

Top and side power wiring and control wiring, accessible screw termi- nals for control wiring, easy to install drain connections and electric heaters all combine to make the installation easy, and minimize installa- tion cost.
FIRE OR ELECTRICAL HAZARD Failure to follow the safety warnings exactly could result in serious injury, death or property damage. A fire or electrical hazard may result causing property damage, per- sonal injury or loss of life.
As soon as a unit is received, it should be inspected for possible dam- age during transit. If damage is evident, the extent of the damage should be noted on the carrier’s freight bill. A separate request for inspection by the carrier’s agent should be made in writing. Also, before installation the unit should be checked for screws or bolts, which may have loosened in transit. There are no shipping or spacer brackets which need to be removed.
Also check to be sure all accessories such as heater kits, suspension kits, and coils are available. Installation of these accessories or field conversion of the unit should be accomplished before setting the unit in place or connecting any wiring, electric heat, ducts or piping.
These units must be wired and installed in accordance with all national and local safety codes.
Voltage limits are as follows:
Airflow must be within the minimum and maximum limits approved for electric heat, evaporator coils and outdoor units.
Clearance must be provided for:
Location is usually predetermined. Check with owner’s or dealer’s installation plans. If location has not been decided, consider the follow- ing in choosing a suitable location:
This Single Piece Air Handler provides the flexibility for installation in any upflow or horizontal application. These versatile models may be used for cooling or heat pump operation with or without electric heat. BRAND LABEL (available from Distribution) apply to center of the blower access panel.
NOTE: When the coil is installed in a draw-thru application, it is recom- mended to trap the primary and secondary drain line. If the secondary drain line is not used, it must be capped. The coil is provided with a secondary drain. It should be piped to a loca- tion that will give the occupant a visual warning that the primary drain is clogged. If the secondary drain is not used it must be capped.
The unit can be positioned for bottom return air in the upflow position, and right or left return in the horizontal position.

If electric heat is used, a minimum clearance of 1” must be main- tained on all sides of the supply air duct and/or plenum continuously for up to 3’ (See Figure 1).
A. Refrigerant piping and connections are located in the front.
B. Maintenance and servicing through the front or access side of unit with both sides and rear of unit having zero inch clear- ance.
C. Condensate drain lines are connected in the front (clear of fil- ter).
D. Filter removal.
E. When no electric heat is used, the unit as well as all duct work and plenum are designed for zero clearance to combus- tible materials.
SUPPLY AIR POWER WIRING
CONTROL WIRING
REFRIGERANT LINES
THERMOSTAT
TO CONDENSATE DRAIN
FILTER ACCESS
LOUVERED
ELECTRIC HOT WATER HEATER (Must comply with water heater installation instructions)
These air handler units are supplied ready to be installed in a right hand horizontal position. If unit requires left hand positioning, the unit must have the pan installed in the correct position.
DO NOT TRY TO KNOCK OUT PANEL OPENING FOR SECOND- ARY DRAIN PAN. SEE ITEM 7.
Models F*FP045,048,060 have a coil baffle and support bracket factory installed for right hand horizontal application (refer to Figure 3C). For left hand applications the coil support bracket must be moved to the right side of the coil, and the coil baffle must be rotated to avoid water blow-off. To rotate baffle, remove the coil assembly from the unit (remove front two screws holding the coil support bracket and the two screws holding the drain pan). Remove four screws in coil baffle and remove the coil baffle and rotate ends. Resecure the baffle and reinstall the coil assembly ensuring that the rear of the drain pan is secured under the back flange of the unit. Reinstall the coil support bracket on the right side of the coil.
3’


DUCT WORK MAY BE FASTENED CAUTIOUSLY WITH SCREWS TO THE SIDES AND REAR OF UNIT
"S" BRACKET MUST BE USED TO FASTEN DUCT WORK TO FRONT OF UNIT

ALL DIMENSIONS ARE IN INCHES. THEY ARE SUBJECT TO CHANGE WITHOUT NOTICE. CERTIFIED DIMENSIONS WILL BE PROVIDED UPON REQUEST.
(21 INCHES) MAX. FILTER WIDTH (B MINUS 1-1/2 INCHES)
FILTER ACCESS DRAIN CONNECTIONS FOR UPFLOW APPLICATIONS BOTTOM VIEW


A suspension kit is available. Models 1BH0601 (unit sizes 018-060) is designed specifically for the units contained in this instruction (upflow application only). For installation of these accessory kits, see the instructions packed with the kit.

Use 1/2" screws to connect ductwork to bottom of unit. Longer screws will pierce the drain pan and cause leakage. If pilot holes are drilled, drill only though field duct and unit bottom flange.
For suspension of these units in horizontal applications, it is recom- mended to use angle steel support brackets with threaded rods, sup- porting the units from the bottom, at the locations shown in Figure 5.
The coil in this Air Handler unit will have a TXV metering device installed at the factory.
The model number will have the following format: F*FPxxxH06T2y - The coil will have a Thermal Expansion Valve (TXV) installed. The y character specifies which TXV is installed at the factory. Please refer to the TXV Metering Device section for installation notes.
The vast majority of problems encountered with combination heating and cooling systems can be linked to improperly designed or installed duct systems. It is therefore highly important to the success of an instal- lation that the duct system be properly designed and installed.

Use flexible duct collars to minimize the transmission of vibration/noise into the conditioned space. If electric heat is used, non-flammable material must be used.
Where return air duct is short, or where sound may be a problem, sound absorbing glass fiber should be used inside the duct. Insulation of duct work is a must where it runs through an unheated space during the heating season or through an uncooled space during the cooling season. The use of a vapor barrier is recommended to prevent absorp- tion of moisture from the surrounding air into the insulation.
The supply air duct should be properly sized by use of a transition to match unit opening. All ducts should be suspended using flexible hang- ers and never fastened directly to the structure. This unit is not designed for non-ducted (freeblow) applications. Size outlet plenum or transition to discharge opening sizes shown in Figure 4.
Duct work should be fabricated and installed in accordance with local and/or national codes. This includes the standards of the National Fire Protection Association for Installation of Air-Conditioning and Ventilat- ing Systems, NFPA No. 90B.

Air filters must be field supplied. A 1" filter access rack has been built into the unit. See Figure 4. Remove filter access cover shown. Install proper size filter. Standard 1" size permanent or throw away filter may be used, or, permanent washable filters are available using model num- bers: 1PF0601, 602, 603BK. See Table 3 for filter size.
Equipment should never be operated without filters.
Please refer to Table 2 to verify which TXV is installed in this Air Han- dler unit and that this AHU is a valid system match for the AC or HP unit installed.

The TXV is bolted into the coil assembly of this Air Handler unit at the factory. The temperature sensing bulb will need to be attached to the coil suction header line after the line set is brazed to the coil.

only, install the 6-pin jumper plug to the control board to bypass the heater limit controls. This jumper plug is secured to the duct cover near the 4-pin power plug harness. Failure to install the plug will cause the blower to run continuously. (See Figure 8).

TRANSFORMER CONNECTIONS (HIGH VOLTAGE)

*
K2 T9A
L 2 L 1
4-PIN POWER CONNECTOR
ROTATE BULB TO KEEP TAIL AT BOTTOM
1 2 3 4
K1 T9A
6-PIN CONNECTOR (LIMIT, 2ND, 3RD & 4TH HEAT RELAY DRIVER)
FAN
& HEAT COM
LIM
& LIM PWR
VERTICAL RISER
BREAK TAB FOR VARIABLE SPEED MOTOR
TEST
24 VOLT R
HEAT 2
DRV
DRV HEAT 3
HEAT 4
2 4 V A C
DRV
2 SPEED LTRIP ECM
5 A M P
24 VOLT COMMON
M A X
R Y G W2 W1 O C
COIL UNDER PRESSURE. Relieve pressure by removing plug from piping connection. Coil will have factory installed TXV. See outdoor unit documentation for cor- rect TXV to be used. Refer to unit nameplate for TXV identification for this unit.
Mark the unit nameplate with the appropriate heater selection on the space provided or NONE to indicate cooling only. To operate these units with electric heat, it is necessary to field install an electric heater kit (2HK). See Electric Heater Kit Accessory Installation instructions for proper installation procedure. Prior to installing electric heat, it is neces- sary to perform the following procedure:
NOTE: The coil should be open to the air for no more than 2 minutes to keep moisture and contaminates from entering the system. If the coil cannot be brazed into the refrigeration system in that time, the ends should be temporarily closed or plugged. For a short term delay, use masking tape over the ends of the copper tubing to close the tube to the air. For a longer term delay, use plugs or caps. There is no need to purge the coil if this procedure is followed.
See the outdoor unit installation instructions for the procedure to install field supplied tubing for systems with sweat fittings.
Right-hand Airflow Application Only - Models with Circuit Breakers - See Figure 9
Stub adapters are available to adapt sweat connections to quick con- nections.
If unit is to be installed for right hand air flow, the circuit breakers in the heat kit will need to be removed and rotated 180°, so the OFF position will be down when the cabinet is positioned on the right side. This is an NEC requirement. Do One Breaker At A Time - to make sure wires are reconnected properly. Loosen terminal screws on the wires and gently pull the wires back from the breaker. Remove screws securing the breaker plate and rotate 180°, then secure the breaker plate and reconnect the wires to the breaker. Proper torque for terminal screws is 35 in/lbs.
Connect lines as follows:
HEAT KIT ASSEMBLY REMOVE 3 SCREWS TO REMOVE THE CIRCUIT BREAKER BRACKET FROM HEAT KIT ASSEMBLY
FIELD SUPPLY WIRING WILL BE ATTACHED TO THIS SIDE OF THE CIRCUIT BREAKER(S)
Lines should be sound isolated by using the appropriate hangers or strapping.
When field supplied lines are used be sure to insulate the suction line only.
CIRCUIT BREAKER(S) - THERE MAY BE ONE, TWO OR THREE
CIRCUIT BREAKER BRACKET HEAT KIT WIRING WILL BE ATTACHED TO THIS SIDE OF THE CIRCUIT BREAKER(S)
The low voltage transformer and fan / heater control, are standard on all models. See Figure 8. The air handlers are shipped pre-wired to oper- ate as cooling only applications. To complete the installation for cooling
Air Flow



The 24 volt power supply is provided by an internally wired low voltage transformer which is standard on all models. However, if the unit is con- nected to a 208 volt power supply the low voltage transformer must be rewired to the 208 volt tap. See the unit wiring label.
Field supplied low voltage wiring can exit the unit on the top right hand corner or the right hand side panel (see Fig. 5, item K).
Power may be brought into the unit through the supply air end of the unit (top when unit is vertical) or the left side panel. Use the hole appro- priate to the unit's orientation in each installation to bring conduit from the disconnect. The power lead conduit should be terminated at the electrical control box. Refer to Tables 4, 8 & 10 for wire requirements. Also see Figure 10.
Install a 7/8" plastic bushing in the selected hole and keep low voltage wiring as short as possible inside the control box.
The field wiring is to be connected at the screw terminals of the control board. Refer to Figure’s 12 and 13.
GND. LUG
ELECTRIC HEAT WITHOUT CIRCUIT BREAKER
1 PHASE ELECTRIC HEAT WITH CIRCUIT BREAKER AS SHIPPED FROM FACTORY
3 PHASE (10 - 15 KW)
GND. LUG
GND. LUG
SINGLE SOURCE (2.5 - 25 KW) - 25 KW SHOWN
GND. LUG
GND. LUG
POWER SUPPLY
1 PHASE ELECTRIC HEAT WITH CIRCUIT BREAKER & BREAKER BAR REMOVED MULTI-SOURCE (15 - 25 KW) - 25 KW SHOWN
ELECTRIC HEAT WITHOUT CIRCUIT BREAKER SINGLE SOURCE (2.5 - 10 KW)
GND. LUG
GND. LUG
GND. LUG
POWER SUPPLY 1
POWER SUPPLY 2
POWER SUPPLY
POWER SUPPLY 3
POWER WIRING (208/230-1-60)
NOTE: USE ONLY COPPER CONDUCTORS
Higher efficiencies will be obtained if the indoor air volume is as high as possible provided the CFM does not exceed limitations and the sound level is not objectionable.
Except for F4FP045, which has a 4-speed motor, and F5FP* which has a 5-speed high efficiency X-13 motor, all air handlers contain three speed blower motors which are pre-wired to the control board.
Connect motor wires to motor speed tap receptacle for speed desired. See wiring label for motor wiring details. See Figure 11.
Adjust blower motor speed to provide airflow within the minimum and maximum limits approved for evaporator coil, electric heat and outdoor unit. Speed tap adjustments are made at the motor terminal block, See Figure 11. Airflow data is shown in Tables 6 and 11.
The unit control is designed for the addition of a two speed fan kit. See accessory kit for details.
1-1/2 TON TO 4 TON STANDARD MOTOR
TO RELAY
TO CONTROL BOARD C (Common)
PUR PUR
BLK
YEL
CAP
FACTORY WIRED TO FAN MOTOR RELAY TERMINAL ON CONTROL BOARD
1 2 3 4 5
GRN
BLU
HIGH
L N
YEL
YEL
PUR TO TRANSFORMER
GRN BLOWER
230V 208 / 230V FAN MOTOR
GND. 230 VOLT BLOWER MOTOR


* May be 0 (no breaker) or 1 (with breaker).

TABLE 7: Electrical Data - (For Single Source Power Supply) - Copper Wire 1 Ø - 208/230-1-601
* May be 0 (no breaker) or 1 (with breaker).
TABLE 8: Electrical Data - (For Multi-Source Power Supply) - Copper Wire 1 Ø - 208/230-1-601

TABLE 10: Electrical Data - (For Single Source Power Supply) - Copper Wire 3 Ø - 208/230-3-601

CFM @ External Static Pressure - IWC
0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00
High 950 910 865 835 775 730 662 590 502 400
High 1,270 1,210 1,150 1,085 1,015 946 862 769 645 502
High - 1,310 1,250 1,175 1,120 1,053 983 894 779 645
High 1,270 1,210 1,150 1,085 1,015 946 802 769 645 502
High - 1,575 1,500 1,420 1,350 1,273 1,192 1,102 996 871
High 1,575 1,535 1,475 1,390 1,310 1,245 1,147 1,030 897 735
Med High 1,375 1,315 1,255 1,185 1,110 1,040 944 848 732 606
Med Low 1,210 1,160 1,110 1,050 980 921 844 737 640 533
High 2223 2158 2090 2029 1929 1861 1788 1679 1594 1501
Med High 1948 1904 1801 1815 1777 1741 1681 1618 1539 1453
Med Low 1499 1454 1415 1370 1328 1269 1228 1191 1132 1093
High 2195 2145 2070 2008 1920 1852 1754 1663 1570 1462
Med High 1938 1899 1873 1824 1791 1724 1679 1603 1521 1420
Med Low 1525 1483 1441 1383 1356 1291 1253 1208 1169 1123
High 2,285 2,195 2,105 2,015 1,950 1,845 1,770 1,685 1,590 1,485
All F*FP series air handler units are UL Listed up to 0.50" w.c. external static pressure, including air filter, wet coil, and largest KW size heater.
230 Volt · Models Blower Motor · Speed

CFM @ External Static Pressure - IWC
0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00
High 855 819 779 752 698 657 596 531 452 360
High 1143 1089 1035 977 914 851 776 692 581 451
High 1235 1179 1125 1058 1008 947 885 804 701 580
High 1143 1089 1035 977 914 851 776 692 581 451
High 1400 1418 1350 1278 1215 1145 1073 991 897 784
High 1418 1382 1328 1251 1179 1120 1032 927 807 661
Med-high 1238 1184 1130 1067 999 936 850 763 659 545
Med-low 1089 1044 999 945 882 829 760 663 576 480
High 2209 2140 2093 2000 1939 1864 1746 1724 1655 1587
Med High 1945 1906 1871 1819 1784 1741 1667 1640 1595 1550
Med Low 1506 1464 1415 1369 1325 1283 1238 1193 1139 1100
High 2134 2124 2052 1979 1861 1756 1639 1597 1512 1427
Med High 1916 1875 1838 1777 1744 1671 1594 1584 1537 1490
Med Low 1494 1435 1390 1341 1284 1241 1194 1139 1087 1036
High 2057 1976 1895 1814 1728 1661 1593 1517 1431 1337
208 Volt · Models Blower Motor · Speed

Air Handler Control Wiring Typical A/C - Cooling only Applications
Air Handler Control Wiring Typical A/C with Electric Heat Applications
THERMOSTAT AIR HANDLER
BOARD 1 - STAGE AIR CONDITIONING R R
BOARD 1 - STAGE AIR CONDITIONING R R
Y Y
Y
Y Y
Y
G G
G G
1 Field Installed Jumper - If Required
W1
HUMIDISTAT
W1
W1
HUMIDISTAT
W2
W2
W2
W2
O
O
HUM
HUM
CFM selection board only on F4FV model
CFM selection board only on F4FV model
Y1
Y2
Y2
THERMOSTAT
BOARD HEAT PUMP
R R R
Y Y Y
G G
E W1 W1 Out
O O O
L X/L
W1 W
HUM
HUMIDISTAT 1
CFM selection board only on F4FV model
Y2

The drain pan connections are designed to ASTM Standard D 2466 Schedule 40. 3/4" PVC is preferred. Since the drains are not subject to any pressure it is not necessary to use Schedule 40 pipe for drain lines.
All drain lines should be trapped a minimum of three inches, should be pitched away from unit drain pan and should be no smaller than the coil drain connection.
It is recommended that all drain connections be sealed with teflon tape or equivalent.
Filters must be cleaned or replaced when they become dirty. Inspect at least once per month. The frequency of cleaning depends upon the hours of operation and the local atmospheric conditions. Clean filters keep unit efficiency high.
Threaded drain connection should be hand-tightened, plus no more than one turn.
If the coil needs to be cleaned or replaced, it should be washed with Calgon CalClean (mix one part CalClean to ten parts water). Allow solu- tion to remain on coil for 30 minutes before rinsing with clean water. Solution should not be permitted to come in contact with painted sur- faces.
Horizontal drain cutout in the center access panel should be removed by using a utility knife. DO NOT TRY TO KNOCK OUT.
Route the drain line so that it does not interfere with accessibility to the coil, air handling system or filter and will not be exposed to freezing temperatures. See Figures 2, 3 and 4.
The bearings of the blower motor are permanently lubricated.
During the cooling season check the condensate drain lines to be sure that condensate is flowing from the primary drain but not from the sec- ondary drain. If condensate ever flows from the secondary drain the unit should be promptly shut off and the condensate pan and drains cleaned to insure a free flowing primary drain.
The coil is provided with a secondary drain that should be trapped and piped to a location that will give the occupant a visual warning that the primary drain is clogged. If the secondary drain is not used it must be capped.
PROBLEM POSSIBLE CAUSE
Blower Runs all of the time
Blown Fuse 1. Low voltage short to C or ground from R, Y, G, W, or O.
No 2nd stage heat 1. Check 6-pin connector and connections to panel mount relays. 2. Verify that both W1 & W2 are connected at the terminal strip.
No Heat or Limited Heating
Subject to change without notice. Printed in U.S.A. 292043-UIM-B-0707 Copyright © by York International Corp. 2007. All rights reserved. Supersedes: 292043-UIM-A-0507
No 24V
Owners and our team usually reply within a day — and your question helps the next person too.
Be the first to ask — other owners or our team will answer.