EN
Emerson logo
Official user manual

Emerson 540VDC

168 pages·10.7 MB·Power Supply·PDF·ENDEFRITNLJA
Emerson 540VDC
Table of Contents 80 sections I MPORTANT S AFETY I NSTRUCTIONS · SAVE THESE INSTRUCTIONS · Safety Precautions · 1.0 G ENERAL S YSTEM I NFORMATION · … ShowHide
I MPORTANT S AFETY I NSTRUCTIONSp.13SAVE THESE INSTRUCTIONSp.13Safety Precautionsp.141.0 G ENERAL S YSTEM I NFORMATIONp.151.1 General Informationp.151.2 General System Descriptionp.161.2.1 General Specificationsp.181.2.2 Features and Benefitsp.19Key Technological Featuresp.19Key Customer Benefitsp.191.2.3 Applicable Standards and Certificationp.192.0 S ITE P REPARATIONp.222.1 System Locationp.222.2 Environmental Considerationsp.222.3 Flooring Requirementsp.232.3.1 Floor Loadingp.232.3.2 Floor-Space Occupationp.232.3.3 Clearancesp.232.4 Electrical Considerationsp.232.4.1 DC Power Connectionsp.232.4.2 Status/Control Connectionsp.242.4.3 Grounding Connectionsp.242.4.4 AC Power Connectionsp.242.4.5 Remote Monitoring Connections—Optionalp.243.0 U NLOADING AND U NPACKINGp.253.1 Inspection Before Removal From the Truckp.253.2 Unloadingp.253.2.1 Handlingp.263.2.2 Unpackingp.263.3 Positioning the Liebert FSp.283.3.1 Moving the Liebert FSp.283.3.2 Storing the Liebert FS for Delayed Installationp.284.0 I NSTALLATIONp.294.1 Cabinet Floor Mountingp.314.1.1 Concrete, Masonry or Stone Floor Mountingp.32Mounting Kit for Concrete, Masonry or Stone Floorsp.32Mounting Toolsp.32Concrete, Masonry or Stone Floor Mounting Instructionsp.324.1.2 Wood Floor Mountingp.36Wood Floor Mounting Partsp.36Wood Floor Mounting Toolsp.36Wood Floor Mounting Instructionsp.364.1.3 Raised Floor Mountingp.374.2 Wiring Connectionsp.384.2.1 General Wiring Considerationsp.38TOP VIEWp.39AWGp.404.2.5 AC Auxiliary Control Power Supply Connectionsp.414.3 Startup Considerationsp.435.0 S YSTEM O VERVIEWp.445.1 Detailed System Descriptionp.445.1.1 System Module Descriptionp.45Control Panelp.45UPS Interconnection Kitp.45Power Conversion Modulep.45Main Control Modulep.45Flywheel Modulep.45E-Stopp.455.1.2 Power Systemp.46IGBT Power Converter +p.46Soft Startp.46To UPS Batteryp.46Inputp.46DC Monitoring Motor Generator Controlsp.46Magnetic Levitationp.46Modulep.46Power Conversion Module Controllerp.46Controlp.46Panelp.46COMp.465.1.3 System Performancep.465.1.4 User interfacesp.47Data Collection Module (DCM)p.47Versatile Interface Board (VIB)p.475.1.5 UPS Interconnection Kitp.475.1.6 Power Conversion Modulep.48Power Conversion Module Controller (PCMC)p.48IGBT Power Conversion Module (PCM)p.485.1.7 Magnetic Levitation Module (MLM)p.49AMPLIFIERp.49
Page 1 of the Emerson 540VDC user manual
Page 1 · click to enlarge
Page 1
Emerson 540VDC diagram (page 1)
Fig. 1
Page 2 of the Emerson 540VDC user manual
Page 2 · click to enlarge
Page 2
Page 2 of the Emerson 540VDC user manual
Page 3 of the Emerson 540VDC user manual
Page 3 · click to enlarge
Page 3
Page 3 of the Emerson 540VDC user manual
Page 4 of the Emerson 540VDC user manual
Page 4 · click to enlarge
Page 4

5.0 SYSTEM OVERVIEW 32

5.1 Detailed System Description 32 5.1.1 System Module Description 33 5.1.2 Power System 34 5.1.3 System Performance 34 5.1.4 User interfaces 35 5.1.5 UPS Interconnection Kit 35 5.1.6 Power Conversion Module 36 5.1.7 Magnetic Levitation Module (MLM) 37 5.1.8 Flywheel Module 38 5.1.9 Rotor/Flywheel—Rotating Group 39 5.1.10 Motor Generator 39 5.1.11 Vacuum System 40 5.1.12 Flywheel Sensors 41 5.1.13 System Safety 42 5.1.14 Cabinet 42 5.1.15 Ventilation and Cooling 43 5.2 List of System User-Configurable Parameters 43

5.3 Modes of Operation 45 5.3.1 OFF Mode 46 5.3.2 STANDBY Mode 46 5.3.3 STARTUP Mode 46 5.3.4 CHARGE Mode 47 5.3.5 READY Mode 47 5.3.6 DISCHARGE Mode 48 5.3.7 SHUTDOWN Mode 48 5.3.8 COAST Mode 49 5.3.9 FAULT Mode 49 5.4 Maintenance and Reliability 51

6.0 OPERATION 52

6.1 Operator Controls 52

6.2 Control Panel 53 6.2.1 Main screen function descriptions 54 6.2.2 System MODE Indicators 55 6.2.3 System STATUS Indicators 55 6.2.4 Other Status Indicators 56 6.3 Security Access 57 6.3.1 Security Levels 57 6.3.2 Password 57 6.3.3 EPROM (System) Parameters 57

Page 5 of the Emerson 540VDC user manual
Page 5 · click to enlarge
Page 5

6.4 Menu Tree and Navigation 57 6.4.1 Screen Tree Menu Functions 57 6.4.2 Navigation and Operation of Control Panel 59 6.4.3 System Setup and Parameter Access 59 6.4.4 View 61 6.4.5 Time/Date 61 6.4.6 Temperatures 62 6.4.7 Voltages 62 6.4.8 History 62 6.4.9 Options 64 6.4.10 Network—Requires DCM Option 65 6.4.11 Electrical 66 6.4.12 Vitals 66 6.4.13 Security 66 6.4.14 About 68 6.4.15 Tools 68 6.5 System Startup 69 6.5.1 Initial System Startup Procedure 69 6.5.2 Inspection before Initial System Startup 69 6.5.3 Control Parameters Setup at Initial System Startup 70 6.5.4 Initial System Startup Procedure 70 6.5.5 Regular Startup Procedure 71 6.5.6 Inspection Before Regular Startup 71 6.5.7 Starting up the System 71 6.6 Shutdown Procedure 72

7.0 MAINTENANCE 73

7.1 Safety Precautions 73

7.2 Liebert Services 74

7.3 Routine Maintenance 74

7.4 Maintenance Schedule 75

7.5 Record Log 75

7.6 Optional Air Filters 76

7.7 Torque Requirements 76

7.8 Detecting Trouble 76

7.9 Reporting a Problem 77

7.10 Corrective Actions 77

7.11 Recommended Test Equipment 77

7.12 Limited Life Components 77

8.0 TROUBLESHOOTING 78

8.1 General 78

8.2 Warnings 79

8.3 Faults 81

Page 6 of the Emerson 540VDC user manual
Page 6 · click to enlarge
Page 6

APPENDIX A.0 UPS INTERCONNECTION KITS 84

Appendix A.1 Wiring Connections 84 Appendix A.1.1 General Wiring Considerations 84 Appendix A.1.2 DC Power Connections 86

Appendix A.2 Installing the Liebert FS With a Liebert Series 610, Liebert Series 600T or Liebert Series 60087 Appendix A.2.1 Description - Liebert Series 610/600T/600 UPS Interconnection Kit 87 Appendix A.2.2 Status/Control Connections - Liebert Series 610/600T/600 UPS Interconnection Kit. 88 Appendix A.2.3 UPS Configuration - Liebert FS and Liebert Series 610, 600T or 600 88 Appendix A.2.4 Liebert FS Configuration - Single Liebert FS on Liebert Series 610/600T/600 DC Bus89 Appendix A.2.5 Liebert FS Configuration - Multiple Liebert FS Units on Liebert Series 610/600T/600 DC Bus89

Appendix A.3 Installing the Liebert FS With a Liebert Npower UPS 90 Appendix A.3.1 Description - Liebert Npower UPS Interconnection Kit 90 Appendix A.3.2 Status/Control Connections - Liebert Npower UPS Interconnection Kit 91 Appendix A.3.3 UPS Configuration - Liebert FS and Liebert Npower 91 Appendix A.3.4 Liebert FS Configuration - Single Liebert FS Unit 91 Appendix A.3.5 Liebert FS Configuration - Multiple Liebert FS Units on Liebert Npower DC Bus . . 92

Appendix A.4 Installing the Liebert FS With a Liebert Series 300 UPS 93 Appendix A.4.1 Description - Liebert Series 300 UPS Interconnection Kit 93 Appendix A.4.2 Status/Control Connections - Liebert Series 300 UPS Interconnection Kit 94 Appendix A.4.3 UPS Configuration - Liebert FS and Liebert Series 300 94 Appendix A.4.4 Liebert FS Configuration - Single Liebert FS on Series 300 DC Bus 95 Appendix A.4.5 Liebert FS Configuration - Multiple Liebert FS Units on Liebert Series 300 DC Bus 95

Appendix A.5 Installing the Liebert FS With a Liebert HiPulse UPS 96 Appendix A.5.1 Description—HiPulse UPS Interconnection Kit 96 Appendix A.5.2 Status/Control Connections—Liebert HiPulse UPS Interconnection Kit 96 Appendix A.5.3 IKIT-A05 DC Power Connections 97 Appendix A.5.4 UPS Configuration—Liebert FS and Liebert HiPulse 97 Appendix A.5.5 Single Liebert FS on UPS DC Bus 98 Appendix A.5.6 Single Liebert FS in Parallel with Battery Pack on UPS DC Bus 98 Appendix A.5.7 Liebert FS Configuration – Multiple Liebert FS Units 99

APPENDIX B.0 DATA COLLECTION MODULE 100

Appendix B.1 General Information 100 Appendix B.1.1 Overview 100 Appendix B.1.2 Features 100

Appendix B.2 DCM Installation and Configuration 100 Appendix B.2.1 Installation 100 Appendix B.2.2 DCM Requirements 101 Appendix B.2.3 Accessing the DCM 103 Appendix B.2.4 Configuring DCM System Parameters 103

Page 7 of the Emerson 540VDC user manual
Page 7 · click to enlarge
Page 7

Appendix B.3 DCM Operation 104 Appendix B.3.1 Logging into the DCM 104 Appendix B.3.2 Status and Detailed Status Screens 104 Appendix B.3.3 Datafiles Screen 105

Appendix B.4 DCM Troubleshooting 106 Appendix B.4.1 DCM Troubleshooting Principles 106 Appendix B.4.2 Resetting the DCM 106

APPENDIX C.0 VERSATILE INTERFACE BOARD 107

Appendix C.1 General Information—Versatile Interface Board 107 Appendix C.1.1 Versatile Interface Board Overview 107 Appendix C.1.2 VIB Features 108

Appendix C.2 VIB Installation and Configuration 110 Appendix C.2.1 VIB Installation 110 Appendix C.2.2 VIB Requirements 110 Appendix C.2.3 VIB Input Specifications 110 Appendix C.2.4 VIB Output Specifications 110 Appendix C.2.5 VIB Connections 111

Appendix C.3 VIB Operation 111 Appendix C.3.1 VIB Operational States 111

Appendix C.4 Troubleshooting the VIB 112 Appendix C.4.1 UIB State Not Displayed on the Front Panel 112 Appendix C.4.2 VIB in “Disabled” or “Not Available” State 112 Appendix C.4.3 Inputs Not Recognized 112 Appendix C.4.4 Outputs Not Asserted 112

APPENDIX D.0 INSTALLATION DRAWINGS 113

Appendix D.1 Liebert FS Flywheel Submittal Document Matrix 113

Appendix D.2 Other Liebert FS Drawings 114

APPENDIX E.0 SPECIFICATIONS 148

Appendix E.1 Ground Test Procedure 149

APPENDIX F.0 AUXILIARY BACKUP AC POWER SUPPLY 150

Appendix F.1 Overview 150

Appendix F.2 Backup AC Power Supply Specification 150

Appendix F.3 Recommended Backup Power Supply Configuration 150 Appendix F.3.1 Operating the Liebert FS+DC in Parallel With Batteries 151 Appendix F.3.2 Operating the Liebert FS Without Batteries 152

Appendix F.4 Scenarios 153

Page 8 of the Emerson 540VDC user manual
Page 8 · click to enlarge
Page 8
Page 8 of the Emerson 540VDC user manual
Page 9 of the Emerson 540VDC user manual
Page 9 · click to enlarge
Page 9
Page 9 of the Emerson 540VDC user manual
Page 10 of the Emerson 540VDC user manual
Page 10 · click to enlarge
Page 10
Page 10 of the Emerson 540VDC user manual
Page 11 of the Emerson 540VDC user manual
Page 11 · click to enlarge
Page 11
Page 11 of the Emerson 540VDC user manual
Page 12 of the Emerson 540VDC user manual
Page 12 · click to enlarge
Page 12

x DISCONTINUED

Page 13 of the Emerson 540VDC user manual — I MPORTANT S AFETY I NSTRUCTIONS
Page 13 · click to enlarge
Page 13

I MPORTANT S AFETY I NSTRUCTIONS

SAVE THESE INSTRUCTIONS

This manual contains important instructions that should be followed during installation and mainte- nance of your Liebert FS.

! WARNING The installation of the Liebert FS must comply with applicable national, federal, state and local codes. ONLY qualified service personnel should perform maintenance on the Liebert FS system. When performing maintenance with any part of the equipment, service personnel and test equipment should be standing on rubber mats. The service personnel should wear insulating shoes for isolation from direct contact with the floor (earth ground). Never work alone, even if all power is removed from the equipment. A second person should be standing by to assist and summon help in case an accident should occur. Under typical operation and with all UPS doors closed, only normal safety precautions are necessary. The area around the Liebert FS system should be kept free of puddles of water, excess moisture and debris. Special safety precautions are required for procedures involving handling, installation and maintenance of the UPS system. Observe all safety precautions in this manual before handling, installing or operating the UPS system. This equipment contains circuits that are energized with high voltage. Only test equipment designed for troubleshooting and for use with those voltages should be used. Always check with an AC and DC voltmeter to ensure safety before making contact or using tools. Even when the power is turned Off, dangerously high electric charges may exist within the UPS.

! WARNING Exercise extreme care when handling Liebert FS cabinets to avoid equipment damage or injury to personnel. Refer to Section 3.0 and Section 4.0 for equipment handling information and installation procedures.

In case of fire involving electrical equipment, use only carbon dioxide fire extinguishers or others approved for use in fighting electrical fires.

! WARNING Extreme caution is required when performing maintenance.

Be constantly aware that the Liebert FS contains high DC as well as AC voltages. With input power off and the battery disconnected, high voltage at filter capacitors and power circuits should be discharged within 30 seconds. However, if a power circuit failure has occurred, you should assume that high voltage may still exist after shutdown. Check with a voltmeter before making contact.

Check for voltage with both AC and DC voltmeters prior to making contact.

! WARNING When the Liebert FS is under power, both the operator and any test equipment must be isolated from direct contact with earth ground and the Liebert FS chassis frame by using rubber mats.

Some components within the cabinets are not connected to chassis ground. Any contact between floating circuits and the chassis is a lethal shock hazard. Exercise caution that the test instrument exterior does not make contact either physically or electrically with earth ground.

Page 14 of the Emerson 540VDC user manual — Safety Precautions
Page 14 · click to enlarge
Page 14

! CAUTION Do not loosen or tamper with vacuum components and fittings.

! CAUTION This unit contains components sensitive to electrostatic discharge.

! CAUTION Do not remove plug-in printed circuit cards during operation. Improper removal of a card can cause severe damage to the unit.

! CAUTION The 110/230VAC must remain connected at all times to ensure reliable backup power to Liebert FS auxiliaries.

! CAUTION Do not use this unit for other than its intended use.

! CAUTION A qualified electrician must perform all electrical connections.

All wiring size and installation must comply with all applicable local, regional and national regulations (e.g., National Electric Code for USA).

Safety Precautions

Read this manual thoroughly, paying special attention to the sections that apply to you, before work- ing with the Liebert FS.

Under typical operation and with all cabinet doors closed, only normal safety precautions are neces- sary. The area around the Liebert FS should be kept free from puddles of water, excess moisture or debris.

Special safety precautions are required for procedures involving handling, installation and mainte- nance of the Liebert FS. Observe precautions in 7.0 - Maintenance before as well as during perfor- mance of any maintenance procedure on the Liebert FS.

This equipment contains circuitry that is energized with high voltage. Only test equipment desig- nated for troubleshooting should be used. This is particularly true for oscilloscopes. Always check with an AC and DC voltmeter to ensure safety before making contact or using tools. Even when the power is turned Off, dangerously high voltage may exist at the capacitor banks.

ONLY qualified service personnel should perform maintenance on the Liebert FS. When performing maintenance with any part of the equipment under power, service personnel and test equipment should be standing on rubber mats. The service personnel should wear insulating shoes for isolation from direct contact with the floor (earth ground).

One person should never work alone. A second person should be standing by to assist and summon help in case an accident should occur.

Page 15 of the Emerson 540VDC user manual — 1.1 General Information
Page 15 · click to enlarge
Page 15

1.0 G ENERAL S YSTEM I NFORMATION

1.1 General Information

1.1.1 Safety Considerations Read and follow the instructions in this manual before interacting with the system. This document contains important information and instructions for your Liebert FS. All procedures defined in the manual related to unpacking, installing and operating the unit must be followed. Refer to this manual before contacting Liebert Services for technical assistance.

! WARNING Failure to recognize electrical hazards could prove fatal. Failure to abide by instructions provided herein may void your warranty.

1.1.2 Requesting Assistance from Liebert If you require assistance for any reason, contact Liebert Services at 1-800-LIEBERT (1-800-543-2378). Have the following information available:

Table 1 System information

Software Version; Primary *

Software Version; Secondary *

Software Version; Bootloader *

Show 8 more labels / short text on this page
General System Information · Date Purchased · Date Installed · Location · System Model Number · System Serial Number · Interconnected UPS Manufacturer · Interconnected UPS Model
Page 16 of the Emerson 540VDC user manual — 1.2 General System Description
Page 16 · click to enlarge
Page 16

1.2 General System Description

The Liebert FS is a flywheel energy storage system, a mechanical battery that stores energy in the form of a rotating mass. This energy is immediately convertible to useful electric power. The Liebert FS is available with a wide performance range up to 200kW as a single unit configura- tion.

Figure 1 Liebert FS

Emerson 540VDC — 1.2 General System Description diagram (page 16)
Fig. 2 · 1.2 General System Description

The Liebert FS is configured as a two-terminal plus ground DC flywheel power system and is used as a functional replacement for or an availability supplement to a bank of chemical batteries for an Uninterruptible Power System. Like a chemical battery bank, Liebert FS receives charge and float power from the two terminal UPS DC bus and returns power to the same DC bus whenever the bus voltage droops below a programmable threshold level. Integrated into a UPS, the Liebert FS is used as the alternate source of power to supply DC power to the UPS inverter if the AC supply voltage (UPS input) is outside the acceptable range. The Liebert FS supplies power to the UPS inverter until the utility power is restored, until an alternate power source is available, or until the Liebert FS’ energy is exhausted. One or more Liebert FS units may be integrated into UPS and can be put in parallel as shown in Figures 2 and 3, to achieve higher power output or higher ride-through duration.

General System Information

Page 17 of the Emerson 540VDC user manual — 1.2 General System Description
Page 17 · click to enlarge
Page 17

Figure 2 Single Liebert FS unit or multiple Liebert FS units integrated into a UPS system

Emerson 540VDC — 1.2 General System Description diagram (page 17)
Fig. 3 · 1.2 General System Description

Figure 3 Liebert FS unit(s) integrated into UPS system for ride-through to backup generator

Emerson 540VDC — 1.2 General System Description diagram (page 17)
Fig. 4 · 1.2 General System Description

Liebert FS Unit 1 Liebert FS Unit 2 Liebert FS Unit N

General System Information

Page 18 of the Emerson 540VDC user manual — 1.2.1 General Specifications
Page 18 · click to enlarge
Page 18

Figure 4 One or more Liebert FS units in parallel with one or more battery strings, battery cabinets or batteries in racks

Emerson 540VDC — 1.2.1 General Specifications diagram (page 18)
Fig. 5 · 1.2.1 General Specifications

1.2.1 General Specifications

Table 2 summarizes the technical specifications of the Liebert FS.

Table 2 General system specifications

Emerson 540VDC — 1.2.1 General Specifications diagram (page 18)
Fig. 6 · 1.2.1 General Specifications

Rated Power Delivery Dependent upon the duration required; refer to Figure 5

Input Voltage (DC) 360 through 600 VDC; > 530 VDC required for 200kW

Output Voltage (DC) 350 through 590 VDC; > 520 VDC required for 200kW

Input Voltage Aux. (AC) 85 VAC – 265 VAC (47-63Hz)

Dimensions (W x D x H) 63 x 83 x 180 cm (25 x 33 x 71 in)

For more-detailed technical specifications, refer to Technical specifications on page 148.

General System Information

Page 19 of the Emerson 540VDC user manual — 1.2.3 Applicable Standards and Certification
Page 19 · click to enlarge
Page 19

1.2.2 Features and Benefits

The Liebert FS provides clean constant DC output to the DC bus, at the user-selected, regulated volt- age, until the stored energy is depleted. See Figure 5 for a graphic representation of the performance power and duration curves of single and paralleled unit combinations.

Key Technological Features

  • Active magnetic bearings
  • Internal, integrated vacuum system
  • Synchronous reluctance motor-generator
  • Fiber composite flywheel
  • Unique patented safety system

Key Customer Benefits

  • High reliability
  • Significantly increased power supply reliability
  • Low total cost of ownership
  • Operational flexibility
  • Environmentally friendly
  • Easy to install and easy to operate.
  • Low standby losses
  • Small footprint
  • Lightweight
  • Reliable, cost effective power systems for UPS ride-through needs

1.2.3 Applicable Standards and Certification

For distribution in North America, the Liebert FS is listed to the following Underwriter’s Laboratory (UL) applicable requirements:

  • UL 508, Standard for Safety for Electrical Industrial Control Equipment;
  • UL 1004, Standard for Safety for Electric Motors;
  • UL 1248, Standard for Safety for Engine-Generator Assemblies; The Liebert FS is designed in accordance with the applicable sections of the requirements published by:
  • National Fire Protection Association (NFPA)/National Electric Code (NEC)
  • National Electrical Manufacturer's Association (NEMA)
  • Occupational Safety & Health Administration (OSHA)

The Liebert FS is also listed to the following Canadian Standards as determined by UL (cUL):

  • CSA-C22.2 No. 100-04, “Motors and Generators,”
  • CSA-C22.2 No. 14-95, “Industrial Control Equipment,” The "Uniform Building Code (UBC) Zone 4" certification requirements.

General System Information

Page 20 of the Emerson 540VDC user manual — 1.2.2 Features and Benefits
Page 20 · click to enlarge
Page 20

For distribution in Europe, the Liebert FS is CE-marked and meets the applicable requirements of the following European directives:

“Low Voltage Directive” 73/23/EEC and its amendments by the directive 93/68/EEC; “Machinery Directive” 98/037/EEC and its amendments by the directive 98/79/EEC;

  • IEC/EN 60439-1:1999—“Low-voltage switchgear and control gear assemblies Part 1: Typetested and partially type-tested assemblies”
  • IEC/EN 60204-1:1997—“Safety of machinery - Electrical equipment of machines Part 1: General requirements”
  • EN 1127-1:1997—“Explosive atmospheres: Explosion prevention and protection Part 1: Basic concepts and methodology”
  • Machinery Directive Annex 1—“Essential Health and Safety Requirements Relating to the Design and Construction of Machinery and Safety Components” “Electromagnetic Compatibility (EMC) Directive” 89/336/EEC and its amendments by the directives 92/31/EEC and 93/68/EEC.

Figure 5 Liebert FS DC power duration for one or multiple units in parallel

2400 kW-sec delivered GTX model, 520 VDC, with filter

Output Power vs. Ride-Through Time

DC Output Power (kWb)

0 12 17 22 27 32 37 42 47 52 57

12 seconds at 200kW (max. power) @ 520 VDC min

kWb = Refers to Kilowatts on the DC bus of the UPS system Discharge Voltage = 520VDC

The Liebert FS is integrated into UPS systems as shown in Figures 2 through 4 and Figures 6 and 7.

Show 8 more labels / short text on this page
General System Information · (Vbus=540V, Vreg=520V) · 5 Units · 4 Units · 3 Units · 2 Units · 1 Unit · Ride-Through Time, Seconds
Page 21 of the Emerson 540VDC user manual — 1.2.2 Features and Benefits
Page 21 · click to enlarge
Page 21

Figure 6 Integrating a single Liebert FS unit into a UPS system

Emerson 540VDC — 1.2.2 Features and Benefits diagram (page 21)
Fig. 7 · 1.2.2 Features and Benefits

Several Liebert FS units can be put in parallel to achieve higher power output and higher ride- through duration (see Figure 7). One or more Liebert FS units may also be connected in parallel with a UPS battery plant (valve- regulated or wet cells) to provide an overall incremental reliability and life improvement for the DC battery plant. In this situation, the Liebert FS unit would be connected in parallel with the battery plant (through its own disconnect device) to the UPS DC Bus.

Figure 7 Integrating multiple Liebert FS units into a UPS system

Emerson 540VDC — 1.2.2 Features and Benefits diagram (page 21)
Fig. 8 · 1.2.2 Features and Benefits

General System Information

Page 22 of the Emerson 540VDC user manual — 2.2 Environmental Considerations
Page 22 · click to enlarge
Page 22

2.0 S ITE P REPARATION

Site preparation for the Liebert FS is minimal. If a UPS system is already installed, the only require- ments are to properly:

  • Place the unit in relation to walls, ceiling and other equipment and
  • Fasten the unit to the floor.

! CAUTION The following sections should be read thoroughly before proceeding with site preparation for installing the Liebert FS.

2.1 System Location

Choose a location for the Liebert FS that offers:

  • Easy connection to inputs, outputs and auxiliary equipment
  • Enough space to service the Liebert FS
  • Air circulation sufficient to expel heat produced by Liebert FS
  • Protection against moisture and excessive humidity (not to exceed 95% non-condensing)
  • Protection against excessive dust and other particulate matter
  • Compliance with fire prevention regulations and practices
  • Operating environment temperature of -4°F to 122°F (-20°C to 50°C)

2.2 Environmental Considerations

Place the system in a clean, dust-free environment. Air must be free to circulate around the cabi- net(s). The system pulls air through the front of the Liebert FS and exhausts it out the top for cooling. If the unit must be located in a dusty environment, Liebert recommends installing an optional air fil- ter, which mounts on the lower inside of the Liebert FS door.

Adequate ventilation, including air conditioning if necessary, must be provided to limit heat accumu- lation. The ambient temperature for the unit must be from -4°F to 122°F (-20°C to 50°C). Avoid plac- ing the unit in direct sunlight or near other heat sources.

There is a 32°F (0°C) minimum ambient temperature requirement for starting up the unit. Once the unit has been running for some time, it will keep itself warm enough in ambient temperatures as low as -4°F (-20°C).

Humidity is not to exceed 95% (non-condensing).

Site Preparation

Page 23 of the Emerson 540VDC user manual — 2.4.1 DC Power Connections
Page 23 · click to enlarge
Page 23

2.3 Flooring Requirements

2.3.1 Floor Loading

The Liebert FS should be mounted on a finished surface, such as concrete, block, brick or wood. The floor must be strong enough to support the equipment load and suitable for installation of an anchor- ing kit with vertical floor loading properly calculated (assume 2,000 PSI or 140 kg/cm2 contact load at caster wheels; this includes safety factors).

  • When installing on a concrete, masonry or stone floor, use the factory-supplied masonry fasteners (anchors). The fastener manufacturer’s allowable shear load (parallel to floor) for these fasteners is 2,030 lb. (9 kN) when mounted in normal-weight concrete (2,000 to 3,000 PSI; 140-210 kg/cm 2 ) of at least 3 in. (7.6cm) thickness.
  • If installing on a floor consisting of a material other than normal-weight concrete as described above, the mounting should be capable of sustaining a shear load (parallel to floor) of at least 1,500 lb. (6.7 kN) for each of the four mounting points.
  • If installing on a raised floor that is less than 2 in. (5cm) thick or constructed of a material not appropriate for the masonry fasteners provided or lag screw engagement, mount using through bolts with nuts and large diameter washers as shown in Figure 155 .

Full details for mounting the cabinet are found in 4.1 - Cabinet Floor Mounting.

2.3.2 Floor-Space Occupation

The Liebert FS cabinet requires a floor space of 23" wide by 33" deep (63 x 83cm), resulting in a foot- print of 5.7 square feet (0.5m2).

2.3.3 Clearances

The Liebert FS installation requires a ceiling height of at least 7 ft. (214cm).

The unit occasionally vents air out of the top. Loose ceiling tiles above the unit may be moved by the airflow. Ample clearance to access the cable connection at the top of the unit must also be provided. All system electrical connections are to be routed through the top or side of the cabinet.

A 36" (91cm) clearance is required in the front of the unit for National Electrical Code (NEC) compli- ance.

Maintenance access to all components is from the front; no side or back access is required for mainte- nance. Either side of the system cabinet can be placed against walls (assuming minimum distance from edge of floor). Repair may require access to the rear of the unit. In this unlikely instance, the unit may need to be rolled out from its installed location (cabinet is on casters).

2.4 Electrical Considerations

! CAUTION A qualified electrician must perform all electrical connections. The wires (DC power, grounding, optional status/control and auxiliary power supply) that connect the Liebert FS system(s) to the UPS system must be provided by the electrical contractor (standard) or by Liebert as an option. Wire size and installation must comply with all applicable local, regional and national regulations (e.g., National Electric Code for USA).

2.4.1 DC Power Connections

Place the Liebert FS as close as practical to the interconnected UPS. The maximum distance allowed between the UPS and the Liebert FS depends on power levels and the type of DC cables used. Liebert requires sizing DC cables and placing the Liebert FS for a maximum of no more than 2V loop drop (at rated power) between the UPS and the Liebert FS.

The Liebert FS is delivered with the standard UPS interconnection kit for connection of the positive and negative terminals coming from the UPS DC bus or from an external disconnect switch.

For details, see 4.2.2 - DC Power Connections.

Site Preparation

Page 24 of the Emerson 540VDC user manual — 2.4.5 Remote Monitoring Connections—Optional
Page 24 · click to enlarge
Page 24

2.4.2 Status/Control Connections

Site preparation for Status/Control connections vary according to the type of UPS interconnection kit provided with your Liebert FS.

Liebert recommends making Status/Control connections on the UPS system side.

For details, refer to 4.2.3 - Status/Control Connections.

2.4.3 Grounding Connections

A grounding wire must be connected from the Liebert FS to the UPS ground terminal. Identify in advance the location of the grounding terminal on the UPS system. For further details, see 4.2.2 - DC Power Connections.

2.4.4 AC Power Connections

Plan for the availability of a dedicated 110 or 230VAC, 50 or 60Hz circuit with branch circuit protec- tion as a source for AC auxiliary power supply to the Liebert FS. This AC power must be rated for 500VA and must be located either on the output circuit of the UPS system or on another UPS-pro- tected circuit. A qualified electrical contractor should make arrangements for this connection to be permanent.

The field-supplied AC wire must comply with all applicable local, regional and national regulations (e.g., National Electric Code for USA). An 18 AWG (0.82mm2) cable is recommended for this connec- tion.

For details, see 4.2.5 - AC Auxiliary Control Power Supply Connections and Appendix F.0 - Auxiliary Backup AC Power Supply.

2.4.5 Remote Monitoring Connections—Optional

If the optional Data Collection Module (DCM) is provided with your Liebert FS system, plan to have communication cables (local network connection, phone line) installed to support the remote notifica- tion and/or monitoring options chosen.

For details, see 4.2.6 - Remote Monitoring Connections—Optional.

Site Preparation

Page 25 of the Emerson 540VDC user manual — 3.2 Unloading
Page 25 · click to enlarge
Page 25

3.0 U NLOADING AND U NPACKING

3.1 Inspection Before Removal From the Truck

While the Liebert FS shipping package is still on the truck:

  • Inspect the equipment and shipping container(s) for any signs of damage or mishandling. Check also if the shock and tilt gauges (installed for shipping purposes) indicate excessive shock and/or tilting. If any damage is noted, file a damage claim with the shipping agency within 24 hours and contact your local sales representative or Liebert at 1-800-LIEBERT to notify them of the damage claim and the condition of the equipment.
  • Compare the contents of the shipment with the bill of lading. Report any missing items to the carrier, your local Liebert representative and Liebert at 1-800-LIEBERT immediately. Please have the bill of lading available.

! CAUTION Do not attempt to install the system if damage is apparent.

3.2 Unloading

Figure 8 Liebert FS shipping package

Emerson 540VDC — 3.2 Unloading diagram (page 25)
Fig. 9 · 3.2 Unloading

Do not tilt the Liebert FS more than 15 degrees from vertical.

Shipping Weight:1462 lb. (663kg) Weight, unit only: 1300 lb (590kg) 24" (610mm)

The FS as shipped (see Figure 8) can weigh up to 1,462 lb. (663kg). It must be handled with care. It must be kept upright—pay special attention to the arrows, which indicate the upright position.

Unloading and Unpacking

Page 26 of the Emerson 540VDC user manual — 3.2.2 Unpacking
Page 26 · click to enlarge
Page 26

3.2.1 Handling

The Liebert FS shipping package is designed to be handled using a forklift. Forklift operators must avoid rough handling when picking up, moving and lowering it.

! CAUTION Exhibit care when handling Liebert FS cabinet to avoid equipment damage or injury to personnel. Failure to do so could throw off the calibration of the mechanical components contained in the unit and possibly cause permanent damage.

! CAUTION The Liebert FS has sensitive electronics and mechanical components that have been calibrated prior to shipment.

! CAUTION Test lift and balance the cabinet before transporting it. Maintain minimum tilt from vertical at all times—do not exceed 15 degrees of tilt.

! CAUTION Sheet metal components and framework may have sharp edges.

3.2.2 Unpacking

To reduce the possibility of shipping damage, flywheel cabinets are secured to the pallet by two mounting brackets and two banding straps. These same two mounting brackets are used to mount the cabinet to the floor.

Packing elements should be removed in this order to ease unpacking:

1. Cut and remove the banding straps (see Figure 8 ).

! CAUTION Use care when removing banding straps and metal mounting brackets. The banding straps are under tension and may snap violently, causing injury. Always wear proper eye and foot protection when unpacking or installing the system.

2. Remove hex head bolts holding mounting brackets to pallet as shown in Figure 9 . 3. Remove lag bolts holding metal mounting brackets to pallet. 4. Remove mounting brackets from Liebert FS.

Figure 9 Removing lag bolts

Emerson 540VDC — 3.2.2 Unpacking diagram (page 26)
Fig. 10 · 3.2.2 Unpacking

securing Liebert FS to shipping pallet

Metal mounting bracket bolted to shipping pallet

Unloading and Unpacking · Lag bolts

Page 27 of the Emerson 540VDC user manual — 3.2.1 Handling
Page 27 · click to enlarge
Page 27
5. Use a forklift to remove the cabinet from the shipping pallet. To lift the Liebert FS, the forks should be inserted between the caster wheel assemblies (see Figure 10 ). Forks must be extended to the full depth of the cabinet—at least 6 ft. (2m) fork length—to properly support the equipment (see Figure 10 ). This likely requires fork extenders. The Liebert FS unit can weigh up to 1,300 lb. (590kg) and must be handled with care.

Figure 10 Lifting the Liebert FS cabinet

Emerson 540VDC — 3.2.1 Handling diagram (page 27)
Fig. 11 · 3.2.1 Handling

Forks must be extended the full depth of the cabinet

6. Unbolt and remove the two metal support plates (one on either side of the pallet).

Figure 11 Removing the metal support plates

Emerson 540VDC — 3.2.1 Handling diagram (page 27)
Fig. 12 · 3.2.1 Handling

Caster (for moving short distances)

Leveling foot (one on each corner)

7. Examine the Liebert FS internally and externally for transit damage. Report any damage to the shipper, your local Liebert representative and Liebert immediately.

! CAUTION Do not attempt to install the system if there is any damage.

8. Check visually for loose connections and unsecured components in the cabinet. 9. You will find the installation manual, operation manual and options manual (if any) enclosed in the pocket inside the cabinet door (see Figure 12). 10. You will find the serial number and model number plate mounted on the cabinet door pocket or on the upper right corner of the face of the cabinet frame inside the door (see Figure 12). Record the model number and serial number in Table 1 - System information.

Unloading and Unpacking · Metal support plate

Page 28 of the Emerson 540VDC user manual — 3.3.2 Storing the Liebert FS for Delayed Installation
Page 28 · click to enlarge
Page 28

Figure 12 Location of serial and model number plate (cabinet side panel removed and open door)

Emerson 540VDC — 3.3 Positioning the Liebert FS diagram (page 28)
Fig. 13 · 3.3 Positioning the Liebert FS

Serial Number and Model Number Plates

3.3 Positioning the Liebert FS

3.3.1 Moving the Liebert FS

When moving the unit a short distance, the Liebert FS may be rolled on its built-in casters (see Figure 13) to its location.

! CAUTION Before moving the Liebert FS across a floor, determine whether the surface will support the unit’s weight—1,462 lb. (663kg) as shipped; 1,300 lb. (590kg) uncrated.

Emerson 540VDC — 3.3 Positioning the Liebert FS diagram (page 28)
Fig. 14 · 3.3 Positioning the Liebert FS

Casters on each corner (for moving unit short distances only)

When moving the unit a longer distance or over rough flooring, move the Liebert FS with a forklift or similar equipment to facilitate the relocation and to reduce vibration of the unit.

! CAUTION Ensure that the handling equipment is rated for the weight of the Liebert FS—1,462 lb. (663kg) as shipped; 1,300 lb. (590kg) uncrated.

3.3.2 Storing the Liebert FS for Delayed Installation

If the equipment will not be installed immediately, it must be stored indoors where the temperature stays within -4°F to 176°F (-20°C to 80°C) and the humidity is no higher than 95% (non-condensing).

Unloading and Unpacking · Manuals

Page 29 of the Emerson 540VDC user manual — 4.0 I NSTALLATION
Page 29 · click to enlarge
Page 29

4.0 I NSTALLATION

The Liebert FS system design and safety characteristics allow for a relatively simple and quick instal- lation. The system is designed to be rolled or lifted into place and bolted to the floor using Liebert's mounting kit, included with the system. The mounting kit in most cases does not require any special floor preparations (see3.0 - Unloading and Unpacking).

! CAUTION The Liebert FS system must be installed in accordance with the instructions and drawings in this manual.

! CAUTION Never attempt to install or power up any unit suspected of damage during shipment.

! CAUTION The Initial System Startup must be performed ONLY under the supervision of a Liebert-certified service technician to ensure proper system operation. Failure to abide by instructions provided herein may void your warranty.

Contact your local Liebert sales representative or Liebert at 1-800-LIEBERT to arrange for system startup.

Figure 14 Dimensions, general layout

Emerson 540VDC — 4.0 I NSTALLATION diagram (page 29)
Fig. 15

Installation · 12-100120-09

Page 30 of the Emerson 540VDC user manual — 4.0 I NSTALLATION
Page 30 · click to enlarge
Page 30

Figure 15 Internal layout

Emerson 540VDC — 4.0 I NSTALLATION diagram (page 30)
Fig. 16

NOTE The Liebert FS is designed for front-access-only for installation and maintenance. While the likelihood of repair is minimal, some repair procedures require side and/or rear access. Normally, the easiest way to handle this is to disconnect the power and control wiring and roll the unit out into an open area on its casters. While it is acceptable, under certain circumstances, to connect the Liebert FS to its companion UPS unit through the sides of the Liebert FS and UPS cabinets rather than through external conduit, repair access to the Liebert FS unit will be easier to facilitate if through-cabinet wiring is not installed.

Installation

Page 31 of the Emerson 540VDC user manual — 4.1 Cabinet Floor Mounting
Page 31 · click to enlarge
Page 31

4.1 Cabinet Floor Mounting

  • For placement on concrete, masonry or stone floors, see 4.1.1 - Concrete, Masonry or Stone Floor Mounting .
  • For placement on wood floors, see 4.1.2 - Wood Floor Mounting .
  • For placement on raised floors, see 4.1.3 - Raised Floor Mounting .

Figure 16 Floor mounting

Emerson 540VDC — 4.1 Cabinet Floor Mounting diagram (page 31)
Fig. 17 · 4.1 Cabinet Floor Mounting

Installation

Page 32 of the Emerson 540VDC user manual — Concrete, Masonry or Stone Floor Mounting Instructions
Page 32 · click to enlarge
Page 32

4.1.1 Concrete, Masonry or Stone Floor Mounting

Mounting Kit for Concrete, Masonry or Stone Floors

Liebert has included a complete anchoring kit with each Liebert FS for surface mounting. The kit is intended to securely fasten the Liebert FS to its intended location for operational safety and seismic requirements.

This kit includes (items depicted in Figure 150):

  • Two (2) cabinet mounting brackets (from shipping pallet)
  • Four (4) concrete expansion anchors
  • Two (2) drop-in hex head anchor bolts
  • Two (2) washers for anchor bolts
  • One (1) masonry drill bit
  • One (1) floor mounting template ( Figure 149 )
  • Two (2) drop-in hex flange anchor bolts
  • One (1) setter rod or drive pin (specifically designed for measuring hole depth and for expanding the anchors)
  • Four (4) hex bolts from shipping package, each 1/2" diameter and 3/4" long (12.7mm diameter x 20mm long)

Mounting Tools

These tools are needed for the mounting the Liebert FS on the floor:

  • Concrete drill with 1/2" (12.7mm) minimum chuck size
  • Masonry drill bit (included in mounting kit)
  • Masonry drill bit—used for pilot hole—for example, 1/8" (3.2mm) diameter
  • Setter rod (included in mounting kit)
  • Hammer or mallet, 16 oz. (0.5kg) or larger
  • Shop vacuum cleaner (to remove dust from hole when drilling)
  • 3/4" (19mm) combination wrench
  • 18mm combination wrench

Concrete, Masonry or Stone Floor Mounting Instructions

To mount the Liebert FS cabinet on the floor:

1. Prepare a clean, level, finished surface, free of obstructions, for installation of the mounting kit. 2. Tape the floor mounting template mounting template ( Figure 149 ) to the installation location. 3. Using a bit smaller than the one provided in the mounting kit, drill a pilot hole at each of the four places marked with an “X” on the template. 4. Remove template and continue with larger drill bit provided.

Figure 17 Floor mounting template layout

Drill 4 holes, each

2" (51mm) deep, with 5/8" masonry bit

Front of Liebert FS

Installation · 16" (406mm) · 29-1/2" (749mm)

Page 33 of the Emerson 540VDC user manual — 4.1.1 Concrete, Masonry or Stone Floor Mounting
Page 33 · click to enlarge
Page 33
5. Drill 2" (51mm) deep holes in prepared surface using the drill bit included in the kit per bolt pattern described in Figure 149 - Floor mounting template . The setter rod should be used as a depth gauge to ensure proper depth. The setter rod is marked with two circles indicating the maximum and minimum hole depth allowed (see Figure 18 ). If a hole is drilled too deep, refill the hole with debris to the achieve proper depth.

Figure 18 Checking hole depth

Emerson 540VDC — 4.1.1 Concrete, Masonry or Stone Floor Mounting diagram (page 33)
Fig. 18 · 4.1.1 Concrete, Masonry or Stone Floor Mounting
6. Insert four (4) drop-in concrete expansion anchors into drilled holes.

Figure 19 Inserting anchors

Emerson 540VDC — 4.1.1 Concrete, Masonry or Stone Floor Mounting diagram (page 33)
Fig. 19 · 4.1.1 Concrete, Masonry or Stone Floor Mounting

Insert anchor flush with floor . Use hammer if required.

7. Tap anchors into drilled holes using hammer or mallet. When top of anchor is flush with mounting surface, use setter rod to expand and secure.

Figure 20 Expanding anchors

Emerson 540VDC — 4.1.1 Concrete, Masonry or Stone Floor Mounting diagram (page 33)
Fig. 20 · 4.1.1 Concrete, Masonry or Stone Floor Mounting

Installation

Page 34 of the Emerson 540VDC user manual — 4.1.1 Concrete, Masonry or Stone Floor Mounting
Page 34 · click to enlarge
Page 34
8. Match mounting brackets with the holes on the bottom of the cabinet (see Figure 21 ). Make sure that the bracket holes align with the mounting spots on the underside of the cabinet and secure the brackets with the four (4) 1/2" diameter x 3/4" long (12.7mm diameter x 20mm long) hex bolts retained from the shipping package. Tighten the bolts with a torque of 40 foot-pounds (54 N-m).

Figure 21 Securing mounting brackets to the cabinet

Emerson 540VDC — 4.1.1 Concrete, Masonry or Stone Floor Mounting diagram (page 34)
Fig. 21 · 4.1.1 Concrete, Masonry or Stone Floor Mounting

Bolt securing bracket to cabinet

9. Insert the two (2) hex flange bolts in the rear anchors, where the back of the cabinet will be. Complete tightening of the rear bolts should result in 1/2" (12.7mm) gap between bolt flange and floor (see Figure 22 and Figure 134). The rear bolts must be tightened to 20 foot-pounds (27 N-m) of torque. Bolt height or length may need to be adjusted if mounting surface is uneven or if mounting bracket does not slide beneath bolt flange. 10. Position and align cabinet and bracket slots with the newly inserted bolts at rear and position cabinet such that bolts fit in bracket slots (see Figure 22).

Figure 22 Mounting rear bolts—rear side of cabinet

Emerson 540VDC — 4.1.1 Concrete, Masonry or Stone Floor Mounting diagram (page 34)
Fig. 22 · 4.1.1 Concrete, Masonry or Stone Floor Mounting

1/2" (12.7mm)

Installation · floor to · flange

Page 35 of the Emerson 540VDC user manual — 4.1.1 Concrete, Masonry or Stone Floor Mounting
Page 35 · click to enlarge
Page 35
11. Insert and begin tightening two (2) hex head bolts with one washer each through bracket mounted at front of cabinet into anchor inserts in mounting surface (see Figure 23 ).

Figure 23 Mounting front bolts—front side of cabinet

Emerson 540VDC — 4.1.1 Concrete, Masonry or Stone Floor Mounting diagram (page 35)
Fig. 23 · 4.1.1 Concrete, Masonry or Stone Floor Mounting
12. Check the bubble level on the floor of the cabinet on the right hand side of the Power Conversion Module (see Figure 24 ). The Liebert FS is sufficiently level when the bubble is within the outer of the two circles. If the bubble is outside the outer circle, use the leveling feet to adjust until bubble is within the outer circle.

Figure 24 Bubble level

Emerson 540VDC — 4.1.1 Concrete, Masonry or Stone Floor Mounting diagram (page 35)
Fig. 24 · 4.1.1 Concrete, Masonry or Stone Floor Mounting
13. Once the cabinet is level, firmly tighten the front bolts to drop-in anchors as shown in Figure 134 . The front bolts must be tightened to 40 foot-pounds (54 N-m) of torque.

Installation · Bubble level

Page 36 of the Emerson 540VDC user manual — Wood Floor Mounting Instructions
Page 36 · click to enlarge
Page 36

4.1.2 Wood Floor Mounting

Determine which of these cases applies to your installation:

  • For wood flooring over concrete, follow the instructions in 4.1.1 - Concrete, Masonry or Stone Floor Mounting .
  • For wood flooring on joists, follow the instructions in this section.

Wood Floor Mounting Parts

  • Two (2) cabinet mounting brackets (previously secured Liebert FS cabinet to shipping pallet)
  • Four (4) (1/2" diameter x 2-1/2" long) [or 12.7mm diameter x 63.5mm] lag screws (not included in mounting kit) are recommended
  • One floor mounting template, see Figure 149
  • Four (4) 1/2" diameter x 3/4" long (12.7mm diameter x 20mm long) hex bolts (from shipping package—see 3.2.2 - Unpacking )

Wood Floor Mounting Tools

The following tools are needed for the cabinet wood floor mounting:

  • Electric drill
  • 1/4" (7mm) drill bit
  • Drill bit—used for pilot hole—for example, 1/8" (3.2mm) diameter
  • Shop vacuum cleaner (to remove dust from hole when drilling)
  • 3/4" (19mm) combination wrench
  • 18mm combination wrench

Wood Floor Mounting Instructions

Installation in wood floor on joists does not require drop-in anchors.

1. Prepare a clean, level surface, free of obstructions, for installation of the mounting kit. 2. Tape the floor mounting template ( Figure 149 ) to the installation location. 3. Drill pilot holes, remove the template and use a 1/4" (7mm) drill bit to drill holes 2.5" (64mm) deep.

! CAUTION Ensure that holes are centered in the joist.

4. Match mounting brackets with holes under base of cabinet (see Figure 21). Make sure that the bracket holes align with the mounting spots on the underside of the cabinet and secure brackets with the four hex bolts retained from the shipping package. Each bolt is 1/2" diameter x 3/4" long (12.7mm diameter x 20mm long). Tighten the bolts with a torque wrench at 40 foot-pounds (54 N-m). 5. Insert two lag screws through bracket mounted at rear of cabinet leaving head with 1/2" (12.7mm) gap above floor (see Figure 22). 6. Position and align cabinet and bracket slots with the newly drilled holes at rear and position cabinet such that bolts fit in bracket slots (see Figure 22). 7. Insert two (2) lag screws through bracket mounted at front of cabinet (see Figure 23). 8. Check the bubble level on the floor of the cabinet on the right hand side of the Power Conversion Module (see Figure 24). The Liebert FS is sufficiently level when the bubble is within the outer of the two circles. If the bubble is outside the outer circle, use the leveling feet to adjust until bubble is within the outer circle. 9. Once the cabinet is level, firmly tighten the front lag screws to a torque 40 foot-pounds (54 N-m).

Installation

Page 37 of the Emerson 540VDC user manual — 4.1.3 Raised Floor Mounting
Page 37 · click to enlarge
Page 37

4.1.3 Raised Floor Mounting

Raised Floor Mounting Kit Liebert has included a complete anchoring kit with each Liebert FS for surface mounting. The kit is intended to securely fasten the Liebert FS to its location for operational safety and seismic requirements. The anchoring kit includes:

  • One floor mounting template, Figure 149
  • 2 cabinet mounting brackets
  • 4 drop-in hex flange bolts, each 1/2" diameter, 3" long (12.7mm, 76.mm)
  • 4 washers (1/2" hole and 2" outer diameter) for hex flange bolts
  • 4 lock washers for hex flange bolts
  • 4 nuts for hex flange bolts, each 1/2" (12.7mm)
  • 4 hex bolts, each 1/2" diameter, 3/4" long (12.7mm diameter, 20mm long) retained from shipping package ( see 3.2.2 - Unpacking )

Raised Floor Mounting Tools The following tools are needed for the cabinet raised floor mounting:

  • Electric drill with 1/2" (12.7mm) minimum chuck size
  • 5/8" (16mm) drill bit
  • Drill bit—used for pilot hole—for example, 1/8" (3.2mm) diameter
  • 3/4" (19mm) combination wrench
  • 18mm combination wrench

Raised Floor Mounting Instructions To mount the Liebert FS cabinet on the floor: 1. Prepare a clean, level finished surface, free of obstructions, for installation of mounting kit. 2. Tape the floor mounting template (see Figure 149) to installation location, pre-drill a pilot hole, then remove paper and continue with 5/8" (16mm) drill bit. 3. Match mounting brackets with holes under base of cabinet (see Figure 21). Make sure that the bracket holes align with the mounting spots on the underside of the cabinet and secure brackets with the four 1/2" diameter x 3/4" long (12.7mm diameter x 20mm long) hex bolts retained from the shipping package. The bolts must be tightened to 40 foot-pounds (54 N-m) of torque. 4. Position and align cabinet and bracket slots with the newly drilled holes (see Figure 22). 5. Insert four drop-in hex flange bolts through bracket mounted at front and rear of cabinet (see Figure 23).

Figure 25 Raised floor mounting

2" (50mm) dia.

1/2" (12.7mm) dia. steel bolt

Installation · Large diameter washer · Lockwasher Raised floor

Page 38 of the Emerson 540VDC user manual — 4.2 Wiring Connections
Page 38 · click to enlarge
Page 38

6. Attach a large diameter washer, a lock washer and a nut to each hex flange bolts as described in Figure 25 and Figure 155. 7. Check the bubble level on the floor of the cabinet on the right hand side of the Power Conversion Module (see Figure 24). The Liebert FS is sufficiently level when the bubble is within the outer of the two circles. If the bubble is outside the outer circle, use the leveling feet to adjust until bubble is within the outer circle. 8. Once cabinet is level, firmly tighten down all hex flange bolts with nuts. The bolts must be tightened to 40 foot-pounds (54 N-m) of torque.

4.2 Wiring Connections

4.2.1 General Wiring Considerations

! CAUTION A qualified electrical contractor must perform all electrical connections. The wires (DC power, ground, upgraded status/control and auxiliary power supply) that connect the Liebert FS system(s) to the UPS system are field-supplied or by Liebert as an option. Wire size and installation must comply with all applicable local, regional and national regulations (e.g., National Electric Code for USA).

The electrical connections to the Liebert FS are:

  • DC power
  • Status/control (upgraded)
  • Ground
  • Auxiliary backup power
  • Remote monitoring—optional

Figure 26 Liebert FS cabinet with UPS interconnection kit

Emerson 540VDC — 4.2 Wiring Connections diagram (page 38)
Fig. 25 · 4.2 Wiring Connections

Power and Status/Control wiring must be run in separate conduits or cable trays. Refer to Appendix D.0 - Installation Drawings for locations of the various electrical connections between Liebert FS system(s) and UPS system.

! CAUTION Power and Status/Control wiring must be separated.

Installation

Page 39 of the Emerson 540VDC user manual — TOP VIEW
Page 39 · click to enlarge
Page 39

! CAUTION Do not cut entry holes for conduit while the access plates are still set on the top of the Liebert FS cabinet. Remove the access plates from the cable-access areas in the top of the Liebert FS cabinet prior to cutting entry holes in them.

! CAUTION After reinstalling access plates, be certain that no foreign matter (metal shavings, insulation or wire fragments, etc.) remains inside the Liebert FS. Likewise, be certain to block any “extra holes” in the plates through which foreign matter (or rodents) could later enter the Liebert FS.

! CAUTION The instructions for installation of DC Power AND Status/Control connections vary according to the type of UPS interconnection kit that is integrated into your Liebert FS unit.

Figure 27 Liebert FS with circuit breaker mounting plate and access panels for DC and control wiring

Emerson 540VDC — TOP VIEW diagram (page 39)
Fig. 26

DC and Ground Connections Access Panel

Control and Communication Access Panel

TOP VIEW

Circuit Breaker Mounting Plate

Figure 28 Typical circuit breaker wiring for DC connections (view from rear of circuit breaker)

Emerson 540VDC — TOP VIEW diagram (page 39)
Fig. 27

Installation · connections

Page 40 of the Emerson 540VDC user manual — AWG
Page 40 · click to enlarge
Page 40

4.2.2 DC Power Connections The instructions for installation of DC power connections vary according to the type of UPS intercon- nection kit integrated into your Liebert FS unit. Follow the installation instructions in Appendix A.0 - UPS Interconnection Kits for the relevant UPS interconnection kit installed in your unit.

4.2.3 Status/Control Connections The instructions for installing Status/Control connections vary according to the type of UPS intercon- nection kit that is integrated into your Liebert FS. Follow the installation instructions in Appendix A.0 - UPS Interconnection Kits for the relevant UPS interconnection kit installed in your unit.

4.2.4 Ground Connections A ground connection is available on the Liebert FS (see Figure 29). The electrical contractor must ensure that the Liebert FS is effectively grounded to UPS chassis or UPS ground terminal. The ground connection must be as short as possible. The maximum ground wire size is 1/0 AWG - 600VDC wire (54mm2 wire section). Wire size and installation must comply with all applicable local, regional and national regulations (e.g., National Electric Code for USA). Check all connections with Multi- meter to verify ground continuity. (Refer also to Appendix E.1 - Ground Test Procedure.

! CAUTION Ensure that all grounds are secure and free of corrosion. Proper grounding is necessary for optimum performance, safety and reliability.

Figure 29 Ground connection on the Liebert FS

Emerson 540VDC — AWG diagram (page 40)
Fig. 28

Ground Terminal Locations (DC ground and filter caps if required)

Side panel removed for clarity.

The tightening torque for the ground connections must be in accordance with Table 3. Use these val- ues unless the equipment is labeled with a different torque value.

Table 3 Tightening torque for ground connection

Ground Wire Gauge Tightening Torque

Approximate metric equivalent wire section (mm2)

AWG

4 21 110 12 2 34 150 17 1 42 150 17 1/0 54 180 20

Installation · Inch- pounds N-m

Page 41 of the Emerson 540VDC user manual — 4.2.5 AC Auxiliary Control Power Supply Connections
Page 41 · click to enlarge
Page 41

4.2.5 AC Auxiliary Control Power Supply Connections

The AC auxiliary power supply connections to the Liebert FS are made through the auxiliary power fused disconnect on the mounting plate above the inductor-capacitor module and to the right of the optional VIB and DCM modules (see Figure 30). See Appendix F.0 - Auxiliary Backup AC Power Supply for details on the purpose of the auxiliary AC power supply.

Figure 30 Service panel location

Service Panel (cover removed); Provides access to fused disconnect and the optional VIB and DCM.

Emerson 540VDC — 4.2.5 AC Auxiliary Control Power Supply Connections diagram (page 41)
Fig. 29 · 4.2.5 AC Auxiliary Control Power Supply Connections

The Auxiliary Power Fused Disconnect (see Figure 31) accommodates the connection of an AC wire (Line, Neutral, Ground) and is rated for 110/230 VAC - 50/60 Hz. Open the circuit while wiring, check the fuses and then close it. The AC wire must be connected to the auxiliary power fused disconnect from the top to a dedicated AC circuit rated for 500VA with branch circuit protection. This AC outlet must be connected to a protected low-voltage (110VAC-230VAC, 500VA) source. A qualified electrical contractor should make this connection permanent.

The AC wire is field-supplied. It must conform to all applicable local, regional, national regulations, such as the National Electric Code for USA. An 18 AWG (0.82 mm2) cable is recommended for this connection.

Tighten the connections for the 18 AWG cable (0.82 mm2) to 15 inch-pounds (1.6N-m).

Figure 31 Auxiliary backup power connections

Emerson 540VDC — 4.2.5 AC Auxiliary Control Power Supply Connections diagram (page 41)
Fig. 30 · 4.2.5 AC Auxiliary Control Power Supply Connections

AC Auxiliary Power Fused Disconnect

Location of MCM (cover plate removed)

! CAUTION The AC power supply must remain connected at all times. Precautions must be taken to ensure that the connection is not broken. Disconnection may cause damage to the equipment.

Installation

Page 42 of the Emerson 540VDC user manual — 4.2.5 AC Auxiliary Control Power Supply Connections
Page 42 · click to enlarge
Page 42

The AC wire is field-supplied. Wire size and installation must comply with all applicable local, regional and national regulations (e.g., National Electric Code for USA). An 18 AWG cable (approxi- mate metric equivalent: 0.82mm2 wire section) is recommended for this connection.

Figure 32 shows the auxiliary power fused disconnect and terminals 1, 2 and 3, the landing points for the AC wire on the Liebert FS side. Open the circuit while wiring, check the fuses and close after- wards when ready to test or start up Liebert FS.

Figure 32 Auxiliary power fused disconnect with connection points for AC wire

Emerson 540VDC — 4.2.5 AC Auxiliary Control Power Supply Connections diagram (page 42)
Fig. 31 · 4.2.5 AC Auxiliary Control Power Supply Connections

Terminal 2 Line Terminal 3 Ground

The AC wire should be pulled from the left (top access recommended) and through the rear top access panel (see Figure 33). Run the AC wire along the underside of the top cabinet frame rail from the rear to the front of the cabinet. Terminate the AC wire at the fused disconnect (pictured in Figure 32; see also Figure 26).

Figure 33 Top access panel

Emerson 540VDC — 4.2.5 AC Auxiliary Control Power Supply Connections diagram (page 42)
Fig. 32 · 4.2.5 AC Auxiliary Control Power Supply Connections

Top access panel for AC auxiliary power supply connections

Front of Liebert FS

Installation · Terminal 1 Neutral · Fused disconnect

Page 43 of the Emerson 540VDC user manual — 4.3 Startup Considerations
Page 43 · click to enlarge
Page 43

4.2.6 Remote Monitoring Connections—Optional The Liebert FS standard unit does not include remote monitoring connections. Remote monitoring capabilities are provided as an option see Figure 34). If your unit is equipped with the optional Data Collection Module (DCM), refer to the installation and configuration instructions in Appendix B.0 - Data Collection Module.

Figure 34 Remote monitoring (DCM) connections (inside cabinet front door)

AC Auxiliary Power Fused Disconnect

Location of MCM (cover plate removed)

4.3 Startup Considerations

! CAUTION The Initial System Startup must be performed ONLY under the supervision of a Liebert-certified service technician to ensure proper system operation. Failure to abide by instructions provided herein may void your warranty. Contact your local Liebert representative or call 1-800-LIEBERT to arrange for system startup.

Installation

Page 44 of the Emerson 540VDC user manual — 5.1 Detailed System Description
Page 44 · click to enlarge
Page 44

5.0 S YSTEM O VERVIEW

5.1 Detailed System Description

Figure 35 Liebert FS front view

Emerson 540VDC — 5.1 Detailed System Description diagram (page 44)
Fig. 33 · 5.1 Detailed System Description

Front View (door open, right side panel removed)

Versatile Interface Board (option)

Data Collection Module (option)

Motor Generator Filter Assembly

Magnetic Levitation Module (above flywheel module)

Show 7 more labels / short text on this page
System Overview · UPS Interconnection Kit · LCD Control Panel · Power Conversion Module · Flywheel Module) · Air Filter (optional) · Built-In Casters, 4
Page 45 of the Emerson 540VDC user manual — E-Stop
Page 45 · click to enlarge
Page 45

5.1.1 System Module Description

The Liebert FS is a modular system composed as follows:

  • Control Panel
  • UPS Interconnection Kit
  • Power Conversion Module
  • Main Control Module
  • Flywheel Module
  • E-Stop (optional-special order)

Components are illustrated in Figure 35.

Control Panel

The Liebert FS uses a control panel as the primary means for an operator to interface with the sys- tem.

UPS Interconnection Kit

The UPS Interconnection Kit is a module that enables the physical interconnection of the Liebert FS and a UPS system. There are several versions that vary, depending on the UPS model.

The Liebert FS is delivered with a UPS interconnection kit consisting of a circuit breaker for connec- tion of the positive and negative terminals coming from the UPS DC bus or from an external discon- nect switch.

Power Conversion Module

The power conversion module is a bi-directional power electronics-based power converter capable of sourcing or sinking power to and from the UPS DC bus.

While performing the Liebert FS’s backup power mission, the power conversion module converts “variable frequency - variable voltage” AC power from the Liebert FS’ motor-generator and delivers regulated DC voltage output to the UPS DC bus.

Conversely, for the Liebert FS’s needs in charging power, the power conversion module converts DC power from the UPS DC bus into “variable frequency - variable voltage” AC power for the Liebert FS’ motor-generator.

Main Control Module

The Main Control Module provides the overall control of the Liebert FS as well as the specific control for:

  • Motor-generator
  • Active magnetic levitation hardware

Flywheel Module

The Flywheel Module houses several major components:

  • Motor-generator—synchronous reluctance technology
  • Rotating group—high-speed carbon composite flywheel, high-speed shaft and rotor of the motorgenerator
  • 5-axis active magnetic levitation hardware
  • Molecular vacuum pump

E-Stop

The E-Stop is an Emergency Stop that allows the Liebert FS to disconnect from the UPS. The E-Stop is a CE requirement for systems shipping to Europe (and other areas requiring the CE Mark). The feature is available elsewhere as an option. Two choices are available for how the E-Stop is powered, internally or externally. If E-Stop is activated, Liebert FS will enter a self-discharge and shutdown mode.

System Overview

Page 46 of the Emerson 540VDC user manual — Panel
Page 46 · click to enlarge
Page 46

5.1.2 Power System

The electrical system of the Liebert FS is shown in Figure 36. The schematic shows the Magnetic Levitation Module [see 5.1.7 - Magnetic Levitation Module (MLM)]. The pre-charge resistor and contactor which limit the inrush current into the DC bus capacitors. The six-pulse IGBT power con- verter (IGBT Power Conversion Module (PCM) on page 36) which is controlled by the Power Conversion Module Controller (Power Conversion Module on page 33) and which also monitors and controls the operation of the entire system. These components are housed within the Power Con- version Module. The Flywheel Module is shown as a cross-section to illustrate the rotating group and the synchronous reluctance motor-generator.

Figure 36 Electrical system schematic

Flywheel Module

Emerson 540VDC — Flywheel Module diagram (page 46)
Fig. 34 · Flywheel Module

IGBT Power Converter +

Soft Start

To UPS Battery

Input

DC Monitoring Motor Generator Controls

Magnetic Levitation

Module

Power Conversion Module Controller

Control

Remote Monitoring & Controls (Optional)

Panel

COM

5.1.3 System Performance

The maximum output power of the Liebert FS varies according to the duration required. This is illus- trated in Figure 5 (output power versus time). Increased power, duration or redundancy may be achieved by adding units in parallel as shown in Figures 2 through 4.

Show 9 more labels / short text on this page
System Overview · Temperature · Position · Speed · Sensors · Sensors · Sensors · AU Auxiliary · Backup
Page 47 of the Emerson 540VDC user manual — 5.1.5 UPS Interconnection Kit
Page 47 · click to enlarge
Page 47

5.1.4 User interfaces

Control Panel

The Liebert FS uses a Control Panel as the primary means for an operator to interface with the sys- tem. Operating parameter values are displayed and updated in real time. Alarm states and system notices are also displayed when they occur. User configurable system parameters are adjusted via the Control Panel.

Data Collection Module (DCM)

An optional software and hardware package that reads data from the Liebert FS is available. The data is stored and then can be transmitted through an RS-232 port, over a LAN (Local Area Network) or over the Internet, enabling a diagnostic reporting capability.

Versatile Interface Board (VIB)

An optional software and hardware package is available that allows for remote monitoring and con- trol; via isolated auxiliary contacts:

  • OFF Mode
  • STARTUP Mode
  • CHARGE Mode
  • State of Charge (SOC) = 0%
  • State of Charge (SOC) = 12.5%
  • State of Charge (SOC) = 25%
  • State of Charge (SOC) = 37.5%
  • State of Charge (SOC) = 50%
  • State of Charge (SOC) = 62.5%
  • State of Charge (SOC) = 75%
  • State of Charge (SOC) = 87.5%
  • Full Charge (SOC) = 100%
  • DISCHARGE Mode
  • SHUTDOWN Mode
  • WARNING Mode
  • FAULT mode
  • Rotor Hot Standby
  • Startup
  • Shutdown
  • Clear Fault

5.1.5 UPS Interconnection Kit

The UPS Interconnection Kit (IKIT) is a module of the Liebert FS that simplifies the interconnection to a UPS system. There are different versions of the IKIT available that have been specifically devel- oped for the UPS systems the Liebert FS can integrate with. The Liebert FS in the standard configu- ration is delivered with an IKIT consisting of a fused Power Terminal Block for connection of the Positive and Negative terminals coming from the UPS DC bus or from an external disconnect switch.

System Overview · Monitored Information · Control Commands

Page 48 of the Emerson 540VDC user manual — IGBT Power Conversion Module (PCM)
Page 48 · click to enlarge
Page 48

5.1.6 Power Conversion Module

Power Conversion Module Controller (PCMC)

The Power Conversion Module Controller is located within the Power Conversion Module. The PCMC uses microprocessor-controlled logic to control the six pulse IGBT solid state switches and monitor the active magnetic levitation system.

These operations are firmware controlled eliminating the need for manual adjustments. The logic includes a self-test and diagnostic circuitry to identify any faults. Diagnostics are performed via a PC through the RS232 communication port or through the control panel located on the front of the Lie- bert FS.

IGBT Power Conversion Module (PCM)

The PCMC provides the overall control of the Liebert FS as well as the specific control for the syn- chronous reluctance motor generator via the IGBT solid-state switches within the Power Conversion Module.

The Power Conversion Module is a bi-directional system capable of sourcing or sinking power to and from the stator. It converts variable frequency, variable voltage from the stator and delivers a con- stant voltage DC output. Conversely, it converts DC power from the UPS System DC Bus to variable frequency, variable voltage output to the stator as directed by the PCMC to increase the speed of the synchronous reluctance motor-generator.

When delivering DC power, the output of the synchronous reluctance generator is rectified to DC by passing the high frequency AC current through a solid-state power conversion device. The DC output voltage of the Liebert FS has less than 2% Vrms ripple.

The voltage and frequency are adjusted using Pulse Width Modulation. The IGBT switches operate at a frequency of 18 kHz to produce the smooth sinusoidal current waveform to and from the motor gen- erator. This is smoothed out further using an inductive and capacitive filter.

System Overview

Page 49 of the Emerson 540VDC user manual — Z
Page 49 · click to enlarge
Page 49

5.1.7 Magnetic Levitation Module (MLM)

The Magnetic Levitation Module provides control of the active magnetic levitation hardware.

The Liebert FS has a unique active magnetic levitation system that fully levitates the flywheel-rotat- ing group, allowing the flywheel to rotate without any physical contact. This has a number of advan- tages over mechanical bearing systems:

  • Reduced dragMechanical bearings have a drag that is proportional to the square of the speed. The levitation system developed by Liebert uses the same power regardless of speed.
  • Reliability and zero maintenanceThe levitation system ensures there is no contact between the rotating parts and the housing and therefore there are no components to wear out. This ensures the unit will operate maintenance free for the life of the system.

The levitation system, works by measuring the displacement using a capacitive sensor, if the distance needs to be adjusted; the current to the electromagnet is altered to change the displacement, each axis is measured and controlled separately with its own capacitive sensor, electromagnet and feed- back loop which, is controlled by the MLM. This is all done using analog control so it is very fast act- ing and reliable. There are 5 different circuits working independently, these are: Radial: Upper X, Y; Lower X, Y and Axial: Z Only

The principle of operation is the same in each case. The upper radial Y-axis is shown in Figure 37.

Figure 37 Schematic of the levitation system

Z

Y

AMPLIFIER

AMPLIFIER

ROTOR ELECTRO

ELECTROMAGNET

MAGNET

CAPACITIVE DISPLACEMENT

MEASUREMENT

CONDITIONER

CONTROLLER DISPLACEMENT SETPOINT

DISPLACEMENT SIGNAL

INFRARED EMITTER

Active Magnetic Levitation Hardware

The electromagnets and capacitive displacement sensors that provide the active magnetic levitation are located within the flywheel module. See 5.1.7 - Magnetic Levitation Module (MLM) for a full description of their operation.

System Overview

Page 50 of the Emerson 540VDC user manual — 5.1.8 Flywheel Module
Page 50 · click to enlarge
Page 50

5.1.8 Flywheel Module

The Flywheel Module houses several major components:

  • The Rotating Group (high-speed carbon composite flywheel, high-speed shaft and rotor of the Motor-Generator)
  • The Motor-Generator (synchronous reluctance technology)
  • The Molecular Vacuum Pump
  • Flywheel Sensors
  • Active Magnetic Levitation Hardware
  • Safety System

Figure 38 Liebert FS flywheel module

Emerson 540VDC — 5.1.8 Flywheel Module diagram (page 50)
Fig. 35 · 5.1.8 Flywheel Module

Synchronous Reluctance 4-pole M-G Rotor

Show 9 more labels / short text on this page
System Overview · Axial Electromagnet · Upper Radial Electromagnet · Inner Housing · Molecular Vacuum System · Carbon Fiber Flywheel · M-G Stator · Liquid Cooling Passages · Lower Radial Electromagnet
Page 51 of the Emerson 540VDC user manual — 5.1.10 Motor Generator
Page 51 · click to enlarge
Page 51

5.1.9 Rotor/Flywheel—Rotating Group

The flywheel is made of carbon/glass composite. This is mounted on a metal shaft with integral motor-rotor and together these components form the rotating group. The rotating group is magneti- cally levitated and centered so that it does not touch any other part while in normal operation.

Figure 39 Rotating group

Emerson 540VDC — 5.1.9 Rotor/Flywheel—Rotating Group diagram (page 51)
Fig. 36 · 5.1.9 Rotor/Flywheel—Rotating Group

5.1.10 Motor Generator

The rotor is positioned within the stator in such a way that the rotor and stator provide the motor-generator function of the Liebert FS. The stator is liquid cooled and operates within a housing in which air has been evacuated. Together the stator and rotor operate as a synchronous reluctance motor-generator produces enough power for the system to supply its own internal demand and to sup- ply to the output DC bus up to the rated power. The illustration in Figure 40 shows the four poles of the synchronous reluctance machine.

Figure 40 Cross-section of the synchronous reluctance motor rotor

System Overview

Page 52 of the Emerson 540VDC user manual — 5.1.11 Vacuum System
Page 52 · click to enlarge
Page 52

5.1.11 Vacuum System

During manufacture, the vacuum chambers are evacuated and baked to remove water vapor. The vac- uum system is then permanently sealed off to prevent any air entering the system and to remove the possibility of accidental loss of vacuum. The Liebert FS does not require an external vacuum pump to maintain a suitable vacuum level; the vacuum system instead relies on absorbers to maintain a rough vacuum within the upper chamber. A zero-maintenance molecular drag pump acts with the flywheel shaft to maintain a high-vacuum in the lower chamber, as shown in Figure 41. Vacuum levels of much less than 100 microTorr (10-7 atmosphere) are maintained in the lower chamber. The absorber material only needs to be recharged or changed, once every 15 years.

Figure 41 Vacuum system operation

Emerson 540VDC — 5.1.11 Vacuum System diagram (page 52)
Fig. 37 · 5.1.11 Vacuum System

Air and Water Vapor

Show 5 more labels / short text on this page
System Overview · Upper Chamber · Molecular Drag Pump · Rotating Shaft · Lower Chamber
Page 53 of the Emerson 540VDC user manual — NONCONTACT
Page 53 · click to enlarge
Page 53

5.1.12 Flywheel Sensors

Speed

The speed detection system uses an infrared emitter and a sensor to detect the rotation of the shaft. A hole drilled through the shaft allows light to pass and is detected on the opposite side by an infrared detector. This signal is used to detect the rotor angle, the speed and any over speed condition. The pulsed signal passes into the 6711 DSP to be converted into a speed signal. This is then passed to the 2812 DSP. The 2812 checks for over-speed and shuts down the power electronics if this occurs. If either of the processors lock-up, the rotor will slow down, this guarantees that on over-speed cannot occur.

Temperature

The stator and rotor temperature detectors are thermocouples and are both conditioned in a similar way. The stator sensor is a Type J thermocouple potted into the stator windings. The rotor sensor is a non-contact type sensor that detects the temperature of the rotor surface and gives an output in a Type J thermocouple format.

Figure 42 Schematic for the speed and temperature sensors

NONCONTACT

ROTOR TEMPERATURE

SENSOR

J TYPE THERMOCOUPLE

STATOR TEMPERATURE

OUTPUT

AMPLIFIERS, CONDITIONERS,

SENSOR

LINEARIZERS AND COLD JUNCTION COMPENSATION IN

STATOR WINDINGS

J TYPE THERMOCOUPLE ROTOR

ONE CHIP

INFRARED DETECTOR

DSP 6711 TIMER INPUT DETERMINES

CONDITIONER AND DIVIDE BY 2

SUPPLY

FROM CIRCUIT

SPEED

BOARD

DSP 2812 DETECTS OVERSPEED

System Overview

Page 54 of the Emerson 540VDC user manual — 5.1.14 Cabinet
Page 54 · click to enlarge
Page 54

5.1.13 System Safety

Every composite flywheel is inspected, spin balanced and tested to 110% over-speed in accordance with NEMA guidelines. A patented dual-wall safety system ensures that in the unlikely event a fly- wheel were to separate during operation, the inner housing would retain the carbon fiber. As the car- bon fiber separates, it will expand and transfer its torque to the inner housing. The inner housing is then allowed to rotate inside the outer housing. The cooling fluid in the outer housing, which sur- rounds the inner housing acts as a dynamic brake. The stored energy is released in a controlled man- ner as the flywheel / inner housing comes to a rest. The outer housing holds the entire safety system and acts as a reservoir for the cooling fluid

The Liebert FS has been previously tested under the following fault conditions with no adverse safety effects:

  • Motor-generator AC short circuit
  • DC short circuit
  • Power Conversion Module failure
  • Magnetic Levitation System failure
  • Composite rotor failure
  • Motor Rotor Failure
  • Loss of Vacuum

Figure 43 Cutaway flywheel module

Emerson 540VDC — 5.1.13 System Safety diagram (page 54)
Fig. 38 · 5.1.13 System Safety

5.1.14 Cabinet

The Liebert FS is a compact design housed in a free-standing cabinet with a NEMA 1 construction rating or IEC equivalent. No space is required between the back or sides of the cabinet and any walls. The front clearance of 36" per the National Electrical Code is required. The Liebert FS accommodates top (standard) and side entry cables. The Liebert FS can be rolled into place and go through standard doors.

Show 5 more labels / short text on this page
System Overview · Outer Housing · Rotating Group · Inner Housing · Coolant
Page 55 of the Emerson 540VDC user manual — Charge Conductance (Charge Amps/Volts)
Page 55 · click to enlarge
Page 55

5.1.15 Ventilation and Cooling

The Liebert FS stator and power electronics are liquid cooled with a liquid-to-air radiator. The radia- tor within the Liebert FS package is designed for natural and forced air-cooling. Air inlets are pro- vided from the bottom front of the Liebert FS enclosure. Air exhaust is from the top of the unit. Air filters are provided as an option. A minimum 12" clearance overhead is required for the exhaust air- flow.

The Liebert FS was designed with reliability in mind, the radiator is positioned to take advantage of natural cooling and forced-air is only used when there is an elevated temperature. This also applies to the circulating pump for the coolant, which is a highly reliable magnetically coupled centrifugal pump that is powered with a brushless DC motor. This pump operates only when there is an elevated tem- perature within the stator or the PCM, this extends the life of the pump to the point that it will con- tinue to operate over the life of the unit.

5.2 List of System User-Configurable Parameters

In order to support a wide set of UPS integrations, the Liebert FS can be configured using the follow- ing operating parameters: See 6.0 - Operation for more information on these parameters and instructions on system setup and entering parameters to system.

Charge Voltage (Vcharge)

Vcharge is the voltage threshold above which the Liebert FS begins to charge/recharge.

Vcharge must be set at least 10VDC greater than Vreg.

  • Range: 360-600VDC
  • Default setting: 530VDC

Regulation Voltage (Vreg)

  • Vreg is the voltage setpoint at which the Liebert FS will regulate the DC bus voltage in Discharge Mode
  • Vreg must be set at least 10 VDC less than Vcharge.
  • Range: 350-590VDC
  • Default setting: 520VDC

Maximum Charge Current (Max Charge Current)

  • Max Charge Current is the Maximum Current the Liebert FS is allowed to draw from the UPS DC bus.
  • Range—1-50A (typical operation requires a minimum of 3A or 5A)
  • Default setting—20 A

Charge Conductance (Charge Amps/Volts)

Charge amps/volts is used to set the Liebert FS charging current drawn from the UPS DC bus based upon how much the UPS DC bus voltage is above Vcharge and so without exceeding the Max Charge Current.

  • Range—0.1-10 A/V
  • Default setting: 2 A/V

System Overview

Page 56 of the Emerson 540VDC user manual — Regulation Voltage Delta Transition at State of Charge (Vreg Delta T SOC)
Page 56 · click to enlarge
Page 56

Figure 44 Voltage and Inductance curve

OverloadConstant Current

User Adjustable Parameters : 1. Vcharge: 260V – 600V 2. Vreg: 250V – 590V 3. Charge Amps/Volt: 0.1A/V – 10A/V 4. Max Charge Current : 1A – 50A

BehaviorVoltage Source
BehaviorCurrent Sink

The V-I (Voltage and Inductance) curve (see Figure 44) shows the performance characteristics and modes of operation of the Liebert FS system based on the seven user-configurable system parameters.

Regulation Voltage Delta During Discharge (Vreg Delta 1)

Vreg Delta is the programmed amount of voltage drop from the beginning of discharge (SOC = 100%) to the Vreg Delta TSOC.

  • Range—from 0 to (Vreg - 250) VDC (Ex: if Vreg = 500, then the Vreg Delta1 can be set between 0 and 250 VDC)
  • Default setting—0 VDC

Regulation Voltage Delta Transition at State of Charge (Vreg Delta T SOC)

  • Range—0-100%
  • Default setting—0
Show 12 more labels / short text on this page
System Overview · DC Bus Current · Mode Discharge · Mode · Vcharge · DC Bus Voltage · Vreg · Max Charge Current · Charge · Charge · Amps/ · Volt
Page 57 of the Emerson 540VDC user manual — [2]V_REG******------------------------- | ****** [5]DELTA1
Page 57 · click to enlarge
Page 57

Regulation Voltage Delta During Discharge (Vreg Delta 2)

Vreg Delta 2 is the programmed amount of voltage drop from the Transition State of Charge to the end of discharge (T SOC to the end of discharge (SOC = 0%)

  • Range—From 0 to (Vreg - Vreg Delta1) VDC (Ex: if Vreg = 500, and Vreg Delta1 = 50, Vreg Delta2 can be set between 0 and 200 VDC)
  • Default setting—0VDC
  • During a discharge the regulation voltage (Vreg) can be adjusted by setting the three parameter set points described above; Vreg Delta 1, the Transition State of Charge (T SOC) and Vreg Delta 2. (For more information on programming these parameters from the Control Panel see 6.4.1 - Screen Tree Menu Functions )
  • The Liebert FS allows for programming two different discharge slopes (Vreg Delta1 and Vreg Delta2) and enabling a soft “handcuff” or transition before end of discharge. (Ex: if T SOC = 20 then transition from Vreg Delta 1 to Vreg Delta 2 will take place when 80%, (Vreg TSOC), of the stored energy has been discharged, see Figure 45 ).
  • Vreg Delta1 is used to program an initial slope from beginning of discharge to Vreg TSOC over which the regulated voltage value will decrease and at which point a transition will automatically occur to the secondary slope to 0% SOC at the Vreg Delta2 setpoint.

Figure 45 Vreg delta help screen

[2]V_REG****** | ****** [5]DELTA1

V| ******------------- O| ** L| **--------- T|

[6]DELTA2 | | | |

|----------------+---+ 100% [7]TSOC 0%

5.3 Modes of Operation

The Liebert FS consists of a variety of operational modes. Each mode is based on a set of programmed conditions. The Control Panel indicates the current mode and the status of that mode. Function keys are enabled or disabled depending on the mode and status.

The Liebert FS modes are:

  • OFF
  • STANDBY
  • STARTUP
  • CHARGE
  • READY
  • DISCHARGE
  • SHUTDOWN
  • COAST
  • FAULT

The Liebert FS is programmed to operate in a variety of conditional modes. The modes and status for each mode will be indicated on the control panel. The Liebert FS is set up to transition through the various modes with no or minimal user intervention.

System Overview

Page 58 of the Emerson 540VDC user manual — State of Charge < 0 State of Charge > 0
Page 58 · click to enlarge
Page 58

5.3.1 OFF Mode When the Liebert FS is initially powered on, it enters the OFF mode and magnetically levitates its rotating group. A manual user command will make the system transition from OFF mode to STAR- TUP mode if all startup conditions are met.

  • UPS DC bus voltage ≥ Vcharge and
  • Status is “OK”.

The Liebert FS also will enter OFF mode at the end of a shutdown and will transition automatically from SHUTDOWN mode to OFF mode.

5.3.2 STANDBY Mode In STANDBY Mode, the Liebert FS will be ready for Startup but be in a STANDBY Mode waiting for user initiation of STARTUP Mode (State of Charge = 0%). By pressing the STARTUP button “F1” at that point the Liebert FS will automatically transition into STARTUP Mode.

Figure 46 STANDBY mode diagram

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 58)
Fig. 39 · 5.1.7 Magnetic Levitation Module (MLM)

State of Charge < 0 State of Charge > 0

The Liebert FS will be in STANDBY Mode as long as:

  • Liebert FS’s SOC is less than 0%; and
  • UPS DC Bus Voltage = Vcharge
  • STARTUP has not been initiated

5.3.3 STARTUP Mode In STARTUP mode, the Liebert FS will charge (increase flywheel speed) up to the minimum operat- ing speed (State of Charge = 0%). At that point the Liebert FS will automatically transition into CHARGE mode.

Figure 47 Startup mode diagram

Emerson 540VDC — State of Charge < 0 State of Charge > 0 diagram (page 58)
Fig. 40 · State of Charge < 0 State of Charge > 0

State of Charge < 0 State of Charge > 0

The Liebert FS will be in STARTUP mode as long as:

  • Liebert FS’s SOC is less than 0% and
  • UPS DC Bus Voltage ≥ Vcharge.

In case the UPS DC bus voltage drops below Vcharge while in STARTUP mode, the Liebert FS will transition automatically into COAST mode. As soon as the UPS DC bus voltage rises above Vcharge, the Liebert FS automatically exits COAST mode and resumes STARTUP mode.

System Overview

Page 59 of the Emerson 540VDC user manual — State of Charge < 0 State of Charge > 0
Page 59 · click to enlarge
Page 59

5.3.4 CHARGE Mode

To charge the Liebert FS, the Liebert FS will draw power from the UPS DC bus to accelerate the fly- wheel (as long as the UPS DC bus voltage is higher than Vcharge). In this mode, the Liebert FS State of Charge (SOC) will progressively increase from 0% to 100%.

Figure 48 CHARGE mode diagram

Emerson 540VDC — 5.3.4 CHARGE Mode diagram (page 59)
Fig. 41 · 5.3.4 CHARGE Mode

State of Charge < 0 State of Charge > 0

The Liebert FS will be in CHARGE mode as long as:

  • Liebert FS’s SOC is between 0% and 100% and
  • UPS DC Bus Voltage ≥ Vcharge.

5.3.5 READY Mode

When the SOC reaches 100%, the unit will automatically transition into the READY mode. This is the mode in which the Liebert FS will spend most of its operating time. In this mode, the Liebert FS maintains its State Of Charge greater than 99.5%. The Liebert FS’s SOC will be allowed to drift down to SOC = 99.5%, at which point it will transition back into CHARGE mode and charge back up to READY mode and SOC = 100%. During normal operation, the Liebert FS will continue to automati- cally transition between the READY and CHARGE modes to maintain a SOC between 99.5 and 100% until either a DISCHARGE or SHUTDOWN is initiated.

Figure 49 READY mode diagram

Emerson 540VDC — 5.3.5 READY Mode diagram (page 59)
Fig. 42 · 5.3.5 READY Mode

State of Charge < 0 State of Charge > 0

The Liebert FS will be in READY mode as long as:

  • Liebert FS’s SOC is between 99.5% and 100% and
  • UPS DC Bus Voltage ≥ Vcharge.

System Overview

Page 60 of the Emerson 540VDC user manual — State of Charge < 0 State of Charge > 0
Page 60 · click to enlarge
Page 60

5.3.6 DISCHARGE Mode

Starting from either CHARGE or READY mode, the Liebert FS will enter the DISCHARGE mode if the UPS DC Bus Voltage goes below Vcharge. In DISCHARGE mode, the Liebert FS will regulate the DC bus at Vreg.

Figure 50 DISCHARGE mode diagram

Emerson 540VDC — 5.3.6 DISCHARGE Mode diagram (page 60)
Fig. 43 · 5.3.6 DISCHARGE Mode

State of Charge < 0 State of Charge > 0

The Liebert FS will be in DISCHARGE mode as long as:

  • UPS DC Bus Voltage < Vcharge and
  • Liebert FS’s SOC is more than 0%.

The Liebert FS will leave the DISCHARGE mode and transition into CHARGE mode if the UPS DC bus recovers (UPS DC Bus Voltage = Vcharge) before the Liebert FS’s SOC reaches 0%. In case the UPS DC bus doesn’t recover before the Liebert FS’s SOC reaches 0%, the Liebert FS will transition into SHUTDOWN mode.

5.3.7 SHUTDOWN Mode

In SHUTDOWN mode, the flywheel will actively spin down.

There are two ways the Liebert FS can transition into SHUTDOWN mode, by a complete discharge and by a user command.

Following a Liebert FS Discharge Down to SOC = 0%

This is the most common SHUTDOWN process. This occurs when the Liebert FS’s SOC drops below 0% and the UPS System DC Bus voltage is less than Vcharge. If the Liebert FS entered the SHUT- DOWN mode after leaving DISCHARGE mode, the Liebert FS will automatically transition into STARTUP mode provided the UPS System DC Bus voltage returns to a value greater than Vcharge (i.e., when the electric grid returns or the standby generator supplies power to the UPS).

Figure 51 SHUTDOWN mode diagram - shutdown after full discharge

Emerson 540VDC — Following a Liebert FS Discharge Down to SOC = 0% diagram (page 60)
Fig. 44 · Following a Liebert FS Discharge Down to SOC = 0%

State of Charge < 0 State of Charge > 0

System Overview

Page 61 of the Emerson 540VDC user manual — 5.3.9 FAULT Mode
Page 61 · click to enlarge
Page 61

Following a User Command

In any mode, except OFF mode, the user may command the Liebert FS to transition in SHUTDOWN. While in SHUTDOWN mode, the user will still be able to command the Liebert FS to transition into CHARGE mode (if SOC > 0%) or STARTUP mode (if SOC < 0%), provided that the UPS System DC bus voltage is greater than Vcharge.

Figure 52 SHUTDOWN mode diagram - user-initiated shutdown

Emerson 540VDC — Following a User Command diagram (page 61)
Fig. 45 · Following a User Command

State of Charge < 0 State of Charge > 0

5.3.8 COAST Mode

A transition into COAST mode can occur when the UPS System DC Bus voltage drops below Vcharge while the Liebert FS is in STARTUP mode. While in COAST mode, the Liebert FS is in an idling con- dition where it neither draws nor generates any power.

As soon as the UPS DC Bus Voltage rises above Vcharge, the Liebert FS will automatically exit COAST mode and resume STARTUP mode.

After five minutes in COAST Mode, if the UPS DC Bus voltage has not risen above Vcharge, the Liebert FS will automatically transition into SHUTDOWN Mode.

5.3.9 FAULT Mode

The Liebert FS includes self-test and diagnostic circuitry such that most systems malfunctions can be identified. In case of a system malfunction, the Liebert FS will transition into FAULT mode.

While in FAULT mode, the Liebert FS is disabled—all power electronics are turned off. Most faults are cleared automatically by the system without the need for user intervention. Some faults do require user action to clear the fault or to notify Liebert Services. Refer to the 8.0 - Troubleshooting for more information).

The Liebert FS is programmed to operate in a variety of conditional modes. The modes and status for each mode will be indicated on the control panel. The Liebert FS is set up to transition through the various modes with no or minimal user intervention. Figure 53 illustrates the various modes of oper- ation.

System Overview

Page 62 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 62 · click to enlarge
Page 62

Figure 53 Typical operation modes

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 62)
Fig. 46 · 5.1.7 Magnetic Levitation Module (MLM)

FS supports the load as the A .T.S. transitions back to grid supply

FS MODES 1 2 3 1 2 1 3

System Overview

Page 63 of the Emerson 540VDC user manual — 5.4 Maintenance and Reliability
Page 63 · click to enlarge
Page 63

5.4 Maintenance and Reliability

The Liebert FS is designed to require minimal preventive servicing and maintenance. There are no user serviceable parts in the Liebert FS. Please contact a Liebert-Certified Technician before attempt- ing to remove or service any components of the system. No bearings maintenance or replacement is required over the life of the Liebert FS under normal operation conditions. No vacuum pump mainte- nance or replacement is required over the life of the Liebert FS under normal operation conditions.

The optional inlet air filter in the cabinet will need to be replaced when it is sufficiently dirty as to reduce the flow of air into the cabinet. Ambient conditions at the installation site will determine the frequency of replacement. The Liebert FS Flywheel Module is designed for fifteen-year service life before first scheduled maintenance. At fifteen years, the vacuum absorbers should be replaced or regenerated.

The reliability of the Liebert FS power electronics is consistent with UPS power electronics of compa- rable energy levels. The mechanical assemblies are of higher life and reliability than other commer- cially available flywheel systems due to the elimination of rolling element bearings and external vacuum-pumping systems.

System Overview

Page 64 of the Emerson 540VDC user manual — 6.1 Operator Controls
Page 64 · click to enlarge
Page 64

6.0 O PERATION

6.1 Operator Controls

The Liebert FS uses a Control Panel as the primary means for an operator to interface with the sys- tem. The Control Panel enables the operator to perform the following tasks:

Initial setup and adjustments to programmable parameters (access limited by Security Access function):

  • Set the Liebert FS Control Parameters
  • Configure Liebert FS for operation with external equipment

Initial setup and adjustments to Security Access functions

  • Set pass codes and access levels

Execute operational procedures:

  • Startup and shutdown of the Liebert FS.

Quick view of operational status:

  • View current Mode of Operation
  • View current Status

Access System Status reports:

  • Check temperatures and voltages
  • Check vital system health indicators
  • Check number of discharges
  • Check for total hours of operation
  • Check for warnings and faults history

Monitor the power flow between the Liebert FS and a UPS and other Liebert FS meter readings:

  • Monitor power flow from Liebert FS to the UPS DC Bus or from UPS to the Liebert FS
  • Monitor Liebert FS State of Charge
  • Monitor DC Bus Voltage
  • Determine if the critical load is being supplied power from the Liebert FS
  • Monitor charging after discharge

Operation · Access System History

Page 65 of the Emerson 540VDC user manual — 6.2 Control Panel
Page 65 · click to enlarge
Page 65

6.2 Control Panel

The Control Panel (see Figure 54) below represents the Control Panel on the Liebert FS. The dia- gram is labeled as a reference for the various keys, functions and data found on the Control Panel.

Figure 54 Control panel view

Emerson 540VDC — 6.2 Control Panel diagram (page 65)
Fig. 47 · 6.2 Control Panel

D V U C P See Table 4 for keyboard layout

Navigating the control panel is a simple process that involves responses to user prompts displayed in the control panel. Using the panel to operate the unit will be described further in this section.

Table 4 Control panel keyboard layout (refer to Figure 54)

Emerson 540VDC — 6.2 Control Panel diagram (page 65)
Fig. 48 · 6.2 Control Panel
1 Numerical Keypad 11 SOCState of Charge Bar

2 LEDs used for Servicing 12 SOC: State of Charge Value

3 F2 Shutdown key - Main Screen 13 PWR: Bus Power

4 F1 Start Up key - Main Screen 14 F5 More Information key - Fault Screen

5 Soft Menus 15 F6 Menu key - Main Screen

6 STATUS: System status (see 6.2.3 - System STATUS Indicators) 16 F3 Clear Fault key - Fault Screen

7 MODESystem mode (see 6.2.2 - System MODE Indicators ) 17 Enter key
8 BUSInternal DC Bus Voltage 18 Scroll Up and Down keys

Operation

Page 66 of the Emerson 540VDC user manual — STATUS:
Page 66 · click to enlarge
Page 66

6.2.1 Main screen function descriptions

Figures 55 and 56. provide descriptions and locations of the information and functions available from the Main screen and the Fault Screen.

Figure 55 Main screen functions

Current Operating Mode Option Status

D V U C P

48020 RPM: SOC: SOC: BUS: PWR:

DISCHARGE

MODE:

73.4% 545V 12.3kW

STATUS:

OK

START LOCK

SHUT DN MENU

F1 F2 F3 F4 F5 F6

Menu Button Panel Lock/Unlock Button Shutdown Button Startup Button

Figure 56 Fault screen functions

D V U C P

48020 RPM: SOC: SOC: BUS: PWR:

FAULT

MODE:

73.4% 545V 12.3kW

STATUS:

2 FAULTS

CLEAR MENU

MORE

F1 F2 F3 F4 F5 F6

Fault Clear Button More Information Button

Show 11 more labels / short text on this page
Operation · Current Security Level · Contactor Status · PWM Status · Liebert FS · Status Message · Charge Status · Internal Bus Voltage · Fault Status Message · Liebert FS · Bus Power
Page 67 of the Emerson 540VDC user manual — 6.2.3 System STATUS Indicators
Page 67 · click to enlarge
Page 67

6.2.2 System MODE Indicators

The Liebert FS has nine modes of operation: OFF, STARTUP, CHARGE, READY, DISCHARGE, SHUTDOWN, COAST, FAULT and STANDBY. These are displayed on the main screen of the control panel as identified in Figure 55. Table 5 lists the system Modes along with the corresponding Con- tactor Status, and the Conditions required to operate in these Modes: external voltage range, speed and command.

Table 5 Operation modes

External Voltage Speed Command

OFF Open Vext < Vchg 0 ~ 3500 —

STANDBY Open Vext > Vchg 0 ~ 200 —

STARTUP Close Vext > Vchg 200 ~ Min Speed STARTUP

CHARGE Close Vext > Vchg Min Speed ~ Max Speed STARTUP

READY Close Vext > Vchg Max Speed ~ Max Speed + 200 STARTUP

DISCHARGE Close Vext < Vchg Min Speed ~ Max Speed STARTUP

COAST Close 330 < Vext < Vchg 200 ~ Min Speed STARTUP

SHUTDOWN Open Vext < 330 200 ~ Min Speed STARTUP

Open Any Min Speed ~ Max Speed SHUTDOWN

Close Vext > 330 200 ~ Min Speed SHUTDOWN

FAULT Open Any 0 ~ Max Speed —

STANDBY — After CLRFLT

Min Speed: Minimum operating speed; State of Charge (SOC) will be 0% at this speed. Max Speed: Maximum operating speed; State of Charge (SOC) will be 100% at this speed.

6.2.3 System STATUS Indicators

The Liebert FS system displays multiple status conditions during operation. Table 6 shows the com- plete list of status indicators for the Liebert FS and the corresponding condition.

Table 6 System status indicators

1 OK All systems operating normally.

2 READY All systems operational and ready for startup.

3 APPLY 520*V External voltage is less than the Charge Voltage*

4 n WARNINGS Multiple warnings

5 n FAULTS Multiple faults

6 OVERSPEED Speed is higher than the Max Speed plus 200 RPM

7 TESTING VACUUM Vacuum testing at 10000 RPM

8 OPENING CONTACTOR Waiting until the current is stabilized

9 CLOSING CONTACTOR Waiting until the voltages are stabilized

10 WAIT Waiting until the voltages are stabilized

* Charge voltage is an adjustable user parameter; 520V is used only as an example.

Show 4 more labels / short text on this page
Operation · Condition · Mode Contactor · Message Condition
Page 68 of the Emerson 540VDC user manual — RPM: SOC: SOC:
Page 68 · click to enlarge
Page 68

6.2.4 Other Status Indicators

The Liebert FS system displays additional indicators during operation.

  • Option Status; DCM or VIB (example: V abbreviation for VIB enabled
Emerson 540VDC — 6.2.4 Other Status Indicators diagram (page 68)
Fig. 49 · 6.2.4 Other Status Indicators
  • Security Levels
Emerson 540VDC — 6.2.4 Other Status Indicators diagram (page 68)
Fig. 50 · 6.2.4 Other Status Indicators
  • PWM: Pulse Width Modulation Status (ON or OFF)
  • SOC: State of Charge (0-100%) SOC shows a relative energy stored in the system. SOC is determined with the following equation. It is 100% at Max Speed. A negative SOC means the required energy in % to get to the CHARGE state.

SOC rpm 2 MinRpm 2 –

MaxRpm 2 MinRpm 2 2 ( ) – ----------------------------------------------------------------- 100 × =

  • Contactor Status

RPM: SOC: SOC:

RPM: SOC: SOC:

95.2%

95.2%

  • LOCK/UNLOCK of the Control Panel

Control Panel can be locked or unlocked for security purposes. Locking or unlocking the display panel requires a user password to confirm. See 6.3.2 - Password.

  • PWR: Bus Power PWR shows the DC power transfer in kW. Positive power indicates DISCHARGE and negative power indicates CHARGE, respectively.
Show 4 more labels / short text on this page
Operation · Default setting · Default setting · Closed Open
Page 69 of the Emerson 540VDC user manual — 6.4 Menu Tree and Navigation
Page 69 · click to enlarge
Page 69

6.3 Security Access

6.3.1 Security Levels

The Liebert FS software has two security levels: READ-ONLY and USER. Security levels restrict access to system resources, such as EEPROM parameters, terminal commands and display panel functions. From the Main Screen, Figure 55, the display can be locked at any time to prevent use of Control Panel. Pressing F4 button under “LOCK” will prompt the user to enter a password to “LOCK” the system. Once locked F4 will now read “UNLOCK” and pressing this will prompt you to enter the Password to the system so that the user will be able to operate the Control Panel and adjust system parameters and settings.

6.3.2 Password

READ-ONLY level has no password and it is default level at reset.

The USER level password is user-configurable and saved in EEPROM. The default USER level pass- word is “1234”, and the password should be between 3 - 12 digits.

6.3.3 EPROM (System) Parameters

EEPROM (system) parameters can be accessed through display panel or terminal commands. They can be read and written through terminal or display panel, but accessible parameters are limited by security levels. The parameters for each level have different number range. Unused numbers are reserved for future usage.

Table 7 EEPROM parameter number ranges

Security Level Parameter Number Range

Read-Only 0 ~ 99

User (Editable) 0 ~ 99

6.4 Menu Tree and Navigation

6.4.1 Screen Tree Menu Functions

The following diagram shows all of the screens accessible from the control panel and the path to bring up these screens. The screens are used for configuring the Liebert FS for operation and accessing data current and historical data on its performance. The screens are organized by five primary function areas; Parameters, View, Security, About, and Tools. These are displayed on the Main Menu screen. Some of the screens require User level or Service level passwords to access as shown in the legend below. Refer to 6.3 - Security Access for more information on this subject.

Table 8 PCMC parameters, read-only and user (Liebert FS software)

No Parameter Name Unit Default Minimum Maximum

1 Vcharge Setpoint V 530 360 800

2 Vreg Setpoint V 520 350 790

3 Icharge Max Setpoint A 30 1 50

4 Amps per Volt Setpoint A/V 20 1 50

5 Vreg Delta Setpoint 1 V 0 0 150

6 Vreg Delta Transition (SOC) % 0 0 100

7 Vreg Delta Setpoint 2 V 0 0 150

Operation

Page 70 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 70 · click to enlarge
Page 70

Figure 57 Menu tree

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 70)
Fig. 51 · 5.1.7 Magnetic Levitation Module (MLM)

Rotor Stator IGBT PCM/ PPM MLM/ MCM Cabinet 24V PS #1 24V PS #2 * * FS models only

Max Drag Power Min Drag Power Last 10k Drag Max Miser Max Runout

Contact Closure Shutdown to Off Bootup Count Hours since bootup Pump On-time Fan 1 On-time Fan 2 On-time* * FS, Serial P or N units only

Operation

Page 71 of the Emerson 540VDC user manual — 6.4.3 System Setup and Parameter Access
Page 71 · click to enlarge
Page 71

6.4.2 Navigation and Operation of Control Panel

Navigation of the menu screens is simple and intuitive. From the Main Screen, also referred to as “Home”, menu functions and screens can be accessed by using the function keys and the numeric key- pad. The function keys, F1- F6, initiate certain system functions and Modes; STARTUP, SHUT- DOWN and also perform certain menu screen functions; DONE, PREVIOUS, NEXT, and HOME. The up and down arrows on the control panel enable the user to scroll up or down certain menus. The numeric keypad can be used to enter values for system setup and the Enter and Backspace keys to enter numbers or backspace to change entry. Pressing F6 or DONE completes the entry process. Always double check by going back to the previous screen to verify the entry is complete and accurate.

To access the Main Menu press the F6 button below the “Menu” option in the lower right. When pressed, the “Menu” key, will display the Main Menu screen as shown in Figure 58. From this screen each of the submenus may be accessed, provided the user has security access where needed, refer to Figure 57.

Each screen in the menu tree will show numbers in front of the subject if more information is avail- able at the next menu level. Pressing the number for the subject using the numeric keypad will bring up that screen. If the subject is preceded by a double arrow symbol (>>) instead of a number no fur- ther information is available or the parameter may not be modified without security access.

At each screen and level in the menu tree, when finished accessing data or changing system parame- ters, the user may select DONE using the function keys to move back to the prior screen in the menu or when available press HOME, F5, to return to the Main Screen. On some screens such as in the His- tory screens you will be able to access additional screens of data recorded by pressing NEXT, see Figures 70 and 71.

Figure 58 User level main menu screen

Emerson 540VDC — 6.4.2 Navigation and Operation of Control Panel diagram (page 71)
Fig. 52 · 6.4.2 Navigation and Operation of Control Panel
Emerson 540VDC — 6.4.2 Navigation and Operation of Control Panel diagram (page 71)
Fig. 53 · 6.4.2 Navigation and Operation of Control Panel
Emerson 540VDC — 6.4.2 Navigation and Operation of Control Panel diagram (page 71)
Fig. 54 · 6.4.2 Navigation and Operation of Control Panel
Emerson 540VDC — 6.4.2 Navigation and Operation of Control Panel diagram (page 71)
Fig. 55 · 6.4.2 Navigation and Operation of Control Panel
Emerson 540VDC — 6.4.2 Navigation and Operation of Control Panel diagram (page 71)
Fig. 56 · 6.4.2 Navigation and Operation of Control Panel

MENU>

1. PARAMETERS 2. VIEW 3. SECURITY 4. ABOUT 5. TOOLS

DONE

F1 F2 F3 F4 F5 F6

I !

0 1 2 3

. 4 5 6

- 7 8 9

6.4.3 System Setup and Parameter Access

Setting up the Liebert FS:

In order to operate the system the system parameters must be configured for the application. The sys- tem parameters or “EEPROM” parameters can be accessed by first pressing MENU, F6, and the num- ber one (1) button on the Control Panel keypad for the PARAMETERS screen. Liebert FS software has two kinds of access screen according to the security level.

In READ-ONLY mode, seven basic parameters can be monitored. Modifying the parameters in this mode is not allowed. In this mode the parameters will have double arrow symbols to the left of the parameters.

Operation

Page 72 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 72 · click to enlarge
Page 72

Figure 59 READ ONLY level parameter view screen

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 72)
Fig. 57 · 5.1.7 Magnetic Levitation Module (MLM)

520 V 500 V 30.0 A 2.0 A 0 V 0% 0 V

V_CHARGE SETPOINT V_REG SETPOINT MAX CHARGE CURRENT CHARGE AMPS/VOLT V_REG_DELTA 1 V_REG_DELTA TRANSITION SOC V_REG_DELTA 2

In the USER mode, below the 7 basic parameters can be modified, see 6.3.2 - Password for access level and passwords. Pressing the corresponding number to the parameter to the left of the number will take you to the parameter setup screen for that particular parameter.

Figure 60 USER level or above parameter edit screen

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 72)
Fig. 58 · 5.1.7 Magnetic Levitation Module (MLM)

V_CHARGE SETPOINT V_REG SETPOINT MAX CHARGE CURRENT CHARGE AMPS/VOLT V_REG_DELTA 1 V_REG_DELTA TRANSITION SOC V_REG_DELTA 2

520 V 500 V 30.0 2.0 A 0 V 0 % 0 V

In setting the parameters there is a help screen to guide the user through the setup and help visualize the operation the system when utilizing this parameter. The help screens are displayed in Figures 61 and 62. The help screen also describes the other system parameters used in operation.

Figure 61 HELP screen for User Setup Parameters

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 72)
Fig. 59 · 5.1.7 Magnetic Levitation Module (MLM)

When voltage is above [1] V_CHARGE Flywheel charges up and draws : (( Vbus – [1] V_CHARGE) * [4] AMPS/VOLT) amps, Not exceeding [3] MAX CHARGE CURRENT. When voltage sags, it is regulated at [2] V_REG whose slope can be adjusted by [5] DELTA 1, [6] SOC TRANS, & [7] DELTA 2

Figure 62 Graphical HELP screen for VREG DELTA1, VREG TSOC, and VREG DELTA2 Transition setup

(Pressing the “MORE” button, F1, from Figure 5-8. accesses this screen)

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 72)
Fig. 60 · 5.1.7 Magnetic Levitation Module (MLM)

Operation

Page 73 of the Emerson 540VDC user manual — 6.4.5 Time/Date
Page 73 · click to enlarge
Page 73

Each EEPROM parameter has its own screen which contains parameter description, data range, cur- rent value and default value button. Default button shows the default value for the parameter. From this screen the UP/DOWN arrow keys can used to move between parameters. The UP/Down arrow will increase/decrease the parameter number, respectively.

Figure 63 USER or higher level parameter selection for view/edit

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 73)
Fig. 61 · 5.1.7 Magnetic Levitation Module (MLM)

6.4.4 View

Functions in MENU > VIEW display various system status including real-time and statistical data. The menu path is represented in the upper left hand corner of the screen and lets you know your cur- rent screen location in the menu tree. You can select the function by entering the number.

Figure 64 VIEW menu

Emerson 540VDC — 6.4.4 View diagram (page 73)
Fig. 62 · 6.4.4 View
1. TIME/DATE 2. TEMPERATURES 3. VOLTAGES 4. HISTORY 5. OPTIONS

6.4.5 Time/Date

In MENU>VIEW>TIME/DATE, system time is displayed and can be adjusted. However, USER secu- rity level or higher is required to adjust the time or date, see 6.3.2 - Password. Pressing SET button changes to the edit mode. Cursor will blink on NEW TIME. You can type in new time data or move to NEW DATE by UP/DOWN arrow button. Moving to NEW DATE should be made before typing in any digits. All digits for time (4 digits) or date (6 digits) should be typed in before ENTER or you will get the INVALID INPUT error message.

Figure 65 TIME/DATE set

Emerson 540VDC — 6.4.5 Time/Date diagram (page 73)
Fig. 63 · 6.4.5 Time/Date

Operation

Page 74 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 74 · click to enlarge
Page 74

6.4.6 Temperatures MENU>VIEW>TEMPERATURES shows the temperatures of various system parts.

Figure 66 Temperature view

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 74)
Fig. 64 · 5.1.7 Magnetic Levitation Module (MLM)

67.12 °C 40.20 °C 52.22 °C 46.17 °C 38.46 °C

6.4.7 Voltages MENU>VIEW>VOLTAGES shows the major power supply voltages on the controller board. These values are updated continuously.

Figure 67 Figure 5-14. Voltages view

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 74)
Fig. 65 · 5.1.7 Magnetic Levitation Module (MLM)

6.4.8 History The Liebert FS records and stores a limited history of the following items; CHARGE, DISCHARGE, WARNING, FAULT, VITALS, and COUNTERS which are listed in the main History menu screen. (See Figure 69). In the event list screens, Figures 71 through 73, users may move between pages using the PREV and NEXT buttons. History data can be cleared by RESET button. SERVICE or higher level is required to reset the list.

Figure 68 History view

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 74)
Fig. 66 · 5.1.7 Magnetic Levitation Module (MLM)
1. CHARGE 2. DISCHARGE 3. WARNING 4. FAULT 5. VITALS
  • Charge: The most recent charge (LAST CHARGE) is displayed in time (sec.) and energy (kW) on this screen as are the accumulated charge time/energy (TOTAL CHARGE). (See Figure 69 .)

Figure 69 Charge history

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 74)
Fig. 67 · 5.1.7 Magnetic Levitation Module (MLM)

Operation

Page 75 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 75 · click to enlarge
Page 75
  • Discharge: The most recent discharge (LAST DISCHARGE) is displayed in time (sec.) and energy (kW) on this screen as are the accumulated discharge time/energy (TOTAL DISCHARGE) and the number of times system has discharged (DISCHARGE COUNT). (See Figure 70 .)

Figure 70 Discharge history

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 75)
Fig. 68 · 5.1.7 Magnetic Levitation Module (MLM)
  • A Discharge History event list screen, Figure 72 , is available and shows the event number, date (month./day/year), time of event (00:00-24:00) average power (kW), and duration of discharge (seconds). The recorded events are sequentially numbered and listed from most recent to last. The letter “D” after the time indicates that this is the DISCHARGE History screen.

The first screen has the function options of NEXT or DONE viewing. The next page will have the function button options of PREV (Previous), NEXT or DONE.

Figure 71 Discharge History, Event list screen

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 75)
Fig. 69 · 5.1.7 Magnetic Levitation Module (MLM)

08 04/31/06 10:15 D 09 03/21/06 03:11 D 10 03/10/06 20:25 D 11 02/01/06 14:12 D 12 01/15/06 09:18 D 13 11/11/05 18:35 D 14 04/25/05 22:12 D

38.14s 08.10s 21.04s 18.19s 28.44s 16.10s 27.12s NEXT DONE PREV

  • Warning/Fault: Liebert FS software holds 35 warning and fault event information, respectively. Seven warnings/faults are displayed in a single screen.

Figure 72 Warning history, Event list screen

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 75)
Fig. 70 · 5.1.7 Magnetic Levitation Module (MLM)

01 03/10/05 11:43 W 02 03/10/05 10:37 W 03 02/24/05 04:03 W 04 01/30/05 23:22 W 05 12/20/04 13:45 W 06 11/13/04 07:28 W 07 09/30/04 16:23 W

AUX POWER LOW VIB INOPERATIVE OVERSPEED STATOR HOT ROTOR HOT RUNOUT VACUUM

Figure 73 Fault history, Event list screen

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 75)
Fig. 71 · 5.1.7 Magnetic Levitation Module (MLM)

01 03/10/05 11:43 F 02 03/10/05 10:37 F 03 02/24/05 04:03 F 04 01/30/05 23:22 F 05 12/20/04 13:45 F 06 11/13/04 07:28 F 07 09/30/04 16:23 F

CURRENT OFFSET CHECKSUM SOFTWARE OV DC BUS OV SPARE OPEN INTER PROCR COMM MISER RESET

Operation

Page 76 of the Emerson 540VDC user manual — 6.4.9 Options
Page 76 · click to enlarge
Page 76
  • Vitals (USER or above): Key system efficiency and performance measurements are displayed in Max/Min measurements along with the date recorded.

Figure 74 Vitals history view

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 76)
Fig. 72 · 5.1.7 Magnetic Levitation Module (MLM)
MAX DRAG POWERMIN DRAG POWER: LAST 10K DRAG: MAX MISER: MAX RUNOUT:

10.0 W, 11/30/05 2.0 W, 11/29/05 1.0 W, 11/30/05 12345, 11/28/05 34567, 11/27/05

  • Counters (USER or above) provide totals of run time hours; system and components, and numbers of startup and shutdown events; contactor closures and bootup. OPERATING HOURS is the total operating hours in the CHARGE/ DISCHARGE/ READY mode.
Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 76)
Fig. 73 · 5.1.7 Magnetic Levitation Module (MLM)
CONTACTOR CLOSURESHUTDOWN TO OFF: BOOTUP COUNT: HOURS SINCE BOOTUP: OPERATING HOURS:

Figure 76 Counters - screen 2

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 76)
Fig. 74 · 5.1.7 Magnetic Levitation Module (MLM)

6.4.9 Options

Each option, if installed, can be enabled by pressing its number and its status will then be displayed. Additional information on setup and operation of these options is available in the related section of this manual.

Figure 77 Options view

Emerson 540VDC — 6.4.9 Options diagram (page 76)
Fig. 75 · 6.4.9 Options

Operation · Figure 75 Counters

Page 77 of the Emerson 540VDC user manual — 6.4.10 Network—Requires DCM Option
Page 77 · click to enlarge
Page 77

6.4.10 Network—Requires DCM Option

The Network view screen displays the addresses of the DCM. Static address settings can be entered using the keypad into this screen. If this option is installed, reference the Liebert Data Collection Module (DCM) Option Manual for more information on setting up the DCM on a network and or assigning IP addresses. Figure 78 shows the Network screen in a read-only mode.

Figure 78 Networks view

Emerson 540VDC — 6.4.10 Network—Requires DCM Option diagram (page 77)
Fig. 76 · 6.4.10 Network—Requires DCM Option
DHCPIP ADDRESS: NET MASK: DEFAULT GATEWAY: DNS SERVER:

By entering a Password to access the User level mode (see 6.3.2 - Password), you can edit this func- tion. Pressing the EDIT button, F1, will place the system in the edit mode. The DHCP must be dis- abled or turned OFF to proceed with setting IP addresses and other settings. After pressing EDIT you will see up/down arrows next to the DHCP ON value. Pressing the up or down arrows on the keypad will allow you to turn OFF or ON this function.

Figure 79 Networks view, Edit DHCP

Emerson 540VDC — 6.4.10 Network—Requires DCM Option diagram (page 77)
Fig. 77 · 6.4.10 Network—Requires DCM Option
DHCPIP ADDRESS: NET MASK: DEFAULT GATEWAY: DNS SERVER:

Once you have turned DHCP OFF, press EDIT again and now you will see numbers next to each of the settings. Pressing the corresponding number will allow you to enter or change that value. At any time you may press CANCEL to cancel the changes. Once the changes or entries are complete, press APPLY to complete entry process. Pressing APPLY will reboot system and in a few minutes the sys- tem will display the new screen.

Figure 80 Networks view, Edit Settings (Service level)

Emerson 540VDC — 6.4.10 Network—Requires DCM Option diagram (page 77)
Fig. 78 · 6.4.10 Network—Requires DCM Option
DHCPIP ADDRESS: NET MASK: DEFAULT GATEWAY: DNS SERVER:

Operation

Page 78 of the Emerson 540VDC user manual — 6.4.13 Security
Page 78 · click to enlarge
Page 78

6.4.11 Electrical

The screen MENU>VIEW>ELECTRICAL shows the major electrical system variables. These quanti- ties are updated continuously.

Figure 81 Electrical view

Emerson 540VDC — 6.4.11 Electrical diagram (page 78)
Fig. 79 · 6.4.11 Electrical
INT. BUS VOLTAGEEXT. BUS VOLTAGE: DC BUS CURRENT: OUTPUT POWER: STATUS OF CHARGE:

6.4.12 Vitals

MENU>VIEW>VITALS shows the current vital system values. These quantities are updated continu- ously.

Figure 82 Vitals view

Emerson 540VDC — 6.4.12 Vitals diagram (page 78)
Fig. 80 · 6.4.12 Vitals

6.4.13 Security

Security levels can be changed in the MENU>SECURITY screen.

Operation

Page 79 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 79 · click to enlarge
Page 79

Figure 83 Password screens

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 79)
Fig. 81 · 5.1.7 Magnetic Levitation Module (MLM)

USER level password can be modified by pressing the CHG PW button. Current password is required to change the password. The USER level password should be between 3 - 12 digits length, hence digits after 13th are ignored if more than 12 digits are entered.

Figure 84 Change password

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 79)
Fig. 82 · 5.1.7 Magnetic Levitation Module (MLM)

Operation

Page 80 of the Emerson 540VDC user manual — 6.4.15 Tools
Page 80 · click to enlarge
Page 80

Figure 85 Change password

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 80)
Fig. 83 · 5.1.7 Magnetic Levitation Module (MLM)

6.4.14 About

About screen shows the version of the firmware and company information. The controller board has two DSPs and each DSP has bootloader and application firmware.

Figure 86 ABOUT screen

Emerson 540VDC — 6.4.14 About diagram (page 80)
Fig. 84 · 6.4.14 About

Figure 87 Serial numbers

Emerson 540VDC — 6.4.14 About diagram (page 80)
Fig. 85 · 6.4.14 About
SYSTEM S/NFM S/N: MLM S/N: PCM S/N: SO#: USER

6.4.15 Tools

Tools menu has REBOOT function for USER to reboot system.

Figure 88 Tools for USER

Emerson 540VDC — 6.4.15 Tools diagram (page 80)
Fig. 86 · 6.4.15 Tools

Operation

Page 81 of the Emerson 540VDC user manual — 6.5.2 Inspection before Initial System Startup
Page 81 · click to enlarge
Page 81

6.5 System Startup

6.5.1 Initial System Startup Procedure

Initial System Startup is defined as the first or initial startup following installation of the system. Several additional steps are required prior to the normal startup procedure including the following Inspection before Initial System Startup, (Section 5.5.2), and Control Parameters Setup (Section 5.5.3.). These steps are required to ensure safe and proper startup of flywheel system and for war- ranty purposes.

! CAUTION The Initial System Startup shall ONLY be performed under the supervision of a Liebert-certified service technician in order to ensure proper system operation. Failure to abide by instructions provided herein may void your warranty.

6.5.2 Inspection before Initial System Startup

A Liebert technician will perform the following tasks:

  • Visual Inspection Inspect equipment for signs of damage Verify installation per drawings Inspect cabinet for foreign objects Verify ground conductors are properly sized and connected Verify all printed circuit boards are configured properly
  • Mechanical Inspection Check all control wiring connections for tightness Check all power wiring connections for tightness Check that cabinet is attached to the floor Check all terminal screws, nuts and/or spade lugs for tightness Check all cooling pump connections
  • Electrical Inspection Check fuses for continuity Check and verify UPS DC bus voltage
  • Pre-Startup Perform MLM Pre-Start procedure using Boot Up process with UPS DC bus Perform MLM Inspection and test Verify UPS settings and adjustments Run pumps and fans for several minutes

Operation

Page 82 of the Emerson 540VDC user manual — 6.5.4 Initial System Startup Procedure
Page 82 · click to enlarge
Page 82

6.5.3 Control Parameters Setup at Initial System Startup

Please have the relevant UPS Interconnection Kit Handbook (Liebert UPS Interconnection Kit [IKIT] Handbook for specific Brand and Model UPS) available for the Liebert technician. The Control Parameters Setup values that need to be programmed are included in this manual.

You may record in Table 9 the values found in the specific IKIT (Interconnection Kit) Handbook for your UPS. For future reference you may also want to record Software Versions; Primary and Second- ary and Bootloader Version from the About parameter screen, Section 5.4.12. above.

Table 9 Control parameters

Control Parameter Value Default

Charge Voltage VDC 530

Regulation Voltage VDC 520

Maximum Charge Current A 30

Charging Amps/Volts A/V 2

Vreg Delta 1 VDC 0

Vreg TSOC % 0

Vreg Delta 2 VDC 0

Table 10 Software versions

The Liebert technician will perform or direct the Control Parameters Setup (described in 6.4.1 - Screen Tree Menu Functions) and proceed to the Initial Startup Procedure.

6.5.4 Initial System Startup Procedure

A Liebert technician will perform or direct the following tasks at Initial System Startup:

  • Inspection before Initial System Startup (Section 5.5.2. of this manual)
  • System Control Parameters Setup
  • Assist with Initial System Startup
  • Complete Warranty documentation
  • Complete commissioning documentation
  • Provide basic user training on Liebert FS operation *
Show 6 more labels / short text on this page
Operation · Software Application Version · Primary application 2812 · Secondary application 6711 · Primary Bootloader · Secondary Bootloader
Page 83 of the Emerson 540VDC user manual — Powering Up the Liebert FS
Page 83 · click to enlarge
Page 83

6.5.5 Regular Startup Procedure

! CAUTION The Initial System Startup shall be performed ONLY under the supervision of a Liebert technician to ensure proper system operation. Failure to abide by instructions provided herein may void your warranty.

6.5.6 Inspection Before Regular Startup

The following verifications must be done before performing a regular startup of the Liebert FS (see 6.5.7 - Starting up the System):

1. Make sure the Liebert FS is properly secured to the floor with the Liebert-provided mounting kit and in compliance with the floor mounting instructions in 4.1 - Cabinet Floor Mounting. 2. Check for coolant leaks in and around the Liebert FS unit. 3. Ensure that Liebert FS cabinet panels are in place on the cabinet and that no tools have been left in the cabinet 4. Ensure that the Liebert FS Main circuit-breaker (optional) or the customer-provided external DC disconnect switch is open 5. Verify that the AC Auxiliary Backup Power is connected and powered by closing fused disconnect or wall disconnect and check if the Control Panel is ON and with no warning or fault messages displayed.

The Liebert FS may now be started up.

6.5.7 Starting up the System

! CAUTION The following procedure assumes that the Initial System Startup has been performed under the supervision of a Liebert technician.

Powering Up the Liebert FS

Once AC voltage is applied to the Liebert FS, the Liebert FS Control Panel will boot up. Its screen will begin to illuminate after 5 to 10 seconds and then display a series of boot up protocols.

Booting Up 1. It takes about 25 seconds to load and initialize the primary application software at STARTUP or after reset. 2. Title block and firmware versions will be displayed (see Figure 82). If the secondary DSP does not boot up properly, versions for the secondary DSP may be corrupted or zero. 3. EEPROM checksum will be calculated and compared with the stored value. EEPROM checksum fault will be generated if they do not match. For this case, default values are loaded for parameters in RAM. However, EEPROM contents are not changed.

! CAUTION Do not attempt to run the system unless the system loads valid parameters.

4. Response from secondary DSP will be checked. “INTERPROCESSOR COMM FAULT” will be generated if the communication is not set up properly. The controller will reset itself for this case. 5. Previous operation command (STARTUP or SHUTDOWN) will be retrieved to determine the current operation mode. 6. Option status is checked. Current available options are VIB and DCM.

Operation

Page 84 of the Emerson 540VDC user manual — 6.6 Shutdown Procedure
Page 84 · click to enlarge
Page 84

Validation of Control Parameters Setup 1. Once the Control Panel has successfully booted up, the Control Panel will display the Main Screen (see Figure 55). 2. Verify the Control Parameters values are correct. (Consult Table 9 and the relevant UPS Interconnection Kit Handbook for choosing the proper Control Parameters values). 3. Adjust the Control Parameters values if necessary (see 6.4.1 - Screen Tree Menu Functions). for instruction on how to change the values of the Control Parameters) then press “F6 DONE”.

Initiating Liebert FS Startup Sequence

  • 1. Once sufficient DC voltage is applied to the UPS DC Bus, the Liebert FS will be able to transition from the OFF Mode to Startup Mode, unless system was previously Shutdown by command. The following action is conditional on the UPS interconnection kit that has been installed on your Liebert FS:
  • Standard UPS Interconnection Kit (IKIT-STD) The Standard UPS interconnection kit (IKIT-STD) includes a fused Power Terminal Block. It is recommended for maintenance use to have an external disconnect switch installed between the UPS and the Liebert FS. Close the customer-provided external disconnect switch at the time indicated by the UPS startup procedure.
  • Optional UPS Interconnection Kit

Open the Liebert FS cabinet front door and close the Liebert FS main circuit-breaker at the time indicated by the UPS startup procedure. Close the cabinet door. 2. The Control Panel will then show the Main screen (see Figure 55). The System Mode should read “OFF”. The Liebert FS will actively check for presence of sufficient voltage to allow system startup. 3. As soon as the UPS DC bus voltage is greater than Vcharge, the System Status will change from “OFF” to “STAND BY”. The “F1 STARTUP” key will then be enabled. 4. Press the “F1 STARTUP” key.

Liebert FS Startup Sequence

As soon as the “F1 STARTUP” key is pressed, the Liebert FS will launch its startup sequence. This will progressively lead the Liebert FS through the different Modes of Operation (STAND BY, STAR- TUP, CHARGE) to eventually reach a ready state of idling (READY Mode) once it is completely charged up. The automatic transition between modes is described in 5.2 - List of System User-Con- figurable Parameters.

6.6 Shutdown Procedure

There are two ways the Liebert FS may enter a Shutdown sequence: either a) following a Liebert FS discharge down to SOC = 0%; or b) following a user-initiated command.

In any Mode, except OFF Mode, the user may command the Liebert FS to transition in SHUTDOWN Mode by pressing the “F2 SHUTDOWN” key. This action is recommended for normal shutdown of the system. In this condition, the Liebert FS will not discharge to support an outage. You will be asked to confirm “Yes” or “No” to SHUTDOWN. Press “Yes” to confirm shutdown and put system in SHUT- DOWN mode.

For more information concerning the SHUTDOWN Mode, please refer to 5.2 - List of System User- Configurable Parameters.

Operation

Page 85 of the Emerson 540VDC user manual — ! WARNING
Page 85 · click to enlarge
Page 85

7.0 M AINTENANCE

7.1 Safety Precautions

Observe all safety precautions in this manual, paying particular attention to Important Safety Instructions on page 1.

ONLY qualified service personnel should perform maintenance on the Liebert FS.

Observe all of the warnings below before performing any maintenance on the Liebert FS and associ- ated equipment.

! WARNING Before performing preventive maintenance tasks, the Liebert FS must be de-energized and electrically isolated (both AC and DC connections to the Liebert FS must be electrically disconnected).

! CAUTION

Always identify connecting wiring prior to disconnecting any wiring.

Do not substitute parts except as authorized by Liebert Corporation.

Keep Liebert FS cabinets free of foreign materials such as solder, wire cuttings, etc.

Contact Liebert Services if you are not sure of the procedures to follow or if you are not familiar with the circuitry.

! WARNING

Extreme caution is required when performing maintenance.

Be constantly aware that the Liebert FS contains high DC as well as AC voltages. With input power off and the battery disconnected, high voltage at filter capacitors and power circuits should be discharged within 30 seconds. However, if a power circuit failure has occurred, you should assume that high voltage may still exist after shutdown. Check with a voltmeter before making contact.

Check for voltage with both AC and DC voltmeters prior to making contact.

When the Liebert FS is under power, both the operator and any test equipment must be isolated from direct contact with earth ground and the chassis frame by using rubber mats.

Some components within the cabinet are not connected to chassis ground.

Any contact between floating circuits and the chassis is a lethal shock hazard. Use differential oscilloscopes when measuring a floating circuit. The differential input should have at least 800 VRMS common mode input rating and a common mode rejection ratio of at least 80dB.

Exercise caution that the test instrument exterior does not make contact, either physically or electrically, with earth ground.

In case of fire involving electrical equipment, use only carbon dioxide fire extinguishers or others approved for use in fighting electrical fires.

Maintenance

Page 86 of the Emerson 540VDC user manual — 7.3 Routine Maintenance
Page 86 · click to enlarge
Page 86

7.2 Liebert Services

Startup, maintenance and training programs for the Liebert FS are available through your Liebert sales representative.

Professional Startup

Liebert FS Startup—Liebert’s customer engineers perform a thorough, non-powered inspection of the units and will then conduct a complete electrical checkout that includes calibrating all compo- nents to published specifications. Customer operation training will be conducted during startup.

Load bank testing and full site acceptance testing are additional services that can be performed dur- ing a Liebert FS startup. One preventive maintenance service call can be added to the initial Liebert FS startup agreement.

Maintenance Agreements: The Signature Program

Liebert FS Service Agreements—Liebert Services has a variety of available maintenance agree- ments, depending on specific site needs. Choose the level of support appropriate for each installation. Mission-critical sites can have the standard parts-and-labor, around-the-clock coverage for their Liebert FS, with or without scheduled preventive maintenance visits. Other sites can benefit from a variety of money-saving options.

While the Liebert FS is designed to be maintenance-free, Liebert suggests at least one preventive maintenance visit per year. This preventive maintenance work would normally be done in conjunction with a service visit for another Liebert UPS product. The annual visit will require taking the Liebert FS off-line for a thorough, nonpowered inspection. These visits are in addition to the general housekeeping tasks (changing air filters, etc.) that can be performed by customer personnel.

Training

Customer training courses include the proper operation of the system, emergency procedures, preven- tive maintenance and some corrective maintenance.

Warranties

Contact Liebert Services if you have any questions regarding the warranty on your Liebert FS.

7.3 Routine Maintenance

You are encouraged to become thoroughly familiar with the equipment, but at no time should you go beyond the specific procedures in this manual while performing maintenance or correcting a malfunc- tion. If you have any doubt as to what must be done, call Liebert Services at 1-800-LIEBERT for fur- ther instructions.

The Liebert FS is designed for unattended operation, but does require some common-sense mainte- nance:

  • Keep good records—Troubleshooting is easier if you have historical background
  • Keep it clean—Keep the Liebert FS free of dust and moisture
  • Keep it cool—The Liebert FS will reliably meet all performance specifications and design life at temperatures up to 122°F (50°C)
  • Keep connections tight—Tighten all connections at installation and at least annually thereafter (see torque requirements, Table 12 )

Maintenance

Page 87 of the Emerson 540VDC user manual — 7.5 Record Log
Page 87 · click to enlarge
Page 87

7.4 Maintenance Schedule

! WARNING Any maintenance on the system should be delayed by at least 10 minutes after system is shut down to be certain all electronics have discharged. Use appropriate safety precautions to ensure unit is disconnected and de-energized.

! CAUTION Unless specified otherwise, ONLY a Liebert-certified service technician should perform all maintenance work. Failure to use a Liebert technician for maintenance actions, unless specifically noted, may void your warranty.

The Liebert FS maintenance schedule consists of actions listed in Table 11.

Table 11 Maintenance schedule

6 yrs Every 15 yrs

System Visual Inspection * Check or Test — — — Liebert/Owner

System Cleaning (if necessary) Check or Test — — — Liebert/Owner

System Testing (and adjustments, if necessary) — Check or Test — — Liebert

PCM Capacitor Bank — — Service or

Check or Test — Service or

UPS Interconnection Kit (if option installed) — Check or Test — — Liebert

Air Filter (if option installed) Check or Test — — — Liebert/Owner

7.5 Record Log

Set up a maintenance log to record scheduled checks and any abnormal conditions.

The log should have space for all metered parameter indications including phase readings, alarm messages, mode of operation, air filter replacement date and observation notes.

A periodic walk-through inspection of the Liebert FS room is advised to check for visible and audible indications of problems. Log the inspection, metered parameter indications and any discrepancies.

Show 11 more labels / short text on this page
Maintenance · Frequency · Service Performer Every · 1 yr Every · 2 yrs Every · Item/Action · Replace — Liebert · Once · Flywheel Module · after Startup · Replace Liebert
Page 88 of the Emerson 540VDC user manual — 7.8 Detecting Trouble
Page 88 · click to enlarge
Page 88

7.6 Optional Air Filters

The optional air filters must be inspected and serviced on a regular schedule. The period between inspections will depend upon environmental conditions. Under normal conditions, the air filters will require cleaning or replacement approximately every 12 months.

! CAUTION

Be certain recyclable filter elements are dry before reinstalling them in the Liebert FS.

Abnormal or dusty conditions will require more-frequent cleaning and replacement of air filters (sometimes as often as every two months). Inspect installations in new buildings more often, then extend the inspection period as experience dictates.

7.7 Torque Requirements

All electrical connections must be tight. Table 12 provides the torque values for the connections in the Liebert FS. Use these values unless the equipment is labeled otherwise.

Table 12 Torque specifications (unless otherwise labeled)

Nut And Bolt Combinations

Electrical Connections With Belleville Washers

Lb-in N-m Lb-in N-m

1/4 53 6.0 46 5.2

5/16 107 12 60 6.8

3/8 192 22 95 11

1/2 428 48 256 29

Circuit Breakers with Compression Lugs (For Power Wiring)

Current Rating Lb-in N-m

250A 250 28

Circuit Breakers with Compression Lugs (For Control Wiring)

AWG Wire Size or Range Lb-in N-m

#22 - #14 3.5 to 5.3 0.4 to 0.6

7.8 Detecting Trouble

It is important that the operator check the instrument readings if abnormal equipment performance is suspected. Any metered value that differs appreciably from normal could mean an impending mal- function and should be investigated.

Items to check include:

  • Alarm messages indicate malfunction or impending malfunction. A daily check of the operator control panel will help to provide an early detection of problems. Refer to Table 16 to interpret alarm messages.
  • Tracing a problem to a particular section is facilitated by alarm messages and the metered parameter indications. These are stored in the Status Reports and can be displayed at the operator control panel or at an optional terminal. A Liebert Services engineer will be familiar with test points inside the unit.

Maintenance · Grade 2 Standard · Bolt Shaft Size

Page 89 of the Emerson 540VDC user manual — 7.12 Limited Life Components
Page 89 · click to enlarge
Page 89

7.9 Reporting a Problem

If a problem occurs within the Liebert FS, review all alarm messages along with other pertinent data. This information should be given by telephone to the Liebert service representative’s office nearest you. This information can be downloaded to Liebert Services by using the optional modem. Contact Liebert Services at 1-800-LIEBERT to report a problem or to request assistance.

7.10 Corrective Actions

For each alarm message on the operator control panel, you can find the recommended corrective action in Table 16.

7.11 Recommended Test Equipment

Table 13 lists recommended test equipment and tools required to maintain, troubleshoot and repair the Liebert FS. You may substitute instruments of equivalent range and accuracy.

All instruments should be calibrated and be within the current calibration cycle. Calibration data for the instruments should be maintained in equipment-history files and the instruments labeled for audit and verification.

Table 13 Recommended test equipment and tools

Qty Test Equipment Manufacturer Model or Type

1 Oscilloscope Tektronix, H-P or Fluke DC to 50 MHz

2 Voltage Probes Tektronix, H-P or Fluke 10X, with 10 ft cable

2 Voltage Probes Tektronix, H-P or Fluke 100X, with 10 ft cable

1 Digital Multi-meter Fluke 87, with test leads

1 Tool Kit N/A Standard electrical contractor tools

7.12 Limited Life Components

Your Liebert FS has a design life well in excess of 15 years. Well-maintained units can continue to provide economic benefits for 20 years or more. Long-life components are used in your Liebert FS wherever practical and cost-effective.

However, due to current component material and manufacturing technology limitations, a few compo- nents in your Liebert FS will wear out and require replacement in less than 10 years. The following limited-life components are utilized in your Liebert FS. In order to prevent a wear-out failure of one of these components affecting your critical load operations, it is recommended these components be peri- odically inspected and replaced before their expected wear-out life. Individual users may have site- specific requirements that differ from these typical life expectations.

Table 14 Projected component life, replacement schedule

Component Expected Life Replace in:

Power DC filter capacitors About 7 years 5-6 years

Air filters, disposable (see also 7.6 - Optional Air Filters) 1-3 years Check 4 times/year

Power capacitors are considered “failed” when their measured capacitance is –5% below their name- plate rating.

In most cases, replacement components must exactly match the original component specifications and are not readily available from third-party component distributors. For assistance with your specific component specifications, replacement component selection and sourcing, call 1-800-Liebert.

For customers using Liebert Services’ Preventive Maintenance Services, periodic inspection of these components are part of this service as is recommending to customers replacement intervals to avoid interruptions in critical load operations.

Maintenance

Page 90 of the Emerson 540VDC user manual — 8.1 General
Page 90 · click to enlarge
Page 90

8.0 T ROUBLESHOOTING

8.1 General

The Liebert FS is capable of detecting conditions outside of normal operating parameters and provid- ing notice at the Control Panel. This data is recorded as either Warnings or Faults and can be viewed in the software menu tree at the screen location MENU>VIEW>. These Warnings and Faults can also be communicated by the Versatile Interface Board (VIB), if this option has been installed, to an exter- nal device or system; (see Appendix C.0 - Versatile Interface Board). This data will also be recorded in the Data Collection Module option if this has been selected. Please see Appendix B.0 - Data Collection Module for instructions on how to access this data via the DCM.

Any Warnings and Faults that may occur will be displayed on the Main screen of the Control Panel. The Liebert FS’ Warnings and Faults tables (see Tables 15 and 16), describe these Warnings, mean- ings and possible causes. The operator action required or automatic system function that will result is explained.

In addition to the information displayed on the Main screen, other system information that can be used for troubleshooting is available and can be accessed from the Control Panel. From the Main screen the Menu screen can be selected by pressing (F6) on the Control Panel located below MENU.

Figure 89 USER level menu

Emerson 540VDC — 8.1 General diagram (page 90)
Fig. 87 · 8.1 General
1. PARAMETERS 2. VIEW 3. SECURITY 4. ABOUT 5. TOOLS

Selecting View displays various system statuses including real-time and historical data. You can select the function by number.

Figure 90 VIEW menu

Emerson 540VDC — 8.1 General diagram (page 90)
Fig. 88 · 8.1 General
1. TIME/DATE 2. TEMPERATURES 3. VOLTAGES 4. HISTORY 5. OPTIONS

Selecting History will provide a history of Warnings and Faults as introduced in Section 5, Opera- tions, of this manual. Other information that can be useful in troubleshooting are the Temperatures, Voltages, Options, Electrical and Vitals screens.

Troubleshooting

Page 91 of the Emerson 540VDC user manual — 8.2 Warnings
Page 91 · click to enlarge
Page 91

Figure 91 Warning history

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 91)
Fig. 89 · 5.1.7 Magnetic Levitation Module (MLM)

01 03/10/05 11:43 W 02 03/10/05 10:37 W 03 02/24/05 04:03 W 04 01/30/05 23:22 W 05 12/20/04 13:45 W 06 11/13/04 07:28 W 07 09/30/04 16:23 W

AUX POWER LOW VIB INOPERATIVE OVERSPEED STATOR HOT ROTOR HOT RUNOUT VACUUM

Figure 92 Fault history

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 91)
Fig. 90 · 5.1.7 Magnetic Levitation Module (MLM)

01 03/10/05 11:43 F 02 03/10/05 10:37 F 03 02/24/05 04:03 F 04 01/30/05 23:22 F 05 12/20/04 13:45 F 06 11/13/04 07:28 F 07 09/30/04 16:23 F

CURRENT OFFSET CHECKSUM SOFTWARE OV DC BUS OV SPARE OPEN INTER PROCR COMM MISER RESET

The warnings, fault meanings and possible causes in the following text and in Table 15 may be used in troubleshooting the messages and may also aid in identifying conditions outside the flywheel sys- tem that may adversely affect it.

8.2 Warnings

A Warning is an indication of an abnormal system condition significant enough to warrant being annunciated and logged. Warning conditions may indicate that a system parameter is out of its nor- mal operating range, or may signal an external problem. A Warning indication is for information only and does not require any operator intervention for continued operation of the unit. While in Warning condition, normal operation of the unit will continue unimpeded. A warning can indicate an operating condition that warrants observation and may require preventative maintenance.

Figure 93 Warning screen

Emerson 540VDC — 8.2 Warnings diagram (page 91)
Fig. 91 · 8.2 Warnings

More information Button (F5) Warning Status Message

The Warning condition is indicated by the System Status field displaying “WARNING” in the Control Panel window (see Figure 93). If one Warning is present, the Warning Label (see Table 15.) will be displayed.

While the Warning condition exists, and if more than one Warning is present, F5 the “More Info” key will be enabled in the Control Panel window. If pressed, the separate Warning Labels will be dis- played in the Control Panel window.

Any of eight warnings could occur while the Liebert FS is operating. Warnings give advance alert of potential problems and schedule service and preventive maintenance. These can be monitored and investigated through the use of data from the Control Panel and system tests.

Troubleshooting

Page 92 of the Emerson 540VDC user manual — AUXPOWER LOW
Page 92 · click to enlarge
Page 92

Table 15 lists the warnings and some troubleshooting steps that may be taken if any of the Warnings in appear.

Auxiliary power supply is low when the system is not in OFF mode. Factory-configurable warning

AUXPOWER LOW

Check / Test Auxiliary power supply

VACUUM LOW Drag power exceeds 85W * Check Vitals and Vacuum History

MISER HIGH Miser voltage is higher than 2V Calibrate board

RUNOUT HIGH Runout is higher than 2.0 mil.* Check Vitals and Runout History

PWR SPLY VOLT LOW Power supply for PPMC/PCMC is lower than 21V. Power supply for PPMC/PCMC is lower than 21V

VIB INOPERATIVE VIB inoperative while enabled Check VIB cable connections and wiring

OVERSPEED Speed is higher than the Max Speed Have Certified Service personnel check software settings

SET TIME/ DATE Time and date have not been set Set Time/Date in Menu>View>Time/Date

* Warnings of this nature should be monitored and may be used to schedule preventive maintenance.

If Warnings persist, contact your local Liebert representative or contact Liebert Services at 800-543- 2378. You may also visit the Liebert Web site for information at www.liebert.com.

Troubleshooting · Table 15 Warnings

Page 93 of the Emerson 540VDC user manual — 8.3 Faults
Page 93 · click to enlarge
Page 93

8.3 Faults

A Fault is defined as an undesirable system operating condition that could cause further damage to the system or potentially drop the load. Once detected, Faults may trigger an appropriate emergency action such as shutting the unit down. Most Fault conditions are automatically taken care of by the Liebert FS control system and require no Operator intervention. A few Fault conditions may be resolved only through operator intervention or service by a Liebert technician.

A Fault condition must be valid for a certain amount of time before it is recognized as an active Fault. This prevents spurious signals from causing false Fault detection and unnecessary state changes. Figure 93 shows the appearance of an active Fault on the main screen.

Figure 94 Fault screen descriptions

Emerson 540VDC — 8.3 Faults diagram (page 93)
Fig. 92 · 8.3 Faults

More information Button (F5)

Fault Clear Button (F3)

While in Fault condition, normal operation of the unit is suspended, the operation of the Power Con- version Module is paused, and the unit transitions into FAULT Mode, where it waits for one of the fol- lowing to occur:

1. The condition to clear the fault [AUTO CLEAR] 2. The unit to automatically transition in SHUTDOWN Mode [AUTO SHUTDOWN] 3. Operator action [OPERATOR CLEAR].

The Fault condition is indicated by the System Mode displaying “FAULT” in the Control Panel win- dow.

If there are multiple Fault conditions present, the F5 “More Info” key will be enabled in the Control Panel window. If pressed, information related to the specific Faults will be displayed in the Control Panel window (see Figures 54 through 56). If there are multiple faults they will both be displayed by pressing the F5 “MORE” button.

In many cases, when FAULT Mode is entered, the Fault may be cleared by pressing the F3 “CLEAR FAULT” button on the Control Panel or utilizing the VIB option - if enabled - to send a “CLEAR FAULT” signal to the system. In order to “CLEAR FAULT” the operator must be in proper security access level; User or above. Table 16 describes the fault labels, meanings and possible causes for the

Troubleshooting · Fault Status Message · Bus Power

Page 94 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 94 · click to enlarge
Page 94

Faults. Table 17 - Troubleshooting describes actions that may alleviate the condition or provide valuable information for technical support.

Table 16 Faults—causes and responses

Fault Label Meaning / Possible Causes

GROUND FAULT Ground fault current out of range. X

HW BUS OV HW overvoltage. (hardware protection) X

X PHASE OC AC phase overcurrent. x = A, B, C. X

IGBT OVRTEMP IGBT overtemperature. X

VACUUM FAULT Drag power exceeds 125W. X

RUNOUT FAULT Runout higher than 2.9mil. X

MISER FAULT Miser voltage is higher than 5V. X

BEARING Magnetic bearing fault. X

AUX POWER LOW Auxiliary power supply voltage is low when the system is in Off mode. Configurable fault. X

INTER PRCR COMM Communication error with secondary DSP. System reboots. X

PWR SPLY VOLT Power supply voltage is lower than 19V. (Speed dependent; auto shutdown at high speed) X X

UNDEF PDP INT Undefined PDP interrupt. X

CURRENT OFFSET AC motor current sensor error. X

SW OV DC bus voltage is higher than the threshold, which is service-configurable. X

CHECKSUM Calculated checksum does not match the stored checksum. S

CONTACTOR TIME OUT Bus voltage/current is not stable while trying to close or open contactor. X

CONTACTOR CLOSE FAIL Contactor failed to close on startup. X

FAN OPEN Fan open circuit or disconnected. X

FAN SHORT Fan short circuit. X

PUMP OPEN Pump open circuit or disconnected. X

PUMP SHORT Pump short circuit. X

HW OVERSPEED Hardware detected overspeed. X

PRECHARGE PROTECTION Stop PWM when large voltage differential exists

between internal and external bus. X

BUS CURRENT OFFSET DC current sensor error. X

S - Indicates a Certified Service Provider will be required to reset system.

Faults that initiate an AUTOSHUTDOWN include: MISER, RUNOUT, PWR SPLY VOLT (at high speed), and will require Service level and higher to reset.

Show 5 more labels / short text on this page
Troubleshooting · Operator · Auto Clear · Auto Shutdown · Clear*
Page 95 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 95 · click to enlarge
Page 95

Fault messages displayed can, in some cases, be investigated for a solution. Listed below in Table 17 are troubleshooting steps for the Fault messages that can occur.

Fault Label Troubleshooting Action

GROUND FAULT Contact Service provider. Schedule service.

HW BUS OV Check DC bus voltage at UPS and adjust as necessary to within threshold.

X PHASE OC Check IGBT, resistor diodes.

IGBT OVRTEMP Check cooling pump, test pump and fans.

VACUUM FAULT Check in History, Vitals, collect data, contact Certified Service Provider.

RUNOUT FAULT Check in History, Vitals, collect data, contact Certified Service Provider.

MISER FAULT Check calibration in Tools.

BEARING Contact Service provider. Schedule service.

AUX POWER LOW Check and test Auxiliary Power module.

INTER PRCR COMM Contact Service provider. Schedule service.

PWR SPLY VOLT Check data in Menu>View>Electrical.

UNDEF PDP INT Contact Service provider. Schedule service.

CURRENT OFFSET Contact Service provider. Schedule service.

SW OV Contact Service provider. Schedule service.

CHECKSUM Contact Service provider. Schedule service.

CONTACTOR TIME OUT Check DC bus voltage at UPS and adjust as necessary to within threshold.

CONTACTOR CLOSE FAIL Check DC bus voltage at UPS and adjust as necessary to within threshold.

FAN OPEN Check fan connections.

FAN SHORT Check fan.

PUMP OPEN Check pump connections.

PUMP SHORT Check pump.

HW OVERSPEED Contact Service provider. Schedule service.

PRECHARGE PROTECTION Contact Service provider. Schedule service.

BUS CURRENT OFFSET Check bus voltages, contact service provider to calibrate settings.

Refer to the general drawings in Appendix D.0 - Installation Drawings for the location of system components.

If a Fault condition persists contact your Liebert technician. You may also visit the Liebert Web site at www.liebert.com for information.

Troubleshooting · Table 17 Troubleshooting

Page 96 of the Emerson 540VDC user manual — Appendix A.1 Wiring Connections
Page 96 · click to enlarge
Page 96

A PPENDIX A.0UPS I NTERCONNECTION K ITS

Your Liebert FS is equipped with a UPS interconnection kit to connect it to one of these Liebert UPS systems:

  • Liebert Series 610™, 600T™ or 600™
  • Liebert Npower™
  • Liebert Series 300™
  • Liebert HiPulse™ The Liebert FS system must be installed according to the instructions in 4.0 - Installation . Integrate your Liebert FS system into an Uninterruptible Power Supply (UPS) system in accordance with the instructions and drawings in this manual.

! CAUTION The initial system startup must be performed ONLY under the supervision of a Liebert-certified service technician to ensure proper system operation. Failure to abide by instructions provided herein may void your warranty. Contact your local Liebert sales representative or Liebert Services at 1-800-LIEBERT to arrange for system startup.

Table 18 Key to UPS model interconnection

Liebert FS Model # Use With Liebert UPS

25FS Liebert Series 300

39FS Liebert Series 610/600T/600

Contact Liebert Liebert NXL

Contact Liebert Liebert NX

Contact Liebert Liebert HiPulse (50Hz European Model)

Appendix A.1 Wiring Connections

Appendix A.1.1 General Wiring Considerations

! CAUTION A qualified electrical contractor must perform all electrical connections. The wires (DC power, ground, optional status/control and auxiliary backup power) that connect the Liebert FS system(s) to the UPS system are field-supplied or, as an option, by Liebert. Wire size and installation must comply with all applicable local, regional and national regulations (e.g., National Electric Code for USA).

The electrical connections to the Liebert FS are:

  • DC power
  • Status/control
  • Ground
  • Auxiliary backup power
  • Remote monitoring (optional)

Instructions for installing ground, auxiliary backup power and remote monitoring connections are in 4.0 - Installation.

UPS Interconnection Kits · 37FS Liebert Npower

Page 97 of the Emerson 540VDC user manual — ! CAUTION Power and status/control wiring must be separated
Page 97 · click to enlarge
Page 97

Power and status/control wiring must be run in separate conduits or cable trays. Refer to Appendix D.0 - Installation Drawings for locations of the various electrical connections between Liebert FS system(s) and UPS system.

! CAUTION Power and status/control wiring must be separated

Figure 95 Top view of Liebert FS Cabinet with UPS interconnection kit

Emerson 540VDC — ! CAUTION Power and status/control wiring must be separated diagram (page 97)
Fig. 93 · ! CAUTION Power and status/control wiring must be se…

! CAUTION Do not cut entry holes for conduit while the access plates are still set on the top of the Liebert FS cabinet. Remove the access plates from the cable-access areas in the top of the Liebert FS cabinet prior to cutting entry holes.

! CAUTION After reinstalling access plates, be certain that no foreign matter (metal shavings, insulation or wire fragments, etc.) remains inside the Liebert FS. Likewise, be certain to block any “extra holes” in the plates through which foreign matter (or rodents) could later enter the Liebert FS.

UPS Interconnection Kits

Page 98 of the Emerson 540VDC user manual — Circuit Breaker Torque
Page 98 · click to enlarge
Page 98

Appendix A.1.2 DC Power Connections

The DC power connections to the Liebert FS are made through the circuit breaker (see Figure 96) in the UPS interconnection kit installed in your Liebert FS. The maximum wire size for the circuit breaker terminals is 350MCM - 600VDC (approximate metric equivalent: 150mm2 wire section). Wire size and installation must comply with all applicable local, regional and national regulations (e.g., National Electric Code for USA).

Figure 96 Circuit breaker

Emerson 540VDC — Appendix A.1.2 DC Power Connections diagram (page 98)
Fig. 94 · Appendix A.1.2 DC Power Connections

Liebert FS Positive Terminal

Liebert FS Negative Terminal

The Liebert FS cabinet is configured for top entry cables in standard configuration. The cables can also be run through the side panels. The Liebert FS cabinet does not accommodate bottom entry cables.

The connection of the circuit breaker is described in Figure 135 - Elevation drawing—Liebert FS cabinet with integrated circuit breaker. Refer to this drawing to ensure that the adequate con- nections are performed.

Circuit Breaker Torque

Tighten the positive and negative terminals of the DC power connections on the circuit breaker to 250 in-lb. (29 N-m) unless the equipment is labeled with a different torque value.

UPS Interconnection Kits

Page 99 of the Emerson 540VDC user manual — Appendix A.2.1 Description - Liebert Series 610/600T/600 UPS Interconnection Kit
Page 99 · click to enlarge
Page 99

Appendix A.2 Installing the Liebert FS With a Liebert Series 610, Liebert Series 600T or

Liebert Series 600

The Liebert Series 610/600T/600 UPS interconnection kit for the Liebert FS is compatible with the Liebert Series 610, Liebert Series 600T and Liebert Series 600 models in Table 19.

Table 19 Liebert Series 610/600T/600 model ratings

kVA 65 80 100 125 150 225 300 400 400 450 500 500 625 750 750 1,000

kW 52 64 80 100 120 180 240 320 360 360 400 450 500 600 675 900

Figure 97 Liebert Series 610 225kVA UPS

Emerson 540VDC — Liebert Series 600 diagram (page 99)
Fig. 95 · Liebert Series 600

Appendix A.2.1 Description - Liebert Series 610/600T/600 UPS Interconnection Kit

The Liebert Series 610/600T/600 UPS interconnection kit for the Liebert FS is composed of:

One Thermal-Magnetic Molded Case circuit breaker rated for 250 ADC - 600VDC equipped with:

  • An undervoltage relay (UVR) rated for 48VDC, 50 mA
  • Auxiliary contacts: Normally Open (NO) and Normally Closed (NC).

One Status/Control Terminal Block used to ensure the status/control connections between the Liebert FS and the Liebert Series 610/600T/600.

Show 4 more labels / short text on this page
UPS Interconnection Kits · UPS Output Rating · DC Power Interface · Status/Control Interface
Page 100 of the Emerson 540VDC user manual — B
Page 100 · click to enlarge
Page 100

Appendix A.2.2 Status/Control Connections - Liebert Series 610/600T/600 UPS Interconnection Kit

The status/control interface is the Status/Control Terminal Block. The connection of the Status/Con- trol Terminal Block is described in Figure 137 - Control wiring diagram—Liebert FS cabinet - manually operated circuit breaker. Refer to this drawing to ensure that proper connections are performed. In case multiple Liebert FS units are connected to the same UPS DC bus, refer to Figure 129 - Control wiring—external interconnect diagram, Liebert FS cabinet to Liebert Series 610 UPS module to perform the Status/Control connections between each Liebert FS.

This interconnection kit includes Status/Control Connections that enable transfer of signals between the Liebert FS system(s) and the UPS system such as:

  • Circuit breaker status (closed/open); and
  • Undervoltage relay coil excitation voltage.

Figure 98 Liebert Series 610/600T/600 status/control terminal block wiring

B

B

B

l l o w

l u e Yellow/

Emerson 540VDC — B diagram (page 100)
Fig. 96

Row for installation of contractor wire

4 2 3 5 7 8 9 6 1 10

The recommended gauge for Status/Control connection wires is 16 AWG - 600VDC (1.3mm2 wire sec- tion). Wire size and installation must comply with all applicable local, regional and national regula- tions (e.g., National Electric Code for USA).

Appendix A.2.3 UPS Configuration - Liebert FS and Liebert Series 610, 600T or 600

To optimize the integration between the Liebert Series 610/600T/600 UPS system and the Liebert FS, some parameters must be checked on the UPS system:

  • The UPS rectifier walk-in time must be set as short as possible. Contact your Liebert representative if your unit has received the upgraded board that enables the setting of “rectifier walk-in time” lower than standard.
  • Ensure that the “auto battery self test” has either been disabled or upgraded to accommodate Liebert FS integration.
Show 8 more labels / short text on this page
UPS Interconnection Kits · Y e · r o w · r o w · n · n · connections · Two rows
Page 101 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 101 · click to enlarge
Page 101

Appendix A.2.4 Liebert FS Configuration - Single Liebert FS on Liebert Series 610/600T/600 DC Bus

The following Software Control Parameters must be set when the Liebert FS is connected to the DC bus of the Liebert Series 610/600T/600 UPS system.

Instructions to set these parameters on the Liebert FS are in 6.5.3 - Control Parameters Setup at Initial System Startup.

Table 20 Liebert FS Software Control Parameter settings

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 101)
Fig. 97 · 5.1.7 Magnetic Levitation Module (MLM)

Table 21 Liebert FS Software Control Parameters varying with UPS size

UPS Output Rating (kVA) 65 80 100 125 150

Liebert FS Maximum Charge Current (A) 25 31 39 49 50

Liebert FS Charge Amps/Volts (A/V) 1.7 2.1 2.6 3.3 3.4

Appendix A.2.5 Liebert FS Configuration - Multiple Liebert FS Units on Liebert Series 610/600T/600 DC Bus

The Liebert FS Software Control Parameters must be reset when multiple Liebert FS units are con- nected in parallel on the DC bus of a Liebert Series 610/600T/600 UPS system.

Instructions to set these parameters on the Liebert FS are in 6.5.3 - Control Parameters Setup at Initial System Startup.

Multiple Liebert FS Parallel Operation - Regular Configuration with Liebert Series 610/ 600T/600

The Liebert FS Software Control Parameters must be reset when multiple Liebert FS units are con- nected in parallel on the DC bus of a Liebert Series 610/600T/600 UPS system for proper operation with longer run times or higher backup power requirements. The Liebert FS units will contribute all together at the same time to the task of supporting the UPS DC bus.

UPS Interconnection Kits

Page 102 of the Emerson 540VDC user manual — Appendix A.3.1 Description - Liebert Npower UPS Interconnection Kit
Page 102 · click to enlarge
Page 102

Appendix A.3 Installing the Liebert FS With a Liebert Npower UPS

The Liebert Npower UPS interconnection kit for the Liebert FS is compatible with the Liebert Npower models in Table 22.

Table 22 Liebert Npower model ratings

kVA 30 40 50 65 80 100 130

kW 24 32 40 52 64 80 104

Figure 99 Liebert FS integrated into a Liebert Npower UPS system

Emerson 540VDC — Appendix A.3 Installing the Liebert FS With a Liebert Npower UPS diagram (page 102)
Fig. 98 · Appendix A.3 Installing the Liebert FS With a Lieber…

Appendix A.3.1 Description - Liebert Npower UPS Interconnection Kit

The Liebert Npower UPS interconnection kit for the Liebert FS is composed of:

One Thermal-Magnetic Molded Case circuit breaker rated for 250 ADC - 600VDC equipped with:

  • An undervoltage relay (UVR) rated for 24VDC, 50 mA
  • Auxiliary contacts: Normally Open (NO) and Normally Closed (NC).

One Liebert Npower Battery Information Board (BIB). This board is used to ensure the status/ control connections between the Liebert FS and the Liebert Npower.

Show 7 more labels / short text on this page
UPS Interconnection Kits · UPS Output · Rating · Liebert FS · Liebert Npower UPS · DC Power Interface · Status/Control Interface
Page 103 of the Emerson 540VDC user manual — Appendix A.3.4 Liebert FS Configuration - Single Liebert FS Unit
Page 103 · click to enlarge
Page 103

Appendix A.3.2 Status/Control Connections - Liebert Npower UPS Interconnection Kit

The status/control interface is the Liebert Npower Battery Information Board (BIB). The connection of the BIB is described in Figure 140 - Control wiring diagram—Liebert FS - optional electri- cally operated circuit breaker Liebert Npower units. Refer to this drawing to ensure that the proper connections are performed. In case multiple Liebert FS units are connected to the same UPS DC bus, refer to Figure 132 - Control wiring diagram, Liebert FS power rack system in paral- lel for capacity to perform the Status/Control connections between each Liebert FS.

This interconnection kit includes Status/Control Connections that enable transfer of signals between the Liebert FS system(s) and the UPS system such as:

  • Circuit breaker status (closed/open); and
  • Undervoltage relay coil excitation voltage.

The recommended gauge for status/control connection wires is 16 AWG - 600VDC (1.3mm2 wire sec- tion). Wire size and installation must comply with all applicable local, regional and national regula- tions (e.g., National Electric Code for USA).

Appendix A.3.3 UPS Configuration - Liebert FS and Liebert Npower

To optimize the integration between the Liebert Npower UPS system and the Liebert FS, some parameters must be checked on the UPS system:

  • The UPS rectifier walk-in time must be set at a value as low as possible. Contact your Liebert representative if your unit has received the upgraded board that permits the setting of “rectifier walk-in time” lower than standard.
  • Ensure that the “auto battery self test” has either been disabled or upgraded to accommodate Liebert FS integration.

Appendix A.3.4 Liebert FS Configuration - Single Liebert FS Unit

The following Software Control Parameters must be set when the Liebert FS is connected to the DC bus of the Liebert Npower UPS system.

Table 23 Liebert FS Software Control Parameters

Liebert FS Software Control Parameter Setting

Maximum Charge Current See Table 24

Charge Amps/Volts See Table 24

Table 24 Liebert FS Software Control Parameters varying with UPS size

UPS Output Rating (kVA) 30 40 50 65 80 100 130

Liebert FS Maximum Charge Current (A) 11 15 19 25 31 38 50

Liebert FS Charge Amps/Volts (A/V) 0.8 1.0 1.3 1.7 2.1 2.6 3.4

Show 4 more labels / short text on this page
UPS Interconnection Kits · Charge Voltage 530VDC · Regulation Voltage 520VDC · Vreg Delta 0VDC
Page 104 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 104 · click to enlarge
Page 104

Appendix A.3.5 Liebert FS Configuration - Multiple Liebert FS Units on Liebert Npower DC Bus

Liebert FS Software Control Parameters must be reset when multiple Liebert FS units are connected in parallel on the DC bus of a Liebert Npower UPS system for proper operation with longer run times or higher backup power requirements.

Instructions to set these parameters on the Liebert FS are in 6.5.3 - Control Parameters Setup at Initial System Startup.

UPS Interconnection Kits

Page 105 of the Emerson 540VDC user manual — Appendix A.4.1 Description - Liebert Series 300 UPS Interconnection Kit
Page 105 · click to enlarge
Page 105

Appendix A.4 Installing the Liebert FS With a Liebert Series 300 UPS

The Liebert Series 300 UPS interconnection kit for the Liebert FS is compatible with the Liebert Series 300 models in Table 25.

Table 25 List of Liebert Series 300 models ratings

kVA 10 15 20 30 40 50 65 75 100 125

kW 8 12 16 24 32 40 52 60 80 100

Figure 100 Liebert Series 300 UPS

Emerson 540VDC — Appendix A.4 Installing the Liebert FS With a Liebert Series 300 UPS diagram (page 105)
Fig. 99 · Appendix A.4 Installing the Liebert FS With a Lieber…

Appendix A.4.1 Description - Liebert Series 300 UPS Interconnection Kit

The Liebert Series 300 UPS interconnection kit for the Liebert FS is composed of:

One Thermal-Magnetic Molded Case circuit breaker rated for 250 ADC - 600VDC equipped with:

  • An undervoltage relay (UVR) rated for 24VDC, 50 mA
  • Auxiliary contacts: Normally Open (NO) and Normally Closed (NC).

One status/control terminal Block used to ensure the status/control connections between the Liebert FS and the Liebert Series 300.

Show 4 more labels / short text on this page
UPS Interconnection Kits · UPS Output Rating · DC Power Interface · Status/Control Interface
Page 106 of the Emerson 540VDC user manual — Appendix A.4.3 UPS Configuration - Liebert FS and Liebert Series 300
Page 106 · click to enlarge
Page 106

Appendix A.4.2 Status/Control Connections - Liebert Series 300 UPS Interconnection Kit

The status/control interface is the Status/Control Terminal Block. The connection of the Status/Con- trol Terminal Block is described in the Figure 137 - Control wiring diagram—Liebert FS cabi- net - manually operated circuit breaker. Refer to this drawing to ensure that the adequate connections will be performed. If multiple Liebert FS units are connected to the same UPS DC bus, refer to Figure 129 - Control wiring—external interconnect diagram, Liebert FS cabinet to Liebert Series 610 UPS module to perform the Status/Control connections between each Liebert FS.

This interconnection kit includes status/control connections that enable transfer of signals between the Liebert FS system(s) and the UPS system such as:

  • Circuit breaker status (closed/open); and
  • Undervoltage relay coil excitation voltage

Figure 101 Liebert Series 300 status/control terminal block wiring

B

B

B

l l o w

l u e Yellow/

Emerson 540VDC — B diagram (page 106)
Fig. 100

Row for installation of contractor wire

4 2 3 5 7 8 9 6 1 10

The recommended gauge for status/control connection wires is 16 AWG - 600VDC (1.3mm2 wire sec- tion). Status/Control wires must be sized and installed in compliance with all applicable local, regional and national regulations (e.g., National Electric Code for USA).

Appendix A.4.3 UPS Configuration - Liebert FS and Liebert Series 300

To optimize the integration between the Liebert Series 300 UPS system and the Liebert FS, some parameters must be checked on the UPS system:

  • The UPS rectifier walk-in time must be set at a value as low as possible. Contact your Liebert representative if your unit has received the upgraded board that enables the setting of “rectifier walk-in time” lower than standard.
  • Ensure that the “auto battery self test” has been either disabled or upgraded to accommodate Liebert FS integration.
Show 8 more labels / short text on this page
UPS Interconnection Kits · Y e · r o w · r o w · n · n · connections · Two rows
Page 107 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 107 · click to enlarge
Page 107

Appendix A.4.4 Liebert FS Configuration - Single Liebert FS on Series 300 DC Bus

The following Software Control Parameters must be reset when the Liebert FS is connected to the DC Bus of the Liebert Series 300 UPS system.

Instructions to set these parameters on the Liebert FS are in 6.5.3 - Control Parameters Setup at Initial System Startup.

Table 26 Liebert FS Software Control Parameter settings

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 107)
Fig. 101 · 5.1.7 Magnetic Levitation Module (MLM)

Table 27 Liebert FS Software Control Parameters varying with UPS size

UPS Output Rating (kVA) 10 15 20 30 40 50 65 75 100 125

Liebert FS Maximum Charge Current (A) 5 8 10 16 21 26 34 39 50 50

Liebert FS Charge Amps/Volts (A/V) 0.7 1.1 1.4 2.1 2.8 3.5 4.5 5.2 6.7 6.7

Appendix A.4.5 Liebert FS Configuration - Multiple Liebert FS Units on Liebert Series 300 DC Bus

Liebert FS Software Control Parameters must be reset when multiple Liebert FS units are connected in parallel on the DC bus of a Liebert Series 300 UPS system for proper operation with longer run times or higher backup power requirements.

Instructions to set these parameters on the Liebert FS are in 6.5.3 - Control Parameters Setup at Initial System Startup.

UPS Interconnection Kits

Page 108 of the Emerson 540VDC user manual — B
Page 108 · click to enlarge
Page 108

Appendix A.5 Installing the Liebert FS With a Liebert HiPulse UPS

The Liebert HiPulse UPS interconnection kit for the Liebert FS is compatible with the Liebert HiPulse™ models in Table 28.

Table 28 Liebert HiPulse model ratings

Emerson 540VDC — Appendix A.5 Installing the Liebert FS With a Liebert HiPulse UPS diagram (page 108)
Fig. 102 · Appendix A.5 Installing the Liebert FS With a Lieber…

kVA 80 120 160 200 300 400 500 600 800

kW 64 96 128 160 240 320 400 480 640

Appendix A.5.1 Description—HiPulse UPS Interconnection Kit

HiPulse UPS interconnection kit is composed of:

One Thermal-Magnetic Molded Case circuit-breaker rated for 250 ADC, 600VDC equipped with auxiliary contacts: two (2) sets of Normally Open (NO) and Normally Closed (NC).

One Status/Control Terminal Block used to ensure the status/control connections between the Liebert FS and the Liebert HiPulse.

Appendix A.5.2 Status/Control Connections—Liebert HiPulse UPS Interconnection Kit

The status/control interface of the IKIT-A05 is the Status/Control Terminal Block. The connection of the Status/Control Terminal Block is illustrated in Figure 102. Please refer to this drawing to ensure that the proper connections are made. In case multiple Liebert FS units are connected to the same UPS DC bus, please refer to Figure 144 to perform the Status/Control connections between each Liebert FS.

This IKIT includes Status/Control Connections that enable transfer of “IKIT circuit-breaker status (closed/open)” signals between the Liebert FS system(s) and the UPS system.

Figure 102 Liebert HiPulse status/control terminal block wiring

B

l l o w Yellow/

B

l l o w

Emerson 540VDC — B diagram (page 108)
Fig. 103

Row for installation of contractor wire

4 2 3 5 7 8 9 6 1 10

The recommended gauge for Status/Control Connection wires is 16 AWG – 600 VDC (approximate metric equivalent: 1.3 mm² wire section). All wiring must comply with all applicable local, regional, national regulations.

Show 8 more labels / short text on this page
UPS Interconnection Kits · DC Power Interface · Status/Control Interface · Y e · Y e · l u e · l u e · connections
Page 109 of the Emerson 540VDC user manual — Appendix A.5.4 UPS Configuration—Liebert FS and Liebert HiPulse
Page 109 · click to enlarge
Page 109

Appendix A.5.3 IKIT-A05 DC Power Connections

The DC power connections to the Liebert FS are made through the circuit-breaker (see Figure 103) in the IKIT-A05. The minimum wire size to be used is 1/0 AWG - 600VDC wire (54 mm2 wire section). The maximum wire size for the circuit-breaker terminals is 350MCM – 600VDC (150 mm2 wire sec- tion). All wiring must comply with all applicable local, regional, national regulations. Use copper con- ductors only, rated minimum 140°F (60°C).

Figure 103 Circuit-breaker (open door and cabinet faceplate removed)

Emerson 540VDC — Appendix A.5.3 IKIT-A05 DC Power Connections diagram (page 109)
Fig. 104 · Appendix A.5.3 IKIT-A05 DC Power Connections

Liebert FS positive terminal

Liebert FS negative terminal

The Liebert FS cabinet is configured for top entry cables in standard configuration. The cables can also be run through the side panels. The Liebert FS cabinet does not accommodate bottom entry cables.

The connection of the circuit-breaker is described in Figure 135 - Elevation drawing—Liebert FS cabinet with integrated circuit breaker. Refer to this drawing to ensure that the proper connec- tions are made.

Circuit Breaker Torque

Tighten the positive and negative terminals of the DC power connections on the circuit breaker to 250 in-lb. (29 N-m) unless the equipment is labeled with a different torque value.

Appendix A.5.4 UPS Configuration—Liebert FS and Liebert HiPulse

To optimize the integration between the interconnected UPS system and the Liebert FS, some param- eters must be checked on the UPS system:

  • The UPS rectifier walk-in time must be set at a value as low as possible. Please check with your UPS Manufacturer representative if your unit has received the upgraded board that enables the setting of “rectifier walk-in time” lower than standard.
  • Check that the “auto battery self test” has either been disabled or upgraded to accommodate Liebert FS integration.

UPS Interconnection Kits

Page 110 of the Emerson 540VDC user manual — Appendix A.5.5 Single Liebert FS on UPS DC Bus
Page 110 · click to enlarge
Page 110

Appendix A.5.5 Single Liebert FS on UPS DC Bus

The following Liebert FS Software Control Parameters must be set when a single Liebert FS is con- nected alone on the DC bus of the Liebert HiPulse UPS system.

Instructions on setting these parameters on the Liebert FS are found in 6.5.3 - Control Parameters Setup at Initial System Startup.

Table 29 Liebert FS Software Control Parameter settings

Liebert FS Software Control Parameter Setting

Charge Voltage 436 VDC

Regulation Voltage 426 VDC

Vreg Delta 0 VDC

Maximum Charge Current See Table 30

Charge Amps/Volts See Table 30

Table 30 Liebert FS Software Control Parameters varying with UPS size

UPS Output Rating (kVA) 80 120

Liebert FS Maximum Charge Current (A) 39 50

Liebert FS Charge Amps/Volts (A/V) 4 5

Appendix A.5.6 Single Liebert FS in Parallel with Battery Pack on UPS DC Bus

The following Software Control Parameters must be reset when the Liebert FS is connected in paral- lel with a battery pack on the DC bus of the Liebert Hipulse UPS system.

Instructions on setting these parameters on the Liebert FS are found in 6.5.3 - Control Parameters Setup at Initial System Startup.

Table 31 Liebert FS Software Control Parameter settings

Liebert FS Software Control Parameter Setting

Charge Voltage 436 VDC

Regulation Voltage 426 VDC

Vreg Delta 0 VDC

Maximum Charge Current See Table 32

Charge Amps/Volts See Table 32

Table 32 Liebert FS Software Control Parameters varying with UPS size

UPS Output Rating (kVA) 80 120

Liebert FS Maximum Charge Current (A) 39 50

Liebert FS Charge Amps/Volts (A/V) 4 5

UPS Interconnection Kits

Page 111 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 111 · click to enlarge
Page 111

Appendix A.5.7 Liebert FS Configuration – Multiple Liebert FS Units Liebert FS Software Control Parameters must be reset when multiple Liebert FS units are connected in parallel on the DC bus of a Liebert HiPulse™ UPS system. Instructions to set these parameters on the Liebert FS are found in 6.5.3 - Control Parameters Setup at Initial System Startup.

Multiple Liebert FS Parallel Operation—Regular Configuration Liebert FS Software Control Parameters must be reset when multiple Liebert FS units are connected in parallel on the DC bus of a Liebert HiPulse™ UPS system for proper operation with longer run times or higher backup power requirements. The Liebert FS units will contribute all together at the same time to the task of supporting the UPS DC bus. Instructions on setting these parameters on the Liebert FS are found in 6.5.3 - Control Parameters Setup at Initial System Startup.

UPS Interconnection Kits

Page 112 of the Emerson 540VDC user manual — Appendix B.2 DCM Installation and Configuration
Page 112 · click to enlarge
Page 112

A PPENDIX B.0D ATA C OLLECTION M ODULE

Appendix B.1 General Information

Appendix B.1.1 Overview

The Data Collection Module (DCM) is designed to provide real-time data monitoring and data storage for the Liebert FS. The DCM collects data on virtually every event that occurs in the Liebert FS. Data such as speed, temperature and voltage are just a few of the data points that the DCM will be collect- ing and storing on its internal memory card. The DCM has an HTML interface, which means any Internet browser, such as Internet Explorer or Netscape, is all that is required to access the Liebert FS data.

Appendix B.1.2 Features

The DCM comes equipped with four (4) RS-232 communication ports and a 10/100 Base-T RJ-45 port. The DCM runs on the Linux operating system, which resides on the internal compact flash memory card. Dynamic Host Configuration Protocol (DHCP) has been enabled on the DCM to allow easy inte- gration with an existing network.

Appendix B.2 DCM Installation and Configuration

Appendix B.2.1 Installation

The DCM has been installed at the front of the Liebert FS inside the door on the service panel and has been securely mounted adjacent to the AC auxiliary fused disconnect. The power cable and the serial communication cable have been connected at the factory as seen in Figure 104.

The DCM has been installed on the inside door of the Liebert FS and has been securely mounted adja- cent to the Control Panel. The power cable and the serial communication cable have been connected at the factory as seen in Figure 104.

Figure 104 Data Collection Module location, features

DCM Power and Serial Connections

Serial Connections Ethernet Port

Emerson 540VDC — Appendix B.2 DCM Installation and Configuration diagram (page 112)
Fig. 105 · Appendix B.2 DCM Installation and Configuration

Data Collection Module · Fused Disconnect · Power Connection

Page 113 of the Emerson 540VDC user manual — Appendix B.2.2 DCM Requirements
Page 113 · click to enlarge
Page 113

Appendix B.2.2 DCM Requirements

The Data Collection Module requires a connection to an existing network via an Ethernet cable. An RJ-45 jack is built directly into the bottom of the faceplate of the DCM and located adjacent to the power supply connection. The DCM may also be connected via modem through COM2 serial port.

By connecting to your existing network with an Ethernet cable, you will be able to access the DCM via your Internet browser. Figure 105 displays the LAN connection, which is located on the bottom side of the DCM.

Figure 105 DCM LAN connection

Emerson 540VDC — Appendix B.2.2 DCM Requirements diagram (page 113)
Fig. 106 · Appendix B.2.2 DCM Requirements

DHCP is enabled at the factory. A connected DHCP Server automatically assigns an IP Address to the DCM. To confirm that the DCM is enabled and operative, check the Liebert FS Control Panel. From the Main Menu Screen, select number 2 “View” screen.

Figure 106 Options view

Emerson 540VDC — Appendix B.2.2 DCM Requirements diagram (page 113)
Fig. 107 · Appendix B.2.2 DCM Requirements
1. TIME/DATE 2. TEMPERATURES 3. VOLTAGES 4. HISTORY 5. OPTIONS

Select the number 5 “Options” screen to view the current status of the options. To enable or disable this option, select and press the number 1 for the DCM option. To exit this screen, press the F6 or “Done” key.

Figure 107 Enable or disable DCM

Emerson 540VDC — Appendix B.2.2 DCM Requirements diagram (page 113)
Fig. 108 · Appendix B.2.2 DCM Requirements

Data Collection Module

Page 114 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 114 · click to enlarge
Page 114

To view the Network settings return to the View menu and press number 6 “Network”. The Network view screen displays the network addresses coming from the DCM. Static address settings can be entered using the keypad into this screen. The Network screen will show the assigned IP Address, Default Gateway, Subnet Mask and DNS Server.

Figure 108 Networks view

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 114)
Fig. 109 · 5.1.7 Magnetic Levitation Module (MLM)
DHCPIP ADDRESS: NET MASK: DEFAULT GATEWAY: DNS SERVER:

By entering a Password to access the User or Service level mode you can edit this function. Pressing the EDIT button, F1, will place the system in the edit mode. The DHCP must be disabled or turned Off to proceed with setting IP addresses and other settings. After pressing EDIT you will see up/down arrows next to the DHCP On value. Pressing the up or down arrows on the keypad will allow you to turn this function Off or On.

Figure 109 Networks view, turn off DHCP

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 114)
Fig. 110 · 5.1.7 Magnetic Levitation Module (MLM)
DHCPIP ADDRESS: NET MASK: DEFAULT GATEWAY: DNS SERVER:

Once you have turned DHCP OFF, press EDIT again and now you will see numbers next to each of the settings. Pressing the corresponding number will allow you to enter or change that value. At any time you may press CANCEL to cancel the changes, once changes or entries are complete, press APPLY to complete entry process. Pressing APPLY will reboot system and in a few minutes the sys- tem will display the new screen.

Figure 110 Networks view, edit settings (service level)

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 114)
Fig. 111 · 5.1.7 Magnetic Levitation Module (MLM)
1. DHCP: 2. IP ADDRESS: 3. NET MASK: 4. DEFAULT GATEWAY: 5. DNS SERVER:

Data Collection Module

Page 115 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 115 · click to enlarge
Page 115

Appendix B.2.3 Accessing the DCM From a personal computer connected to the same network as the DCM, enter the IP Address of the DCM, assigned by the LAN network server or manually configured, into the address line of the Inter- net browser to gain access to the DCM as seen in Figure 111.

Figure 111 DCM screen

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 115)
Fig. 112 · 5.1.7 Magnetic Levitation Module (MLM)

The DCM software has a screen menu bar along the top of the page. Three screens may be accessed: STATUS, SETUP and DATAFILES. The screens allow for setup of the DCM and different ways to browse the data recorded by the DCM.

Appendix B.2.4 Configuring DCM System Parameters One of the tabs in the menu bar is the DCM system “Setup” page. This page will allow you to custom- ize your DCM settings. For example, you may want to assign a static IP Address to the DCM. There are seven fields on the Setup page as seen in Figure 112. Enter data in the fields and once you are done with entries, click the Submit button to enter changes or click Reset to reset the DCM. The default Username and Password for setup are “hello” and “hello” respectively. Liebert recom- mends changing both the username and password to prevent unauthorized changes to the system.

Figure 112DCM setup screen

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 115)
Fig. 113 · 5.1.7 Magnetic Levitation Module (MLM)

Data Collection Module · Enter IP Address

Page 116 of the Emerson 540VDC user manual — Appendix B.3.2 Status and Detailed Status Screens
Page 116 · click to enlarge
Page 116
  • Software Version: The current version of the software running on the DCM.
  • Configuration Type: Select from the drop-down menu as to whether it is a Static IP Address or a DHCP server assigned.
  • IPAddress: The IP Address of the DCM
  • Subnet Mask: The Subnet mask of the DCM
  • Gateway: The Gateway of the DCM
  • User: The user name to gain access to the DCM.
  • Password: The password to gain access to the DCM.

If a parameter setting needs to be changed (i.e., dynamic IP to static IP), please consult your network administrator for the correct parameters. To save any changes, click the Submit button. The DCM will automatically reboot itself. You will need to reconnect to the DCM through the browser.

Appendix B.3 DCM Operation

Upon Initial System Startup of the Liebert FS by a Liebert-certified service technician, the DCM will be operational. There is nothing to turn on or configure.

Appendix B.3.1 Logging into the DCM

Enter the IP Address into the address line of the Internet browser to gain access to the DCM as shown in Figure 111. The DCM’s IP Address is described in Appendix B.2 - DCM Installation and Configuration. The first page that appears is the Status Page.

Appendix B.3.2 Status and Detailed Status Screens

The Status page displays various data points from the Liebert FS as shown in Figure 113. Data is refreshed approximately every five (5) seconds.

Figure 113 DCM status screen

Emerson 540VDC — Appendix B.3.2 Status and Detailed Status Screens diagram (page 116)
Fig. 114 · Appendix B.3.2 Status and Detailed Status Screens

The Status page provides basic system operational data, all data normally found on the Main Screen of the system Control Panel, such as Mode, RPM and Power.

The Status screen provides more detailed information on system characteristics, such as Serial No., and performance. This includes real time information on voltages and temperatures in the system.

Data Collection Module

Page 117 of the Emerson 540VDC user manual — Appendix B.3.3 Datafiles Screen
Page 117 · click to enlarge
Page 117

Appendix B.3.3 Datafiles Screen

This screen lists the different files types for viewing and download. There are five files types: F, S, L, A and D.

  • F indicates a fast data packet, containing electrical information such as voltages, amps and watts.
  • S represents a slow packet for measurements collected over a longer period, such as temperatures.
  • L stands for Log files and these contain information on system modes, statuses and commands.
  • A indicates an alarm file and will contain information on any Faults or Warnings recorded.
  • D files indicate a system discharge and allow a user to view the time, duration and amount of Discharge.

Figure 114 Datafiles screen

Emerson 540VDC — Appendix B.3.3 Datafiles Screen diagram (page 117)
Fig. 115 · Appendix B.3.3 Datafiles Screen

Data Collection Module

Page 118 of the Emerson 540VDC user manual — Appendix B.4.2 Resetting the DCM
Page 118 · click to enlarge
Page 118

Appendix B.4 DCM Troubleshooting

Appendix B.4.1 DCM Troubleshooting Principles

There are few circumstances in which the Liebert FS might operate in an unexpected manner. This section explains a few of these circumstances and offers some solutions to such issues.

What You See… What It Means… What To Do…

Ensure that the correct IP address is entered and or check with IT administrator

A gray windows appears in the Web browser when connecting to the DCM

The HTML page is not loading properly

Cannot connect to specified address The DCM is not online or connect to the network

Verify that the Ethernet cable is securely connected to the DCM

Appendix B.4.2 Resetting the DCM

If the DCM requires rebooting, use a small object, such as a paperclip, to press the reset button, shown in Figure 115. The reset button is marked RST. It is adjacent to the RS-232 COM2 Port. The DCM will emit a series of beeps if the DCM is reset. Allow a minimum of 90 seconds for a complete reboot before attempting to connect to the DCM.

Figure 115 Data Collection Module reset button

Emerson 540VDC — Appendix B.4.2 Resetting the DCM diagram (page 118)
Fig. 116 · Appendix B.4.2 Resetting the DCM

Data Collection Module · Table 33 Troubleshooting · Reset Button

Page 119 of the Emerson 540VDC user manual — P/N 11516
Page 119 · click to enlarge
Page 119

A PPENDIX C.0V ERSATILE I NTERFACE B OARD

Appendix C.1 General Information—Versatile Interface Board

Appendix C.1.1 Versatile Interface Board Overview

The Versatile Interface Board (VIB) is designed to provide real-time status feedback and control of the Liebert FS. The VIB has 16 digital outputs (isolated, dry Form C contacts) and three digital inputs (optical isolator) that provide the user with information about the operational mode and state of charge of the Liebert FS, as well as the ability for the user to start the system, stop the system and clear alarms.

The VIB consists of the following components:

  • 12578 - Auxiliary I/O Interface Board
  • 11516 - User Interface Board (UIB)
  • 12781 - Cable Assembly
  • Mounting hardware

Figure 116 shows the two main electrical components of the VIB.

Figure 116 VIB components

P/N 11516

P/N 12578

Emerson 540VDC — P/N 11516 diagram (page 119)
Fig. 117

Versatile Interface Board

Page 120 of the Emerson 540VDC user manual — Appendix C.1.2 VIB Features
Page 120 · click to enlarge
Page 120

Appendix C.1.2 VIB Features

The VIB provides fully isolated inputs and outputs that operate on a wide range of voltages for maxi- mum flexibility. Each I/O is programmed to perform a dedicated function. The specific function of each I/O is listed below in Table 34.

Table 34 VIB I/O functions

I/O Interface VIB Designation Description

1 Output 1 Off1 Mode = Off (RPM < 200)

2 Output 2 Startup Mode = Startup (200 < RPM < 25000)

3 Output 3 Charge Mode = Charge (RPM > 25000)

4 Output 4 SOC >= 0% State of Charge >= 0%

5 Output 5 SOC >= 12.5% State of Charge >= 12.5%

6 Output 6 SOC >= 25% State of Charge >= 25%

7 Output 7 SOC >= 37.5% State of Charge >= 37.5%

8 Output 8 SOC >= 50% State of Charge >= 50%

9 Output 9 SOC >= 62.5% State of Charge >= 62.5%

10 Output 10 SOC >= 75% State of Charge >= 75%

11 Output 11 SOC >= 87.5% State of Charge >= 87.5%

12 Output 12 Ready Mode = Ready (SOC >= 99%)

13 Output 13 Discharge Mode = Discharge

14 Output 14 Shutdown Mode = Shutdown

15 Output 15 Warning Mode = Warning

16 Output 16 Fault Mode = Fault

17 Input 1 Start2 Start Command Issued

18 Input 2 Shutdown2 Shutdown Command Issued

19 Input 3 Clear Fault Clear Fault Command Issued

20 Output 17 Rotor Temp Rotor Temp High

1. The “OFF” signal is also used to indicate if the temperature of the rotor is too warm. If the “OFF” output is asserted while any of the other “Mode” outputs are asserted (STARTUP, CHARGE, SHUTDOWN, DISCHARGE) or while the State of Charge is >= 0%, then the rotor is too warm and must cool before charge resumes. 2. “START” and “SHUTDOWN” inputs are mutually exclusive. If they are asserted simultaneously, both will be ignored.

For reference, the I/O designations are shown in Figure 117. The number of each I/O is also labeled on the circuit board.

Versatile Interface Board

Page 121 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 121 · click to enlarge
Page 121

Figure 117 I/O Designations

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 121)
Fig. 118 · 5.1.7 Magnetic Levitation Module (MLM)

Xxxxxxxxxx xxxxx xxxxxxx xxxxx xxxxxxx xx x xxxx xxxxx xx x xxxxxx xxxxxxxx xxx xxxxx xxxxxxx xx

Versatile Interface Board

Page 122 of the Emerson 540VDC user manual — Appendix C.2.2 VIB Requirements
Page 122 · click to enlarge
Page 122

Appendix C.2 VIB Installation and Configuration

Appendix C.2.1 VIB Installation

The VIB has been installed behind the service panel of the Liebert FS. The power/communications cable has been connected to the Main Control Module at the factory.

Figure 118 Versatile Interface Board mounted in the Liebert FS

Emerson 540VDC — Appendix C.2 VIB Installation and Configuration diagram (page 122)
Fig. 119 · Appendix C.2 VIB Installation and Configuration

Appendix C.2.2 VIB Requirements

The VIB requires software version 2.09 or later to operate properly. To verify the software version, press F6 from the main screen of the display panel. The software version is displayed in the lower left corner of the display. Press F6 when finished.

  • Appendix C.2.3 VIB Input Specifications
  • Opto-isolated inputs, active high.
  • Minimum Trigger Voltage: 3.5V DC (“IN” relative to “COM”).
  • Maximum Operating Voltage: 32V DC (“IN” relative to “COM”).
  • Minimum Input Current: 5mA DC.
  • Inputs must be present for at least 200ms to be recognized as valid signals.
  • Each input has a green status LED to indicate assertion of the signal.
  • Appendix C.2.4 VIB Output Specifications
  • Dry contact Form C relay: Normally Open (NO), Normally Closed (NC) and Common (COM) outputs available.
  • Maximum Contact Resistance: 50m Ω
  • Minimum Insulation Resistance: 100M Ω at 500V DC
  • Maximum Switching Power: 500VA, 90W
  • Maximum Switching Voltage: 250V AC, 30V DC
  • Maximum Switching Current: 2A AC, 3A DC
  • Minimum Life: 100,000 operations on resistive loads
  • Each output has a green status LED to indicate assertion of the signal

Versatile Interface Board

Page 123 of the Emerson 540VDC user manual — “Not Available” State
Page 123 · click to enlarge
Page 123

Appendix C.2.5 VIB Connections

The VIB is supplied with removable screw-terminal connectors to allow for easy integration Figure 119. The user must supply the wire as specified below to make the connections to the VIB connectors.

  • Wire gauge: 12-24 AWG
  • Stripped length: 0.125" - 0.250"
  • Tightening torque: 4.4 inch-pounds (maximum)

Figure 119 VIB screw terminal connections

Emerson 540VDC — Appendix C.2.5 VIB Connections diagram (page 123)
Fig. 120 · Appendix C.2.5 VIB Connections

Appendix C.3 VIB Operation

Upon Initial System Startup of the Liebert FS by a Liebert-certified service technician, your VIB will be operational. There is nothing to turn on or configure. Make sure that all external connections to the VIB are made with the Liebert FS power off. Making connections while power is applied may have undesirable effects and may damage the equipment.

Appendix C.3.1 VIB Operational States

The operational status of the VIB is indicated on the main screen of the Display Panel. There are three possible states: “Enabled”, “Disabled” and “Not Available”. They are indicated on the Display Panel by “1,” “0” or “NA,” respectively.

“Enabled” State

If the VIB is detected when the system is powered-up or rebooted, it will automatically be enabled. If for any reason the VIB has been disabled, it can be re-enabled by pressing F6 (Setup Parameters), then F3 (UIB Enable). While the VIB is enabled, the “Start,” “Stop” and “Clear Fault” buttons will not be visible on the Display Panel. To control the Liebert FS from the Display Panel, the VIB must first be disabled.

“Disabled” State

If the VIB is not detected when the system is powered-up or rebooted, it will automatically be dis- abled. At any time during operation the VIB can be disabled by pressing F6 (Setup Parameters), then F3 (UIB Disable). When the VIB is disabled, the inputs are ignored and all outputs are turned off. Before disabling the VIB, consider how disabling the board will affect other system components.

“Not Available” State

The Liebert FS continually monitors the status of the VIB to verify that it is operating correctly. If the response from the VIB is not what is expected by the Liebert FS, “WARNING” will be displayed on the front panel.

Versatile Interface Board

Page 124 of the Emerson 540VDC user manual — Appendix C.4 Troubleshooting the VIB
Page 124 · click to enlarge
Page 124

Appendix C.4 Troubleshooting the VIB

  • Appendix C.4.1 UIB State Not Displayed on the Front Panel
  • Check that no other faults are present on the display panel.
  • Call Liebert for instructions on how to enable the VIB functionality.
  • Appendix C.4.2 VIB in “Disabled” or “Not Available” State
  • Attempt to enable the VIB by pressing F6 (Setup Parameters), then F3 (UIB Enable).
  • Verify that the cable to the VIB is plugged in properly.
  • Verify power is present on the Auxiliary I/O board. This is indicated by illumination of LED “LD2”.
  • Verify power is provided to the UIB. This is indicated by illumination of “LD1” on the Auxiliary I/O board and “LD21Pentagon on the UIB. Note that “LD2”on the Auxiliary I/O board will be illuminated only if the UIB is connected.
  • Check the continuity of the cable from pin to pin.
  • Appendix C.4.3 Inputs Not Recognized
  • Verify power is present at the VIB.
  • Verify the VIB is enabled on the display panel.
  • Verify that the proper voltage is being supplied to the input.
  • Verify that the LED indicator corresponding to the input illuminates when the input signal is applied.
  • Appendix C.4.4 Outputs Not Asserted
  • Verify power is present at the VIB.
  • Verify the VIB is enabled on the display panel.
  • Verify that the LED indicator corresponding to the output illuminates when the output is asserted.

Versatile Interface Board

Page 125 of the Emerson 540VDC user manual — Appendix D.1 Liebert FS Flywheel Submittal Document Matrix
Page 125 · click to enlarge
Page 125

A PPENDIX D.0I NSTALLATION D RAWINGS

Appendix D.1 Liebert FS Flywheel Submittal Document Matrix

Following is a list of submittal documents that must accompany each Liebert FS that ships from the factory. The documents are grouped by Liebert FS model number.

Table 35 Submittal documents accompanying Liebert FS

Liebert FS Model Number:

Liebert FS Model Number:

Liebert FS Model Number39FS19ES0000; Liebert Series 610/600T/ 600 Flywheel Storage Solution

25FS19ES0000; Liebert Series 300 Flywheel

37FS19ES0000; Liebert NPower Flywheel

Show 20 more labels / short text on this page
Installation Drawings · Storage Solution · Storage Solution · 12-100120-00 12-100120-00 12-100120-00 · 12-100120-02 12-100120-01 12-100120-03 · 12-100120-08 12-100120-08 12-100120-04 · 12-100120-09 12-100120-09 12-100120-08 · 12-100120-10 12-100120-10 12-100120-09 · 12-100120-11 12-100120-11 12-100120-11 · 12-100120-12 12-100120-12 12-100120-12 · 12-100120-13 12-100120-13 12-100120-13 · 12-100120-14 12-100120-14 12-100120-14 · 12-100120-16 12-100120-16 12-100120-16 · 12-100120-17 12-100120-17 12-100120-17 · 12-100120-18 12-100120-18 12-100120-18 · 12-100120-20 12-100120-19 12-100120-20 · 12-100120-21 12-100120-20 12-100120-21 · 12-100120-22 12-100120-21 12-100120-22 · Control_WL_S300 12-100120-22 Control_WL_S610 · — Control_WL_NPower —
Page 126 of the Emerson 540VDC user manual — Appendix D.2 Other Liebert FS Drawings
Page 126 · click to enlarge
Page 126

Appendix D.2 Other Liebert FS Drawings

Following is a list of additional Liebert FS drawings that are available for distribution. These draw- ings are not directly linked to any specific Liebert FS model number, because most of them are appli- cable to Liebert FS cabinets connected in parallel and we do not have a unique model number to identify such units.

Parallel Liebert FS Cabinets – Two - Three Cabinets, no DC Junction Box

  • 12-100120-04 – Control Wiring, Liebert Series 610, 600T, 600, 300
  • 12-100120-14 – One Line Diagram
  • 12-100120-10 – Control Wiring, Paralleled Units
  • 12-100120-20 – One Line Diagram, Paralleled Units

Parallel Liebert FS Cabinets – Four-Eight Cabinets with DC Junction Box

  • 12-100120-17 – One Line Diagram
  • 12-100120-10 – Control Wiring, Paralleled Units
  • 12-100120-20 – One Line Diagram, Paralleled Units

Single Liebert FS Cabinets – Additional Elevation Drawings

  • 12-100120-11 – Liebert FS Custom Configuration without Circuit Breaker

Figure 120 No UVR, circuit breaker to terminal block wiring

Emerson 540VDC — Appendix D.2 Other Liebert FS Drawings diagram (page 126)
Fig. 121 · Appendix D.2 Other Liebert FS Drawings

Installation Drawings

Page 127 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 127 · click to enlarge
Page 127

Figure 121 Electrical connections

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 127)
Fig. 122 · 5.1.7 Magnetic Levitation Module (MLM)

Installation Drawings

Page 128 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 128 · click to enlarge
Page 128

Figure 122 Electrical system block diagram

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 128)
Fig. 123 · 5.1.7 Magnetic Levitation Module (MLM)

Installation Drawings

Page 129 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 129 · click to enlarge
Page 129

Figure 123 24 UVR, circuit breaker to terminal block wiring

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 129)
Fig. 124 · 5.1.7 Magnetic Levitation Module (MLM)

12-100120-16 Rev. 0

Figure 124 48 UVR, circuit breaker to terminal block wiring

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 129)
Fig. 125 · 5.1.7 Magnetic Levitation Module (MLM)

12-100120-16 Rev. 0

Installation Drawings

Page 130 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 130 · click to enlarge
Page 130

Figure 125 Outline drawing, Liebert FS cabinet

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 130)
Fig. 126 · 5.1.7 Magnetic Levitation Module (MLM)

Installation Drawings

Page 131 of the Emerson 540VDC user manual — C.G. #116
Page 131 · click to enlarge
Page 131

Figure 126 Control wiring, external interconnect diagram—Liebert FS cabinet to Liebert Npower UPS

Provided by others; 120V, 60Hz AC, 400VA UPS-Protected Aux. Control Power

C.G. #116

FUSED DISCONNECT

C.G. #17

TB1 TB69

C.G. #18

TB6 TB73

C.G. #19

TB7 TB70

Liebert FS Liebert Npower

UPS Module

12-100120-01 Rev. 01

Figure 127Control wiring external interconnect—Liebert FS to Liebert Series 300

C.G. #116

Provided by others; 120V, 60Hz AC, 400VA UPS-Protected Aux. Control Power

FUSED DISCONNECT

C.G. #29

TB1 IL-TB1

Liebert FS Liebert Series 300

UPS Module

12-100120 -02 Rev. 01

Installation Drawings · module

Page 132 of the Emerson 540VDC user manual — C.G. #116
Page 132 · click to enlarge
Page 132

Figure 128Control wiring—external interconnect diagram, Liebert FS cabinet to Liebert Series 610 UPS

Provided by others; 120V, 60Hz AC, 400VA UPS-Protected Aux. Control Power

C.G. #116

FUSED DISCONNECT

I1-TB1 C.G. #16 TB1

Liebert FS Liebert Series 610

UPS Module

12-100120-03 Rev. 01

Installation Drawings · module

Page 133 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 133 · click to enlarge
Page 133

Figure 129 Control wiring—external interconnect diagram, Liebert FS cabinet to Liebert Series 610 UPS module

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 133)
Fig. 127 · 5.1.7 Magnetic Levitation Module (MLM)
1. Minimum available UV coil current must be N times 50mA where N = number of Liebert FS paralleled units. 2. 16AWG - 600VDC (minimum) wires to be provided and installed by customer or installation contractor. 3. Contact closed when circuit breaker is closed. 4. Series 600/610 can power a total of three UVRs maximum in any combination of FS units, plus module battery disconnect switches.
5. UPS-protected 1PH AC source recommended. See Section 2.4.4 in user manual.

Installation Drawings

Page 134 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 134 · click to enlarge
Page 134

Figure 130Elevation drawing, Liebert FS cabinet with shipping package

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 134)
Fig. 128 · 5.1.7 Magnetic Levitation Module (MLM)

Installation Drawings

Page 135 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 135 · click to enlarge
Page 135

Figure 131Elevation drawing—Liebert FS cabinet

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 135)
Fig. 129 · 5.1.7 Magnetic Levitation Module (MLM)

Installation Drawings

Page 136 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 136 · click to enlarge
Page 136

Figure 132Control wiring diagram, Liebert FS power rack system in parallel for capacity

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 136)
Fig. 130 · 5.1.7 Magnetic Levitation Module (MLM)

Installation Drawings

Page 137 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 137 · click to enlarge
Page 137

Figure 133Liebert FS cabinet with optional power terminal block

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 137)
Fig. 131 · 5.1.7 Magnetic Levitation Module (MLM)

Installation Drawings

Page 138 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 138 · click to enlarge
Page 138

Figure 134Liebert FS cabinet mechanical installation

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 138)
Fig. 132 · 5.1.7 Magnetic Levitation Module (MLM)

Installation Drawings

Page 139 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 139 · click to enlarge
Page 139

Figure 135Elevation drawing—Liebert FS cabinet with integrated circuit breaker

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 139)
Fig. 133 · 5.1.7 Magnetic Levitation Module (MLM)

Installation Drawings

Page 140 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 140 · click to enlarge
Page 140

Figure 136One-line drawing, three Liebert FS systems in parallel configuration

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 140)
Fig. 134 · 5.1.7 Magnetic Levitation Module (MLM)

When parallel, all DC power cables must be identical in length, ± 10%. 1 12-100120-14 Rev. 01

Liebert FS (1) Liebert FS (2) Liebert FS (3)

Installation Drawings

Page 141 of the Emerson 540VDC user manual — (+)
Page 141 · click to enlarge
Page 141

Figure 137Control wiring diagram—Liebert FS cabinet - manually operated circuit breaker

UPS Module

To Liebert

12-100120-16 Rev. 01

1. PCM – Power Conversion Module

UVR Control

NO COM

NC

TB1

1 3 3 4 5 6 7 8 9 10

NOTE

Contractor to Provide Cables

(+) (-) (GND)

To Liebert UPS Module

UVR Aux.

(+)

(-)

PCM DC Output

To Liebert FS

Show 10 more labels / short text on this page
Installation Drawings · Brown · Brown · Blu/Yel · Blu · Yel · Liebert FS · Contacts · Circuit · Breaker
Page 142 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 142 · click to enlarge
Page 142

Figure 138One-line diagram—Liebert FS systems with factory-integrated circuit breakers with Liebert UPS

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 142)
Fig. 135 · 5.1.7 Magnetic Levitation Module (MLM)
2. Series 610/600 2-3 units in parallel without requiring a DC disconnect switch. It can power a total of three UVRs

maximum in any combination of FS units, plus module

1. Npower: 2-8 units in parallel without requiring a DC disconnect switch.

Installation Drawings · module

Page 143 of the Emerson 540VDC user manual — FLYWHEEL
Page 143 · click to enlarge
Page 143

Figure 139 One-line diagram—single Liebert FS system with factory-integrated circuit breaker supplying

3 Out 3 In

FLYWHEEL

12-100120-18 Rev. 0

Show 10 more labels / short text on this page
Installation Drawings · Liebert UPS module · Liebert UPS Module · Rectifier Inverter · Battery/DC In · Battery/Usage (optional) · Circuit Breaker · Normally Open · Liebert FS System · Bi-Directional Power Converter
Page 144 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 144 · click to enlarge
Page 144

Figure 140Control wiring diagram—Liebert FS - optional electrically operated circuit breaker Liebert

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 144)
Fig. 136 · 5.1.7 Magnetic Levitation Module (MLM)

101 24 VDC + 102 24 VDC - 103 Control Relay Power 104 Motor Oper . On Signal 105 Motor Oper . Off Signal 106 N.O.

Installation Drawings · Npower units

Page 145 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 145 · click to enlarge
Page 145

Figure 141Two-eight paralleled Liebert FS units with factory-integrated circuit breaker in parallel with a

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 145)
Fig. 137 · 5.1.7 Magnetic Levitation Module (MLM)
1. Series 610/600 requires the use of MBD for more than three units in parallel. It can power a total of three UVRs

maximum in any combination of FS units, plus module

Installation Drawings · Liebert UPS

Page 146 of the Emerson 540VDC user manual — FLYWHEEL
Page 146 · click to enlarge
Page 146

Figure 142One-line diagram, single Liebert FS and battery with factory-integrated circuit breaker supplying

Liebert UPS—UPS DC terminal point of common connection

FLYWHEEL

12-100120 -21 Rev. 0

Show 11 more labels / short text on this page
Installation Drawings · Liebert UPS Module · Rectifier Inverter · 3 In · 3 Out · Circuit Breaker · Liebert FS System · Normally Open · VRLA Battery · or Flooded Battery · Bi-Directional Power Converter
Page 147 of the Emerson 540VDC user manual — FLYWHEEL
Page 147 · click to enlarge
Page 147

Figure 143One-line diagram, single Liebert FS and battery with factory-integrated circuit breaker supplying

Liebert UPS—UPS battery point of common connection

or Flooded Battery Bi-Directional Power Converter

FLYWHEEL

12-100120 -22 Rev. 0

Show 9 more labels / short text on this page
Installation Drawings · Liebert UPS Module · Rectifier Inverter · 3 In · 3 Out · Circuit Breaker · Liebert FS System · Normally Open · VRLA Battery
Page 148 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 148 · click to enlarge
Page 148

Figure 144 Status/control wiring, multiple units

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 148)
Fig. 138 · 5.1.7 Magnetic Levitation Module (MLM)
1. Minimum UV coil current must be N times 50mA where N = Number of Liebert FS
2. 16 AWG-600VDC (minimum) wires to be provided and installed by customer or installation contractor.
4. UVR not available with IKIT-CB1, A05, D01, E01.
5. Available only with IKIT-CB1, A05, D01, E01.
3. Contact closed when circuit breaker is closed

9 9 8 8 7 7 6 6 5 5 3 3 10 10 4 4 1 1 2 2

paralleled units.

Installation Drawings

Page 149 of the Emerson 540VDC user manual — 916 FBO TB1-3 GND 120VAC 3.5A
Page 149 · click to enlarge
Page 149

Figure 145 Wiring specifications, Liebert FS and Liebert Series 300

No.

Length Remarks From To

Series 300 UPS - Cable Group # 27 (Flywheel CB IFM) From I1 In UPS Module to TB1 on Liebert FS Module

901 I1-TB1-1 TB1-1 Trip Signal (+) +24 VDC 100mA 1/C #16 (2.5 mm2)

500 ft (150 m) 902 I1-TB1-2 TB1-2 Trip Signal (-) -24 VDC 100mA

903 I1-TB1-7 TB1-7 Aux Comm 24 VDC 100mA

904 I1-TB1-8 TB1-8 Aux N.O. 24 VDC 100mA

Series 300 UPS - Cable Group # 116 Flywheel Aux Power, Customer-Provided to Liebert FS TB1 on Fused Disconnect

914 FBO TB1-1 Line 120VAC 3.5A 1/C #16 (2.5 mm2)

500 Ft (150 Meters)

915 FBO TB1-2 Neutral 120VAC 3.5A

916 FBO TB1-3 GND 120VAC 3.5A

1. Each cable group must be run in a separate, grounded, rigid metal conduit to prevent control signal interference. 2. Refer to UPS module/Liebert FS control connection diagram for location of wiring connections. 3. All external wires furnished by others. 4. N.O. = Normally Open; N.C. = Normally Closed; Comm = Common; F.B.O. = Furnished By Others, GND = Ground 5. All wiring must be in accordance with national and local electrical codes.

Dwg. No. Control_WL_S300_Liebert-FS Rev. 01

Show 17 more labels / short text on this page
Installation Drawings · Terminal Designation Signal · Wire · Maximum · Maximum · Wire Size · Maximum · Name · Voltage · Current Color · & Type · Stranded · UPS- Protected · Auxiliary · Stranded · Control · Power
Page 150 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 150 · click to enlarge
Page 150

Figure 146 Wiring specifications, Liebert FS and Liebert Npower

No.

Length Remarks From To

Liebert N-Power UPS - Cable Group # 17 (Flywheel CB IFM) From TB69 in UPS Module to TB1 on Liebert FS Module

101 TB69-1 TB1-1 Trip Signal (+) +24 VDC 100mA 1/C #16 (2.5 mm2) Stranded

102 TB69-2 TB1-2 Trip Signal (-) -24 VDC 100mA

103 TB69-3 TB1-3 Motor Op Relay 24 VDC 100mA

104 TB69-4 TB1-4 Motor Op On 24 VDC 100mA

105 TB69-5 TB1-5 Motor Op Off 24 VDC 100mA

1/C #16 (2.5 mm2) Stranded 500 ft (150m)

106 TB69-6 TB1-6 Aux N.O. 24 VDC 100mA

107 TB69-7 TB1-7 Aux Comm 24 VDC 100mA

108 TB69-8 TB1-8 Aux N.C. 24 VDC 100mA

109 TB69-9 TB1-9 Comm 24 VDC 100mA

110 TB69-10 TB1-10 Battery Sense (+) +24 VDC 100mA

112 TB69-12 TB1-11 Battery Sense (-) -24 VDC 100mA

Liebert N-Power UPS - Cable Group # 18 (Flywheel CB IFM) from TB73 in UPS Module to TB6 on Liebert FS Module

Line TB73-1 TB6-1 Motor Op Pwr 120 VAC 100mA 500 FT (150m) Neutral TB73-2 TB6-2 Motor Op Neutral N 100mA

Liebert N-Power UPS - Cable Group # 19 (Flywheel CB IFM) From TB70 in UPS Module to TB7 on Liebert FS Module

113 TB70-1 TB7-1 Temp Sensor 24 VDC 100mA 1/C #16 (2.5 mm2) Stranded

500 ft (150m) 114 TB70-2 TB7-2 Sensor Return 24 VDC 100mA

Liebert N-Power UPS - Cable Group # 116 Flywheel Aux Power, Customer Provided to Liebert FS TB1 on Fused

Output A PHS FBO TB1-1 Line 120VAC 3.5A

1/C #16 (2.5 mm2) Stranded

Net FBO TB1-2 Neutral 120VAC 3.5A

Gnd FBO TB1-3 GND 120VAC 3.5A

1. Each cable group must be run in a separate grounded rigid metal conduit to prevent control signal interference. 2. Refer to UPS module/Liebert FS control connection diagram for location of wiring connections. 3. All external wires furnished by others. 4. N.O. = Normally Open; N.C. = Normally Closed; Comm = common; F.B.O. = Furnished By Others, GND = ground 5. All wiring must be in accordance with national and local electrical codes.

Dwg. No. Control_WL_NPower_Liebert-FS Rev. 1

Show 18 more labels / short text on this page
Installation Drawings · Terminal Designation Signal · Wire · Maximum · Maximum · Wire Size · Maximum · Name · Voltage · Current Color · & Type · Disconnect · UPS- Protected · 500 ft (150m) · Output · Auxiliary · Control · Power
Page 151 of the Emerson 540VDC user manual — 916 FBO TB1-3 GND 120VAC 3.5A
Page 151 · click to enlarge
Page 151

Figure 147 Wiring specifications, Liebert FS and Liebert Series 610

No.

Liebert Series 610 UPS - Cable Group #16 (Flywheel CB IFM) From I1 in UPS Module to TB1 on Liebert FS Module

901 I1-TB1-1 TB1-1 Trip Signal (+) +24 VDC 100mA

500 Ft (150 M 902 I1-TB1-2 TB1-2 Trip Signal (-) -24 VDC 100mA

1/C #16 (2.5 mm2) Stranded

903 I1-TB1-7 TB1-7 Aux Comm 24 VDC 100mA

904 I1-TB1-8 TB1-8 Aux N.O. 24 VDC 100mA

Liebert Series 610 UPS - Cable Group #116 Flywheel Aux Power, Customer-Provided to Liebert FS TB1 on Fused

914 FBO TB1-1 Line 120VAC 3.5A

915 FBO TB1-2 Neutral 120VAC 3.5A

1/C #16 (2.5 mm2) Stranded

916 FBO TB1-3 GND 120VAC 3.5A

1. Each cable group must be run in a separate, grounded, rigid metal conduit to prevent control signal interference. 2. Refer to UPS module/Liebert FS control connection diagram for location of wiring connections. 3. All external wires furnished by others. 4. N.O. = Normally Open; N.C. = Normally Closed; Comm = common; F.B.O. = Furnished By Others, GND = ground 5. All wiring must be in accordance with national and local electrical codes.

Dwg. No. Control_WL_S610_Liebert-FS Rev. 01

Show 19 more labels / short text on this page
Installation Drawings · Terminal Designation Signal · Remarks · Wire · Maximum · Maximum · Wire Size · Maximum · From To · Name · Voltage · Current Color · & Type · Length · Disconnect · UPS- Protected · 500 Ft (150m) · Auxiliary · Power Control
Page 152 of the Emerson 540VDC user manual — ARE AVAILABLE BY CONTACTING:
Page 152 · click to enlarge
Page 152

Figure 148 Wiring specifications, Liebert FS and Liebert HiPulse, Liebert NXL or Liebert NX

WIRING SPECIFICATIONS FOR THE LIEBERT FS AND LIEBERT HIPULSE, LIEBERT NXL OR LIEBERT NX

ARE AVAILABLE BY CONTACTING:

Your local Liebert Sales Representative

Your local Liebert Service Representative

Liebert Corp. at 1-800-Liebert (1-800-543-2378

Installation Drawings

Page 153 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 153 · click to enlarge
Page 153

Figure 149 Floor mounting template

2.25 (57mm) max. 4X O5/8" (16mm) Mason Drill x 2.00 (51mm) min.

to proper depth.

Installation Drawings · 16" (406mm) · 29-1/2" (749mm)

Page 154 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 154 · click to enlarge
Page 154

Figure 150 System mounting kit

Bolts and Washers come with cabinet

3 7 4 5

Installation Drawings · Drill Template Dwg

Page 155 of the Emerson 540VDC user manual — AUXILIARY BACKUP
Page 155 · click to enlarge
Page 155

Figure 151 Liebert FS block diagram

CAPACITORS

OPTIONAL

CIRCUIT BREAKER

POWER CONVERSION MODULE

(OPTIONAL) TERMINAL BLOCK

POWER INTERFACE BOARD

POWER DISTRIBUTION BOARD

24VDC POWER SUPPLY

24VDC POWER SUPPLY

PRECHARGE BOARD

CAPACITOR BANK

FUSE BOARD

POWER BLOCK

FILTER

AND FUSE

STATOR POWER CABLE

FILTER

INSULATOR UPPER BEARING COIL

INSULATOR LOWER BEARING COIL

UNIVERSAL POSITION SENSOR

UNIVERSAL POSITION SENSOR

UPPER BEARING COIL

LOWER BEARING COIL

Z Y

Y

X TEMP.

AUXILIARY BACKUP

SPEED

MCM POWER SUPPLY

PCM TO MCM

POWER 24V

UPPER BEARING SENSOR

UPPER BEARING POWER

LOWER BEARING SENSOR

LOWER BEARING POWER

FLYWHEEL MODULE

DATA COLLECTION

MODULE (DCM)

(OPTIONAL)

UPPER BEARING SENSOR

UPPER BEARING POWER

LOWER BEARING SENSOR

LOWER BEARING POWER

DISPLAY

INTERFACE BOARD

(VIB) (OPTIONAL)

VERSATILE

BACKPLANE

MCM

ANALOG RADIAL AXIS CONTROLLER

ANALOG RADIAL AXIS CONTROLLER

ANALOG RADIAL AXIS CONTROLLER

ANALOG RADIAL AXIS CONTROLLER

ANALOG AXIAL AXIS CONTROLLER

POWER CONVERSION MODULE

FAN #1 FAN #2 PUMP

CONTROL MODULE

COOLING SYSTEM

CONTROLLER

UPPER X

UPPER Y

LOWER X

LOWER Y

Z

MAIN

Installation Drawings

Page 156 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 156 · click to enlarge
Page 156

Figure 152 Power line diagram

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 156)
Fig. 139 · 5.1.7 Magnetic Levitation Module (MLM)

Installation Drawings

Page 157 of the Emerson 540VDC user manual — NOTES
Page 157 · click to enlarge
Page 157

Figure 153 UPS cable entry—bottom

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 157)
Fig. 140 · 5.1.7 Magnetic Levitation Module (MLM)
3. Cabinets shown connected as one system. When connected to a UPS module, all power
5. All external wiring is to be in accordance with national and local electrical codes.
4. See installation, operation and maintenance manual for additional information.
7. Power connection must be connected with a bus structure or to a single point

and control wiring supplied by customer (standard) or Liebert (option).

1. All cables should be routed before bolting cabinets together.
6. Bus wiring must be capable of handling total load current.
2. All Liebert FS cabinets shown with front door open.

connection at the UPS (Do not daisy-chain).

NOTES

Installation Drawings

Page 158 of the Emerson 540VDC user manual — NOTES
Page 158 · click to enlarge
Page 158

Figure 154 UPS cable entry—top

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 158)
Fig. 141 · 5.1.7 Magnetic Levitation Module (MLM)
5. All external wiring is to be in accordance with national and local electrical codes.
3. Cabinets shown connected as one system. When connected to a UPS module, all
4. See installation, operation and maintenance manual for additional information.

power and control wiring supplied by customer (standard) or Liebert (option).

7. Power connection must be connected with a bus structure or to a single point
1. All cables should be routed before bolting cabinets together.
6. Bus wiring must be capable of handling total load current.
2. All Liebert FS cabinets shown with front door open.

connection at the ups (Do not daisy-chain).

NOTES

Installation Drawings

Page 159 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 159 · click to enlarge
Page 159

Figure 155 Raised floor mounting

Emerson 540VDC — 5.1.7 Magnetic Levitation Module (MLM) diagram (page 159)
Fig. 142 · 5.1.7 Magnetic Levitation Module (MLM)

NOTE: Combination of floor material of given thickness , plus properties of large diameter washer and fastener , should result in lateral load capability to withstand shear due to load F =1500 lb (680kg), parallel to floor. For thicker floors that might require a bolt length longer than can fit inside mounting channel , insert bolt from below with nut above.

Installation Drawings

Page 160 of the Emerson 540VDC user manual — STANDARDS / MARKINGS
Page 160 · click to enlarge
Page 160

A PPENDIX E.0 S PECIFICATIONS

Table 36 Technical specifications

INPUT, DC

Float Voltage 350 through 600 VDC; > 520 VDC required for 200kW

Charging Current 5 through 50 Amps per Liebert FS

Rated Input Charging 350-600 VDC; > 530 VDC required for 200kW

Maximum Idling Consumption Less than 300 W

INPUT, AC

Control Circuit Rating 100-240VAC, 440W, 50/60Hz

OUTPUT, DC

Nominal Power 200kW 1

Nominal Delivered Energy 200kW for 12 seconds 1

Maximum Delivered Energy 200kW for 12 seconds 1

Discharge Voltage (adjustable) 350 through 600 VDC

Rated Output Discharge 350-600 VDC, 250A; > 520 VDC required for 200kW

DC Voltage Regulation ± 1% steady state

DC ripple < 2%

Current Short Time 500A

Short Circuit Withstand Current Capacity

(Circuit-breaker/fused terminal block) 20 kADC / 10 kADC

INPUT, AC (AUX)

Auxiliary Voltage 110VAC – 230VAC (50/60Hz)

Auxiliary Power Rating 500VA

ENVIRONMENTAL

Operating Temperature -20°C to 50°C (-4°F to 122°F)

Startup Temperature 0°C to 50°C (32°F to 122 °F)

Non-Operating Temperature -20°C to 80°C (-4°F to 176 °F)

Humidity 5% to 95% non-condensing

Operating Altitude Up to 3,000 meters (9,842 feet) above sea level

Non-Operating Altitude Up to 12,000 meters (39,370 feet) above sea level

Operating Audible Noise Level

Heat Dissipation Less than 300W (1,025 BTU/h)

Cabinet Environmental Rating NEMA 1 / IP 30

Pollution Degree 3 (Industrial)

PHYSICAL DATA

Dimensions (W x D x H) 63 x 83 x 181 cm (25 x 33 x 71 in)

Footprint 0.5 m² (5.7 sq ft)

Weight 590 kg (1,300 lb)

Shipping Package Weight 660 kg (1,460 lb)

Cable Access Top or Side Entry

STANDARDS / MARKINGS

1. For discharge voltages below 520 VDC, contact Liebert (1-800-LIEBERT) or your local representative.
Show 4 more labels / short text on this page
Specifications · UL Listed · cUL Listed · CE Mark
Page 161 of the Emerson 540VDC user manual — Items Required
Page 161 · click to enlarge
Page 161

Appendix E.1 Ground Test Procedure

The purpose of the GTS is to confirm integrity of grounding path. This test is performed when the sys- tem is completely shutdown and isolated from all external powers. Use the checklist below.

Items Required

  • Handheld Multimeter - Ohmmeter

The ground-test procedure consists of verifying the resistance between the following points (expected values are given in some instances):

  • PE and PPM Box (0 Ohms)
  • PE and MCM Box (0 Ohms)
  • PE and outer containment (0 Ohms)
  • PE and door 0 Ohms.
  • PE and external capacitor box (0 Ohms)
  • PE and right side of enclosure (0 Ohms)
  • PE and left side of enclosure (0 Ohms)
  • PE and bottom of enclosure (0 Ohms)
  • PE and top of enclosure (0 Ohms)
  • PE and water slide (0 Ohms)
  • PE and the ground on fused disconnect
  • PE and the building ground

Specifications

Page 162 of the Emerson 540VDC user manual — Appendix F.3 Recommended Backup Power Supply Configuration
Page 162 · click to enlarge
Page 162

Auxiliary Backup AC Power Supply

A PPENDIX F.0 A UXILIARY B ACKUP AC P OWER S UPPLY

Appendix F.1 Overview

The Liebert FS must be operated with a backup AC power supply to protect the unit’s mechanical bearings if:

  • the external DC supply is lost,
  • the Liebert FS has developed a fault and
  • the configuration is two (and only two) flywheels arranged in a capacity configuration (i.e.: both flywheels are required to carry full load). Not applicable to a redundant configuration.

If these two events occur simultaneously, the backup power supply will power the magnetic levitation hardware to prevent the rotating group from running on the mechanical touchdown bearings.

This section details the function of the backup power supply and how it should be attached to the Liebert FS. This is supplementary information—refer to appropriate sections of the user manual for details on installation and operation.

Appendix F.2 Backup AC Power Supply Specification

Voltage110 to 230VAC, 500VA Frequency: 50 to 60Hz

Appendix F.3 Recommended Backup Power Supply Configuration

If the Liebert FS is operating: Liebert recommends: For details, see:

In parallel with batteries Attaching the backup AC power supply to the output of the UPS. Figures 156 and 157

Feeding the backup AC supply from a separate, protected supply. This may be the output of another UPS or a supply from a separate feeder circuit.

Figures 158 and 159

Without batteries

Page 163 of the Emerson 540VDC user manual — BACKUP AC POWER SUPPLY
Page 163 · click to enlarge
Page 163

Auxiliary Backup AC Power Supply

Appendix F.3.1 Operating the Liebert FS+DC in Parallel With Batteries

If the Liebert FS is operating in parallel with batteries, Liebert recommends attaching the backup AC power supply to the output of the UPS, as shown in Figures 156 and 157.

Figure 156 A single Liebert FS+DC unit operating with a UPS in conjunction with batteries

Emerson 540VDC — Appendix F.3.1 Operating the Liebert FS+DC in Parallel With Batteries diagram (page 163)
Fig. 143 · Appendix F.3.1 Operating the Liebert FS+DC in Parall…

BACKUP AC POWER SUPPLY

Figure 157 Multiple Liebert FS+DC units operating with a UPS in conjunction with batteries

Emerson 540VDC — BACKUP AC POWER SUPPLY diagram (page 163)
Fig. 144

BACKUP AC POWER SUPPLY Distribution

* NOTEDistribution panel allows removal of a Liebert FS without disrupting the other units

3 Liebert FS units

UPS AC Output · Liebert FS

Page 164 of the Emerson 540VDC user manual — UPS
Page 164 · click to enlarge
Page 164

Auxiliary Backup AC Power Supply

Appendix F.3.2 Operating the Liebert FS Without Batteries

If the Liebert FS is operating without batteries, Liebert recommends feeding the backup AC power supply from a separate, protected supply. This may be the output of another UPS or a supply from a separate feeder circuit (see Figures 158 and 159).

Figure 158 Two Liebert FS units operating in a paralleled for capacity (not redundancy) configuration, with

a UPS and without batteries attached to the DC bus

Emerson 540VDC — Appendix F.3.2 Operating the Liebert FS Without Batteries diagram (page 164)
Fig. 145 · Appendix F.3.2 Operating the Liebert FS Without Batt…

UPS

Fed from a protected AC supply, either the output of another UPS or a separate feeder supply

BACKUP AC POWER SUPPLY

Fed from a protected AC supply, either the output of another UPS or a separate feeder supply

BACKUP AC POWER SUPPLY

Emerson 540VDC — BACKUP AC POWER SUPPLY diagram (page 164)
Fig. 146

Figure 159 Multiple Liebert FS units operating with a UPS and without batteries attached to the DC bus

UPS

Emerson 540VDC — UPS diagram (page 164)
Fig. 147
* NOTEDistribution panel allows removal of a Liebert FS without disrupting the other units

3 Liebert FS Units

Show 10 more labels / short text on this page
Grid Supply · UPS Output · DC Bus · Liebert FS · Liebert FS · Grid Supply · UPS Output · Distribution · panel* · DC Bus
Page 165 of the Emerson 540VDC user manual — Appendix F.4 Scenarios
Page 165 · click to enlarge
Page 165

Auxiliary Backup AC Power Supply

Appendix F.4 Scenarios

This section describes five scenarios that might occur.

  • Loss of backup AC supply at 0 RPM - This causes a fault message to appear on the control panel to indicate there is a problem with the backup supply. The unit will not start until the backup supply is reinstalled.
  • Loss of backup AC supply at full speed - This causes a warning message to appear on the control panel to indicate there is a problem with the backup supply. This warning does not affect the operation of the system.
  • Loss of external DC supply - The Liebert FS will discharge normally until it reaches 25000 RPM. It will then change to shutdown mode and drive down to 3500 RPM, it will then coast to a stop over a number of hours.
  • Loss of external DC supply and loss of backup supply - The Liebert FS can support the magnetic levitation hardware using energy from the flywheel. It will discharge normally until 25000 RPM, then change to shutdown mode and drive down to 3500 RPM. At this speed it can no longer support itself, and the unit will turn off. The flywheel will safely drop onto the mechanical touchdown bearings and will slowly come to a stop.
  • Loss of external DC supply, loss of backup supply and a fault message appears on the control panel - This unlikely combination of events will cause the flywheel to drop onto the mechanical touchdown bearings without slowing to a safe rotation speed. The ceramic touchdown bearings can withstand very high speeds. However, if the flywheel were to drop onto the ceramic bearings at full speed, the bearings would last only a minute before starting to degrade. Although the system has been designed to retain the rotor as it slows, internal damage will occur during this period. The Liebert FS would require refurbishing at the factory before it could be used again.

Figure 160 Liebert FS connection

BACKUP AC POWER SUPPLY DC bus

Emerson 540VDC — Appendix F.4 Scenarios diagram (page 165)
Fig. 148 · Appendix F.4 Scenarios

Liebert FS · Flywheel module

Page 166 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 166 · click to enlarge
Page 166

Auxiliary Backup AC Power Supply

Page 167 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 167 · click to enlarge
Page 167
Page 167 of the Emerson 540VDC user manual — 5.1.7 Magnetic Levitation Module (MLM)
Page 168 of the Emerson 540VDC user manual — SL-29315_REV5_04-10
Page 168 · click to enlarge
Page 168

Ensuring The High Availability Of Mission-Critical Data And Applications.

Emerson Network Power, the global leader in enabling business-critical continuity, ensures network resiliency and adaptability through a family of technologies—including Liebert power and cooling technologies—that protect and support business-critical systems. Liebert solutions employ an adaptive architecture that responds to changes in criticality, density and capacity. Enterprises benefit from greater IT system availability, operational flexibility and reduced capital equipment and operating costs.

Technical Support / Service

Web Site www.liebert.com

Monitoring liebert.monitoring@emerson.com

800-222-5877 Outside North America+00800 1155 4499

Single-Phase UPS & Server Cabinets

liebert.upstech@emerson.com

800-222-5877 Outside North America+00800 1155 4499

Three-Phase UPS & Power Systems

800-543-2378 Outside North America614-841-6598
800-543-2778 Outside the United States614-888-0246

Locations United States 1050 Dearborn Drive P.O. Box 29186 Columbus, OH 43229

Europe Via Leonardo Da Vinci 8 Zona Industriale Tognana 35028 Piove Di Sacco (PD) Italy +39 049 9719 111 Fax: +39 049 5841 257

While every precaution has been taken to ensure the accuracy and completeness of this literature, Liebert Corporation assumes no responsibility and disclaims all liability for damages resulting from use of this information or for any errors or omissions. © 2008 Liebert Corporation All rights reserved throughout the world. Specifications subject to change without notice. ® Liebert is a registered trademark of Liebert Corporation. All names referred to are trademarks or registered trademarks of their respective owners.

Asia 29/F, The Orient Square Building F. Ortigas Jr. Road, Ortigas Center

Philippines +63 2 687 6615 Fax: +63 2 730 9572

SL-29315_REV5_04-10

Emerson Network Power. The global leader in enabling Business-Critical Continuity™ EmersonNetworkPower.com

Embedded Computing Embedded Power

Racks & Integrated Cabinets Services

Power Switching & Controls Precision Cooling

Infrastructure Management & Monitoring

Emerson, Business-Critical Continuity, Emerson Network Power and the Emerson Network Power logo are trademarks of Emerson Electric Co. or one of its affiliated companies. ©2010 Emerson Electric Co.

Show 6 more labels / short text on this page
Environmental Systems · Pasig City 1605 · AC Power Connectivity · Outside Plant · DC Power · Surge Protection
Sources

References & links

Pages referenced in this manual — manufacturer, support and downloads.

Fix-it

Troubleshooting

Common problems, likely causes, and what to do.

ProblemPossible causeRemedy
Check / Test Auxiliary power supplyAuxiliary power supply is low when the system is not in OFF mode. Factory-configurable warning p.92
Check Vitals and Vacuum HistoryDrag power exceeds 85W * p.92
Calibrate boardMiser voltage is higher than 2V p.92
Check Vitals and Runout HistoryRunout is higher than 2.0 mil.* p.92
Power supply for PPMC/PCMC is lower than 21VPower supply for PPMC/PCMC is lower than 21V. p.92
Check VIB cable connections and wiringVIB inoperative while enabled p.92
Have Certified Service personnel check software settingsSpeed is higher than the Max Speed p.92
Set Time/Date in Menu>View>Time/DateTime and date have not been set p.92
GROUND FAULTGround fault current out of range. p.94
HW BUS OVHW overvoltage. (hardware protection) p.94
X PHASE OCAC phase overcurrent. x = A, B, C. p.94
IGBT OVRTEMPIGBT overtemperature. p.94
VACUUM FAULTDrag power exceeds 125W. p.94
RUNOUT FAULTRunout higher than 2.9mil. p.94
MISER FAULTMiser voltage is higher than 5V. p.94
BEARINGMagnetic bearing fault. p.94
AUX POWER LOWAuxiliary power supply voltage is low when the system is in Off mode. Configurable fault. p.94
INTER PRCR COMMCommunication error with secondary DSP. System reboots. p.94
PWR SPLY VOLTPower supply voltage is lower than 19V. (Speed dependent; auto shutdown at high speed) p.94
UNDEF PDP INTUndefined PDP interrupt. p.94
CURRENT OFFSETAC motor current sensor error. p.94
SW OVDC bus voltage is higher than the threshold, which is service-configurable. p.94
CHECKSUMCalculated checksum does not match the stored checksum. p.94
CONTACTOR TIME OUTBus voltage/current is not stable while trying to close or open contactor. p.94
CONTACTOR CLOSE FAILContactor failed to close on startup. p.94
FAN OPENFan open circuit or disconnected. p.94
FAN SHORTFan short circuit. p.94
PUMP OPENPump open circuit or disconnected. p.94
PUMP SHORTPump short circuit. p.94
HW OVERSPEEDHardware detected overspeed. p.94
PRECHARGE PROTECTIONStop PWM when large voltage differential exists between internal and external bus. p.94
BUS CURRENT OFFSETDC current sensor error. p.94
GROUND FAULTContact Service provider. Schedule service. p.95
HW BUS OVCheck DC bus voltage at UPS and adjust as necessary to within threshold. p.95
X PHASE OCCheck IGBT, resistor diodes. p.95
IGBT OVRTEMPCheck cooling pump, test pump and fans. p.95
VACUUM FAULTCheck in History, Vitals, collect data, contact Certified Service Provider. p.95
RUNOUT FAULTCheck in History, Vitals, collect data, contact Certified Service Provider. p.95
MISER FAULTCheck calibration in Tools. p.95
BEARINGContact Service provider. Schedule service. p.95
AUX POWER LOWCheck and test Auxiliary Power module. p.95
INTER PRCR COMMContact Service provider. Schedule service. p.95
PWR SPLY VOLTCheck data in Menu>View>Electrical. p.95
UNDEF PDP INTContact Service provider. Schedule service. p.95
CURRENT OFFSETContact Service provider. Schedule service. p.95
SW OVContact Service provider. Schedule service. p.95
CHECKSUMContact Service provider. Schedule service. p.95
CONTACTOR TIME OUTCheck DC bus voltage at UPS and adjust as necessary to within threshold. p.95
CONTACTOR CLOSE FAILCheck DC bus voltage at UPS and adjust as necessary to within threshold. p.95
FAN OPENCheck fan connections. p.95
FAN SHORTCheck fan. p.95
PUMP OPENCheck pump connections. p.95
PUMP SHORTCheck pump. p.95
HW OVERSPEEDContact Service provider. Schedule service. p.95
PRECHARGE PROTECTIONContact Service provider. Schedule service. p.95
BUS CURRENT OFFSETCheck bus voltages, contact service provider to calibrate settings. p.95

Ask about the Emerson 540VDC

Owners and our team usually reply within a day — and your question helps the next person too.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
No questions yet about the Emerson 540VDC

Be the first to ask — other owners or our team will answer.

Original document

Emerson 540VDC manual PDF

168 pages·10.7 MB·Power Supply·PDF
Click any page above to open it here
Page 1 / …
100%
Loading pages…