Instruction/ maintenance manual of the product TL-SG5428 TP-Link
Go to page of 32
Ins t allation Guide L2 Managed S wit ch TL-SG5428/TL-SG5412F Enterprise Networking Solution.
I Spe cif icatio ns are subjec t to change without not ice. i s a r e gi s t e r e d t r a d e m a r k of T P - L I N K TECHN OLOGIES CO. , L TD . Oth er brand s and pro duc t names are t rademark s of the ir res pe ct ive holder s.
II Related Document The Us er Guid e and CL I Refere nce G uide of the produc t are pr ovided o n the re so urce C D. T o obt ain the lates t pro duc t information, plea se visit t he Of f ic ial Website: ht tp: / /ww w.
III This Inst allation Guide i s for: Net work Engine er Net work Adminis trator D u e t o t h e s i m i l a r i t y i n t h.
IV Contents Chapter 1 Introduction ———————————— 01 1.1 Product Overview ......................................... 01 1.2 Appearance ................................................. 01 Chapter 2 Installation ————————————— 04 2.
01 L2 Managed Switch TL -SG5428 and TL -SG5 4 12F are Gi gabit Ether net switc hing pro duc t s rec ently develo pe d by T P-L IN K.
02 L2 Managed Switch LEDs ( f or TL-SG5 428 ) LED Sta tus Indic ati on PWR On The Swit ch is p ower ed on Of f The Swit ch is p ower ed of f o r power s uppl y is abn ormal Flashi ng Power sup ply i s.
03 L2 Managed Switch Por t Fe atur e Mode l 1 0/ 100/ 1 000 Mbps R J45 Por t SFP Por t Con sole P or t TL -SG 5428 24 4 1 TL -SG 54 12 F 4 12 1 10 / 100 / 1000 Mbps R J45 Po r t D e s i g n e d t o c o n n e c t t o t h e d e v i c e w i t h a b a n d w i d t h o f 10 M b p s , 10 0 M b p s o r 1 00 0 Mbp s.
04 L2 Managed Switch Make s ure that the pac kage co ntains the fo llowing items. If any of the lis ted ite ms is damaged or mis sing, pleas e cont ac t your distr ibutor .
05 L2 Managed Switch Please keep a pro per tempe rature and humidit y in the equipme nt r oom. T oo high/low humidit y may lead to b ad insulation, ele c tricit y l eakage, mec hanical prope r t y change s and cor rosio ns.
06 L2 Managed Switch prote c tion mea sures s hould be t aken. Ensure the rac k and device ar e well ear the d. ■ Make sure the power so cket has a go od co ntac t with th e ground. ■ Keep a reas onable c abling sys tem and avoid induce d lightning.
07 L2 Managed Switch T urnover t he dev ice an d at t ac h the s upplie d rub be r fee t to t he re ce ss e d area s on 3. the bot tom at each c orne r of the devic e.
08 L2 Managed Switch In t he ac t ual.
09 L2 Managed Switch Requirement s for the dis t ance be t ween Et herne t c able and ot her pipe lines are shown ■ in the tab le. Oth er Pipe lines Ethe rnet C able Min Parallel Ne t Leng th L ( mm.
10 L2 Managed Switch Co nne c t in g th e d evi ce to g ro und is to q uic k ly rel ea se th e lig htn ing over -volt ag e an d over -c urrent of the devic e, whic h is also a nec es sar y me asure to pr otec t the b ody fro m elec t ric sho ck.
11 L2 Managed Switch Not e: The f igure is to illustrate th e applic ation and principl e. The power c ord you get fro m ■ the pac kage and the so cket in your situation will comply with the re gulation in your countr y , s o they may dif fer fro m the f igure above.
12 L2 Managed Switch Power lightning arres ter and si gnal lightning arrest er are us ed fo r lighting prote ct ion. Power lightning arre st er is used for limiting the voltage surge due to a lightning.
13 L2 Managed Switch Connection Conne c t the Ether net por t s of the Switch to the ne t work device s by R J45 c able as the following f igure shown.
14 L2 Managed Switch Connection Opt ic al fib er Optic al f ib er can b e u se d a s a medium f or t ele communicati on an d c omputer net work ing. It is esp ec ially advant ageo us for lon g-dis tan ce communic ations, b ec ause light prop agates through the f ibe r with much les s att enuation comp ared to ele c tric al cable s.
15 L2 Managed Switch CL I ( Command L ine Inter f ace ) enable s you to manage th e Switc h, thus you c an loa d the CL I af ter conne c ting the PC s or T erminals to the con sole p or t on the Switch via the provide d cabl e.
16 L2 Managed Switch Conne c ting t o Power Suppl y Figure 4 -5 Not e: The gure is to illustrate the applic ation and principle. The p ower cor d you ge t fro m th e pa c kag e and the so c ket in yo ur sit uat ion w ill c omp ly wit h th e re gul atio n in your countr y , s o they may diffe r from t he gure above.
17 L2 Managed Switch T o a c c e s s t h e G U I o f t h e S w i t c h , o p e n a w e b b r o w s e r a n d t y p e t h e d e f a u l t 1.
18 L2 Managed Switch Y ou c an log o n to the Switch an d acce ss t he CL I by the following t wo met hod s: Log on to t he Switch by the c onso le por t o n the Switch.
19 L2 Managed Switch Sel ec t the p or t to c onne c t Figure 5-6 Co nf i gur e t he po r t s el ec te d i n th e s t ep ab ove a s t he fo ll owin g F igu re 5- 7 sh own. 5. Conf igure Bits per s eco nd a s 38 40 0, Dat a bits a s 8, Parit y as Non e, Stop bits as 1, Flow contro l as None, and t hen clic k OK .
20 L2 Managed Switch Logon by T elne t ■ T o log on t o the switc h by a T elnet c onne ct ion, please t ake the following s teps: Make sure the switc h and the PC ar e in the same L AN. 1. Click St ar t 2. → Run to open th e Run window . Ope n the Run window Figure 5-9 T ype c md in the pro mpt Run window as Figure 5- 1 0 and clic k OK.
21 L2 Managed Switch T y pe th e U s er nam e a nd Pa ss wo rd (the fa c to r y de fa ult va lue fo r b o th of t he m i s 5. admin ) and pres s the Enter bu t ton, then you can us e the C LI now, wh ich is sh own as Figure 5- 12.
22 L2 Managed Switch .
23 L2 Managed Switch Item Content Standar ds IEEE 802.3 1 0 Bas e- T IEEE 802.3u 1 0 0Ba se - T X IEEE 802.3ab 1 0 00 Bas e- T IEEE 802.3 z 1 00 0Ba se - X IEEE 802.
24 L2 Managed Switch For mo re help, please go t o : ■ ht tp :/ /ww w. tp-link.com/ en/ suppor t /faq T o download th e lates t Firmware, Driver , Utilit y and Us er Guid e, go to: ■ http: / /ww w .
25 L2 Managed Switch Ger many /A us tria T e l: +49 1805 875465 ( Ger man S e r vi ce ) / +49 1805 TPL IN K E-mail : suppor t.de@tp -link.com F e e: 0.
.
W ebsite: http://www .tp-link.com T el: +86 755 26504400 E-mail: support@tp-link.com 7106503848 Rev: 2.0.1.
An important point after buying a device TP-Link TL-SG5428 (or even before the purchase) is to read its user manual. We should do this for several simple reasons:
If you have not bought TP-Link TL-SG5428 yet, this is a good time to familiarize yourself with the basic data on the product. First of all view first pages of the manual, you can find above. You should find there the most important technical data TP-Link TL-SG5428 - thus you can check whether the hardware meets your expectations. When delving into next pages of the user manual, TP-Link TL-SG5428 you will learn all the available features of the product, as well as information on its operation. The information that you get TP-Link TL-SG5428 will certainly help you make a decision on the purchase.
If you already are a holder of TP-Link TL-SG5428, but have not read the manual yet, you should do it for the reasons described above. You will learn then if you properly used the available features, and whether you have not made any mistakes, which can shorten the lifetime TP-Link TL-SG5428.
However, one of the most important roles played by the user manual is to help in solving problems with TP-Link TL-SG5428. Almost always you will find there Troubleshooting, which are the most frequently occurring failures and malfunctions of the device TP-Link TL-SG5428 along with tips on how to solve them. Even if you fail to solve the problem, the manual will show you a further procedure – contact to the customer service center or the nearest service center