Instruction/ maintenance manual of the product 0066B Raypak
Go to page of 40
INST ALLA TION & OPERA TING INSTR UCTIONS CA T ALOG NO. 2100.50AB Effective: 09-02-09 Replaces: 12-26-07 P/N 240488 Rev . 29 WARNING: If these instructions are not followed exactly , a fire or explosion may result causing property damage, personal injury or death .
2 Rev . 29 reflects the following: Changes to: Note on Page 8, text on Page 10, Item 7 on Page 1 1, mounting instructions on Page 12.
WARNINGS 4 Pay Attention to These T erms 4 RECEIVING EQUIPMENT 5 GENERAL SPECIFICA TIONS 5 INST ALLA TION 7 Code Requirements 7 Mounting Base 7 Clearance Requirements 7 Combustion/V entilation Air 8 V.
D ANGER: I ndicates the presence of immediate hazards which will cause severe personal injury , death or substantial property damage if ignored. WARNING: Indicates the presence of hazards or unsafe practices which could cause severe personal injury , death or substantial property damage if ignored.
RECEIVING EQUIPMENT On receipt of your equipment, visually check for exter- nal damage to the carton. If the carton is damaged, it is suggested that a note be made on the Bill of Lading when signing for the equipment. Remove the boiler from the carton, and if it is dam- aged, report the damage to the carrier immediately .
6 16 33 1 / 4 22 1 / 8 12 1 / 2 5 18 3 1 / 4 2 THERMOST A T CONN (ELECTRICAL CONN ON OTHER SIDE) GAS CONN 3/4 NPT PIPE TO DRAIN 26 1 / 4 1 / 2 C 11 7 / 8 6 INLET OUTLET 3 1 / 8 MIN 19 K A UTOMA TIC VENT DAMPER (FIELD INST ALLED) B A Fig. 1: Dimensions Model No.
7 INST ALLA TION Code R equir ements I nstallation must be in accordance with local codes, or in the absence of local codes, with the latest editions o f the National Fuel Gas Code, ANSI Z223.
8 3. Except for carpeted flooring, boilers are certified for installation on combustible floors. 4. For un-insulated hot water pipes, maintain a 2" clearance, or consult local authority having juris- diction.
9 Location of the openings is the same as in the previ- ous case - that is, within 12" of the top, and within 12" of the bottom of the enclosure.
10 Roof Pitch (X/12) H (Min. ft) Flat to 6/12 1 6/12 to 7/12 1.25 Over 7/12 to 8/12 1.5 Over 8/12 to 9/12 2 Over 9/12 to 10/12 2.5 Over 10/12 to 1 1/12 3.25 Over 1 1/12 to 12/12 4 Over 12/12 to 14/12 5 Over 14/12 to 16/12 6 Over 16/12 to 18/12 7 Over 18/12 to 20/12 7.
11 At the time of removal of an existing boiler , the follow- ing st eps shal l be foll owed wit h each app liance remaining connected to the common venting system placed in operation, while the other appliances remain- ing connected to the common venting system are not in operation.
12 Mounting On vertical vents, the vent damper may be mounted with the actuator in any position. On horizontal vents, do not mount the actuator either directly above or d irectly below the vent pipe; mount the vent damper actuator to the side of the vent.
13 2. T urn the thermostat or controller up to call for heat a nd check that the vent damper indicator points to the open position, as shown in Fig. 1 1. 3. T urn the thermostat or controller down again and check that the vent damper position indicator returns to the closed position.
14 VENT DAMPER.
15 Gas Supply Connections The inlet gas connection of the boiler gas valve is 1/2". Provide an adequate gas piping supply line no smaller than 1/2", according to T able H above. Gas piping must have a sediment trap ahead of the boiler gas controls, and a manual shut-off valve locat- ed outside the jacket.
16 shipped loose. The full open position is appropriate for most systems, and ensures adequate flow through the boiler . If system flow is inadequate, (indicated by excessive temperature drop through the system) the bypass valve can be throttled slightly .
17 Air S coop Air V ent Diaphra gm Expansi on T ank F eed V alve Pipe Pressure R elie f V alve to Drain C old W a ter I nlet Heating Units Fig. 15: Single-Zone Piping Air S coop Ai r V e nt Diaphragm Expan sion T ank Feed V alve Pipe Pressure R elie f V alve to Drain Cold Wa ter I nlet Heating Units Circulators 12” Max.
18 Electrical W iring The electrical power supply requirement for these boil- ers is 120 V AC, 60 Hz. Field wiring connections and electrical grounding must comply with the local codes, or in the absence of local codes, with the latest edition o f the National Electrical Code, ANSI/NFP A 70.
19 W iring Diag r ams.
20.
21.
22 Fig. 17: Single-Zone T aco V alve Fig. 18: Dual-Zone T aco V alve Fig. 19: Dual-Zone Honeywell V alve NOTE: Maximum three (3) zone valves per one (1) 40 V A transformer .
23 Fig. 20: System with Three (3) Zone Pumps NOTE: Check V A rating of each relay coil. T otal load must not exceed V A rating of transformer . Fig. 21: Power V ent System with Zone V alve.
24 Fig. 22: Primary/Secondary Pumping System Honeywell Zone V alve Fig. 23: Standing Pilot with Low W ater Cut-off Device Note: Low water cut-off (L WCO) and system switch supplied by others.
25 Fig. 24: IID Units with Low W ater Cut-off Device Note: Low water cut-off (L WCO) and system switch supplied by others..
26 SER VICING PR OCEDURES General Location of Controls Fast- Response Temperature Sensor 2-Stage Controller Relay Ignition Module (Auto Ignition Only) Fig.
27 ST AR T -UP PR OCEDURES Lighting the Boiler Safe-lighting and other performance criteria were met with the gas manifold and control assembly provided on the boiler when the boiler underwent tests specified in the latest edition of the ANSI-Z21.13/CSA 4.
28 F or Standing Pilot Models with R ober tshaw Gas V alv e, 2-stage Oper ation (Models 90, 135 & 180) 10. T urn on all electrical power to the boiler .
29 technician. Force or attempted repair may result in a fire or explosion. D . Do not use this boiler if any part has been under water . Immediately call a qualified service techni- cian to inspect the boiler and to replace any part of the control system and any gas control which has b een under water .
30 3. T urn off all gas valves supplying gas to the boiler . Refer to operating instruction label on the boiler . 4. Shut-off the water supply to the boiler piping sys- tem loop. 5. Open drain valve on the boiler to remove water from the boiler and the piping circuits.
31 Inspection Procedur es Bur ner s C lean main burners and air louvers of dust, lint and debris. Keep boiler area clear and free from com- bustibles and flammable liquids. Do not obstruct the flow of combustion and ventilation air . Make visual check of burner and pilot flame.
32 Bur ner T r ay R emo val 1. Shut-off power and gas supply to the boiler . Disconnect union(s) and pilot tubing when pres- ent; then loosen and remove burner hold-down s crews. 2. Disconnect wires at gas valve and slide burner t ray out. Main Bur ner and Orifice Remo val 1.
9. Install flue collector , jacket top and inspection pan- els. Install top holding screws. Install draft diverter and vent piping if so equipped. 10. If gas piping was disconnected, reconnect gas pip- ing system and check for leakage using a soap s olution.
34 TR OUBLESHOO TING These instructions are primarily intended for the use of qualified personnel specifically trained and experienced i n the installation of this type of heating equipment and related system components. Installation and service per- sonnel may be required by some states to be licensed.
35 10) Befo re modu le goes into a l ock-out, check voltage across MV and MV/ PV. If n o 24 V is p resent , replace module. I f 24V is prese nt, repla ce gas valve. 1) Adju st i nlet g as p ress ure as shown on rati ng p late. 2) C lean pilot o rifice.
36 Adjustment & R eplacement of Components Gas V alve R eplacement 1. Shut-off electrical power and gas supply to the boiler . 2. Remove gas piping to gas valve inlet. 3. Disconnect wiring connections, pilot tubing (when present). 4. Remove screws (2) holding the burner tray .
37 7. Remove the wedge or retaining clip holding the sensing bulb in the control well in the in/out head- er . 8. Pull out the sensing bulb carefully from the control well. 9. Remove the limit control with capillary from unit. 10. Reverse above procedure to re-install.
38 LIMITED P ARTS W A R RAN TY RESI DENTIAL HEA TING BOILERS MODELS 42 TO 180 SCOPE: Raypak, Inc. (“Raypak”) warrants to the original owner that all parts of th is b oiler w hich a re actu ally m .
39.
w w w .r ay pa k .co m Raypak, Inc., 2151 Eastman Avenue, Oxnard, CA 93030 (805) 278-5300 Fax (805) 278-5468 Litho in U.S.A..
An important point after buying a device Raypak 0066B (or even before the purchase) is to read its user manual. We should do this for several simple reasons:
If you have not bought Raypak 0066B yet, this is a good time to familiarize yourself with the basic data on the product. First of all view first pages of the manual, you can find above. You should find there the most important technical data Raypak 0066B - thus you can check whether the hardware meets your expectations. When delving into next pages of the user manual, Raypak 0066B you will learn all the available features of the product, as well as information on its operation. The information that you get Raypak 0066B will certainly help you make a decision on the purchase.
If you already are a holder of Raypak 0066B, but have not read the manual yet, you should do it for the reasons described above. You will learn then if you properly used the available features, and whether you have not made any mistakes, which can shorten the lifetime Raypak 0066B.
However, one of the most important roles played by the user manual is to help in solving problems with Raypak 0066B. Almost always you will find there Troubleshooting, which are the most frequently occurring failures and malfunctions of the device Raypak 0066B along with tips on how to solve them. Even if you fail to solve the problem, the manual will show you a further procedure – contact to the customer service center or the nearest service center