Instruction/ maintenance manual of the product PM3 APC
Go to page of 17
PM3 Seri es Non-Modu lar Su rge Pr otection Device (SPD ) User ’ s Manual Copyright © 2000 Am erican Power Conversion Corpor ation 132 Fa i rgrounds Road P .
6XU JH$UUHVW306HULHV INTRODUCTION .................... ...................... ............ ................. ...................... ............ ................ ................. 1 Installation .............. ....................... ........
Ta b l e s T able 1 - V oltage Rating and Service T ype (by Model) ................... ............................ ...................... 4 T able 2 - Relay Con tact Pin Arrangement ................ ....................... ................. .........
INTRODUCTION Thank you for choosing the APC Sur geArrest PM3 Series Surge Protection Device. The APC non-mo dular Sur ge Protection Devi ce (SPD) is a high qu ality , high energ y sur ge attenuation system that has been designed to protect sensitive equipment fro m d amaging transient v o ltage surges.
LOCA TION CONSID ERA TIONS Environment 7KHXQLWLVGHVLJQHGWR RSHUDWHLQGRRUVLQDQDPELHQ W WHP SHUDWXUHUDQJHRI & )WR .
Service Cl earance In addition to national and local code requirements, 32 inches of service clearance is needed at the front of th e SPD. Equipment Performance T o obtain the maximum system performan ce, the unit must be located as close to the circuit to be protected as possi- ble, mini mizing the interc onnectin g wire leng th.
Te r m i n a l s T erminals have been provid ed in side the APC non-m odular SPD units for li ne (phase), neut ral (if used), and equip- ment saf ety ground connect ions. T ermin al wire size range fo r all mode ls is #8 A WG - #1 A WG. Instal lation t orque is 65 inc h- pounds.
Parallel Connection When making a parallel type of connection (Figure 2), th e length of the wiring to the Surge Protection Devi ce (SPD) must b e kept as sh ort as possible to subst antially enhance the performance. Lo ng wire runs are to be avoided fo r the unit to perform as inten ded.
7. Mount the SPD to the wall or other mounting surface using the flanges. The SPD should be installed as close as possible to the p a nel b eing protected. Page 6 Phase A Phase B Phase C Neutral Ground Not to exact sca le. Cover removed for clari ty .
8. Dress the power cabl es so the ribbo n cables wi ll not be pinched , crush ed, or other wise damaged when th e cover is installed. If connecting Dry Contacts, it may be ef fective to in stall communication lines prior to p ower conductors.
OPERA TION and FEA TURES SPD’ s do not require alot of operator interven tio n after installation. NOTE: The PM Series has a green LED for each phase which exting uishes when the module is no longer pr oviding protecti on (fau lt cond it i on ).
Audible Alarm and Control 7KH 30; 6HULHV GHYLFH L V HTXLSSHG Z LWK DQ DXGLOH DODUP Z KLFK Z LOO VRXQG LQ WK H HYHQW RI DQ DODUP FRQGLWLRQ .
127( 3LQ SDLUV DQG DUH FRQQHFWHG YLD MXPSHU LQWHUQDOO 7KH FRPELQHG FXUUHQW RI.
3DJH 67 $5 7 $ODUP (1' $XGLEOH9 LV XDO 5HG6HUYLFH /('/LW" $OO )URQW3DQHO *UHHQ/('V /LW " 1R $SSDUHQ W 3URE O HP 1R < HV 1R 3RVVLEOH 'LVSOD %RD.
Display Board Remov al and Replacement Instructions 7 RUHPRYHWKH'LVSOD ERDU GUHIHUWR)LJXUHDQGSUR FHHGDVIROORZV 'LVFRQQHFWSRZHUWRWKH63' Carefully rem ove the front co ver by loosening t he fo ur (4) captive screws that secure the front cover to the chassis.
3DJH Disp lay Boa rd Chas si s C ov e r (Chassis not shown) )LJXUH'LVSOD%RDUG/RFDWRU'LDJUD P Not to exact scale .
LIMITED W ARRANTY APC warrants it’ s AC panel protection prod ucts against defects i n workmanship and materi als for 5 years from the date of original purchase. The panel protection device must be installed by a qualified and licensed el ectr ician in order t o qualif y for warrant y proctection .
An important point after buying a device APC PM3 (or even before the purchase) is to read its user manual. We should do this for several simple reasons:
If you have not bought APC PM3 yet, this is a good time to familiarize yourself with the basic data on the product. First of all view first pages of the manual, you can find above. You should find there the most important technical data APC PM3 - thus you can check whether the hardware meets your expectations. When delving into next pages of the user manual, APC PM3 you will learn all the available features of the product, as well as information on its operation. The information that you get APC PM3 will certainly help you make a decision on the purchase.
If you already are a holder of APC PM3, but have not read the manual yet, you should do it for the reasons described above. You will learn then if you properly used the available features, and whether you have not made any mistakes, which can shorten the lifetime APC PM3.
However, one of the most important roles played by the user manual is to help in solving problems with APC PM3. Almost always you will find there Troubleshooting, which are the most frequently occurring failures and malfunctions of the device APC PM3 along with tips on how to solve them. Even if you fail to solve the problem, the manual will show you a further procedure – contact to the customer service center or the nearest service center