Instruction/ maintenance manual of the product UC-15IO Sub-Zero
Go to page of 32
I N S TA L L AT I O N &O P E R AT I O N U NDERCOUNTER I C E M A C H I N E.
SUB-ZER O ® is a re gistere d tradema rk of Sub-Z ero, Inc. As you follow these instructions, you will notice W ARNING and CAUTION symbols. This blocked information is important for the safe and efficient installation of Sub-Zero equipment. There are two types of potential hazards that may occur during installation.
3 T H A N K Y O U Congra tulat ions on th e purch ase of you r Sub-Ze ro ice ma chine. I t produ ces the s ame high qua lity cl ear ice th at you wo uld expe ct from Sub -Zero . The impo rtanc e of the ins tallat ion of th e ice machin e canno t be overe mphas ized.
I C E M A C H I N E REQUIREMENTS M odels UC -15I an d UC-15I O must ha ve open site (gravity) drain available (see pag e 8). A grounded, polarized electrical power supply o n a separ ate circ uit ser vicing o nly this appliance is required.
5 S U B - Z E R O I C E M A C H I N E INST ALLA TION O VERALL DIMENSIONS Models UC-15I, UC-15IP , UC-15IO & UC-15IPO 33 5 / 8 " (854) 33 5 / 8 " (854) 14 3 / 4 " (375) 29 5 / 8 &quo.
6 S U B - Z E R O I C E M A C H I N E I N S T A L L A T I O N L O C AT I O N O F I C E M A C H I N E T he locat ion sel ected fo r the ice ma chine m ust meet the following criteria.
7 Dimensions in parentheses are in millimeters unless otherwise specified. S U B - Z E R O I C E M A C H I N E INST ALLA TION I M P O R T A N T N O T E Y ou mus t fol low all National Electrical Code regulations. In add iti on, b e awa re of local codes and ordinances when installing your services.
8 S U B - Z E R O I C E M A C H I N E I N S T A L L A T I O N P L U M B I N G REQUIREMENTS W A T E R S U P P L Y Prepar e water s upply li ne and dr ain befo re installation of your ice machine. Installation requir es a mini mum 1 / 4 " ID cop per col d water line and c ompre ssion fi tting ( not supp lied) .
9 Dimensions in parentheses are in millimeters unless otherwise specified. S U B - Z E R O I C E M A C H I N E INST ALLA TION I M P O R T A N T N O T E Plumbing must con for m to st ate and local codes.
Dimensions in parentheses are in millimeters unless otherwise specified. 10 S U B - Z E R O I C E M A C H I N E I N S T A L L A T I O N I N S TA L L A T I O N INST ALLA TION PR OCEDURE 1) Prepar e the sit e by follo wing th e instru c- tions un der Ele ctric al Requi rement s and Plumbi ng Requ iremen ts on pag es 7–9.
11 S U B - Z E R O I C E M A C H I N E INST ALLA TION I N S TA L L A T I O N 13) Prepare sanitizer solution and sanitize the ice ma chine a ccord ing to In Pl ace Cleani ng / San itizi ng Steps 6 a nd 7 on page 25. 14) Put one ga llon (4 L ) of cold wa ter int o a contai ner tha t will eas ily pou r under th e l ifted wa ter shu tters.
12 S U B - Z E R O I C E M A C H I N E I N S T A L L A T I O N I N S TA L L A T I O N L E V E L I N G 1) Adjust the levelers close to desired height. 2 ) M ove the bi n into it s final po sitio n. 3) Level th e ice mac hine to as sure th at the bin door clo ses and s eals pr operly.
13 S U B - Z E R O I C E M A C H I N E INST ALLA TION I N S TA L L A T I O N 3 ) R emove th e upper p lastic t rim pie ce (rig ht han d con fig ure d) fr om the do or by r emo vin g the two sc rews th at secur e it to the d oor . T hen repl ace it wi th left ha nd trim p iece.
14 I N S TA L L A T I O N D OOR P ANEL INST ALLA TION Y ou shou ld be sure o f the doo r panel s ize and placem ent bef ore proc eedin g with the i nstal la- tion. If y ou have q uesti ons, con tact yo ur Sub-Ze ro deal er or cab inet sup plier . In struc- tions regarding sizing of the door panel are provid ed in the S ub-Zer o desig n guide.
15 Dimensions in parentheses are in millimeters unless otherwise specified. I nstall t he door p anel by en gagin g the tabb ed bracke t to the do or first a nd then s liding t he hinge si de hard ware ove r the pos itioni ng screws . Y ou will h ave a 1 / 4 " inc h adjus tment, up and dow n, side t o side, wi th this h ardwar e.
Has the ice machine been installed where the incoming water temperature will remain in the range of 50–80°F (10–27°C)? Is the ice m achin e drain li ne route d to an open site drain for gravity .
17 Dimensions in parentheses are in millimeters unless otherwise specified. S U B - Z E R O I C E M A C H I N E FEA TURES W A R R A N T Y Sub-Zero products are c ove red b y a two, five and twelve year resi- dential warranty (exclusions apply). See w arr ant y details at the end of th is gu ide .
18 BEFORE ST AR TING THE ICE MACHINE S A N I T I Z E It is impo rtant t o clean an d sanit ize the ic e machin e prior t o use to ens ure opt imum ic e qualit y .
19 S U B - Z E R O I C E M A C H I N E OPERA TION CLE AN Bu tt on (G ree n) Pressi ng the CLE AN button will initiate a clean cycle and de-activate the ICE light. The CLE AN light will flash during the clean cycle to indicate the proper time to add ice machine cleaner or sanitizer .
20 S E Q U E N C E O F OPERA TION Depend ing on am bient c onditi ons and c old water supply temperature, the ice making process will take approximately 30 minutes.
21 S U B - Z E R O I C E M A C H I N E OPERA TION O P E R AT I O N A L C H E C K S T ESTING AND ADJUSTING THE B I N T H E R M O S T A T The bin th ermos tat stop s the ice ma chine when the b in is full . It is pres et for no rmal ambient temperatures and adjustments are usuall y not req uired.
22 S U B - Z E R O I C E M A C H I N E OPERA TION O P E R AT I O N A L CHECKS CUBE WEIGHT ADJUSTMENT The cube w eight c an be incr eased f rom the factory setting by adjusting the finish time. Additional finishing time check: 1) Press and hold the POWER button for 5 second s.
23 S U B - Z E R O I C E M A C H I N E C A R E T o ensure efficient operation, Sub-Zero recom- mends an annual cleaning performed by a qualified service company .
24 C L E A N I N G THE CONDENSER A dirty condenser restricts airflow , resulting in excessively high operating temperatures. This reduces ice production and shortens compo- nent life. Clean the condenser at least every six months. Follow the steps below .
25 Dimensions in parentheses are in millimeters unless otherwise specified. S U B - Z E R O I C E M A C H I N E C A R E INTERIOR CLEANING Perfor m an in pla ce clean ing / sa nitizi ng proc e- dure mon thly an d a cleani ng / san itizin g proce - dure eve ry 6 mont hs for eff icien t operat ion.
26 S U B - Z E R O I C E M A C H I N E C A R E W A TER FIL TER REPLA CEMENT T o repla ce the wat er filt er incom ing wat er does not need t o be turn ed off. Th e unit is e quippe d with an a uto bypa ss feat ure whic h bypas ses t he filter when removed.
27 Dimensions in parentheses are in millimeters unless otherwise specified. S U B - Z E R O I C E M A C H I N E C A R E I C E M A C H I N E MAINTENANCE R EMO V AL FR OM SER VICE, LONG TERM ST ORA GE A.
28 S U B - Z E R O TROUBLESHOO TING G U I D E S E R V I C E C E N T E R Contact your Sub-Zero dealer or che ck th e Loc ato r sec tio n of ou r web sit e, subzero.
29 Dimensions in parentheses are in millimeters unless otherwise specified. S U B - Z E R O TROUBLESHOO TING GUIDE T R O U B L E S H O O T I N G GUIDE PR OBLEM POSSIBLE C AUSE POSSIBLE SOLUTION Fre ez.
30 SER VICE INFORMA TION If you do ne ed serv ice, be s ure to hav e the model an d seria l number o f your un it when you call . Y ou’ll f ind the se numbe rs on the rating plate. Refer to the illustration on page 4. For warr anty pu rposes , you will a lso need t he date of in stall ation an d the name o f your Su b- Zero dea ler .
Su b- Ze r o Pr od uc t s Li mi t ed W ar ra n ty R ESIDENTIAL USE ONL Y FULL FIVE YEAR SEALED SYSTEM W ARRANTY LIMITED SIXTH THROUGH TWELFTH YEAR W ARRANTY ON THE SEALED SYSTEM FULL TWO YEAR W ARRANT.
7 0 1 2 2 0 6 R E V - B 0 0 0 0 0 2 6 2 8 S U B - Z E R O , I N C . P. O . B O X 4 4 1 3 0 M A D I S O N , W I 5 3 7 4 4 - 4 1 3 0 8 0 0 - 2 2 2 - 7 8 2 0 S U B Z E R O .
An important point after buying a device Sub-Zero UC-15IO (or even before the purchase) is to read its user manual. We should do this for several simple reasons:
If you have not bought Sub-Zero UC-15IO yet, this is a good time to familiarize yourself with the basic data on the product. First of all view first pages of the manual, you can find above. You should find there the most important technical data Sub-Zero UC-15IO - thus you can check whether the hardware meets your expectations. When delving into next pages of the user manual, Sub-Zero UC-15IO you will learn all the available features of the product, as well as information on its operation. The information that you get Sub-Zero UC-15IO will certainly help you make a decision on the purchase.
If you already are a holder of Sub-Zero UC-15IO, but have not read the manual yet, you should do it for the reasons described above. You will learn then if you properly used the available features, and whether you have not made any mistakes, which can shorten the lifetime Sub-Zero UC-15IO.
However, one of the most important roles played by the user manual is to help in solving problems with Sub-Zero UC-15IO. Almost always you will find there Troubleshooting, which are the most frequently occurring failures and malfunctions of the device Sub-Zero UC-15IO along with tips on how to solve them. Even if you fail to solve the problem, the manual will show you a further procedure – contact to the customer service center or the nearest service center