EN
Emerson logo
Official user manual

Emerson 4015

64 pages·5.4 MB·Power Supply·PDF·ENDEFRITNLJA
Emerson 4015
Table of Contents 116 sections Important Safety Instructions · General Safety · Voltages · AC Input Voltages · … ShowHide
Important Safety Instructionsp.5General Safetyp.5Voltagesp.5AC Input Voltagesp.5DC Input/Output Voltagesp.5Battery (if equipped)p.6Personal Protective Equipment (PPE)p.7Maintenance and Servicing Proceduresp.8Generalp.8Dual Hazardous Input Power Sourcesp.8Circuit Card Handlingp.8STATIC WARNINGp.9CHAPTER 1. GENERAL INFORMATION AND INSTALLATION ACCEPTANCE CHECKLISTp.11Customer Documentation Packagep.11Bound System Installation Manualp.11Bound System Operation Manualp.11Bound ACU+ Controller Operation Manualp.11USB Drive with All Customer Documentationp.11System Packagingp.11Power and Control Sub-Rack (List 11, 12)p.12Generalp.12Rectifiersp.12Temperature Probes (List 98, 99)p.12DC Load Distribution Sub-Rack (List 21, 22, 23, 24)p.13Generalp.13Battery Tray (List 91, 92)p.14Generalp.14Recommended Tools and Test Equipmentp.15Installation Acceptance Checklistp.16Generalp.16Checklist –Factory Integrated System (List R1, R2)p.16Chapter 2. Installing the Systemp.16Chapter 3. Making Electrical Connectionsp.16Chapter 4. Installing the Rectifiersp.16Chapter 5. Initially Starting the Systemp.16Checklist – Customer Integrated System (ship loose)p.17Chapter 2. Installing the Systemp.17Chapter 3. Making Electrical Connectionsp.17Chapter 4. Installing the Rectifiersp.17Chapter 5. Initially Starting the Systemp.17CHAPTER 2. INSTALLING THE SYSTEMp.18General Requirementsp.18Inspecting the Equipment and Storing for Delayed Installationsp.19Inspecting the Equipmentp.19Storing for Delayed Installationp.19Securing the IT Rack to the Floorp.19Factory Integrated Systems (List R1, R2)p.19Procedurep.19Installing Individual Sub-Racks into Cutomer Provided IT Rack (not applicable with List R1, R2)p.20Customer Supplied IT Rack Guidelinesp.20Installing the Sub-Racksp.20Procedurep.20Electrically Interconnecting the Sub-Rack(s)p.22CHAPTER 3. MAKING ELECTRICAL CONNECTIONSp.23Important Safety Instructionsp.23Wiring Considerationsp.23Torquep.23Output Ground Configurationsp.23Cable Routingp.23When System is Furnished in a Factory Provided IT Rack (List R1, R2)p.23When System Components are Furnished Loose to be Installed in a Customer Furnished IT Rackp.25Tasks to Be performed for Customer Integrated Systemsp.27Groundingp.27Sub-Rack Grounding (Frame Ground)p.27NPG Configurations Only: Return Busbar (-Bus) Grounding Connectionp.27HRMG Configurations Only: Bus Grounding Connectionp.27Sub-Racks Electrical Interconnectionsp.31Connecting the Load Distribution Sub-Rack(s) to the Power and Control Sub-Rackp.31Procedurep.31Connecting the Battery Tray(s) to the Power and Control Sub-Rackp.31Procedurep.31Connecting the Battery Tray Control and Alarm Harness to Other Battery Trays and/or to the Power and Control Sub-Rackp.31Procedurep.31Tasks to Be Perform for All Installationsp.35Groundingp.35IT Rack Grounding (Frame Ground)p.35Conduit Grounding (Frame Ground)p.35AC Input Power Connectionsp.38DC Load Distribution Electrical Connections to List 21-24 DC Load Distribution Sub-Rack(s) (if furnished)p.39HRMG (High Resistance Midpoint Ground) Configurationp.39NPG (Negative Pole Ground) Configurationp.39Installing Battery Sub-Trays in List 91 and 92 Battery Tray(s) (if furnished)p.41Battery Manufacturer Informationp.41Installing Battery Sub-Traysp.41Procedurep.41External Battery Connections (if required)p.43IB2 (ACU+ Controller Interface Board) Connections (if required)p.45Digital Inputs and Programmable Relay Outputsp.45Digital Inputsp.45Programmable Relay Outputsp.45Temperature Probesp.46ACU+ Controller Ethernet Connection (if required)p.46Power and Control Sub-Rack Bulk Output Connections (if required)p.50CHAPTER 4. INSTALLING THE RECTIFIER MODULEp.51Procedurep.51CHAPTER 5. INITIALLY STARTING THE SYSTEMp.52Initial Startup Preparationp.52Initially Starting the Systemp.53Procedurep.53ACU+ Controller Initializationp.54Procedurep.54Verifying the Configuration Filep.56Procedurep.56Changing Battery Capacity Rating in the ACU+p.56Procedurep.56Checking Basic System Settingsp.57Procedurep.57Configuring the ACU+ Identification of Rectifiersp.59Procedurep.59Checking the System Shutdown Circuitp.60Procedurep.60Checking System Statusp.60Procedurep.60Final Stepsp.61Procedurep.61Reference Documentsp.61
Page 1 of the Emerson 4015 user manual
Page 1 · click to enlarge
Page 1
Emerson 4015 diagram (page 1)
Fig. 1
Emerson 4015 diagram (page 1)
Fig. 2
Emerson 4015 diagram (page 1)
Fig. 3
Emerson 4015 diagram (page 1)
Fig. 4

LOAD DISTRIBUTION SUB-RACK HRMG Configuration (w/ row breaker) NPG Configuration (w/ row breaker) HRMG Configuration (w/out row breaker) NPG Configuration (w/out row breaker)

Page 2 of the Emerson 4015 user manual
Page 2 · click to enlarge
Page 2

Business-Critical Continuity™, Emerson Network Power, and the Emerson Network

Power logo are trademarks and service marks of Emerson Electric Co.

NetSure™, NetSpan™, NetReach™, NetXtend™, and NetPerform™ are trademarks of Emerson Network Power, Energy Systems, North America, Inc.

All other trademarks are the property of their respective owners.

The products covered by this instruction manual are manufactured and/or

sold by Emerson Network Power, Energy Systems, North America, Inc.

The information contained in this document is subject to change without notice and may not be suitable for all applications. While every precaution has been taken to ensure the accuracy and completeness of this document, Emerson Network Power, Energy Systems, North America, Inc. assumes no responsibility and disclaims all liability for damages resulting from use of this information or for any errors or omissions. Refer to other local practices or building codes as applicable for the correct methods, tools, and materials to be used in performing procedures not specifically described in this document.

This document is the property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use or disclosure of it without the written permission

of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Copyright © 2013, Emerson Network Power, Energy Systems, North America, Inc.

All rights reserved throughout the world.

Page 3 of the Emerson 4015 user manual — Table of contents
Page 3 · click to enlarge
Page 3

Table of contents

Important Safety Instructionsp.5General Safetyp.5Voltagesp.5AC Input Voltagesp.5DC Input/Output Voltagesp.5Battery (if equipped)p.6Personal Protective Equipment (PPE)p.7Maintenance and Servicing Proceduresp.8Generalp.8Dual Hazardous Input Power Sourcesp.8Circuit Card Handlingp.8STATIC WARNINGp.9CHAPTER 1. GENERAL INFORMATION AND INSTALLATION ACCEPTANCE CHECKLISTp.11Customer Documentation Packagep.11Bound System Installation Manualp.11Bound System Operation Manualp.11Bound ACU+ Controller Operation Manualp.11USB Drive with All Customer Documentationp.11System Packagingp.11Power and Control Sub-Rack (List 11, 12)p.12Generalp.12Rectifiersp.12Temperature Probes (List 98, 99)p.12DC Load Distribution Sub-Rack (List 21, 22, 23, 24)p.13Generalp.13Battery Tray (List 91, 92)p.14Generalp.14Recommended Tools and Test Equipmentp.15Installation Acceptance Checklistp.16Generalp.16Checklist –Factory Integrated System (List R1, R2)p.16Chapter 2. Installing the Systemp.16Chapter 3. Making Electrical Connectionsp.16Chapter 4. Installing the Rectifiersp.16Chapter 5. Initially Starting the Systemp.16Checklist – Customer Integrated System (ship loose)p.17Chapter 2. Installing the Systemp.17Chapter 3. Making Electrical Connectionsp.17Chapter 4. Installing the Rectifiersp.17Chapter 5. Initially Starting the Systemp.17CHAPTER 2. INSTALLING THE SYSTEMp.18General Requirementsp.18Inspecting the Equipment and Storing for Delayed Installationsp.19Inspecting the Equipmentp.19Storing for Delayed Installationp.19Securing the IT Rack to the Floorp.19Factory Integrated Systems (List R1, R2)p.19Procedurep.19Installing Individual Sub-Racks into Cutomer Provided IT Rack (not applicable with List R1, R2)p.20Customer Supplied IT Rack Guidelinesp.20Installing the Sub-Racksp.20Procedurep.20Electrically Interconnecting the Sub-Rack(s)p.22CHAPTER 3. MAKING ELECTRICAL CONNECTIONSp.23Important Safety Instructionsp.23Wiring Considerationsp.23Torquep.23Output Ground Configurationsp.23Cable Routingp.23When System is Furnished in a Factory Provided IT Rack (List R1, R2)p.23When System Components are Furnished Loose to be Installed in a Customer Furnished IT Rackp.25Tasks to Be performed for Customer Integrated Systemsp.27Groundingp.27Sub-Rack Grounding (Frame Ground)p.27NPG Configurations Only: Return Busbar (-Bus) Grounding Connectionp.27HRMG Configurations Only: Bus Grounding Connectionp.27Sub-Racks Electrical Interconnectionsp.31Connecting the Load Distribution Sub-Rack(s) to the Power and Control Sub-Rackp.31Procedurep.31Connecting the Battery Tray(s) to the Power and Control Sub-Rackp.31Procedurep.31Connecting the Battery Tray Control and Alarm Harness to Other Battery Trays and/or to the Power and Control Sub-Rackp.31Procedurep.31Tasks to Be Perform for All Installationsp.35Groundingp.35IT Rack Grounding (Frame Ground)p.35Conduit Grounding (Frame Ground)p.35AC Input Power Connectionsp.38DC Load Distribution Electrical Connections to List 21-24 DC Load Distribution Sub-Rack(s) (if furnished)p.39HRMG (High Resistance Midpoint Ground) Configurationp.39NPG (Negative Pole Ground) Configurationp.39Installing Battery Sub-Trays in List 91 and 92 Battery Tray(s) (if furnished)p.41Battery Manufacturer Informationp.41Installing Battery Sub-Traysp.41Procedurep.41External Battery Connections (if required)p.43IB2 (ACU+ Controller Interface Board) Connections (if required)p.45Digital Inputs and Programmable Relay Outputsp.45Digital Inputsp.45Programmable Relay Outputsp.45Temperature Probesp.46ACU+ Controller Ethernet Connection (if required)p.46Power and Control Sub-Rack Bulk Output Connections (if required)p.50CHAPTER 4. INSTALLING THE RECTIFIER MODULEp.51Procedurep.51CHAPTER 5. INITIALLY STARTING THE SYSTEMp.52Initial Startup Preparationp.52Initially Starting the Systemp.53Procedurep.53ACU+ Controller Initializationp.54Procedurep.54Verifying the Configuration Filep.56Procedurep.56Changing Battery Capacity Rating in the ACU+p.56Procedurep.56Checking Basic System Settingsp.57Procedurep.57Configuring the ACU+ Identification of Rectifiersp.59Procedurep.59Checking the System Shutdown Circuitp.60Procedurep.60Checking System Statusp.60Procedurep.60Final Stepsp.61Procedurep.61Reference Documentsp.61
Page 4 of the Emerson 4015 user manual — Table of contents
Page 4 · click to enlarge
Page 4

Table of contents

Important Safety Instructionsp.5General Safetyp.5Voltagesp.5AC Input Voltagesp.5DC Input/Output Voltagesp.5Battery (if equipped)p.6Personal Protective Equipment (PPE)p.7Maintenance and Servicing Proceduresp.8Generalp.8Dual Hazardous Input Power Sourcesp.8Circuit Card Handlingp.8STATIC WARNINGp.9CHAPTER 1. GENERAL INFORMATION AND INSTALLATION ACCEPTANCE CHECKLISTp.11Customer Documentation Packagep.11Bound System Installation Manualp.11Bound System Operation Manualp.11Bound ACU+ Controller Operation Manualp.11USB Drive with All Customer Documentationp.11System Packagingp.11Power and Control Sub-Rack (List 11, 12)p.12Generalp.12Rectifiersp.12Temperature Probes (List 98, 99)p.12DC Load Distribution Sub-Rack (List 21, 22, 23, 24)p.13Generalp.13Battery Tray (List 91, 92)p.14Generalp.14Recommended Tools and Test Equipmentp.15Installation Acceptance Checklistp.16Generalp.16Checklist –Factory Integrated System (List R1, R2)p.16Chapter 2. Installing the Systemp.16Chapter 3. Making Electrical Connectionsp.16Chapter 4. Installing the Rectifiersp.16Chapter 5. Initially Starting the Systemp.16Checklist – Customer Integrated System (ship loose)p.17Chapter 2. Installing the Systemp.17Chapter 3. Making Electrical Connectionsp.17Chapter 4. Installing the Rectifiersp.17Chapter 5. Initially Starting the Systemp.17CHAPTER 2. INSTALLING THE SYSTEMp.18General Requirementsp.18Inspecting the Equipment and Storing for Delayed Installationsp.19Inspecting the Equipmentp.19Storing for Delayed Installationp.19Securing the IT Rack to the Floorp.19Factory Integrated Systems (List R1, R2)p.19Procedurep.19Installing Individual Sub-Racks into Cutomer Provided IT Rack (not applicable with List R1, R2)p.20Customer Supplied IT Rack Guidelinesp.20Installing the Sub-Racksp.20Procedurep.20Electrically Interconnecting the Sub-Rack(s)p.22CHAPTER 3. MAKING ELECTRICAL CONNECTIONSp.23Important Safety Instructionsp.23Wiring Considerationsp.23Torquep.23Output Ground Configurationsp.23Cable Routingp.23When System is Furnished in a Factory Provided IT Rack (List R1, R2)p.23When System Components are Furnished Loose to be Installed in a Customer Furnished IT Rackp.25Tasks to Be performed for Customer Integrated Systemsp.27Groundingp.27Sub-Rack Grounding (Frame Ground)p.27NPG Configurations Only: Return Busbar (-Bus) Grounding Connectionp.27HRMG Configurations Only: Bus Grounding Connectionp.27Sub-Racks Electrical Interconnectionsp.31Connecting the Load Distribution Sub-Rack(s) to the Power and Control Sub-Rackp.31Procedurep.31Connecting the Battery Tray(s) to the Power and Control Sub-Rackp.31Procedurep.31Connecting the Battery Tray Control and Alarm Harness to Other Battery Trays and/or to the Power and Control Sub-Rackp.31Procedurep.31Tasks to Be Perform for All Installationsp.35Groundingp.35IT Rack Grounding (Frame Ground)p.35Conduit Grounding (Frame Ground)p.35AC Input Power Connectionsp.38DC Load Distribution Electrical Connections to List 21-24 DC Load Distribution Sub-Rack(s) (if furnished)p.39HRMG (High Resistance Midpoint Ground) Configurationp.39NPG (Negative Pole Ground) Configurationp.39Installing Battery Sub-Trays in List 91 and 92 Battery Tray(s) (if furnished)p.41Battery Manufacturer Informationp.41Installing Battery Sub-Traysp.41Procedurep.41External Battery Connections (if required)p.43IB2 (ACU+ Controller Interface Board) Connections (if required)p.45Digital Inputs and Programmable Relay Outputsp.45Digital Inputsp.45Programmable Relay Outputsp.45Temperature Probesp.46ACU+ Controller Ethernet Connection (if required)p.46Power and Control Sub-Rack Bulk Output Connections (if required)p.50CHAPTER 4. INSTALLING THE RECTIFIER MODULEp.51Procedurep.51CHAPTER 5. INITIALLY STARTING THE SYSTEMp.52Initial Startup Preparationp.52Initially Starting the Systemp.53Procedurep.53ACU+ Controller Initializationp.54Procedurep.54Verifying the Configuration Filep.56Procedurep.56Changing Battery Capacity Rating in the ACU+p.56Procedurep.56Checking Basic System Settingsp.57Procedurep.57Configuring the ACU+ Identification of Rectifiersp.59Procedurep.59Checking the System Shutdown Circuitp.60Procedurep.60Checking System Statusp.60Procedurep.60Final Stepsp.61Procedurep.61Reference Documentsp.61
Page 5 of the Emerson 4015 user manual — VOLTAGES
Page 5 · click to enlarge
Page 5

IMPORTANT SAFETY INSTRUCTIONS

GENERAL SAFETY

a) The tasks should be performed in the order indicated.

b) Remove watches, rings, and other metal objects.

c) Prior to contacting any uninsulated surface or termination, use a voltmeter to

verify that no voltage or the expected voltage is present.

d) Wear eye protection, and use recommended tools.

e) Use double insulated tools appropriately rated for the work to be performed.

f) Do not work on an energized system without full arc flash and PPE protection.

VOLTAGES

DANGER! This system operates from AC voltage capable of producing fatal electrical shock. AC input power must be completely disconnected from the branch circuits wiring used to provide power to the system before any AC electrical connections are made. Follow local lockout/tagout procedures to ensure upstream branch circuit breakers remain de-energized during installation. DO NOT apply AC power to the system until all electrical connections have been completed and checked.

DANGER! This system produces DC power and may have a battery source connected to it. The DC voltage IS hazardously high and the rectifiers and/or battery can deliver large amounts of current. Exercise extreme caution not to inadvertently contact or have any tool inadvertently contact an output terminal or battery terminal or exposed wire connected to an output terminal or battery terminal. NEVER allow a metal object, such as a tool, to contact more than one termination at a time, or to simultaneously contact a termination and a grounded object. Even a momentary short circuit can cause explosion and injury. Remove watches, rings, and other metal objects before connecting battery leads.

Follow local lockout/tagout procedures to ensure DC branch circuit breakers remain de-energized during installation at loads, as required.

Extreme caution is required when performing maintenance. Be constantly aware that this system contains high DC as well as AC voltages.

The maximum output voltage is 400V DC and is potentially lethal.

Check for voltage with both AC and DC voltmeters prior to making contact.

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

AC Input Voltages · DC Input/Output Voltages

Page 6 of the Emerson 4015 user manual — BATTERY (IF EQUIPPED)
Page 6 · click to enlarge
Page 6

BATTERY (IF EQUIPPED)

The following precautions should be observed when working on batteries:

Remove watches, rings, and other metal objects.

Eye protection should be worn to prevent injury from accidental electrical arcs.

Use certified and well maintained insulated tools. Use double insulated tools appropriately rated for the work to be performed. Ensure that wrenches with more than one working end have only one end exposed.

Do not lay tools or metal parts on top of batteries.

Disconnect charging source prior to connecting or disconnecting battery terminals.

Risk of explosion if battery is replaced with an incorrect type or if polarity is reversed. When replacing batteries, replace with the same manufacturer and type, or equivalent. See your local Emerson representative for a list of approved batteries.

Dispose of used batteries according to the instructions provided with the batteries. Do not dispose of batteries in a fire. They may explode.

ALWAYS FOLLOW THE BATTERY MANUFACTURER'S RECOMMENDATIONS AND SAFETY INSTRUCTIONS.

In addition to the hazard of electric shock, gas produced by batteries can be explosive and sulfuric acid can cause severe burns. Do not open or mutilate batteries. Released electrolyte is harmful to the skin and eyes, and is toxic. If electrolyte comes into contact with skin, the affected area should be washed immediately with large amounts of water.

Page iv Important Safety Instructions

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Page 7 of the Emerson 4015 user manual — PERSONAL PROTECTIVE EQUIPMENT (PPE)
Page 7 · click to enlarge
Page 7

Batteries contain sulfuric acid.

Batteries generate explosive gases during normal operation. Systems containing batteries should never be installed in an airtight room or space. Only install in a ventilated environment.

Batteries are an energy source that can produce high amounts of electrical current.

FOR THESE REASONS, IT IS OF CRITICAL IMPORTANCE THAT YOU READ THESE INSTRUCTIONS AND FOLLOW THEM EXACTLY.

WHEN WORKING WITH LEAD-ACID BATTERIES:

Wear complete protection for eyes, face, hands, and clothing. Examples are safety goggles or face shield, a rubber apron and gloves.

If battery acid enters your eye, immediately flush your eye with running cold water for at least 15 minutes. Get medical attention immediately.

If battery acid contacts skin or clothing, wash immediately with soap and water.

PERSONAL PROTECTIVE EQUIPMENT (PPE)

This product is intended only for installation in a Restricted Access Location.

Only authorized and properly trained personnel should be allowed to install, inspect, operate, or maintain the rack/equipment.

Do not work on LIVE parts. If required to work or operate live parts, obtain appropriate Energized Work Permits as required by the local authority, per NFPA 70E “Standard for Electrical Safety in the Workplace”.

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Page 8 of the Emerson 4015 user manual — CIRCUIT CARD HANDLING
Page 8 · click to enlarge
Page 8

MAINTENANCE AND SERVICING PROCEDURES

Special safety precautions are required for procedures involving maintenance of this system and the batteries. Observe all safety precautions in this manual and in the battery instruction manual before as well as during performance of all maintenance procedures. Observe all battery safety precautions before working on or near the batteries. Service personnel and test equipment should be standing on rubber mats. Service personnel should wear insulating shoes for isolation from direct contact with the floor (earth ground).

This equipment contains several circuits that are energized with dangerous voltage. Only test equipment designed for troubleshooting should be used. This is particularly true for oscilloscopes. Always check with an AC and DC voltmeter to ensure safety before making contact or using tools. Even when the power is turned OFF, dangerously high electric charges may exist within the system.

Never work alone, even if all power is removed from the equipment. A second person should be standing by to assist and summon help in case an accident should occur.

Dual Hazardous Input Power Sources

CIRCUIT CARD HANDLING

Page vi Important Safety Instructions

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

General

Page 9 of the Emerson 4015 user manual — STATIC WARNING
Page 9 · click to enlarge
Page 9

STATIC WARNING

The printed circuit cards used in this equipment contain static sensitive components. The warnings listed below must be observed to prevent damage to these components. Disregarding any of these warnings may result in personal injury or damage to the equipment.

1. Strictly adhere to the procedures provided in this document.
2. Before touching any static sensitive component or printed circuit card containing such a component, discharge all static electricity from yourself by wearing a wrist strap grounded through a one megohm resistor. Some wrist straps, such as Emerson Network Power Part Number 631810600, have a built-in one megohm resistor; no external resistor is necessary. Read and follow wrist strap manufacturer’s instructions outlining use of a specific wrist strap.
3. Do not touch the traces or components on a printed circuit card containing static sensitive components. Handle the printed circuit card only by the edges that do not have connector pads.
4. After removing a printed circuit card containing a static sensitive component, place the printed circuit card only on conductive or anti-static material such as conductive foam, conductive plastic, or aluminum foil. Do not use ordinary Styrofoam or ordinary plastic.
5. Store and ship static sensitive devices or printed circuit cards containing such components only in static shielding containers.
6. If necessary to repair a printed circuit card containing a static sensitive component, wear an appropriately grounded wrist strap, work on a conductive surface, use a grounded soldering iron, and use grounded test equipment.

Static Warning Page vii This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Page 10 of the Emerson 4015 user manual — STATIC WARNING
Page 10 · click to enlarge
Page 10

This Page Left Intentionally Blank

Page viii Static Warning

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Page 11 of the Emerson 4015 user manual — SYSTEM PACKAGING
Page 11 · click to enlarge
Page 11

CHAPTER 1. GENERAL INFORMATION AND INSTALLATION ACCEPTANCE CHECKLIST

CUSTOMER DOCUMENTATION PACKAGE

This document (IM584000300) provides Installation Instructions for NetSure™ Power System Model 4015-X003, Spec. No. 584000300, and the individual components (Spec. Nos. listed on the front cover of this document) comprising the system.

The complete Customer Documentation Package consists of…

Bound System Installation Manual

Power System Installation InstructionsIM584000300

Bound System Operation Manual

Power System Operation InstructionsUM584000300
Rectifier InstructionsUM1R40015000e
Power System “System Application Guide”SAG584000300

Bound ACU+ Controller Operation Manual

ACU+ Controller Operation InstructionsUM1M820NNB-1

USB Drive with All Customer Documentation

Power System Installation InstructionsIM584000300
Power System Operation InstructionsUM584000300
Rectifier InstructionsUM1R40015000e
Power System “System Application Guide”SAG584000300
ACU+ Controller Operation InstructionsUM1M820NNB-1

Also provided on the USB drive is an ACU+ configuration drawing and the ACU+ configuration files loaded into the ACU+ as shipped.

SYSTEM PACKAGING

The following describes how the system components and hardware are packaged for shipment, and provides a means of identifying the components and hardware described in these instructions.

Chapter 1. General Information and Installation Acceptance Checklist Page 1 This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Page 12 of the Emerson 4015 user manual — Power and Control Sub-Rack (List 11, 12)
Page 12 · click to enlarge
Page 12

Power and Control Sub-Rack (List 11, 12)

Emerson 4015 — Power and Control Sub-Rack (List 11, 12) diagram (page 12)
Fig. 5 · Power and Control Sub-Rack (List 11, 12)
ItemPart NumberQty. Power and Control Sub-Rack553199 (List 11) 554097 (List 12)1 Rear Mounting Brackets (Sub-Rack)553313 and 5544231, each Screws to Mount Rear Mounting Brackets to Sub-Rack (10-32 x 1/2”)2216714006 Cage Nuts (Sub-Rack Data Rack Mounting)P8857720 Sub-Rack Mounting Screws for Use with Cage Nuts (Sub-Rack Data Rack Mounting)P9489620 Snap Bushing, 1.0932448231005 Snap Bushing, 1.752448238001 Hole Plug, 1.3751441521 KEPS Nuts (10-32) (AC Ground)1045644 KEPS Nuts (1/4-20) (DC Load and Battery)11663840 USB Flash Drive (Config File)1443451 Cabinet Grounding Jumper5549321 Flat Washer, 1/4” (Data Rack Ground Bar)21411010040 Lock Washer, 1/4” (Data Rack Ground Bar)21511110040 Screw, 1/4-20 x 3/4” (Data Rack Ground Bar)22764040040 Screw, 6-32 x 3/8” (Spares for Rear Cover)2333627004
ItemPart NumberQty. Rectifier1R40015000e1 or 2
ItemPart NumberQty. Temperature Probe, 12 Feet (4m)04118246 and 041182471, each Temperature Probe, 33 Feet (10m)04118246 and 041167401, each

Page 2 Chapter 1. General Information and Installation Acceptance Checklist

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Page 13 of the Emerson 4015 user manual — DC Load Distribution Sub-Rack (List 21, 22, 23, 24)
Page 13 · click to enlarge
Page 13

DC Load Distribution Sub-Rack (List 21, 22, 23, 24)

Emerson 4015 — DC Load Distribution Sub-Rack (List 21, 22, 23, 24) diagram (page 13)
Fig. 6 · DC Load Distribution Sub-Rack (List 21, 22, 23, 24)

553221 (List 21) 553663 (List 22) 553349 (List 23) 554061 (List 24)

Sub-Rack Mounting Screws for Use with Cage Nuts (Sub-Rack Data Rack Mounting)

Flat Washer, 1/4” (Data Rack Ground Bar) 214110100 3

Lock Washer, 1/4” (Data Rack Ground Bar) 215111100 3

Screw, 1/4-20 x 3/4” (Data Rack Ground Bar) 227640400 3

Chapter 1. General Information and Installation Acceptance Checklist Page 3 This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Page 14 of the Emerson 4015 user manual — Battery Tray (List 91, 92)
Page 14 · click to enlarge
Page 14

Battery Tray (List 91, 92)

Emerson 4015 — Battery Tray (List 91, 92) diagram (page 14)
Fig. 7 · Battery Tray (List 91, 92)

Battery Tray 553266 (List 91) 554671 (List 92) 1

Rear Mounting Brackets (Tray) 553158 and 554041 1, each

Screws to Mount Rear Mounting Brackets to Tray (10-32 x 1/2”) 221671400 6

Sub-Rack Mounting Screws for Use with Cage Nuts (Tray Data Rack Mounting)

Flat Washer, 1/4” (Data Rack Ground Bar) 214110100 4

Lock Washer, 1/4” (Data Rack Ground Bar) 215111100 4

Screw, 1/4-20 x 3/4” (Data Rack Ground Bar) 227640400 4

Page 4 Chapter 1. General Information and Installation Acceptance Checklist

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Page 15 of the Emerson 4015 user manual — RECOMMENDED TOOLS AND TEST EQUIPMENT
Page 15 · click to enlarge
Page 15

RECOMMENDED TOOLS AND TEST EQUIPMENT

The following tools and test equipment are recommended to install the DC Power System.

Contact Emerson for a full turn key installation quote.

Digital Multimeter (DMM), capable of measuring system AC input and DC output voltages

NO-OX-ID-A or Approved Equivalent

Electrician's Insulated Screwdrivers, Phillips, No. 1 and 2

Electrician's Insulated Screwdrivers, Flat-Blade, Small and Large

Adjustable Torque Wrench, 1/2" (13mm) Drive, 0 in-lb (0 Nm) to 100 in-lb (11 Nm)

Ratchet, 1/2" (13mm) Drive

Insulated Nut Driver Set

Chapter 1. General Information and Installation Acceptance Checklist Page 5 This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Show 5 more labels / short text on this page
Non-Contact Voltage Detector · Lineman's Scissors · Lineman's Strippers · Lineman's Cutters · Hexagonal Bit Set
Page 16 of the Emerson 4015 user manual — Checklist –Factory Integrated System (List R1, R2)
Page 16 · click to enlarge
Page 16

INSTALLATION ACCEPTANCE CHECKLIST

General

The individual components of the DC Power System may be shipped as a complete solution factory installed and wired in an IT rack, or may be shipped separately to be installed in a customer provided IT rack.

Provided next is an Installation Acceptance Checklists for each option:

Factory Integrated System (List R1, R2)

Customer Integrated System (ship loose)

These Installation Acceptance Checklists help ensure proper installation and initial operation of the system. As the procedures presented in Chapters 2 through 5 of this document are completed, check the appropriate box on the appropriate Installation Acceptance Checklist. If the procedure is not required to be performed for your installation site, also check the box to indicate that the procedure was read. When installation is done, ensure that each block in the appropriate Installation Acceptance Checklist has been checked. Some of these procedures may have been factory performed for you.

Checklist.

Checklist –Factory Integrated System (List R1, R2)

Chapter 2. Installing the System

IT Rack Secured to Floor

Chapter 3. Making Electrical Connections

IT Rack Grounding Connection (Frame Ground) Made

AC Input Power and AC Input Equipment Grounding Connections Made

DC Load Distribution Connections to List 21-24 Distribution Sub-Rack(s) Made (if

Battery Sub-Trays Installed in List 91-92 Battery Tray(s) (if furnished)

External Battery Connections Made (if required)

IB2 (ACU+ Controller Interface Board) Connections Made (if required)

ACU+ Controller Ethernet Connection Made (if required)

Power and Control Sub-Rack Bulk Output Connections Made (if required)

Chapter 4. Installing the Rectifiers

Chapter 5. Initially Starting the System

System Started, Configured, and Checked

Page 6 Chapter 1. General Information and Installation Acceptance Checklist

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Equipment Inspection Completed · furnished) · Rectifiers Installed

Page 17 of the Emerson 4015 user manual — Checklist – Customer Integrated System (ship loose)
Page 17 · click to enlarge
Page 17

Checklist – Customer Integrated System (ship loose)

Chapter 2. Installing the System

IT Rack Secured to Floor

Power and Control Sub-Rack, Load Distribution Sub-Rack(s), and Battery Tray(s)

Installed in IT Rack

Chapter 3. Making Electrical Connections

Sub-Racks Cabinet Grounding Connection (Frame Ground) Made

IT Rack Grounding Connection (Frame Ground) Made

Return Bar Grounding Connection Made (NPG Configuration Only)

HRMG Grounding Connection Made (HRMG Configuration Only)

Sub-Rack Electrical Interconnections Made

AC Input Power and AC Input Equipment Grounding Connections Made

DC Load Distribution Connections to List 21-24 Distribution Sub-Rack(s) Made (if

Battery Sub-Trays Installed in List 91-92 Battery Tray(s) (if furnished)

External Battery Connections Made (if required)

IB2 (ACU+ Controller Interface Board) Connections Made (if required)

ACU+ Controller Ethernet Connection Made (if required)

Power and Control Sub-Rack Bulk Output Connections Made (if required)

Chapter 4. Installing the Rectifiers

Chapter 5. Initially Starting the System

System Started, Configured, and Checked

Chapter 1. General Information and Installation Acceptance Checklist Page 7 This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Equipment Inspection Completed · furnished) · Rectifiers Installed

Page 18 of the Emerson 4015 user manual — GENERAL REQUIREMENTS
Page 18 · click to enlarge
Page 18

CHAPTER 2. INSTALLING THE SYSTEM

The individual components of the DC Power System may be shipped as a complete solution factory installed and wired in an IT rack, or may be shipped separately to be installed in a customer provided IT rack.

GENERAL REQUIREMENTS

This product is intended only for installation in a restricted access location on or above a non-combustible surface.

Front and rear access is required for installation.

Required minimum spacing from the rear of the power and control sub-rack to a wall or other solid surface is thirty-six (36) inches for proper ventilation of system components. Required minimum spacing from the rear of the load distribution sub- rack to a wall or other solid surface is twelve (12) inches for proper ventilation of system components.

See Figure 2-1 for an air flow diagram.

Emerson 4015 — GENERAL REQUIREMENTS diagram (page 18)
Fig. 8

Figure 2-1 Air Flow Diagram

Page 8 Chapter 2. Installing the System

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Hot Aisle · Air Flow

Page 19 of the Emerson 4015 user manual — Factory Integrated Systems (List R1, R2)
Page 19 · click to enlarge
Page 19

INSPECTING THE EQUIPMENT AND STORING FOR DELAYED INSTALLATIONS

Inspecting the Equipment

Compare the contents of the shipment with the bill of lading. Report any missing items to the carrier and your local Emerson representative immediately.

While the DC Power System is still on the truck, inspect the equipment and shipping container(s) for any signs of damage or mishandling.

As the equipment is moved off the truck and unpacked, visually examine the DC Power System for transit damage.

Do not attempt to install the system if damage is apparent.

If any damage is noted, file a damage claim with the shipping agency within 24 hours and contact Emerson Network Power (number located on last pages of this document) to inform them of the damage claim and the condition of the equipment.

Storing for Delayed Installation

If the equipment will not be installed immediately, it must be stored indoors where the humidity is no higher than 95%. The storage area must protect the DC Power System from excessive moisture.

SECURING THE IT RACK TO THE FLOOR

Secure the IT rack to the floor per site requirements. Refer also to the General Requirements section at the beginning of this chapter.

Factory Integrated Systems (List R1, R2)

For systems factory furnished in an IT rack (List R1, R2), position and secure the Emerson Network Power DCM IT Rack to the floor as follows.

1. Use at least two people when moving the IT rack.
2. Using a pallet jack or forklift, move the IT rack on its pallet to the installation location.
3. Cut the shrink wrap and remove all packaging.
4. Remove the lag bolts securing each shipping bracket to the shipping pallet. There is one bracket at each corner of the IT rack (each bracket has two lag bolts).
5. Use a pallet jack or forklift to raise the IT rack off the shipping pallet.
6. Slide the shipping pallet out from under the IT rack.
7. The IT rack may be positioned for installation either with the forklift or by rolling the cabinet on its casters. If the casters are to be used to move the cabinet, prepare the IT rack for rolling as follows.

a) Set the IT rack on the floor.

b) Using a hex wrench, lower each leveling feet until the IT rack is not resting

on the shipping brackets.

c) Remove the hex bolts securing each shipping bracket to the IT rack.

Chapter 2. Installing the System Page 9 This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Procedure

Page 20 of the Emerson 4015 user manual — Installing the Sub-Racks
Page 20 · click to enlarge
Page 20

d) Using a hex wrench, raise each leveling feet until the IT rack is resting on the

casters.

8. Position the IT rack.
9. Lower the leveling feet or bolt the IT rack to the floor by using the shipping brackets (the shipping brackets will have to be re-attached to the IT rack if removed for rolling the IT rack into position).

INSTALLING INDIVIDUAL SUB-RACKS INTO CUTOMER PROVIDED IT RACK (not applicable with List R1, R2)

For customer provided IT rack installation only.

control sub-rack, load distribution sub-rack(s), and battery tray(s) are installed.

Customer Supplied IT Rack Guidelines

If you plan to assemble / configure your own system, note that the NetSure 4000 Series components (power and control sub-rack / load distribution sub-rack / battery tray) were evaluated as a UL Listed system in an Emerson Network Power DCM IT Rack in an ambient of +35°C (95°F), with a front and rear door free area ratio of 83%.

Installing the Sub-Racks

If the system was ordered to be installed in a customer provided IT rack, install the individual components of the DC Power System into a 19” mounting frame of the IT rack.

1. If furnished, the DC load distribution sub-rack(s) is typically installed at the top of the IT rack.

a) Slide the DC load distribution sub-rack into position and secure the front

mounting flanges to the IT rack with the furnished cage nuts and screws.

b) Repeat this procedure if a second DC load distribution sub-rack is furnished.

2. The power and control sub-rack is typically installed below the DC load distribution sub-rack(s).

a) Secure the rear mounting brackets to the IT rack with the furnished cage nuts

and screws.

b) Remove the rear cover from the power and control sub-rack.

c) Slide the power and control sub-rack into the front of the IT rack until it is in

position (with the bottom of the sub-rack resting on the angles of the rear mounting brackets).

d) Secure the front mounting flanges to the IT rack with the furnished cage nuts

and screws.

Page 10 Chapter 2. Installing the System

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Procedure

Page 21 of the Emerson 4015 user manual — Installing Individual Sub-Racks into Cutomer Provided IT Rack (not applicable with List R1, R2)
Page 21 · click to enlarge
Page 21

e) Secure the rear mounting brackets to the power and control sub-rack with the

furnished hardware (hardware is installed from inside the sub-rack, the rear mounting brackets have captive fasteners).

3. If furnished, the battery tray(s) is typically installed at the bottom of the IT rack due to the weight of the batteries.

batteries) will be installed in the “Making Electrical Connections” section.

sub-rack from either the top or bottom of the power and control sub-rack. Note that a space is required between the power and control sub-rack and battery tray to allow the cables to enter from the bottom.

a) Secure the rear mounting brackets to the IT rack with the furnished cage nuts

and screws.

b) Slide the battery tray into the front of the IT rack until it is in position (with the

bottom of the sub-rack resting on the angles of the rear mounting brackets).

c) Secure the front mounting flanges to the IT rack with the furnished cage nuts

and screws.

d) Secure the rear mounting brackets to the battery tray with the furnished

hardware (hardware is installed from inside the battery tray, the rear mounting brackets have captive fasteners).

e) Repeat this procedure if other battery tray(s) are furnished.

Chapter 2. Installing the System Page 11 This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Page 22 of the Emerson 4015 user manual — Electrically Interconnecting the Sub-Rack(s)
Page 22 · click to enlarge
Page 22

The rear mounting bracket can be adjusted from 28.75” (730mm) to 32.25” (819mm) for the Power and Control Sub-Rack and 26.39” (670mm) to 32.60” (828mm) for the Batter Tray.

Emerson 4015 — Electrically Interconnecting the Sub-Rack(s) diagram (page 22)
Fig. 9 · Electrically Interconnecting the Sub-Rack(s)

(3) per side for the distribution sub-rack(s). (4) per side (front and rear brackets) for the power and control sub-rack. (3) per side (front and rear brackets) for the battery tray(s).

Remove back cover to secure rear mounting brackets, hardware is installed from inside the sub-rack, the brackets have captive fasteners to secure hardware.

Rear Mounting Brackets (both sides) (Secure rear mounting brackets to IT rack first,

then slide sub-rack into IT rack so sub-rack rests on rear mounting brackets bottom angles,

Power and Control Sub-Rack

then secure sub-rack’s front mounting flanges

to IT rack, and finally secure rear mounting

Figure 2-2 Mounting Details

Electrically Interconnecting the Sub-Rack(s)

The sub-racks are electrically interconnected later in the “Sub-Racks Electrical Interconnections” procedure on page 21.

Page 12 Chapter 2. Installing the System

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Load Distribution Sub-Rack · Battery Tray · Front

Page 23 of the Emerson 4015 user manual — CABLE ROUTING
Page 23 · click to enlarge
Page 23

CHAPTER 3. MAKING ELECTRICAL CONNECTIONS

IMPORTANT SAFETY INSTRUCTIONS

this document.

WIRING CONSIDERATIONS

All AC input and 400V DC output wiring, branch circuit protection, and grounding should follow the current edition of the American National Standards Institute (ANSI) approved National Fire Protection Association's (NFPA) National Electrical Code (NEC), and applicable local codes. For operation in countries where the NEC is not recognized, follow applicable codes.

For wire size, branch circuit protection, crimp lug, and general wiring recommendations; refer to System Application Guide SAG584000300.

TORQUE

Torque all connections as specified in the illustrations presented in this chapter.

OUTPUT GROUND CONFIGURATIONS

These instructions apply both to the High Resistance Midpoint Grounded (HRMG) and Negative Pole Grounded (NPG) configurations. Ensure you follow the proper procedures for the configuration you have. Refer to the part number on your equipment. The table on the front cover of this document lists the various equipment part numbers and the configuration they apply to.

CABLE ROUTING

When System is Furnished in a Factory Provided IT Rack (List R1, R2)

If the system is furnished in a factory provided IT rack, connections between the system’s sub-racks and also to the IT rack ground bar are factory made. The electrical connections the customer is required to make are the following. Refer to Figure 3-1 on the next page for a cable routing diagram.

Site Ground to IT Rack Ground Bar (page 25)

AC Input Connections (page 28)

DC Load Distribution Connections to List 21-24 Distribution Sub-Rack(s) (page 29)

Battery Sub-Trays Installed in List 91-92 Battery Tray(s) (page 31)

External Batteries (if required) (page 33)

IB2 (ACU+ Controller Interface Board) Connections (if required) (page 35)

ACU+ Controller Ethernet Connection (if required) (page 36)

Power and Control Sub-Rack Bulk Output Connections (if required) (page 40)

GO TO PAGE 25 FOR THE ELECTRICAL CONNECTIONS PROCEDURES.

Chapter 3. Making Electrical Connections Page 13 This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Page 24 of the Emerson 4015 user manual — CHAPTER 3. MAKING ELECTRICAL CONNECTIONS
Page 24 · click to enlarge
Page 24

Top Plate Two options available: 1) P/N 554472. Holes sized for imperial conduit fittings (25mm [1”] conduit fittings except AC Input and External Battery which are 32mm [1.25”] conduit fittings). 2) P/N 554473. Holes sized for corded connections using metric cord grips (38mm [1.5”] holes).

Emerson 4015 — CHAPTER 3. MAKING ELECTRICAL CONNECTIONS diagram (page 24)
Fig. 10

External Battery 1 External Battery 2 Building Ground * Alarm

* Ground Bar Provided on Rear of IT Rack

DC Distribution Leads Openings for 25mm (1”) Conduit (snap bushings are furnished for use without conduit)

Emerson 4015 — CHAPTER 3. MAKING ELECTRICAL CONNECTIONS diagram (page 24)
Fig. 11

AC Input Leads Opening for 25mm (1”) Conduit

Alarm Leads Opening for 25mm (1”) Conduit

Battery Leads Openings for 19mm (0.75”) Conduit (top and bottom)

Figure 3-1 Top Feed Cable Landing Diagram – Factory Provided IT Rack

Page 14 Chapter 3. Making Electrical Connections

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Show 6 more labels / short text on this page
Distribution · Sub-Rack · Power and · Control Sub-Rack · Battery · Tray
Page 25 of the Emerson 4015 user manual — When System Components are Furnished Loose to be Installed in a Customer Furnished IT Rack
Page 25 · click to enlarge
Page 25

When System Components are Furnished Loose to be Installed in a Customer Furnished IT Rack

If the system components are furnished loose to be installed in a customer furnished IT rack, the following connections are required. Refer to Figure 3-2 for a cable routing diagram.

Grounding Connections between the Sub-Racks and the IT Rack Ground Bar (page 17)

Return Bar Grounding Connection (NPG Configurations Only) (page 17)

HRMG Grounding Connection (HRMG Configurations Only) (page 17)

Sub-Racks Electrical Interconnections (page 21)

Site Ground to IT Rack Ground Bar (page 25)

AC Input Connections (page 28)

DC Load Distribution Connections to List 21-24 Distribution Sub-Rack(s) (page 29)

Battery Sub-Trays Installed in List 91-92 Battery Tray(s) (page 31)

External Batteries (if required) (page 33)

IB2 (ACU+ Controller Interface Board) Connections (if required) (page 35)

ACU+ Controller Ethernet Connection (if required) (page 36)

Power and Control Sub-Rack Bulk Output Connections (if required) (page 40)

Chapter 3. Making Electrical Connections Page 15 This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Page 26 of the Emerson 4015 user manual — When System Components are Furnished Loose to be Installed in a Customer Furnished IT Rack
Page 26 · click to enlarge
Page 26

Alarm Leads Opening for 25mm (1”) Conduit

Emerson 4015 — When System Components are Furnished Loose to be Installed in a Customer Furnished IT Rack diagram (page 26)
Fig. 12 · When System Components are Furnished Loose to be Ins…

Battery Leads Openings for 19mm (0.75”) Conduit (top and bottom)

Power and Control Sub-Rack DC Output Leads Openings for 32mm (1.25”) Conduit

Power and Control Sub-Rack DC Output Leads to Distribution Sub-Rack

Return Bar Grounding Point (19mm [0.75"] Conduit Opening) (NPG Configurations Only) Note: This connection can be made here or on the power and control sub-rack. Rear

to Power and Control Sub-Rack Battery Terminals

Figure 3-2 Individual Cable Landing Points – Sub-Racks

Page 16 Chapter 3. Making Electrical Connections

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Show 6 more labels / short text on this page
Distribution · Sub-Rack · Power and · Control Sub-Rack · Battery · Tray
Page 27 of the Emerson 4015 user manual — Grounding
Page 27 · click to enlarge
Page 27

TASKS TO BE PERFORMED FOR CUSTOMER INTEGRATED SYSTEMS

ALSO MAKE THE CONNECTIONS DESCRIBED UNDER “Tasks to Be Perform for All Installations” STARTING ON PAGE 25.

Grounding

hazard to personnel or the risk of fire, should a ground fault occur.

For grounding requirements, refer to the current edition of the American National Standards Institute (ANSI) approved National Fire Protection Association's (NFPA) National Electrical Code (NEC), applicable local codes, and your specific site requirements. For operation in countries where the NEC is not recognized, follow applicable codes.

Refer to Figure 3-8 for a complete system grounding scheme diagram.

Sub-Rack Grounding (Frame Ground)

When individual system components are furnished, the individual components must be grounded on site by the customer after installation into an IT rack. A cabinet grounding stud is located on the rear of the power and control sub-rack and distribution sub-rack. A tray grounding stud is located on the rear side panel of the battery tray. Refer to Figure 3-3 for connection points.

NPG Configurations OnlyReturn Busbar (-Bus) Grounding Connection

The return busbar (–Bus) in a negative pole ground (NPG) configuration is to be connected to ground. A grounding connection point for the return busbar (-Bus) is provided on the negative bus in the power and control sub-rack. This connection can also be made on the rear of the load distribution sub-rack, if furnished. Only connect in one place. Refer to Figure 3-4 for connection points.

HRMG Configurations OnlyBus Grounding Connection

A lead exits the rear of the power and control sub-rack in a High Resistance Midpoint Ground (HRMG) configuration. This lead MUST be connected directly to ground for proper operation of the mid-point grounding circuit and the ground fault detection circuit. Refer to Figure 3-5 for connection point.

ground fault detection circuit and the ±200V DC voltage reference inoperable. It is essential to properly bond this lead to ground.

1/4” clearance hole.

Chapter 3. Making Electrical Connections Page 17 This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Page 28 of the Emerson 4015 user manual — Tasks to Be performed for Customer Integrated Systems
Page 28 · click to enlarge
Page 28
Emerson 4015 — Tasks to Be performed for Customer Integrated Systems diagram (page 28)
Fig. 13 · Tasks to Be performed for Customer Integrated System…

84 in-lbs [9 Nm])

Emerson 4015 — Tasks to Be performed for Customer Integrated Systems diagram (page 28)
Fig. 14 · Tasks to Be performed for Customer Integrated System…

Stud (1/4-20 x 5/8”) (Recommended Torque:

Rear View (covers removed)

84 in-lbs [9 Nm])

Emerson 4015 — Tasks to Be performed for Customer Integrated Systems diagram (page 28)
Fig. 15 · Tasks to Be performed for Customer Integrated System…

Tray Grounding Stud (1/4-20 x 1/2”) (Recommended Torque:

84 in-lbs [9 Nm])

Figure 3-3 Sub-Racks Frame Grounding Connections

Page 18 Chapter 3. Making Electrical Connections

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Sub-Rack Grounding

Page 29 of the Emerson 4015 user manual — Tasks to Be performed for Customer Integrated Systems
Page 29 · click to enlarge
Page 29
Emerson 4015 — Tasks to Be performed for Customer Integrated Systems diagram (page 29)
Fig. 16 · Tasks to Be performed for Customer Integrated System…

Grounding Point (cover removed) (NPG Configurations Only) Note: This connection can be

made here or on the power

and control sub-rack as

shown below.

(Wire Size Capacity:

10 AWG to 4 AWG) (Recomended Torque:

80 in-lbs [9 Nm])

Return Busbar (-Bus) Grounding Point (NPG Configurations Only) Note: This connection can be made here or on the distribution sub-rack (if furnished) as shown above.

(Recommended Torque:

84 in-lbs [9 Nm])

(one set of 1/4-20 x 1/2” studs on 5/8” centers for double hole lugs)

Emerson 4015 — Tasks to Be performed for Customer Integrated Systems diagram (page 29)
Fig. 17 · Tasks to Be performed for Customer Integrated System…

Rear View (covers removed)

Figure 3-4 Return Busbar (-Bus) Grounding Connection (NPG Configurations Only)

Chapter 3. Making Electrical Connections Page 19 This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Load Distribution Sub-Rack · Return Busbar (-Bus)

Page 30 of the Emerson 4015 user manual — (MUST BE PROPERLY CONNECTED TO GROUND)
Page 30 · click to enlarge
Page 30

Power and Control Sub-Rack

Emerson 4015 — Tasks to Be performed for Customer Integrated Systems diagram (page 30)
Fig. 18 · Tasks to Be performed for Customer Integrated System…

HRMG Ground Connection (HRMG Configurations Only)

(MUST BE PROPERLY CONNECTED TO GROUND)

Rear View (covers removed)

A lead exits the rear of the power and control sub-rack in a High Resistance Midpoint Ground (HRMG) configuration. This lead MUST be connected directly to ground for proper operation of the mid-point grounding circuit and the ground fault detection circuit. This lead is 16 AWG, approximately 100” long, and terminated in a ring lug with a 1/4” clearance hole.

Figure 3-5 HRMG Ground Connection (HRMG Configuration Only)

Page 20 Chapter 3. Making Electrical Connections

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Page 31 of the Emerson 4015 user manual — Sub-Racks Electrical Interconnections
Page 31 · click to enlarge
Page 31

Sub-Racks Electrical Interconnections

If the system components are furnished loose to be installed in a customer furnished IT rack, the following electrical interconnections are required.

Connecting the Load Distribution Sub-Rack(s) to the Power and Control Sub-Rack

Output Connections (if required)” on page 40.

1. Locate the load distribution sub-rack input cables which are factory connected to the load distribution sub-rack. Route these cables into the power and control sub-rack. Connect these cables to the DC output terminals located inside the power and control sub-rack as follows. Repeat this procedure if a second load distribution sub-rack is furnished. Refer to Figure 3-6.

Connect the cable labeled /+/ to the positive DC output terminals.

Connect the cable labeled /-/ to the negative DC output terminals.

Connecting the Battery Tray(s) to the Power and Control Sub-Rack

1. Locate the battery tray output cables which are factory connected to the battery tray. Route these cables into the power and control sub-rack. Cables can be routed from the top or bottom into the power and control sub-rack. Connect these leads to the battery terminals located inside the power and control sub-rack as follows. Repeat this procedure if additional battery trays are furnished. Refer to Figure 3-6.

Connect the cable labeled /+/ to the positive battery terminals.

Connect the cable labeled /-/ to the negative battery terminals.

Connecting the Battery Tray Control and Alarm Harness to Other Battery Trays and/or to the Power and Control Sub-Rack

1. If only one battery tray is furnished, locate the control/alarm wire harness exiting the battery tray. Locate the two (2) battery control/alarm connectors located on the rear of the power and control sub-rack. Remove a termination plug from one of these connectors. Connect the extension control/alarm cable between the battery tray control/alarm wire harness and the power and control sub-rack connector which the termination plug was removed from. Refer to Figure 3-7.
2. If more than one battery tray is furnished, use the supplied battery tray control/alarm daisy chain cable as shown in Figure 3-7.

Chapter 3. Making Electrical Connections Page 21 This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Procedure · Procedure · Procedure

Page 32 of the Emerson 4015 user manual — Sub-Racks Electrical Interconnections
Page 32 · click to enlarge
Page 32
Emerson 4015 — Sub-Racks Electrical Interconnections diagram (page 32)
Fig. 19 · Sub-Racks Electrical Interconnections

Load Distribution Sub-Rack DC Input Cables (Factory connected in load distribution sub-rack, customer to route into power and control sub-rack and connect to power and control sub-rack DC output terminals.)

Battery Tray Output Cables (Factory connected in battery tray, customer to route into power and control sub-rack and connect to power and control sub-rack battery terminals.)

Battery Terminals for 400V DC Battery Strings

400V DC Output Terminals (two sets of 1/4-20 x 5/8”

(five sets of 1/4-20 x 5/8”

studs on 5/8” centers for

studs on 5/8” centers for

*Note: Battery cables can also be routed through the bottom of the power and control sub-rack.

Emerson 4015 — Sub-Racks Electrical Interconnections diagram (page 32)
Fig. 20 · Sub-Racks Electrical Interconnections

Rear View (covers removed)

Figure 3-6 Sub-Rack Interconnections

Page 22 Chapter 3. Making Electrical Connections

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Show 12 more labels / short text on this page
Rear · double hole lugs, · double hole lugs, · each polarity) · each polarity) · Negative Battery* · Positive Battery* · Negative Output · Positive · Output · Power and · Control Sub-Rack
Page 33 of the Emerson 4015 user manual — Sub-Racks Electrical Interconnections
Page 33 · click to enlarge
Page 33

Battery Tray Alarm / Control Connections - 1 Tray Only

Emerson 4015 — Sub-Racks Electrical Interconnections diagram (page 33)
Fig. 21 · Sub-Racks Electrical Interconnections

Internal/External Battery Tray Control/Alarm Connectors (If an internal or external battery tray is not connected, MUST have termination plugs installed.) (Use either connector.)

1. Remove a termination plug from one of the connectors (either one) located on the rear of the power and control sub-rack. 2. Plug the extension control/alarm cable into the connector the termination plug was removed from. 3. Connect the other end of the extension control/alarm cable into the battery tray control/alarm harness.

Extension Control/Alarm Cable (P/N 554715) (56”)

Battery Tray Control/Alarm Harness

Figure 3-7 (cont’d on next page) Internal Battery Tray Interconnections

Chapter 3. Making Electrical Connections Page 23 This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Rear

Page 34 of the Emerson 4015 user manual — Sub-Racks Electrical Interconnections
Page 34 · click to enlarge
Page 34

Battery Tray Alarm / Control Connections - 2 or More Trays

Internal/External Battery Tray Control/Alarm Connectors (If an internal or external battery tray is not connected, MUST have termination plugs installed.) (Use either connector.)

Extension Control/Alarm Cable (P/N 554715) (56”)

Battery Tray Control/Alarm Daisy Chain Cable (P/N 553614)

Battery Tray Control/Alarm Harness

Battery Tray Control/Alarm Harness

1. Remove a termination plug from one of the connectors (either one) located on the rear of the power and control sub-rack. 2. Plug the extension control/alarm cable into the connector the termination plug was removed from. 3. Connect the other end of the extension control/alarm cable into the end of the battery tray control/alarm daisy chain cable. 4. Plug the center connector of the battery tray control/alarm daisy chain cable into the battery tray control/harness of the first battery tray. 5. Plug the remaining end of the battery tray control/alarm daisy chain cable into the battery tray control/harness of the second battery tray.

Figure 3-7 (cont’d from previous page)

Internal Battery Tray Interconnections

Page 24 Chapter 3. Making Electrical Connections

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Show 9 more labels / short text on this page
Power and Control · Sub-Rack · Rear · Battery · Tray · Rear · Battery · Tray · Rear
Page 35 of the Emerson 4015 user manual — Grounding
Page 35 · click to enlarge
Page 35

TASKS TO BE PERFORM FOR ALL INSTALLATIONS

Grounding

hazard to personnel or the risk of fire, should a ground fault occur.

For grounding requirements, refer to the current edition of the American National Standards Institute (ANSI) approved National Fire Protection Association's (NFPA) National Electrical Code (NEC), applicable local codes, and your specific site requirements. For operation in countries where the NEC is not recognized, follow applicable codes.

Refer to Figure 3-8 for a complete system grounding scheme diagram.

IT Rack Grounding (Frame Ground)

Supply a grounding lead from site ground to the IT rack ground bar. For factory integrated systems (List R1, R2), refer to Figure 3-9 for connection point.

from the individual system components to a ground bar located on the rear left side of the furnished IT rack.

Conduit Grounding (Frame Ground)

Conduit grounding points are provided on terminal strips located on the left and right inside side walls of the distribution sub-rack. Refer to Figure 3-9 for connection points.

Chapter 3. Making Electrical Connections Page 25 This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Page 36 of the Emerson 4015 user manual — - BUS
Page 36 · click to enlarge
Page 36

System Grounding Connections Overview

Conduit Gnd (if req’d)

To Building Facility Ground

±200V DC Load Wiring + -

DC Load Distribution Sub-Rack

Conduit Gnd (if req’d)

To Building Facility Ground

400V DC Load Wiring + -

DC Load Distribution Sub-Rack

- BUS

Figure 3-8 Grounding Scheme Diagram

Page 26 Chapter 3. Making Electrical Connections

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Show 21 more labels / short text on this page
HRMG System Grounding · IT Rack · Main Ground Bar · Rack Frame Ground · Power & Control · AC Input · Sub-Rack · HRMG Ground Connection · Battery Tray · IT Rack · Tray 2-5 · NPG System Grounding · IT Rack · Main Ground Bar · Rack Frame Ground · Power & Control · AC Input · Sub-Rack · Battery Tray · IT Rack · Tray 2-5
Page 37 of the Emerson 4015 user manual — Tasks to Be Perform for All Installations
Page 37 · click to enlarge
Page 37
Emerson 4015 — Tasks to Be Perform for All Installations diagram (page 37)
Fig. 22 · Tasks to Be Perform for All Installations

Emerson Network Power DCM IT Rack Ground Bar (1/4-20 Captive Nuts on 5/8” Centers) (Recommended Torque: 84 in-lbs [9 Nm])

(Wire Size Capacitysee below) (Recommended Torque: see below)

14-10 AWG (2.5-6mm2) 20 in-lbs (2 Nm) 8 AWG (10mm2) 25 in-lbs (3 Nm) 6-4 AWG (16-25mm2) 35 in-lbs (4 Nm)

Emerson 4015 — Tasks to Be Perform for All Installations diagram (page 37)
Fig. 23 · Tasks to Be Perform for All Installations

Figure 3-9 IT Rack and Conduit Grounding Connections

Chapter 3. Making Electrical Connections Page 27 This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Page 38 of the Emerson 4015 user manual — A B C
Page 38 · click to enlarge
Page 38

AC Input Power Connections

this document. DO NOT attempt to work on an energized system.

AC input connections are made to an AC input terminal block located behind an access panel located on the rear of the power and control sub-rack. Studs are also provided for the AC Input ground leads. Refer to Figure 3-10 for location and connection details.

AC Input Nominal 380V/400V/480V AC,

Three-Phase, 50/60 Hz. (Wire Size Capacity: see below) (Recommended Torque: see below)

2-3 AWG (35-30mm2) 50 in-lbs (5.65 Nm) 4-6 AWG (25-16mm2) 45 in-lbs (5.08 Nm)

A B C

Emerson 4015 — A B C diagram (page 38)
Fig. 24

Rectifier Shelf Rear View

Figure 3-10 AC Input Power Connections

Page 28 Chapter 3. Making Electrical Connections

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

(covers removed)

Page 39 of the Emerson 4015 user manual — DC Load Distribution Electrical Connections to List 21-24 DC Load Distribution Sub-Rack(s) (if furnished)
Page 39 · click to enlarge
Page 39

DC Load Distribution Electrical Connections to List 21-24 DC Load Distribution Sub-Rack(s) (if furnished)

this document. DO NOT attempt to work on an energized system.

HRMG (High Resistance Midpoint Ground) Configuration

Load distribution leads are connected to the load distribution devices as shown in Figure 3-11.

NPG (Negative Pole Ground) Configuration

Load distribution leads are connected to the load distribution devices and return busbar as shown in Figure 3-11. Note that the return busbar is connected to ground as described in “NPG Configurations Only: Return Busbar (-Bus) Grounding Connection on page 17.

Chapter 3. Making Electrical Connections Page 29 This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Page 40 of the Emerson 4015 user manual — CONNECT ONLY TO "+"
Page 40 · click to enlarge
Page 40

Load Distribution Sub-Rack (HRMG Configurations)

DETAIL A Load Connections to Load Distribution Circuit Breakers

Load Connections (See Detail A) (Stripped Wire Type Connection)

Field Connection to External Customer Loads. OBSERVE CORRECT POLARITY.

Emerson 4015 — DC Load Distribution Electrical Connections to List 21-24 DC Load Distribution Sub-Rack(s) (if furnished) diagram (page 40)
Fig. 25 · DC Load Distribution Electrical Connections to List…

±200V DC

+ -

Wire Size Capacity10-4 AWG (6-25mm 2 ) Recomended Torque:

18 in-lbs (2 Nm)

Load Distribution Sub-Rack (NPG Configurations)

Load Connections (See Detail B) (Stripped Wire Type Connection)

DETAIL B Load Connections to Load Distribution Circuit Breakers and Return Bar

Emerson 4015 — ±200V DC diagram (page 40)
Fig. 26

Field Connection to External Customer Loads. OBSERVE CORRECT POLARITY.

+400V DC

Emerson 4015 — +400V DC diagram (page 40)
Fig. 27
Wire Size Capacity10-4 AWG (6-25mm 2 ) Recomended Torque:
Wire Size Capacity10-4 AWG (6-25mm 2 ) Recomended Torque: 18 in-lbs (2 Nm)

CONNECT ONLY TO "+"

SIDE OF BREAKER,

AS SHOWN.

Figure 3-11 DC Load Distribution Connections to Distribution Sub-Rack(s)

Page 30 Chapter 3. Making Electrical Connections

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Return (-) · factory connection

Page 41 of the Emerson 4015 user manual — Installing Battery Sub-Trays in List 91 and 92 Battery Tray(s) (if furnished)
Page 41 · click to enlarge
Page 41

Installing Battery Sub-Trays in List 91 and 92 Battery Tray(s) (if furnished)

this document.

out before beginning work.

ends. DO NOT install batteries into a battery tray that is not wired into the power and control sub-rack.

Refer to System Application Guide SAG584000300 for specifications and manufacturers of the batteries to be installed in this power system.

Batteries are furnished with this system but shipped separately. These batteries are packaged in six (6) battery sub-trays. All battery wiring within the battery sub-trays are done at the factory.

Refer to Figure 3-12 as this procedure is performed.

1. ENSURE BATTERY BREAKER ON FRONT OF BATTERY TRAY IS TURNED OFF AND LOCKED-OUT.
2. Remove the battery retaining bracket from the rear of the battery tray.
3. Unpack the battery sub-trays.
4. In the battery sub-trays that hold five (5) batteries, one battery string cable is disconnected and sleeved at the factory for transportation. Locate this lead and connect it to the open battery terminal in that tray. See Figure 3-12.

Battery Sub-Tray Connector Red + Black -

5. Check each battery sub-tray voltage before installing as follows.
Emerson 4015 — Installing Battery Sub-Trays in List 91 and 92 Battery Tray(s) (if furnished) diagram (page 41)
Fig. 28 · Installing Battery Sub-Trays in List 91 and 92 Batte…

a) Battery sub-trays contain either four (4) or five (5) pre-wired battery blocks.

b) With an external meter, measure each battery sub-tray voltage at the battery

sub-tray connector (see illustration in left margin). If battery sub-tray voltages are OK, install each battery sub-tray as detailed in the remaining steps of this procedure. Contact Emerson Technical Support if battery sub- tray voltages are not within limits. Contact information is provided on the inside back cover of this document.

6. If a battery temperature probe is to be used, it is recommended to secure it on top of a battery block near the location indicated in Figure 3-12.
7. Slide pre-wired battery sub-trays into battery tray.
8. Connect each battery sub-tray connector to the respective connector located on the battery tray.
9. Re-install the battery retaining bracket to the battery tray.

Chapter 3. Making Electrical Connections Page 31 This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Battery Manufacturer Information · Installing Battery Sub-Trays · Procedure

Page 42 of the Emerson 4015 user manual — Installing Battery Sub-Trays in List 91 and 92 Battery Tray(s) (if furnished)
Page 42 · click to enlarge
Page 42
Emerson 4015 — Installing Battery Sub-Trays in List 91 and 92 Battery Tray(s) (if furnished) diagram (page 42)
Fig. 29 · Installing Battery Sub-Trays in List 91 and 92 Batte…

On the sub-trays that hold five (5) batteries, one battery string cable is disconnected and sleeved at the factory. Locate this lead and connect it to the open battery terminal in that tray.

If a battery temperature probe is to be used, it is recommended to secure it on top of a battery block near this location.

Figure 3-12 Installing Battery Sub-Trays in List 91 and 92 Battery Tray(s)

Page 32 Chapter 3. Making Electrical Connections

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Page 43 of the Emerson 4015 user manual — External Battery Connections (if required)
Page 43 · click to enlarge
Page 43

External Battery Connections (if required)

this document. DO NOT attempt to work on an energized system.

Up to five internal or external battery strings can be connected to busbars located in the power and control sub-rack. If the system is furnished in a factory provided IT rack, connections to internal battery trays are factory made.

Connect any external battery strings to the positive and negative battery connection points per Figure 3-13. Cables can be routed from the top or bottom to the power and control sub-rack. Refer to SAG584000300 for wire size and crimp lug information.

If there is a battery breaker associated with the external battery string that is to be controlled (tripped) by the system’s LVD circuit, wire per Figure 3-13.

Use 22 AWG (0.5mm2) wire.

The mating connector for the alarm/control connector on the power and control sub-rack is P/N 247874900 (Tyco 172167-1).

The mating contacts for the alarm/control connector on the power and control sub-rack is 245381700 (Tyco 170360-3) (22-18 AWG).

The contacts are to be crimped with Tyco hand tool P/N 724651.

External battery breaker requirements are as follows.

External battery breaker must contain a 48V shunt trip with the following specifications.

a) Rated Voltage: 12 to 60 VDC.

b) Maximum Release Duration: ≤ 10ms.

c) Minimum Resistance: >1 ohm.

External battery breaker must contain auxiliary contacts that are normally closed if the breaker is close. Minimum contact rating is 48V DC at 2A.

Chapter 3. Making Electrical Connections Page 33 This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Page 44 of the Emerson 4015 user manual — CUSTOMER CONNECTION TO EXTERNAL BATTERY STRINGS
Page 44 · click to enlarge
Page 44

CUSTOMER CONNECTION TO EXTERNAL BATTERY STRINGS

Battery Terminals for 400V DC Battery Strings (five sets of 1/4-20 x 1/2” studs on 5/8” centers

for double hole lugs, each polarity)

Emerson 4015 — CUSTOMER CONNECTION TO EXTERNAL BATTERY STRINGS diagram (page 44)
Fig. 30

*Note: Battery cables can also be routed through the bottom of the power and control sub-rack.

(Use either connector.) (If an internal or external battery tray is not connected, MUST have termination plugs

Figure 3-13 External Battery Connections

Page 34 Chapter 3. Making Electrical Connections

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Positive Battery*

Page 45 of the Emerson 4015 user manual — IB2 (ACU+ Controller Interface Board) Connections (if required)
Page 45 · click to enlarge
Page 45

IB2 (ACU+ Controller Interface Board) Connections (if required)

The IB2 (ACU+ Controller Interface Board) provides connection points for digital inputs, programmable relay outputs, and temperature probes. The IB2 interface board is accessed from the front of the power and control sub-rack. Loosen the two captive fasteners and slide the tray the IB2 assembly is mounted to out far enough to make the electrical connections. Refer to Figure 3-14.

When connecting input and output wires to the IB2 board, route the leads through the opening provided on the top of the power and control sub-rack for I/O wiring (see Figure 3-14), through the I/O wiring cable tray, and out to the IB2 assembly at the front of the system.

bias supplies. If a voltage potential is required to be connected to digital inputs and/or relay contacts, customer must supply the voltage source.

Digital Inputs and Programmable Relay Outputs

Digital input and relay output leads are connected to screw-type terminal blocks located on the IB2. Recommended torque for these connections is 2.2 in-lbs (0.25 Nm). Refer to Table 3-1 and Table 3-2 for pin-out information.

Connect up to eight (8) digital inputs to the IB2 (ACU+ Controller Interface Board). Note that you must supply both paths for the digital input (either a positive or negative signal and the opposite polarity return path). Observe proper polarity. Refer to Figure 3-14 for terminal locations and Table 3-1 for pin-out information.

The digital inputs can be programmed to provide an alarm when the signal is applied (HIGH) or removed (LOW). Refer to the ACU+ Controller Operation Instructions (UM1M820NNB-1) for programming information.

Digital Input Ratings: Refer to the following.

a) Maximum Voltage Rating: 60V DC.

b) Active High: > 19V DC.

c) Active Low: < 1V DC.

The IB2 provides eight programmable alarm relays with dry Form-C contacts. Refer to the ACU+ Controller Operation Instructions (UM1M820NNB-1) for programming information. Connect up to eight (8) relay outputs to the IB2. Refer to Figure 3-14 for terminal locations and Table 3-2 for pin-out information.

Relay Ratings: Refer to the following.

a) 1A Steady State @ 30V DC.

b) 3A Peak @ 30V DC.

Chapter 3. Making Electrical Connections Page 35 This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Digital Inputs · Programmable Relay Outputs

Page 46 of the Emerson 4015 user manual — ACU+ Controller Ethernet Connection (if required)
Page 46 · click to enlarge
Page 46

complete probe. See SAG584000300 for part numbers and descriptions.

Up to two (2) temperature probes can be connected to the IB2. Any combination of the two (2) temperature probes can be programmed to monitor ambient air temperature and/or battery temperature. A temperature probe set to monitor battery temperature can also be used for the rectifier battery charge temperature compensation feature. The battery charge temperature compensation feature allows the controller to automatically increase or decrease the output voltage of the system to maintain battery float current as battery temperature decreases or increases, respectively. Battery life can be extended when an optimum charge voltage to the battery with respect to temperature is maintained. A temperature probe set to monitor battery temperature can also be used for the BTRM (battery thermal runaway management) feature. The BTRM feature lowers output voltage when a high temperature condition exist to control against battery thermal runaway. Refer to the ACU+ Controller Operation Instructions (UM1M820NNB-1) for programming information.

A temperature probe programmed to monitor battery temperature should be mounted on the top or side of a battery block to sense battery temperature. A temperature probe used for battery charge temperature compensation and/or BTRM (Battery Thermal Runaway Management) should also be mounted on the top or side of a battery block. A temperature probe programmed to monitor ambient temperature should be mounted in a convenient location, away from direct sources of heat or cold.

Recommended Battery Temperature Probe Location for Furnished List 91, 92 Battery Tray: If a battery temperature probe is to be used, it is recommended to secure it on top of a battery block near the location indicated in Figure 3-12.

ACU+ Controller Ethernet Connection (if required)

The ACU+ Controller provides a Web Interface via an Ethernet connection. This interface can be accessed locally on a computer or remotely through a network. An RJ-45 10BaseT jack is provided on the front of the ACU+ Controller for connection to a computer or into a customer's network. This jack has a standard Ethernet pin configuration scheme, twisted pair. Refer to Figure 3-14 for location. Use shielded Ethernet cable (grounded at both ends). Note that the ACU+ RJ-45 jack is connected to chassis ground. Refer to the ACU+ Controller Operation Instructions (UM1M820NNB-1) for operational details.

connection to intra-building or unexposed wiring or cabling only. The intra- building port(s) of the equipment or subassembly MUST NOT be metallically connected to the interfaces that connect to the OSP or its wiring. These interfaces are designed for use as intra-building interfaces only (Type 2 or Type 4 ports as described in GR-1089-CORE, Issue 4) and require isolation from the exposed OSP cabling. The addition of Primary Protectors is not sufficient protection in order to connect these interfaces metallically to OSP wiring.

The intra-building port (RJ-45) of the equipment or subassembly must use shielded intra-building cabling/wiring that is grounded at both ends.

Page 36 Chapter 3. Making Electrical Connections

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Temperature Probes

Page 47 of the Emerson 4015 user manual — IB2 TEMP PROBE 1
Page 47 · click to enlarge
Page 47

I/O Wiring Cable Tray Top cover removed in illustration for clarity only.

Emerson 4015 — Temperature Probes diagram (page 47)
Fig. 31 · Temperature Probes

Customer Input/Output (I/O) Connections Top View ACU+ IB2 Interface Board

Emerson 4015 — Temperature Probes diagram (page 47)
Fig. 32 · Temperature Probes

Relay Output Term. Blocks Digital Input Term. Blocks J9 J8 J7 J6 J5 J4 J3

No.

1 8 7 6 5 4 3 2 Input No. (–)

IB2 TEMP PROBE 2

No.

IB2 TEMP PROBE 1

Switch sections must be set to this position to interface with the ACU+ controller.

J3-J9: Wire Size Capacity: 16-26 AWG (1.5-0.5mm2). Recommended Torque: 2.2 in-lbs (0.25 Nm).

Figure 3-14 External Interface Connections

Chapter 3. Making Electrical Connections Page 37 This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Relay · Relay · Connector to ACU+

Page 48 of the Emerson 4015 user manual — Temperature Probes
Page 48 · click to enlarge
Page 48
Emerson 4015 — Temperature Probes diagram (page 48)
Fig. 33 · Temperature Probes

Table 3-1 Programmable Digital Inputs

Page 38 Chapter 3. Making Electrical Connections

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Page 49 of the Emerson 4015 user manual — Temperature Probes
Page 49 · click to enlarge
Page 49
Emerson 4015 — Temperature Probes diagram (page 49)
Fig. 34 · Temperature Probes

Table 3-2 Programmable Relay Outputs

Chapter 3. Making Electrical Connections Page 39 This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Page 50 of the Emerson 4015 user manual — CUSTOMER CONNECTION
Page 50 · click to enlarge
Page 50

Power and Control Sub-Rack Bulk Output Connections (if required)

this document. DO NOT attempt to work on an energized system.

are installed. The power and control sub-rack provides connection points for up to two (2) total DC load distribution sub-racks / bulk output combinations.

Refer to Figure 3-15 for connection details. Refer to SAG584000300 for wire size and crimp lug information.

CUSTOMER CONNECTION

TO BULK DISTRIBUTION

400V DC Output Terminals (two sets of 1/4-20 x 1/2” studs

on 5/8” centers for double

hole lugs, each polarity)

Emerson 4015 — CUSTOMER CONNECTION diagram (page 50)
Fig. 35

Rear View (covers removed)

Figure 3-15 Bulk DC Distribution Connections to Power and Control Sub-Rack

Page 40 Chapter 3. Making Electrical Connections

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Negative Output · Positive · Output

Page 51 of the Emerson 4015 user manual — CHAPTER 4. INSTALLING THE RECTIFIER MODULE
Page 51 · click to enlarge
Page 51

CHAPTER 4. INSTALLING THE RECTIFIER MODULE

The rectifier module is hot swappable. It can be installed with the system operating if these instructions are carefully followed.

1. Unpack the rectifier module.
2. Open the respective rectifier module’s AC input circuit breaker on the front of the power and control sub-rack.
3. Place the “Latch Release” located on the front of the rectifier module to the LEFT position. See Figure 4-1.
4. Place the rectifier module into an unoccupied mounting slot without sliding it in completely. Gently push the rectifier module into the mounting slot until it stops. Note that the rectifier module will NOT be completely seated in the mounting slot until the next step is performed.
5. Live Systems: Wait for the green power indicator to illuminate. Ensuring the green power indicator stays on, slide the “Latch Release” located on the front of the rectifier module to the RIGHT position. Gently push the rectifier module into the mounting slot until it is completely seated.

De-energized Systems: Slide the “Latch Release” located on the front of the rectifier module to the RIGHT position. Gently push the rectifier module into the mounting slot until it is completely seated.

6. Secure the rectifier module to the power and control sub-rack by tightening the retaining screw.
7. Repeat the above steps for each rectifier module being installed in the system.
8. After the rectifier modules are physically installed in their mounting slots, they are ready for operation immediately after power is supplied to them.
9. Close the respective rectifier module’s AC input circuit breaker on the front of the power and control sub-rack.
Emerson 4015 — CHAPTER 4. INSTALLING THE RECTIFIER MODULE diagram (page 51)
Fig. 36

Figure 4-1 Installing a Rectifier Module

Chapter 4. Installing the Rectifier Module Page 41 This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Procedure · Retaining Screw · Front View

Page 52 of the Emerson 4015 user manual — INITIAL STARTUP PREPARATION
Page 52 · click to enlarge
Page 52

CHAPTER 5. INITIALLY STARTING THE SYSTEM

service interruption and/or result in the extension of alarms. Notify any appropriate personnel before starting these procedures. Also, notify personnel when these procedures are completed.

INITIAL STARTUP PREPARATION

Refer to Figure 5-1 for circuit breaker locations.

Ensure that all blocks in the appropriate “Installation Acceptance Checklist” starting on page 6 have been checked (except the last one).

Ensure that a rectifier module or a blank cover panel is installed in all rectifier mounting positions.

Ensure the distribution row input circuit breaker is in the OFF position (if furnished).

Ensure each load distribution circuit breaker is in the OFF position.

Ensure each rectifier module AC input circuit breaker is in the OFF position.

Ensure each battery tray circuit breaker is in the OFF position.

Load Distribution Circuit Breakers

Emerson 4015 — INITIAL STARTUP PREPARATION diagram (page 52)
Fig. 37

Power and Control Sub-Rack

Battery Tray Circuit Breaker

Figure 5-1 Circuit Breaker Locations

Page 42 Chapter 5. Initially Starting the System

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Load Distribution Sub-Rack · Battery Tray

Page 53 of the Emerson 4015 user manual — INITIALLY STARTING THE SYSTEM
Page 53 · click to enlarge
Page 53

INITIALLY STARTING THE SYSTEM

1. Close the external AC disconnect or protective device that supplies AC power to the system.
2. Place each rectifier module AC input circuit breaker located on the front of the power and control sub-rack to the ON position. Rectifiers automatically start.
3. Place each internal battery tray circuit breaker to the ON position. Place each external battery string circuit breaker to the ON position.
4. Place each distribution row input circuit breaker located on the load distribution sub-rack to the ON position (if furnished).
5. Place each load distribution circuit breaker located on the load distribution subrack to the ON position.

Chapter 5. Initially Starting the System Page 43 This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Procedure

Page 54 of the Emerson 4015 user manual — ACU+ CONTROLLER INITIALIZATION
Page 54 · click to enlarge
Page 54

ACU+ CONTROLLER INITIALIZATION

configuration file that sets all adjustable parameters. Provided on a USB drive furnished with the system is an ACU+ configuration drawing (C-drawing) and the ACU+ configuration files loaded into the ACU+ as shipped. If ordered for customer integration, you will have to program the controller for your application per step 8) below.

Refer to the ACU+ Controller Operation Instructions (UM1M820NNB-1) for detailed instructions.

Refer to Figure 5-2 for locations of the ACU+ local indicators and navigation keys.

Emerson 4015 — ACU+ CONTROLLER INITIALIZATION diagram (page 54)
Fig. 38

10/100M Ethernet Port (RJ-45)

Figure 5-2 ACU+ Controller Local Indicators and Navigation Keys

indicators may illuminate on the ACU+ front panel and an audible alarm may sound. Disregard all alarms. An audible alarm can be silenced at any time by momentarily depressing the ENT key on the ACU+ Controller.

1. After the ACU+ is powered on, the display alternates between the “ Emerson Network Power ” screen and a screen displaying “ Advanced Control Unit Plus Version ***** Starting… ”.

Page 44 Chapter 5. Initially Starting the System

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Show 5 more labels / short text on this page
Information Alarm · Indicator (Yellow) · USB Port · Menu Navigation Keys · Procedure
Page 55 of the Emerson 4015 user manual — ACU+ Controller Initialization
Page 55 · click to enlarge
Page 55
2. Next, the language screen appears. Press the up or down arrow key to select the desired language. Press the ENT key to confirm the selection. If no key is pressed within 10 seconds, the ACU+ selects the displayed language automatically.
3. As initialization continues, the Main screen is displayed, but with zero volts. Initialization is not complete.
4. When initialization is complete, the Main screen displays voltage and current normally, and no alarms are active.
5. System information is displayed in multiple screens. Repetitively press the up or down arrow key to view other system information screens one by one.
6. From the Main screen, press ENT to go to the “Main Menu” screen.
7. From the Main Menu, select a sub-menu by repetitively pressing the up or down arrow key. The selected sub-menu will be indicated by the cursor. Press ENT to open the sub-menu.

any sub-menu until the Main screen appears.

8. Verify and set the ACU+ Controller as required for your application. Refer to the ACU+ Controller Operation Instructions (UM1M820NNB-1) for procedures. Note that you will have to program the ACU+ for any temperature probes and external inputs/outputs connected to the IB2 Interface Board, and battery capacity if different then the factory default of 8.5 Ah (8.5 Ah per internal battery tray).

Chapter 5. Initially Starting the System Page 45 This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Page 56 of the Emerson 4015 user manual — CHANGING BATTERY CAPACITY RATING IN THE ACU+
Page 56 · click to enlarge
Page 56

VERIFYING THE CONFIGURATION FILE

For factory configured systems, your ACU+ was programmed with a configuration file that sets all adjustable parameters. The version number of the configuration file can be found on the configuration drawing (C-drawing) that is supplied with your power system documentation, and on a label located on the ACU+. You can verify that the correct configuration file has been loaded into your ACU+ by performing the following procedure.

approximately 10 seconds, the ACU+ will automatically return to the Main screen.

1. With the Main screen displayed, press ESC . A screen displays the serial number and software version.
2. Press ENT . A screen displays the hardware version and MAC address.
3. Press ENT . A screen displays the configuration version number.
4. Press ESC , or wait approximately 10 seconds, to return to the Main screen.

CHANGING BATTERY CAPACITY RATING IN THE ACU+

To change the battery capacity setting of the ACU+ to match the battery connected to the power system, perform the following procedure.

1. With the Main screen displayed, press ENT to go to the Main Menu. Navigate to and select “ Settings ” (ENT).

2) If a password screen opens, a password must be entered to allow the User to make adjustments. If a password was previously entered and has not yet timed out, skip this step and proceed to step 3). Otherwise, to enter a password, with the cursor at the User Name field (default is “Admin”), press the down arrow key to move cursor down to the password line. Press ENT. “0” is highlighted. Press the up arrow key once to change the “0” to”1” (default password is “1”), then press ENT twice. (Note: If you have been assigned a unique User Name and password, follow this procedure to enter these.)

3. With the Settings menu screen displayed, navigate to and select “ Battery ” (ENT) / “ Basic ” (ENT).
4. Navigate to “ Rated Capacity ”. Press ENT . Use the up or down keys to adjust the value as required. Press ENT .

tray. For customer provided batteries, enter the C10 battery capacity rating in A-hr.

5. Return to the Main screen by repeatedly pressing ESC (escape).

Page 46 Chapter 5. Initially Starting the System

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Procedure · Procedure

Page 57 of the Emerson 4015 user manual — CHECKING BASIC SYSTEM SETTINGS
Page 57 · click to enlarge
Page 57

CHECKING BASIC SYSTEM SETTINGS

Navigate through the controller menus and sub-menus to check system settings. You can adjust any parameter as required. Note that these settings can also be checked (and changed if required) via the WEB Interface.

sub-menu until the Main screen appears.

To Select a Sub-Menu: Press the up or down arrow keys to move the cursor up and down the list of sub-menus in the menu screen (selects the sub-menu), then press ENT to enter the selected sub- menu.

To Enter a Password: If a password screen opens, a password must be entered to allow the User to make adjustments. To enter a password, with the cursor at the User Name field (default is “Admin”), press the down arrow key to move cursor down to the password line. Press ENT. “0” is highlighted. Press the up arrow key once to change the “0” to”1” (default password is “1”), then press ENT twice. (Note: If you have been assigned a unique User Name and password, follow this procedure to enter these.)

To Change a Parameter: Press the up or down arrow keys to move the cursor up and down the list of parameters in the menu screen (selects the parameter to change), then press ENT to change the selected parameter. The parameter field highlights. Press the up or down arrow keys to change the parameter value. Press ENT to confirm the change.

Table 5-1 shows the menu navigation for some basic settings. (Refer to the ACU+ Controller Operation Instructions (UM1M820NNB-1) for details and additional settings.)

Chapter 5. Initially Starting the System Page 47 This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Procedure

Page 58 of the Emerson 4015 user manual — Checking Basic System Settings
Page 58 · click to enlarge
Page 58

Date Main Menu / Settings / Controller / Date

Time Main Menu / Settings / Controller / Time

IP Communications Parameters (IP address, subnet mask address, gateway address)

Main Menu / Settings / Communication

Float Voltage Main Menu / Settings / Battery / Charge / Operating Voltage

Equalize Voltage Main Menu / Settings / Battery / Charge / Batt EQ Voltage

Battery Capacity Main Menu / Settings / Battery / Basic / Rated Capacity

BTRM Feature Main Menu / Settings / Battery / Basic / BTRM Action Main Menu / Settings / Battery / Basic / BTRM Voltage

Temperature Compensation Center Temperature Main Menu / Settings / Battery / Temp Comp / TempComp Center

Temperature Compensation Slope Main Menu / Settings / Battery / Temp Comp / TempComp Coeff

Maximum Temperature Compensation Voltage Main Menu / Settings / Battery / Temp Comp / Max TempComVolt

High Voltage Shutdown Limit Main Menu / Settings / Rectifier / All Rect Set / HVSD Limit

Over Voltage Alarm Main Menu / Settings / Power System / General / Over Voltage

Under Voltage Alarm Main Menu / Settings / Power System / General / Under Voltage

Table 5-1 Basic Settings Local Menu Navigation

Page 48 Chapter 5. Initially Starting the System

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Parameter Menu Navigation

Page 59 of the Emerson 4015 user manual — CONFIGURING THE ACU+ IDENTIFICATION OF RECTIFIERS
Page 59 · click to enlarge
Page 59

CONFIGURING THE ACU+ IDENTIFICATION OF RECTIFIERS

When rectifier modules are all installed prior to applying power and starting the system, the order in which the ACU+ identifies the rectifiers is by serial number (lowest serial number is Rect 1, next lowest is Rect 2, etc.). If you prefer the ACU+ to identify the rectifiers by position in the system, perform the following procedure.

1. With the Main screen displayed, press ENT to go to the Main Menu. Navigate to and select “ Settings ” (ENT).

2) If a password screen opens, a password must be entered to allow the User to make adjustments. If a password was previously entered and has not yet timed out, skip this step and proceed to step 3). Otherwise, to enter a password, with the cursor at the User Name field (default is “Admin”), press the down arrow key to move cursor down to the password line. Press ENT. “0” is highlighted. Press the up arrow key once to change the “0” to”1” (default password is “1”), then press ENT twice. (Note: If you have been assigned a unique User Name and password, follow this procedure to enter these.)

3. With the Settings menu screen displayed, navigate to and select “ Rectifier ” (ENT).
4. Navigate to “ Rect # ” (# is used here to represent the rectifier identification number). Press ENT . The rectifier # menu screen is displayed, and the green LED on one rectifier starts flashing. This is the rectifier currently identified by the ACU+ as rectifier #. (If this is not the rectifier you want, press ESC to return to rectifier menu screen and select a different rectifier.)
5. Navigate to and select “ Rectifier ID ”. Press ENT . Use the up or down keys to change the ACU+ identification number for the flashing rectifier. Press ENT .
6. Press ESC to return to rectifier menu screen.
7. Repeat steps 4) through 6) for each of the remaining rectifiers in the system.
8. When you have finished selecting identification numbers for all rectifiers, repeatedly press ESC to return to the Main Menu.
9. Navigate to and select “ Manual ” (ENT) / “ Rectifier ” (ENT) / “ All Rect Ctrl ” (ENT).
10. Navigate to “ Confirm ID/PH ”. Press ENT . “ Yes ” highlights.
11. Press ENT to select the operation. Press ENT again to confirm.

numbering, rectifiers with conflicts will be assigned the next available sequential number.

12. Return to the Main screen by repeatedly pressing ESC (escape).

Chapter 5. Initially Starting the System Page 49 This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Procedure

Page 60 of the Emerson 4015 user manual — CHECKING SYSTEM STATUS
Page 60 · click to enlarge
Page 60

CHECKING THE SYSTEM SHUTDOWN CIRCUIT

1. With the system operating, momentarily depress the System Shutdown pushbutton located on the power and control sub-rack.
2. Verify that the rectifier module AC input circuit breakers located on the power and control sub-rack and the battery circuit breaker located on the internal battery trays open.
3. Restart the system by first turning ON the rectifier module AC input circuit breakers then the battery circuit breaker(s).

CHECKING SYSTEM STATUS

1. Observe the status of the indicators located on the ACU+ Controller, rectifier modules, and power and control sub-rack. If the system is operating normally, the status of these is as shown in Table 5-2.
Emerson 4015 — CHECKING SYSTEM STATUS diagram (page 60)
Fig. 39

Table 5-2 Status and Alarm Indicators

Page 50 Chapter 5. Initially Starting the System

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Procedure · Procedure

Page 61 of the Emerson 4015 user manual — REFERENCE DOCUMENTS
Page 61 · click to enlarge
Page 61

FINAL STEPS

1. If any ACU+ Controller configuration settings were changed, refer to the ACU+ User Instructions (UM1M820NNB-1) and save a copy of the configuration file. This file can be used to restore the ACU+ Controller settings, if required, at a later date.
2. Verify there are no external alarms and the local indicators are as shown in Table 5-2.

REFERENCE DOCUMENTS

Refer to “Customer Documentation Package” on page 1 for a list of other documents that can be referenced for additional information.

Chapter 5. Initially Starting the System Page 51 This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Procedure

Page 62 of the Emerson 4015 user manual — REVISION RECORD
Page 62 · click to enlarge
Page 62

REVISION RECORD

Emerson 4015 — REVISION RECORD diagram (page 62)
Fig. 40

Page 52 Revision Record

This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy

Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.

Page 63 of the Emerson 4015 user manual — NetPerform™ Optimization Services
Page 63 · click to enlarge
Page 63

NetPerform™ Optimization Services

At Emerson Network Power, we understand the importance of reliable equipment – it’s critical to both your business and your bottom line. That is why we offer a wide array of services to meet all of your network infrastructure needs.

Emerson 4015 — NetPerform™ Optimization Services diagram (page 63)
Fig. 41 · NetPerform™ Optimization Services

Email NetSure4000Series@Emerson.com Pricing and availability[1], quotes, purchase orders, expediting requests and order tracking. Phone 1.800.800.1280 option 1

Emerson 4015 — NetPerform™ Optimization Services diagram (page 63)
Fig. 42 · NetPerform™ Optimization Services

Email ESNACustomerSupportCenter@Emerson.com After an order has shipped, contact our Customer Support Center with related questions, concerns or claims. Phone 1.956.661.6867

Emerson 4015 — NetPerform™ Optimization Services diagram (page 63)
Fig. 43 · NetPerform™ Optimization Services

Pricing and purchase orders for spare parts, including but not limited to breakers, cables, fuses, rectifier fans, misc. breaker and fuse panels, enclosure fans, doors and switches, etc. Phone 1.800.800.1280, option 5

Emerson 4015 — NetPerform™ Optimization Services diagram (page 63)
Fig. 44 · NetPerform™ Optimization Services

Email DCpower.Repair@Emerson.com Creates and processes RMAs for depot repair and refurbishment. Determines repair and refurbishment lead times and pricing based on warranties/contractual agreements. Provides repair shipping information and status. Phone 1.800.800.1280, option 6

Emerson 4015 — NetPerform™ Optimization Services diagram (page 63)
Fig. 45 · NetPerform™ Optimization Services

Answers technical product and system questions; determines status of warranties and contractual agreements for repair. Phone 1.800.800.5260

[1] Contact DC Power Spare Parts for parts and accessories. For More Information To learn more about service offerings from Emerson Network Power, please contact your sales representative, call 1-800-800-1280 option 7, email ES.Services@Emerson.com or visit www.EmersonNetworkPower.com/EnergySystems

Page 64 of the Emerson 4015 user manual — Final Steps
Page 64 · click to enlarge
Page 64
Emerson 4015 — Final Steps diagram (page 64)
Fig. 46 · Final Steps
Sources

References & links

Pages referenced in this manual — manufacturer, support and downloads.

Ask about the Emerson 4015

Owners and our team usually reply within a day — and your question helps the next person too.

Add your email to get notified when it’s answered — no spam, ever.

0 questions
No questions yet about the Emerson 4015

Be the first to ask — other owners or our team will answer.

Original document

Emerson 4015 manual PDF

64 pages·5.4 MB·Power Supply·PDF
Click any page above to open it here
Page 1 / …
100%