Instruction/ maintenance manual of the product 1F95-71 White Rodgers
Go to page of 8
All wiring must conform to local and national electrical codes and ordinances. This control is a precision instrument, and should be handled carefully.
2 Approximately 5 feet from floor 1 ⁄ 2 ” hole for thermostat wire Stout cord with 6” chain attached Baseboard strip moulding 1 ⁄ 4 ” guide hole for sighting Quarter round removed 3 ⁄ 4 ” hole in floor of partition Hooked wire for snagging chain Figure 1.
3 TABLE 1. TERMINAL REFERENCE LABEL NUMBER 1F95 TERMINAL DESIGNATION FUNCTION OLD THERMOSTAT TERMINAL DESIGNATION (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) G C R O B Y1 Y2 W1 W2 W3 Fan O.
4 C R G B O CHANGEOVER ENERGIZED IN HEAT CHANGEOVER ENERGIZED IN COOL COMPRESSOR CONTACTOR STAGE 1 FAN RELAY HEAT RELAY STAGE 1 HEAT RELAY STAGE 2 HEAT RELAY STAGE 3 THERMOSTAT CONTROL CIRCUIT COMPRESSOR CONTACTOR STAGE 2 24 VAC 120 VAC HOT NEUTRAL THERMOSTAT SYSTEM Y1 Y2 W1 W2 W3 Figure 4.
5 CAUTION ! NOTE NOTE C R O B CHANGEOVER ENERGIZED IN HEAT CHANGEOVER ENERGIZED IN COOL G FAN RELAY HEAT RELAY STAGE 1 HEAT RELAY STAGE 2 HEAT RELAY STAGE 3 THERMOSTAT CONTROL CIRCUIT 24 VAC 120 VAC HOT NEUTRAL THERMOSTAT SYSTEM COMPRESSOR CONTACTOR STAGE 1 Y1 COMPRESSOR CONTACTOR STAGE 2 Y2 W1 W2 W3 Figure 5.
6 SYSTEM CONFIGURA TION ANY TIME OPTION SWITCHES #1 OR #2 ARE CHANGED, THE 9 VOLT ENERGIZER ® BATTERY MUST BE REMOVED FOR A MINIMUM OF 2 MINUTES. Set Option Switches 1. For furnaces not requiring a G terminal to energize fan (systems with fan/limit switch or automatic fan on/ off operation): 2.
7 CAUTION ! Cooling System Operation To prevent compressor and/or property damage, if power to the compressor has been off or interrupted for more than 1 hour and the outdoor temperature is below 50 .
If you need further information about this product, please write to White-Rodgers Division, Emerson Electric Co. 9797 Reavis Road St. Louis, MO 63123-5398 Attention: Technical Service Department.
An important point after buying a device White Rodgers 1F95-71 (or even before the purchase) is to read its user manual. We should do this for several simple reasons:
If you have not bought White Rodgers 1F95-71 yet, this is a good time to familiarize yourself with the basic data on the product. First of all view first pages of the manual, you can find above. You should find there the most important technical data White Rodgers 1F95-71 - thus you can check whether the hardware meets your expectations. When delving into next pages of the user manual, White Rodgers 1F95-71 you will learn all the available features of the product, as well as information on its operation. The information that you get White Rodgers 1F95-71 will certainly help you make a decision on the purchase.
If you already are a holder of White Rodgers 1F95-71, but have not read the manual yet, you should do it for the reasons described above. You will learn then if you properly used the available features, and whether you have not made any mistakes, which can shorten the lifetime White Rodgers 1F95-71.
However, one of the most important roles played by the user manual is to help in solving problems with White Rodgers 1F95-71. Almost always you will find there Troubleshooting, which are the most frequently occurring failures and malfunctions of the device White Rodgers 1F95-71 along with tips on how to solve them. Even if you fail to solve the problem, the manual will show you a further procedure – contact to the customer service center or the nearest service center