When installing or using this track system, basic safety precautions should always be followed including the following
When installing or using this rail system, certain basic safety measures must be taken including the following.
1. Read all of these installation instructions before installing the track system.
1. Read all of these installation instructions before installing the rail system.
2. Save these instructions and refer to them when additions to or changes in the track configuration are made.
2. Store these instructions and refer to them if any additions or changes are required on the rail.
3. Do not install this track in lamp or wet locations.
3. Do not install this rail in wet or damp areas.
4. Do not install any part of this track system less than 5 feet above the floor.
4. N-install any part of this rail system less than 5 feet from the ground.
5. Track is to be installed on ceiling only.
5. Installation limit only.
6. Disconnect electrical power before adding to or changing the configuration of the track.
6. Cut the current before any addition or change on rail.
7. Do not try to put on anything other than lamps from the rail. To mitigate the risks of fire and electric shock, do not attempt to connect tools, extension cords or electrical appliances and similar devices on rail.
7. Do not expect to energize anything other than track lighting settings on the track. To reduce the risk of fire and electrical shock, do not anticipate to connect power tools, extension cords, apps and the like to the track.
8. CAUTION: This track system is not intended for use with power supply cord or convenience receptacle adapt.
8. CAUTION: This rail system is not intended for use with cords or power adapters.
9. The track system is to be requested by one or two 240V/120V 60Hz single phase system with grounded neutral.
9. The rail shall be powered by one or two single-phase networks of 240 V/120 V and 60 Hz with ground neutral.
10. The track should be supported as follows: Every four fee. Complexity of curve will dictator more supports at apex of curve on track.
10. The rail shall be supported as follows: Each four-foot length. The complexity of the curves may require other l-apex supports for each rail curve.
11. CAUTION: The maximum capacity of the track system is 20A per 120 volt circuit and 25A on the 12 volt circuits. When installing, do not exceed the capacity of your circuits. Check fuses and circuits carefully before installing.
11. CAUTION: The maximum intensity capacity of the rail system is 20 A per 120 volt circuit and 25 A for 12 volts circuit. Do not exceed these intensities during installation. Check fuses and circuits before installation.
POWER HUB CONNECTOR 4" POWER CONNECTOR 4" (LF604 & LF606) FIG. 1 (LF604 and LF606) Fig. 1 Step 1. After laying track, POWER HUB CONNECTOR. Using a plumb bob Step 1. After bending the rail, locate CONNECTOR D'alimentATION. In gold laser light, mark hole on ceiling for mounting assembled HUB PSPAER using lead wire or a laser viewfinder, marking the location and HUB COVER ceiling. d) a hole for mounting the Step 2 CALL. Drill appropriate hole size in ceiling to install toggle bowl. CONNECTOR AND THE LID OF THE CONNECTOR. Step 3. Insert toggle bolt screen through washer and HUB SPACER/HUB COVER assembled with toggle nut on opposite side. Install assembly into ceiling and Step 2. Perform a drill of an appropriate diameter to install the bolt with tighten securely. fins. Step 4. Install POWER HUB CONNECTOR on cover and turn clockwise to secure. Step 3. Pass the rod of the wing bolt through the puck, CALLE Tighten HUB COVER SET SCREW. CONNECTOR'S DISCUSSION and the COVER OF THE CONNECTOR (with fins opposite). Install the set on Step 5. Clamp TRACK JAWS provided with TRACK onto track 2 inches from TRACK ceiling and tighter. End. Step 4. Install the FOOD CONNECTOR on the lid and do so Step 6. Insert track into POWER HUB CONNECTOR until fully planted. turn clockwise to fix it. Tighten the BLOCK VISES in Step 7. Secure track with set screen provided. Unscrew CENTER CAP to access CONNECTOR'S COVER. set screens for securing center track section. Step 5. Tighten the RAIL PINCE provided with RAIL to attach it 2 inches from POWER HUB CONNECTOR (LF604 & LF606) Fig. 2 l from the end of RAIL. Step 6. Pass the rail into the FOOD CONNECTOR and press it well in place. Step 1. After laying track, POWER HUB CONNECTOR. Using a plumb bob or laser light, mark hole on ceiling for mounting CEILING COUPLER. Step 7. Tighten the rail with the supplied locking screws. Unscrew the BOUCHON CENTRAL to access locking screws and attach the centre part of the rail. Step 2. Drill appropriate hole size in ceiling to install toggle bowl. Step 3. Insert toggle bolt screen thru CEILING COUPLER with togble on opposite site. POWER SUPPLY CONNECTOR (LF604 AND LF606) FIG. 2 Install assembly into ceiling. Step 1. After bending the rail, locate CONNECTOR D'alimentATION. Step 4. Thread DOVETAIL STEM ono DOVETAIL CUPLING. Using lead wire or laser sighting device, mark in Step 5. Slide CEILING HANGER onto Dovetail STEM. ceiling l ́location of the PLAStep RACORDMENT fixing holes 6. Install COLLAR ono the end of DOVETAIL STEM with the 2 set screens FUND. provided. Step 2. Make a hole of the right diameter by drilling the ceiling to place the bolt in Step 7. Align DOVETAIL STEM with CEILING COUPLER. Slide CEILING HANGER fins into CEILing COUPLER and install with the set screen provided. Step 3. Insert the threaded part of the fin bolt through the PLAFOUND RACORDMENT (the fins must be on the other side of ACCORDEstep 8. Clamp TRACK JAWS provided with TRACK onto track 2 inches from TRACKMENT). Install the set on the ceiling. End. Step 4. Screw the QUEUE D'ARONDE TIGE on Step 9 ACCORDANCE. Insert track into POWER HUB CONNECTOR until fully planted. ARONDE TAIL. Step 10. Secure track with set screen provided. Unscrew center cap to access set Step 5. Slide PLAFOND SUPPORT onto the QUEUE D'ARONDE TIGE. screens for securing center track section. Step 6. Mount the COLLET on the QUEUE D-ARONDE TIGE using both locking screws provided. FIG. 1 FIG. 2 TOGGLE LF604, FINS LF 604, TOGGLE WING LF606 HUB SPACER LF 606 CEILING COUPLER (4 INCH) CEILING CONNECTION HUB COVER SET SCREEN LID LOCK SCREW WASHER COLLAR WASHER CEILING HANGER GLUE CEILING SUPPORT HUB COVER SETUP CRACK JAW SET SNAP WINDOW FALLTAIL STEM RAIL CLAMP SCREW TAIL ROD BOLT LOCKING BLOCK DARONDE TRACK RAIL POWER HUB TRACK JAW TRACKS C CO ON NN NE EC CT TOEUR R PLIERS DE RAIL RAIL POWER HOP FEED CONNECTOR SUPPLY SETTING SENSOR PLUG LOCK SCREWS SET SCREEN LOCKABLE LOCK SCREW SET SCREW CENTER CAP INSERT REMOVABLE CENTRAL STOPPER RELEASE SWITCH LOCK LOCK HOLE PULL-OFF HEAD LOCK LOCK CENTRAL STOPPERS INSERTION INTEGRATION COOPERATE LIGHTING • 1121 HIGHWAY 74 SOTH • PEACHTREE CITY GA 30269 • 770-468-4800 7032184" POWER CONNECTOR (LF604 AND LF606) FIG. 1
Step 1. After bending the rail, locate CONNECTOR D'alimentATION. Using a lead wire or laser viewfinder, mark on the ceiling where a hole is located for mounting the CONNECTOR'S CALL AND THE CONNECTOR'S COOVER.
Step 2. Perform a drill of an appropriate diameter to install the fin bolt.
Step 3. Pass the rod of the wing bolt through the puck, CALL OF THE CONNECTOR and COINER'S COLLECTION (with fins opposite). Install the set on the ceiling and tighten well.
Step 4. Install the CONNECTOR ON THE COOL and rotate it clockwise to fix it. PRESS THE PLUG SCREW ON THE CONNECTOR LID.
Step 5. Tighten the RAIL PINCE provided with RAIL to attach it 2 inches from the end of RAIL.
Step 6. Pass the rail into the FOOD CONNECTOR and press it well in place.
Step 7. Tighten the rail with the supplied locking screws. Unscrew the BOUCHON CENTRAL to access locking screws and attach the centre part of the rail.
POWER SUPPLY CONNECTOR (LF604 AND LF606) FIG. 2
Step 1. After bending the rail, locate CONNECTOR D'alimentATION. Using lead wire or laser sighting device, mark the ceiling position of mounting holes in PLAFOUND RACORDMENT.
Step 2. Make a hole of the right diameter by piercing the ceiling to place the fin bolt
Step 3. Insert the threaded part of the fin bolt through the PLAFOUND RACORDMENT (the fins must be on the other side of the ACCORDEMENT). Install the set on the ceiling.
Step 4. Screw the QUEY D'ARONDE TIGE on the RACORDEMENT OF QUUE D'AROUNDE.
Step 5. Slide PLAFOND SUPPORT onto the QUEUE D'ARONDE TIGE.
Step 6. Mount the COLLET on the QUEUE D-ARONDE TIGE using both locking screws provided.
Page 3 · click to enlarge
Page 3
HALO ®
POWER FEED HUB (LF603 & LF605) FIG. 3
7. Align the QUEUE D'ARONDE TIGE with PLA-
BOTTOM. Slide the PLAFOND SUPPORT into the PLOFOND RACCOND and install using 2 locking screws provided.
1. After laying track, POWER HUB CONNECTOR.
8. Fix the RAIL PINCE (provided with rail) to 2 inches from the end of
2. Using a plumb bob or laser light, mark hole on ceiling for installing junction
Rail.
Box.
9. Insert the rail into the right CONNECTOR by pushing it well
3. Slide canopy flat onto stem.
10. Fix the rail with the supplied locking screws. Unscrew the central stopper
4. Slide mounting strap onto stem in orientation shown.
to access the locking screws and fix the central part of the rail.
5. Install COLLAR onto the end of STEM with the 2 set screens provided.
POWER SUPPLY CONNECTOR (LF603 AND LF605) FIG. 3
6. Install MOUNTING STRAP onto junction box through countriesunk holes with
screen provided with junction box.
1. After bending the rail, locate the CONNECTOR OF FOOD.
7. Make all electrical connections. Contact a professional electrician if not
2. By using lead wire or laser sighting device, mark on the
qualified.
ceiling l-position of the junction box fixing holes.
8. Install CANOPY PLATE to MOUNTING STRAP with the screen provided.