Instruction/ maintenance manual of the product MOV Dacor
Go to page of 20
Installa tion I nstru ctions Dis cove r y W al l O ven EO, MOH and MOV Series Part No. 65433 Rev . L.
All specifications are subject to change without notice. Dacor ® assumes no liability for changes to specifications. © 2007 Dacor , all rights reserved.
1 Planning the Installation ................................................... 6 Selecting the Location ...................................................... 6 Cabinet Cutout ................................................................. 6 Electrical Specifications .
2 Impor tant Safety Instructions • Read the accompanying use and care manual before operating this appliance. • Keep packaging materials away from children. Plastic sheets and bags can cause suffocation. • If you receive a damaged product, immediately con- tact your dealer or builder .
3 If Y ou Need Help... If you have questions or problems with installation, contact your Dacor dealer or the Dacor Customer Service T eam. For repairs to Dacor appliances under warranty call the Dacor Distinctive Service line. Whenever you call, have the model and serial number of the appliance ready .
4 Product Specifications Model Number A B C D E F G H EO127 27” (68.6 cm) 27 15/16” (71.0 cm) 23 3/8” (59.4 cm) 2 5/16” (5.9 cm) 7 3/8” (18.7 cm) 6 3/8” (16.2 cm) 27 3/8” (69.5 cm) 25 3/8” (64.4 cm) MOH127 MOV127 EO130 30” (76.2 cm) 28 3/8” (72.
5 G D E F C 66” (167.6 cm) Flexible conduit A B 1 1/4” (3.2 cm) H Chassis notch side view Control panel front T op of chassis L K T op of chassis Utility cutout J G D E F C 66” (167.
6 Planning the Installation Selecting the Location • Carefully check the location where the oven is to be installed. The oven should be placed for convenient access, but away from drafts that may be caused by doors, windows, and heating, ventilation and air condi- tioning outlets.
7 Planning the Installation Alternate electrical locations 4“ (10.2 cm) min. between cutout Recommended electrical location 4“ typical toe kick (shown) 1“ (2.5 cm) min. to combustibles A B 3/4” (1.9 cm) support platform A B 3/4” (1.9 cm) support platform 36” T ypical (91.
8 Planning the Installation Cabinet Cutout (Continued) Suppor t Platform W ARNING The top surface of the support platform must be installed flush with the cutout in the front of the cabinet or wall and any trim. Failure to install the platform properly may cause the exhaust vent to deform and/or become obstructed.
9 Planning the Installation Installation Instructions Electrical Specifications IMPORT ANT • Preheat times and cavity temperature recovery times will be increased slightly if operating on less than a 240 V ac circuit. • This appliance is provided with electrical connection leads in a flexible metal conduit.
10 1. Before proceeding, turn off power to the circuit to which the oven will be connected at the circuit breaker or fuse box. 2. Position the oven directly in front of the cabinet cutout. 3. Feed the appliance conduit into the electrical junction box and attach it using a UL approved strain relief.
11 Installation Instructions Connecting to a Three (3) W ire Electrical System - Where Local Codes Permit W ARNING Do not connect the green appliance conduit wire to the neutral (white) junction box wire unless local building codes permit. 1. Separate the wires coming out of the appliance conduit.
12 Installation Instructions Three (3) Wire Connection with External Ground Conduit to wall oven Cable from circuit breaker panel or fuse box Wire nut (4 places) Junction box Separate No.
13 3. Raise the door so that it is at a 15° angle from the front of the oven. Hold the door with one hand on each side. Lift the door up and out. Install the Oven in the Cabinet W ARNING • Use an appliance dolly to move the appliance when installing it or removing it from the wall for service.
14 Installation Instructions Install Exhaust Deflector CAUTION Install the exhaust deflector before installing the oven door(s). Attach the exhaust deflector to the front of the oven. It attaches to the oven just below the oven chamber in the door jam.
15 Installation Instructions Installation Checklist W ARNING • T o ensure a safe and proper installation, the follow- ing checklist should be completed by the installer to ensure that no part of the installation has been over- looked. • Proper installation is the responsibility of the home- owner .
16 Notes.
.
Dacor●600 AntonBlvd.Suite1000CostaMesa,CA 92626●Phone:(800)793-0093●Fax:(626)403-3130●www .
An important point after buying a device Dacor MOV (or even before the purchase) is to read its user manual. We should do this for several simple reasons:
If you have not bought Dacor MOV yet, this is a good time to familiarize yourself with the basic data on the product. First of all view first pages of the manual, you can find above. You should find there the most important technical data Dacor MOV - thus you can check whether the hardware meets your expectations. When delving into next pages of the user manual, Dacor MOV you will learn all the available features of the product, as well as information on its operation. The information that you get Dacor MOV will certainly help you make a decision on the purchase.
If you already are a holder of Dacor MOV, but have not read the manual yet, you should do it for the reasons described above. You will learn then if you properly used the available features, and whether you have not made any mistakes, which can shorten the lifetime Dacor MOV.
However, one of the most important roles played by the user manual is to help in solving problems with Dacor MOV. Almost always you will find there Troubleshooting, which are the most frequently occurring failures and malfunctions of the device Dacor MOV along with tips on how to solve them. Even if you fail to solve the problem, the manual will show you a further procedure – contact to the customer service center or the nearest service center