Instruction/ maintenance manual of the product BB121250 Sterling Plumbing
Go to page of 9
S TERLING POWER PRODUCTS BA TTER Y - to - BA TTER Y CHARGER Advanced char ging technology Installations Instructions & manual Installations- und Bedienungsanleitung BB121250 BB122430 REMOTE CONTRO.
ENSURE ALL NEGS ARE COMMON DOMESTIC BA TTER Y SYSTEM Battery temperature sensor cable ( supplied ) Remote control and information panel ( optional remote kit ) Full System wiring.(including optional remote kit if used) ENGINE ST ARTER BA TTERY CE 1 2 3 4 Power Management with AMP Hr Counter Sterling power products Amp hr Amps V olts 14.
main engine alternator d/c batter y charger domestic/aux batter y bank d/c battery charger Bow thruster battery bank engine alternator star ter motor domestic/aux batter y bank already installed split.
Battery-Battery Digital Charger Sterling power products CE on/off 1 2 3 4 light alarm alarm Alarm shutdown System disengaged Low input voltage System o.k. 2 1 3 4 InBat v=13.7v Current = 38A 20min ON 17min CHARGE BATTERY IN 13.7V 38A BATTERY OUT 14.2V 31A in 13.
Why do I need the d/c battery charger? What does it do? Advantages of this unit. installation : no dir ect connections to the standar d engine alternator ensur es the engine battery if maintained and .
Program the battery type into the unit, Non sealed lead acid Gel / Exide spec. Gel U.S.A. spec. Sealed lead acid/ A.G .M. My advise is where possible use the open lead acid batteries, which ar e also by far the lowest cost . Due to their slow recharge rate, avoid gel batteries for fast charging cycles.
If on start up nothing happens, Auto pause switch off. WHA T CABLE T O USE IN mm sq A charger or inverter up to cable run distance 0-1.5 mtr 1.5 4 mtr 0-25 amps 6 mm sq 10 mm sq 25-45 amps 16 mm sq 25.
BA TTERY OUTPUT OVER TEMPERA TURE: Red : This shows that the battery temperature sensor has picked up a temperature in excess of 50 deg C at its source ( where ever you have fitted it ) this will trip the unit until it has been reset. Please find the fault before resetting HEA T -SINK OVER TEMP .
this displays the output voltage and current of the battery you are charging. ( a less current but higher voltage ) ( this is the setup information screen ) This screen gives dif ferent information depending on the system cycle, it is informing you.
An important point after buying a device Sterling Plumbing BB121250 (or even before the purchase) is to read its user manual. We should do this for several simple reasons:
If you have not bought Sterling Plumbing BB121250 yet, this is a good time to familiarize yourself with the basic data on the product. First of all view first pages of the manual, you can find above. You should find there the most important technical data Sterling Plumbing BB121250 - thus you can check whether the hardware meets your expectations. When delving into next pages of the user manual, Sterling Plumbing BB121250 you will learn all the available features of the product, as well as information on its operation. The information that you get Sterling Plumbing BB121250 will certainly help you make a decision on the purchase.
If you already are a holder of Sterling Plumbing BB121250, but have not read the manual yet, you should do it for the reasons described above. You will learn then if you properly used the available features, and whether you have not made any mistakes, which can shorten the lifetime Sterling Plumbing BB121250.
However, one of the most important roles played by the user manual is to help in solving problems with Sterling Plumbing BB121250. Almost always you will find there Troubleshooting, which are the most frequently occurring failures and malfunctions of the device Sterling Plumbing BB121250 along with tips on how to solve them. Even if you fail to solve the problem, the manual will show you a further procedure – contact to the customer service center or the nearest service center