Instruction/ maintenance manual of the product AB20001 Demco
Go to page of 16
OWNERS MANUAL OWNERS MANUAL OWNERS MANUAL OWNERS MANUAL OWNERS MANUAL ASSEMBLY CALIBRATION OPERATION REPLACEMENT PARTS READ complete manual CAREFULLY BEFORE attempting operation.
Thank you for purchasing a Demco boom. We feel you have made a wise choice and hope you are completely satisfied with your new flotation boom. Your new Demco boom features the newest and most up-to-date design of a boom it's type currently marketed.
Normal sprayer frame, without Height Adjuster. (Shown Above) 1. Mount the Boom Carrier Center Section (#1) to the Mounting Angles (#2) on the back of the sprayer frame using four 3/8" x 2-1/2" square U-bolts (#3) and eight 3/8" nylon locknuts (#4).
MOUNTING THE BOOM CENTER SECTION TO HYDRAULIC HEIGHT ADJUST 7 4 3 15 15 14 28 16 15 5 4 8 2 2 6 2 2 6 5 11 12 5 3 3 3 5 5 3 2 16 15 16 15 17 14 5 3 5 3 1 25 24 23 22 21 20 20 19 13 26 26 13 2 18 18 27 15 16 29 2 18 11 5 5 2 16 16 3 5 17 3 5 17 3 5 R E F .
MOUNTING THE BOOM CENTER SECTION TO MANUAL HEIGHT ADJUST 2 2 3 5 5 5 5 5 3 3 3 6 7 9 11 13 15 16 16 17 17 18 2 19 24 24 29 30 5 4 9 23 9 2 23 27 26 25 1 3 5 3 3 5 16 14 12 10 6 2 19 16 17 17 19 7 3 2 17 16 5 5 31 9 25 26 27 2 20 5 22 3 2 4 5 3 18 17 16 15 3 5 18 8 28 5 5 29 24 (DFBHA OPTION) 8 21 27 25 26 R E F .
CENTER SECTION BOOM CARRIER BREAKDOWN 5 15 19 21 16 16 17 14 10 12 8 6 10 5 5 2 20 19 22 21 13 9 23 20 30 Note: This bracket must be 5" off center in either direction. ASSEMBL Y INSTRUCTIONS 1. Begin by referring to the boom carrier (#1) mounting to the sprayer frame (page 1) or mounting to the height adjust (pages 2 & 3).
LEFT INNER WING P ARTS BREAKDOWN 1. Attach the upper offset linkage (#6) to center section (#1) using one 1/2" x 2" bolt (#7), bushing (#8) and one 1/2" locknut (#9). 2. Next attach the lower linkage bracket (#10) to the upper offset linkage (#6) using one 1/2" x 2" bolts (#7) and one 1/2" locknut (#9).
RIGHT INNER WING P ARTS BREAKDOWN ASSEMBL Y INSTRUCTIONS 1. Attach the upper offset linkage (#6) to center section (#1) using one 1/2" x 1-3/4" bolt (#7), bushing (#8) and one 1/2" locknut (#9).
R E F . PART N O. NO. QTY. DESCRIPTION RIGHT AND LEFT OUTER WING P ARTS BREAKDOWN Page 7 Please order replacement parts by PART NO. and DESCRIPTION. 1. 03322 1 Left Inner Wing 2. 03323 1 Right Inner Wing 3. 03328 2 Right and Left Outer Wing 4. 03326 2 Breakaway Pin 5.
TIP PLACEMENT 1. Marking location of boom clamps: Mark the clamp locations by starting at the center of the center boom section. From this mark, locate 20 inch spaces to both ends of the boom. 2. Fasten preassembled boom lines: Fasten the boom clamps (#3) on the boom so the sprayer tip will be on the back side of the boom.
ADJUSTMENT PROCEDURES After the boom is completely assembled and before attempting to fold the boom for the first time, the boom should be adjusted so it lays straight both horizontally and vertically. There are several ad- justment points built into the boom for this purpose.
ADJUSTMENTS FOR FOLDING AND STORAGE 4. Finally unlock the latch between the center section and inner right wing. (4th fold) Fold the inner right wing and outer right wing back and around to fold to the rear of the center section and into the storage bracket and lock in place with pin.
RIGHT WING MAINTENANCE AND LUBRICA TION LEFT WING TWO GREASE ZERKS FIVE GREASE ZERKS Y our Flotation Boom is designed to require only occasional light maintenance. Atten- tion to the following procedures will signifi- cantly prolong the useful life of your boom.
7 2 1 3. 05619 2 Pin (1/2" x 3" lg.) 4. 02384 4 Machine Washer (1/2" ID x 14 GA.) 5. 00185 2 5/32" x 1 Cotter Pin 6. 05564 2 Wheel Fork 7. 05328 2 1/2" x 3" lg. Ball Lock Hitch Pin 8. 05566 2 Wing Mounting Plate 9. 02802 12 5/16"-18UNC Nylon Insert Locknut 10.
XR8001VS X 20 .07 5.3 4.3 2.8 2.2 25 .08 5.9 4.7 3.1 2.4 30 .09 6.4 5.1 3.4 2.6 40 .10 7.4 6.0 4.0 3.0 XR80015VS X 20 .11 7.8 6.3 4.3 3.2 25 .12 8.8 7.1 4.7 3.6 30 .13 9.7 7.7 5.2 3.9 40 .15 11.1 8.9 6.0 4.5 XR8002VS X 20 .14 10.5 8.4 5.6 4.2 25 .16 11.
SAFETY FIRST SPRA YER CHECK LIST Down time in the field caused by breakdowns is costly and time consuming. Many breakdowns can be eliminated by periodic equipment maintenance. By spending time run- ning over this checklist before seasonal spraying application time and following proper af- ter season care, you can save time and money later on.
An important point after buying a device Demco AB20001 (or even before the purchase) is to read its user manual. We should do this for several simple reasons:
If you have not bought Demco AB20001 yet, this is a good time to familiarize yourself with the basic data on the product. First of all view first pages of the manual, you can find above. You should find there the most important technical data Demco AB20001 - thus you can check whether the hardware meets your expectations. When delving into next pages of the user manual, Demco AB20001 you will learn all the available features of the product, as well as information on its operation. The information that you get Demco AB20001 will certainly help you make a decision on the purchase.
If you already are a holder of Demco AB20001, but have not read the manual yet, you should do it for the reasons described above. You will learn then if you properly used the available features, and whether you have not made any mistakes, which can shorten the lifetime Demco AB20001.
However, one of the most important roles played by the user manual is to help in solving problems with Demco AB20001. Almost always you will find there Troubleshooting, which are the most frequently occurring failures and malfunctions of the device Demco AB20001 along with tips on how to solve them. Even if you fail to solve the problem, the manual will show you a further procedure – contact to the customer service center or the nearest service center