CHAPTER 2-1 Catalyst 4500 Series Switches Installation Guide 78-14409-08 2 Preparing for Installation Warning This unit is intended for installation in restricted access areas. A restricted access area can be accessed only through the use of a special tool, lock and key , or other means of security.
Chapter 2 Preparing for Installation Electrostatic Discharge 2-2 Catalyst 4500 Series Switches Installation Guide 78-14409-08 If you will be using your switch as a PoE source, the follo wing warning a.
2-3 Catalyst 4500 Series Switches Installation Guide 78-14409-08 Chapter 2 Preparing for Installation Electrostatic Discharge Sometimes, voltage is dischar ged to some of the pins of the connector and not others, or to some pins on the connector before others.
Chapter 2 Preparing for Installation Site Power Requirements and Heat Dissipation 2-4 Catalyst 4500 Series Switches Installation Guide 78-14409-08 • When removing a component, use an y av ailable ejector le vers or capti ve installation scre ws to release the bus connectors from the backplane or midplane.
2-5 Catalyst 4500 Series Switches Installation Guide 78-14409-08 Chapter 2 Preparing for Installation Power Connection Guidelines for AC-Powered Systems Power Connection Guidelines for AC-Powered Systems This section provides guidelines for connecting the Catalyst 4500 series switch A C po wer supplies to the site power source.
Chapter 2 Preparing for Installation Power Connection Guidelines for AC-Powered Systems 2-6 Catalyst 4500 Series Switches Installation Guide 78-14409-08 • 1400 W— T able 2-1 lists the A C-input po.
2-7 Catalyst 4500 Series Switches Installation Guide 78-14409-08 Chapter 2 Preparing for Installation Power Connection Guidelines for AC-Powered Systems Italy CAB-7KA CI= 8.2 ft (2.5 m) 250 V A C, 16 A 1/3/16 CEI 23-16 United Kingdom CAB-7KA CU= 8.2 ft (2.
Chapter 2 Preparing for Installation Power Connection Guidelines for AC-Powered Systems 2-8 Catalyst 4500 Series Switches Installation Guide 78-14409-08 Italy CAB-7513A CI= 14 ft (4.3 m) 250 V A C, 16 A 1/3/16, CEI 23-16 United Kingdom CAB-7513A CU= 14 ft (4.
2-9 Catalyst 4500 Series Switches Installation Guide 78-14409-08 Chapter 2 Preparing for Installation Power Connection Guidelines for AC-Powered Systems International CAB-A C-2800W -INT= 13.
Chapter 2 Preparing for Installation Power Connection Guidelines for AC-Powered Systems 2-10 Catalyst 4500 Series Switches Installation Guide 78-14409-08 4200 W Power Supply (PWR-C45-4200ACV=) Appliance Coupler North America 120 V A C operation CAB-US515P-C19-US 9.
2-11 Catalyst 4500 Series Switches Installation Guide 78-14409-08 Chapter 2 Preparing for Installation Power Connection Guidelines for AC-Powered Systems Australia CAB-A3112-C19-A US 14 ft (4.3 m) 250 V A C, 15 A AS/NZZS 3112 Italy CAB-C2316-C19-IT 14 ft (4.
Chapter 2 Preparing for Installation Power Connection Guidelines for DC-Powered Systems 2-12 Catalyst 4500 Series Switches Installation Guide 78-14409-08 Power Connection Guidelines for DC-Powered Sys.
2-13 Catalyst 4500 Series Switches Installation Guide 78-14409-08 Chapter 2 Preparing for Installation Power Connection Guidelines for DC-Powered Systems Calculating DC Input Current Complete po wer usage tables are in the Catalyst 4500 Series Module Installation Guide.
Chapter 2 Preparing for Installation Ventilation 2-14 Catalyst 4500 Series Switches Installation Guide 78-14409-08 Step 6 Add the DC input current used by data and the DC input current used by inline de vices to f ind the total DC input current. • T otal DC input current = 6.
2-15 Catalyst 4500 Series Switches Installation Guide 78-14409-08 Chapter 2 Preparing for Installation Ventilation Appendix A, “Specif ications, ” lists the operating and nonoperating environmental site requirements for the switches.
Chapter 2 Preparing for Installation Site-Planning Checklist 2-16 Catalyst 4500 Series Switches Installation Guide 78-14409-08 Note Although a class 3 de vice needs 15.4 W to power up, 17.3 W need to be generated from the backplane in order to hav e 15.
2-17 Catalyst 4500 Series Switches Installation Guide 78-14409-08 Chapter 2 Preparing for Installation Site-Planning Checklist 3 Power e valuation: • Input power type • Receptacle proximity to the.
Chapter 2 Preparing for Installation Site-Planning Checklist 2-18 Catalyst 4500 Series Switches Installation Guide 78-14409-08.
An important point after buying a device IronPort Systems 4500 Series (or even before the purchase) is to read its user manual. We should do this for several simple reasons:
If you have not bought IronPort Systems 4500 Series yet, this is a good time to familiarize yourself with the basic data on the product. First of all view first pages of the manual, you can find above. You should find there the most important technical data IronPort Systems 4500 Series - thus you can check whether the hardware meets your expectations. When delving into next pages of the user manual, IronPort Systems 4500 Series you will learn all the available features of the product, as well as information on its operation. The information that you get IronPort Systems 4500 Series will certainly help you make a decision on the purchase.
If you already are a holder of IronPort Systems 4500 Series, but have not read the manual yet, you should do it for the reasons described above. You will learn then if you properly used the available features, and whether you have not made any mistakes, which can shorten the lifetime IronPort Systems 4500 Series.
However, one of the most important roles played by the user manual is to help in solving problems with IronPort Systems 4500 Series. Almost always you will find there Troubleshooting, which are the most frequently occurring failures and malfunctions of the device IronPort Systems 4500 Series along with tips on how to solve them. Even if you fail to solve the problem, the manual will show you a further procedure – contact to the customer service center or the nearest service center