Instruction/ maintenance manual of the product NAV40GBL-1104 Anchor Hocking Glass
Go to page of 16
40’ Wide Gabled End System Quality , Craft smanship and Service since 1892 NA V40Gbl-1 104 Copyright © Anchor Industries 2004 Please read all assembly / installation instructions before the inst allation or removal of this product. 1 100 Burch Dr .
T ABLE OF CONTENTS Page No. Assembly S tep 3 Introduction with Frame T erminology Illustration 4 Component Illustrations 5 40’ Navi-T rac Component List T able 6 40’ Navi-T rac Component List T ab.
3 40’ Gabled Navi-T rac Frame T erminology INTRODUCTION: Like the hip-end version, the gabled end NA VI-TRAC frame is made up of extruded aluminum members joined by weldments. The aluminum frame members themselves are extruded with channels into which the NA VI- TRAC fabric “kedar” is fed.
40’ NA VI-TRAC COMPONENT ILLUSTRA TIONS 4.
40’ NA VI-TRAC COMPONENT LIST A MINIMUM GABLED UNIT CONSISTS OF (1) KIT #1, (1) KIT #2 AND (2) EXTENSION MIDS. TO EXTEND THE LENGTH FURTHER, SIMPL Y ADD ADDITIONAL EXTENSION MIDS.
6 I.D. 40’ GABLED END NA VI-TRAC LABEL (LETTER ON DRA WING) COMPONENT DESCRIPTION CODES (ST AMPED OR T APED) GBL KIT 1 GBL KIT 2 HIP KIT 3 20’ MID STR 20’ MID EXT 15’ MID STR 15’ MID EXT 10’ MID STR 10’ MID EXT ST AKES, CABLES & WEB GUYS **OPTIONS OF 10’,15’, OR 20’ BA YS MUST BE SPECIFIED.
7 NA VI-TRAC INST ALLA TION SAFETY GUIDELINES Y our installation techniques will evolve to fit the needs of your clients, the experience level of your crews, the nature of other tentage on-site, and the equipment that you have most readily available.
DIRECTIONS FOR SQUARING THE TENT 1. USE A T APE MEASURE TO MARK THE ENDS OF A LINE FOR ONE END (A TO B ABOVE) EQUAL TO THE EXACT WIDTH OF THE UNIT . 2. HOLD THE “0” END OF ONE T APE A T POINT “A” AND THE “0” END OF ANOTHER T APE A T POINT “B”.
9 1 3 4 2 6 5 CONSTRUCT FIRST BEAM LA YOUT OF ALL BEAMS MCW RW ON MID BEAMS, R WE ON END BEAMS R21-9 U8 BHW T -30 XRB FOR (X-CABLED BEAMS ONL Y) MAKE CONNECTIONS IN NUMBER SEQUENCE SHOWN. ST AKE PLA TES BEFORE ERECTING . 7 8 9 10 FIRST (2) BEAMS BUTTERFLIED SO THA T ADJACAENT BASE PLA TE ST AKES CAN BE USED FOR SAFETY GUYING .
10 ERECTING 2nd BEAM 1st SECURING THE 1st BEAM SAFEL Y ERECTING THE 2nd BEAM WORKERS LIFT FIRST A T THE PEAK, THEN SHUFFLE SIDEW A YS TOW ARD THE UPRIGHTS.
11 SECURING THE 2nd BEAM WITH DROP-IN RIDGE/EA VE BARS INST ALLING PURLINS AND RIDGE BARS COMPLETING THE 1ST BA Y IN 20’ MID BA YS ONL Y , INST ALL A SUPPORT PURLIN BETWEEN THE EA VE AND THE PURLIN A T THE MID-RAFTER LOCA TION.
12 COMPLETING THE TOP FRAME INST ALLING GABLED END FRAME INST ALLING GUY WEBS BEFORE INST ALLING F ABRIC ST AKING DISCLAIMER: DUE TO V ARYING SOIL CONDITIONS A T EACH INST ALLA TION SITE, THE ST AKES PROVIDED MA Y NOT MEET THE LOADING REQUIREMENT SHOWN ON THE BLUEPRINT AND ENGINEERING ANAL YSIS.
13 INST ALLING MID P ANEL PULL MID P ANEL UP AND OVER THROUGH CHANNELS IN RAFTER EXTRUSIONS. WHEELED P ANEL GUIDE RAFTER INSERT FINGERS OF WHEELED P ANEL GUIDE INTO THE OPEN END OF THE RAFTER AND WELDMENT . TIGHTEN THE BUTTERFL Y NUT . REVERSE FOR OPPOSITE SIDE OF BA Y .
14 COMPLETED 40’ GABLED END NA VI-TRAC WITH F ABRIC INST ALLED AND TENSIONED, GUY WEBS ST AKED AND RA TCHETED TIGHT . TO MEET ENGINEERING REQUIREMENTS W ALLS SHOULD BE INST ALLED ON ALL (4) SIDES.
15 HIP/GABLED END COMBINA TION UNIT SEE THE ST ANDARD NA VI-TRAC INST ALLA TION INSTRUCTIONS FOR ASSEMBL Y OF THE HIP END UNIT . EXTENSION BEAMS ARE PIVOTED IN THE SAME MANNER AS SHOWN ABOVE IN THIS GABLED END ASSEMBL Y INSTRUCTION.
EV ANSVILLE, INDIANA 28.3 1 1-01-02 Thank you for purchasing an Anchor product. In return, we pledge Quality , Service and Craft smanship and are available for any questions you may have or assistance you may need.
An important point after buying a device Anchor Hocking Glass NAV40GBL-1104 (or even before the purchase) is to read its user manual. We should do this for several simple reasons:
If you have not bought Anchor Hocking Glass NAV40GBL-1104 yet, this is a good time to familiarize yourself with the basic data on the product. First of all view first pages of the manual, you can find above. You should find there the most important technical data Anchor Hocking Glass NAV40GBL-1104 - thus you can check whether the hardware meets your expectations. When delving into next pages of the user manual, Anchor Hocking Glass NAV40GBL-1104 you will learn all the available features of the product, as well as information on its operation. The information that you get Anchor Hocking Glass NAV40GBL-1104 will certainly help you make a decision on the purchase.
If you already are a holder of Anchor Hocking Glass NAV40GBL-1104, but have not read the manual yet, you should do it for the reasons described above. You will learn then if you properly used the available features, and whether you have not made any mistakes, which can shorten the lifetime Anchor Hocking Glass NAV40GBL-1104.
However, one of the most important roles played by the user manual is to help in solving problems with Anchor Hocking Glass NAV40GBL-1104. Almost always you will find there Troubleshooting, which are the most frequently occurring failures and malfunctions of the device Anchor Hocking Glass NAV40GBL-1104 along with tips on how to solve them. Even if you fail to solve the problem, the manual will show you a further procedure – contact to the customer service center or the nearest service center