX — 12.4.2 Screen Types diagram (page 205)
Fig. 209 · 12.4.2 Screen Types

For example, if Enter is pressed when a circuit is high- lighted, the Actions Menu would display all available options for that circuit, such as Manual Defrost, meaning that by selecting Manual Defrost the Manual Defrost screen would come up for that particular circuit.

Emerson E2 RX — 12.4.2 Screen Types diagram (page 205)
Fig. 210 · 12.4.2 Screen Types

Figure 12-9 - Summary Screen (RX-400 Version Shown)

Figure 12-7 - Example Actions Menu for Standard Circuit

Status screens are real-time views of application func- tions. They show the current status of all outputs, the cur- rent values of all inputs, and other important data such as control setpoints, run times, and whether or not bypasses or overrides are active.

Emerson E2 RX — 12.4.2 Screen Types diagram (page 205)
Fig. 211 · 12.4.2 Screen Types

Each status screen is specially designed to provide a concise at-a-glance view of how one or more systems are functioning.

Figure 12-8 - Example Actions Menu for Suction Group Value

12.4.2 Screen Types

Summary screens let you view status information for multiple applications of the same type. For example, (Fig- ure 12-9) is the Circuits Summary screen in the E2 RX controller. This screen shows the name, state, temperature, setpoint, alarm, refrigeration, and defrost information for all defined standard and case control circuits displayed. To see a more detailed status when on an application sum- mary screen, highlight the desired application from the list with the arrow keys and press . This will take you to the Status screen.

Figure 12-10 - Status Screen (RX-400 Version Shown)

The Setup utility is the interface used to change set-

Navigation Operator’s Guide to Using the E2 • 12-5

Status Screens · Summary Screens · Setup Screens

Page 206 of the Emerson E2 RX user manual — 12.4.3 The E2 Keypad
Page 206 · click to enlarge
Page 206

tings and setpoints, and define inputs and outputs in the E2. Figure 10-11 shows a typical Setup screen and its pri- mary elements.

Header Icons:

Index Tabs:

Figure 12-12 - Header Icons

At the very top of every screen in the E2, there are icons that indicate various stages of activity, number of users logged into the controller, battery alerts, connectivity status, and more.

Emerson E2 RX — 12.4.3 The E2 Keypad diagram (page 206)
Fig. 212 · 12.4.3 The E2 Keypad

Figure 12-11 - Index Tabs (RX-400 Version Shown)

The 10 boxes at the top of the screen labeled C1 through C0 are known as the index tabs. These tabs pro- vide you with a short index of the screens that are used to set up an application. C1 through C0 represent the screen numbers (C1 being screen 1, C2 being screen 2, and so

Battery indicator. Yellowless than 30% of battery life left. Red: less than 10% of bat-

tery life left or battery switch is disabled.

on.) Press the key and the number of the index tab (next to the C) and the cursor highlights that index tab.

Single user is logged in

Multi-users are logged in

Each of the Setup screens that you may access will have a name beside its number. In Figure 10-11, for exam- ple, you will notice some tabs have names, while others are blank. This is because there are only four screens in the Setup for this particular application; C3 is not an accessi- ble screen.

Terminal mode in use

E2 is connected to Ethernet

Wait, or system is busy

Disk activity, or saving to disk

There are several reasons why a tab may be inaccessi- ble (i.e., without a name next to the number):

Caps lock is ON

  • The tab (and the corresponding screen) is unused and reserved for later revisions.

Table 12-4 - Header Icons and Descriptions

  • The screen may only be accessed when running in Full Options mode (see Section 12.2, Logging On and Access Levels ).
Emerson E2 RX — 12.4.3 The E2 Keypad diagram (page 206)
Fig. 213 · 12.4.3 The E2 Keypad
  • The screen may require one or more fields to be set to certain values before the screen may be accessed. For example, a screen containing nothing but compressor proof input definitions might be hidden if there is a field on another screen that tells the system there are no proof checking devices on the group’s compressors. To access this screen, you would have to set this field to YES .

The screen you are currently in is always highlighted in the screen’s index tab. For example, because Screen 1 is displayed, tab C1 is highlighted.

As you move to other screens within Setup, the high- light will move to different tabs to indicate which screen will be displayed.

Figure 12-13 - Setup Screen (RX-400 Version Shown)

12.4.3 The E2 Keypad

The cursor highlights individual fields on the E2

Icon Description · The Cursor

Page 207 of the Emerson E2 RX user manual — CANCEL
Page 207 · click to enlarge
Page 207

screen, allowing you to change their contents and/or select them to perform other functions like viewing logs/graphs or setting alarm parameters. The E2 includes arrow keys for the user to easily navigate the cursor around each screen. Areas can be accessed for detailed information and certain functions by guiding the cursor with the arrow keys.

Key RX Function BX Function

SUCTION GROUP AHU

CONDENSERS ZONES

LIGHTING

CIRCUITS

When an E2 screen is split into multiple areas (like the

SENSOR CONTROL,

SENSORS

default Main Status screen), the Tab key moves the cursor to each section of the current screen. The border around each section is highlighted by the cursor so the user will know which section the cursor is on.

POWER MONITORING

SETUP, CANCEL SETUP, CAN-

CEL

Table 12-6 - Function Keys for Status Screens

Pressing the key from the Home screen or any application status screen will pop up the Actions Menu. If an option is highlighted when is pressed, that high-

Key Function The Help key opens the Help menu

lighted option is selected. Pressing on an applica- tion summary screen will bring you to the status screen of that application.

The Alarms key opens the Alarms Advi-

sory Log The Home key opens the Home screen

The Menu key opens the Main Menu

Key RX and BX Function Description

The Back key moves you back to the

PREV TAB Moves backward one

Table 12-7 - Icon Function Keys

NEXT TAB Moves forward one

  • The Help key opens a pop-up window containing either information about the screen or menu you are currently on, or information about the input, output, or setpoint you have highlighted with the cursor (if available). After the Help key has been pressed, will open the General Help menu containing Troubleshooting options. Press the and keys together at any time to open General Help.

EDIT Opens the Edit Menu

STATUS, OVER- RIDE, or LOOK UP

Opens the Detailed Status screen, Opens

screen, or Look Up

Opens the Setup screens, or Cancels

CANCEL

  • The Alarms key displays the alarm advisory log that shows all the current alarms in the E2.

Table 12-5 - Function Keys for Setup Screens

  • When the Home key is pressed from any location, the Home screen opens.
  • When the Menu key is pressed from any location, the Main Menu opens.
  • The Back key will take you to the previous screen.

Pressing from an application status screen, Home screen, or Input/Output Status screen brings up the

Navigation Operator’s Guide to Using the E2 • 12-7

Show 12 more labels / short text on this page
STANDARD and CASE · The Tab Key · The Enter Key · Keypad · previous screen · screen · screen · box · the Override Update · Tables · SETUP, or · an operation
Page 208 of the Emerson E2 RX user manual — + Maintenance Log
Page 208 · click to enlarge
Page 208

Actions Menu and gives the user access to controller func- tions such as graphing, logging, setup, and detailed status.

The Log In/Out Key

The Log In/Out key brings up the current E2 User Login Screen when logging in. If the Log In/Out key is pressed in order to log out and there is data on the screen that has been edited and not saved, a dialog box opens asking if the data should be saved. If Yes is selected, the data is saved, the user is logged out and returned to the Home screen. If No is selected, the dialog box closes and the screen is refreshed as necessary. Press- ing the Log In/Out key in order to log out when no data needs to be saved simply logs the user out and returns to the Home screen.

Application + All Applications

+ AHU Summary

+ Time Schedule Summary

+ Sensor Control Summary

+ Lighting Control

+ Power Monitoring

+ ARTC/RTU Summary

Four Directional Arrow Keys

Directional arrow keys move the cursor in the direction of the arrow pressed. The arrow keys are always func- tional on menus and can be used to move from section to section on the Home and Status screens.

+ HVAC Zones Summary

+ Suction Summary

+ Case Control Summary

Page Up/Page Down Keys

+ TD3 summary

The Page Up and Page Down keys scroll the user through menus, application summary screens, and setup screens too large to fit on one screen.

+ Case Control Summary

+ Condenser Summary

Ctrl Page Up/Ctrl Page Down Keys

+ Time Schedule Summary

The Ctrl Page Up or Ctrl Page Down keys on an application setup screen take the user to the next or previous application on the same screen.

+ Sensor Control Summary

+ Power Monitoring

+ Suction Summary

The numeric keypad is fully functional from both the front panel and an external keyboard.

+ Circuit Summary

General + Global Data Status

Hot Keys are quick and easy shortcuts to frequently used functions and applications. For a complete menu screen that lists all Hot Keys and how to access them, press the key and the key together.

+ Expanded Info

+ Graph Current Application

Use the control keys to access Insert Mode, Edit

Mode, and Names. Pressing and (INS will appear on the top right of the screen) activates Insert Mode. Insert Mode toggles between Insert and Overwrite edit modes.

+ Input Definitions

+ Output Definitions

+ Log Current Application

Pressing and (ED will appear on the top right of the screen) activates Edit Mode. Edit Mode allows you to change the name of the application to something besides

+ Maintenance Log

the name of the application and the number. Pressing

System + Add/Delete Application

and (NAMES will appear on the top right of the screen) switches from a Point number to a Point Name when setting up Board and Points in a Setup screen.

Table 12-8 - Shortcut Keys

Keys Function · Numeric Keypad · Hot Keys

Page 209 of the Emerson E2 RX user manual — 12.6 Manual Defrost and Clean Mode
Page 209 · click to enlarge
Page 209

12.5 Customizing the Home Screen

+ Toggle Full Options

+ Serial Setup

The Home screen can be customized to show different information depending on the user’s needs. If you wish to change the Home screen from the default screen, follow the steps below. There are eight different screen options available with the Device Summary screen as the default choice.

+ Network Status

+ TCP/IP setup

+ Firmware Version

+ System Logs and Stats

Edit + Edit Mode

+ Insert Mode

Options, press the key and together.

+ Names Mode

Table 12-8 - Shortcut Keys

1. Press the button to open the Main Menu screen.
2. Press for the System Configuration screen.
3. Press for the System Information screen.
4. Press for General Controller Info and scroll down to RX Home Screen or BX Home Screen depending on which controller you are using.
5. Press (LOOK UP) to open the Option List Selection menu.
6. Choose the desired Home screen from the list.
7. Log off to save changes.

12.6 Manual Defrost and Clean Mode

A circuit can be placed in manual defrost from the RX Home screen or a Circuit Status screen. If a refrigeration circuit needs to be placed in manual defrost, follow these steps:

1. Press (CIRCUITS) to go to the Circuits Status screen, or place the cursor on the desired circuit from the Home screen and press to open the Actions Menu. Select Manual Defrost .
2. Once inside a Circuits Status screen, press to open the Actions menu.
3. Select Manual Defrost from the list and the Cir-

Customizing the Home Screen Operator’s Guide to Using the E2 • 12-9

Keys Function

Page 210 of the Emerson E2 RX user manual — 12.7 Overrides
Page 210 · click to enlarge
Page 210

cuit Bypass screen opens.

  • Clean - This mode disables all refrigeration and defrost so that the case can be cleaned or serviced.
Emerson E2 RX — 12.7 Overrides diagram (page 210)
Fig. 214 · 12.7 Overrides
  • End Manual Mode - Selecting this command will end any defrost cycle or the Clean Mode initiated manually.

If the defrost time needed is shorter than what the nor- mal programmed defrost time allows or if in Clean Mode, follow the procedures to the Option List menu and select End Manual Mode.

Figure 12-14 - Circuit Bypass Screen (RX-400 Version Shown)

12.7 Overrides

4. The Circuit Bypass screen (see Figure 12-14 ) will display the circuit name, its current state, and the bypass state. The Bypass Command field will be highlighted.

If a compressor stage or a fan on the condenser needs to be bypassed, follow these instructions:

1. From the default Home screen, arrow to either the COMPRESSOR STGS or FAN STAGES sections and highlight the stage or fan to be bypassed. Press Enter to access the override option from the menu.
Emerson E2 RX — 12.7 Overrides diagram (page 210)
Fig. 215 · 12.7 Overrides
Emerson E2 RX — 12.7 Overrides diagram (page 210)
Fig. 216 · 12.7 Overrides

Figure 12-15 - Option List Selection Screen

5. Press LOOK UP . The Option List Selection screen (see Figure 12-15 ) will give you five choices of defrost modes.

Figure 12-16 - Override Update Screen (RX Version Shown)

  • No Action - Normal (no manual defrost) state.
2. The Override Update screen appears (see Figure
  • Defrost - This is the normal defrost mode. The defrost ends according to the terminating device (sensor) or fail-safe time, whichever occurs first.

12-16). Press the or to enter Yes to place the stage in override. Scroll down one space to enter the Override Time.

  • Emergency Defrost - The defrost time goes the full duration of programmed defrost time and ignores any defrost termination sensors.
3. Choose the Override Value of either OFF or ON

using or .

Page 211 of the Emerson E2 RX user manual — 3. Select (Network Summary) and the Network
Page 211 · click to enlarge
Page 211

The compressor stage or condenser fan stage in over- ride mode will be marked with a cyan blue background in the Main Status screen indicating that the override is in effect.

Summary screen opens.

12.8 Checking Boards Online

12.9 Checking Status Screens

Figure 12-18 - RX Function Button Menu

The E2 RX controller has four status screens that are each accessible (from the Home screen) by pressing the corresponding function key (see Figure 12-18). The Suc- tion Group status screen, the Condenser status screen, the Circuits status screen, and the Sensors status screen can all be accessed by pressing one of the function keys (- ) if the application has been added to the E2.

Figure 12-17 - Network Summary Screen

Suction Group Status Screen

Press . The suction group selected will be dis- played with information such as active stages, discharge temperature, current setpoint, associated condenser, and other general information.

You can check all boards that are on either the Echelon Network (E2 controllers) or the I/O Network from the Net- work Summary screen (See Figure 12-17). This screen displays information such as board status, name of the device, type of device (board, controller, etc.), firmware revision, the network address for each device, the number of Echelon controllers (E2s) that are online or offline, and the number of I/O boards online or offline. After determin- ing which board is offline, turn to Appendix F: Trouble- shooting for more information.

Press . Information on the condenser such as con- trol setpoints, detailed fan status, and other general infor- mation will be displayed.

Press . Select which circuit status to view with the arrow buttons and press . Information such as current temperature, current state, individual case informa- tion, and other information are given.

To access the Network Summary screen:

1. From the Main Menu screen, press (Status) for the Status menu.
2. Press (Network Summary) and the Network Summary screen will be displayed.

Press . Select an analog or digital sensor and press . Information such as control value, and com- mand values will be displayed. The analog sensor will have Cut In/Cut Out temperature values.

The Network Summary screen can also be accessed by:

1. From the Main Menu screen, press (System Configuration).
2. Press (Network Setup) for the Network Setup menu.

3. Select (Network Summary) and the Network

Figure 12-19 - BX Function Button Menu

Checking Boards Online Operator’s Guide to Using the E2 • 12-11

Condenser Status Screen · Circuit Status Screen · Sensor Status Screen

Page 212 of the Emerson E2 RX user manual — 12.10 Alarms
Page 212 · click to enlarge
Page 212

12.10.2 Viewing the Controller Advisory Log

The E2 BX controller has four status screens that are each accessible (from the Home screen) by pressing the corresponding function key.

The current number of advisory log entries (the log that is highlighted) is displayed at the top right of the Advisory Log Screen. The total number of alarms and/or notices in the Advisory Log is displayed below the current field. To move between Advisory Log entries, press the up or down arrow key.

Press . The AHU information such as control temperature, season mode, space humidity, apparent tem- perature, heat/cool mode, fan state, economization status, dehumidification, and humidity status are all included on this screen.

Press . Zone information including outdoor and zone temperature, outdoor humidity, season mode, occu- pied state, and economization status are displayed in the Zone Status screen.

Emerson E2 RX — 12.10.2 Viewing the Controller Advisory Log diagram (page 212)
Fig. 217 · 12.10.2 Viewing the Controller Advisory Log

Press . Lighting status information can be found on this screen. Check light level, bypass, and other modes from here.

Press . Select an analog or digital sensor and press . Information such as control value, and com- mand values will be displayed. The analog sensor will have Cut In/Cut Out temperature values.

Other status screens in the E2 controller may be

Figure 12-20 - Alarm Advisory Log

accessed by selecting (Configured Applications) from the Main Menu. This menu gives you access to Summary and Status screens such as Anti-Sweat, Power Monitoring, Time Schedules, Holidays, and many more. To gain access to any of the given applications, select the corresponding number and press .

The Advisory Log is divided these categories:

  • Date
  • Time
  • State
  • Area Ctrl: Application: Property

12.10 Alarms

  • Message 12.10.3 Date and Time

This section describes how to view and use the Alarm Advisory Log. 12.10.1 Accessing the Alarm Advi- sory Log

The Date and Time columns simply display the date and time when the alarm or notice was generated and logged into the controller. 12.10.4 State

The Alarm Advisory Log can be accessed by pressing the alarm icon key on the controller.

The State column describes the alarm type, the current alarm state, and whether or not the alarm has been acknowledged. There are three possible alarm states:

  • ALARM - A high-priority warning, usually signifying a condition that requires attention.
  • NOTICE - A low-priority message, usually signifying a condition or a system change that requires no attention or may require attention in the future.
Show 5 more labels / short text on this page
AHU Status Screen · Zones Status Screen · Lighting Status Screen · Sensors Status Screen · Other Status Screens
Page 213 of the Emerson E2 RX user manual — 12.10.5 Ack/Reset State
Page 213 · click to enlarge
Page 213
  • FAIL - A failure is a special message that signifies a failure in an E2 system, an application, or in an input or output device controlled by an application (such as a sensor or fan).Returned-To-Normal and Forced-To-Normal Alarms

ure was generated from. Alarms and notices can either be generated within the E2 system or from an input value that is higher or lower than an alarm or notice setpoint defined during the system configuration process. 12.10.7 Advisory Message

For as long as the condition that caused the alarm mes- sage exists, the State field will show either ALARM, NOTICE, or FAIL as appropriate to the alarm type. How- ever, if the condition that caused the alarm, notice, or fail- ure is corrected, the message shown in the State field will change to signify the correction.

The Advisory Message column is a brief description of the alarm, notice, or failure. Because of screen size con- straints, it is often the case that the full advisory message will not be displayed in the Message field. To view the full advisory message, as well as the alarm priority and other important alarm information, press (EXPD INFO) for Expanded Information.

There are two ways an alarm, notice, or failure condi- tion may be corrected:

  • Return-To-Normal - “Return-To-Normal” means the condition that generated the alarm, notice, or failure has returned to normal on its own, or the E2 has automatically corrected the condition. If an alarm returns to normal, a “N-” will appear in front of the alarm state in the State field.
Emerson E2 RX — 12.10.5 Ack/Reset State diagram (page 213)
Fig. 218 · 12.10.5 Ack/Reset State
  • Reset (Forced)-To-Normal - “Reset-To-Normal” means the E2 has been forced by a user to consider the condition “normalized” for purposes of alarm control. A Reset-To-Normal occurs when an alarm is reset using the Alarm Reset button (ALARM RST). If an alarm is forced to normal, an “R-” will appear in front of the alarm state in the State field.

Figure 12-21 - Expanded Info Screen

12.10.8 Acknowledging, Resetting, and Clearing Log Entries

Table 12-9 lists the nine possible state messages as they appear in the State field.

12.10.8.1 Acknowledging

When an alarm, notice, or failure is acknowledged, the alarm stays in the Alarm Log, but all annunciation of the alarm is suspended until the alarm is reset or cleared. As stated in Section 12.10.5, the state of the alarm or notice will also change to a dash “—” indicating acknowl- edgement.

Advisory Type Condition Still Exists

Alarms ALARM N-ALM R-ALM

Failures FAIL N-FL R-FL

When you acknowledge an alarm, you prevent it from ever annunciating again in any way until you manually reset or clear the alarm. A condition that causes an alarm will never automatically return to normal when it is acknowledged.

Table 12-9 - Alarm States

12.10.5 Ack/Reset State

For setting acknowledging permissions, see Section 10.12.1, Changing Required User Access Levels.

The State field also shows whether or not an advisory record has been acknowledged or reset by a user. If an alarm has been acknowledged or reset, a dash “—” will appear at the end of the State field. If an alarm has not been acknowledged or reset, an asterisk “*” will appear at the end of the State field. 12.10.6 Area Ctrl: Application: Prop- erty

This column describes where the alarm, notice, or fail-

Alarms Operator’s Guide to Using the E2 • 12-13

Show 5 more labels / short text on this page
Condition · Condition · Returned To Normal · Reset to · Normal
Page 214 of the Emerson E2 RX user manual — 12.10.8.3 Clearing
Page 214 · click to enlarge
Page 214

prompting the user to either clear the selected advisory, clear all advisories or to cancel the operation.

TIPS: ACKNOWLEDGEMENT VS. RESETTING

1. Press to clear the selected advisory.
  • Reset an alarm if you believe the condition that caused it is fixed, but you wish for a new alarm to occur if the problem happens again.
2. Press to clear all advisories.

3. Press to cancel the operation.Expanded Advisory Information

  • You MUST reset an alarm that has been previously acknowledged to re-enable alarming for the alarm. Failure to do so will cause the alarm to remain in ACK, and the alarm will not be generated again. AN ACKNOWLEDGED ALARM WILL NOT AUTOMATICALLY RESET.
  • Acknowledge an alarm to silence alarm panel horns or lights, ONLY IF technicians have been notified of the problem and have been dispatched. Technicians, after fixing the problem, MUST reset or clear the alarm to re-enable alarming.

Figure 12-22 - Expanded Info Screen

To acknowledge an alarm or notice, highlight the desired log entry and press (ALARM ACK). A screen will come up prompting the user to either acknowl- edge the selected advisory, acknowledge all advisories, or to cancel the operation.

To view expanded information on a log entry, highlight the desired log and press (EXPD INFO). A screen will come up telling the user what advisory is being viewed out of a total number of advisories.

  • Press to acknowledge the selected advisory.

This message shows the location where the advisory was generated. This will be a board and point address or an application input or output (in Area Ctrl:Applica- tion:Property) format.

  • Press to acknowledge all advisories.
  • Press to cancel the operation.

12.10.8.2 Resetting

The advisory message is displayed below the Property or Board/Point. The Advisory Message describes the advi- sory log entry (what went wrong in the system).

When a log entry is reset, it is forced to a normal con- dition and the log entry remains in the Controller Advisory Log.

An alarm, notice, or failure can be reset by highlight- ing a log entry and pressing (ALARM RST) while at the Advisory Log screen. A screen will come up prompt- ing the user to either reset the selected advisory, reset all advisories or to cancel the operation.

Acknowledge Status describes the state of the advi- sory. If an advisory has been acknowledged or reset, the user name or the person who acknowledged or reset the alarm will appear below the acknowledge status. The date and time when the advisory was acknowledged or reset will also be displayed below the user’s name.

1. Press to reset the selected advisory.

If the advisory has not been acknowledged or reset, this field will display an asterisk “*” along with the word “UNK.”

2. Press to reset all advisories.
3. Press to cancel the operation.

12.10.8.3 Clearing

The report priority fields describe the priority level of the advisory, as well as the date and time the advisory occurred.

The option to clear logs completely removes a log entry from the Advisory Log.

Advisory Log entries may be cleared by highlighting the log entry and pressing (ALARM CLR) while viewing the Advisory Log screen. A screen will come up

If the advisory has returned to a normal state, either on its own or because of a user-ordered alarm reset, the date

Show 5 more labels / short text on this page
Property or Board/Point · Advisory Message · Acknowledge Status · Report Priority · Return To Normal
Page 215 of the Emerson E2 RX user manual — 12.11 Viewing Logs and Graphs
Page 215 · click to enlarge
Page 215

and time on which the reset occurred will be shown beside the report priority. 12.10.9 Facility Status Display (FSD) Alarms

entries that shows how the sampled value has changed over time. Graphing is a quick, easy way to get an idea of how the application has been behaving. Special graphing features also allow you to zoom in on specific areas of the graph. 12.11.1 Locating Logged Inputs/ Outputs

The FSD can be used to handle alarms. Information such as time stamp, alarm ID string, current status, the rea- son an alarm was triggered, (if a case temp limit was exceeded) configured priority of the advisory, Return-To- Normal information, and if available, the limit that was exceeded can be viewed through the FSD. Alarms cannot be configured from the FSD unit.

12.11.1.1 Home/Status Screens

If more than one E2 controller is at a site, one E2 must be set up as the alarm annunciator for that site. The FSD will receive alarms from that alarm-annunciator E2 for the entire site. The FSD will point only to a single E2 at a site (it will not poll multiple controllers for alarms). For more information, refer to the FSD Manual (P/N 026-1400).

Emerson E2 RX — 12.11.1.1 Home/Status Screens diagram (page 215)
Fig. 219 · 12.11.1.1 Home/Status Screens

Figure 12-24 - Sample Actions Menu From RX Home Screen

The easiest way to access a log or graph is from the Actions menu while on the Home screen or an applica- tion’s Status screen. These screens contain a number of different input and output values from the application. If a particular input or output is being logged by the E2 and has log data stored in the system, you can view the log or graph by following the instructions below:

1. Use the arrow keys to highlight the desired input or output on the Home or a Status screen.

Figure 12-23 - FSD General Setup

2. Press to call up the Actions Menu, and

select either option to view a graph or to view a log.

12.11 Viewing Logs and Graphs

If Graph and Log options are not listed in the Actions Menu, this means the property you have selected is not set up to be logged.

There are two basic forms used by the E2 to display data: logs and graphs.

It may also be the case that there are currently no logged values to be viewed (this often happens when a controller is first set up or after a log has been cleared). If this is the case, E2 will tell you that no logged samples exist. For a complete list of items in the Actions Menu, refer to Section 10.7.3, The Actions Menu.

A log is simply a list of sampled values for a particular input or output along with the sampling times and dates. When you view logged data in this form, it is usually listed with the most recent sample at the top of the list, and the other samples listed below it in reverse chronological order.

A graph is a graphical representation of these log

Viewing Logs and Graphs Operator’s Guide to Using the E2 • 12-15

Page 216 of the Emerson E2 RX user manual — 12.11.1.2 Setup Screens
Page 216 · click to enlarge
Page 216

12.11.1.2 Setup Screens

tion Pressure is coming from. Note that:

  • An output pointer can be connected to multiple input pointers
  • A single input pointer cannot be connected to multiple output pointers
  • Pointers can be set up for all applications

To set up pointers from a Setup screen:

1. Press (SETUP) from the desired application’s Status screen. (If starting from the Home screen, move the cursor to the desired application’s value and press to open the Actions Menu. Choose Setup . This will take you to the Setup screen.)
2. Once inside the application’s Setup screen, use the and keys to highlight the Inputs and Outputs index tabs.

Figure 12-25 - Example Setup Screen (Setpoints)

3. Press (EDIT) to open the Edit menu.

When setting up an application using a Setup screen (see Section 10.7.2, Status Screens) all inputs and outputs that are set up to be logged will be marked with an L on the right-hand side. From the Setup screen, you may access the logs of these inputs by pressing . 12.11.1.3 Setting Up Input and Output Pointers

4. Choose Alternate I/O Formats to open the format menu.
5. Choose one of the pointer formats.

If you are in the Inputs setup and have selected Area Ctrl: Application: Property as the pointer format, the third column (the Output field) is the output that you are pointing (connecting) the input to. If you are in the Out- puts setup and have selected Area Ctrl: Application: Property as the pointer format, the third column (the Input field) is the input that you are pointing (connecting) the output to.

Emerson E2 RX — 12.11.1.2 Setup Screens diagram (page 216)
Fig. 220 · 12.11.1.2 Setup Screens

Changing the format to a Fixed Value will give you the option of entering a value in the field that will be read by the input instead of being hooked to a board:point or another cell.

For information on naming conventions for E2 control- lers, applications, and points, see Section 12.13, Naming Conventions for E2 Controllers, Applications, and Points.

Figure 12-26 - Pointer Format Box

Pointers allow a property to get or send its value to another property, and are a way to transfer information or values (input and outputs) from one application to another within a controller.

For example, if you are setting up a Suction Pressure pointer, you are specifying the location of where the Suc-

Page 217 of the Emerson E2 RX user manual — 12.11.2 Log View
Page 217 · click to enlarge
Page 217

12.11.2 Log View

12.11.3 The Graph View

Emerson E2 RX — 12.11.2 Log View diagram (page 217)
Fig. 221 · 12.11.2 Log View
Emerson E2 RX — 12.11.2 Log View diagram (page 217)
Fig. 222 · 12.11.2 Log View

Figure 12-27 - Sample Log View

The Log view shows logged data in a tabular format arranged by the date/time of sample.

Figure 12-28 - Sample Graph View

The Graph view shows logged data in a graphical for- mat with sample times as the X (horizontal) coordinate and sample values as the Y (vertical) coordinate. To access a graph view:

1. Highlight a value from any screen and press to open the Actions Menu.
2. Select Log , and the Log screen opens.
1. Highlight a value from any screen and press to open the Actions Menu.

Several function keys may be used to navigate the Log view and provide additional information:

2. Select Graph , and a graphed view of the selected value opens.
  • BEGINNING - Move the cursor to the top of the table (the most recently recorded sample).

Upon first entering the Graph view for a logged value, all available samples are displayed. The X axis (sample time) ranges from the time and date of the earliest avail- able sample relative to the time and date of the latest sam- ple. The Y axis (sample value) ranges from the minimum sensor reading to the maximum sensor reading.

  • END - Move the cursor to the bottom of the table (the oldest sample).
  • GRAPH - Displays logged data in a graph format (see Sample Graph View Figure 12-28 ).
  • UPDT DATA - Pressing this key updates the Log View by adding all newly recorded samples to the top of the table.

In the case of an input point log, (e.g., suction pres- sure) assume the Log Group setup specifies Samples as 1000 and Log Interval as 0:03:00. Also assume that the system has been running continuously with no interrup- tions for one week. The X axis would span a time interval starting approximately six days and six hours ago all the way up to the present.

  • EXPD INFO - Pressing this key will display the board/point address or the controller/application/property address for the point that is being logged.
  • Page Up - Scrolls up one page.

If suction pressure ranged from 18 psi to 25 psi during the time period of the log, the Y axis of the graph would be just large enough to show all samples in the log. 12.11.4 Zooming In and Out

  • Page Down - Scrolls down one page.

For a more detailed view of a graph, zoom in by press- ing . This results in half of the samples of the current view being redrawn to fill the entire view. Using the above example, the graph would now shows three days and three hours of samples from the middle of the original graph.

Viewing Logs and Graphs Operator’s Guide to Using the E2 • 12-17

Page 218 of the Emerson E2 RX user manual — 12.12 Low Battery Notification
Page 218 · click to enlarge
Page 218

Pressing again zooms in even farther.

12.13 Naming Conventions for E2 Controllers, Applications, and Points

Pressing zooms out, resulting in a graph whose time scale spans twice that of the previous view. This dou- bles the number of displayed samples.

Navigating a Zoomed View

While zoomed in on a graph, only a subset of the total number of samples are visible. To view samples that were recorded earlier or later than those in the current view, press the left and right cursor keys. The availability of ear- lier or later samples is indicated by the presence of arrows at either end of the X (time) axis.

  • Do not name applications, controllers, or points with all numeric characters.
  • Do not use colons (:) in the names of applications, controllers, or points.

12.12 Low Battery Notification

The E2 keeps track of how long the E2 battery has been active, and will display a battery icon at the top of the E2 screen whenever the battery is reaching the end of its recommended battery life. If a battery has less than 30% of its battery life left, a yellow battery icon will appear at the top of the screen. If the battery has less than 10% life left, or if the battery switch is currently disabled, a red battery icon will appear.

For more information on battery testing and replace- ment, refer to Section 4.4, Battery Testing and Replace- ment.

Page 219 of the Emerson E2 RX user manual — Appendix A: Case Type Defaults
Page 219 · click to enlarge
Page 219

Appendix A: Case Type Defaults

The table below lists the sixty-four default case types that may be used in Standard Circuit or Case Control Cir- cuit applications along with the recommended defaults for each case type.

High Alarm, Low Alarm, and Delay

The High Alarm, Low Alarm, and Delay columns are the suggested high and low case temperature alarm set- points and the report delay. To set up these alarm setpoints and delays, locate the Case Temperature control input and select the Generic Alarm Setup action from the Actions Menu. Enter the High and Low setpoints in the Normal Hi and Normal Low fields respectively. Enter the Delay in the Report Delay field.

When one of these sixty-four case types is selected, the E2 automatically enters the following information from the table into the Circuit application:

  • The setpoint
  • The number of defrosts per day and the defrost time length from the “Elec” column under Defrost types

The E2 assumes by default that all cases have electric defrost. If this is not the case, you will have to enter new values for the Number of Defrosts and the Defrost Time in the circuit. The suggested defaults are listed under the Hot Gas, Elec, Rev. Air, and Timed columns. The number to the left of the slash indicates the suggested number of defrost times per day, and the number to the right of the slash indicates the recommended Defrost Time length.

For example, if you select #14 “RIFF” (reach-in frozen food), the E2 sets the circuit’s setpoint at -10, the number of defrosts at 1, and the defrost time at 60 minutes.

The other columns in this table, such as the High and Low Alarm/Dly columns and the Hot Gas, Rev. Air, and Timed columns, are suggested values that are not automat- ically entered into the Circuit application.

Elec. (DEF) Rev. Air Timed 0 **** Undefined 1 SDIC Single deck ice cream -25 -5° -30° 01:00 2/18 1/45 1/60 1/60 2 MDIC Multi-deck ice cream -25 -5° -30° 01:00 3/22 3/45 2/60 2/60 3 SDFJ Single deck freezer juice -18 0° -30° 01:00 2/18 1/45 1/60 1/60 4 MDFJ Multi-deck freezer juice -10 5° -25° 01:00 3/22 3/45 2/60 2/60 5 RIIC Reach-in ice cream -15 -5° -25° 01:00 2/22 1/45 1/60 1/60 6 ICBX Ice cream freezer box -20 -5° -30° 01:00 3/20 2/45 2/60 2/60 7 SDFF Single deck freezer food -15 5° -25° 01:00 2/18 1/60 1/60 1/60 8 RIFJ Reach-in freezer juice -15 -5° -20° 00:15 2/22 1/45 1/60 1/60 9 FRBX Frozen food box -12 -5° -20° 00:15 3/18 3/45 2/60 2/60 10 FFBX Frozen fish box -12 -5° -20° 00:15 3/18 3/45 2/60 2/60 11 FJBX Frozen juice box -12 -5° -25° 01:00 3/18 3/45 2/60 2/60 12 MDFF Multi-deck freezer food -10 0° -20° 01:00 2/22 1/45 2/60 2/60 13 FZBK Multi-deck freezer bakery -10 0° -20° 01:00 2/22 1/45 2/60 2/60 14 RIFF Reach-in freezer food -10 5° -15° 01:00 1/20 1/60 1/60 1/60 15 SDMT Single deck meat 22 32° 12° 01:00 3/18 3/45 3/60 3/60 16 SDPF Single deck prepared 22 32° 12° 01:00 3/18 3/45 3/60 3/60 17 PZZA Single deck pizza 22 32° 12° 01:00 3/18 3/45 3/60 3/60 18 KOSH Single deck kosher 22 32° 12° 01:00 3/18 3/45 3/60 3/60 19 SDFH Single deck fish 22 32° 12° 01:00 3/18 3/45 3/60 3/60 20 MDMT Multi-deck meat 23 34° 18° 01:00 4/18 4/45 4/60 4/60 21 MDPO Multi-deck poultry 23 34° 18° 01:00 4/18 4/45 4/60 4/60 22 MDFH Multi-deck fish 23 34° 18° 01:00 4/18 4/45 4/60 4/60 23 RIMC Reach-in meat 25 35° 15° 01:00 2/18 2/45 2/60 2/60 24 SVMT Service meat 22 35° 15° 01:00 2/18 2/45 2/60 2/60 25 SVFH Service fish 22 35° 15° 01:00 2/18 2/45 2/60 2/60 26 MTBX Meat cooler 30 42° 22° 01:00 3/18 3/45 2/60 2/60

Low Alarm Delay Hot Gas

Type Abbr. Description

Table A-1 - Case Type Default Settings

Appendix ACase Type Defaults • A - 1
Show 4 more labels / short text on this page
Defrost Type · Defrost Type · Set- Point · High Alarm
Page 220 of the Emerson E2 RX user manual — Appendix A: Case Type Defaults
Page 220 · click to enlarge
Page 220

Low Alarm Delay Hot Gas

Elec. (DEF) Rev. Air Timed

Type Abbr. Description

27 HDBX Meat holding box 30 44° 22° 01:00 3/18 3/45 2/60 2/60 28 DYCS Multi-deck dairy 35 44° 24° 01:00 4/20 4/45 2/60 4/60 29 RFDY Rear load dairy 28 38° 18° 01:00 4/20 4/45 2/60 4/45 30 RIDY Reach-in dairy 30 40° 20° 01:00 4/20 4/45 2/60 2/60 31 DYBX Dairy cooler 34 44° 24° 01:00 2/22 2/45 2/60 2/60 32 BKBX Bakery Cooler 36 46° 26° 01:00 2/22 2/45 2/60 2/60 33 PRBX Produce cooler box 36 50° 30° 01:00 2/22 2/45 2/60 2/60 34 MILK Milk case 34 40° 20° 01:00 4/20 4/45 2/60 2/60 35 PKDL Packaged deli 32 38° 18° 01:00 4/20 4/45 2/60 2/60 36 DLDS Deli display case 34 38° 18° 01:00 4/20 4/45 2/60 2/60 37 CHEZ Cheese case 34 40° 20° 01:00 3/18 3/45 2/45 2/60 38 POBX Poultry box 36 42° 22° 01:00 4/20 4/45 2/45 2/60 39 BEER Beer/Beverage 34 44° 24° 01:00 2/18 2/45 2/45 2/60 40 BVCS Beverage case 34 44° 24° 01:00 2/18 2/45 2/45 2/60 41 DLBX Deli cooler box 36 46° 26° 01:00 3/18 3/45 2/45 2/60 42 FHBX Fish cooler box 36 46° 26° 01:00 3/18 3/45 2/45 2/60 43 SVDL Service deli 32 42° 22° 01:00 2/16 2/45 2/60 1/40 44 PRCS Produce case 35 45° 25° 01:00 2/16 2/45 2/60 3/40 45 ISPR Produce case (island) 35 45° 25° 01:00 2/16 2/45 2/60 1/60 46 SALD Salad table 36 50° 30° 01:00 2/16 2/45 2/60 1/60 47 FLBX Flower cooler box 40 54° 34° 01:00 2/16 2/45 2/60 2/40 48 FLWR Flower cooler 40 54° 34° 01:00 2/16 2/45 2/60 2/40 49 CTBX Controlled temp box 50 75° 40° 00:15 2/16 2/45 2/60 2/45 50 SDPO Single deck poultry 24 38° 18° 01:00 2/16 2/45 2/45 2/60 51 CAKE Bakery cake case 40 55° 35° 01:00 2/16 2/45 2/45 2/60 52 BART Bakery retarder 35 60° 40° 01:00 2/16 2/45 2/45 2/60 53 RTDR Bakery retarder 35 60° 40° 01:00 2/16 2/45 2/45 2/60 54 MTPK Meat packaging room 45 60° 40° 01:00 2/16 2/45 2/45 2/90 55 MTCU Meat cutting room 45 60° 40° 01:00 2/16 2/45 2/45 2/90 56 MTPR Meat prep room 45 60° 40° 01:00 2/16 2/45 2/45 2/90 57 MTWR Meat wrapping room 45 60° 40° 01:00 2/16 2/45 2/45 2/90 58 FHPR Fish prep room 45 60° 40° 01:00 2/16 2/45 2/45 2/90 59 SBCL Subcooler 55 60° 45° 00:15 2/16 2/45 2/60 2/45 60 PRPR Produce prep room 55 65° 45° 01:00 2/16 2/45 2/45 2/90 61 SDFM Single deck freezer meat -10 0° -20° 01:00 2/18 2/40 1/35 1/45 62 RIFM Reach-in freezer meat -10 2° -18° 01:00 2/18 2/40 1/35 1/45 63 MDFM Multi-deck freezer meat -10 0° -20° 01:00 2/18 2/40 2/60 2/45 64 BKFZ Bakery freezer box -12 -2° -22° 01:00 2/18 2/30 2/60 2/45

Table A-1 - Case Type Default Settings

A-2 • E2 RX/BX/CX I&O Manual 026-1610 Rev 13 14-SEP-2011

Defrost Type · Set- Point · High Alarm

Page 221 of the Emerson E2 RX user manual — (VDC)
Page 221 · click to enlarge
Page 221
Appendix BPressure/Voltage and Temperature/Resistance Charts for Eclipse Transducers & Retail Solutions Temp Sensors

Retail Solutions Temperature Sensors

Resistance (ohms) Temperature (F)

(VDC)

100 lb. xducer

200 lb. xducer

500 lb. xducer

0.5 0 0 0

0.7 5 10 25

0.9 10 20 50

1.1 15 30 75

1.3 20 40 100

1.5 25 50 125

1.7 30 60 150

1.9 35 70 175

2.1 40 80 200

2.3 45 90 225

2.5 50 100 250

2.7 55 110 275

Table B-1 - Temp Sensor Temperature/Resistance Chart

2.9 60 120 300

3.1 65 130 325

3.3 70 140 350

3.5 75 150 375

3.7 80 160 400

3.9 85 170 425

4.1 90 180 450

4.3 95 190 475

4.5 100 200 500

Table B-2 - Eclipse Voltage to Pressure Chart

Appendix B: Pressure/Voltage and Temperature/Resistance Charts for Eclipse Transducers & Retail Solutions Temp Sensors • B-1

Show 17 more labels / short text on this page
Eclipse Transducers · Voltage · Pressure (PSI) · 336,450 -40 · 234,170 -30 · 165,210 -20 · 118,060 -10 · 85,399 0 · 62,493 10 · 46,235 20 · 34,565 30 · 26,100 40 · 19,899 50 · 15,311 60 · 11,883 70 · 9,299 80 · 7,334 90
Page 222 of the Emerson E2 RX user manual — Appendix B: Pressure/Voltage and Temperature/Resistance Charts for Eclipse Transducers & Retail Solutions Temp Sensors
Page 222 · click to enlarge
Page 222
Page 222 of the Emerson E2 RX user manual — Appendix B: Pressure/Voltage and Temperature/Resistance Charts for Eclipse Transducers & Retail Solutions Temp Sensors
Page 223 of the Emerson E2 RX user manual — Appendix C: Alarm Advisory Messages
Page 223 · click to enlarge
Page 223

Appendix C: Alarm Advisory Messages

The table below is a list of all alarm messages that may appear in E2’s Alarm Advisory Log. Each alarm message is listed by its Alarm Name, which is the text recorded in the Alarm Advisory Log when the error occurs, and the Default Priority, which is the default priority value for the alarm. A Default Priority of “User” indicates the alarm type’s priority is programmed by the user during application setup.

Alarm Name Default Priority Definition

# Of Events Exceeded Limit User A digital value has transitioned ON more times than its defined Number of Events setpoint. 50/60 Hz Line Clock Is Bad 20 E2 is not successfully synchronizing its clock with the 50/60 Hz pulse of its incoming power. A FreezeStat Input Is Too Low User A temperature sensor on an HVAC cooling stage is lower than the programmed freezestat setpoint, indi- cating possible coil freeze. Access Log Lost - CRC Error 20 An internal error has caused the loss of E2’s user access log. Advisory Log Lost - CRC Error 20 An internal error has caused the loss of E2’s alarm advisory log. Alarm Limit Exceeded User An Analog Sensor or a Suction Group has an input value greater than one of its high limit setpoints. Alarm(s) Were Cleared 99 A user has erased one or more alarms from the alarm advisory log. Alarm(s) Were Reset 99 A user has reset one or more alarms from the alarm advisory log. All Config/Logs Were Cleared 30 A user has performed a clean out on this E2, remov- ing all programming and stored data. All Lights On User A Global Data application’s All Lights On input has turned ON to switch on all the lights. All network connections used 50 Echelon controller has reached its limit of bound NVs Alternate Hi Limit Exceeded User An analog value in an application using “alternate” setpoints has risen above its programmed Hi Limit setpoint. Alternate Low Limit Exceeded User An analog value in an application using “alternate” setpoints has risen above its programmed Lo Limit setpoint. Appl Not Keeping Setpoint User An Air Handling Unit or Heat/Cool Heat/Cool appli- cation has not achieved setpoint for a prolonged period of time. Application Cell Is Lost 15 An internal error has caused the loss of an entire application cell. Application Config Has Changed 99 A user has changed the configuration of one of E2 applications.

Appendix CAlarm Advisory Messages • C - 1
Page 224 of the Emerson E2 RX user manual — Appendix C: Alarm Advisory Messages
Page 224 · click to enlarge
Page 224

Alarm Name Default Priority Definition

Application Setpoint Has Changed 99 A user has changed a setpoint in one of E2’s applica- tions. Application Was Created 99 A user has created a new application in this E2. Application Was Deleted 99 A user has deleted an existing application in this E2. ARTC/MultiFlex RTU Override Switch Stuck

20 An override switch on an ARTC/ MultiFlex RTU has been ON for a prolonged period of time, suggesting a possible switch failure. ARTC/MultiFlex RTU Reset From Power Failure

50 An ARTC/MultiFlex RTU lost power and reset when power was restored. Attempt To Write Past Mem. EOB 50 The E2 attempted to write data to memory, but the memory was full. Average Log Stuck-No Memory 15 The Average Log cannot be written because there is not enough memory. Bad Modem 20 The modem on this E2 is not functioning properly. Battery backed memory lost 30 Battery backed memory loss not due to cleanout. Batt Runtime Limit 99 Battery runtime has exceeded 80% of the battery life- time. Binding Input To Output Failed 20 A valid connection could not be made between an input and an output. BIOS/BIOS Ext. Update Failed 20 An update to the E2’s BIOS has failed. BIOS/BIOS Extension Updated 50 The E2’s BIOS was successfully updated. Can't Set Hardware Clock 20 The E2 is unable to change the time on its hardware clock. Case Cleaning Was Started User A case circuit has entered clean mode. Case Temp Hi Limit Exceeded User A single temperature sensor in a Standard Circuit or Case Control Circuit is recording a temperature higher than its defined case temperature high set- point. Case Temp Low Limit Exceeded User A single temperature sensor in a Standard Circuit or Case Control Circuit is recording a temperature lower than its defined case temperature low setpoint. Cell Config Not Restored 15 E2’s attempt to restore configuration data to its appli- cations has failed. Cell Create Failed For Restore 20 E2 attempted to create new applications as part of the configuration restoration process and failed to do so successfully. Checkit Sensor Has Failed User A Checkit sensor is returning an invalid temperature value, indicating a sensor failure. Checkit Sensor Is Alarming User A Checkit sensor on a Suction Group application is recording a high temperature. Checkit Sensor Is In Notice User A Checkit sensor’s temperature is above its pro- grammed notice setpoint.

C-2 • E2 RX/BX/CX I&O Manual 026-1610 Rev 13 14-SEP-2011

Page 225 of the Emerson E2 RX user manual — Appendix C: Alarm Advisory Messages
Page 225 · click to enlarge
Page 225

Alarm Name Default Priority Definition

Comb Temp Hi Limit Exceeded User The combined temperature of an entire Standard Cir- cuit or Case Control Circuit has risen above its pro- grammed high temperature setpoint. Comb Temp Low Limit Exceeded User The combined temperature of an entire Standard Cir- cuit or Case Control Circuit has fallen below its pro- grammed low temperature setpoint. Commission failed-chk network 50 Commission of Echelon controller failed; binding of NV was not successful. Check the Echelon network. Communication Port 1 Is Down 20 E2 cannot communicate with the RS232 port on the E2 main board. The E2 main board likely needs repair or replacement. Communication Port 2 Is Down 20 E2 cannot communicate with the RS485 network port on the E2 main board. The E2 main board likely needs repair or replacement. Communication Port 3 Is Down 20 E2 cannot communicate with the modem slot on the E2. The E2 main board likely needs repair or replace- ment. Communication Port 4 Is Down 20 COM4 is used by service personnel to attach hard- ware used in test or debug functions. This alarm indi- cates the port that allows E2 to communicate with these devices is faulty. The E2 board likely needs repair or replacement. Communication Port 6 is down 20 E2 cannot communicate with port 6 on the E2 main board. Completed Firmware Update 50 The E2’s firmware was successfully updated. Config Loss - Chg In Tmpl Rev. 15 Due to a difference between configuration templates in a previous E2 version and templates in the current version, configuration data could not be restored. Config Loss-CRC Error 15 Due to an internal error, E2 has lost configuration data. Config Loss-File CRC Error 15 Due to an internal error, E2 has lost configuration data. Config Not Saved To Flash 20 E2 could not save configuration data to flash mem- ory. Controller (or Device) Absent From Network

20 The current E2 could not find the specified E2, I/O board, or Echelon controller Controller Reset 50 An ARTC/MultiFlex RTU has gone through a reset. Controller Shutdown 50 The E2 has gone through a shutdown. Controller Startup 50 The E2 has re-started after a shutdown.

Appendix CAlarm Advisory Messages • C - 3
Page 226 of the Emerson E2 RX user manual — Appendix C: Alarm Advisory Messages
Page 226 · click to enlarge
Page 226

Alarm Name Default Priority Definition

Controller Type Mismatch 20 A device on the Echelon network is of a different type than the user has specified. In other words, a user might have wired a device such as a CC-100P to the network but set it up in the E2 software as a CC- 100LS. Check your network setup and if necessary reconfigure the device with the correct type. Controller Was Warm-booted 50 A user has reset the E2 using the “reset” button on the main board. Couldn't Get File Handle 20 E2 tried to get a file from its memory and failed to do so. This alarm likely indicates one or more templates in the E2 software have been corrupted. Contact Retail Solutions service for further assistance. Curtail On User A Curtailment device set up in Global Data has acti- vated to begin curtail. DFMC Standby Mode 20 A DFMC is put into standby by a service technician; it indicates the unit is not actually controlling. DFMC Check Clock Settings 99 Sent by the DFMC when it has lost its internal time- of-day, E2 will resend the time upon receipt and this alarm should return-to-normal without user interac- tion. DFMC Over Max Defrost 20 A defrost duration was in excess of the maximum limit defined. For example, the case is not defrosting within spec. DFMC Over Max Fan Delay 30 Maximum fan delay time has been exceeded. DFMC Inject Alarm 30 Related to the case's ability to get refrigerant into the coil. For example, this alarm may occur if the case is not being supplied with the proper temperature refrigerant. DFMC Door Alarm 99 Door to a case has been left open too long. Defrost terminated on Time 30 EC2, EC3 Defrost terminated on Temp. 30 EC2, EC3 Dest. Mem. Not Allocated Block 50 An internal error has occurred in the E2. Dest. Mem. Out Of Stack Bounds 50 An internal error has occurred in the E2. Device Absent From Network 20 The current E2 could not find the specified E2, I/O board, or Echelon controller Diagnostic Rate Change Failed 20 A user tried to change the update rate of a CC-100, RT-100, or similar Echelon device, but the change was not accepted. Try the update rate change again. If this alarm persists, call Retail Solutions service. Dial To Day Time Site 1 Failed 20 E2 tried to dial out to the site listed as Day Time Site 1 and was unsuccessful. Dial To Day Time Site 2 Failed 20 E2 tried to dial out to the site listed as Day Time Site 2 and was unsuccessful.

C-4 • E2 RX/BX/CX I&O Manual 026-1610 Rev 13 14-SEP-2011

Page 227 of the Emerson E2 RX user manual — Appendix C: Alarm Advisory Messages
Page 227 · click to enlarge
Page 227

Alarm Name Default Priority Definition

Dial To Day Time Site 3 Failed 20 E2 tried to dial out to the site listed as Day Time Site 3 and was unsuccessful. Dial To Night Site 1 Failed 20 E2 tried to dial out to the site listed as Night Site 1 and was unsuccessful. Dial To Night Site 2 Failed 20 E2 tried to dial out to the site listed as Night Site 2 and was unsuccessful. Dial To Night Site 3 Failed 20 E2 tried to dial out to the site listed as Night Site 3 and was unsuccessful. Did Not Defrost User A case circuit did not enter defrost at its scheduled time. Did Not Exit Defrost User A CC-100 or CS-100 that entered defrost did not ter- minate or exit defrost at its programmed time. Did Not Exit Wait User A CC-100 or CS-100 terminated defrost and entered the WAIT state, but did not exit the WAIT state when refrigeration re-started. Did Not Exit Wash User A CC-100 or CS-100 did not exit Clean Mode. Did Not Respond To command User A CC-100 or CS-100 did not respond to an E2 com- mand. Did Not Terminate Defrost User Defrost in a standard circuit lasted for its entire pro- grammed time duration and did not terminate. Usu- ally this means the termination sensor did not record a temperature higher than its setpoint, but it could also mean sensor failure has occurred. Did Not Wash User A case circuit that was ordered to go into cleaning mode did not successfully enter Clean Mode. Differential Limit Exceeded User The difference between the supply air temperature and the return air temperature in an HVAC applica- tion was less than the programmed heating or cooling differential setpoint. This might indicate a problem with cooling or heating. Dirty Filter Detected 30 A filter-checking device connected to an ARTC/ MultiFlex RTU is detecting a dirty filter. Discharge Trip User A high discharge pressure detected by a Suction Group application has caused an emergency shut- down of the compressor rack. Door Open 30 EC2, EC3 Duplicate Controller Names 20 Two controllers on the network have the same names. One of them will need to be renamed to prevent com- munications problems. Events Per Hour Exceeded Limit User A digital value has transitioned ON more times in the past hour than its defined Events Per Hour setpoint.

Appendix CAlarm Advisory Messages • C - 5
Page 228 of the Emerson E2 RX user manual — Appendix C: Alarm Advisory Messages
Page 228 · click to enlarge
Page 228

Alarm Name Default Priority Definition

External Fault 30 An external fault input defined in a Multiflex PAK controller has indicated a failure. External fault inputs in the PAK are used to detect a Rack (Pack) failure produced by some device out of the PAK's control. Failed Attempt To Bind Input 50 A valid link could not be made between an E2 appli- cation and an input assigned to it. Failed Sensor Or Bad Wiring 20 E2 is unable to get a valid sensor value due to a possi- ble hardware problem. Failed To Create logging 20 E2 is unable to create logs for the input or output shown. Failed to Obtain DHCP Lease 20 Failed to obtain a DHCP lease from the DHCP Server, when a lease is requested. This happens at system startup, if a DHCP lease is requested, or if the user switches to using DHCP. Failed to Renew DHCP Lease 20 DHCP Lease failed to renew altogether. DHCP Leases are renewed at an interval of half the time of the requested lease. If the lease is for 5 days, then a renewal will happen at 2.5 days. If this fails, it will retry at the ¾ of the lease time. If both attempts fail, the alarm is generated. Fax Init String Is Not Valid 30 The fax initialization string for the E2’s modem is incorrect and may need editing. Features denied during restore 99 License manager has denied permission to access a feature during a restore. Either the license for that feature is invalid or it does not exist, or the number of licenses for that feature is less than the number needed for the configuration. Further information may be found in the service log. Features denied during startup 99 License manager denied permission to access a fea- ture during startup. Either the license for that feature is invalid or it does not exist, or the number of licenses for that feature is less than the number needed for the configuration. Further information may be found in the service log. File Not Found 50 An internal error has occurred in the E2. Firmware File Bad - AI200 15 A 16AIe has corrupted firmware. Firmware File Bad - RO200 15 An 8ROe has corrupted firmware. Firmware File Bad - CC100 Liq 15 A CC-100P or CC-100LS has corrupted firmware. Firmware File Bad - CC100 Suct 15 A CC-100H has corrupted firmware. Firmware File Bad - CS100 Ckt 15 A CS-100 has corrupted firmware. Firmware File Bad - ESR8 15 An ESR8 has corrupted firmware. Firmware File Bad - RT100 15 An RT-100 has corrupted firmware.

C-6 • E2 RX/BX/CX I&O Manual 026-1610 Rev 13 14-SEP-2011

Page 229 of the Emerson E2 RX user manual — Appendix C: Alarm Advisory Messages
Page 229 · click to enlarge
Page 229

Alarm Name Default Priority Definition

Firmware Is Not Compatible 20 The firmware in a unit controller is not compatible with the current version of E2. Firmware Update Failed 10 The firmware on a unit controller was not success- fully updated. Flash File Has A Bad CRC Error 50 An internal error has occurred in the E2. Flow obstructed 30 Irrigation pipe obstruction detected. Fuse Is Blown - ESR8 20 A fuse has blown on an ESR8 board and will require replacement. Global Spare Dig1 On User The Spare Dig 1 input in Global Data has switched ON. Gradual Change Limit Exceeded User An analog value has undergone a gradual change greater than its programmed Minimum Change set- point. Heap Memory Corrupted - Reboot 30 A problem with memory has resulted in a reset of the E2. High Discharge Limit Exceeded User A high discharge pressure detected by a Suction Group application is causing the suction group to operate at a reduced capacity. High Limit Alarm User An HVAC application (AHU, Zone, RT-100, or ARTC/MultiFlex RTU) has a temperature above one of its cooling setpoints. High Limit Notice 50 Network variable high limit exceeded. High Suction Limit Exceeded User The suction pressure has risen above a Suction Group’s high suction setpoint. HVAC Phase Loss User A phase loss device connected to Global Data has switched ON to shut down all HVAC systems. HVAC Shutdown User A Global Data application’s HVAC Shutdown input has turned ON to shut down all HVAC systems. Incomplete Advisory Setup 15, 99 An important setting used in advisory and/or dial-out set up were not configured correctly. Inhibit Sensor Failed User A Demand Defrost Inhibit sensor on a case circuit is not functioning correctly. Input Bypass Failure 15 A command to bypass an input was not successfully carried out. Input Sensor Is Open 20 An analog input sensor is OPEN, possibly due to a severed connection or sensor failure. Input Sensor Is Short 20 An analog input sensor is CLOSED, possibly due to a short-circuit or sensor failure. Instance limit exceeded 20 Maximum number of a particular type of licensed Open Echelon controllers has been reached. A new instance cannot be commissioned. Invalid Cell ID In Scratch Pad 30 An internal error has occurred in the E2. Invalid Nxt Ptr In Scratch Pad 30 An internal error has occurred in the E2. Invalid Scratch Pad Block Size 30 An internal error has occurred in the E2.

Appendix CAlarm Advisory Messages • C - 7
Page 230 of the Emerson E2 RX user manual — Appendix C: Alarm Advisory Messages
Page 230 · click to enlarge
Page 230

Alarm Name Default Priority Definition

IRLDS: Absorption Data Error 20 An internal error has occurred in the IRLDS. Check the IRLDS display for error code information, and call Retail Solutions service. IRLDS: ADC Error 20 An internal error has occurred in the IRLDS. Check the IRLDS display for error code information, and call Retail Solutions service. IRLDS: Data Error 20 An internal error has occurred in the IRLDS. Check the IRLDS display for error code information, and call Retail Solutions service. IRLDS: Detector Data Error 20 An internal error has occurred in the IRLDS. Check the IRLDS display for error code information, and call Retail Solutions service. IRLDS: Drift Fault 20 An internal error has occurred in the IRLDS. Check the IRLDS display for error code information, and call Retail Solutions service. IRLDS: General Fault 20 An internal error has occurred in the IRLDS. Check the IRLDS display for error code information, and call Retail Solutions service. IRLDS: Line/Filter Flow Fault 20 A zone on an IRLDS unit has a dirty filter or a crimped tube. IRLDS: Pressure Data Error 20 An internal error has occurred in the IRLDS. Check the IRLDS display for error code information, and call Retail Solutions service. IRLDS: Self-Test Failure 20 An IRLDS has failed its self-test procedure. IRLDS: Temperature Data Error 20 An internal error has occurred in the IRLDS. Check the IRLDS display for error code information, and call Retail Solutions service. IRLDS: Unknown Error 20 The IRLDS has experienced an error not recognized by the E2. IRLDS: Voltage Data Error 20 An internal error has occurred in the IRLDS. Check the IRLDS display for error code information, and call Retail Solutions service. ISD Missing Phase Lockout 20 After 10 consecutive missing phase trips, the com- pressor is locked out on missing phase lockout. ISD Missing Phase Trip 99 If any of the 3 phases of power is missing after the compressor is called to be on, this advisory is gener- ated. ISD Oil Pressure Lockout 20 If we have been in Low Oil warning for 2 minutes we will lock out the compressor. ISD Welded Contactor 20 If there is voltage on the 3 phase sense inputs 0.5 sec- onds after the compressor is called to be off, this advisory is generated. ISD Compressor Module Failure 20 A hardware failure has occurred in the ISD module.

C-8 • E2 RX/BX/CX I&O Manual 026-1610 Rev 13 14-SEP-2011

Page 231 of the Emerson E2 RX user manual — Appendix C: Alarm Advisory Messages
Page 231 · click to enlarge
Page 231

Alarm Name Default Priority Definition

ISD Discharge Pressure Lockout 20 The discharge pressure has gone above the high dis- charge cut out, and this condition is set to only gener- ate a lock out. ISD Discharge Temp Lockout 20 A lock out has occurred on the compressor because the discharge temperature sensor has gone above its alarm set point. ISD Supply Voltage Trip 99 If the supply voltage to the ISD falls below 170V, this advisory is generated. ISD Motor Temp Trip 99 The motor winding temperature sensor has gone above their preset value on compressors equipped with them. ISD Low Oil Warning 99 Low oil pressure is sensed on starting the compres- sor. ISD Internal Line Break 99 The internal line breaks have opened on compressors equipped with them. ISD Discharge Pressure Trip 99 The discharge pressure has gone above the high dis- charge cut out, and this condition is set to only gener- ate a trip. ISD Discharge Temp Trip 99 A trip has occurred on the compressor because the discharge temperature sensor has gone above its alarm setpoint. ISD Suction Pressure Trip 99 The suction pressure has fallen below the low pres- sure cut out. ISD No 3 Phase On Start 99 If there is no 3 phase power on the 3 phase sense inputs when the compressor is called to be on. ISD No Command Communica- tions

99 The ISD will only accept run commands from the Einstein when the communications jumper is installed. If this jumper is not installed, an advisory will be generated. KW Demand Limit Exceeded User The power measurement taken by a Power Monitor- ing or Demand Control application is higher than the programmed demand setpoint. Link To Output Bad-No Output 50 A valid link could not be made between an E2 appli- cation and an output assigned to it. Last Off Time Expired 99 Notice or alarm generated in digital generic alarming. Last On Time Expired 99 Notice or alarm generated in digital generic alarming. Leak detected 30 Irrigation pipe leak detected. Log Data Loss-SRAM Data Bad 50 A memory error has resulted in lost log data. Log Stamp Loss-Flash Data Bad 50 A memory error has resulted in lost log time stamp data. Log Stamp Loss-SRAM Data Bad 50 A memory error has resulted in lost log time stamp data. Logging Group Stuck-No Memory 15 A Logging Group is unable to save logging data because there is not enough memory.

Appendix CAlarm Advisory Messages • C - 9
Page 232 of the Emerson E2 RX user manual — Appendix C: Alarm Advisory Messages
Page 232 · click to enlarge
Page 232

Alarm Name Default Priority Definition

Lost Log Data-CRC Error 30 An internal error has occurred in E2, resulting in lost log data. Low Battery Voltage 99 The backup battery that keeps the time and date resi- dent on the E2 main board may need to be replaced. Low Limit Alarm User An HVAC application (AHU, Zone, RT-100, or ARTC/MultiFlex RTU) has a temperature below one of its heating setpoints. Low Limit Notice 50 Network variable low limit exceeded. Low Pack Superheat 11 Multiflex Pak ProAct superheat low limit exceeded. Low Suction Limit Exceeded User The suction pressure has fallen below a Suction Group’s low suction setpoint. MIP Receive Buffer Overflow 20 Messages from the Echelon network are coming into E2 too fast for the controller to process. This might be caused by an E2 having too many applications and/or logs running, or there may be too many Eche- lon devices on the same segment as the E2 (i.e., more than 63). If this message persists, call Retail Solu- tions service. Modem Didn't Initialize 20 E2 attempted to initialize the modem but failed. Modem Init String Is Not Valid 30 The dial-out initialization string for the E2’s modem is incorrect and may need editing. Neuron Not Responding 20 The chip that handles Echelon networking on the E2 is either defective or in a mode that makes it non- responsive. Contact Retail Solutions service for assistance. No Configuration Template 15 There is an internal error in the E2 software. Notify Retail Solutions service. No Description File 20 The Description File has failed to load onto the E2 when the Echelon device was commissioned. No description file exists for the Open Echelon controller being commissioned. No Refrigerant flowing Varies depend- ing on applica- tion type

Low or no refrigerant flowing.

No update has been received Varies depend- ing on applica- tion type

No update has been received from the output point connected to.

Normal Hi Limit Exceeded User An analog value has risen above its programmed Hi Limit setpoint.

C-10 • E2 RX/BX/CX I&O Manual 026-1610 Rev 13 14-SEP-2011

Page 233 of the Emerson E2 RX user manual — Appendix C: Alarm Advisory Messages
Page 233 · click to enlarge
Page 233

Alarm Name Default Priority Definition

Normal Low Limit Exceeded User An analog value has fallen below its programmed Lo Limit setpoint. Not Enough Backed Memory 10 The E2 tried to save data to the battery-backed mem- ory, but the memory was full. Not Enough Flash Memory 20 The E2 tried to save data to the flash memory, but the memory was full. Not Enough Memory 10 The E2 tried to save data to unbacked memory, but the memory was full. Not Enough Scatch Pad Memory 50 The E2 tried to save data to the scratch pad memory, but the memory was full. Notice Limit Exceeded User An analog sensor’s programmed notice limit has been exceeded. Num. Of Events Exceeded Limit User A digital value has transitioned ON more times than its defined Number of Events setpoint. Occupied Hi Limit Exceeded User An analog value has risen above its defined high limit setpoint during OCCUPIED mode. Occupied Low Limit Exceeded User An analog value has fallen below its defined low limit setpoint during the OCCUPIED mode. Off Time Exceeded Limit User A digital value has been OFF longer than its defined Time Off Last setpoint. Oil Failure Occurred User An oil sensor for a compressor has detected a failure. On Time Exceeded Limit User A digital value has been ON longer than its defined Time On Last setpoint. Open Wire 30 MultiFlex ESR controller has detected an open wire on the valve input. Overcurrent 30 MultiFlex ESR controller has detected an overcurrent condition on the valve. Override Log lost - CRC Error 20 An internal error in the E2 has resulted in a loss of the override log. Override Lost Output Cleared 20 A user tried to override an output on a CC-100, RT- 100, or similar Echelon device, but the override was not performed successfully. Try the override com- mand again. If this alarm persists, call Retail Solu- tions service. Override Operation Didn't Take 20 The E2 tried to carry out an override and was unsuc- cessful. Override State Not Restored 50 An overridden input or output has remained in the override state longer than its programmed time. Pad Memory Corrupted - Reboot 30 A problem with memory has resulted in a reset of the E2. Part Cnfg Loss-Ptr 15 Due to an internal error, part of E2’s configuration data has been lost.

Appendix CAlarm Advisory Messages • C - 11
Page 234 of the Emerson E2 RX user manual — Appendix C: Alarm Advisory Messages
Page 234 · click to enlarge
Page 234

Alarm Name Default Priority Definition

Point Log Cleared-Stamps Ahead 50 After a power failure or reset, E2 tried to recover log data from its memory, but the log data was corrupted. E2 cleared all data from its point logs and started over. Point Log Stuck-No Memory 15 A Point Log is unable to save new values because there is not enough memory. Point Logs Not Restored 15 The point logs stored in memory were not restored after the last reset or upgrade. Pressure Table Lost-Being Rblt 50 A Suction Group’s internal list of possible compres- sor combinations became temporarily invalid, requir- ing a rebuild. Product Temp Hi Limit Exceeded User A product temperature probe in a standard or case- controlled circuit has measured a product tempera- ture above the low limit setpoint. Product Temp Lo Limit Exceeded User A product temperature probe in a standard or case- controlled circuit has measured a product tempera- ture below the low limit setpoint. Program ID mismatch 20 Open Echelon controller Program ID does not match expected Program ID. Proof Fail User A proof checking device is registering a failure in one of the Application’s control devices. Proof Failure Occurred User A proof checking device is registering a failure in one of the Application’s control devices. Proof Reset-Stage In retry 50 Due to a FAIL signal from a proof checking device, the E2 is attempting to reset the proof failure. Rack Failure Occurred User A Suction Group application is registering a total rack failure. REFR Phase Loss User A phase loss device connected to Global Data has switched ON to shut down all refrigeration systems. REFR Shutdown User A Global Data application’s REFR Shutdown input has turned ON to shut down all suction groups, con- densers, and circuits. Relativ Adv: No Active Setpt 99 An application that is supposed to be generating an alarm for a specified input has no active setpoint to use for alarming. This usually occurs when alarm set- points are supplied by other applications or inputs, and the application or input fails. Resize bad! Logging Terminated 10 The number of samples was changed in a log group and the resizing of the file storing data was not suc- cessful. Check memory. Runtime Log Stuck-No Memory 15 A Runtime Log is unable to save new data because there is not enough memory. Runtime Logs Not Restored 15 The runtime logs stored in memory were not restored after the last reset or upgrade.

C-12 • E2 RX/BX/CX I&O Manual 026-1610 Rev 13 14-SEP-2011

Page 235 of the Emerson E2 RX user manual — Appendix C: Alarm Advisory Messages
Page 235 · click to enlarge
Page 235

Alarm Name Default Priority Definition

RX/BX Firmware Update Failed 20 The E2’s firmware update was not successful. RX/BX Firmware Was Updated 50 The E2’s firmware was successfully updated. Smoke Detected 30 A smoke detector input on an ARTC/MultiFlex RTU has detected smoke. SRAM Memory Corrupted - Reboot

30 A problem with memory has resulted in a reset of the E2. State Switched 'On' User A digital value that has been set up to alarm when ON has switched ON. Status Config Loss-CRC Error 30 An internal error has occurred in the E2. Stuck 30 MultiFlex ESR controller has detected a stuck valve. System date needs manual reset 20 The date/time of the box is not valid. System In Pump Down User The suction pressure has fallen below the pump down setpoint for a Suction Group, causing shutdown of the rack. Template File Bad - CC100 Liq 15 A template file in E2 for a CC-100P or CC-100LS is bad. Template File Bad - CC100 Suct 15 A template file in E2 for a CC-100H is bad. Template File Bad - CS100 Ckt 15 A template file in E2 for a CS-100 is bad. Test Dial Successful 50 E2 performed a test dial-out with its modem, and the dial-out was successful. Time Updated By A User 99 A user changed the time in the current E2. Time Updated Over Network 99 The time in the current E2 was updated by another controller or user on the network. Timed Out Waiting For FW Updt. 50 The E2 waited for a firmware update to begin, and it never did. Too Many Reboots: Flash erased 50 A number of successive reboots has erased the Flash RAM. Too Many Reboots: SRAM erased 50 A number of successive reboots has erased the SRAM. Total On Time Exceeded Limit User A digital value’s total ON time has exceeded its defined Time ON Total setpoint. Trip Alarm 30 Generic pulse trip alarm. Tripped 20 WPK condenser fan or compressor trip. Unit Ctlr Cell Create Failed 20 The E2 unsuccessfully tried to create a unit controller cell. Unknown FW Update Attempted 50 An error has occurred during a firmware update of E2. Call Retail Solutions service for assistance. Unknown Heap Operation Error 50 There is an internal error in the E2 software. Notify Retail Solutions service. Unoccupied Hi Limit Exceeded User An analog value has risen above its defined high limit setpoint during UNOCCUPIED mode. Unoccupied Low Limit Exceeded User An analog value has fallen below its defined low limit setpoint during UNOCCUPIED mode.

Appendix CAlarm Advisory Messages • C - 13
Page 236 of the Emerson E2 RX user manual — Appendix C: Alarm Advisory Messages
Page 236 · click to enlarge
Page 236

Alarm Name Default Priority Definition

User Cleared All Applications 50 A user has cleared out all data from all applications in this E2. User/Appl. Forced Reset 50 A user or an application has forced a reset of this E2. VS Alarm 20 Multiflex PAK variable speed device alarm. VS Inverter Fail User A variable-speed inverter driving a variable-speed fan or compressor has failed. WCC Controller Alarm 20 Woodley case controller alarm. WPK Controller Alarm 20 Woodley Pack Amps Fail alarm. Watchdog Countdown Hit Zero 20 E2 locked up while trying to perform a task. If this alarm occurs often, there may be a problem with your system. Contact Retail Solutions service. Watchdog Reset Timer Failed 20 E2 tried to reset itself to clear a hung task, but the “watchdog” feature on the E2 was disabled. Check the jumper J19 labeled “Watch Dog” on the E2 main board. This jumper should be either be set to “ENABLE” or it should not be present at all. X300X300 Links Lost-CRC Err 20 An internal error has caused a loss of communication between E2s.

C-14 • E2 RX/BX/CX I&O Manual 026-1610 Rev 13 14-SEP-2011

Page 237 of the Emerson E2 RX user manual — Throttling Range
Page 237 · click to enlarge
Page 237

Appendix D: PID Control

Introduction to PID Control

output after each update are made by three different modes of control: Proportional (“P”) Mode, Integral (“I”) Mode, and Derivative (“D”) Mode. Each mode of control makes its own adjustment to the output percentage, and the three adjustments are added to the previous output percentage to determine the new output percentage. In mathematical terms, every update will affect the output percentage as follows:

PID Control is a specialized method of closed-loop control that strives to maintain equality between an input value and a user-defined setpoint by operating a device or a number of devices at somewhere between 0% and 100% of full capacity.

PID Control works by making adjustments to the out- put at a constant rate called the update rate (usually 2-6 seconds). For every update that occurs, PID Control takes a reading from the input sensor or transducer, measures the distance between the input and the setpoint (also called the error), makes a series of calculations, and adjusts the out- put percentage in such a way as to move the input towards the setpoint in the most efficient manner.

NEW OUT% = OLD OUT% + (“P” mode adjustment) + (“I” mode

adjustment) + (“D” mode adjustment)

Each of the three modes (P, I, and D) serves a different and important purpose, as described below:

The “calculations” that determine the new value of the

P Proportional Mode

Tries to stop the error from changing. Measures difference between current and previous error, and adjusts output per- centage to prevent any further movement. I Integral Mode

Tries to bring the error to zero (input = setpoint).

D Derivative Mode

Tries to slow or stop a rapidly changing error so P and I Modes may effectively work to eliminate it.

Proportional (“P”) Mode

of input value units between a 0% output and a 100% out- put. For example, in a Case Control application, the Throt- tling Range would be the number of degrees between the input temperature that would result in a 0% output and the temperature that would cause a 100% output. Therefore, the Throttling Range essentially determines the percentage of the output adjustment that will be added to the previous percentage when a change in input occurs.

The Proportional Mode in PID determines the system’s immediate reaction to a change in the error. Proportional Mode simply analyzes the difference between the current error and the previous error. Based on the size of this dif- ference, Proportional Mode will make a change to the out- put in an attempt to stabilize the input value and keep it from changing any further.

PID Control places this Throttling Range around the setpoint. As a result, Proportional Mode works to keep the temperature near the setpoint and within the throttling range. In most cases, the Throttling Range straddles the setpoint evenly on both sides, as shown in Figure D-1. However, in some applications such as Condenser Con- trol, the Throttling Range may be placed elsewhere see

Mathematically, the following equation determines the “P” Mode adjustment for a single update:

“P” mode adjustment = Kp (E – E-1)/TR

Kp = proportional constant

E = current error E-1 = error during last update

TR = throttling range

Throttling Range

In simplest terms, the Throttling Range is the number

Introduction to PID Control Appendix D: PID Control • D-1

Page 238 of the Emerson E2 RX user manual — CONTROL INPUT
Page 238 · click to enlarge
Page 238

Throttling Range on page D-1.

If Proportional Mode is functioning incorrectly in your system, it may be more appropriate for you to change the Throttling Range value to a more appropriate value. Kp is designed as a fine-tuning constant (for example, it might be used to speed up reaction slightly by setting it to 1.04, or to slow down reaction by setting it to 0.98). Integral Mode

THROTTLING

OUTPUT AT SETPOINT (shown here as 50%)

RANGE

The Integral Mode (also called “I” Mode) is the por- tion of PID control that seeks to make the input equal to the setpoint. When an update occurs, the Integral Mode measures the difference between the current input value and the setpoint. The size of this difference determines Integral Mode’s output percentage adjustment. Why “I” Mode is Necessary

CONTROL INPUT

Figure D-1 - Throttling Range

Example 1: Suppose a Case Control application has a throttling range of 10 degrees. Also, for simplicity’s sake, assume only the Proportional Mode is active and the pro- portional constant Kp is one. The system begins with a 0% output at the bottom of the Throttling Range and with an input value of 24F. Because the throttling range is 10 degrees, Proportional Mode will gradually add 100% to the output percentage as the input changes to 34 over time.

Though Proportional Mode handles the majority of the workload during PID control, there are two major short- comings that make the “I” Mode necessary.

Proportional Mode, if left to operate all by itself, is only capable of stopping the error from changing. When the error is not changing, neither is the “P” portion of the output. This means the system may reach stability at any value, regardless of whether it is above or below the set- point (see Figure D-2). Proportional Mode alone has no mechanism that can bring the error to zero after stability has occurred. The “I” Mode is necessary in order to move the input in the direction of the setpoint.

Suppose, for example, the input increases by one degree every time an update occurs. The following adjust- ment would then likewise occur after every update:

“P” mode adj. = (1.0)(1 degree) / 10 degrees = 0.1 = 10%

After 10 updates, the input value would be 34F and the output would be 100%. The same would happen if it were five updates at two degrees each or one hundred updates at 0.1 degrees each. In every case, the tempera- ture travels a total of 10 degrees, and because the throt- tling range is also 10 degrees, the output travels from 0% to 100% proportionally.

Higher Throttling Range values will result in a wider 0-100% range, and therefore will result in smaller reaction to changes in input values. Proportional Constant (Kp)

The Proportional Constant is simply a multiplier that can be used to fine-tune the size of the Proportional Mode adjustment. Raising the value of Kp results in a greater reaction to input value changes, while lowering it results in a smaller reaction.

Changing Kp is essentially the same thing as changing the value of the throttling range. For example, having a TR of 10 and a Kp of 2 is the same as having a TR of 5 and a Kp of 1. Mathematically speaking, the effective propor- tional range is calculated by dividing the Throttling Range by Kp.

D-2 • E2 RX/BX/CX I&O Manual 026-1610 Rev 13 14-SEP-2011

0% 100% · 26512028 · Proportional Offset

Page 239 of the Emerson E2 RX user manual — The “I” Mode Calculation
Page 239 · click to enlarge
Page 239
Emerson E2 RX — Saturation diagram (page 239)
Fig. 223 · Saturation

S E T P O I N T S E T P O I N T

Figure D-2 - Comparison of “P” Mode vs. “P” + “I” Mode

setpoint, Proportional Mode will reduce the 100% output percentage in an attempt to stop the movement and stabi- lize the temperature.

Once the input value has wandered outside Propor- tional Mode’s throttling range, the output percentage will be at 0% (if below the Throttling Range) or at 100% (if above the Throttling Range). At this point, PID is consid- ered to be in saturation, meaning it is operating at full (or zero) capacity and is not able to react any further to changes that occur beyond the throttling range.

To put it another way, when a system is saturated, the input changes the placement of the Throttling Range. As shown in Figure D-2, as the input rises above the Throt- tling Range, the top end of the Throttling Range rises with it. When the input finally changes direction, the Throttling Range remains at its new position.

Proportional Mode cannot distinguish between a satu- rated and an unsaturated system; it simply makes propor- tional adjustments to the output percentage. Therefore, once an input value in a saturated system changes direc- tion, Proportional Mode reacts to correct the movement, regardless of how much error exists. As the temperature changes direction and again moves in the direction of the

The “I” Mode covers for Proportional Mode’s inability to account for saturation. When the input value is outside the throttling range, “I” Mode will continue to adjust the output percentage to bring the input value towards the set- point

Emerson E2 RX — Saturation diagram (page 239)
Fig. 224 · Saturation

AS INPUT IN SATURATED SYSTEM CHANGES DIRECTION, THROTTLE RANGE REMAINS CHANGES DIRECTION, THROTTLE RANGE REMAINS

“I” CORRECTS ERROR AND BRINGS THROTTLING RANGE BACK TO NORMAL

S E T P O I N T S E T P O I N T

TIME TIME “P” MODE ONLY “P” + “I” MODES

Figure D-3 - Saturation in “P” vs. “P” + “I” Modes

The “I” Mode Calculation

When changing the value of Ki, it should be noted that small adjustments yield large results. For this reason, it is suggested that Ki should remain close to 1.0 and certainly no less than 0.5 and no greater than 2.0. Derivative Mode

To determine the “I” Mode adjustment for each update, the following calculation occurs:

“I” mode adjustment = Ki * (current error)

The Proportional and Integral Modes provide a good method of controlling a closed-loop system. However, in special circumstances where the input value is changing rapidly, there may be a lag time between when the error is noted and the length of time it takes the system to compen-

Ki in this equation is called the integral constant. It is simply a multiplier that increases or decreases the speed at which the “I” Mode will increase or decrease the percent- age.

Introduction to PID Control Appendix D: PID Control • D-3

Saturation

Page 240 of the Emerson E2 RX user manual — How Condenser Control and HVAC PID Differs From The Others
Page 240 · click to enlarge
Page 240

sate for error.

the case temperature equal to the temperature setpoint.

To reduce this lag time, Derivative Mode is used. Derivative Mode constantly analyzes the rate of change of the error, makes a prediction about what the future error will be, and makes an adjustment to the output in an attempt to reduce the rate of change in the error.

Condenser Control and HVAC Control seek only to keep pressure or temperature values below or above their setpoints. Thus, the system is only concerned when the input value is on the wrong side of the setpoint (e.g., above the setpoint in Condenser Control and Cooling Control, or below the setpoint in Heating Control). Any value on the other side of the setpoint is considered an acceptable value for the purposes of controlling, and therefore the output will be at or near 0%.

In layman’s terms, Derivative Mode causes PID con- trol to “overshoot” the amount of output percentage to compensate for the slow reaction times of the P and I Modes. As a result, Derivative Mode slows the rate error change down to a level the P and I Modes can handle. The “D” Mode Calculation

Condenser PID and HVAC Cooling Control only react to pressure or temperature levels that climb above the set- point. Likewise, in HVAC Heating Control, the tempera- ture level must be below the heating setpoint in order to begin heating. The 0-100% output percentage is then determined based on the distance between the input and setpoint, and the rate of change. Output at Setpoint

To determine the “D” Mode adjustment for each update, PID performs the following calculation:

“D” mode adjustment = Kd * (E – (2E-1/t-1)+(E-2/t-2))

Kd = derivative gain E = current error E-1=error from the previous update t-1=the amount of time elapsed since the previous exe-

Mathematically, the only difference between PID for Condenser and HVAC Control and PID for other systems is the Output at Setpoint value.

cution E-2=error from the update before the previous update t-2=the amount of time elapsed between 2 executions

The Output at Setpoint value is simply the percentage the output will be when the input value is stabilized at the setpoint. In other words, when the PID input equals the PID setpoint, the PID output percentage will be fixed at the Output at Setpoint value.

ago and the previous execution The factors E-1/t-1 and E-2/t-2 are the rates of change of the error (in units per minute). The rate of change for the previous error (E-1) weighs twice as much in the

Output at Setpoint is the value that determines where the throttling range is placed. As mentioned in “Throttling Range” on page 1, the Throttling Range is the range of input values across which Proportional Mode will gradu- ally move the output percentage from 0% to 100% (excluding effects by the Integral and Derivative Modes). The Output at Setpoint value basically tells the RMCC where to place the Throttling Range in relation to the set- point (this is explained in further detail below). Output at Setpoint for Non-Condenser/ HVAC PID

Derivative Mode calculation as the 2nd previous error (E-

2), since E-1 is closer to the current rate of change than E-2.

The derivative gain Kd is a multiplier that changes the total size of the Derivative Mode adjustment. If Derivative Mode is causing PID control to react too quickly or too slowly, the derivative gain may be adjusted to correct the problem. Higher values of Kd result in quicker reactions; lower values result in slower reactions.

How Condenser Control and HVAC PID Differs From The Others

For all non-condenser and non-HVAC PID control, the Output at Setpoint is fixed at 50% (except for Analog Out- put Modules, which may be programmed with any value from 0-100%). As mentioned before, this means that PID control will constantly strive to achieve a stable system where the input is equal to the setpoint and the output is 50%.

The RMCC approaches condenser control and HVAC control from a different angle than other PID-controlled systems such as Pressure Control and Case Control. PID control for Pressure Control and Case Control seeks to maintain a constant equality between the input and the set- point. Specifically, in Pressure Control, the RMCC tries to keep the suction pressure or temperature equal to the suc- tion setpoint, and in Case Control, the RMCC tries to keep

The throttling range in a PID Control application with a 50% Output at Setpoint is placed in such a way as to put the setpoint right in the middle of the throttling range, as shown in Figure D-3.

D-4 • E2 RX/BX/CX I&O Manual 026-1610 Rev 13 14-SEP-2011

Page 241 of the Emerson E2 RX user manual — Other PID Features
Page 241 · click to enlarge
Page 241

point, the output percentage is dropped from 50% (it is assumed this will result in the input rising back to the set- point). Likewise, when the input is higher than the set- point, the output percentage is raised. For Condenser Control PID, no reaction is made to an input that is lower than the setpoint, since the output percentage is already 0%. Changing the Output at Setpoint

Emerson E2 RX — Output at Setpoint for Condenser/HVAC PID Control diagram (page 241)
Fig. 225 · Output at Setpoint for Condenser/HVAC PID Control

Advanced users may wish to change the Output at Set- point in order to change the stabilization characteristics of their system(s). In most cases, the default values of the Output at Setpoint (0% for Condenser Control and HVAC, 50% for all others) are appropriate and recommended. Changing the value of the Output at Setpoint may have some beneficial results, but at the same time it may also hamper the system’s ability to react to changing condi- tions, and it may also result in decreased energy efficiency.

Figure D-4 - Centered Setpoint PID Control (Output @ Setpoint = 50%)

Therefore, as the input value gradually drops below the setpoint, the Proportional Mode of PID will gradually bring the output percentage down. When the input drops below the low end of the throttling range, the output will be zero.

Other PID Features

The opposite happens with the input value begins to rise above the setpoint. The output percentage is gradually brought up from 50% until, when the input is at or above the throttling range, Proportional Mode will bring the out- put to 100%. Output at Setpoint for Condenser/HVAC PID Control

The following section lists other PID-related constants or control structures that are a part of some PID control algorithms. Many of these features are advanced features that are accessible only by service personnel or advanced users. As a general rule, it is best to contact Retail Solu- tions before changing any of these values. Output at Minimum / Output at Max- imum

For Condenser and HVAC PID Control, the Output at Setpoint defaults to 0%. This places the 0% end of the Throttling Range at the setpoint value, and it generally means Proportional Mode will strive to pull the input back down below the setpoint and attain a 0% output percent- age. As the input climbs from the setpoint to the top of the Throttling Range, Proportional Mode likewise increases the output percentage to 100%.

The Output at Minimum and Output at Maximum val- ues are used to change the range of possible output per- centages. The default values (0% for minimum, 100% for maximum) allow the output to vary from fully off to fully on; changing these values, therefore, would only be neces- sary if you desire a limited output range.

Emerson E2 RX — Other PID Features diagram (page 241)
Fig. 226 · Other PID Features

Two things occur when the Output at Minimum or Output at Maximum values are changed:

1. The throttling range is shortened as dictated by the new values. For example, if you specified a 20% minimum, the portion of the throttling range that would usually represent the range of outputs from 0% to 20% is cut off. Any input value that falls within the previous 0% to 20% portion of the throttling range will cause the Proportional Mode to move the output towards 20%.

Figure D-5 - End Setpoint PID Control (Output @ Setpoint = 0%)

2. The Output at Minimum or Output at Maximum value replaces any calculated adjustment that would normally call for the output to be outside of the specified range. In other words, if the Output at Minimum and Output at Maximum values

The differences between the two PIDs can be seen by observing the throttling ranges. For non-Condenser Con- trol applications, PID reacts to error that exists on either side of the setpoint. If the input goes lower than the set-

Other PID Features Appendix DPID Control • D - 5
Page 242 of the Emerson E2 RX user manual — Minimum Accumulated Error
Page 242 · click to enlarge
Page 242

are 20% and 100% respectively, the output per- centage will never be below 20%, even if the P, I, and D Mode adjustments call for the output to be below 20%. The output will remain in saturation at 20% until a higher output percentage is called for.

trolled by PID control. Valve filtering is active in this CC- 100, with the filter period set to six seconds and the filter percentage set to 75%.

During one sample taken during a period interval, the CC-100 calls for a valve position of 50%. One period (six seconds) later, the CC-100 asks for a 58% valve opening.

In short, PID works as it normally does, except the out- put never goes below Output at Minimum or above Output at Maximum. Minimum Accumulated Error

The total difference between the current sample and the previous sample is +8% (58 - 50%). To determine the actual amount the valve will change, the CC-100 multi- plies the filter percentage (75%) with the total amount of valve position change (8%). As a final result, the new PID output value for the CC-100 will be 56%.

The Minimum Accumulated Error setting disables error accumulation in the “I” Mode when the current error is equal to or less than a certain amount. For example, if the PID setpoint is 30 and the Minimum Accumulated Error is 1, the “I” Mode will not adjust the PID output per- centage as long as the input is between 29 and 31.

To demonstrate this, suppose in the example above the CC-100 continues to call for a 58% output during the period immediately after the 6% adjustment. Since the total difference between the asked-for percentage and the current actual percentage is 2% (58 - 56), valve filtering will make the new adjustment for that period 1.5% (75% of 2). As a result, the new valve output would be 57.5%. Future filter periods will bring the actual output even closer to the asked-for output.

Because “I” Mode does not accumulate error within the Minimum Accumulated Error range, the control input is allowed to settle on a value other than the setpoint. It is possible in the example given above for the system to achieve stability at any value between 29 and 31 without the “I” Mode trying to bring the error to zero.

The practical use of Minimum Accumulated Error is to set up a “close enough” zone around your PID setpoint. When the control input is within the zone, PID will not worry about making any “I” adjustments to attempt to equalize the input and the setpoint. Proportional Mode will handle any minor input changes that occur within this zone. Filtering

PID filtering is used for systems that appear to be over- reacting to changes in the control input. If filtering is to be used at all, it is recommended to use caution, since even a small amount of filtering may cause the PID loop to become underreactive.

Filtering is a feature commonly used by CC-100s in valve control (and it thus sometimes called “valve filter- ing”). The primary purpose of filtering is to dampen the rate of change of the PID percentage in an effort to make the PID control loop less reactive.

The filtering feature takes samples of the PID output percentage at regular intervals (which are determined by a parameter called the filter period). Every time a new filter period interval occurs, the PID percentage sampled during the last period interval is subtracted from the current PID percentage from the current period interval.

The result of this subtraction is multiplied by a param- eter called the filter percentage (0 - 100%) to yield the actual amount the PID percentage will change.

Over time, the application of the filter percentage to the change in PID position will result in a PID control loop with a smaller amount of reaction to changes in the input.

ExampleA stepper EEV valve on a CC-100 is con-

D-6 • E2 RX/BX/CX I&O Manual 026-1610 Rev 13 14-SEP-2011

Application · Application

Page 243 of the Emerson E2 RX user manual — Minimum Accumulated Error
Page 243 · click to enlarge
Page 243
Page 243 of the Emerson E2 RX user manual — Minimum Accumulated Error
Page 244 of the Emerson E2 RX user manual — Minimum Accumulated Error
Page 244 · click to enlarge
Page 244
Page 244 of the Emerson E2 RX user manual — Minimum Accumulated Error
Page 245 of the Emerson E2 RX user manual — Appendix E: Compressed Point Log Sample Limits and Precision Tab
Page 245 · click to enlarge
Page 245

Appendix E: Compressed Point Log Sample Limits and Precision Tab

Medium Resolution Low Resolution Engineering Unit Low Clip High Clip Precision Low Clip High Clip Precision Temperature Degrees Centigrade* -200 1,500 0.0259427 -40 97.7778 0.555556 Degrees Fahrenheit -328 2,732 0.0466969 -40 208 1 Differential Temperature Delta Degrees Centigrade* -200 200 0.00610417 -68.889 68.889 0.555556 Delta Degrees Fahrenheit -360 360 0.0109875 -124 124 1 Temperature Change Rate Degrees Centigrade Per Minute* -50 50 0.00152604 -6.889 6.889 0.055556 Degrees Fahrenheit Per Minute -90 90 0.00274688 -12 12 0.1 Degrees Centigrade Per Hour -3,000 3,000 0.0915625 -413.333 413.333 3.3333 Degrees Fahrenheit Per Hour -5,400 5,400 0.164813 -744 744 6 Pressure Pascals* -100,000 20,000,000 306.734 -100,000 4,200,000 17339 Kilopascals -100 20,000 0.306734 -100 4,200 17.3387 Pounds Per Square Inch -14.50 2,901 0.0444881 -14.5038 609.160 2.51477 Bars -1 200 0.00306734 -1 42 0.173387 Pascals (low readings)* -1,250 5,000 0.0953776 -1,250 3,500 19.1532 Inches of Water -5.02 20.0732 0.000382906 -5.018 14.0512 0.0768931 Centimeters of Water -12.75 50.9870 0.000972604 -12.7468 35.6909 0.195313 Differential Pressure Delta Pascals -2,000,000 2,000,000 61.0417 -500,000 500,000 4032.26 Delta Kilopascals -2,000 2,000 0.0610417 -500 500 4.03226 Delta Pounds Per Square Inch -290.08 290.076 0.00885336 -72.5190 72.5190 0.584831 Delta Bars -20 20 0.000610417 -5 5 0.0403226 Delta Pascals (low readings)* -3,000 3,000 0.0915625 -1,000 1,000 8.06452 Delta Inches of Water -12.04 12.0439 0.000367590 -4.01463 4.01463 0.03237606 Delta Centimeters of Water -30.59 30.5922 0.000933700 -10.1974 10.1974 0.08223710 Humidity Relative Humidity* 0 100 0.00152604 0 100 0.403226 Light Level Lux* 0 25,000 0.381510 0 10,000 40.3226 Foot-Candles 0 2,323.5 0.0354576 0 929.400 3.74758 Electrical Voltage Volts* -3,276.8 3,276.1 0.1 0 496 2 Electrical Current Amps* 0 6,552.90 0.1 0 4,960 20 Milliamps 0 6,552,900 100 0 4,960,000 20000 Electrical Resistance Ohms* 0 655,290 10 0 496,000 2000 Power Watts* 0 6,552,900 100 0 496,000 2000 Kilowatts* 0 6,552.9 0.1 0 496 2

Appendix ECompressed Point Log Sample Limits and Precision Tab • E - 1
Page 246 of the Emerson E2 RX user manual — Appendix E: Compressed Point Log Sample Limits and Precision Tab
Page 246 · click to enlarge
Page 246

Energy Watt-Hours* 0 131,058,000 2000 0 9,920,000 40000 Kilowatt-Hours* 0 131,058 2 0 9,920 40 Parts Per Million Parts Per Million* 0 32,764.5 0.5 0 2,480 10 Percentage Percentage* 0 200 0.00305208 0 124 0.5 Revolutions Per Minute Revolutions Per Minute* 0 65,529 1 0 2,480 10 RPM Change Rate Revolutions Per Minute Per Minute* 0 6,552.9 0.1 0 4,960 20 Time Milliseconds* 0 65,529 1 0 248 1 Seconds* 0 65,529 1 0 248 1 Minutes* 0 65,529 1 0 248 1 Hours* 0 6,552.9 0.1 0 248 1 Days* 0 6,552.9 0.1 0 248 1 Months* 0 6,552.9 0.1 0 248 1 Years* 0 6,552.9 0.1 0 248 1 Time (seconds display)* 0 65,529 1 0 248 1 Time (minutes display)* 0 6,552.9 0.1 0 248 1 Time (hours display)* 0 6,552.9 0.1 0 248 1 Volume Liters* 0 248,056 3.78544 0 9,387.894 37.8544 Gallons 0 65,529 1 0 2,480 10 Cubic Meters* 0 1,855.57 0.0283168 0 70.2258 0.283168 Cubit Feet 0 65,529 1 0 2,480 10 REU_CCF* 0 65,529 1 0 248 1 Volume Change Rate (liquid) Liters Per Second* 0 65.529 0.001 0 7.82319 0.0315451 Gallons Per Minute 0 1,038.66 0.0158503 0 124 0.5 REU_CCFH* 0 655.29 0.01 0 25 0 Volume Change Rate (gas) Cubit Meters Per Second* 0 30.9262 0.000471947 0 1.17043 0.00471948 Cubic Feet Per Minute 0 65,529 1 0 2,480 10 Distance Meters* 0 65,529 1 0 248 1 Feet 0 214,990 3.28084 0 813.648 3.28084 Inches 0 65,529 1 0 248 1 Centimeters 0 65,529 1 0 248 1 Distance Change Rate (speed) Meters Per Second* 0 332.89 0.005080 0 248 1 Feet Per Minute 0 65,529 1 0 48,818.9 196.850 Meters Per Minute 0 19,973 0.304800 0 14,880 60 Frequency Hertz* 0 6,552.9 0.1 0 248 1 Weight Pounds (lb) 0 1,444.6 0.2 0 546.7 2.2 Kilograms (kg) 0 655.3 0.1 0 248 1

E-2 • E2 RX/BX/CX I&O Manual 026-1610 Rev 13 14-SEP-2011

Page 247 of the Emerson E2 RX user manual — Appendix E: Compressed Point Log Sample Limits and Precision Tab
Page 247 · click to enlarge
Page 247
Page 247 of the Emerson E2 RX user manual — Appendix E: Compressed Point Log Sample Limits and Precision Tab
Page 248 of the Emerson E2 RX user manual — Appendix E: Compressed Point Log Sample Limits and Precision Tab
Page 248 · click to enlarge
Page 248
Page 248 of the Emerson E2 RX user manual — Appendix E: Compressed Point Log Sample Limits and Precision Tab
Page 249 of the Emerson E2 RX user manual — SYMPTOM POSSIBLE PROBLEM SOLUTION
Page 249 · click to enlarge
Page 249

Appendix F: Troubleshooting

The chart below describes symptoms and solutions if troubleshooting the system or equipment is needed. For further information, contact Retail Solutions Service at 1-800-829-2724.

SYMPTOM POSSIBLE PROBLEM SOLUTION

I/O Network Problems I/O board not getting power. Check I/O board power--is the green STATUS light on? If not, check power wiring connections, and use a multimeter to verify the board is getting 24VAC. Reset power to board.

I/O board not communicating or won’t come online.

Check I/O network connections: 1. Check wire polarity (positive to positive/negative to negative) 2. Check for broken or loose wires.

Dip switches are set incorrectly. Check I/O board network dip switches. Verify network ID number is not a duplicate and that baud rate switches are set to 9600. (If switches are wrong, make changes and then reset the controller.) Refer to Section 6.1.6, Network ID Numbers (Board Numbers).

Terminating resistance jumpers are set incorrectly.

Check for proper setting of ter- minating resistance jumpers. Network segment should be ter- minated on the two endpoints of the daisy chain and unterminated everywhere else. Refer to Sec- tion 6.1.8, Setting the Terminat- ing and Biasing Jumpers.

Boards are not powered. Check Network/Power voltages. Refer to Section 6.1.9, Powering the I/O Boards.

Appendix FTroubleshooting • F - 1
Page 250 of the Emerson E2 RX user manual — SYMPTOM POSSIBLE PROBLEM SOLUTION
Page 250 · click to enlarge
Page 250

SYMPTOM POSSIBLE PROBLEM SOLUTION

Echelon Network Problems Faulty wiring. Check connections. Are wires broken or loose? Check network polarity (positive to positive/ negative to negative). Check for wire damage.

Termination jumpers are set incorrectly.

Check for proper setting of ter- minating resistance jumpers. Network segment should be ter- minated on the two endpoints of the daisy chain and unterminated everywhere else. Refer to Sec- tion 8.4, Device Termination.

Subnet (unit #) is set incorrectly. Each controller must have its own subnet address. Refer to Section 8.3, Echelon Network Structuring (Daisy-Chains).

F-2 • E2 RX/BX/CX I&O Manual 026-1610 Rev 13 14-SEP-2011

Page 251 of the Emerson E2 RX user manual — SYMPTOM POSSIBLE PROBLEM SOLUTION
Page 251 · click to enlarge
Page 251

SYMPTOM POSSIBLE PROBLEM SOLUTION

Compressor will not Operate Compressor is not programmed properly.

Verify that E2 was programmed for correct number of compres- sor stages. Highlight the General tab (C1) in the Suction Group Setup screen. Is the correct num- ber of stages in the “Number of Stages” field?

Compressor types are set up incorrectly.

Make sure that compressor stages were properly set up as VS (variable speed), C (com- pressor), or U (unloader).

Compressor programmed with incorrect rating.

Verify that compressors were assigned the proper rating (HP/ AMP, or BTU).

Pressure setpoints are set up incorrectly.

Set proper pressure setpoints. If you are controlling the rack using suction pressure, enter the pressure setpoint in the SUC PRES SETPT field. If you are controlling by temperature, enter the temperature setpoint in the CTRL TEMP SETPT field. Note: Pressure setpoints are located under the Setpoints tab (C2) in the Suction Group Setup screen.

Board and point addresses are incorrect.

Set proper board and point set- tings for input, output, and com- pressor outputs. Board and point settings are located under the Inputs tab (C4), Outputs tab (C5), and Comp Outs tab (C7) in the Suction Group Setup screen.

Appendix FTroubleshooting • F - 3
Page 252 of the Emerson E2 RX user manual — SYMPTOM POSSIBLE PROBLEM SOLUTION
Page 252 · click to enlarge
Page 252

SYMPTOM POSSIBLE PROBLEM SOLUTION

Compressor will not Operate (Cont.)

8RO fail-safes are not wired cor- rectly.

Verify fail-safe wiring on 8RO board for N.O./N.C. positions. One wire of the two-wire con- nection should always be con- nected to the middle terminal. The second wire must be either connected to the N.C. terminal (if you want the relay to be closed (ON) during power fail- ure) or the N.O. terminal (if you want the relay to be open (OFF) during power failure.)

Compressor in override. Highlight compressor stage and cancel the override by pressing Enter to open the Actions Menu. Select 3 for Override options, or go to the Override/Bypass Log to view and cancel overrides: 1. From the Main Menu, press 8 to open the Status menu. 2. From the Status menu, press 4 for the Graphs/Logs menu. 3. Press 3 for the Override/ Bypass Log. (This screen gives you quick access to all overrides/ bypasses in the system)

Rack is in Phase Fail. Verify correct phase and verify correct input for phase loss. If you specified that phase pro- tection would be used on this rack, the Phase Loss input is dis- played. The Phase Loss input is automatically configured to use E2’s Global Data phase loss pro- tection source. If you wish to define a different source, re- define this input definition. To point this input to a board and point address: press (EDIT) and then 1 to change the definition format.

Oil sensors are set up but are not in use.

Remove oil sensors from indi- vidual compressors. 1. Highlight the Comp Setup tab (C6) in the Suction Group Setup screen. 2. Use the arrow keys to select the OIL SENSOR field. 3. Choose “None” from the LOOK UP menu.

F-4 • E2 RX/BX/CX I&O Manual 026-1610 Rev 13 14-SEP-2011

Page 253 of the Emerson E2 RX user manual — SYMPTOM POSSIBLE PROBLEM SOLUTION
Page 253 · click to enlarge
Page 253

SYMPTOM POSSIBLE PROBLEM SOLUTION

Problems with Condenser Condenser will not operate. Verify that E2 is programmed with proper number of fans. 1. Highlight the General tab (C1) in the Condenser Setup screen. 2. Is the correct number of fans in the Number of Fans field?

Incorrect board and point set- tings.

Confirm proper board and point settings: Go to the Inputs tab (C3) in the Condenser Setup screen to check PRES CRTL IN and DISCH TRIP IN.

Fail-Safe wiring on 8RO is incorrect.

Verify proper fail-safe switch positions on the 8RO board. The fail-safe dip switches are labeled S2 on the 8RO and S3 on the 8ROe and 8IO. Set the rocker UP (ON) to close the relay and turn the output ON during net- work failure. Set the switch DOWN (OFF) to open the relay and turn the output OFF during network failure.

Condenser will not split. Enable the condenser to split. Go to the General tab (C1) in the Condensers Setup screen and set the Split Enable field to Yes.

Unsplit setpoint is set too low. Unsplit setpoint value is com- pared with discharge pressure value instead of temperature. Enter the value in terms of dis- charge pressure. Go to the Setpoints tab (C2) in the Condensers Setup screen and check that the UNSPLIT STPT field value has been entered as a pressure value.

Half of the fans are not running. Check the split fan relay output: 1. Go to the Other Outs tab (C7) in the Condensers Setup screen and check that SPLIT FAN has a board and point assignment. 2. Verify Split is enabled: Go to General tab (C1) in the Condens- ers Setup screen and set the Split Enable field to Yes. 3. Verify output is ON.

Appendix FTroubleshooting • F - 5
Page 254 of the Emerson E2 RX user manual — SYMPTOM POSSIBLE PROBLEM SOLUTION
Page 254 · click to enlarge
Page 254

SYMPTOM POSSIBLE PROBLEM SOLUTION

Problems with Cases Case will not go into hot gas or cool gas defrost.

Check Group LLSV in Suction Group setup: 1. Go to the Outputs tab (C5) on the Suction Groups Setup screen and check GROUP LLSV. 2. Verify that the case(s) is assigned to the correct group.

Case will not terminate out of defrost mode.

1. Verify the termination type (Term Type) in the Defrost tab (C4) in the Standard Circuits Setup screen. 2. Check the defrost termination input location on circuit input. 3. Go to the Inputs tab (C6) and check DEFROST AV TERM.

Problems with Global Actions Information cannot be read from another E2 controller.

Verify that the controller with the sensor is set up as the Pri- mary and the controller receiv- ing the information is set up as the User (both controllers default as local).

F-6 • E2 RX/BX/CX I&O Manual 026-1610 Rev 13 14-SEP-2011

Page 255 of the Emerson E2 RX user manual — SYMPTOM POSSIBLE PROBLEM SOLUTION
Page 255 · click to enlarge
Page 255

SYMPTOM POSSIBLE PROBLEM SOLUTION

Problems with Temp Sensor or Pressure Transducer Displaying Proper Value

16AI input dip switches are set improperly.

The 16 dip switches on the 16AI board correspond to each of the inputs: Dip Switches Up = Temperature Sensor Dip Switches Down = Pressure Transducer

Incorrect board and point address.

Set proper board and point set- tings for both input and output: Go to the Inputs tab in the appli- cation’s Setup screen and check Board and Point.

Incorrect sensor type. 1. Verify that the sensor type in E2 is the same as the sensor installed. (For example, “5V- 200PSI” is a 5-volt powered 200PSI pressure transducer, and “Temperature” is the standard Retail Solutions temperature sensor.

2. From the Main Menu, select System Configuration (7) and Input Definitions (1). 3. Highlight the desired input and press (SETUP) to check Sensor Type.

No Heat or Air Will Come On Incorrect board and points assignment.

Make sure that your board and points are assigned to the correct compressors and heat stages

Check the Heat and Cool OAT lockout temps.

From the Home screen, press (AHU), (SETUP). Move cursor to C5 (HT/CL Setup) to check the Lockout temperatures.

Appendix FTroubleshooting • F - 7
Page 256 of the Emerson E2 RX user manual — SYMPTOM POSSIBLE PROBLEM SOLUTION
Page 256 · click to enlarge
Page 256

SYMPTOM POSSIBLE PROBLEM SOLUTION

Dehumidification Problems Number of stages are not set up or set up incorrectly.

From the Home screen, press (AHU), (SETUP). Move cursor to C9 (Dehum) to check Dehum Stages.

Dehumidifier source not set up. From the same screen, verify what the sensor source is.

Temperature setting for DEHUM OCC or DEHUM UOC is set too high.

From the same screen, check the minimum temperature setting.

Lighting Control Problems Lights will not come on. Make sure you have a Time Schedule set up. A Time Sched- ule is not Lighting Control. You can use the same Time Schedule for several Lighting Controls. Set up the Time Schedule first and then assign it to a Lighting Control.

Set up a Time Schedule and got to Lighting Control. Choose the desired application and press (SETUP). Move the cursor to C7 (Inputs) and highlight the Board field. Press (LOOK UP), choose the input device and press . Highlight the Point field and press (LOOK UP). Select the type of schedule and press .

Make sure Lighting Control out- put is assigned.

Lights Will Not Come On With The Photocell

Photocell is not recognized by controller.

Make sure the photocell is con- figured as an analog input.

Verify that the type of light sen- sor is correct.

If using a light level sensor from another E2 controller, set it up on the controller it is associated with in the Global Data section.

F-8 • E2 RX/BX/CX I&O Manual 026-1610 Rev 13 14-SEP-2011

Page 257 of the Emerson E2 RX user manual — Appendix F: Troubleshooting
Page 257 · click to enlarge
Page 257
Page 257 of the Emerson E2 RX user manual — Appendix F: Troubleshooting
Page 258 of the Emerson E2 RX user manual — Appendix F: Troubleshooting
Page 258 · click to enlarge
Page 258
Page 258 of the Emerson E2 RX user manual — Appendix F: Troubleshooting
Page 259 of the Emerson E2 RX user manual — Appendix G: Revision Log
Page 259 · click to enlarge
Page 259

Appendix G: Revision Log

What's New in the E2 Manual Rev 13:

  • Light Commercial Thermostat
  • Refrigerant Leak Detection System (RLDS)
  • XM Series of Controllers
  • Copeland Scroll — K5 Refrigeration Compressor (Lrg Ref Scroll)
  • XR75CX-Case Display
Appendix GRevision Log • G - 1
Page 260 of the Emerson E2 RX user manual — Appendix G: Revision Log
Page 260 · click to enlarge
Page 260
Page 260 of the Emerson E2 RX user manual — Appendix G: Revision Log
Page 262 of the Emerson E2 RX user manual — E2
Page 262 · click to enlarge
Page 262

viewing 12-12 date and time stamp 12-12 dial-out 10-22

Box-To-Box 1-6 Building Controller 1-2 Buttons

The Alarm Output 10-22 The Display Line 10-22 The Echelon Network 10-22 forced to normal. See Alarms, reset to nor-

cold reset 10-1 reset 10-1 BX Capabilities 1-2 BX Home Screen 12-1 -C- Case Circuits, Standard. See Standard Circuits. Case Control Circuits

mal. resetting 12-14 reset-to-normal 12-13 return-to-normal 12-13 state, in advisory log 12-12 the Alarm Annunciator 10-22 Alternate I/O Formats 10-27 Analog Sensor Control 11-38 Anti-Sweat

associating CC-100s with 11-16 defrost in 11-12 overview 11-10 Case Controllers

anti-sweat control 11-13 associating with Case Control Circuits 11-16 CC-100H

dewpoint input 11-14 how setpoints work 11-14 how anti-sweat works 11-45 setup 11-45 zones, definition of 11-45 Application Setup 10-25 -B- Base Log Group 11-17 Battery 4-5

defined 2-12, 11-10 CC-100LS

defined 2-12, 11-10 CC-100P

defined 2-12, 11-10 clean mode 11-14 CS-100

defined 2-12, 11-10 defrost 11-12

enable switch 4-6 low 4-6, 12-18 replacement 4-6 test 4-6 Baud Rates 10-12

pump down delay 11-12 defrost types 11-12 digital sensors

installing 9-14 dual temp control 11-14 EEPRs

E2

RS-232 port 10-12 E2, setting for I/O Network 10-12 I/O Network 6-3

recovery mode 11-12 fail-safe mode 11-15 fan control 11-14 humidity sensor installation 9-15 inputs 9-14 installation guide 8-6 light control 11-14 mounting dimensions 3-5 power modules

8DO 6-3 8IO 6-3 ARTC 6-3 E2 6-3 IRLDS 6-3 Blue "R". See Cold Reset. Board Types 6-1 Boards on the I/O Network 10-2, 10-15 Boiler 11-55

wiring 9-15 wiring schematic 9-15 problems with cases F-6 recovery mode

Alarms 11-55 Box to Box Communications 7-1

I-2 • E2 RX/BX/CX I&O Manual 026-1610 Rev 13 14-SEP-2011

case-controlled 11-13 · EEPRs 11-12

Page 263 of the Emerson E2 RX user manual — Index
Page 263 · click to enlarge
Page 263

EEVs 11-11 sensor default locations 9-14 sensor failures 11-15–11-16 sensors

evaporative 11-4 fail-safe dip switch setup 11-5 fan control 11-4

single-speed 11-4 two-speed 11-4 variable-speed 11-4 fast recovery 11-4 hardware overview 11-4 input types 11-5 output wiring 11-5 overriding compressor stages 12-10 problems with F-5 split mode 11-4 Temperature Differential Strategy 11-3 Control Keys 12-8 Convenience Store Controller 1-3 Cool cut in/cut out setpoints 11-52 Copeland Digital Discus Compressor 11-1, 11-2 CPU 2-2 Creating 10-14 CS-100 11-10 CS-100. See Case Controllers, CS-100 CT Drives 6-6 CUB 2-7, 11-30 CX Home Screen 12-2 -D- Daisy Chains

default installation locations 9-14 setting up individual CC-100s 11-16 specifying the number of 10-2, 10-16 stand-alone mode 11-15 superheat control 11-11 temperature control 11-11 temperature probes

installing 9-14 valve cable 9-15 valves 11-11

EEPRs 11-12 EEVs 11-11 liquid pulse 11-11 liquid stepper 11-11 pulse 11-11 stepper 11-11 suction stepper 11-12 walk-in freezer control 11-15 wash mode. See Clean Mode. 11-14 CC-100H. See Case Controllers. CC-100LS. See Case Controllers. CC-100P. See Case Controllers. Checking Boards Online 10-16, 12-11 Checking Status Screens 12-11 Clean Mode 11-14, 12-9

diagram of 6-2 Date and Time 12-12 Date Setup 10-9 Daylight Savings Dates 10-10 Defrost

initiating 12-9 Clean Out 10-1 Clean Switches 11-7 Cold Reset

defrost cycle 11-6, 11-12 demand 11-13

performing a 10-1 Cold Reset Button 10-1 COM Port Setup 5-1 Commissioning 10-17 Commissioning CC-100s 10-17

fail-safe time 11-13 drip time. See Defrost, run-off time. electric 11-13 emergency 11-13

how commissioning works 10-17 Commissioning MODBUS 10-17 Compressors

initiating 12-9 hot gas 11-12 in case controlled circuits 11-12 inhibiting, using demand sensors 11-13 manual defrost

ending a cycle 12-10 initiating 12-9 off-cycle 11-12

strategy 11-3 bypassing fan stages 12-10

  • I - 3

troubleshooting F-3 Condensers · air cooled 11-3

Page 264 of the Emerson E2 RX user manual — Index
Page 264 · click to enlarge
Page 264

pulsed 11-13 pump down delay 11-12 reverse cycle hot gas 11-12 run-off time 11-12 standard circuits 11-6

blank face 3-3 Box-to-Box 1-6 capabilities 1-1 connection to other 1-6 documentation 1-6 Echelon connectors 4-2 Echelon jumpers 4-2 installation instructions 4-7 mounting

defrost states 11-6 defrost type 11-6 electric defrost 11-6 emergency defrost 11-7 pulsed defrost 11-7 termination 11-7 timed and reverse air 11-6 termination 11-13

blank face 3-3 recessed mount 3-1 retrofit 3-2 standard mount 3-1 networking

pulsed defrost 11-13 temperature 11-13 timed (off-cycle) 11-12 Dehumidification 11-52 Demand

introduction to 1-4 Quick Start 10-1 repeater

part number for manual 1-6 routers

explanation of 11-43 Demand Control 11-34 Demand Defrost. See Defrost, demand. Detailed Setpoint Change Logging 11-56

part number for manual 1-6 RS-232 Baud Rate 10-12 RS485 port 4-2 RS485 termination jumpers 4-2 specifications 2-2 user’s guide 1-6 EC-2 Case Controller

Log Information 11-56 Logged Changes 11-57 Unlogged Changes 11-57 Dewpoint Probe 3-11

location 3-11 mounting 3-11 Dewpoint Probe. See Sensors, Dewpoint Probe. DHCP Enabled 10-11 Digital Discus Compressor 11-1, 11-2 Digital Scroll Compressor Support 11-2 Digital Sensor Control 11-38 Dip Switches

defined 2-11 detail 2-11 Echelon Network

checking boards online 10-16, 12-11 daisy-chaining 8-1 device wiring 8-1 E2 RX 1-5 installing Echelon devices 8-3 location of connectors on E2 4-2 maximum number of nodes 8-2 Neuron ID number

baud rate 6-3 input type 9-1 network settings 6-3 Discontinued boards

manual entry of 10-19 overview 8-1 peripherals for the 1-5 powering Echelon devices 8-3 problems with F-2 subnets

16AIe 2-11 8ROe 2-11 ESR8 2-12 Discus 6-8 Discus Compressor 11-1, 11-2 Door Switches 11-7 -E- E2 1-1

setting the number 10-2, 10-16 termination block installation 8-3 unit controllers 10-2, 10-16

I-4 • E2 RX/BX/CX I&O Manual 026-1610 Rev 13 14-SEP-2011

Page 265 of the Emerson E2 RX user manual — Index
Page 265 · click to enlarge
Page 265

wire length limitations 8-3 wire restrictions 8-3 wiring 8-1 wiring type 8-1 Echelon Network, Setting Up 10-16 Economizers. See AHUs, economizers. ECT MODBUS

Hand-held Terminal 2-8 Hardware Overview 2-1 Header Icons 10-4, 12-6 Heat cut in/cut out setpoints 11-52 Help Line 10-28 Holiday Schedules 11-43 Home Screens

Control Techniques VSD 6-6 Copeland ISD Compressors 6-6 Energy Meter 6-7 iPro DAC 6-7 MRLDS 6-7 XR, XEV and XEV22D Case Controller 6-6 Edit Menu 10-27 EEPRs. See Valves. EEVs. See Valves. Electric Defrost. See Defrost, electric. Enhanced Lighting

RX and BX 12-1 Hot Gas Defrost. See Defrost, hot gas. Hot Keys 12-8 Humidistats. See Sensors, humidity. Humidity Sensors. See Sensors, humidity. -I I/O Board Names 6-1 I/O Boards

snap-track installation 3-4 I/O Formats

alternate 10-27 I/O Network

combination strategies 11-31 occupied mode 11-32 Enhanced Suction Group 11-1 ESR8 Board

baud rate 10-12 Baud Rate Dip Switches 6-3 Baud Rate Settings

defined 2-12 features 2-12 installation guide 8-7 mounting 3-5 specifying the number of 10-2, 10-17 Ethernet Box to Box 7-1 -F- Flexible Combiner 1-7, 11-53 Full Options On and Off 12-3 Function Buttons

ARTC 6-3 baud rate settings 6-3

8DO 6-3 8IO 6-3 E2 6-3 IRLDS 6-3 boards on the 10-2, 10-15 checking boards online 10-16, 12-11 daisy chains 6-2 dip switches and rotary dials 6-3 E2 RX 1-4 max number of RS485 Boards 6-1 peripherals for the 1-5 problems with F-1 terminating resistance jumpers 6-4 I/O Network, Setting Up 10-15 Icons 10-4 IMC Controllers 6-5 Index Tabs 10-28, 12-6 Inputs

BX controller 12-12 RX controller 12-11 Function Keys 10-4, 10-28 -G- Gateway Board 2-4

models 2-4 Global Data

priority settings 10-24 setup 10-24 Graph View 12-17

zooming 12-17 -H- Hand-Held Terminal

default values on sensor failure 9-9 selecting units 9-8 setup screen 9-7

connection to case controller 9-15

  • I - 5

analog

Page 266 of the Emerson E2 RX user manual — Index
Page 266 · click to enlarge
Page 266

zones and cycles 11-50 -J- Jumpers

push button mode 9-10 selecting units 9-9 pulse type

setting units per pulse 9-9 Insertion Temperature Probe. See Sensors, Inser- tion Probe. Inside Temperature Sensor. See Sensors, Inside Temperature. Installation Guide

E2 4-2 RS485 termination

settings on I/O boards 6-4 -K- Keyboard 2-2 Keypad 12-6 KW Transducer. See Sensors, KW Transducer. -L- LED Status

16AI 6-18 4AO 6-15 8IO 6-17 CC-100/CS-100 8-6 E2 4-7 ESR8 8-7 MultiFlex 16 6-13 MultiFlex Combo 6-14 MultiFlex ESR 6-19, 6-20, 6-21 TD3 8-8 Interal Modem (Previous Generation Board) 3-6 Internal Modems (New Processor Board) 3-5, 4-4 IRLDS

Keyboard 2-3 Main Board (CPU) 2-3 PIB 2-2 LEDs Plug-In I/O Card 4-5 LEDs Plug-In RS-485 4-5 License Management 10-19 Licensing 1-8 Light Commercial Thermostat 6-8

Advisory and Alarm 6-8 Inputs 6-8 Light Level Sensor 3-11 Lighting

specifying the number of 10-2, 10-15 Irrigation

cycle control types 11-51 cycle control types

multi-logic combiner 11-32 offset solar 11-33 control method select 11-31 functions 11-31 overview 11-30 separate control

timed 11-51 volume 11-51 cycle scheduling 11-51 flow sensor related tests 11-52

leak 11-52 obstructed zone 11-52 number of zones 11-50 override failsafe 11-52 service modes 11-52 zone inhibit 11-51

min ON/OFF cell 11-33 proof cell 11-33 slave scheduling 11-33 standard control 11-31

light level interface 11-31 schedule interface cell 11-32 unoccupied mode 11-32 Line Up ESR 11-6 Line Up MultiFlex ESR 11-6 Liquid Level Sensors 3-11 Log View 12-17 Logged Inputs and Outputs 12-15

alarm 11-51 freeze lockout 11-51 rain delay 11-51 timed 11-51 volume 11-51 zone override 11-51

I-6 • E2 RX/BX/CX I&O Manual 026-1610 Rev 13 14-SEP-2011

Show 5 more labels / short text on this page
digital · Echelon termination · E2 4-2 termination · zones and cycles · alternate control 11-32
Page 267 of the Emerson E2 RX user manual — RS485 I/O
Page 267 · click to enlarge
Page 267

standard mount 3-1 ESR8 3-5 I/O Boards And Enclosures

power monitoring 11-44 Logging Groups 11-16

Base Log Group 11-17 Data Compression 11-17

single enclosure 3-3 light level sensors 3-11 liquid level sensors 3-11 temperature sensors

Clipping 11-17 Incompressible DataTypes 11-17 Log Reports 11-19 Logging Setup 11-18 Logging On 10-1 Logs and Graphs 12-15 LonMark Device 8-5 LonWorks Network. See Echelon Network. -M- Main Board 2-2 Main Processor Board 2-2 Main Status Screen 10-3 Manual Defrost

insertion probe 3-8 inside 3-7 outside 3-8 supply and return air sensors 3-8 MuliFlex Boards

mounting in enclosure 3-3 plus board 6-2 MultiFlex 16 Board

features 2-4, 2-5 MultiFlex Boards 2-4

ending 12-10 initiating from Main Status Screen 12-9 Memory

16 2-4 combination input/output 2-5 CUB 2-7, 11-30 PAK 2-7, 11-30 RCB 2-7, 11-26 RCB,RTU compared 11-26 RTU 2-7 MultiFlex CUB 2-7, 11-30 MultiFlex ESR Board 2-8 MultiFlex PAK 2-7, 11-30 MultiFlex Plus Board 6-2 MultiFlex RCB 2-7, 11-26 MultiFlex RTU 2-7, 11-26 -N- Navigation 12-3 Network

clearing all data from 10-1 Menu

actions 10-6 User Access 10-13 Menus 12-3 Messages

alarm advisory C-1 MODBUS Commissioning 10-19 Modem

setup 10-10 Modem Board 3-5, 4-4 Modem Mounting 3-7 Modem/Communication Expansion Board 3-5 Modem/Communication Expansion Card 4-4 Modular Chiller Control 11-53

RS485 I/O

Learning Mode 11-54 Parameters 11-54 Mounting

baud rate dip switches 6-3 daisy chain diagram 6-2 dip switches and rotary dials for board

bullet and pipe mount sensors 3-9 CC-100 3-5 dewpoint probe 3-11 E2

numbering 6-3 Network Summary Screen 12-11 Neuron ID

manual entry of 10-19 No Description File 8-5 Noise Minimization 6-2

blank face 3-3 recessed mount 3-1 retrofit 3-2

  • I - 7

Logging · 1616 6-5 MultiFlex

Page 268 of the Emerson E2 RX user manual — Index
Page 268 · click to enlarge
Page 268

-O- Off-Cycle Defrost. See Defrost, off-cycle. Open Echelon 8-4 Operator’s Guide to Using the E2 12-1 OSS. See AHUs, optimum start-stop. Outputs

accumulator reset types 11-50 configuration 11-49 high trip 11-50 logging 11-50 outputs 11-49 Pulse Modulating Anti-Sweat Controller. See PMAC II. Pulsed Defrost. See Defrost, pulsed. -R- RCB 2-7, 11-26 Recovery Mode, for Case Controllers 11-11 Refrigeration Controller 1-1 Repeaters

selecting units 9-13 Outside Temperature Sensor. See Sensors, out- side temperature. Overrides

initiating 12-10 -P- PAK 2-7, 11-30 Part Numbers and Model Descriptions 2-1 Passwords

part number for manual 1-6 two-channel

setting 10-13 Peer Communications 7-1

mounting 3-6 Reset Button 10-1 Resetting 12-14 Resetting the E2 Controller 10-1 Retrofit Mounting 3-2 Returned-To-Normal and Forced-To-Normal Alarms 12-13 Reverse Cycle Hot Gas. See Defrost, reverse cy- cle hot gas. Revision Log G-1 RLDS 6-11

closed network layout 7-2 ethernet IP configurations 7-1 ethernet network layouts 7-2 hardware specifications 7-1 open network layout 7-2, 7-3 software specifications 7-2 troubleshooting 7-4 PIB 2-2 PID Control D-1 Plus Board 6-2 PMAC II

Diagnostic Alarms 6-11 RMS 11-56

defined 2-10 features 2-10 Pointers

RMS Asset 11-56 RMS Scale 11-56 Rotary Dials

input and output 12-16 Points. See Inputs or Outputs. Power

I/O Board Settings 6-3 Settings For 8IO 6-3 Routers

I/O Boards 6-5 Power Modules

part number for manual 1-6 RS-232 Baud Rate 10-12 RS485 Network

wiring 9-15 wiring schematic 9-15 Power Monitoring 11-43

I/O Network 6-1 noise minimization 6-2 RTU 2-7, 11-26 RX Capabilities 1-1 RX Home Screen 12-1 -S- Screen Elements 10-4

daily logs 11-44 hourly logs 11-44 logging 11-44 monthly logs 11-44 shed mode 11-43 Pressure Transducers 3-7

I-8 • E2 RX/BX/CX I&O Manual 026-1610 Rev 13 14-SEP-2011

Pulse Accumulation 11-49 · digital · function keys 10-4

Page 269 of the Emerson E2 RX user manual — Index
Page 269 · click to enlarge
Page 269

header 10-4 Help line 10-4 Screen Types 10-5, 12-5

indoor RH sensors 3-9 outdoor RH sensor 3-10 insertion probe 3-8

actions menu 10-6 RX and BX Main Menus 10-5 setup screens 10-7 status screens 10-5 system configuration menu 10-7 system information menu 10-8 Screens

location 3-8 mounting 3-8 inside temperature 3-7

location 3-7 mounting 3-8 Klixons

Main Status 10-3 Status 10-5 Sensor Control

wiring to input board 9-3 KW Transducer

wiring to input board 9-6 light level

alarm control 11-38 combiner function 11-38 cut in/cut out control 11-38 analog sensor control modules 11-38 digital

location 3-11 mounting 3-11 wiring to input board 9-4 liquid level

mounting 3-11 liquid level probe

alarm control 11-39 logical combination methods 11-39 digital sensor control modules 11-38 Sensors

wiring to input board 9-5 offsets 9-9 outside temperature 3-8

location 3-8 mounting 3-8 power connections on input boards for 9-2 pressure transducers

E2 setup 9-7 analog liquid level indicator

wiring to input board 9-4 bullet and pipe mount

mounting 3-9 coil in temperature

wiring to input board 9-3 Eclipse voltage-to-pressure chart B-1 mounting 3-7 refrigeration probes and sensors 3-9

location 3-9 mounting 3-9 coil out temperature

location 3-9 mounting 3-9 relative humidity

location 3-9 mounting 3-9 dewpoint probe 3-11

wiring to input board 9-3 sail switches

location 3-11 mounting 3-11 wiring to input board 9-5 digital

wiring to input board 9-3 supply and return air

selecting units 9-9 wiring to input board 9-3 Hansen probe. See Sensors, liquid level

temp-to-resistance chart B-1 wiring to input board 9-3 Wiring To 16AI/8IO Input Points 9-1 Separate Setpoints 11-24

probe. humidity

connecting to a case controller 9-15

  • I - 9
Show 6 more labels / short text on this page
installation 3-9 · analog · analog · Eclipse · mounting 3-8 temperature · configuration 11-53
Page 270 of the Emerson E2 RX user manual — Index
Page 270 · click to enlarge
Page 270

Serial Configuration 5-1 Serial Connection Manager 5-1 Serial Tab 5-1 Service Button 10-17

temperature monitor 11-6 temperature control 11-6 temperature monitor 11-6 wiring 11-8 State 12-12 Status Screen 12-5 Status Screen, The Main 10-3 Status Screens 10-5

separate 11-24 Setpoints, entering 10-27 Setting Number of Applications 10-3 Setting the Time and Date 10-9 Setup Screen 12-5 Setup Screen Configuration 10-26 Setup Screens 10-7 Single Enclosure Mounting For I/O Boards 3-3 Snap-track Installation For I/O Boards 3-4 SNTP Support 10-9 Software Applications 11-1 Software Licensing 1-8, 10-19 Software Overview

Circuit Status Screens 12-11 Condenser Status Screen 12-11 Home Screen 12-1 navigation of cursor 12-7 Network Summary Screen 10-16, 12-11 Sensor Control Screen 12-11 Suction Group Status Screen 12-11 Subnet

setting the number 10-2, 10-16 Suction Groups 11-1

bypassing compressor stages 12-10 Enhanced 11-1 floating setpoint control 11-1 hardware overview 11-2 Introduction 11-1 overriding compressor stages 12-10 PID control strategy overview 11-1 variable-speed compressors 11-1 Summary Screen 12-5 Superheat Control 11-11 Supply And Return Air Sensors 3-8 System Configuration Menu 10-7 System Information Menu 10-8 -T- Tabs, Index 10-28 TCP/IP

Demand Monitoring 11-34 Specify Number of Boards 10-15 Split Mode 11-4 Standard Circuits

electric defrost 11-6 hot gas 11-6 reversed cycle hot gas 11-6 states 11-6 termination 11-7 timed and reverse air 11-6 types 11-6 emergency defrost 11-7 fan control 11-8 inputs

setup 10-11 TD3 Temperature Display

wiring 11-9 line up ESR Defrost control 11-6 line up MFESR Defrost control 11-6 outputs

defined 2-13 features 2-13 Temperature Control

wiring 11-10 problems with F-6 pulsed defrost 11-7 refrigeration control 11-5

case controllers 11-11 Temperature Differential (TD) Control 11-48

alarms 11-49 configuration 11-48 inputs 11-49 setpoints 11-48 TD failsafes 11-48

line up ESR 11-6 line up MFESR 11-6 temperature control 11-6

I-10 • E2 RX/BX/CX I&O Manual 026-1610 Rev 13 14-SEP-2011

CC-100 10-18 Setpoints · Demand Control · defrost 11-6

Page 271 of the Emerson E2 RX user manual — EEPR
Page 271 · click to enlarge
Page 271

TD strategy 11-48 Temperature Differential Strategy 11-3 Termination 8-2

EEPR

cables for CC-100 9-15 EEVs

block 8-3 Echelon jumpers

cables for CC-100 9-15 Sporlan CDS

E2 4-2 RS485 jumpers

wire colors 9-16 Sporlan SEI

E2 4-2 Termination Block 8-3 Termination Resistance Jumpers I/O Network 6-4 Termination Resistance Jumpers, I/O Network. See Jumpers, termination. Thermostatic Expansion Valves. See TXVs. Time/Date Setup 10-9

wire colors 9-16 -W- Watt-hour Transducer. See Sensors, KW Trans- ducer. Web Services 10-20 Wire Types, Echelon Network 8-1 -X- XM Series of Controllers 6-12 -Z- Zone Control 11-26

Active Date 10-9 Active Time 10-9 Date Format 10-10 Daylight Savings Dates 10-10 Daylight Savings Time uses GMT 10-10 Sundown 10-10 Time Zone 10-9 Unit Location From 10-10 Toggle Full Options 12-3 Transducers, Pressure. See Sensors, pressure transducers. Transformers

AHUs 11-24, 11-26

dehumidification 11-28 dehumidification 11-28 economization 11-27, 11-28

enabling 11-27 MultiFlex RTU 11-26 MultiFlex RTUs

dehumidification 11-28 optimum start-stop (OSS) 11-28 stand-alone mode 11-29

I/O board 6-5 selecting the correct VA rating 6-5, 8-3 six-board 6-5 ten-board 6-5 three-board 6-5 Troubleshooting F-1 Two speed fan control 11-52 TXVs

MultiFlex RTU 11-29 temperature control 11-27 zone humidity 11-28 zone temperature 11-27

control using CC-100s 11-12 -U- Unit Controllers (Echelon) 10-2, 10-16 User Access Menu 10-13 Usernames, Creating 10-13 -V- Valves

wire colors 9-16 Alco ESV

  • I - 11

Alco ESR · wire colors 9-16

Page 272 of the Emerson E2 RX user manual — Index
Page 272 · click to enlarge
Page 272
Page 272 of the Emerson E2 RX user manual — Index
Page 273 of the Emerson E2 RX user manual — Index
Page 273 · click to enlarge
Page 273

The contents of this publication are presented for informational purposes only and they are not to be construed as warranties or guarantees, express or implied, regarding the products or services described herein or their use or applicability. Computer Process Controls, Inc. reserves the right to modify the designs or specifications of such products at any time without notice. Computer Process Controls, Inc. does not assume responsibility for the selection, use or maintenance of any product. Responsibility for proper selection, use and main- tenance of any Computer Process Controls, Inc. product remains solely with the purchaser and end-user.

026-1610 14-SEP-2011 Emerson is a trademark of Emerson Electric Co. ©2011 Computer Process Controls, Inc. All rights reserved. Printed in the USA.

Sources

References & links

Pages referenced in this manual — manufacturer, support and downloads.

Display codes

Error codes

What the fault codes shown on the display mean and how to clear them.

CodeMeaningFix
E2Call Retail Solutions service for assistance. p.235
CC-100HSee Case Controllers. p.263
CC-100PSee Case Controllers. p.263
CS-100See Case Controllers, CS-100 p.263
Fix-it

Troubleshooting

Common problems, likely causes, and what to do.

ProblemPossible causeRemedy
I/O Network ProblemsCheck I/O board power--is the green STATUS light on? If not, check power wiring connections, and use a multimeter to verify the board is getting 24VAC. Reset power to board. p.249
I/O Network ProblemsCheck I/O network connections: 1. Check wire polarity (positive to positive/negative to negative) 2. Check for broken or loose wires. p.249
I/O Network ProblemsCheck I/O board network dip switches. Verify network ID number is not a duplicate and that baud rate switches are set to 9600. (If switches are wrong, make changes and then reset the controller.) Refer to Section 6.1.6, Network ID Numbers (Board Numbers). p.249
I/O Network ProblemsCheck for proper setting of ter- minating resistance jumpers. Network segment should be ter- minated on the two endpoints of the daisy chain and unterminated everywhere else. Refer to Sec- tion 6.1.8, Setting the Terminat- ing and Biasing Jumpers. p.249
I/O Network ProblemsCheck Network/Power voltages. Refer to Section 6.1.9, Powering the I/O Boards. p.249
Echelon Network ProblemsCheck connections. Are wires broken or loose? Check network polarity (positive to positive/ negative to negative). Check for wire damage. p.250
Echelon Network ProblemsCheck for proper setting of ter- minating resistance jumpers. Network segment should be ter- minated on the two endpoints of the daisy chain and unterminated everywhere else. Refer to Sec- tion 8.4, Device Termination. p.250
Echelon Network ProblemsEach controller must have its own subnet address. Refer to Section 8.3, Echelon Network Structuring (Daisy-Chains). p.250
Compressor will not OperateVerify that E2 was programmed for correct number of compres- sor stages. Highlight the General tab (C1) in the Suction Group Setup screen. Is the correct num- ber of stages in the “Number of Stages” field? p.251
Compressor will not OperateMake sure that compressor stages were properly set up as VS (variable speed), C (com- pressor), or U (unloader). p.251
Compressor will not OperateVerify that compressors were assigned the proper rating (HP/ AMP, or BTU). p.251
Compressor will not OperateSet proper pressure setpoints. If you are controlling the rack using suction pressure, enter the pressure setpoint in the SUC PRES SETPT field. If you are controlling by temperature, enter the temperature setpoint in the CTRL TEMP SETPT field. Note: Pressure setpoints are located under the Setpoints tab (C2) in the Suction Group Setup screen. p.251
Compressor will not OperateSet proper board and point set- tings for input, output, and com- pressor outputs. Board and point settings are located under the Inputs tab (C4), Outputs tab (C5), and Comp Outs tab (C7) in the Suction Group Setup screen. p.251
Compressor will not Operate (Cont.)Verify fail-safe wiring on 8RO board for N.O./N.C. positions. One wire of the two-wire con- nection should always be con- nected to the middle terminal. The second wire must be either connected to the N.C. terminal (if you want the relay to be closed (ON) during power fail- ure) or the N.O. terminal (if you want the relay to be open (OFF) during power failure.) p.252
Compressor will not Operate (Cont.)Highlight compressor stage and cancel the override by pressing Enter to open the Actions Menu. Select 3 for Override options, or go to the Override/Bypass Log to view and cancel overrides: 1. From the Main Menu, press 8 to open the Status menu. 2. From the Status menu, press 4 for the Graphs/Logs menu. 3. Press 3 for the Override/ Bypass Log. (This screen gives you quick access to all overrides/ bypasses in the system) p.252
Compressor will not Operate (Cont.)Verify correct phase and verify correct input for phase loss. If you specified that phase pro- tection would be used on this rack, the Phase Loss input is dis- played. The Phase Loss input is automatically configured to use E2’s Global Data phase loss pro- tection source. If you wish to define a different source, re- define this input definition. To point this input to a board and point address: press  (EDIT) and then 1 to change the definition format. p.252
Compressor will not Operate (Cont.)Remove oil sensors from indi- vidual compressors. 1. Highlight the Comp Setup tab (C6) in the Suction Group Setup screen. 2. Use the arrow keys to select the OIL SENSOR field. 3. Choose “None” from the LOOK UP menu. p.252
Problems with CondenserVerify that E2 is programmed with proper number of fans. 1. Highlight the General tab (C1) in the Condenser Setup screen. 2. Is the correct number of fans in the Number of Fans field? p.253
Problems with CondenserConfirm proper board and point settings: Go to the Inputs tab (C3) in the Condenser Setup screen to check PRES CRTL IN and DISCH TRIP IN. p.253
Problems with CondenserVerify proper fail-safe switch positions on the 8RO board. The fail-safe dip switches are labeled S2 on the 8RO and S3 on the 8ROe and 8IO. Set the rocker UP (ON) to close the relay and turn the output ON during net- work failure. Set the switch DOWN (OFF) to open the relay and turn the output OFF during network failure. p.253
Problems with CondenserEnable the condenser to split. Go to the General tab (C1) in the Condensers Setup screen and set the Split Enable field to Yes. p.253
Problems with CondenserUnsplit setpoint value is com- pared with discharge pressure value instead of temperature. Enter the value in terms of dis- charge pressure. Go to the Setpoints tab (C2) in the Condensers Setup screen and check that the UNSPLIT STPT field value has been entered as a pressure value. p.253
Problems with CondenserCheck the split fan relay output: 1. Go to the Other Outs tab (C7) in the Condensers Setup screen and check that SPLIT FAN has a board and point assignment. 2. Verify Split is enabled: Go to General tab (C1) in the Condens- ers Setup screen and set the Split Enable field to Yes. 3. Verify output is ON. p.253
Problems with CasesCheck Group LLSV in Suction Group setup: 1. Go to the Outputs tab (C5) on the Suction Groups Setup screen and check GROUP LLSV. 2. Verify that the case(s) is assigned to the correct group. p.254
Problems with Cases1. Verify the termination type (Term Type) in the Defrost tab (C4) in the Standard Circuits Setup screen. 2. Check the defrost termination input location on circuit input. 3. Go to the Inputs tab (C6) and check DEFROST AV TERM. p.254
Problems with Global ActionsVerify that the controller with the sensor is set up as the Pri- mary and the controller receiv- ing the information is set up as the User (both controllers default as local). p.254
Problems with Temp Sensor or Pressure Transducer Displaying Proper ValueThe 16 dip switches on the 16AI board correspond to each of the inputs: Dip Switches Up = Temperature Sensor Dip Switches Down = Pressure Transducer p.255
Problems with Temp Sensor or Pressure Transducer Displaying Proper ValueSet proper board and point set- tings for both input and output: Go to the Inputs tab in the appli- cation’s Setup screen and check Board and Point. p.255
Problems with Temp Sensor or Pressure Transducer Displaying Proper Value1. Verify that the sensor type in E2 is the same as the sensor installed. (For example, “5V- 200PSI” is a 5-volt powered 200PSI pressure transducer, and “Temperature” is the standard Retail Solutions temperature sensor. NOTE: The previous Eclipse and Standard sensors are now 5V and 12V respectively. 2. From the Main Menu, select System Configuration (7) and Input Definitions (1). 3. Highlight the desired input and press  (SETUP) to check Sensor Type. p.255
No Heat or Air Will Come OnMake sure that your board and points are assigned to the correct compressors and heat stages p.255
No Heat or Air Will Come OnFrom the Home screen, press  (AHU),  (SETUP). Move cursor to C5 (HT/CL Setup) to check the Lockout temperatures. p.255
Dehumidification ProblemsFrom the Home screen, press  (AHU),  (SETUP). Move cursor to C9 (Dehum) to check Dehum Stages. p.256
Dehumidification ProblemsFrom the same screen, verify what the sensor source is. p.256
Dehumidification ProblemsFrom the same screen, check the minimum temperature setting. p.256
Lighting Control ProblemsMake sure you have a Time Schedule set up. A Time Sched- ule is not Lighting Control. You can use the same Time Schedule for several Lighting Controls. Set up the Time Schedule first and then assign it to a Lighting Control. p.256
Lighting Control ProblemsSet up a Time Schedule and got to Lighting Control. Choose the desired application and press  (SETUP). Move the cursor to C7 (Inputs) and highlight the Board field. Press  (LOOK UP), choose the input device and . press Highlight the Point field and press  (LOOK UP). Select the type of schedule . and press p.256
Lighting Control ProblemsMake sure Lighting Control out- put is assigned. p.256
Lights Will Not Come On With The PhotocellMake sure the photocell is con- figured as an analog input. p.256
Lights Will Not Come On With The PhotocellVerify that the type of light sen- sor is correct. p.256
Lights Will Not Come On With The PhotocellIf using a light level sensor from another E2 controller, set it up on the controller it is associated with in the Global Data section. p.256

Ask about the Emerson E2 RX

Owners and our team usually reply within a day — and your question helps the next person too.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
No questions yet about the Emerson E2 RX

Be the first to ask — other owners or our team will answer.

Original document

Emerson E2 RX manual PDF

273 pages·10.6 MB·Freezer·PDF
Click any page above to open it here
Page 1 / …
100%
Loading pages…