SUMMER RAIN ™ II 2 PERSON SHOWER SYSTEM TWO W ALL AND THREE W ALL INST ALLA TION AND OPERA TING INSTRUCTIONS Jacuzzi Whirlpool Bath © BZ00000 03/05.
Note: This is a professional grade product. A knowledge of construction techniques, plumbing and electrical installation according to codes are required for proper installation and user satisfaction. We recommend that a licensed contractor perform the installation of all Jacuzzi Whirlpool Bath © products.
CONTENTS Specifications _________________________________________________________________________ 2 Enclosure Specifications ________________________________________________________________ 3 Rough-in.
Important: Read complete instructions before beginning installation. Each unit arrives ready for installation, equipped with base, glass and associated hardware. Remove the unit from the carton. Retain the shipping carton until satisfactory inspection of the product has been made.
ROUGH-IN REFERENCE Shown is 2 wall left hand base. Right hand opposite. The 3 wall base has tile flange on both sides and back. ENCLOSURE SPECIFICATIONS 48" 27-1 1/16" TOP VIEW 72" 38-1.
COMPONENT IDENTIFICA TION FRONT VIEW SIDE VIEW (2 WALL ONLY ) GLASS SIDE P ANEL GLASS DOORS RAIL BRACKET AND COVER CAP (2 WALL ONLY) (2 WALL ONLY) SIDE SUPPORT RAIL CENTER SUPPORT RAIL AIR TOWER W A T.
PRELIMINARY ROUGH-IN The floor structure beneath the unit must be able to support a total weight of the unit and bather(s). Refer to page 2, SPECIFICATIONS, for weight speci- fications. Refer to COMPONENT IDENTIFICATION on page 4 to help identify parts.
STEP 6 With a large screwdriver and the tool included with the drain, tighten the inside compression nut to seal the drain pipe connection. After drain is fully installed, test for proper drainage. If the shower base does not drain properly, rectify this condition before proceeding with the installation.
CLEAN UP AFTER BASE INST ALLA TION To avoid dulling and scratching the acrylic surface of the base, never use abrasive cleaners. A mild liquid detergent and warm water clean soiled surfaces. Remove spilled plaster with a wood or plastic edge. Metal tools scratch the surface.
T OWERS AND DOORS INST ALLA TION THESE INSTRUCTIONS ARE FOR SUMMER RAIN II 2 WALL AND 3 WALL UNITS WITH AND WITHOUT AIR FEATURE OPTION. Refer to COMPONENT IDENTIFICATION on page 4 to help identify parts. STEP 1 On the 2 wall unit attach the wall jamb to the water tower adjacent to the side wall.
TOWERS AND DOORS INST ALLA TION STEP 4 Place the center support rail into slot on each tower. If rail does not readily fit into slots, it may be necessary to loosen the bolts holding towers to base (it may only be necessary to loosen one tower). DO NOT FORCE CENTER RAIL INTO SLOTS.
TOWERS AND DOORS INST ALLA TION 10 Jacuzzi Whirlpool Bath © BZ00000 03/05 GROUT STUD SHIM IF NECESSARY DO NOT FILL CEMENT BOARD TILE SILICONE SEALANT 1-1/8" MAXIMUM NO MINIMUM SHOWER BASE CAULKI.
STEP 9 (2 WALL ONLY) Place the side support rail into the slot on the water tower. Place the short wall rail into the slot on the other water tower. Rotate flat end of short wall rail flush to wall. With rails in position install hold down brackets, but do not tighten screws.
STEP 10 Two shut-off valves are provided per water tower. To hook up supply lines, unscrew valves from braided line. Using thread sealant, screw each valve to stub out at bottom of tower. Then reconnect braided line using provided gasket. Do not twist or kink supply lines when connecting.
TOWERS AND DOORS INST ALLA TION STEP 12 Move the door assembly to the door post on water tower and slide the assembly into the door post. Locate the base of the door into the slot of serrated door positioner that positions the hinge barrel as shown.
TOWERS AND DOORS INST ALLA TION FINISH W ALL EDGE OF BASE GLASS SIDE PANEL MOUNTED PARALLEL TO EDGE OF BASE W ALL POST T APE (3) SCREWS (3) STEP 15 (2 WALL ONLY) Position the fixed glass wall post so that the glass side panel will be parallel with the outside edge of the base.
TOWER AND DOOR INST ALLA TION STEP 18 (2 WALL ONLY) Align the glass with glass jamb and insert. W ALL POST GLASS GLAZING GASKET INSIDE OF ENCLOSURE APPLY SEALANT JAMB GLASS GLAZING GASKET INSIDE OF ENCLOSURE APPLY SEALANT STEP 19 (2 WALL ONLY) Install glazing gasket on fixed glass wall post and jambs on the outside.
STEP 23 Install handles as shown. Note orientation of handle. Hand tighten knob. Flat screw has a screw driver notch. Do not over tighten either knob or flat screw as cracked glass may result.
TOWERS AND DOOR INST ALLA TION STEP 26 Seal all around all bases of towers with sealant. Also seal the inside of wall posts, jambs, door posts, tile joint to wall post, and bottom of glass side panel on the inside only.
OPERA TION SHOWER T OWERS 18 Jacuzzi Whirlpool Bath © BZ00000 03/05 Shower Head There are three selectable positions: Jet, Normal Pul- sating, and Aerated flow. Body Sprays (2 Upper and 2 Lower) To adjust the flow and intensity, turn as shown. The spray can also be turned to change the direction of the spray.
OPERA TION CONTROLLER To turn ON press ON/OFF button or turn ON water at either shower tower. The unit will then automatically go into a preheat cycle to heat the air transmission pipes. There will be a 5 (five) minute pause while the system preheats.
To remove any lime scale from the shower head and body sprays, rub with your finger the outer ring of nozzles on the shower head and all nozzles on the body spray. To clean the foot temperature tester, unscrew the nozzle and back flush the wire mesh filter.
T OWER FIXTURES REP AIR P ARTS 21 Jacuzzi Whirlpool Bath © BZ00000 03/05 TOWER ASSEMBLY WASHER (PART OF D709827) 4 6 9 (5X) 10 11 (4X) 13 14 15 16 17 18 19 3 (5X) 2 (5X) 1 (5X) 8 5 12 PART OF D709827 7 (PART OF U547000) 1. C546000 Lock Nut, 1/2" NPT WP (5X) 2.
TOWER PLUMBING REP AIR P ARTS 1 11 4 5 4 7 10 6 14 12 13 5 4 16 11 2 8 2 3 2 3 3 17 15 9 18 19 18 18 18 ITEM NO. QTY. PART NO. DESCRIPTION 1 1 Y221000 TOWER, 2 PERSON SHOWER 2 3 U401000 FTG, ELL, .50" FST x 10 mm BARB 3 4 Y724000 1/2" ELBOW, SLIP x THREAD, SCH 40 4 3 7164000 ELL, STREET, .
23 Jacuzzi Whirlpool Bath © BZ00000 03/05.
Printed in U.S.A . Jacuzzi Whirlpool Bath © BZ00000 03/05 Printed on Recycled Pape r Jacuzzi Whirlpool Bath National Headquarters P.O. Box 702168, Dallas, TX 75370-2168 Service Support: (800) 288-4002 PRODUCT SPECIFICATIONS ARE SUBJECT TO CHANGE WITHOUT NOTICE.
Jacuzzi Whirlpool Bath P .O. Box 702168 Dallas, TX 75370-2168 WARRANTY COVERAGE Jacuzzi Whirlpool Bath (the “Company”) offers the following express limited warranty to the original purchaser of any Jacuzzi Whirlpool Bath Designer Collection Bath Product (“unit”) who purchases the product for personal or single family use (“user”).
RESPONSIBILITIES OF OTHERS Inspecting the unit prior to installation is the responsibility of the installer or building contractor who acts on behalf of the user. They are responsible for ensuring the unit is free of defect or damage. Notices are placed on and in the unit and on the shipping carton advising the installer of this responsibility.
An important point after buying a device Jacuzzi BZ00000 (or even before the purchase) is to read its user manual. We should do this for several simple reasons:
If you have not bought Jacuzzi BZ00000 yet, this is a good time to familiarize yourself with the basic data on the product. First of all view first pages of the manual, you can find above. You should find there the most important technical data Jacuzzi BZ00000 - thus you can check whether the hardware meets your expectations. When delving into next pages of the user manual, Jacuzzi BZ00000 you will learn all the available features of the product, as well as information on its operation. The information that you get Jacuzzi BZ00000 will certainly help you make a decision on the purchase.
If you already are a holder of Jacuzzi BZ00000, but have not read the manual yet, you should do it for the reasons described above. You will learn then if you properly used the available features, and whether you have not made any mistakes, which can shorten the lifetime Jacuzzi BZ00000.
However, one of the most important roles played by the user manual is to help in solving problems with Jacuzzi BZ00000. Almost always you will find there Troubleshooting, which are the most frequently occurring failures and malfunctions of the device Jacuzzi BZ00000 along with tips on how to solve them. Even if you fail to solve the problem, the manual will show you a further procedure – contact to the customer service center or the nearest service center