Instruction/ maintenance manual of the product BH15 Roberts Gorden
Go to page of 25
WARNING Installation must be done by a contractor qualified in the installation and service of gas-fired heating equipment. Improper installation, adjustment, alteration, service or maintenance can result in death, injury or property damage.
© 2001 All rights reserved. No part of this work covered by the copyrights herein may be reproduced or copied in any form or by any means - graphic, electronic, or mechanical, including photocopying, recording, taping or information storage and retrieval systems - without the written permission of Roberts-Gordon.
TABLE OF FIGURES F i gu r e 1: Deleted F i gu r e 2: L i near Ho r i z o n t a l M oun t s . . . . .. . . . .. . . . . 4 F i gu r e 3: L i near, O ne S i d e Re f l ec t o r . . . .. . . . .. . . . . 4 F i gu r e 4: L i near, T w o S i de Re f l ec t o r s .
SECTION 1: H EATER S AFET Y 1 SECTION 1: HEATE R SAFETY Y o ur Safe ty is Im p or ta n t to Us ! This symbol is used throughou t t he manual to notify you of p ossible fire, electr ical or bur n hazards. Pleas e pay special attention wh en reading an d followi ng the war nin gs in these sect ions.
SECTION 3 : C RI TICAL C ONS IDERA TIONS 3 SECTION 3 : CRITICAL CONSIDERATIONS 3.1 Minimum Required Clearances to Combustib les Clearances are the required di st ances that combustible objects must be kept awa y from the heater to p re vent serious f ire haz ards.
BLACKHEAT® I NSTA LLATI ON O PERATION AND S ERVICE M ANUA L 4 3 . 2 C le a ran c e D a t a - NOTE: 1. A ll dimensions are fr o m the T ube surf ace. 2. Clearance s B , C and D can be reduced by 50% after 7 m of t ubing downstream from the burner . 3.
SECTION 3 : C RI TICAL C ONS IDERA TIONS 5 NOTE: 1. All dimens ions are from the T ube surf ace. 2. Clearances B, C and D can be red uc ed by 50 % afte r 7 m of tubing d ownstream from the b ur n er .
BLACKHEAT ® I NSTA LLATI ON O PER ATION AND S ERVI CE M AN UA L 6 3. 3 Clea rance Dat a -U T u be NOTE: 1. A ll dimensions are fr o m the T ube surf ace. 2. Clearance s B , C and D can be reduced by 50% after 7 m of t ubing downstream from the burner .
SECTION 3 : C RI TICAL C ONS IDERA TIONS 7 NOTE: 1. All dimens ions are from the T ube surf ace. 2. Clearances B, C and D can be red uc ed by 50 % afte r 7 m of tubing d ownstream from the b ur n er .
BLACKHEAT ® I NSTA LLATI ON O PER ATION AND S ERVI CE M AN UA L 8 SECTION 4: SPECIFICATIONS 4.1 Ma terial Specif ications 4.1.1 C ombustion a nd T ubes First 3 m eters ALUMI-THERM ® steel tubing. Remai ning tu be 1 00 mm d ia. 16 gau ge h eat treate d alum inised mild steel.
SECTION 4: Specifications ------------- ------------- ---------- ------------- ---------- ------------- ------------- ---------- ------------- ------------- ---------- ---------- ------------- ---------- ------------- -- 4.
BLACKHEAT ® I NSTA LLATI ON O PER ATION AND S ERVI CE M AN UA L 10 4.9 Bu r ner Specificat ions Figure 16: BLACKHE AT ® Lin ear and U-T u be Fan Damper Swirler* Plan View Reflector 171 mm End View I.
SECTION 5: M AJO R C OMPO NEN T D ESCRIPT I ONS 11 SECTION 5: M AJOR COMP ONENT DESCRIPTIONS Bu rne r (shown wi th T u be Gasket) Must be installed wi th the flame obser vation window facing do wn. Reflector (A l umini um or Stainles s Steel) Alter nate overlap as shown on ov e r view .
BLACKHEAT ® I NSTA LLATI ON O PER ATION AND S ERVI CE M AN UA L 12 SECTION 6: G ENERAL SUSPENSION DETAILS Ste p 6.1 Suspen sion D etails WARNING Suspension Hazard Hang heater with general purpose welded link steel chain, 4 mm or larger in diameter, with working load of 340 Kg.
SECT I ON 7: L I N E A R H E A T ER I N S T A LL A T I ON 13 S E CTI O N 7 : LIN E AR H E AT E R IN S TALLATI O N The figures in this sec tion provi de a general ov er view of c o m p onent p l a c e m ent i n a B L A C K H E A T ® L i n e ar s ys t e m .
BLACKHEAT ® I NSTA LLATI ON O PER ATION AND S ERVI CE M AN UA L 14 Figure 17: BLACKHE AT ® Lin ear Ge nera l Ass embly Ove r view Fan Tube Reflector Reflector End Cap Reflector Support Burner Coupli.
SECT I ON 7: L I N E A R H E A T ER I N S T A LL A T I ON 15 F i gure 1 8 : B L A C K H E A T ® L i n e ar L a y o ut O v e r v ie w s -[BH55 Not Available] Model Reflect or Overlap (appro x.) a b c d e f g B H 1 5 700 mm 365 m m 50 mm 50 mm 2290 mm 3050 mm 366 mm 291 mm B H 2 0 .
SECT I ON 7: L I N E A R H E A T ER I N S T A LL A T I ON 19 Step 7.3 B urner T ube Install ation Step 7.4 Coup lin g an d T ube Asse mb ly End View Weld Seam Bow Shackle Burner Tube Hanger NOTE: Tubing requires a downward slope of 13 mm per 6 m away from burner.
BLACKHEAT ® I NSTA LLATI ON O PER ATION AND S ERVI CE M AN UA L 20 Ste p 7.4. 1 Couplin g a nd T ub e Ass em bly (Co ntinue d) Ste p 7.4. 2 Couplin g a nd T ub e Ass em bly (Co ntinue d) WARNING Tighten slidebar as shown below. Tubes will fall down if slidebar is incorrect.
SECT I ON 7: L I N E A R H E A T ER I N S T A LL A T I ON 21 Step 7.5 T ube C lamp P a ckag e Insta lla tion Step 7.6 Re fl ector Instal lation Flat W asher Nut (T orque 13.
BLACKHEAT ® I NSTA LLATI ON O PER ATION AND S ERVI CE M AN UA L 22 Ste p 7.6. 1 Refle cto r Insta lla tion (C o ntinu ed ) Figure 21: Reflecto r Over l ap De ta il U-Clip (2 clips per alternate overl.
BLACKHEAT ® I NSTA LLATI ON O PER ATION AND S ERVI CE M AN UA L 24 SECTION 8: U-T UBE HEATE R INSTALLATION The figures in this s ection provide a ge neral overview of compone nt placement in a BLA CKHEA T ® U-T ube syste m. The l ocatio n of some co mponents such as supp or ts and coup lings is cr ucial f or proper installation.
SECTION 8 : U-T UBE H EATER I NS TALLA TI ON 25 Figure 22: BL ACK HEAT ® B H15U T A ss embly O ver v iew 20cm Maximum Coupling 180° U-T ube 457 mm Center to Center U-Clips Reflector End Caps Burner .
BLACKHEAT ® I NSTA LLATI ON O PER ATION AND S ERVI CE M AN UA L 26 Figure 23: BLACKHE AT ® U- T ub e La y out Ove rvie ws Mod el Re fl e cto r Ov erl ap (appro x. ) a b c d e f g B H 1 5 1780 mm 850 mm 50 mm 50 mm 2290 mm 3050 mm 366 mm 291 mm B H 2 0 .
SECTION 8 : U-T UBE H EATER I NS TALLA TI ON 27 Step 8.2 C r itic al Ha ng er P lace m en t Step 8.3 Bu r n er T u be and F a n T u be In sta llatio n 229 cm ± 25cm See Assembly Drawing First Tube and Reflector Hanger Bow Shackle T ube and Reflector Hanger Suspension Chain Optional Hanging Configuration W ashers Bolt (T orque: 13.
An important point after buying a device Roberts Gorden BH15 (or even before the purchase) is to read its user manual. We should do this for several simple reasons:
If you have not bought Roberts Gorden BH15 yet, this is a good time to familiarize yourself with the basic data on the product. First of all view first pages of the manual, you can find above. You should find there the most important technical data Roberts Gorden BH15 - thus you can check whether the hardware meets your expectations. When delving into next pages of the user manual, Roberts Gorden BH15 you will learn all the available features of the product, as well as information on its operation. The information that you get Roberts Gorden BH15 will certainly help you make a decision on the purchase.
If you already are a holder of Roberts Gorden BH15, but have not read the manual yet, you should do it for the reasons described above. You will learn then if you properly used the available features, and whether you have not made any mistakes, which can shorten the lifetime Roberts Gorden BH15.
However, one of the most important roles played by the user manual is to help in solving problems with Roberts Gorden BH15. Almost always you will find there Troubleshooting, which are the most frequently occurring failures and malfunctions of the device Roberts Gorden BH15 along with tips on how to solve them. Even if you fail to solve the problem, the manual will show you a further procedure – contact to the customer service center or the nearest service center