A Technical Manual from the experts in Business-Critical Continuity™
Specification Number: 582145500 Model: NetSure™ ITM




NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
This page is intentionally blank.


NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
4.5 Making Module-to-Module -48VDC and Ground/Return Interconnections (if system consists of multiple DC UPS modules) 32 4.5.1 -48Vdc and Ground/Return Busbar Interconnects 32 4.6 Making Alarm/Control Interconnections between Modules (if system consists of multiple DC UPS modules) 35 4.6.1 RS-485 Module-to-Module Interconnect 35 4.6.2 CAN-Bus Module-to-Module Interconnect 35 4.6.3 BLVD Module-to-Module Interconnect 36 5.0 INSTALLING PCUS 42
6.0 START-UP INSTRUCTIONS 43 6.1 General 43 6.2 Final Battery Connections 43 6.2.1 Introduction 43 6.2.2 Safety 43 6.2.3 Connecting Batteries 43 6.3 Initially Starting and Verifying DC UPS System Operation 54 6.3.1 Initially Starting the DC UPS System and Verifying System Operation 55 6.3.2 Setting Common Controller Parameters 55 6.3.3 Changing the Numbering Scheme of the PCUs 56 7.0 SPECIFICATIONS AND TECHNICAL DATA 57 7.1 Agency Approvals 57 7.2 Environmental 57 7.3 Mechanical Characteristics 57 7.4 Monitoring Capability 58 7.5 Electrical Characteristics 59 7.5.1 Termination Type, Recommended Wire Size, Recommended Lugs 59 7.5.2 Power Ratings 61 7.5.3 AC Input Specifications 61 7.5.4 DC Output Specifications 62 7.5.5 Battery Specifications 63 7.5.6 Advanced Control Unit Plus (ACU+) Controller 65 7.5.7 SM-DU+ 65 7.5.8 SM-DU (used in Expansion Modules only in place of Controller) 66 7.5.9 SM-AC 66 7.5.10 SM-BRC 66 7.5.11 Standard Features 67



NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
This manual contains important instructions that should be followed during installation of your NetSure™ ITM Row-Based DC UPS system.
Read this manual thoroughly before installing the DC UPS system. Retain this manual for use by installing personnel.
! WARNING The DC UPS system should be installed by a qualified technician in accordance with the information contained in this document.
! WARNING Special safety precautions are required for procedures involving handling and installation of the DC UPS system. Observe all safety precautions in this manual before handling or installing the DC UPS system.
! WARNING Exercise extreme care when handling DC UPS modules (cabinets) to avoid equipment damage or injury to personnel. The DC UPS module weighs 3240 lb. (1470 kg), fully loaded.
Be aware of module weight and locate center of gravity symbols before handling the DC UPS module. Test lift and balance the module before transporting. Never tilt module more than 10 degrees from vertical.
! WARNING All power and control wiring should be installed by a qualified electrician. All power and control wiring must comply with the National Electrical Code (NEC) and applicable local codes.
Maximum load must not exceed that shown on the DC UPS module rating label.
Maximum output short circuit current is 7000 amperes.
! WARNING High Ground Leakage Current: Ground connection is essential before connecting the input supply.
This equipment must be grounded in accordance with the NEC and applicable local codes.
! CAUTION Ground leakage current exceeds 3.5 mA and is less than 30 mA.
Transient and steady-state ground leakage currents, which may occur when starting the equipment, should be taken into account when selecting instantaneous residual current circuit breakers (RCCBs) or residual current devices (RCDs).
RCCBs must be selected sensitive to DC unidirectional pulses (Class A) and insensitive to transient current pulses.

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
! CAUTION This equipment is fitted with RFI suppression filters.
This unit complies with the limits for a Class A digital device, pursuant to Part 15 Subpart J of the FCC rules. These limits provide reasonable protection against harmful interference in a commercial environment. This unit generates, uses and radiates radio frequency energy and, if not installed and used in accordance with this instruction manual, may cause harmful interference to radio communications. This unit is not designed for use in a residential area. Operation of this unit in a residential area may cause harmful interference that the User must correct at his own expense.
! WARNING In case of fire involving electrical equipment, use only carbon dioxide fire extinguishers or those approved for use in fighting electrical fires.
Batteries are factory installed in the DC UPS module. Final battery connections will be made by Emerson after the DC UPS module is installed. DO NOT MAKE BATTERY CONNECTIONS. The following precautions apply to the battery compartment that is part of the DC UPS module.
! WARNING Special safety precautions are required for procedures involving handling, installing, and servicing batteries. Observe all battery safety precautions presented here and in the battery instruction manual. These precautions should be followed implicitly at all times.
! WARNING A battery can present a risk of electrical shock and high short circuit current. Servicing of batteries should be performed or supervised only by properly trained and qualified personnel knowledgeable about batteries and the required precautions.
The following precautions should be observed when working on batteries:

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
! WARNING The DC UPS module’s internal batteries are connected and energized even if the DC UPS module is turned OFF. Battery disconnect fuses are provided inside the DC UPS module. To minimize the risk of injury, remove the battery disconnect fuses before any off-line servicing is performed on the unit.
! WARNING DO NOT REMOVE BATTERY STRAPS. If a battery cell is replaced, ensure the battery strap is replaced and appropriately tighten.
Call Emerson before moving DC UPS modules (after initial installation).

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
1.0 INSPECTING THE EQUIPMENT AND STORING FOR DELAYED INSTALLATIONS
1.1 External Inspections 1. While the DC UPS system is still on the truck, inspect the equipment and shipping container(s) for any signs of damage or mishandling. Do not attempt to install the system if damage is apparent. If any damage is noted, file a damage claim with the shipping agency within 24 hours and contact Emerson Network Power (number located on last pages of this document) to inform them of the damage claim and the condition of the equipment. 2. Compare the contents of the shipment with the bill of lading. Report any missing items to the carrier and your local Emerson representative immediately.
1.2 Internal Inspections 1. Remove any packaging material, then visually examine the DC UPS system for transit damage, both internally and externally. Report any such damage to the shipper and to Emerson immediately. 2. Check the nameplate inside the DC UPS module (located on the front top right side with front door open) to verify that the "base configuration part number" and the "configured system spec. number" correspond to the units ordered. Record the DC UPS module identification numbers and serial number in the front of this manual. This information is necessary should service be required. See Table 1.
If the equipment will not be installed immediately, it must be stored indoors where the humidity is no higher than 95%. The storage area must protect the DC UPS system from excessive moisture.
For optimal battery life, store at a temperature between -4°F to +77°F (-20°C to +25°C) (see 7.2 - Environmental).
! CAUTION If the batteries must remain disconnected from the DC UPS module for more than six (6) months, the batteries must be recharged before use. To charge the batteries, the batteries must be connected to the DC UPS module and the DC UPS module must be connected to utility power and started up by qualified personnel.

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Table 1 DC UPS Module "Base Configuration Part Numbers" and "Configured System Spec. Numbers"

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
2.0 INSTALLATION DRAWINGS AND RECOMMENDED TOOLS AND TEST EQUIPMENT
The diagrams in this section illustrate the key mechanical and electrical characteristics of the NetSure ITM DC UPS system.
General Notes Applicable to All Illustrations 1. All dimensions are in inches (millimeters). 2. Minimum clearance above unit required for air exhaust is 8 in. (203mm). 3. Keep module within 10 degrees of vertical while handling. 4. Top and bottom cable entry options available. 5. Color - black. 6. Unit bottom is structurally adequate for forklift handling. 7. M12 mounting holes used for seismic anchoring or floor stand.
8. The Primary Module includes side panels. For installations consisting of Expansion Module(s), one side panel on the Primary Module must be removed and be placed on the end Expansion Module. 9. Leveling feet are not designed to carry the full weight of the module. 10. Finger-tighten leveler against the floor, then tighten with a wrench less than 2 turns for friction fit against floor. 11. Control wiring, output cabling, and input cabling must be run separately. 12. Aluminum and copper-clad aluminum cables are not recommended. 13. All wiring is to be in accordance with the NEC and applicable local codes.

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Figure 1 Outline Drawing

DC UPS MODULE WITH TOP FEED DC DISTRIBUTION DC UPS MODULE WITH BOTTOM FEED DC DISTRIBUTION
Top Cabled Version X = 11.81 (300) Y = 26.38 (670) Z = 36.61 (930)
Bottom Cabled Version X = 11.81 (300) Y = 26.38 (670) Z = 40.55 (1030)

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Figure 1, Detail A

M12 x 1.75 x 70 Metric Socket Head Cap Screw. Plain Finish with Allen Drive (hex drive) / Coarse thread. Grade 12.9.
M12 X 1.75 Metric Hex Nuts - Grade 10.9 / Coarse Thread / Zinc Plated.
M12 Metric Flat Washer. Grade 10.9 / Zinc. D=28mm or 11/8".
Hole through foot (4x) for anchoring on raised floor

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Figure 2 Bottom DC Distribution Feed Modules


NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Figure 3 Top DC Distribution Feed Modules

Front Cable Tray Supports if Mounted on Top of Module

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
The NetSure ITM DC UPS system provides the flexibility to meet the needs of any data center.
The NetSure ITM DC UPS system is delivered fully configured for quick and easy field installation. Multiple DC UPS modules can easily be connected on site in order to increase capacity. Each module takes only 24" (w) x 41" (d) of floor space, including batteries and primary distribution. The NetSure ITM DC UPS system is typically installed in the middle or at the end of a row of server racks. This makes the system uniquely flexible and scalable. Deploy only the capacity that is initially needed; modules can be added at any time to existing units on the data center floor.
Figure 4 depicts a top distribution feed installation powering IT racks. Depending on your site and budget requirements, the NetSure ITM DC UPS solution can either be installed as a single deployment, or incrementally by row. In either scenario, DC distribution cabling to each rack is reduced by placing the NetSure ITM DC UPS in-the-row.
Whatever the physical layout of your data center, the NetSure ITM DC UPS allows for maximum space for IT equipment. With DC UPS building block modules, you can mix and match configurations and standard layouts to fit your available space.
Figure 4 NetSure™ ITM Row-Based DC UPS System Installation Example


NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
The following tools and test equipment are recommended to install the DC UPS modules.
Contact Emerson for full turn key installation quote.

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
This section describes the environmental and mechanical considerations that must be taken into account when planning the positioning and cabling of the DC UPS system. This section also provides procedures for physical installation of the DC UPS cabinet.
Because every site is unique, some subsections present a guide to general procedures and practices that should be observed by the installing engineer, rather than step-by-step installation instructions.
Choose a location for the DC UPS system that offers:
DC distribution and alarm cables enter the DC UPS module from the top or bottom, depending on module configuration (top distribution feed or bottom distribution feed).
AC input cables can enter either at the top or bottom. Conduit openings are provided in both locations.
Before installing the DC UPS system, verify that the room satisfies the environmental conditions stipulated in 7.2 - Environmental, paying particular attention to the ambient temperature and air exchange system. Also refer to 7.2 - Environmental for details on heat dissipation.
The DC UPS system should be installed in a cool, dry, clean-air environment with adequate ventilation to keep the ambient temperature within the specified operating range +23°F to +95°F (-5°C to +35°C).
The DC UPS module is cooled by internal fans. Cooling air enters the system through the front of the unit and is exhausted out the top. To permit proper air flow and prevent overheating, do NOT block or cover the ventilation openings or blow air down onto the unit. Ventilation clearance above the unit must be a minimum of 8 in. (203mm).

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
The DC UPS system can be comprised of up to four (4) modules (cabinets), depending upon your power requirements. All modules used are the same size and are designed to be positioned side-by- side to form an aesthetically appealing equipment suite. The system always contains one (1) Primary Module. For increased power demands, up to three (3) Expansion Modules may be added. Locate the Primary Module at the far left or far right of the row. Remove the side panel from the Primary Module from the side that will face adjacent Expansion Modules. Place the first Expansion Module next to the Primary Module. Place additional Expansion Modules (if required) next to each other. Install the side panel removed from the Primary Module to the open side of the last Expansion Module in the row.
NOTE When the DC UPS system consists of multiple modules, the switches inside the modules are pre-set at the factory to identify the module as the Primary Module, 1st Expansion Module, 2nd Expansion Module, or 3rd Expansion Module. When placing modules, refer to the nameplate identification number (see Table 1) to ensure the Primary Module is placed on the end, and Expansion Modules are place in sequential order.
There are no ventilation grilles on the sides of the DC UPS module. The DC UPS modules may be placed with the sides touching or against a wall.
To enable routine tightening of power terminations within the DC UPS module, make sure there is sufficient clearance in front and rear of the DC UPS module to permit free passage of personnel and that the front door can be fully opened.
Leave a minimum of 8 in. (203mm) between the top of the DC UPS module and the ceiling to permit adequate air circulation above the unit. Emerson recommends against using air conditioning or other systems that blow air onto the top of the unit.
Leave a minimum of 36 in. (914 mm) between the back of the DC UPS module and a wall to permit adequate air circulation for the battery compartment fans and facilitate maintenance access.
Refer also to 3.1 - General Requirements.
The diagrams in 2.0 - Installation Drawings and Recommended Tools and Test Equipment show the location of holes in the base plate for bolting the DC UPS module to the floor.
If the module is to be placed on a raised floor, it should be mounted on a floor stand that will support the equipment point loading. Refer to the cabinet-bottom views in 2.0 - Installation Drawings and Recommended Tools and Test Equipment to design this pedestal. Contact your Emerson Sales Representative for a floor stand designed for this system (see Figure 5).
Figure 5 Emerson Floor Stands

P/N 547823 36” Tall Floor Stand P/N 547822 24” Tall Floor Stand

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
3.4.1 Transporting
Ensure that the DC UPS module weight is within the designated surface weight loading (lb./ft2 or kg/ cm2) of any handling equipment. The DC UPS module weighs 3240 lb. (1470 kg), fully loaded.
! WARNING Ensure that any equipment that will be used to move the DC UPS module has sufficient lifting capacity. Ensure adequate personnel and lifting equipment are available when taking the module off its shipping pallet. The module presents a tipping hazard. Do not tilt the module further than 10 degrees from vertical.
The DC UPS module is fitted with casters. Take care to prevent movement when unbolting the module from its shipping pallet. The casters are strong enough for movement across even surfaces only. Casters may fail if they are subjected to shock loading, such as being dropped or rolled over holes in the floor or obstructions. Such failure may cause the unit to tip over, injuring personnel and damaging the equipment.
! WARNING Batteries are factory installed in the DC UPS module’s battery compartment. Care must be taken when maneuvering modules with batteries. Keep such moves to a minimum. See Battery Compartment Precautions on page 2.
Cabinet Preparation 1. Inspect the cabinet as described in 1.1 - External Inspections and 1.2 - Internal Inspections. 2. Remove the front and rear bottom panels to gain access to the bolts securing the cabinet to the pallet.
Use lifting equipment, such as a forklift or similar equipment, appropriately rated for the weight of the load to move the DC UPS cabinet from its shipping pallet.
When moving a DC UPS cabinet with a forklift or similar equipment, make sure that the fork is of sufficient length for the pallet size and capable of lifting the cabinet. Also use a forklift with adjustable forks or a narrow type.
The DC UPS module may be rolled on its casters when moving the unit a short distance. For longer distances, move the DC UPS module with a forklift or similar equipment to ease the relocation and to reduce vibration.

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Refer to Figure 6 for mounting locations for overhead cable tray rails.
Figure 6 Mounting Locations for Overhead Cable Tray Rails

Brackets can be used to secure rails for overhead cable trays, drill as required.
Holes for 1/4” thread-forming screws to secure rails for overhead cable trays.

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
3.6.1 Bottom DC Distribution Feed (Bottom Cabled) Modules
Refer to Figure 7 and install the front and rear bottom panels.
Figure 7 Installing Front and Rear Bottom Panels

Installing the Supplied Air Duct Assembly: The Air Duct Assembly must be installed in DC UPS modules configured for top DC distribution feed (top cabled). The Air Duct Assembly allows air to be drawn from the bottom front of the DC UPS module and up into the battery compartment for cooling. Refer to Figure 8 and install the supplied Air Duct Assembly.

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Figure 8 Installing Air Duct Assembly
Procedure: 1) Partially slide the half of the air duct assembly with vents into the front bottom compartment of the DC UPS module (power compartment bottom). 2) Install and secure the supplied bracket with the supplied screws. 3) Slide the half of the air duct assembly with vents completely into the DC UPS module, and secure with the supplied screws.
Install supplied bracket after partially sliding assembly in.
Secure with supplied screws.
Secure with supplied screws.

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
The DC UPS system requires grounding, DC output distribution, AC input power, alarm/control, and battery wiring once it has been mechanically installed.
If the system consists of multiple DC UPS modules, battery and ground/return busbars must be interconnected and alarm/control interconnect wiring between modules must be made.
4.1.1 Cable Lengths (Floor or Cabinet Top to Connection Point Inside DC UPS Module)
To help calculate the total cable length required, refer to Table 2 for the distance from the floor or cabinet top to selected connection points inside the DC UPS module. Determine the cable length required to reach the DC UPS module, then add the appropriate length from the table and adequate slack for repair and maintenance.
Table 2 Distance to Connection Points inside the DC UPS Module
Distance - Bottom DC Distribution Feed Module
Distance - Top DC Distribution Feed Module
From Top of Module
From Top of Module
in. (mm)
in. (mm)
in. (mm)
in. (mm)
AC Input 79 (2000) 138 (3500) 157 (4000) 59 (1500)
DC Output 28 (700) N/A N/A 28 (700)
Grounding 79 (2000) 138 (3500) 157 (4000) 59 (1500)
Alarm/Control 59 (1500) N/A N/A 47 (1200)
The main factors affecting the choice and size of wires are voltage, current (also taking into account overcurrent), room temperature, and installation conditions.
The power cables of the system must be sized with respect to the following:
Refer to Termination Type, Recommended Wire Size, Recommended Lugs on page 59 for recommended wire sizes and recommended lugs. Refer to the illustrations in this section for torque requirements.
The following are guidelines only and are superseded by the NEC and applicable local codes where applicable.

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Wiring connection access requires removing protective covers from the DC UPS module. When making electrical connections, remove the appropriate protective cover, as shown in Figure 9.
Replace all protective covers after all electrical connections have been made and checked.
Figure 9 Protective Covers

SU ITABLE FOR MOU NTIN G ON CON CRET E
Dual AC Input Circuit Breaker Option Protective Cover View (Top cabled configuration shown, bottom cabled configuration similar.) AC Input Protective Cover

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
The DC UPS module input and output cable connections are easily accessible from the front of the unit for installation. Refer to Figure 10, Figure 11, Figure 12, Figure 13, Figure 14, Figure 16, Figure 17, Figure 18, and Figure 19 for connection locations. The DC UPS module contains a battery compartment. Battery cables are factory supplied and connected to the DC UPS module. Final connections to the batteries are made in the procedure in 6.2 - Final Battery Connections. Battery connections are done from the rear of the DC UPS module.
Figure 10 Wiring Connections Locations (DC UPS Module with Bottom Feed DC Distribution)

(AC input cables may also enter at bottom of cabinet.)
Alarm/Control Connections (to ACU+ IB2 Interface Board) (Primary Module only)
Battery Fuses (3) (Battery leads factory connected and routed to Battery Compartment.)
Load Distribution Devices DCCB01 - DCCB11 (Top Row) DCCB12 - DCCB22 (Bottom Row) (DC distribution breakers shown, large fuses available.)
Battery Compartment and Base Removed in Illustrations for Clarity
Battery Return and Load Return (Battery return leads factory connected and routed to Battery Compartment.)

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Figure 11 Wiring Connections Locations (DC UPS Module with Top Feed DC Distribution)

AC Input Conduit Openings (AC input cables may also enter
Battery Return and Load Return (Battery return leads factory connected and routed to Battery Compartment.)
Load Distribution Devices DCCB01 - DCCB11 (Top Row) DCCB12 - DCCB22 (Bottom Row) (DC distribution breakers shown, large fuses available.)
Alarm/Control Connections (to ACU+ IB2 Interface Board) (Primary Module only)
Battery Fuses (3) (Battery leads factory connected and routed to Battery Compartment.)
Battery Compartment and Base Removed in Illustrations for Clarity

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
! CAUTION The electrical connections described in this section must be performed by authorized electricians or qualified technical personnel. Follow the NEC and applicable local codes. If you have any difficulties, contact your local Emerson representative or Emerson Services.
Before making electrical connections, do the following for each DC UPS module (see Figure 10 and Figure 11 for circuit breaker and fuse locations).
The cabinet grounding connection is made to a stud located on the top of the DC UPS module, as shown in Figure 12. A cabinet grounding cable must be connected to this stud, per site requirements. Tighten the connection to the torque indicated in Figure 12.
Each module also contains a separate stud located on each side to connect the supplied grounding strap between DC UPS modules, if desired.
All modules and cable conduit should be grounded in accordance with the NEC and all applicable local codes.
! WARNING Failure to follow proper grounding procedures can result in electric shock hazard to personnel or the risk of fire, should a ground fault occur.
Figure 12 Cabinet Grounding Connection

Grounding Strap between Modules 3/8” (M10) Stud. Recommended Torque is 407-434 in-lbs (46-49 Nm). 5/16” (M8) Studs. Recommended Torque is 204-221 in-lbs (23-25 Nm).
The DC distribution ground/return busbar must be connected via a solidly grounded lead to the main building ground. Three extra positions are provided on the ground/return busbar for customer connection to site ground. Refer to Figure 10 and Figure 11 for location of the DC distribution ground/return busbar. Refer to Table 250-122 in the American National Standards Institute (ANSI) approved National Fire Protection Association's (NFPA) National Electrical Code (NEC) for grounding conductor size. Typically use equivalent or minimum of 1/0 AWG.

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Connect the DC output distribution cables between the DC UPS module and the loads as required. These connections are made to the output circuit breaker or fuse busbars and the ground/return busbar, as shown in Figure 10 or Figure 11. Refer to Figure 13 for a view of the busbar terminations. Tighten the connections to the torque indicated in Figure 13.
! WARNING If the load equipment will not be ready to accept power on the arrival of the commissioning engineer, then ensure that the system output cables are safely isolated.
Figure 13 DC Output Connections

DC Output (-48Vdc) (per distribution position) to distribution device busbar
Terminals are 3/8” (M10) studs. Recommended Torque is 407-434 in-lbs (46-49 Nm).
DC Output Return (per distribution position) to ground/return busbars
DC Output (-48Vdc) (per distribution position) to distribution device busbar
Terminals are 1/2” (M12) studs. Recommended Torque is 690-743 in-lbs (78-84 Nm).
DC Output Return (per distribution position) to ground/return busbars

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
! WARNING AC input power connections must be performed by a qualified electrician.
Before connecting AC input cables to the DC UPS module, ensure that you are aware of the location and operation of the overcurrent protection devices that connect these cables to the power distribution panel. Before connecting AC input cables, de-energize and lockout or tagout these overcurrent protection devices.
Do not apply AC input power to the DC UPS module before the arrival of the commissioning engineer.
! CAUTION To reduce the risk of fire, connect AC input only to a circuit provided with correct amperes maximum branch circuit overcurrent protection in accordance with the NEC, ANSI/NFPA 70.
External overcurrent protection for the AC input circuit is to be provided by the customer. Refer to AC Input Specifications on page 61 for maximum input current ratings. Each DC UPS module is provided with one or two internal 150A AC input circuit breaker.
AC input leads can enter the DC UPS module from the top or from the bottom. Refer to Figure 14 for an AC input routing diagram. Figure 15 provides a diagram for installing conduit fittings when AC is fed from the top.
One or two AC input breakers are provided (depending on module configuration). Refer to Figure 16 for an AC input connections diagram. Tighten the connections to the torque indicated in Figure 16. Note that a cover needs to be removed to access the circuit breakers as shown in Figure 9.

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Figure 14 AC Input Power Connection Routing Options

Figure 15 Installing Conduit Fittings when AC is Fed from the Top

Figure 16 AC Input Power Connections

One or two AC input circuit breakers are provided (depending on module configuration).
Two ground studs (5/16” [M8]) are provided attached to the sides of the enclosure surrounding the AC input circuit breaker(s).
Recommended torque is 124 in-lbs (14 Nm) for AC input circuit breaker connection.
Recommended torque is 204-221 in-lbs (23-25 Nm) to grounding studs.

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Alarm/control connections are made to the ACU+ Controller Customer Interface Board (IB2). The IB2 board provides connection points for digital inputs and relay outputs. System required connections are factory wired to the IB2 board. The customer may wire to un-used digital input and relay outputs, if desired. The IB2 board is located in an enclosure above the ACU+ Controller (see Figure 10 or Figure 11). To access these connections, loosen the captive fastener on the front of the enclosure and slide the IB2 board partially out of the shelf. Note that a wireway is provided to route the wires to the IB2 board, as shown in Figure 10 or Figure 11. Connect external alarm/control wiring to terminal blocks J3-J9 of the IB2 board, as required. Refer to Figure 17.
Figure 17 Alarm and Control Connections

NC = Norm ally Closed COM = Com mon NO = Normally Open
NO C NC NO C NC NO C NC
5 3 1 5 3 1 5 3 1
5 3 1 5 3 1 5 3 1
All relay contacts are shown with the relay deenergized.
6 4 2 6 4 2 6 4 2 6 4 2
6 4 2 6 4 2 6 4 2
NO C NC NO C NC NO C NC NO C NC
Terminals are M2 screws. Recommended Torque is 1.92-2.16 in-lbs (0.22-0.25 Nm). Wire size range is 26 AWG to 16 AWG (0.14 mm^2 to 1.0 mm^2).
Up to eight (8) digital inputs may be connected to the IB2 board. Digital inputs that have factory connections are listed in Table 3. A blank column in Table 3 is also provided if you want to document custom connections to un-used digital inputs.
Connecting a NetSure RDB Rack PDU (Power Distribution Unit) to the NetSure ITM: The following applies to all PDUs listed in the NetSure RDB Installation and Operation Manual (Section 6041).
Perform the following after installing and making the DC input and output connections to the PDU per Section 6041.

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
board. Assign a unique signal name to this digital input (Web interface "Signal Information Modification Submenu"). Refer to Appendix A in the NetSure ITM Operation Manual (Section 6047).
Table 3 Programmable Digital Inputs
Digital Input Pin No. Dedicated to... Customer Custom Digital Input
1 J3-1 – Available for Customer
Custom Digital Input J3-2 +
2 J3-3 – Available for Customer
Custom Digital Input J3-4 +
3 J3-5 – Available for Customer
Custom Digital Input J3-6 +
PCU EPO factory wired J4-2 +
Fan Supply Alarm factory wired J4-4 +
Fan Alarm factory wired J4-6 +
7 J5-1 – Available for Customer
Custom Digital Input J5-2 +
8 J5-3 – Available for Customer
Custom Digital Input J5-4 +
Relay Output Connections
The IB2 board provides eight (8) programmable alarm relays with Form-C contacts. Default relay assignments are documented in Table 4. A blank column in Table 4 is also provided if you want to document a custom configuration. Alarm relay contacts are rated for 2A @ 30VDC and 0.5A @ 125VAC (60W maximum power consumption).
Programmable · internal connections J5-6

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Table 4 Programmable Relay Outputs
Relay Output Pin No. Alarms Assigned to this Relay (Default)
Alarms Assigned to this Relay (Custom)
J6-5 NO All alarms programmed
with alarm severity of
"critical alarm". Relay de-energizes during an alarm condition.
(See Note 1.)
J6-6 NO All alarms programmed
with alarm severity of
"warning alarm". Relay energizes during an alarm condition.
(See Note 1.)
J7-5 NO All alarms programmed
with alarm severity of
"information alarm".
Relay energizes during an alarm condition.
(See Note 1.)
Custom Setting J7-4 COM
J8-5 NO
Custom Setting J8-3 COM
J8-6 NO
Custom Setting J8-4 COM
J9-5 NO
Custom Setting J9-3 COM
J9-6 NO
Custom Setting J9-4 COM

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Dip Switch SW1 on the IB2 board is used to set the communications address for this board (Table 5). In this system, both switches of SW1 are to be set in the OFF position. Refer to Figure 17 for SW1 location.
Table 5 IB2 Board Communications Address Settings

The IB2 board has a green LED indicator which is lit in normal operation and flashes when the IB2 board is communicating with the Controller.
The ACU+ Controller provides a Web Interface via an Ethernet connection to a TCP/IP network. An RJ-45 10BaseT jack is provided on the front of the ACU+ Controller for connection into a customer's network running TCP/IP. This jack has a standard Ethernet pin configuration scheme, twisted pair. Refer to Figure 10 or Figure 11 for location of the ACU+. Refer to Figure 18 for location and Table 6 for pinouts of the Ethernet port. Use shielded Ethernet cable (grounded at both ends). Note that the ACU+ Controller’s RJ-45 jack is connected to chassis ground.
You can access the Web pages of the power system locally by using a "crossover" or "straight" cable connected directly between your PC and the ACU+.
Figure 18 ACU+ Controller RJ-45 Ethernet Port
Table 6 ACU+ Controller RJ-45 Ethernet Port

Ethernet Port (RJ-45)

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
The DC UPS module has an Emergency Power Off (EPO) function operated by a remote contact provided by the User.
! WARNING The EPO circuit operates with -48Vdc. There is -48Vdc present on the terminals the EPO jumper connects to. There is -48Vdc present on these same terminals that an external EPO switch will be connected to.
If the EPO function is desired, locate the EPO jumper in the Primary Module (see Figure 19). Remove the EPO jumper (the jumper connects from the bottom terminal of the EPO terminal block and the bottom of EPO Fuse F11). Connect a customer provided external normally closed switch between the bottom terminal of the EPO terminal block and the bottom of the EPO Fuse.
The following occurs when the EPO switch is opened.
It does not internally disconnect the input power supply. To disconnect ALL power to the DC UPS module, open the upstream feeder breaker(s) when the remote EPO is activated.
It does not disconnect the SM-BRC. The SM-BRC will still be powered by the batteries.

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Figure 19 EPO Jumper Location

Top DC Distribution Feed Shown, Bottom DC Distribution Feed Similar
Batteries are factory installed and connected. Final connections to the batteries are made in the procedure presented in 6.2 - Final Battery Connections.
4.5 Making Module-to-Module -48VDC and Ground/Return Interconnections (if system consists of multiple DC UPS modules)
4.5.1 -48Vdc and Ground/Return Busbar Interconnects 1. Install the provided -48Vdc Interconnect Busbar(s) between the -48Vdc busbars located in each adjacent DC UPS module. Refer to Figure 20 (DC UPS module with bottom feed DC distribution) and Figure 21 (DC UPS module with top feed DC distribution). Torque to the values listed in the illustrations. 2. Install the provided Ground/Return Interconnect Busbar(s) between the ground/return busbars located in each adjacent DC UPS module. Refer to Figure 20 (DC UPS module with bottom feed DC distribution) and Figure 21 (DC UPS module with top feed DC distribution). Torque to the values listed in the illustrations.

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Figure 20 Module-Module Interconnect Busbars (DC UPS Module with Bottom Feed DC Distribution)

Hardware Build-Up M10 Nut (electro zinc treatment with bright chromate)
M10 Belleville Lock Washer DIN 6796-10.5 STEEL (electro zinc treatment with bright chromate)
Hardware Build-Up M10 x 30mm Bolt (electro zinc treatment with bright chromate)
M10 Belleville Lock Washer DIN 6796-10.5 STEEL (electro zinc treatment with bright chromate)
Battery Compartment and Base Removed in Illustrations for Clarity
-48Vdc Interconnect Busbar (can be installed on left and/or

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Figure 21 Module-Module Interconnect Busbars (DC UPS Module with Top Feed DC Distribution)

Hardware Build-Up M10 Nut (electro zinc treatment with bright chromate)
M10 Belleville Lock Washer DIN 6796-10.5 STEEL (electro zinc treatment with bright chromate)
Hardware Build-Up M10 x 30mm Bolt (electro zinc treatment with bright chromate)
M10 Belleville Lock Washer DIN 6796-10.5 STEEL (electro zinc treatment with bright chromate)
Battery Compartment and Base Removed in Illustrations for Clarity
Ground/Return Interconnect Busbar (can be installed on left and/or right side of module)
-48Vdc Interconnect Busbar (can be installed on left and/or right side of module)

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
4.6 Making Alarm/Control Interconnections between Modules (if system consists of multiple DC UPS modules)
Make the following module-to-module alarm/control interconnections as required. Refer to Figure 23 for an interconnect diagram. See also the Cabinet Interconnections illustration in Figure 24, Figure 25, and Figure 26.
Primary Module to 1st Expansion Module (Skip if No 1st Expansion Module) 1. Locate the long RS-485 interconnect cable (RPM 628 415/2) (yellow/white wire twisted pair) coiled up on the right side of the Primary Module. 2. Route this cable through the openings in the sides of the cabinets to the 1st Expansion Module. 3. Connect this cable to the mating RS-485 interconnect cable connected to the SM-AC located in the 1st Expansion Module (yellow/white wire twisted pair).
1st Expansion Module to 2nd Expansion Module (Skip if No Additional Expansion Module) 1. Locate the long RS-485 interconnect cable (RPM 628 415/2) (yellow/white wire twisted pair) coiled up on the right side of the 1st Expansion Module. 2. Route this cable through the openings in the sides of the cabinets to the 2nd Expansion Module. 3. Connect this cable to the mating RS-485 interconnect cable connected to the SM-AC located in the 2nd Expansion Module (yellow/white wire twisted pair).
Additional Expansion Modules (Skip if No Additional Expansion Module) 1. Make similar connections between each adjacent Expansion Module.
SM-BRC RS-485 Termination Resistor Setting in Last DC UPS Module 1. A jumper on the SM-BRC circuit board is used for selecting a termination resistor for the RS-485 connection. RS-485 termination is disabled when the jumper is across pins 1 and 2 (default). It is enabled when the jumper is across pins 2 and 3. See Figure 22 for the location of the jumper.
In most cases, RS-485 termination is not necessary because maximum baud rate is 19200 bps (default is 9600). RS-485 termination is recommended when intermittent communications occur.
If there are intermittent communications errors, it is recommended to set the termination resistor on the SM-BRC in the last module to the enabled position (jumper between pins 2 and 3) instead of the factory disabled position (jumper between pins 1 and 2).
Figure 22 SM-BRC RS-485 Jumper Locations

CAN-Bus End Resistor (move only if more than one DC UPS module) 1. Locate the short CAN-Bus interconnect cable jumper connected to the SM-DU+ in the Primary Module (black/white wire twisted pair located behind the SM-DU+ sheetmetal enclosure and

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
exiting the top of the SM-DU+). Remove the CAN-Bus End Resistor plugged into this cable only if there are Expansion Modules. 2. Locate the short CAN-Bus interconnect cable jumper connected to the SM-DU in the last (end) Expansion Module (black/white wire twisted pair located behind the SM-DU sheetmetal enclosure). Plug the CAN-Bus End Resistor into this cable.
1st Expansion Module to Primary Module 1. Locate the long CAN-Bus interconnect cable (RPM 628 351/1) coiled up on the right side of the 1st Expansion Module (black/white wire twisted pair). 2. Route this cable through the openings in the sides of the cabinets to the Primary Module. 3. Route this cable through the top lip of the Primary Module’s SM-DU+ sheetmetal enclosure. 4. Connect this cable to the mating CAN-Bus interconnect cable connected to the SM-DU+ in the Primary Module (black/white wire twisted pair located behind the SM-DU+ sheetmetal enclosure and exiting the top of the SM-DU+).
2nd Expansion Module to 1st Expansion Module 1. Locate the long CAN-Bus interconnect cable (RPM 628 351/1) coiled up on the right side of the 2nd Expansion Module (black/white wire twisted pair). 2. Route this cable through the openings in the sides of the cabinets to the 1st Expansion Module. 3. Connect this cable to the mating CAN-Bus interconnect cable connected to the SM-DU in the 1st Expansion Module (black/white wire twisted pair located behind the SM-DU sheetmetal enclosure).
Additional Expansion Modules 1. Make similar connections between each remaining Expansion Module.
1st Expansion Module to Primary Module 1. Locate the BLVD control interconnect cable (RPM 628 466/3) coiled up on the right side of the 1st Expansion Module (the Expansion Module’s BLVD cable is factory connected to the bottom connector on the LVD Relay Board, and exits at the back of the LVD Relay Board’s sheetmetal enclosure). 2. Route this cable through the openings in the sides of the cabinets to the Primary Module. 3. Route the cable through the back of the Primary Module’s LVD Relay Board sheetmetal enclosure. 4. Connect this cable to the mating BLVD control interconnect cable (RPM 628 465/3) in the Primary Module (the Primary Module’s BLVD cable is factory connected to the bottom connector located on the LVD Relay Board).
2nd Expansion Module to 1st Expansion Module 1. Locate the BLVD control interconnect cable (RPM 628 466/3) coiled up on the right side of the 2nd Expansion Module (the Expansion Module’s BLVD cable is factory connected to the bottom connector on the LVD Relay Board, and exits at the back of the LVD Relay Board’s sheetmetal enclosure). 2. Route this cable through the openings in the sides of the cabinets to the 1st Expansion Module. 3. Route the cable through the back of the 1st Expansion Module’s LVD Relay Board sheetmetal enclosure. 4. Connect this cable to the mating BLVD control interconnect cable (RPM 628 465/3) in the 1st Expansion Module (the 1st Expansion Module’s BLVD cable is factory connected to the bottom connector located on the LVD Relay Board).
Additional Expansion Modules 1. Make similar connections between each remaining Expansion Module.

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Figure 23 Alarm/Control Cable Interconnects (cont’d on next page)

(RPM 628 351/1) located coiled up on right side of Expansion Module cabinet (mating connector located behind Detail A cover)
(RPM 628 415/2) located coiled up on right side of
BLVD Control Cable (RPM 628 466/3) located coiled up on right side of Expansion Module cabinets
LVD Relay Board Can-Bus End Resistor (if no Expansion Module)

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Figure 23 Alarm/Control Cable Interconnects (cont’d from previous page)

(RPM 628 351/1) located coiled up on right side of 2nd Expansion Module cabinet (mating connector located on SM-DU)
(RPM 628 415/2) located coiled up on right side of 1st Expansion Module cabinet (mating connector located on SM-AC)
BLVD Control Cable (RPM 628 466/3) located coiled up on right side of Expansion Module cabinets
Can-Bus End Resistor (moved from Primary Module to last Expansion Module)

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Figure 24 System Configuration and Communications Connections


NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Figure 25 Cabinet Interconnections


NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Figure 26 Signal Cabling and Switch Settings


NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)

! WARNING In order to prevent damage to the latching mechanism, do not use excessive force on the PCU handle when pushing the PCU into the cabinet.
PCUs are hot swappable. They can be installed with the system operating.
Procedure 1. Place the PCU into an unoccupied mounting position without sliding it in completely. 2. Push the “Safety Latch Release” located on the front of the PCU "UP". Refer to Figure 27 for an illustration. 3. Gently push the PCU into the mounting location until it stops. 4. Note that the PCU will NOT be completely seated in the mounting location until the next step is performed. 5. Push the “Safety Latch Release” located on the front of the PCU "DOWN". Gently push the PCU into the mounting location until it is completely seated. 6. Push the PCU’s handle in and secure the PCU to the cabinet by tightening the captive fastener located on the handle. 7. Repeat the above steps for each PCU being installed in the DC UPS module. 8. After the PCUs are physically installed, they are ready for operation immediately after power is supplied to them.
Figure 27 PCU Handle and Safety Latch


NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
The NetSure ITM DC UPS system must be fully installed and commissioned before startup. The start-up procedure consists of making final battery connections, initially starting the system, and verifying system operation. Emerson Network Power will perform ALL start-up procedures, including making final battery connections.
THE FOLLOWING ARE GENERAL GUIDELINES FOR EMERSON TECHNICIANS.
6.2.1 Introduction
Each DC UPS module contains a battery compartment. The battery compartment consists of six battery shelves that house (4) 6V batteries, each. Batteries are factory installed and wired for (3) -48VDC battery strings. Also provided is a 800A battery disconnect fuse for each string.
Special care should be taken when working with the batteries associated with the DC UPS module. See the precautions in the battery instruction manual and in Battery Compartment Precautions at the beginning of these instructions.
Battery Leads The batteries are factory installed and most battery interconnections are factory made. The following interconnections need to made during installation to complete the battery electrical path to the DC UPS module. Refer to Figure 28 for the battery connections torque value for the Emerson EB4 6V200 battery. 1. Refer to Figure 28 and connect the supplied Battery Interconnect Links between the indicated Battery Shelves. For each connection: a. Install the faston lugs on top of the battery links as shown in Figure 28. Note that battery monitoring leads are factory connected to the faston lugs and each faston lug is insulated for shipping. Observe proper polarity when attaching the faston lugs with factory wiring to the battery posts. b. Tighten the connections to the torque indicated in Figure 28. c. Place the plastic cover over the battery terminals and interconnect link. 2. On all remaining battery terminals (factory connections); remove the plastic covers, check the torque, then reinstall the plastic covers. Torque to value indicated in Figure 28.
DO NOT INSTALL THE BATTERY FUSES BEFORE THE EQUIPMENT HAS BEEN COMMISSIONED AND THE PROCEDURE IN "6.3.1 - Initially Starting the DC UPS System and Verifying System Operation" IS PERFORMED.

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Figure 28 Making Final Battery Shelf Battery Interconnect Link Connections

Lead Labeled 1.5+ (Battery One Link) 2.5+ (Battery Two Link) 3.5+ (Battery Three Link)

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Use the Alber software to run an Intercell Resistance test.


NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)


NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)


NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)


NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)


NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)


NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)


NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)


NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)


NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Battery monitoring leads are factory connected to the mating halves of the SM-BRC unit’s Load Inputs terminal blocks labeled 1, 3, 5, 7 and 2, 4, 6, 8. The DC UPS module is factory shipped with the mating halves of the SM-BRC’s Load Inputs terminal blocks labeled 1, 3, 5, 7 and 2, 4, 6, 8 disconnected. This is to prevent the batteries from discharging when the system is not powered.
When the DC UPS module is to be placed into service, open the battery compartment’s top rear access panel. Locate the disconnected connectors labeled "Load Inputs 1, 3, 5, 7" and "Load Inputs 2, 4, 6, 8". Plug these connectors into the back of the SM-BRC, as shown in Figure 29. Repeat this procedure for each DC UPS module in the system.
Figure 29 Field Battery Monitoring Lead Connections to the SM-BRC Unit

The DC UPS module is factory shipped with the mating halves of the SM-BRC’s Load Inputs terminal blocks 1, 3, 5, 7 and 2, 4, 6, 8 disconnected. When ready to place the module into service, locate and plug the mating halves of the SM-BRC’s Load Inputs terminal blocks 1, 3, 5, 7 and 2, 4, 6, 8 here.
! WARNING During this procedure the output terminals will become live.
If any load equipment is connected to the DC UPS module output terminals, please check with the load user and ascertain whether it is safe to apply power to the load. If the load is not ready to receive power, then ensure that it is safely isolated from the DC UPS module output terminals.

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
The NetSure ITM DC UPS must be fully installed and commissioned before startup.
Procedure 1. Open the front door on each DC UPS module. 2. Apply AC input power to each DC UPS module by closing the external AC disconnect(s) or protective device(s) that supplies power to each DC UPS module. If the dual AC input feed option is furnished, there will be two (2) devices per DC UPS module. 3. On each DC UPS module, close the main AC input circuit breaker. If the dual AC input feed option is furnished, a safety latch is provided on the circuit breakers to prevent both circuit breakers from being placed in the ON position. Slide the latch over to allow the desired circuit breaker to be turned ON. 4. On each DC UPS module, close all PCU AC input circuit breakers. Note that each circuit breaker feeds two (2) PCUs. 5. In the Primary DC UPS module, once the ACU+ Controller is powered on, a starting... screen appears followed by a language screen.
Press “” or “” to select the desired language. Press ENT to confirm the selection. If no key is pressed within 30 seconds, the ACU+ Controller automatically selects the displayed language. Refer to the NetSure ITM Operation Manual (Section 6047) for ACU+ Controller local menu operating instructions. Once initialized, the ACU+ Main Screen displays.
Main Screen Main Menu
09:20:20 Float
MAIN MENU
Press or to browse through MAIN MENU.
Status Settings Energy Saving Manual CustomizeMenu
ESC
Press ENT to enter Sub-Menu.
Navigate through the controller menus and submenus to set common controller parameters (time, date, IP address, etc.). Refer to Section 3.5 of the NetSure ITM Operation Manual (Section 6047) for common tasks performed locally.
English · Auto NoAlarm

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Follow these procedures to change how the ACU+ identifies (numbers) the PCUs installed in the system. These procedures are performed from the ACU+ Controller’s local display and keypad.
Initial Installation (numbering the PCUs per their Physical Location in the System) 1. Go to Main Menu / Settings / PCU. 2. Press Enter. 3. Navigate down to PCU 1 (001). 4. Press Enter. 5. Look for the PCU installed in the system with a flashing LED. 6. Press Enter. 7. Press the Up or Down Arrow until the number displayed is the same as the physical position of the PCU with the flashing LED. 8. Press Enter. 9. Press ESC. 10. Navigate down to the next PCU and repeat steps 4 thru 10. 11. After all PCUs are renumbered, go to Main Menu / Control / PCU / All PCU Ctrl. 12. Press Enter. 13. Navigate down to Confirm Posi/PH. 14. Select Yes, then press Enter. 15. Verify that the ACU+ now numbers the PCUs via their physical position in the system by going to Main Menu / Status / PCU and scrolling down to each PCU listed in the display. Compare the PCU number highlighted in the display with the physical position of the PCU with the flashing LED.
Swapping PCUs Physical Positions without Adding or Removing the Number of PCUs 1. If you swap PCUs, the ACU+ numbering stays with the PCUs. For example, if PCU in physical position 1 is swapped with PCU in physical position 2, the ACU+ numbers the PCU now installed in physical position 1 as 2 and the PCU now installed in physical position 2 as 1. To correct this, repeat the steps shown in the "Initial Installation" procedure for ONLY the two PCUs that were swapped.
Removing a PCU without Replacing It 1. Remove the PCU. 2. Go to Main Menu / Control / PCU / All PCU Ctrl. 3. Press Enter. 4. Navigate down to Confirm Posi/PH. 5. Select Yes, then press Enter. 6. Now, when you view the voltage and current for the removed PCU, the fields will be highlighted in BLACK to indicate this PCU is not present. Also, the WEB interface shows that PCU information GREYED out. 7. If you now re-install that same PCU in it's previous physical position, it will retain its previous slot number.
Replacing a Previously Installed PCU with a New PCU 1. Remove a previously installed PCU. 2. Clear the PCU Lost Alarm. 3. Install the new PCU. 4. The new PCU is automatically assigned the same numbering as the original PCU it replaced.

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
The NetSure ITM DC UPS system has the following agency approval ratings:
The NetSure ITM DC UPS system is designed to operate under the following environmental conditions without damage or degradation in electrical operating characteristics:
Table 7 DC UPS System Environmental Characteristics
+23°F to +95°F (-5°C to +35°C) Recommended Operation with Battery (Air Inlet): +68°F to +77°F (+20°C to +25°C)
System Storage Temperature (optimal) -4°F to +77°F (-20°C to +25°C)
Relative Humidity 0 to 95%, non-condensing
Operating Elevation 6562 ft (2000m) at full power
Audible Noise < 60dB
Heat Rejection at Full Load 18,096 BTU/hr. (5.3kW) per module
EMI FCC Class A
Table 8 DC UPS System Mechanical Characteristics (per module)
Unit Weight 3240 lb (1470 kg)
Airflow 560 CFM (950 m3/h)
Cable Entry Bottom or Top
Protection Grade (with open/closed front doors) IP 20
System Operating Temperature · Form Factor Rack · Color Black (Z-0350)

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Table 9 Shipping Dimensions and Weights
Size 70KW 140KW 210KW 280KW
(1) Module:
(2) Modules, per module: Inches: 92H x 29W x 47D Millimeters: 2337H x 737W x 1194D Weight: 3307lb (1500kg)
(3) Modules, per module: Inches: 92H x 29W x 47D Millimeters: 2337H x 737W x 1194D Weight: 3307lb (1500kg)
(4) Modules, per module: Inches: 92H x 29W x 47D Millimeters: 2337H x 737W x 1194D Weight: 3307lb (1500kg)
PCUs 12 PCUs: Pallet (12 PCUs): Inches: 22H x 44W x 48D Millimeters: 559H x 1118W x 1219D Weight: 258lb (117kg)
24 PCUs: Pallet (24 PCUs): Inches: 38H x 44W x 48D Millimeters: 965H x 1118W x 1219D Weight: 486lb (220kg)
36 PCUs: 1st Pallet (30 PCUs): Inches: 46H x 44W x 48D Millimeters: 1168H x 1118W x 1219D Weight: 600lb (272kg)
48 PCUs: 1st Pallet (30 PCUs): Inches: 46H x 44W x 48D Millimeters: 1168H x 1118W x 1219D Weight: 600lb (272kg)
2nd Pallet (6 PCUs): Inches: 14H x 44W x 48D Millimeters: 356H x 1118W x 1219D Weight: 144lb (65kg)
2nd Pallet (18 PCUs): Inches: 30H x 44W x 48D Millimeters: 762H x 1118W x 1219D Weight: 372lb (169kg)
Standard: Web-based monitoring, alarm reporting via SNMP, and integration with Liebert SiteScan via SiteLink-E module.
Optional: Energy Master Remote Supervision available from Emerson.
System · Module · w/ Batteries

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
7.5.1 Termination Type, Recommended Wire Size, Recommended Lugs
AC Input
Table 10 AC Input and AC Input Grounding (per DC UPS module)
Recm.
Wire Size1 Conduit Size
Screw Clamp 2/0 AWG 2" 400Vac 110A
Recommended Lug (Thomas & Betts P/N)
Recm.
Compression 1-Hole; 3/8" Bolt
480Vac 5/16" (M8) 1/0 AWG 2" 54109 400Vac
1 Wire sizes based on recommendations of the American National Standards Institute (ANSI) approved National Fire Protection Association's (NFPA) National Electrical Code (NEC). Table 310-16 for copper wire at 90°C conductor temperature operating in ambient of 35°C was used. For other operating ambient temperatures, refer to the NEC. For operation in countries where the NEC is not recognized, follow applicable codes.
Equipment grounding conductors must be provided with the AC input conductors supplied to the module. Frame ground terminals must be connected to earth ground, not power system neutral. Equipment grounding conductor size based on recommendations of the NEC Table 250-122 for copper wire. When aluminum or copper clad aluminum grounding conductor is used, refer to Table 250 122 for increased conductor size. For operation in countries where the NEC is not recognized, follow applicable codes.
Table 11 Cabinet Frame Grounding (per DC UPS module)
Recommended Lug (Thomas & Betts P/N)
Recm.
Compression 1-Hole; 3/8" Bolt

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Table 12 DC Distribution (Distribution Circuit Breaker Option - per circuit breaker position)
Recm. Wire Size1 Lug Requirement Recommended Lug (Thomas & Betts P/N)
1/0 AWG 2-Hole, 1" Centers 54209
1/0 AWG 2-Hole, 1" Centers 54209
2/0 AWG 2-Hole, 1" Centers 54210
3/0 AWG 2-Hole, 1" Centers 54211
1 Wire sizes based on recommendations of the American National Standards Institute (ANSI) approved National Fire Protection Association's (NFPA) National Electrical Code (NEC). Table 310-16 for copper wire at 75°C conductor temperature operating in ambient of 35°C was used. For other operating ambient temperatures, refer to the NEC. For operation in countries where the NEC is not recognized, follow applicable codes. Sizes assume one layer of cables in open cable tray. Alternate sizing may be required for other installation configurations. Refer to the NEC or contact Emerson Services (contact information provided at the end of this document).
Table 13 DC Distribution (Distribution Fuse Option - per fuse position)
Recm. Wire Size1 Lug Requirement Recommended Lug (Thomas & Betts P/N)
3/0 AWG
1/2" (M12)
2-Hole, 1.75" Centers
(2) 250 kcmil (2) 54275 Return
1 Wire sizes based on recommendations of the American National Standards Institute (ANSI) approved National Fire Protection Association's (NFPA) National Electrical Code (NEC). Table 310-16 for copper wire at 75°C conductor temperature operating in ambient of 35°C was used. For other operating ambient temperatures, refer to the NEC. For operation in countries where the NEC is not recognized, follow applicable codes. Sizes assume one layer of cables in open cable tray. Alternate sizing may be required for other installation configurations. Refer to the NEC or contact Emerson Services (contact information provided at the end of this document).
The battery cables are factory provided and sized accordingly.

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Screw Size Recm. Wire Size
7.5.2 Power Ratings
Table 15 Power Ratings
Full 70 kW 70 kW 70 kW 70 kW
N + 1 64 kW 70 kW 70 kW 70 kW
Table 16 AC Input Specifications
Power Factor 0.99 at full load, 0.98 at 50% load
Input Voltage – Nominal 400 / 480V, 3 wire + ground
Input Voltage – Range 304-530 VAC; shall withstand up to 600 VAC input without damage.
Internal AC Input Breaker Size 150A
Internal AC Input Breaker AIC Rating 65,000A
Nominal 480V: 115A @ 384V; 92A @ 480V Nominal 400V: 138A @ 320V; 110A @ 400V Nominal 380V: 145A @ 304V; 116A @ 380V
Max Input Current / Module
Inrush Current Inrush current does not exceed 150% of the
rated input steady state peak value.
Total Harmonic Distortion

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Table 17 DC Output Specifications
96% peak (system level including branch distribution losses).
See Figure 30.
Energy Optimization Mode; Intelligent Power Matching
Allows operation at near-peak efficiency
down to 5% overall load.
Distribution Types 22 Circuit Breakers, 100-200A each; Optional: 6 Fuses, 100-500A each
Figure 30 System Efficiency Curve

Typical readings were taken at nominal input voltage, nominal output voltage, 50% load, and 25 degrees C ambient.
a. Wide Band Noise: Complies with Telcordia GR-947-CORE. 1. Typically 55 millivolts peak-to-peak. Does not exceed 200 millivolts peak-to-peak 2. Typically 15.9 millivolts rms. Does not exceed 100 millivolts rms.
10 ms (The DC voltage is allowed to decrease to 42V from 54V during the test.)
Voltage · System Efficiency

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Table 18 Battery Specifications
Type VRLA, Emerson Excellence EB4, 200 Ah
Arrangement 3 strings; eight 6V blocks per string
Per 6V Block Per 70 kW Module
Capacity - Ah 200 4800
Acid Weight - lb. (kg) 14.9 (6.7) 357.6 (160.8)
Total Acid Volume - gal. (L) 0.97 (3.67) 23.2 (87.8)
Free Acid Volume - gal. (L) 0.1 (0.37) 0.23 (0.88)
Lead Weight - lb. (kg) 54.7 (24.8) 1312.8 (595.2)
Total Weight - lb. (kg) 77.2 (35.0) 1852.8 (840)
Backup Time See backup time table at various loads.
Case Material UL94-HB or UL94-V0
Design Life 15 years @ 68°F (20°C); 10 years @ 77°F (25°C)
Recharge Time (to 97% of nominal capacity)
Less than 3 hours for > 35% load; Less than 4 hours > 15% load.
377 mm, including connectors and covers 135 mm, including ventilation spacing 250 mm
Constant Power Discharge @ 20°C (w/cell):
End Voltage Operating Time To End Voltage (minutes)
Per Cell 600 480 360 300 240 180 120 60
Constant Current Discharge @ 20°C (A):
End Voltage Operating Time To End Voltage (minutes)
Per Cell 600 480 360 300 240 180 120 60
(24 blocks)

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)

280kW 10kW 130 300 480 630 20kW 55 130 210 300 30kW 28 90 130 180 40kW 17 55 90 130 50kW 12 41 70 100 64kW 7 24 50 75 70kW 3 21 43 69 80kW 17 34 55 90kW 14 27 47 100kW 12 22 40 110kW 10 19 34 120kW 8 17 28 134kW 6 16 25 140kW 3 14 22 150kW 12 19 160kW 10 17 170kW 9 15 180kW 8 14 190kW 7 13 204kW 4 11 210kW 2 10 220kW 9 230kW 9 240kW 8 250kW 7 260kW 6 274kW 3 280kW 1

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Display LCD with 4 × 16 Characters
Communication RS232, RS485, Ethernet, USB
Protocol HTTP, SNMP, EEM, SocTpe, RSoc
Local Indicators Green LED: Illuminates when CPU is working correctly. Red LED: Illuminates when there is a critical or warning alarm. Yellow LED: Illuminates when there is an information alarm.
System Output Voltage Battery Voltage Battery Temperature Ambient Temperature Battery Shunt (for Battery Current)
3 Battery Fuses 2 DC Distribution Fuses 8 Generic Digital Inputs (where D15 reserved for "Fan CB Tripped" and D16 for "Fan Alarm") 1 Contactor Status
DC Power Plant Alarms AC Mains Failure, PCU Failure, High Voltage Shutdown, Fan Failure, Thermal Derating (of PCU output due to high temperature)
Monitoring Capability SNMP/Web Based Monitoring Included; Compatibility with SiteScan Available
EnergyMaster Remote Monitoring (contact your Emerson Representative)
Communication RS485, CAN, RS232
Local Indicators Green LED: Illuminates when CPU is working correctly. Flashes (1/3Hz) to indicate communication fault with controller. Flashes (1Hz) to indicate communicating with controller. Red LED: Illuminates when there is a critical or warning alarm. Yellow LED: Illuminates when there is an information alarm.
Inputs 22 Current Measurements 22 DC Fuse/Breaker Status Detection

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Communication RS485, CAN, RS232
Local Indicators Green LED: Illuminates when CPU is working correctly. Flashes (1/3Hz) to indicate communication fault with controller. Flashes (1Hz) to indicate communicating with controller. Red LED: Illuminates when there is a critical or warning alarm. Yellow LED: Illuminates when there is an information alarm.
Output Voltage Output Current 3 Battery Fuse Alarms 1 Fan Alarm 2 DU Fuse Alarms
Communication RS232 / RS485
Local Indicators Green LED: Illuminates when CPU is working correctly. Red LED: Illuminates when there is an alarm.
12 Digital Inputs Alarms/Events
3 Mains/Phase Voltage 3 Phase Current 1 Battery Voltage 1 Temperature 1 Network Frequency 3 Apparent Powers 3 Active Powers 3 Reactive Powers 3 Current Distortions Energy
0-600 VAC, 0-346 VAC 0-5 A External Current Transformer 0-36 VDC -25°C to +80°C / -13°F to +176°F 45-65 Hz kVA (calculated in software) kW (calculated in software) kVA (calculated in software) 0-100% (calculated in software), THD (Total Harmonic Distortion) kWh (calculated in software)
7.5.10 SM-BRC

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Type of Power Conversion Circuit: High frequency.
Float Charging Output Mode: In this mode of operation, system output voltage is constant and output current does not exceed the current limit setting. During normal operation, the battery is not required to furnish load current and remains in a fully charged condition.
Float voltage is set via the Controller, default @ 54.5V for furnished batteries.
Input Protection:
a. Input Over/Under Voltage Protection: The PCU shuts down and its protection indicator (yellow) illuminates when the input voltage is lower than 260VAC or higher than 530VAC. This condition is reported to the power system Controller and the power system Controller processes the alarms accordingly. b. Input Fusing: Input fuse is provided in each PCU. This fuse is not customer replaceable.
Output Protection:
High Temperature Protection:
a. When the PFC board temperature is higher than 85°C, the PCU turns off. When the PFC board temperature is lower than 75°C, the PCU resumes normal operation, and the hysteresis is at least 10°C. b. When the difference between “ambient temperature" and "PFC board temperature” is greater than 5°C, the PCU turns off. When the difference between “ambient temperature" and "PFC board temperature” is less than 2°C, the PCU resumes normal operation, and the hysteresis is at least 3°C. c. When the DC board temperature is higher than 105°C, the PCU turns off. When the DC board temperature is lower than 95°C, the PCU resumes to normal operation, and the hysteresis is at least 10°C.

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
Fan Fault Protection: An alarm will be generated upon a fan fault. In such cases, the fault indicator (red) on the PCU front panel will flash and the PCU will also inhibit its output. Auto- recovery is enabled upon the clearing of the corresponding fault.
PFC Over/Under Voltage: The PCU will shut down when its bus voltage is higher than the over voltage set point or is lower than the under voltage set point. During such conditions, the PCU does not output any power and its protection indicator (yellow) will light up.
Active Load Sharing (PCU): The PCU uses advanced digital active load sharing technology that maintains balancing to within ±3A. The difference in the average current between PCUs is
a. Normal Soft Start Time: The duration from the time when the PCU is powered on to the time when the PCU provides output voltage is 8s at 90% of the rated load, and the maximum time is 90s at 100% of the rated load.
Hot Swappable: The PCU is designed to be plug-and-play. The PCU can be inserted or removed from a live DC power system with no damage. When the PCU is plugged into the system, the system output voltage will not be affected.
Cooling: Each PCU contains a fan for forced convection cooling.
Fan Control: When the PFC bus voltage is within a normal range, the built-in processor adjusts the fan’s speed according to the PCU’s internal temperature and output current. For example, a higher temperature or output current will increase the fan speed. Above 45°C at full load, the fan operates at full speed. When the PFC bus voltage is abnormal, such as very low bus voltage, the fan turns off.
Communication Failure: The PCU’s protection indicator (yellow) will flash should it experience a communication failure. The failure information will be reported to the Controller and the Controller will process the failure accordingly. During a communication failure, in order to protect the battery, the PCU output voltage will automatically adjust to 53.5 V (this is a default value which can be modified using the Controller). The PCU will revert to normal operation once normal communication is restored.
Unbalance of PCU Output Current: When the output current of the PCUs in a DC power system is unbalanced, the PCU having the unbalanced output current will be identified automatically and its protection indicator (yellow) will turn on.
The failure information will be reported to the Controller and the Controller will process the failure accordingly.
Local Status and Alarm Indicators:
a. Power (Green) b. Protection (Yellow) c. Alarm (Red) d. A 10-segment Green LED is located on the front panel to represent output current, each segment represents 10A.

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
At Emerson Network Power, we understand the importance of reliable equipment – it’s critical to both your business and your bottom line. That is why we offer a wide array of services to meet all of your network infrastructure needs.
Answers technical product and system questions; determines status of warranties and contractual agreements for repair. Phone 1.800.800.5260
Services - Design, Deployment & Optimization Email ES.Services@Emerson.com Provides quotes and bid responses, order placement and scheduling for design, and deployment and optimization services. Download service & maintenance reports online.
Phone 1.800.800.1280, option 7
FreedomCare Secure.EmersonNetworkPower.com
Pricing and PO processing of spare parts, including but not limited to breakers, cables, fuses, rectifier fans, misc. breaker and fuse panels, enclosure fans, doors & switches, etc. Phone 1.800.800.1280, option 5
DC Power Depot Repair Email DCpower.Repair@Emerson.com Creates and processes RMAs, determines lead times and pricing, provides repair shipping information and status. Phone 1.800.800.1280, option 6
DC Power Product Training Email DCpower.Training@Emerson.com Requests for quotes, order placement and
scheduling. Phone 1.800.800.1280, option 8
For More Information To learn more about service offerings from Emerson Network Power, please contact your sales representative, call 1-800-800-1280 option 7, email ES.Services@Emerson.com or visit www.EmersonNetworkPower.com/EnergySystems

NetSure™ ITM with eSure™ Technology Installation Manual, Section 6040 (Issue AB, April 8, 2013)
The information contained in this document is subject to change without notice and may not be suitable for all applications. While every precaution has been taken to ensure the accuracy and completeness of this document, Emerson Network Power, Energy Systems, North America, Inc. assumes no responsibility and disclaims all liability for damages result- ing from use of this information or for any errors or omissions. Refer to other local practices or building codes as applicable for the correct methods, tools, and materials to be used in performing procedures not specifically described in this document.
The products covered by this instruction manual are manufactured and/or sold by Emerson Network Power, Energy Systems, North America, Inc. This document is the property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy Systems, North America, Inc. Any copying, use or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.
Names of companies and products are trademarks or registered trademarks of the respective companies. Any questions regarding usage of trademark names should be directed to the original manufacturer.
Learn more about the NetSure™ ITM DC UPS from Emerson at: EmersonNetworkPower.com/NetSureITM
EmersonNetworkPower.com/EnergySystems (North America) EmersonNetworkPower.eu/EnergySystems (EMEA)
© Emerson Network Power, Energy Systems, North America, Inc. 2013.
Business-Critical Continuity™, Emerson Network Power™, the Emerson Network Power logo, Emerson™ and Consider it Solved are service marks and trademarks of Emerson Electric Co. EnergyMaster™, eSure™, NetPerform™, NetReach™, NetSpan™, NetSure™ and NetXtend™ are trademarks of Emerson Network Power, Energy Systems, North America, Inc.
Pages referenced in this manual — manufacturer, support and downloads.
Owners and our team usually reply within a day — and your question helps the next person too.
Be the first to ask — other owners or our team will answer.