Instruction/ maintenance manual of the product Extended-Run Single-Phase Battery Cabinet Tripp Lite
Go to page of 16
1. Introduction 2 2. Important Safety Instructions 3 3. Battery Cabinet Installation 5 3.1 Preparation 5 3.2 T ranspor tation 5 3.3 Mechanical Check 5 3.4 Internal Wiring (T ypical) 6 3.5 Preliminary Electrical Check 6 3.6 Battery Cabinet Placement 6 3.
2 1. Introduction T ripp Lite’ s Extended-Run Single-Phase Battery Cabinets connect to SmartOnline 3-Phase UPS Systems to provide long-lasting battery backup for data centers, telecommunications, ne.
3 2. Important Safety Instructions SA VE THESE INSTRUCTIONS All sections of this manual contain instructions and warnings that must be followed during the installation and operation of the battery cabinet described in this manual. Read ALL instructions thoroughly before attempting to move, install or connect your battery cabinet.
4 2. Important Safety Instructions ( continued ) Battery W arnings The battery cabinet does not require routine maintenance by the user . There are no user-serviceable parts inside. Only • qualied, knowledgeable service personnel familiar with all required precautions should open the access panels for any reason.
5 3.1 Preparation 3.2 T ransportation 3.3 Mechanical Check 3. Battery Cabinet Installation Read Section 2 – Important Safety Instructions Before Installation At your site, prepare to off-load the battery cabinet from the delivery truck and transport it to the nal installation location.
6 3.4 Internal Wiring (T ypical) 3.5 Preliminary Electrical Check 3.6 Battery Cabinet Placement 3. Battery Cabinet Installation ( continued ) Battery cabinets use multiple 12 VDC batteries connected in series to provide nominal DC voltages ranging from 192 VDC • to 240 VDC.
7 3.7 Electrical Connection 3.8 Battery Charger Electrical Connection (Select Models) 3.9 Final Electrical Check 3. Battery Cabinet Installation ( continued ) The battery cabinet should be connected to the load through a DC disconnect switch or a DC circuit breaker .
8 Additional battery strings can be daisy-chained to the UPS internal battery system via a unique connector inside the UPS battery compartment (Figure 3.10a). A 15-ft. BP240EXTNDR15DL cable is required to connect the rst battery cabinet to the UPS system (Figure 3.
9 4. Operation and Charging 4.1 Determine Charging V oltages 4.2 Initial Charge 4.3 Operational Check 4.4 Acceptance T est (Optional) T o determine the appropriate equalization (freshening) charge vol.
10 5. Maintenance 5.1 Maintenance Schedule 5.2 Fuse Replacement Quarterly Check Measure individual battery unit temperature. (Measure with a digital thermometer by placing the surface thermocouple on 1. the at surface of the negative terminal—not the “L” connection surface.
11 6.1 Battery Cabinet Diagram (3 Shelves) 6. Diagrams Note : All dimensions are in inches. 28.80 6.00 32.4 6.00 3.25 4.50 4.50 4.00 3.50 10.58 13.50 2.25 15.75 60.00 13.50 13.50 15.40 8.25 11.00 16.00 AC Input for Battery Charger Breaker Mounting Plate 14.
12 .
13 6.3 Integrated Battery Charger (Select Models) 6. Diagrams ( continued ) 6.25 MAX 0.5 12.5 13.5 Notes : • All dimensions are in inches. • AC input is preset with fuses for 120V 30 A, but can be rewired for 208 and 240 V AC, 60 Hz by a qualied electrician.
14 7.1 Dimensions and Floor Loading 7.2 Recommended T orque 7. Specifications Battery Cabinet Model Shelves Dimensions (Width x Depth x Height) Weight Floor Loading BP240V557C-1PH 3 32.4 x 28.8 x 60 inches (82.3 x 73.2 x 152.4 cm) 1250 lb (567.5 kg) 193 lb/ft 2 (943 kg/m 2 ) BP240V787C-1PH 3 32.
15 9. W arranty 8. Storage and Service Storage The battery cabinet must be stored in a clean, secure environment with a temperature less than 40° C (104° F) and a relative humidity less than 90% (non-condensing). Store the battery cabinet in its original shipping container if possible.
200809068 93-2847 1 1 1 1 W . 35th Street, Chicago, IL 60609 USA +1.773.869.1234 • www .tripplite.com.
An important point after buying a device Tripp Lite Extended-Run Single-Phase Battery Cabinet (or even before the purchase) is to read its user manual. We should do this for several simple reasons:
If you have not bought Tripp Lite Extended-Run Single-Phase Battery Cabinet yet, this is a good time to familiarize yourself with the basic data on the product. First of all view first pages of the manual, you can find above. You should find there the most important technical data Tripp Lite Extended-Run Single-Phase Battery Cabinet - thus you can check whether the hardware meets your expectations. When delving into next pages of the user manual, Tripp Lite Extended-Run Single-Phase Battery Cabinet you will learn all the available features of the product, as well as information on its operation. The information that you get Tripp Lite Extended-Run Single-Phase Battery Cabinet will certainly help you make a decision on the purchase.
If you already are a holder of Tripp Lite Extended-Run Single-Phase Battery Cabinet, but have not read the manual yet, you should do it for the reasons described above. You will learn then if you properly used the available features, and whether you have not made any mistakes, which can shorten the lifetime Tripp Lite Extended-Run Single-Phase Battery Cabinet.
However, one of the most important roles played by the user manual is to help in solving problems with Tripp Lite Extended-Run Single-Phase Battery Cabinet. Almost always you will find there Troubleshooting, which are the most frequently occurring failures and malfunctions of the device Tripp Lite Extended-Run Single-Phase Battery Cabinet along with tips on how to solve them. Even if you fail to solve the problem, the manual will show you a further procedure – contact to the customer service center or the nearest service center