Instruction/ maintenance manual of the product SB19-1/SB1901 Pelco
Go to page of 20
SB19/SB1900 Series Discr eet Surveillance Enclosures Installation/Operation Manual C467M-D (5/95) ® Pelco • 3500 W. Pontiac Way, Clovis, CA 93612-5699 • USA • www.
REVISION HISTORY Manual # Date Comments C467M 2/90 Original Version. C467M 3/90 Rev. A. “Scope” section expanded to include warnings. Updated model and options section. Figure 5 Added. C467M 11/90 Rev. B. Addendum incorporated @ Figure 19 Exploded Assy Diagram.
Pelco Manual C467M-D (5/95) 1 Please thoroughly familiarize yourself with the information in this manual prior to installation and operation. This symbol indicates that dangerous voltage constituting a risk of electric shock is present within this unit.
2 Pelco Manual C467M-D (5/95) 2.0 SCOPE The information contained within this manual covers the SB19/SB1900 Series of Discreet Surveillance En- closures.
Pelco Manual C467M-D (5/95) 3 Figure 1. SB1900 Series Wiring Diagram.
4 Pelco Manual C467M-D (5/95) 4.3 MOUNTING INSTRUCTIONS Determine the type of mounting desired. The enclo- sure can be mounted in a hard ceiling, completely re- place a standard 2' x 2' suspended ceiling tile using the APSB19 optional faceplate, or be inserted through a cut-out in a standard 2' x 2' suspended ceiling tile.
Pelco Manual C467M-D (5/95) 5 7. Slide the back box through the ceiling tile and mounting plate and replace the four (4) 1/4-20 bolts and tighten to secure the back box to the mounting plate. 8. Check the alignment of the back box to the ceiling tile by attaching the 12.
6 Pelco Manual C467M-D (5/95) 13. Attach the dome to the pan/tilt by aligning the two ball studs protruding through the flange of the dome with the two holes in the dome attachment brack- ets and engaging the studs. 14. Attach the safety chain on the side of the back box to the short 4-40 threaded screw in the 12.
Pelco Manual C467M-D (5/95) 7 4.3.1.2 Suspended Ceiling Tile Replacement Mounting T o mount the enclosure into a suspended ceiling grid where the tile is replaced, perform the following steps. 1. Determine the location for mounting the enclosure and remove the appropriate ceiling tile.
8 Pelco Manual C467M-D (5/95) 12. Attach the safety chain on the side of the back box to the short 4-40 threaded screw in the 12.5" round faceplate trim with the provided hardware. 13. Attach the faceplate trim to the back box by align- ing the two serrated studs with two of the holes in the edges of the back box and engaging the studs.
Pelco Manual C467M-D (5/95) 9 12. Attach the faceplate trim to the back box by align- ing the two serrated studs with two of the holes in the edges of the back box and engaging the studs. 13. Operate the pan/tilt to verify that there are no ob- structions or dragging cables within the back box or dome.
10 Pelco Manual C467M-D (5/95) 5.0 CARE AND MAINTENANCE Regularly scheduled maintenance will prolong the op- erational life and appearance of the equipment. IMPORT ANT : The lower dome of the en- closure is an optical surface. When cleaning the inner surface of the dome and viewing window , treat as carefully as you would a fine camera lens.
Pelco Manual C467M-D (5/95) 11 6.0 EXPLODED ASSEMBL Y DIAGRAM Refer to Figure 7 for an exploded assembly diagram of the SB19 enclosure. Figure 7. SB19 Exploded Assembly Diagram PP ONL Y NON SL ONL Y *.
12 Pelco Manual C467M-D (5/95) 7.0 EXPLODED ASSEMBL Y MECHANICAL PARTS LIST Item Qty Description Pelco Part Number 1 1 UL, Pad, camera, black .062" thick EH200010004 2 1 PCB assembly , pan/tilt PCB3000100ASSY 3 1 Bushing, 3/8" tilt shaft PT180010001 4 1 Shaft, tilt table PT18004002COMP 5 1 Sprocket .
Pelco Manual C467M-D (5/95) 13 7.0 EXPLODED ASSEMBL Y MECHANICAL PARTS LIST (continued) Item Qty Description Pelco Part Number 48 Not used 49 Not used 50 Not used 51 1 Slip ring, 24 circuit for presets 250010000 52 Not used 53 Not used 54 Not used 55 1 Bracket, tilt pot PT18044012COMP 56 1 Bracket, LPP lens connector PT18044013COMP 57 1 Gear , 1.
14 Pelco Manual C467M-D (5/95) 8.0 MODELS DD1900 Dome drive unit for SB1900. (UL) DD1900-PP Dome drive unit for SB1900-PP . DD1900-SL Dome drive unit for SB1900-SL.
Pelco Manual C467M-D (5/95) 15 9.2 MODELS SB1900, SB1900-SL, SB1900-PP AND SB1900SL-PP CM7500 Series Coaxitron Matrix Switcher/Control System rack mount card cage with CPU and power supply . Capable of up to 64 inputs and up to 4 monitor outputs. (See C584 product specifi- cation sheet for details).
16 Pelco Manual C467M-D (5/95) Pan Speed: 24 ° /sec ± 1 ° T ilt: -9 0 ° movement from horizontal plane T ilt Speed: 12 ° /sec ± .5 ° Maximum Load: 10 lbs (4.
Pelco Manual C467M-D (5/95) 17 12.0 W ARRANTY AND RETURN INFORMA TION This equipment contains electrical or electronic components that must be recycled properly to comply with Directive 2002/96/EC of the European Union regarding the disposal of waste electrical and electronic equipment (WEEE).
18 Pelco Manual C467M-D (5/95) Pelco 3500 Pelco Way • Clovis, CA 93612-5699 (559) 292-1981 • (800) 289-9100 FAX (800) 289-9150 or (559) 292-3827 International customers call 1-559-292-1981 or FAX 1-559-348-1120 (Product specifications subject to change without notice.
An important point after buying a device Pelco SB19-1/SB1901 (or even before the purchase) is to read its user manual. We should do this for several simple reasons:
If you have not bought Pelco SB19-1/SB1901 yet, this is a good time to familiarize yourself with the basic data on the product. First of all view first pages of the manual, you can find above. You should find there the most important technical data Pelco SB19-1/SB1901 - thus you can check whether the hardware meets your expectations. When delving into next pages of the user manual, Pelco SB19-1/SB1901 you will learn all the available features of the product, as well as information on its operation. The information that you get Pelco SB19-1/SB1901 will certainly help you make a decision on the purchase.
If you already are a holder of Pelco SB19-1/SB1901, but have not read the manual yet, you should do it for the reasons described above. You will learn then if you properly used the available features, and whether you have not made any mistakes, which can shorten the lifetime Pelco SB19-1/SB1901.
However, one of the most important roles played by the user manual is to help in solving problems with Pelco SB19-1/SB1901. Almost always you will find there Troubleshooting, which are the most frequently occurring failures and malfunctions of the device Pelco SB19-1/SB1901 along with tips on how to solve them. Even if you fail to solve the problem, the manual will show you a further procedure – contact to the customer service center or the nearest service center